Guide to Synchronising and Load Sharing

PART 1 – Usage of DSE Load Share


Controllers in synchronisation / load sharing
systems.
Document Number 057-045 Issue 11

Author:- Anthony Manton

1
Deep Sea Electronics Plc
Highfield House
Hunmanby
North Yorkshire
YO14 0PH
ENGLAND

Sales Tel: +44 (0) 1723 890099


Sales Fax: +44 (0) 1723 893303

E-mail: [email protected]
Website: www.deepseaplc.com

Deep Sea Electronics Guide to Synchronising and Load Sharing

© Deep Sea Electronics Plc


All rights reserved. No part of this publication may be reproduced in any material form (including
photocopying or storing in any medium by electronic means or other) without the written permission
of the copyright holder except in accordance with the provisions of the Copyright, Designs and
Patents Act 1988.
Applications for the copyright holder’s written permission to reproduce any part of this publication
should be addressed to Deep Sea Electronics Plc at the address above.

Any reference to trademarked product names used within this publication is owned by their
respective companies.

Deep Sea Electronics Plc reserves the right to change the contents of this document without prior
notice.

1 BIBLIOGRAPHY
1. Diesel generator handbook. L.L.J.Mahon. ISBN 0-7506-1147-2
2. On-Site Power Generation. EGSA Education Committee. ISBN 0-9625949-3-8

2
TABLE OF CONTENTS
Section Page
1 BIBLIOGRAPHY .......................................................................................... 2
2 INTRODUCTION .......................................................................................... 5
3 STEP BY STEP GUIDE ................................................................................ 5
3.1 CLARIFICATION OF NOTATION AND TERMINOLOGY USED WITHIN THIS
PUBLICATION. ..................................................................................................................... 6
4 GENERATOR USES..................................................................................... 7
4.1 STANDBY GENERATORS .......................................................................................... 7
4.1.1 TRANSFER SWITCH............................................................................................ 7
4.1.2 NO BREAK TRANSFER........................................................................................ 7
4.2 CONTINUOUS PARALLEL OPERATION..................................................................... 8
4.3 BASE LOAD WITH DSE ‘20 CONTROLLER ................................................................ 8
4.3.1 TRUE PEAK LOPPING AND IMPORT/EXPORT CONTROL ................................... 9
4.4 MULTIPLE GENERATORS ....................................................................................... 10
4.4.1 MUTIPLE SET PRIME POWER ........................................................................... 10
4.4.2 MULTIPLE SETS PROVIDING STANDBY TO THE MAINS SUPPLY ..................... 11
4.4.3 LOAD-SWITCHING USING DSE333 ATS (BREAK TRANSFER) ........................... 11
4.4.4 MULTIPLE SETS (STANDBY) – NO BREAK TRANSFER ..................................... 12
4.4.5 MULTIPLE MAINS SUPPLIES ............................................................................. 12
5 SYNCHRONISING AND LOAD SHARING SOLUTIONS ............................. 13
5.1 SINGLE SETS .......................................................................................................... 13
5.1.1 SINGLE SET NO BREAK RETURN WITH MAINS ................................................ 13
5.1.2 SINGLE SET FIXED EXPORT ............................................................................. 13
5.2 MULTIPLE SETS ...................................................................................................... 14
5.2.1 MULTIPLE SET PRIME POWER ......................................................................... 14
5.2.2 MULTIPLE SET STANDBY TO MAINS SUPPLY (BREAK RETURN) ..................... 15
5.2.3 MULTIPLE SET STANDBY TO MAINS SUPPLY (NO BREAK RETURN) ............... 16
5.2.4 MULTIPLE MAINS SUPPLIES ............................................................................. 17
5.2.5 SINGLE SET STANDBY TO MULTIPLE MAINS SUPPLY (NO BREAK RETURN) .. 17
6 LOAD SHARING ........................................................................................ 18
6.1 ACTIVE POWER SHARING ...................................................................................... 18
6.2 REACTIVE POWER SHARING .................................................................................. 18
7 THE NEED FOR SYNCHRONISING ........................................................... 19
8 METHODS OF ADJUSTING VOLTAGE & FREQUENCY ............................ 20
8.1 REMOTE SPEED / VOLTAGE POTENTIOMETERS ................................................... 20
8.2 DC VOLTAGE INPUT................................................................................................ 20
8.3 RAISE / LOWER PUSH BUTTONS ............................................................................ 20
8.4 CAN / ELECTRONIC ENGINE SPEED CONTROL ..................................................... 21
9 REQUIREMENTS FOR SYNCHRONISING ................................................. 22
9.1 GOVERNOR WITH REMOTE SPEED CONTROL CAPABILITY .................................. 22
9.2 AVR WITH REMOTE VOLTAGE ADJUST CAPABILITY............................................. 22
9.3 FUNCTION COMPARISON CHART ........................................................................... 23
9.4 SYNC / LOAD SHARE PROTECTION COMPARISON CHART .................................. 24
10 LOAD SWITCHING DEVICES.................................................................. 25
10.1 CHOOSING A LOAD SWITCHING DEVICE ............................................................ 25
10.1.1 CONTACTORS .................................................................................................. 25
10.1.2 CHARGED SPRING BREAKERS ........................................................................ 25
10.1.3 AIR CIRCUIT BREAKERS (ACBS) ...................................................................... 25
10.1.4 MOTOR OPERATED BREAKERS ....................................................................... 26
10.1.5 MANUALLY OPERATED BREAKERS ................................................................. 26
10.2 NEUTRAL EARTHING ........................................................................................... 26

3
11 MULTI SET COMMUNICATIONS (MSC) LINK .........................................27
11.1 SYNCHRONISING ................................................................................................ 27
11.2 LOAD SHARING ................................................................................................... 27
11.3 START/STOP ON LOAD DEMAND........................................................................ 27
11.4 COMPATIBILITY................................................................................................... 27
11.5 CONNECTIONS .................................................................................................... 28
11.6 SPECIFICATIONS................................................................................................. 29
11.7 MSC ALARMS ...................................................................................................... 30
11.7.1 MSC ID ALARM ................................................................................................. 30
11.7.2 MSC DATA ERROR ........................................................................................... 30
11.7.3 MSC FAILURE ................................................................................................... 30
11.7.4 MSC TOO FEW SETS ........................................................................................ 30
12 LOAD SHARE LINES ...............................................................................31
12.1 TYPICAL P123 INSTALLATION ............................................................................ 31
13 TYPICAL CONNECTIONS .......................................................................32
13.1.1 TYPICAL SINGLE LINE DIAGRAM OF MULTI SET MAINS FAIL .......................... 32
13.1.2 SINGLE LINE DIAGRAM OF MULTI MAINS SYSTEM.......................................... 33

4
2 INTRODUCTION
A general overview of generator uses is given including synchronising. This is only to be treated as
a guide to newcomers to this particular subject, and should not be treated as a total learning
package.
Part 2 of this manual details the interfacing the DSE controllers with many of the most common
AVRs and Governors in use on generating sets.

3 STEP BY STEP GUIDE


This section details the mains steps that need to be taken in producing a synchronising / load
sharing system. This is intended as a guide only and is not a substitute for in depth knowledge of
synchronising and load sharing.

• Identify your base application. Applications supported by the DSE controllers are detailed in
the section headed ‘Synchronising and load sharing solutions’.
• Identify your governor and AVR interface methods. Details of this are contained in the sections
headed ‘Interfacing to governors’ and ‘Interfacing to automatic voltage regulators’.
• Design your panel and system wiring. DSE can assist with your specific questions on this but
cannot design the panel for you. If you want a panel designing, please contact DSE Technical
Support Department who may be able to recommend a third party panel designer / builder
capable of producing a synchronising / load sharing system.
• Check / adjust the module’s configuration using the PC configuration software. If it is a MultiSet
system, ensure that the settings for the MultiSet Communications Link are correctly configured
and the MultiSet communications cable is of the correct specification.
• Commission each set in the system as a single standalone set. Before doing this, ensure the
governor/AVR interface is disabled as detailed in the section entitled ‘On site commissioning’.
• Set up the governor and AVR as detailed in their respective manufacturers’ handbooks.
• Before synchronising sets for the first time, double check that all the Bus wiring is correct and
that the controllers initial settings are suitable. This may include lowering the settings for ‘gain’
and ‘stability’ in the synchronising, voltage matching and load control sections.

Further detailed information on this subject is contained in the DSE Load Share Design and
Commissioning Guide (DSE PART 057-047).

Should you have any queries arising from this manual please contact our Technical
Department:
INTERNATIONAL TEL: +44 (0) 1723 890099
INTERNATIONAL FAX: +44 (0) 1723 893303
E-mail: [email protected]
Web: http://www.deepseaplc.com

5
3.1 CLARIFICATION OF NOTATION AND TERMINOLOGY USED WITHIN
THIS PUBLICATION.

NOTE: Highlights an essential element of a procedure to ensure correctness.

Indicates a procedure or practice which, if not strictly observed, could result


CAUTION! in damage or destruction of equipment.
Indicates a procedure or practice, which could result in injury to personnel
WARNING! or loss of life if not followed correctly.
DEEP SEA ELECTRONICS PLC own the copyright to this manual, which
 cannot be copied, reproduced or disclosed to a third party without prior
written permission.
Compliant with BS EN 60950 Low Voltage Directive
Compliant with BS EN 50081-2 EMC Directive
Compliant with BS EN 50082-2 EMC Directive

Two crossing wires with no interconnection between the two.

Three wires, all connected together

Connections to the DSE controller’s battery supply negative terminal,


usually the earthed battery –ve terminal.
Automatic Voltage Regulator. Fitted to the alternator to regulate the output
A.V.R.
of the generator.
Engine Speed Governor. Fitted to the engine to electronically control the
Governor
speed of the engine.
When load is applied to a generator fitted with a droop governor / AVR, the
speed/voltage will drop. This is called droop. It is common for a droop set
Droop
to drop between 3% and 10% in speed / voltage from no load applied to full
load applied.
A governor with no speed droop, or where speed droop is disabled is
Isochronous known as an isochronous governor. The engine speed remains constant so
long as the load levels are within the set’s capability.

Synchronise To get the supplies identically matched, ready for paralleling.

Connect two or more supplies together. These supplies must be in


Parallel
synchronism before this can occur.

Datum ‘centre’ point of an electronic pot, digital resistance or AVR/Governor.

The nominal voltage or frequency of the system i.e. 230V 50Hz. This is not
necessarily the same as the Datum.
Nominal
(i.e. when droop governors/AVRs are used, the datum will be higher than
the nominal )
The AC distributed power supply of a power generation company. Often
Mains supply
also called the ‘grid’, or ‘utility’ supply.

6
Generator uses

4 GENERATOR USES
AC Power Generators are widely used to supply power to a load at “mains” voltage levels.
Most people first encounter a generating set when used as the primary power source. An example
of this is the small trailer mounted generators often seen in use supplying power to highway
maintenance equipment.
Other terms used to describe a generator as the sole supply are ‘Primary power’ or ‘Prime power’.
Knowledge of prime power generation in this way is assumed and is not covered within this
manual.

4.1 STANDBY GENERATORS


Generators are commonly used as a backup to the mains supply. Due to their nature, backup
supply generators are rarely seen by the public! Should the mains supply fail, the generator will be
started and used to provide power until it returns. Applications include factories, offices, schools,
emergency services (including hospitals), airports, telecommunications providers etc.

Backup generators fall into two main categories:

Illustration Description
4.1.1 TRANSFER SWITCH The most common form of backup generator to the mains
supply is a single generator in “standby” mode. When the
mains supply fails, the load is left without power until the
generator is started. Once the set is “available”, the
transfer switch changes over so that the load is supplied by
the generator.
Typically, the “down time” will be around 15 seconds, but
may be longer depending upon the time taken to run the
engine to nominal speed and other application dependent
factors. When the mains supply returns, the load-switching
device (contactors/breakers) will momentarily remove
power from the load (typically 1 second) before transferring
the load back to mains supply power.
4.1.2 NO BREAK TRANSFER The break in supply when transferring back to the mains
can be eradicated by synchronising the generator supply to
the returned mains supply, and closing the supplies in
parallel with each other for a short period of time. Then, the
generator load switch is opened, returning the mains to
supply power to the load. There has been no break in
supply to the load during this return transfer process.
Terms often used for this procedure are “bumpless
transfer”, “no break return” and “no break transfer”.
Additionally, the same procedure can be used to transfer
from mains supply to generator supply enabling, for
instance, “on load” testing of the genset with no break in
supply to the load. This can also be performed if the supply
authority informs customers of a scheduled break in
supply.

7
Generator uses

4.2 CONTINUOUS PARALLEL OPERATION

Electricity supply boards have many tariffs


based upon the customer’s load demand. In
some cases, the tariffs can treble or more
during certain times of the day if a specific load
level is exceeded.
In this example, the customer is charged more
for his electricity in the hours around midday, as
his load level places his power usage into the
next charging tariff.
In some cases, it can be more cost effective for the customer to provide an alternative power
supply during this time of high tariff. There are a number of possibilities open to him:

Illustration Description
GENSET SUPPLY. During the time of high load level a single
(or multiple) generator(s) could be started,
and then used to power the load using a
‘no break’ transfer. This genset supply
must be capable of supplying the entire
load during this time of high usage.

4.3 BASE LOAD WITH DSE ‘20 In this example, a DSE ’20 controller is
CONTROLLER being used in a base load peak lopping
system. The controller has been configured
to start the generating set at 10am,
synchronise with the mains and parallel the
supplies. It will then export a fixed amount
of power (kW) to the load and maintain a
specified power factor (both configurable).
If the set is large enough to supply the
entire load, mains failure duty is also
available.

8
Generator uses

Illustration Description
4.3.1 TRUE PEAK LOPPING AND A more advanced variation of the peak
IMPORT/EXPORT CONTROL lopping system described above is to use a
7520 (for single set) or DSE8610 with
DSE8660 (up to 32 sets). In this situation
variable Peak Lopping or true import/export
can be achieved.
The DSE8660 or DSE7520 will monitor the
site load levels and vary the generator(s)
power production. This can be used to
ensure the set is used at its economic load
level, and prevents the system exporting
power.
It can also be used to hold the mains
usage to a certain level (DSE Mains
Mode), helping to avoid higher electricity
board tariffs or supplementing the mains
supply on a site with limited supply
available.

NOTE: - It is recommended that the mains decoupling is enabled in the DSE module
when paralleling a generating set with the mains.
Additional equipment of this type is normally specified by the local electricity Supply
Company to protect against the generator feeding the mains grid in the case of a mains
failure. If in doubt, you should refer to your local Electricity Supply Company for advice.

NOTE:- Mains decoupling functionality is included within the DSE8600 and DSE8700
series controllers. DSE 7500 and DSE 5500 include this function in versions 8 or above.
When using other controllers, this functionality should be provided externally.
Additional equipment of this type is normally specified by the local electricity Supply
Company to protect against the generator feeding the mains grid in the case of a mains
failure. If in doubt, you should refer to your local Electricity Supply Company for advice.

9
Generator uses

4.4 MULTIPLE GENERATORS

There are many reasons for requiring more than one generator on the same site.
The most commons reasons are described below:

Illustration Description
4.4.1 MUTIPLE SET PRIME In this example, the site has four generating sets, used as
POWER the primary power source.
One genset will be running all the time, to provide power to
the site. If the load demand of the site increases, one or
more generators will be automatically called to start. They
will then synchronise onto the bus, and provide power in
parallel with the other set(s). At this point, the sets
connected to the bus will share the load, normally utilising
load sharing equipment.
Using multiple generating sets rather than one large set
allows for maintenance to be performed on one of the sets
while the other set(s) are still available for duty.
Additionally, if load demands are low, individual generators
can be started as required, rather than one large generator
being used at (for instance) only 25% of its full load rating.
If the overall size of the load increases, for instance due to
factory expansion another set can be added to increase
capacity with minimal disruption to the rest of the system.
Using this system, “redundancy” can be built in by utilising
a larger number of gensets than is required to supply the
load. This way, the load can still be supplied if one or more
sets are unavailable due to engine failure or maintenance.
The DSE controllers have “no master” ensuring a seamless
transition when one or more sets are removed from the
system.

10
Generator uses

4.4.2 MULTIPLE SETS PROVIDING STANDBY TO THE MAINS SUPPLY

Illustration Description
If multiple gensets in parallel are used to backup the mains
supply, care should be taken when designing the system.
In the example above for instance, should the mains supply
fail, two possibilities exist. Firstly, if only two generating
sets are providing power to the bus, they must be capable
of supplying the currently active load. Secondly, if none of
the sets are available, they will all start up simultaneously.
The first set will close onto the dead bus, and supply power
to the load. Again, the set must be capable of supplying
this power to the currently active load.
Two solutions exist :
a) Ensure each generating set is capable of supplying the
entire load so that the above situations will not occur.
b) Ensure before closing the load switch and powering
the load with the generating sets, that all of the
generating sets are available and synchronised onto
the generator bus. While running in this manner, not in
parallel with the mains supply, this is called ‘island
mode’.
4.4.3 LOAD-SWITCHING USING DSE333 ATS (BREAK TRANSFER)
The DSE333 automatic transfer switch can be used to monitor the mains supply to ensure it is
within limits. Should the mains supply fail, the 333 can be used to ‘remote start on load demand’
the DSE8610 controllers used in the example shown. All sets in the system will start together. The
first available set will close onto the dead bus. The other generating sets will synchronise onto the
generator bus, and then close in parallel with it.
Configure and output of the DSE8610s to all available sets on load and connect them all to the
auxiliary generator ready input DSE333 automatic transfer switch.
The DSE333 module will sense the generator bus voltage and frequency, and once within limits
will ‘wait’ for the presence of the auxiliary generator ready input. This signifies the correct closure of
all sets in the system onto the generator bus. The mains – generator load transfer is then
performed by the DSE333 automatic transfer switch controller.

Note that this functionality can be provided by any of the DSEAts range of controllers.

11
Generator uses

4.4.4 MULTIPLE SETS (STANDBY) – NO BREAK TRANSFER

Illustration Description
In the example above, it was not possible to perform
no break transfers to/from the mains supply.

If a DSE8660 ‘mains controller’ is fitted, to monitor


the mains supply and power supplied by the mains
to the load, additional possibilities exist, the most
important of which are :

1) Should the mains supply fail, DSE8660 can call


for the generating sets, which will synchronise
and close onto the generator bus. When the sets
are available on the generator bus DSE8660 can
close the generator bus interconnecting load
switch. When the mains supply returns, the
generator bus can be synchronised and closed
in parallel with it, to allow a no break return to
the mains supply.
2) As the power being supplied by the mains is also
being monitored, the DSE8660 can pass this
information to the generator controllers, allowing
load sharing between the generator bus and the
mains supply.
3) No-break on load testing is possible, by calling
for generators to start. The first to become
available will close onto the dead generator bus,
the remaining generators synchronising with the
now live generator bus and closing in parallel
with it. The DSE8660 will then communicate with
the generating set controllers to effect
synchronism of the generator bus with the mains
supply. When synchronism has been achieved,
the DSE8660 can close the supplies in parallel.

4.4.5 MULTIPLE MAINS SUPPLIES


Due to local electrical supply conditions or historical growth of the load, it is possible for the load to
be fed by more than one incoming AC mains supply. Normally each mains supply will feed a
separate part of the load. The DSE8660 module allows the standby generators to parallel with
any one of the mains supplies at a time and will transfer the loads accordingly. Peak lopping is
also possible on any one DSE8660 module in the system, in the event of a mains failure condition
peak lopping can be automatically terminated to ensure the gen-sets are available for standby
operation.

NOTE: - It is recommended that the mains decoupling is enabled in the module when
paralleling a generating set with the mains.
Additional equipment of this type is normally specified by the local electricity Supply
Company to protect against the generator feeding the mains grid in the case of a mains
failure. If in doubt, you should refer to your local Electricity Supply Company for advice.

NOTE:- Mains decoupling functionality is included within the DSE8600 and DSE8700
series controllers. DSE 7500 and DSE 5500 include this function in versions 8 or above.
When using other controllers, this functionality should be provided externally.
Additional equipment of this type is normally specified by the local electricity Supply
Company to protect against the generator feeding the mains grid in the case of a mains
failure. If in doubt, you should refer to your local Electricity Supply Company for advice.

12
Synchronising and Load Sharing Solutions

5 SYNCHRONISING AND LOAD SHARING SOLUTIONS


As the DSE synchronising and load sharing controllers can be used in many varying
configurations, this chapter explains how the controllers are utilised and what controller options
must be fitted. Where droop governors or AVRs are required, this is also mentioned.
A more detailed description on synchronising and load sharing follows this section.

5.1 SINGLE SETS

5.1.1 SINGLE SET NO BREAK RETURN WITH MAINS

A single set primarily used to provide backup to the mains supply should it fail. When the mains
supply returns, the generator is synchronised to the mains supply and momentarily closed in
parallel with it before opening the generator load switching device.

8620
Controller : 7520
5520

• Generator Mode (Fixed export or Base load)


Load Share
• Mains Mode (Import / Export control or peak
options :
lopping)

NOTE: - It is recommended that the mains decoupling is enabled in the DSE module
when paralleling a generating set with the mains.
Additional equipment of this type is normally specified by the local electricity Supply
Company to protect against the generator feeding the mains grid in the case of a mains
failure. If in doubt, you should refer to your local Electricity Supply Company for advice.

5.1.2 SINGLE SET FIXED EXPORT

A single set used solely to parallel with the mains. No control of the mains breaker is provided.
If the mains breaker opens, the decision must be made if the set can be used to power the load (if
the set is large enough. Upon mains return, the set breaker must be opened before the mains
breaker can be closed.

8610
8710
Controller :
7510
5510

Load Share • Fixed export through Mains parallel mode


options : operation of the DSE ’10 controller.

NOTE: - It is recommended that the mains decoupling is enabled in the DSE module
when paralleling a generating set with the mains.
Additional equipment of this type is normally specified by the local electricity Supply
Company to protect against the generator feeding the mains grid in the case of a mains
failure. If in doubt, you should refer to your local Electricity Supply Company for advice.

13
Synchronising and Load Sharing Solutions

5.2 MULTIPLE SETS

5.2.1 MULTIPLE SET PRIME POWER

Two or more sets are used to provide power to the load, sharing power equally as a percentage of
the sets full load rating. Sets are automatically started and stopped depending upon load levels
allowing economic use of the available generators.

8610 (max 32 set system)


8710 (max 32 set system)
Controller :
7510 (max 16 set system)
5510 (max 16 set system)
• Full control of the kW/KVAr load share is
possible, the sets equally sharing the kW
load between them pro rata (i.e. same
percentage of their rating).

NOTE: - DSE8610 and DSE8710 are


compatible in the same system.
Load Share
options : DSE5510 and DSE7510 are compatible in the
same system.

HOWEVER – DSE8610 and DSE8710 cannot


be used in the same system as DSE5510 or
DSE7510. A DSE125 MSC is used to interface
these two devices together. Contact DSE for
further advice.

14
Synchronising and Load Sharing Solutions

5.2.2 MULTIPLE SET STANDBY TO MAINS SUPPLY (BREAK RETURN)

Two or more sets are used to provide backup to the mains supply. When the mains supply fails,
the sets are started, synchronised and paralleled together. The generators bus is then closed to
feed the load, the sets sharing power equally as a percentage of their full load rating. Sets are
automatically started and stopped depending upon load levels allowing economic use of the
available generators. When the mains supply returns, there will be a break in supply to the load
while the transfer takes place.

8610 (max 32 set system)


8710 (max 32 set system)

Controller : 7510 (max 16 set system)


5510 (max 16 set system)

DSE333 ATS controller


• DSE333 handles BREAK change between
mains / generator bus. NO PARALLEL
operation with mains is possible.
• Full control of the kW/KVAr load share is
possible, the sets equally sharing the kW
load between them pro rata (i.e. same
percentage of their rating).

NOTE: - DSE8610 and DSE8710 are


Load Share compatible in the same system.
options :
DSE5510 and DSE7510 are compatible in the
same system.

HOWEVER – DSE8610 and DSE8710 cannot


be used in the same system as DSE5510 or
DSE7510. A DSE125 MSC is used to interface
these two devices together. Contact DSE for
further advice.

15
Synchronising and Load Sharing Solutions

5.2.3 MULTIPLE SET STANDBY TO MAINS SUPPLY (NO BREAK RETURN)

Two or more sets are used to provide backup to the mains supply. When the mains supply fails,
the sets are started, synchronised and paralleled together. The generators bus is then closed to
feed the load, the sets sharing power equally as a percentage of their full load rating. Sets are
automatically started and stopped depending upon load levels allowing economic use of the
available generators. When the mains supply returns, there will be NO break in supply to the load
while a ramped transfer takes place.

A DSExx60 controller is connected to the load share controllers via the Multi Set Communications
link and monitors the mains supply, signalling all available sets to start should the supply fail.
Additionally the controller will start the sets if the mains load reaches a configurable level to provide
peak lopping and import/export control.
All available sets will start and after the minimum number of sets have successfully paralleled with
each other, the controller will transfer the load to the generator bus.
The generators will then share the load using their load sharing communications link, sets being
stopped / started depending upon load demands (if enabled)
Upon mains restoration, the controller will synchronise the generator bus to the mains and ramp
the load back to the mains. The sets are then instructed to cool down and stop.

DSE8610 (max 32 set system)


DSE8710 (max 32 set system)
DSE8660 or DSE8760 mains controller
Controller :
7510 (max 16 set system)
5510 (max 16 set system)
DSE7560 or DSE5560 mains controller
• DSExx60 handles mains monitoring and soft
transfer between mains / generator bus.
• Full control of the kW/KVAr load share is
possible, the sets equally sharing the kW
load between them pro rata (i.e. same
percentage of their rating).
• Generator Mode (Fixed export or Base load)
• Mains Mode (Import / Export control or peak
lopping)

Load Share NOTE: - DSE86xx and DSE87xx are


options : compatible in the same system.

DSE55xx and DSE75xx are compatible in the


same system.

HOWEVER – DSE86xx and DSE87xx cannot


be used in the same system as DSE55xx or
DSE75xx. A DSE125 MSC is used to interface
these two devices together. Contact DSE for
further advice.

16
Synchronising and Load Sharing Solutions

5.2.4 MULTIPLE MAINS SUPPLIES

5.2.5 SINGLE SET STANDBY TO MULTIPLE MAINS SUPPLY (NO BREAK RETURN)

Set(s) are used to provide backup to multiple mains supplies. Should one of the mains supplies
fails, the set is started, and the appropriate load is transferred to the generator set. Should further
mains supplies fail, the appropriate loads will also be transferred to the generator.
Should one of the mains supplies return, there will be NO break in supply to the load while a
ramped transfer takes place. This will be repeated for each returning mains supply until the
generator set is transferred off load and finally stopped.
The order of the mains restoration depends upon module priority and operating state. This priority
is covered in the DSExx60 operator manual.

DSE8610 (max 32 set system)


DSE8710 (max 32 set system)
DSE8660 or DSE8760 mains controller
Controller :
7510 (max 16 set system)
5510 (max 16 set system)
DSE7560 or DSE5560 mains controller

17
Load Sharing

6 LOAD SHARING
6.1 ACTIVE POWER SHARING

We have discussed the synchronising of one or more supplies to the mains or bus supply. Once
these supplies are closed in parallel with each other, the power will be shared between the
supplies depending upon the generating set characteristics.

Control over the set’s active power is achieved by controlling the amount of fuel into the engine.
Instructing the governor to increase fuel to the engine will also have little or no effect on engine
speed because the generator is “tied” to the other supply. Instead, the generator will supply more
power to the load. This in turn decreases the amount of power provided by the other supplies. This
is known as Kilowatt (kW) control.

This can be taken a step further, by paralleling multiple generating sets, all operating isochronously
(zero droop). Utilising an active load-sharing controller such as the DSE8610, precise changes can
be made to the amount of power supplied to the load by each generating set. This is achieved by
altering the amount of fuel supplied to the engine, and monitoring the amount of power supplied by
the set.
Each controller can communicate with the others, passing information regarding load levels. This
can also be used to bring in or drop off other generating sets as load demands change.

6.2 REACTIVE POWER SHARING

Again, consider two identical generating sets closed together in parallel.


Adjusting the amount of field excitation in one of the generators has the effect of that generator
supplying more or less of the reactive power to the load, matched by an equal drop in the reactive
power supplied by the other generator.
Reactive power is the power used to supply inductive or capacitive load.

Uses of reactive power control include:

1) Where multiple generators are used in parallel with each other, the reactive power is equalised
between the sets, removing circulating currents caused by imbalance in the reactive power
(VAr) supplied by the paralleled generating sets. This circulating current can generate heat in
the alternator windings. If left unchecked, excess circulating current can also damage the
alternator windings.
2) Power factor control or VAr control. This feature maintains a specific power factor where one
generating set is used in parallel with the mains supply. This is normally used so that the
generator maintains its VAr to keep its output at the site load’s average power factor level, to
minimise demands on the mains supply.

18
The need for synchronising

7 THE NEED FOR SYNCHRONISING


Before two or more A.C. supplies can be ‘closed’ together in parallel, the frequency, voltage and
phase of the supplies must be matched as closely together as possible. Collectively, frequency and
voltage matching are known as synchronisation, although voltage matching may not be required in
all applications.
Additionally, the phase rotation of the supplies must be the same, i.e. L1, L2, L3 (Anticlockwise
rotation) or L3, L2, L1 (Clockwise rotation). The DSE synchronising and load sharing modules will
check the phase rotation. If this is wrong, the controller can not act, apart from notifying the
operator with an alarm condition. The fault must be corrected before synchronising of the supplies
can be attempted.
Synchronisation is achieved firstly by adjusting the
engine speed and generator voltage to get the
frequency and voltage of the generator closely
matched to that of the bus / mains supply.
Then the phase angle of the supplies is monitored
until it is within an acceptable ‘window’ before the
supplies can be closed together in parallel.
In the example to the left, the two supplies (shown
by the two sine waves) have very similar frequencies
(seen as the distance between the “peaks” of the
waves). However, they have very different voltages
(overall heights of the waves) and the supplies are
not in phase (the two supply waves are not “on top”
of each other).
Typically, a frequency difference (called slip frequency) of 0.1Hz, a voltage difference of 5% and a
phase angle of 5° will allow for satisfactory paralleling of the supplies.
Once the supplies are closed in parallel, the phase of the supplies will not alter, they are ‘locked’ in
parallel together.

WARNING! Attempting to close the supplies in parallel when they are not in
synchronism can result in damage to the generating set system.
For example: If synchronising (using two gensets) is effected 120°° out of phase, the
coupling torque can be as high as 12 times full load torque, depending on the ratio of
engine and generator inertias (Source: Diesel Generator Handbook L.L.J. Mahon).

The actual synchronising process can be achieved through various methods. Put simply, each
method involves manipulating the engine governor to increase/decrease engine speed (which has
a direct relationship with generator frequency) and the Automatic Voltage Regulator (which
controls the alternator excitation field to produce voltage).
The engine governor determines engine speed, by sensing the speed of rotation of the flywheel
(normally using a magnetic pickup probe). The governor can then control the actuator to adjust the
amount of fuel into the engine, which changes engine speed (similar to the accelerator in a car).
Most governors are also fitted with a ‘remote speed adjust’ input to allow an external device to
increase or decrease the set speed of the engine.
The Automatic Voltage Regulator effects change in the generator output voltage by controlling the
alternator’s exciter field. The AVR adjusts the voltage output to the required set voltage. Most
AVRs are also fitted with a ‘remote volts adjust’ input to allow an external device to increase or
decrease the set voltage of the alternator.
Automatic synchronisers act upon the ‘remote speed adjust’ and ‘remote volts adjust’ inputs of the
governor and AVR to affect synchronism and voltage matching.
The method of interface between the automatic synchroniser and the governor/AVR depends upon
the type of governor and AVR being used, and are described in the section entitled “Methods of
Adjusting Voltage and Frequency”.

19
Methods of adjusting voltage and frequency

8 METHODS OF ADJUSTING VOLTAGE & FREQUENCY


8.1 REMOTE SPEED / VOLTAGE POTENTIOMETERS
The most common way to remotely adjust engine speed/generator voltage is by speed/voltage
potentiometers. These are fitted to the control panel to allow the operator to adjust the supply to
the parameters required and connect directly to most AVRs/Governors, which are fitted with
terminals designed for the purpose.
A simple way to replace this manual operation with an automatic one is by utilising a motor driven
potentiometer, which is adjusted automatically by the synchronising controller.
Two popular methods of interfacing with potentiometers have been adopted by AVR/Governor
manufacturers and are commonly shown on their ‘connection diagrams’ as shown in the following
examples:
Illustration Description
Variable resistance This diagram shows a two terminal connection to the
governor/AVR. The value of the variable resistor
(rheostat) depends upon the requirements of the
governor/AVR being used.
This type of interface is suitable for connection direct
to the analogue governor output of the DSE8610 or
DSE8710 controllers.
Potentiometer This diagram shows a three terminal arrangement, for
connection to a potentiometer. The value of the
potentiometer depends upon the requirements of the
governor/AVR being used.
This type of interface is usually suitable for connection
direct to the analogue governor output of the
DSE8610 or DSE8710 controllers.

8.2 DC VOLTAGE INPUT


Another analogue interface often used by governor manufacturers utilises a DC voltage, the level
of which is proportional to the engine speed required. An example of this is the G.A.C.ESD5500E
that accepts a DC signal from 2V to 8V to represent adjustment away from the set speed point.
When the DC level is at 5V, the engine speed is the governors’ set speed.
This type of interface is suitable for connection direct to the analogue governor output of the
DSE8610 or DSE8710 controllers.

8.3 RAISE / LOWER PUSH BUTTONS


Push buttons to raise/lower the engine speed / alternator output voltage can also be used. The
push buttons are fitted to the control panel and allow step changes in voltage / frequency with a
single press of the button.

Illustration Description
RAISE / LOWER PUSH BUTTONS This diagram shows switched inputs to the
governor/AVR to raise/lower speed/voltage.

This type of interface is suitable for direct connection


to outputs configured to raise/lower DSE8610 or
DSE8710 controllers, though it is usual to fit
interposing slave relays between the controller and
the governor/AVR to provide isolation between the
devices.

NOTE:- Governor and AVR connections are covered in detail (including typical
connection for commonly used governors and AVRs) in the DSE Guide to Synchronising
and Load Sharing Part 2.

20
Methods of adjusting voltage and frequency

8.4 CAN / ELECTRONIC ENGINE SPEED CONTROL

Some electronic engine ECUs support speed control via the CAN data interface negating the
requirement to connect additional speed control signals to the speed controller.
This feature is supported by the DSE8700, DSE8600, DSE7500 and DSE5500 series controllers.

NOTE:- Connections to electronic engine ECUs are detailed in the DSE publication
Electronic Engines and DSE wiring and the Guide to Synchronising and Load Sharing Part
2.

21
Requirements for synchronising

9 REQUIREMENTS FOR SYNCHRONISING


9.1 GOVERNOR WITH REMOTE SPEED CONTROL CAPABILITY

This can be an electronic governor with either analogue (preferred) or digital (raise/lower inputs) to
control engine speed. Alternatively it could be an electronic engine ECU (CANbus for instance) that
supports speed control over the engine data link (CAN) or via analogue / digital control signals.
You should check with the engine supplier about these possibilities.

If you use digital raise/lower inputs you must have droop configured in the governor. If you use
analogue or CAN for speed control, it is usual to disable governor droop.

9.2 AVR WITH REMOTE VOLTAGE ADJUST CAPABILITY

This can be an Automatic Voltage Regulator with either analogue (preferred) or digital (raise/lower
inputs) to control generator output. You should check with the alternator supplier about these
possibilities.

The alternator manufacturer will usually demand that a Droop Kit is fitted to the alternator to
maintain warranty if you are paralleling with another set. While this is recommended, it is not
always necessary. Again, you should consult with the alternator manufacturer if in any doubt.

If an AVR with remote voltage adjust capability does not exist, you may still be able to load share.
You will need to fit a Droop Kit to the AVR. In this instance, no voltage matching will take place and
rudimentary VAr (reactive power) sharing will take place using the droop kit. The DSE module will
not control the AVR.

22
Function comparison chart

9.3 FUNCTION COMPARISON CHART

(Current production DSE modules)


8660 mains 8760 mains 7560 mains 5560 mains
8610 load share 8620 load control 8710 load share 7510 load share 7520 load control 5510 load share 5520 load control
controller controller controller controller
Power measurement
          
instrumentation
Auto synchronising           
Isochronous load
          
sharing / control
MultiSet
          
communications
Starts sets on rising
          
mains load
Automatic first set on
 N/A     N/A   N/A 
the bus determination
Calls for more or less
sets on changing load  N/A     N/A   N/A 
demands
Mains power
N/A   N/A  N/A   N/A  
monitoring
Adjustable priority  N/A     N/A   N/A 
Automatically balances
run hours (multiset  N/A     N/A   N/A 
system)
RS232 option
          
available?
RS485 option
          
available?
Configurable LEDs?           
Interface to Inbuilt analogue Inbuilt analogue Inbuilt analogue Inbuilt analogue Inbuilt analogue Inbuilt analogue Inbuilt analogue
N/A N/A N/A N/A
governor/AVR output output output output output output output
Inbuilt fascia
Inbuilt fascia Inbuilt fascia Inbuilt fascia Inbuilt fascia buttons, also Inbuilt fascia Inbuilt fascia Inbuilt fascia Inbuilt fascia Inbuilt fascia Inbuilt fascia
buttons, also buttons, also buttons, also buttons, also available buttons, also buttons, also buttons, also buttons, also buttons, also buttons, also
Load switch push
available using available using available using available using using digital available using available using available using available using available using available using
buttons? digital inputs and digital inputs and digital inputs and digital inputs and inputs and digital inputs and digital inputs and digital inputs and digital inputs and digital inputs and digital inputs and
external buttons external buttons external buttons external buttons external external buttons external buttons external buttons external buttons external buttons external buttons
buttons
DSE DSE DSE DSE DSE
PC configuration
Configuration Configuration Configuration Configuration Configuration 5xxx for Windows 5xxx for Windows 5xxx for Windows 5xxx for Windows 5xxx for Windows 5xxx for Windows
software Suite Suite Suite Suite Suite
DSE DSE DSE DSE DSE
Remote Comms Configuration Configuration Configuration Configuration Configuration
Link5000Plus Link5000Plus Link5000Plus Link5000Plus Link5000Plus Link5000Plus
software Suite or DSE Suite or DSE Suite or DSE Suite or DSE Suite or DSE
SCADA Suite SCADA Suite SCADA Suite SCADA Suite SCADA Suite
Inbuilt PLC           

23
Sync / load share protection comparison chart

9.4 SYNC / LOAD SHARE PROTECTION COMPARISON CHART

(Current production DSE modules)


8610 8620 8660 8710 8760 7510 7520 7560 5510 5520 5560
load load mains load load load load mains load load mains
share control controller share share share control controller share control controller
Phase
rotation           
protection
Dead bus           
relay
Frequency
          
check
Voltage
          
check
Phase           
angle check
Fail to
synchronise           
alarm
Generator
reverse           
power
Mains
reverse           
power
Loss of
excitation           
protection
Earth fault           
protection
Negative
phase           
sequence
protection
Vector shift           
R.O.C.O.F.           

NOTE:- With DSE5500 series controllers, Mains decoupling, Vector shift and R.O.C.O.F.
is fitted internally to versions 8.0 and above only.

NOTE:- Model 5560 must be used in conjunction with one or more 5510 controllers. It is
not a stand alone module.

24
Load switching devices

10 LOAD SWITCHING DEVICES


The paralleling of two or more supplies requires that the switching of the supplies be performed as
close to zero phase as possible. The check sync feature of the DSE synchronising and load
sharing controller can accurately measure the phase, and when within the ‘check sync’ window can
issue the load switching closure signal within a few milliseconds. However, there will be a delay in
the actual operation and physical movement of the switching device that must be minimised and
taken into account when designing and commissioning any paralleling system.
10.1 CHOOSING A LOAD SWITCHING DEVICE
It is typically considered that load switching for parallel supplies be performed within 5 supply
cycles of the close signal being given to ensure the phase or the supplies has not changed too
greatly after the closing signal has been given.
Cycle time Max load switch
closing time
50Hz system 20.0 ms 100 ms
60Hz system 16.7 ms 83 ms

NOTE: - The closing time of any load switching device slave relays should also be
taken into account. For instance, plug in relays typically used in generating set control
panels have an operation time of 10ms-20ms.

NOTE: - If fitting a mains (utility) ‘Breaker’ with a trip position, it is recommended to fit
one equipped with auxiliary contacts to indicate the “tripped” position. This can be fed into
an input configured to “auxiliary mains failure” so that the module is ‘informed’ of mains
(utility) supply breaker tripping should this occur. This is particularly important when the
module is operating in parallel with the mains (utility) supply.

WARNING!: Manually operated breakers CANNOT be used as they cannot be operated


within the required closing time.

10.1.1 CONTACTORS

Contactors normally operate fast enough for paralleling applications but care should be taken to
choose a contactor that the manufacturer specifies be fast enough for use in paralleling
applications. (See above).

10.1.2 CHARGED SPRING BREAKERS

In general, charged spring breakers will operate much faster than contactors.
Charged spring breakers ‘pre charge’ a large spring device within the breaker, so that when
breaker operation is required, the spring is ‘released’ which operates the closing action of the
device.
Typically, the spring is charged when the undervolts input is energised, normally when the set is
first started. Once charged, the breaker is ready for the closing signal.

10.1.3 AIR CIRCUIT BREAKERS (ACBS)

A.C.B.’s normally operate fast enough for paralleling applications but care should be taken to
choose an A.C.B. that the manufacturer specifies be fast enough for use in paralleling applications.
(See above).

25
Load switching devices

10.1.4 MOTOR OPERATED BREAKERS

Some types of motor operated breakers are not suitable for paralleling operations due to the
excessive amount of time that the breaker takes to motor into position before the closing process
can be completed. Care should be taken to choose a motor operated breaker that the
manufacturer specifies be fast enough for use in paralleling applications. (See above).

10.1.5 MANUALLY OPERATED BREAKERS

As these cannot be closed within the required time, manually operated breakers cannot be used.

10.2 NEUTRAL EARTHING

Where the generator star point (Neutral conductor) is connected to earth, care must be taken to
avoid earth loops. This is of particular importance when paralleling a generator with other sets or
with the mains
supply.
LOAD
GENERATOR MAINS

This diagram shows a typical situation where the generator neutral conductor is earthed.
The mains neutral conductor is earthed by the supply company. If the generator is placed in
parallel with the mains supply, the neutral will be earthed at two points, creating an earth loop,
which in turn generates current flow in the loop. To prevent this situation, the generator neutral
earth link can be broken when the supplies are in parallel using a neutral earthing contactor in the
neutral to earth link.

Similarly, when two or more sets are in parallel with each other, it is important to ensure that only
one neutral to earth link exist in the system at any one time.

Control over the neutral earthing is not made by the DSE controller. Provision for this function must
be made by external switching, often utilising auxiliary contacts of the load switching devices.

26
Multiset communications (MSC) Link

11 MULTI SET COMMUNICATIONS (MSC) LINK

The Multi Set Communications (MSC) link in use with DSE synchronising and load sharing
modules performs many functions including load sharing and protection.

11.1 SYNCHRONISING
o First Set on the Bus determination (Virtual Key)
o Security against bus sensing failure (Broken fuse)

11.2 LOAD SHARING


o Active (kW)
o Reactive (kVAr)

11.3 START/STOP ON LOAD DEMAND


o Starting sequence
o Run Priority
o Balance engine hours
o Control by DSE8660 / DSE7560 / DSE5560

11.4 COMPATIBILITY
o The load demand scheme uses the DSE controller’s MSC link.
o DSE7500 series are compatible with DSE5500 and DSE550 series
controllers. For instance a DSE7510 controller can be used in a load demand scheme
with a DSE5510 controller.
o DSE8600 series controllers are NOT compatible with DSE7510, DSE5510 or DSE550 series
controllers without the use of DSE125 MSC interface. Contact DSE for further advice.
o Priority based upon engine hours is available on all DSE8610 and DSE7510 controllers. It is
not available on DSE5510 controllers prior to Version 6 and is not available on DSE550
controllers.

For details of Run priority and balance engine hours, see DSE Part Number 056-013 Load Demand Scheme

27
Multiset communications (MSC) Link

11.5 CONNECTIONS
o A maxmium of 32 generator controllers (DSE8610) can be connected to the MSC link.
o A maxmium of 32 mains controllers (DSE8660) can be connected to the MSC link.
o A combined maximum of 40 DSE8600 series controllers can be connected to the MSC link.
o A maxmium of 16 generator controllers (DSE7510 / DSE5510) can be connected to the MSC
link.
o A maxmium of 16 mains controllers (DSE7560 / DSE5560) can be connected to the MSC link.
o A combined maximum of 20 DSE7500 / DSE5500 series controllers can be connected to the
MSC link.
o DSE8620, DSE7520 and DSE5520 DO NOT connect to the MSC link and cannot be used in
multiset systems or systems including DSE8660, DSE7560 or DSE5560
o MSC is a high speed data transmission line. As such it must be wired in cable rated for such
operation. DSE Stock and Supply Belden 9841 cable which is suitable for MSC link operation
(DSE part number 016-030)
o Ensure spurs off the MSC link are not used. The connections MUST be in ‘daisy chain’ fashion,
with the cable entering, and leaving the ‘middle’ controllers as shown below.
o Ensure termination resistors are fitted to the beginning and end of the MSC data link as shown
below. A termination resistor is supplied in the box with every DSE controller that has an MSC
link connection.
o The maximum combined length of the MSC link must not exceed 240m (320yds). If further
range is required, use DSE124 MSC Link Extender.

28
Multiset communications (MSC) Link

11.6 SPECIFICATIONS

Parameter Value
Connection type Twin conductors with screen. Ensure screen
is connected to SCR terminal of every
controller on the bus.
Cable impedance 120Ω
Maximum cable resistance 0.050Ω/m
Maximum cable capacitance (between conductors) 75pF/m
Maximum cable capacitance (conductor to shield) 110pF/m
Termination resistors (one at each end of cable run) 120Ω 4W (supplied loose with controller)
Max number of 8610/8710 controllers per bus 32(only 3 shown above for clarity)
Max number of 8660/8760 controllers per bus 32
Max number of 86xx + 87xx controllers per bus 40
Max number of 7510/5510 controllers per bus 16 (only 3 shown above for clarity)
Max number of 7560/5560 controllers per bus 16
Max number of 55xx + 75xx controllers per bus 20
Max number of 550 controllers per bus 16
Max number of 556 controllers per bus 1
Max cable length 250m
Max Spur length (see note 2 below) 1m
Recommended cable * BELDEN 9841 120Ω cable.

NOTE :- * Deep Sea Electronics part number of BELDEN 9841 cable: 016-030

WARNING! 120Ω Ω impedance cable must be used for the MultiSet Communications Link.
Use of any other impedance cable may cause intermittent failures in communications,
indicated by MSC alarms although the system may function normally during engine / panel
testing.

Ω terminator must be enabled on the first and last devices on the


NOTE 1: - The 120Ω
communications bus. See section header MSC Settings for further details.

NOTE 2: - It is important that the MultiSet Communications Link cable is run from one
module to the next in a ‘bus’ fashion. ‘Spurs’ off this bus should be avoided where possible,
but where a spur is unavoidable; its length should be kept less than 1m from the bus cable.

29
Multiset communications (MSC) Link

11.7 MSC ALARMS

Several alarms are provided to warn the operator of possible problems with the communication link
between the gensets.

11.7.1 MSC ID ALARM


Each genset must have a unique MSC ID so that they can properly communicate. Should two or
more sets have the same ID then one or more of the affected sets will declare “MSC ID ERROR”
this will cause an electrical trip on the affected set. The correct ID must be set using the PC
configuration software.

NOTE: - To avoid possible problems with spare modules it is suggested that units are
commissioned in the system starting with ID 1 and then 2,3… etc. Any modules used as
spares should be configured as number 16,15… etc. These can then be added to the system
without causing any conflicts with existing modules. Alternatively, use the PC
configuration software to reconfigure the module to suit.

NOTE:- DSE8710, DSE8610 and DSE7510 controllers “auto negotiate” their MSC ID
alarms to ensure that conflicts will never occur.
5510 controllers version 5 and later also include this feature.

11.7.2 MSC DATA ERROR


When the sets are communicating on the MultiSet Communications link, should the data be
corrupted the affected modules will display ‘MSC DATA ERROR’. This will cause an electrical trip
on the affected set.

CAUTION! - Care should be taken to ensure that correct wiring is used between the
modules, the MSC terminator is correctly enabled on only end units on the link and that
maximum cable run distances are not exceeded. Should data error alarms be apparent,
operation of the MultiSet system may not be possible.

11.7.3 MSC FAILURE


If the number of modules communicating on the Multset communications link should fall, then an
MSC failure alarm will occur. This can be configured to a ‘warning’ or ‘electrical trip’ type alarm.
Should the number of modules on the communications link fall below the “Minimum modules on
Multiset comms link” configurable setting, an additional alarm is triggered. This alarm can be
disabled, or configured to generate a warning or electrical trip alarm.

If the number of modules communicating on the Multset communications link should rise, then any
existing ‘MSC failure’ warning alarm is cleared, and all communicating modules are automatically
reconfigured to ‘expect’ the increased number of sets on the bus.

Additionally, one of the module’s digital inputs can be configured so that the MSC failure alarm is
disabled when the input is active. The module can be configured to alert / remind the user of this
via an indication or warning alarm if required via the “Multiset comms alarm disabled action”
setting.

NOTE:- For details on the MSC failure alarm settings, you are referred to the
appropriate PC configuration manual.

11.7.4 MSC TOO FEW SETS


This alarm activates if the number of sets on the MSC link is less than minimum number configured
in the module.

30
Load share lines

12 LOAD SHARE LINES


While the MSC link provides functions far in excess of what is possible using conventional load
share line technology, occasions arise when it may be necessary to interface to an existing
installation.

The DSE P123 module provides a method of connecting the DSE7510 and DSE5510 modules into
the load share line based system.

This mimics an additional set on the load share line system and will operate in both kW share and
Kvar share modes (if supported by the installation).

The P123 is compatible with a range of different load share lines commonly found in the field;
selection is via switches on the P123.

DSE123 is NOT compatible with DSE86xx or DSE87xx controllers.

12.1 TYPICAL P123 INSTALLATION

31
Typical connections

13 TYPICAL CONNECTIONS
13.1.1 TYPICAL SINGLE LINE DIAGRAM OF MULTI SET MAINS FAIL

32
Typical connections

13.1.2 SINGLE LINE DIAGRAM OF MULTI MAINS SYSTEM

33