Combined Pile Cap

Uploaded by

ندى حسين
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views8 pages

Combined Pile Cap

Uploaded by

ندى حسين
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

Arab Academy for Science, Technology and Maritime

Transportation

Design of foundation and Earth Structures

CB463

Spring (2019/2020)
E-learning courses
Sheraton Branch

Lecturers:- Prof.Fathallah Al-Nahass


Eng.Mohamed Khaled
Eng.Rowaid Ibrahim
Combined Pile Cap
Example:-
Fy = 360 N/mm2
Fcu = 25 N/mm2
Pile Diameter (ф) = 60 cm
Pile Working Load = 85 t
Pile Type (Fiction Piles)
Solution:-
400t 300t
(120 x 40) (70 x 40)

3.6 m

3.6 m

400t 300t
o

x
700t

∑ 𝑀 𝑎𝑡 𝑂 = 𝑍𝑒𝑟𝑜: 300 x 3.6 = 700 x (X)………….. X= 1.54m


-No. of Piles (700 x 1.15)/85≈ 10 Piles
-Smin= 3 ф =3 x 0.6 = 1.8 m
-e = 1 ф = 0.6 m -Pultclo1 = 400 x 1.5 = 600 t
-Pult act pile =(700x1.5)/10 =105 t -Pultclo2 = 300 x 1.5 = 450 t
1.54 m
1.8 m
𝑋 = √1.82 − 0.92 =1.55 m

Smin
0.9 m

450 t
0.26
600 t 0.04

0.56 0.3
0.81
Statistical 0.86

System
0.09
105 t 210 t 105 t 210 t 105 t 210 t 105 t

315 t 345 t
d/2
135 t
105 t
5 30 t
S.F.D 3
7 8 9
1 2 6
180 t 105 t
285 t 4 168 t.m
d/2
5
33.6 t.m
2
B.M.D 4
5.4 t.m 3
58.8 t.m
31.5 t.m
1
S.F.D:- (all from L.H.S)
1) +105 t
2) 105+210 = +315 t
3) 315-600 = -285 t
4) -285+105 = -180 t
5) -108+210 = +30 t
6) 30+105 = +135 t
7) 135+210 = +345 t
8) 345 – 450 = -105 t
9) -105+105 = zero

B.M.D:-
1) 105 x (0.56) = +58.8 t.m (L.H.S)
2) 105 X 1.76 + 210 X 0.86 – 600 X 0.6 = +5.4 t.m (L.H.S)
3) 105 x 0.3 = +31.5 t.m (R.H.S)
4) 105 x 1 + 210 x 0.09 – 450 x 0.35 = -33.6 t.m (R.H.S)
5) 105 X 2.7 + 210 X 1.8 + 105 X 0.9 – 600 X 1.54 = -168 t.m (L.H.S)

Design for Flexure:-


-Mult(Max) = 168 t.m

168𝑥107
-𝑑 = 5x√ = 625.05 mm (Cover =150 mm) t≈800mm Take d=650mm
25𝑥4300
Check Shear:- d/2=0.325 m
-Qsh= 180 t -qsh=(180 x 104)/4300x650 =0.644 N/mm2

25
𝑞𝑐𝑢 = 0.16√ =0.65 N/mm2 (Safe)
1.5

Check Punching:-

1.35

1 2

1.05

0.325

0.585

1.85

Qpun1=400x1.5-[ (0.585/0.6) x105]= 497.625 t 0.6………105


Qpun2=300x1.5-[ (0.325/0.6) x105]= 393.125 t 0.585…….??
qpun1= (497.625 x104)/[(1850+1050)x2x650)] = 1.319 N/mm2 0.6………105
qpun2= (393.125 x104)/[(1350+1050)x2x650)] = 1.26 N/mm2 0.325….??

25
𝑞𝑝𝑢𝑛𝑐𝑢 = 0.316√ = 1.29 N/mm2
1.5
𝑝𝑢𝑛𝑐𝑢1 = 1.075N/mm2

0.4 25
𝑝𝑢𝑛𝑐𝑢1 = 0.316[0.5 + ( )]√ = 1.075 N/mm2
1.2 1.5
𝑝𝑢𝑛𝑐𝑢2 = 1.29N/mm2

0.4 25
𝑝𝑢𝑛𝑐𝑢2 = 0.316[0.5 + ( )]√ = 1.38 N/mm2
0.7 1.5

𝑞𝑝𝑢𝑛𝑐𝑢1 = 1.075 N/mm2 < qpun1 = 1.312 N/mm2 (Unsafe)


𝑞𝑝𝑢𝑛𝑐𝑢2 = 1.29 N/mm2 > qpun2 = 1.26 N/mm2 (safe)
-Make qpun1 Safe:
(497.625 x104)/{[(1200+d)+(400+d)]x2xd} = 1.075 N/mm2 d= 716.92mm
t= d+150 mm(cover) ≈ 900 mm d= 750 mm………d/2=375mm

Design of Transvers Direction:-

1.35 m

M M

d/2=0.425m

S S

Design for Flexure (Transvers Direction) (Sec M-M):-


Mult=105 x 3 x 1.35 = 425.25 t.m

425.25𝑥107
-𝑑 = 5x√ = 802mm (Cover =150 mm) t≈1000mm Take t=1000mm
25𝑥6600

d=850 mm d/2=425 mm
Check Shear (Transvers Direction) (S-S):-
Qsh = 105 x 3 = 315 t
qsh = (315 x 104) / (6600 x 850) = 0.561 N/mm2

25
𝑞𝑐𝑢 = 0.16√ =0.65 N/mm2 (Safe)
1.5
-Reinforcement:-

Ast=(Mult/(J x Fy x d)

-Long Direction top:

Ast=(168 x 107)/(0.826x 360 x 850)=………./4.3=……. Ф…../mˋ

-Long Direction Bottom:

Ast=(58.6 x 107)/(0.826x 360 x 850)=………./4.3=……. Ф…../mˋ

-Transvers Direction Bottom:

Ast=(425.25x 107)/(0.826x 360 x 850)=………./6.6=……. Ф…../mˋ

-Check with Area Steel Min.:

Astmin=1.5 d =……. Ф…../mˋ

-Transvers Direction top: (Using Astmin)


Reinforcement (Plan):-

s s

Reinforcement (Elevation Sec S-S):-