Notesheet Turbine
Notesheet Turbine
Notesheet Turbine
9068)
भारत सरकार
GOVERNMENT OF INDIA
SUBJECT
Sub Category :
Procurement of spare Turbine Flow Meters & RPD Meters for metering skids under
Description :
Dibiyapur region
OTHER DETAILS
Language : English
Remarks :
Previous References :
Later References :
1
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
Note # 1
1.0 Subject: Procurement of spare Turbine Flow Meters &
RPD Meters for metering skids under Dibiyapur region.
2.0 Background: GAIL Dibiyapur is supplying Natural Gas
to various customers such as IOAGPL, Torrent, CUGL etc.
Recently many Metering skids for CGD customers were
commissioned under Dibiyapur region. The skids are
supplying NG to various City Gas Distribution companies.
Supply to CGD network is priority allocation. Hence proper
functioning of these metering skids is very much impor tant
for actual measurement of Natural gas supplied to the
customers. In addition to this, there are gas turbine
compressors & generators installed at Dibiyapur
compressor station which consume natural gas as fuel. To
measure the fuel consumption of the machines, turbine flow
meters are present.
3.0 Main Body:
3.1 These LMC metering skids in general have four
streams, two streams are equipped with RPD meters and
two streams are equipped with turbine flow meters. The
RPD meters are taken in line when the flow range is lower
however in case of high flow, TFM comes in line. At a time,
one meter (either RPD or TFM) in each skid is in the
operation and the other meter acts as standby to ensure
uninterrupted supply of natural gas the customers.
3.2 For proper functioning of the commissioned Metering
skid, we require O&M spares of metering equipment of the
skid. TFM & RPD Meters are the main equipment in
metering skid, which is mainly responsible for Gas Custody
Metering & subsequently invoicing to customers of GAIL.
As per GAIL’s Maintenance policy these flow meters are
required to be calibrated in 2 Years from NABL accredited
Flow Lab such as GAIL Hazira Meter prover facility. The
lead time for calibration is more than 1 Month and, in this
period, only stand by meter is left behind which is kept in
line in subjected skid. In such situation, no spare Turbine
/ RPD meter are present which can cater the emergency
situation such as meter failure or mismeasurement.
3.3 Turbine Flow Meters of size 4inch G-250 are installed in
the Fuel Gas conditioning skid of GTG with Qmin 20 m3/hr,
2
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
3
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
Note # 2
Proposal is forwarded for financial concurrence and approval.
Note # 3
Please review the proposal as per today's discussion.
Note # 4
4
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
Various sites were requested to confirm availability of spare flowmeters under procurement for
utilization at Dibiyapur by 29.11.2023. As per email communication received from sites, spare meter is
not available in some location and can't be spared by other location. Email communication is attached.
Proposal is re-submitted for financial concurrence and approval as per requirement listed in Annexure-
2.
Note # 5
For financial concurrence please
Note # 6
May kindly bifurcate the amount for major spares and normal O&M spares before FC with applicable
DOP.
Note # 7
In reference to raised query, please find herewith pointwise bifurcation:
1. Major spares under DOP clause 6.1.1.(i).a) = Rs 76,88,570.6
(including taxes)
2. Normal O&M spares under DOP clause 6.1.1.(iii) = Rs 6,73,747.0
(Including taxes)----------------------------------------------------------------------
---------------------------------Total
= Rs 83, 62,317.60 (Incl. Taxes)
Note # 8
The amount of Major spares and Normal O&M spares mentioned above is not matched with attached
cost estimation sheet. Therefore may kindly review.
Note # 9
In reference to raised query, please find herewith pointwise bifurcation:
5
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
Note # 10
In view of above proposal is concurred for Rs 83,62,317.60 including 18% GST amount subject to
approval of CA.
Note # 11
Approved.
Note # 12
Note # 13
Please provide IO number for Rs 66,41,438.78(including taxes) for CAPEX. The budget
for this proposal has been placed in BE 24-25 under head ‘New metering system & GC’ for capital
expenditure.
Note # 14
IO NO 3600748 is issued for required amount for BE 2024-25.
Note # 15
Above bifurcation of Capital and revenue Expenditure was calculated inadvertently. Revised
expenditure are as below:
6
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
However total expenditure will remain same. Submitted for the approval please.
Note # 16
Forwarded for the approval please.
Note # 17
Approved as proposed in Note#15
Note # 18
For implementation
Note # 19
Note # 20
Please top up the existing IO NO 3600748 with difference amount of INR 15,50,977.67(including
taxes) for CAPEX.The budget for this proposal has been placed in BE 24-25 under head ‘New
metering system & GC’ for capital expenditure.
Note # 21
7
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
Note # 22
Forwarded.
8
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
NOTE 1 (Attachment : Annexure-1(i)email _ terminal requirement.pdf)
Madam,
As required , Q min & Q max information of installed Flow meters are updated in attached sheet.
सादर / Regards,
गौरव स सेना / Gaurav Saxena
मु य बंधक (उपकरण) / Ch.Manager( NG P/L O&M)
गेल – बबराला / Gail- Babrala
HBJ:- 637-460
9 1
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
NOTE 1 (Attachment : Annexure-1(i)email _ terminal requirement.pdf)
<[email protected]>; Upasana Priyadarsini Pal (उपासना यद शनी पाल) <[email protected]>; Kapil Gangwar ( क पल गंगवार ) <[email protected]>
Subject: RE: Procurement of Turbine & RPD Flow Meters
Dear Sir,
A requirement list with meter details was obtained earlier for procurement of spare Turbine & RPD flow Meters , which is as attached.
Further it is requested to provide Q min & Q max of installed Flow meter also. This is required for finalizing the specification.
सादर / Regards,
गौरव स सेना / Gaurav Saxena
मु य बंधक (उपकरण) / Ch.Manager( NG P/L O&M)
गेल – बबराला / Gail- Babrala
HBJ:- 637-460
Madam,
10 2
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
NOTE 1 (Attachment : Annexure-1(i)email _ terminal requirement.pdf)
3. Minimum length of cable required from TFM/RPD Pulse pickup to JB are updated in sheet.
4. For Turbine & RPD meters only HF pulse transmitters are required, further for turbine meter having size ≥ 4 inch, both HF pulse transmitters are required.
5. Model nos. of the existing TFMs/ RPDs are updated in sheet.
सादर / Regards,
गौरव स सेना / Gaurav Saxena
मु य बंधक (उपकरण) / Ch.Manager( NG P/L O&M)
गेल – बबराला / Gail- Babrala
HBJ:- 637-460
Dear sir,
As discussed, please provide –
1. Flange to flange distance of the flowmeters where data hasn’t been provided.
2. Kindly review Flange to flange distance of 2inch and 6 inch flowmeters.
3. Kindly confirm whether FCs are Field mounted or in Control room and provide minimum length of cable required from TFM/RPD Pulse pickup to JB.
4. Kindly confirm how many pulsars are required for TFMs/RPDs.
5. Model nos. of the existing TFMs/ RPDs.
Regards,
Upasana Priyadarsini Pal
Sr. Manager (O&M)
GAIL (India) Limited,Dibiyapur, Distt.- Auraiya, Pin: 206244, Uttar Pradesh (India)
Ph: +91 (0) 5683 282355, Extension no. 1464(O), HVJ-631464
Mob. 9756526961
Email: [email protected]
11 3
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
NOTE 1 (Attachment : Annexure-1(i)email _ terminal requirement.pdf)
Dear Sir,
Flange to Flange distance of installed Flow meters have also been obtained & updated in attached sheet.
Pl process further.
सादर / Regards,
गौरव स सेना / Gaurav Saxena
मु य बधं क (उपकरण) / Ch.Manager( NG P/L O&M)
गेल – बबराला / Gail- Babrala
HBJ:- 637-460
12 4
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
NOTE 1 (Attachment : Annexure-1(i)email _ terminal requirement.pdf)
From: Gaurav Saxena (गौरव स सेना)
Sent: 10 January 2023 10:19
To: S Dhanasekar (एस धनशेखर) <[email protected]>; Rishi Yadav ( ऋिष यादव) <[email protected]>; Kapil Gangwar ( किपल गगं वार ) <[email protected]>; Rahul Kumar Jatav (राहल
कुमार जाटव) <[email protected]>; Vivek Mishra (Instrument) (िववेक िम ा (साधन)) <[email protected]>; Abhishek Gupta (अिभषेक गु ा) <[email protected]>
Cc: Mahipal Singh (मिहपाल िसंह) <[email protected]>; S B Pandey (एस बी पांडेय) <[email protected]>; S P Singh - Mech (एस पी िसंह -मैके) <[email protected]>; G Pandey (जी पांडेय)
<[email protected]>; Sandesh Kumar Naik (सदं ेश कुमार नायक) <[email protected]>; R K Pal (आर के पाल) <[email protected]>; Salil K Bajpai - (सिलल के बाजपाई )
<[email protected]>; Prashant Kr. Singh ( शा त कुमार िसंह) <[email protected]>; Prateek Rajput ( तीक राजपतू ) <[email protected]>
Subject: FW: Procurement of Turbine & RPD Flow Meters||Unjustified Requirement
Dear Sir,
A requirement list with meter details was obtained earlier for procurement of spare Turbine & RPD flow Meters , which is as attached.
Further it is requested to provide Flange to Flange distance of installed Flow meter also. This is required for finalizing the specification.
सादर / Regards,
गौरव स सेना / Gaurav Saxena
मु य बधं क (उपकरण) / Ch.Manager( NG P/L O&M)
गेल – बबराला / Gail- Babrala
HBJ:- 637-460
Dear Sir,
As it was stated earlier in trailing mail dated 19.12.2022 , that spare TFM required to be used at the time of calibration of in line TFM. The requirement is not for failure of
complete TFM or maintenance of TFM but to keep both metering line ready at the time of calibration of in line TFM.
13 5
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
NOTE 1 (Attachment : Annexure-1(i)email _ terminal requirement.pdf)
However if it is difficult to procure region vise ( 18”, 24 “ & 30” Line region) then spare TFM may be kept at HQ for all the CGD Metering location & revised proposed Qty in
trailing mail dated 12.12.2022 is accepted to undersigned.
सादर / Regards,
गौरव स सेना / Gaurav Saxena
मु य बधं क (उपकरण) / Ch.Manager( NG P/L O&M)
गेल – बबराला / Gail- Babrala
HBJ:- 637-460
Dear Gaurav,
May please share the last 02 years consumption pattern , failure of complete TFM to justify your requirement because the said items are in capital nature.
As per maintenance policy need to maintain the sufficient spares like probes , internal etc.
Regards
Dear Sir,
14 6
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
NOTE 1 (Attachment : Annexure-1(i)email _ terminal requirement.pdf)
It is requested not to reduce the requirement Quantity of TFM-6 Inch G-400, 300# considering it’s total installed quantity & lead time in calibration at HAZIRA Meter Prover.
Further upcoming CGD skids are also equipped with same type of TFM.
Hence Procured TFM-6 Inch G-400, 300# may be kept at each region as spare. Which may to be used at the time of calibration of Installed meter.
Revised
Initial
Installed Qty to
S.No Description Requirement Unit
total qty be
Received
procured
1 Flow meter, TFM-3 Inch G-100, 600# 2 1 1 EA
2 Flow meter, TFM-4 Inch G-250,300# 4 2 1 EA
3 Flow meter, TFM-4 Inch G-400, 300# 4 1 1 EA
4 Flow meter, TFM-6 Inch G-400, 300# 14 6 2 EA
5 Flow meter, TFM-6 Inch G-650, 300# 2 2 1 EA
6 Flow meter, RPD-2 Inch G-65, 300# 22 9 2 EA
सादर / Regards,
गौरव स ेना / Gaurav Saxena
मु बं धक (उपकरण) / Ch.Manager( NG P/L O&M)
गे ल – बबराला / Gail- Babrala
HBJ:- 637-460
Dear Sir,
15 7
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
NOTE 1 (Attachment : Annexure-1(i)email _ terminal requirement.pdf)
Instrumentation Department Dibiyapur has received attached consolidated requirement to procure new turbine/RPD meters. As A flow meter is a capital natured item &
replacement of turbine/RPD meter is generally required when the in-line meter is sent for calibration/repair, therefore, the requirement to procure 21 qty flow meters for
Dibiyapur region is not justified. In this regard, we have examined the sheet and revised the quantities as follows according to the category of the meter.
Revised
Initial
Installed Qty to
S.No Description Requirement Unit
total qty be
Received
procured
1 Flow meter, TFM-3 Inch G-100, 600# 2 1 1 EA
2 Flow meter, TFM-4 Inch G-250,300# 4 2 1 EA
3 Flow meter, TFM-4 Inch G-400, 300# 4 1 1 EA
4 Flow meter, TFM-6 Inch G-400, 300# 14 6 2 EA
5 Flow meter, TFM-6 Inch G-650, 300# 2 2 1 EA
6 Flow meter, RPD-2 Inch G-65, 300# 22 9 2 EA
In order to operate, maintain & ensure healthiness of the metering systems, It is suggested to all that if required, please proceed to procure the internals/repair kits for the
installed meters at your respective sites.
16 8
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
NOTE 1 (Attachment : Annexure-1(ii) terminal requirement.pdf)
22
17
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
NOTE 1 (Attachment : Annexure-2 Cost Estimate.pdf)
Estimate
Unit Rate excl tax Unit Rate excl tax
considering
(in INR) as per offer from Apex (in INR) as per offer from Genus
Installed Spares in Spares in Required GAIL Latest PO no Unit rate as 7% Year on
S.No Description Material code Unit Automation Ref no. PowerInfrastructures Limited Ref no. Total Remarks
Qty store shopfloor Quantity & date per PO year
SAK/GAIL/DBY/002A/2023-24 GPIL/2023-24/GM-C&I/026 dtd
escalation or
DTD 18.09.2023 17.10.2023
pro rata basis
5700046328 dtd
1 Flow meter, TFM-3 Inch G-100, 600# 8115142851 2 0 0 1 EA 3,65,635 418615.51 609083.24 700000 418615.5115 01 no. for Dibiyapur Compressor Station
18.11.2021
5700050355 dtd 01 no. for 18" AJPL , 24" APPL,30 " & 36"
2 Flow meter, TFM-4 Inch G-250, 300# 8115141943 4 0 0 1 EA 136387.29 141160.85 141160.8452
13.06.2023 612690.9 770000 VAPL
3 Flow meter, TFM-4 Inch G-400, 300# 8115142844 4 0 0 1 EA - 612690.9 772000 612690.9 01 no. for 24" ABPL, 30 " & 36" VAPL
01 no. for 18" AJPL & 24" APPL
4 Flow meter, TFM-6 Inch G-400,300# 8115148081 14 0 2 EA - 1652643.74
826321.87 990000 01 no. for 24" ABPL
01 no. for 24" ABPL to be kept as spare
Flow meter, TFM-6 Inch G-650, 300# 01 no. will be installed in Adani Shiwali skid
5 8115142861 2 0 2 EA - 1652643.74
as the existing meter has issues with internal
826321.87 990000 pinion in TFM.
18
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
NOTE 1 (Attachment : Annex-3 (i) Budgetary offer from Apex Automation.pdf)
APEX AUTOMATION PVT. LTD.
INSTRUMENTATION/CONTROL/AUTOMATION DESIGN & ENGINEERING SOFTWARE DEVELOPMENT
Ref.: SAK/GAIL/DBY/002A/2023-24
September 18, 2023
To,
M/s Gail India Limited
Dibiyapur,
Distt: Auraiya,
Pin: 206244,
Uttar Pradesh (India)
Kind Attn: Ms. Upasana Priyadarshini Pal (Sr. Manager – O&M)
Sub.: Revised offer for supply of Vemmtec make Turbine flow meters
Dear Sir,
We refer to your e-mail received on dated September 12, 2023 & our earlier submitted offer ref #
SAK/GAIL/DBY/002/2023-24, dated August 16, 2023 regarding mentioned subject matter.
Apex Automation Pvt. Ltd. (AAPL) have a long history as supplier and integrator of quality measurement/ process
control hardware/software/communications products/services in the field of Oil and Gas industry. We recognize the
importance of this project to GAIL. With the back drop of the installed base at various locations across the country we
can supply the mentioned products to complete satisfaction of your company.
Should you require any additional information please feel free to contact us on + 91 79 26304182 or on
[email protected].
Thanking you,
For APEX AUTOMATION PVT. LTD.
Shaishavi Kayastha
Encl.: As mentioned
I. Validity Period:
1. The prices quoted are valid for 30 days from the date of this quotation
2. The VENDOR in writing, if any, shall confirm extensions in validity period.
II. Price Basis:
1. The prices quoted are Ex-works Ahmedabad and payable to us at Ahmedabad.
2. The prices exclude the following, which shall be charged extra as indicated:
a) Packing & Forwarding : Inclusive
b) Freight : Extra at actual to your account
c) Transit Insurance : Extra at actual to your account
III. Taxes & Duties:
These shall be charged extra as applicable at the time of dispatch, at actual. The prevailing rates are given below:
a) GST: Extra as applicable
V. Payment Terms:
For Supply
25% advance along with purchase order
25% along with approved document /manufacturing clearance
Balance against Pro forma before dispatch
Interest will be charged at 1/2 % per week on all amounts that are not paid within 7 days of payment falling date
V. Delivery:
Within 18 weeks from date of receipt of technically and commercially clear Purchase Order and/or manufacturing clearance
whichever is later
Holding charges will be charged at 1/2 % per week on ordered amount post 2 weeks of readiness intimation
VI. Force Majeure:
The delivery schedule (as per V above), shall be suitably extended if one of many of the following FORCE MAJEURE conditions
occurs/persists
a. Acts of God
b. Fires, Epidemics/Pandemics, Floods, Riots, Wars
c. Any Act of Govt. Bodies/ Institutions/ Law Enforcing Agencies.
d. Changes in the Govt's Import Policy relevant to Vendor’s imported inputs.
e. Any situation beyond the reasonable control of Apex Automation Pvt. Ltd.
VII. Warranty:
The Vendor warrants (back to back), subject to normal wear/burn out, supplies to be free from defects in design, materials and
workmanship for a period of 12 months from the date of dispatch.
VIII. Transfer of Ownership:
Transfer of Ownership of the material supplied from the Vendor to Purchaser, shall be deemed to have taken place, Ex-Vendor's
works, on the date the goods have been consigned to the purchaser and a lorry receipt has been obtained by the vendor.
IX. Statutory Variations:
a. Any impact, even if on a provisional basis, on the price due to any variation in taxes/ duties as applicable to
the Seller’s scope of supply and services shall be to the Purchaser’s account at actual against documentary evidence.
Statutory variation shall include any variation in existing statutes or due to a new statute.
b. The scope of statutory variations shall include changes in rates of taxes and duties even if due to changes in classification or
in scope of the applicability of such taxes and duties, or changes in basis of valuation.
X. Once your order has been received & Apex OA issued, your order cannot be cancelled. In the event of order cancellation from
your end, 100% amount will be chargeable and needs to be paid by you within 7 days of order cancellation, else Interest will be
charged at 1/2 % per week on all amounts that are not paid within 7 days of payment falling date.
XI. Any other Terms & Conditions: Not expressly stipulated in this document shall be mutually discussed and agreed upon, if required
To,
M/s. GAIL India Ltd.
Dibiyapur, Distt.- Auraiya,
Pin: 206244, Uttar Pradesh (India)
Dear Sir
We acknowledge with thanks receipt of the inquiry and are pleased to submit the Techno-
Commercial proposal.
1. Contractor details
2. Bank Details
3. Price Schedule
4. Genus Terms and conditions
5. Annexure 1 – Catalogue
We hope you will find our technical proposal in line with your requirement. Should you require any
further clarification please feel free to send the queries to the undersigned with a copy to
[email protected]
Notes:
Price is subject to change in case of change of Qty.
Offer validity is 15 Days from the date of submission.
Yours Sincerely,
For Genus Power Infrastructures Limited.
23
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
NOTE 1 (Attachment : Annex-3 (ii) Budgetary offer from GPIL.pdf)
Contractor Details:
Any order should be placed under the following address:
Bank details:
24
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
NOTE 1 (Attachment : Annex-3 (ii) Budgetary offer from GPIL.pdf)
*We need to know exact working pressure to reconfirm the rangeability of 1:50,
however, it is possible to achieve the same with high pressure calibration.
25
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
NOTE 1 (Attachment : Annex-3 (ii) Budgetary offer from GPIL.pdf)
Sales T&C: ‐
4. Payment terms : 30% advance along with PO, 70% against the PI before material
Dispatch from Germany Factory
8. LD : NA
10. Limitation of Liability : Notwithstanding anything contrary contained herein, the aggregate
total liability of Supplier, excluding his liability towards infringement
of patent & trade mark or industrial design rights or wilful misconduct
or fraud, under the contract or otherwise shall be limited to 100% of
value of Purchase order.
However, neither party shall be liable to the other party for any In-
direct and consequential damages, loss of profits or loss of
production.
26
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
NOTE 1 (Attachment : Annexure-4(i) Technical specification.pdf)
18-43 to 49 kg/cm2
* For TFM at S/N-6 in beow table,
Pressure Range operating pressure is 50 kg/cm2 and
(Operating/ Max) max pressure is 70 kg/cm2
Accuracy where
Qt is 0.2 Qmax for rangeability 1:20
Qt is 0.15 Qmax for rangeability 1:30
Qt is 0.10 Qmax for rangeability 1:50
As per standard
CONFORMITY
/ IS 2147 or better
2. Instrinsially safe certificate from
SUPPLY
FM/ATEX/CSA/IECEx/PESO
3. Hydrotest certificate
4. Air Seal test certificate
5. Meter calibration certificate
27
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
NOTE 1 (Attachment : Annexure-4(i) Technical specification.pdf)
better
from 0.2 Qmax to Qmax: +/- 2% or
Accuracy better
Repeatability +/- 0.1% or better
Rangeability 1:200 or better
G-Rating As per table below
0.5 bar or better
Max. allowable pressure drop
Pressure Tap on Body Required, 01 no or more
Pressure Tap Size ½” NPTF with plug
Pulses/m3 LF : 1 m3, HF : After calibration
24V DC loop powered from respective
Power Supply flow computer
Mounting Integral with RPD flow meter
TRANSMITTER
As per standard
CONFORMITY
IS 2147 or better
DURING MATERIAL
FM/ATEX/CSA/IECEx/PESO
3. Hydrotest certificate
4. Air Seal test certificate
5. Meter calibration certificate
28
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
NOTE 1 (Attachment : Annexure-4(i) Technical specification.pdf)
29
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
NOTE 1 (Attachment : Annexure-4 (ii)SCC and SOW.pdf)
2. CONSIGNEE ADDRESS:
3. TECHNICAL SPECIFICATIONS:
i) The bidders must refer Annexures (Technical Specification) & fill in /submit vendor acceptance
on vendor’s letter head, failing which their bids shall be considered incomplete. Accessories and
certificates as mentioned in Annexures and elsewhere shall be part of the standard accessories of
the offered “Turbine flow Meters and RPD meters for Natural gas application”.
ii) Vendor has to sign and stamp each page of specification sheet with filled Vendor Acceptance as
a token of acceptance.
4. DOCUMENTS REQUIRED:
a) ALONG WITH OFFER: Catalogues & detailed data sheets with model, type, detailed
specifications etc.
b) AFTER PLACEMENT OF ORDER:
*(i) Calibration certificates should carry validity of 2 year from date of purchase from OEM facility
Lab/ Approved lab/ calibration agency accredited to ISO/IEC 17025 including calibration
certificates of corresponding master meter.
5. DELIVERY PERIOD/SCHEDULE:
1
30
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
NOTE 1 (Attachment : Annexure-4 (ii)SCC and SOW.pdf)
6. PAYMENT TERMS:
100% Payment within 30 days from the date of acceptance of the materials at site subject to
submission of Original Invoice & other required documents.
7. WARRANTY / GUARANTEE:
The materials / Goods shall have warranty for 12 months from the date of acceptance of materials
at site or 18 months from the date of dispatch, whichever is earlier.
(i) In this supply contract, the portion of supply completed in all respect which can be used
for commercial operation shall not be considered for applying PRS, if delivered within
contractual delivery period. The remaining supplies which are completed beyond the
contractual delivery shall attract price reduction schedule @½ % of the delayed
delivery value maximum up-to 5% of the total order value.
(ii) The value referred in PRS clause is excluding taxes and duties.
(iii) As mentioned in GCC‐Goods, in case delay in supply, supplier will raise invoice for
reduced value as per PRS clause. If supplier has raised the invoice for full value, then
supplier will issue Credit Note towards the applicable PRS amount. In case supplier
fails to submit the invoice for reduced value or does not issue credit note as mentioned
above, GAIL will release Payment of reduced value after application of PRS.
9. INSPECTION:
Inspection will be carried out at GAIL’s store. However, during inspection at GAIL’s Store, a
sample of supplied material may be test at GAIL’s indenting department to ascertain the quality of
the material as per specified standard and in case the supplied material is found substandard, then
the whole lot of the supplied material will be rejected and the vendor will have to replace the
substandard material by standard/on spec material without any extra financial implication to GAIL.
2
31
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
NOTE 4 (Attachment : Email reg. spare flowmeter.pdf)
Dear Madam,
Spare Flow meter with given capacity is not available at GAIL Vaghodia
With Regards
Ratul Mukherjee
Senior Manager (Instrumentation)
HVJ: 71-461
Mob: 09099936783
Vaghodia Compressor Station-GIDC VAGHODIA
32 1
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
NOTE 4 (Attachment : Email reg. spare flowmeter.pdf)
S/N Description Required qty
(nos.)
1 Flow meter, TFM-3 Inch G-100, 600#, Rangeability 1:20 1
2 Flow meter, TFM-4 Inch G-250, 300#, Rangeability 1:20 1
3 Flow meter, TFM-4 Inch G-400, 300#, Rangeability 1:30 1
4 Flow meter, TFM-6 Inch G-400,300#, Rangeability 1:20 2
5 Flow meter, TFM-6 Inch G-650, 300#, Rangeability 1:20 2
6 Flowmeter, TFM- 4 inch G 250, 600#, Rangeability 1:50 2
7 Flow meter, RPD-2 Inch G-65, 300#, Rangeability 1:200 2
You are requested to kindly confirm if any of the above meter is available at your site in good & working condition and can be spared
to Dibiyapur Region for utilization.
Regards,
Upasana Priyadarsini Pal
Sr. Manager (O&M)
GAIL (India) Limited,Dibiyapur, Distt.- Auraiya, Pin: 206244, Uttar Pradesh (India)
Ph: +91 (0) 5683 282355, Extension no. 1464(O), HVJ-631464
Mob. 9756526961
Email: [email protected]
33 2
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
NOTE 4 (Attachment : Email reg. spare flowmeter.pdf)
Dear madam,
None of the meters mentioned in trailing mail can be spared for Dibiyapur Region.
GAIL (India) Ltd | Kailaras Compressor Station | Village Rithoniya | District Morena | Madhya Pradesh |476224
Contact No.: +91-8527864090/7879723152
Extn: 898-1461
34 1
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
NOTE 4 (Attachment : Email reg. spare flowmeter.pdf)
Cc: M K Siddiqui (एम के स द क़ ) <[email protected]>; Narendra Kumar Sahu (नरे कुमार साहू) <[email protected]>
Subject: Requirement of TFM and RPD by GAIL Dibiyapur
You are requested to kindly confirm if any of the above meter is available at your site in good & working condition and can be spared
to Dibiyapur Region for utilization.
Regards,
Upasana Priyadarsini Pal
Sr. Manager (O&M)
GAIL (India) Limited,Dibiyapur, Distt.- Auraiya, Pin: 206244, Uttar Pradesh (India)
Ph: +91 (0) 5683 282355, Extension no. 1464(O), HVJ-631464
Mob. 9756526961
Email: [email protected]
35 2
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm
File No. GAIL/DBPR/INST/23/2023-O&M CR(DBPR)(OICC) (Computer No. 9068)
NOTE 4 (Attachment : Annexure-2 Cost Estimate.pdf)
Estimate
Unit Rate excl tax Unit Rate excl tax
considering
(in INR) as per offer from Apex (in INR) as per offer from Genus
Installed Spares in Spares in Required GAIL Latest PO no Unit rate as 7% Year on
S.No Description Material code Unit Automation Ref no. PowerInfrastructures Limited Ref no. Total Remarks
Qty store shopfloor Quantity & date per PO year
SAK/GAIL/DBY/002A/2023-24 GPIL/2023-24/GM-C&I/026 dtd
escalation or
DTD 18.09.2023 17.10.2023
pro rata basis
5700046328 dtd
1 Flow meter, TFM-3 Inch G-100, 600# 8115142851 2 0 0 1 EA 3,65,635 418615.51 609083.24 700000 418615.5115 01 no. for Dibiyapur Compressor Station
18.11.2021
5700050355 dtd 01 no. for 18" AJPL , 24" APPL,30 " & 36"
2 Flow meter, TFM-4 Inch G-250, 300# 8115141943 4 0 0 1 EA 136387.29 141160.85 141160.8452
13.06.2023 612690.9 770000 VAPL
3 Flow meter, TFM-4 Inch G-400, 300# 8115142844 4 0 0 1 EA - 612690.9 772000 612690.9 01 no. for 24" ABPL, 30 " & 36" VAPL
01 no. for 18" AJPL & 24" APPL
4 Flow meter, TFM-6 Inch G-400,300# 8115148081 14 0 0 2 EA - 1652643.74
826321.87 990000 01 no. for 24" ABPL
01 no. for 24" ABPL to be kept as spare
Flow meter, TFM-6 Inch G-650, 300# 01 no. will be installed in Adani Shiwali skid
5 8115142861 2 0 0 2 EA - 1652643.74
as the existing meter has issues with internal
826321.87 990000 pinion in TFM.
36
Generated from eOffice by RISHI YADAV, 00015817(E4)OnM(230705), SR MANAGER (O&M-NG P/L)(E4)KFCL, GAIL on 19/02/2024 02:33 pm