IMS IA Training - Part-5
IMS IA Training - Part-5
IMS IA Training - Part-5
Clause – 01 Scope
Standards Scope – Application
Clause - 4.3 Scope
2 Type Scope
4.3 -
Scope – Generation of Electricity and
OMS Activity for PAN India.
2 Type of Standards
9001 – QMS
Requirement Standards – Certification
Standards
Reference / Normative Reference SDT
9000 – Fundamental & Vocabulary
Guideline STD - Certificate??
Non Conformity – Non fulfilment of
Requirements
Inox Site – Fire @ Windmill -001
Preventive Action
Prevent to occurrence of non-
conformity
Before @ PM for the Limit Switch
Condition @ Suzlon @ Windmill-
002.
Risk: Effect of Uncertainty
Extreme Heat : Dehydration/ Unconscious
Risk & Opportunity for ISO 9001, ISO 14001
and ISO 45001
Parent Company
Management
Cross Function
Operation & Maintenance
Purchase
HR&A
Project
External – IP
Local Community
Gov. Authority
Electricity Board
Gram Panchayat
Nagar Nigam
Factory Inspector – DISH
Supplier
O&M Providers
Customers
Grid
4.3 -
Scope – Generation of Electricity and
OMS Activity for PAN India.
Boundary = HO & All Site Address.
Document: IMS Manual CL. Ref. no. 4.3
Any Procedure????? – Ref.
Regulations – PPA –
Policy????
Operation & Maintenance Documents?????
Audit Area – Management/ MR Only.
4.4
Process Mapping/ SIPOC – Dept. Manual
S – Supplier (Internal/ External)
I – Input (4M)
P – Process (Activity)
O – Output (Product - Electricity)
C – Customer (Grid)
5.1 Leadership -
Process/ Department Audit???
HSE
FH – All Process
Authority:
Outcome Conclude – Compliance / non-compliance.
5.4 – Participation & Consultation of Workers – ISO 45001
Worker
“Non-Managerial Workers” – Below Supervisors i.e.
Operator/ Technician, Housekeeper
Participation – Involvement “Non-Managerial Workers”
Consultation – Seeking View “Non-Managerial Workers”
Participation
Hazard Identification
How/ Method: Daily Talk | HSE Committee Meeting ???|
Hazard reporting register – Siet HSE
Mitigation: Settlement
Issue: Lighting
Risk/ Effect: Damage of Solar Module
Risk Classification
Acceptable / Not Acceptable
Quantitative Method
S x P x F = Risk Score 125 – Cutt off score: >65 - Not
Acceptable Risk
Qualitative Method
E/ LC/ DC/ CE – Not Acceptable Risk
Action to Control the Risk
Management Program/ Procedure
Other Requirements
OEM Req.
Management
Customer Requirements
Product – Energy
Initial Stage - Solar Ray/ Wind Speed
Generation
O&M
Waste Generation due to damage of module – 25 years
Switch Yard – Step-up
Transmission Line – Charge
Transmission Loss
Distribution
Distribution Loss
Step down
Usage
Control - Define
Vendor Evaluation/ Vendor Authorization
Competency of Personnel
Scope of Work
Rate Contract
Work Procedure
Risk Assessment
Performance Rating
Based on previous Year Data
Evidence
Test Report/ Certificate
OEM/ NABL/ Authorized Party
8.2 – 45001 + 14001
Emergency Situations
Fire - EHS
Flood/ Earthquake/ Land Slide - EHS
Lighting – EHS
Heavy/ Major Leak/ Spill - EHS
Medical Emergency
Fall form Hight - OHS
Electric Shock - OHS
Fire Burn - OHS
Road Accident - OHS
Reptile Bit - OHS
Response Plan
Prevention Action
Mitigation Action/ Response Activity
Checking – Violation
Self – NC - Close
Cross IA – NC Closer
Management Level - MRM : Action Plan (MRM - Give
Cause)
Process for Purchase
Indent from User
RFQ Is Approved Supplier
RFQ Floating Evaluation (Techno-Com +
Legal) & Selection
Offer Received
Offer Comparison
PR
PO (PO Follow up - OTD)
Receipt - Invoice - GRN Supplier Performance Rating
PC (Quality + Delivery + Qty. )
Frequency – Six Monthly
Communication – Positive of
Negative – Demand Improve
Plan
Improvement – Evidence
Mock Drill Findings Improvements
IMS Objective Target Sheet
Action Plans
Idea/ Suggestion/ Kaizen
MRM – Improvements
DPR/ MPR – Performance Improvement
Auditors Qualification
12+2/ 3/ 4 = Education Minimum
Experience
4-5 Year work experience
Min 1 Audit Experience
Trainee Auditors
External Auditors – 20 Nos. Audit/ Days as Observations.
Audit Criteria
IMS Requirements – i.e. IMS Policy
Customer Requirements – i.e. Agreement – Jointly Calibration
of Energy Meter – Witness
Legal & Other Requirement – i.e. Hazardous Waste disposal
withing time frame. (Used/ Spent Oil - >10 ton 6 month) - <5
365 Days.
Org. Own Req. – i.e. Drug Test, Monthly Review Meeting.
Audit Checklist
5.2 IMS Policy
Mgt Process
Is IMS Policy established?
Is IMS Policy as per ISO 9001, 14001 & 45001
requirements.
Is IMS communicated in the organization, and how?
O&M
Is IMS policy available, latest copy??
How to communicated within dept.?
Person is understood the IMS policy?
Major NC
Legal Violation
Complete STD requirements missing i.e. Objective &
Targets – 6.2 missing
Repeated Minor NC
Minor
Isolate case STD requiremenrs missing
Repeated Observation
Observation
Potential NC
OFI
Scope of Improvement Near-miss identification by
manual/ physical form however QR Code – Digitally
Collect Near-miss records.
NC -01
In Maintenance of Transformer, activity of carried out Oil
Replacement - 200 Liter Transformer Oil Drum, same time
drum Fall due to slippery surface and more than 25 liters oil
spill on land, however incident report is not evident.
ISO 45001 9001 14001 14001/
No. 45001
CL. 8.1/ 7.1.5 8.1/6.1.2 9.1.1/
No 10.2 10.2
NC/ NC
C
CASE NO. 02
When auditing the production department on HIRA register, it was found that hazard and risk
register did not include the recently installed new machine No. 10B (3 month ago) for
operations. Mr. Mahesh was working on the machine. When asked to the production manager
about not updating HIRA register, he explained that we revise HIRA register once in year
generally before the external surveillance audit.
NC/ C NC
CASE NO. 03
Purchasing Department personnel are not aware of the department objective of Maintenance
Department.
NC/ C NC NC C - OFI
CASE NO. 04
It is seen that some of the equipment's of the Company such as crane are not covered under
the maintenance plan. The trouble free operation of the crane is critical towards smooth and
safe handling of materials. Crane failures do occur sometimes. The plant personnel have been
complaining that rectification of the faults now a days takes much more time than it used to 2
years back. This is attributed to non-availability of spares, which are not adequately
maintained in stock. This delays maintenance activities leading to downtime of the crane.
NC/ C NC NC NC NC
CASE NO. 05
The organization has recruited a new technician to work in the electrical testing laboratory.
The work involves taking readings of current value and continuity during testing. The
previous technician who was doing the same work had resigned abruptly and left due to
certain reasons. The new technician has been performing the job for the last 8 months;
however, no formal evaluation has been made whether he is qualified for doing that work. No
records of any competence or training are available.
NC/ C NC
CASE NO. 06
During the process round audit of the boiler operation observed leakages, however, the
auditee explained leakages have identified and a tag was also displayed at the point of
leakages, a leakages notification has generated and a status report was also maintained as
evidence.
NC/ C C C
Dinesh Patel – 8155951262
External Audit
Training
Resume by
14:15