Shell & Tube Heat Exchanger Inspection Report Example

Shell & Tube Heat Exchanger Inspection Report Example
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
171 views4 pages

Shell & Tube Heat Exchanger Inspection Report Example

Shell & Tube Heat Exchanger Inspection Report Example
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Detailed Clause-Wise Inspection Report for Shell & Tube Heat Exchanger as per

ASME BPVC Section VIII Div. 1 & TEMA

1. General Information

• Client/Owner: [Client Name]


• Project: [Project Name]
• Inspection Date: [Date]
• Location: [Location]
• Inspector: [Inspector Name]
• Heat Exchanger ID: [Exchanger ID/Serial Number]
• Design Code: ASME BPVC Section VIII Div. 1 & TEMA
• Service: [Service/Fluid]

2. Design Verification (Clause UG-22 to UG-30)

• Design Conditions: [Operating pressure, design pressure, temperature, etc.]


• Materials: Verified material specifications and certificates.
o Clause UG-4: [Materials conform to specified ASME standards]
o TEMA R, C, or B: [Material specifications as per TEMA standards]
• Design Drawings and Calculations: Reviewed and verified.
o Clause UG-22 to UG-30: [Design meets stress, load, and other mechanical
requirements]

3. Material Verification (Clause UG-4 to UG-14)

• Material Test Reports: Verified MTRs for compliance.


o Clause UG-4: [Material specification]
o Clause UG-14: [Material identification and traceability]
• Material Markings: Checked for legibility and correctness.

4. Fabrication Inspection (Clause UG-75 to UG-79)

• Welding Procedures: Reviewed and approved.


o Clause UW-2: [Welding processes and qualification]
o TEMA R, C, or B: [Specific welding requirements as per TEMA standards]
• Welder Qualifications: Verified certifications and qualifications.
o Clause UW-31: [Welder qualifications]
• Weld Joint Design: Conformance to approved drawings and standards.
o Clause UW-12: [Joint design and preparation]
• Tube-to-Tubesheet Welding: Verified tube-to-tubesheet joints.
o Clause UW-20: [Special requirements for tube-to-tubesheet welding]

5. Nondestructive Examination (NDE) (Clause UG-90 to UG-103)

• NDE Methods: [RT, UT, MT, PT]


o Clause UW-11: [Radiographic examination of welds]
o Clause UW-52: [Ultrasonic examination of welds]
• NDE Results: Documented and reviewed.
o Clause UG-102: [Acceptance criteria]
o Clause UG-103: [Repairs and re-examinations]
• Tube Leak Test: Conducted and verified.
o TEMA R, C, or B: [Specific NDE requirements for tubes]

6. Pressure Testing (Clause UG-99 to UG-101)

• Hydrostatic Test: Conducted at [test pressure], held for [duration].


o Clause UG-99: [Hydrostatic testing requirements]
o TEMA R, C, or B: [Specific testing requirements]
• Pneumatic Test: Conducted at [test pressure], held for [duration].
o Clause UG-100: [Pneumatic testing requirements]
• Test Results: [Pass/Fail, documented findings]

7. Post-Fabrication Heat Treatment (Clause UCS-56 to UCS-68)

• Heat Treatment Procedures: Reviewed and approved.


o Clause UCS-56: [Heat treatment requirements]
• Heat Treatment Records: Verified time-temperature charts.

8. Inspection and Tests for Components (Clause UG-11 to UG-12)

• Component Inspection: Verified baffles, tubes, shells, and other components.


o Clause UG-11: [Inspection of components]
o Clause UG-12: [Standard pressure parts]
• Compliance: Components meet design and material specifications.
9. Assembly and Dimensional Checks

• Assembly Verification: Checked overall assembly for compliance with design.


o TEMA R, C, or B: [Assembly and tolerance requirements]
• Dimensional Inspection: Measured and verified key dimensions.
o Clause UG-80: [Dimensional tolerances]

10. Nameplate and Marking (Clause UG-116 to UG-119)

• Nameplate Verification: Confirmed marking information.


o Clause UG-116: [Nameplate requirements]
o TEMA R, C, or B: [Additional marking requirements]
• Marking Legibility: Checked for durability and correctness.
o Clause UG-119: [Stamping requirements]

11. Documentation and Certification (Clause UG-90 to UG-120)

• Data Report Forms: Completed and signed.


o Clause UG-120: [Manufacturer's data report]
• Inspector’s Certification: Inspector's signature and ASME stamp.
o Clause UG-90: [Certification of inspection]

12. Final Acceptance

• Overall Compliance: Verified compliance with ASME BPVC Section VIII Div. 1 and
TEMA.
• Non-Conformities: [List any non-conformities and corrective actions taken]
• Recommendations: [Any additional recommendations or observations]

13. Inspector's Signature

• Inspector's Name: [Inspector Name]


• Inspector's Signature: [Signature]
• Date: [Date]
14. Attachments

• Drawings and Calculations


• Material Test Reports (MTRs)
• Welding Procedure Specifications (WPS) and Procedure Qualification Records
(PQR)
• NDE Reports
• Pressure Test Certificates
• Heat Treatment Records
• Manufacturer’s Data Report