8103 M-42 6u2816013 Plate Type Coolers
8103 M-42 6u2816013 Plate Type Coolers
8103 M-42 6u2816013 Plate Type Coolers
□ APPROVAL
DOCUMENT FOR □ INSPECTION
■ FINAL
CLIENT : 현대삼호중공업㈜
SHEET 1 OF 60
디에이치피이엔지㈜
DHP Engineering Co., Ltd.
☞ HEAD FACTORY
#105, GIMHAE-DAERO 1022BEON-GIL, HALLIM-MYEON,
GIMHAE, GYEONGNAM, KOREA ZIP CODE : 50850
TEL : +82-55-338-4301~3
FAX : +82-55-338-4304
DOCUMENT LIST
SHEET NO. 1 OF 59
APPLICATION &
REPORT SHEET NO. 1 OF 3
DATA SHEET
SHEET NO. 1 OF 5
Date 2023-02-24
Client 현대삼호중공업㈜ Hull No. 8103
Project 13,200 TEU Class Container Carrier Model No. DX-30DLHVV - 1P - 369
Service No.1/2 Central F.W Cooler Quantity 2
[Process data] Hot Side Cold Side
Fluid F.W S.W
Flow rate (m³/h) 970 1220
Inlet temperature (°C) 56.7 32.0
Outlet temperature (°C) 36.0 49.1
Pressure drop (Allow./Calc) (kg/cm²) 0.8 / 0.73 1.2 / 1.2
Inlet Pressure (kg/cm².g) 4.0 3.0
Date 2023-02-24
Client 현대삼호중공업㈜ Hull No. 8103
Project 13,200 TEU Class Container Carrier Model No. DX-30DLH - 1P - 455
Service Main L.O Cooler Quantity 1
[Process data] Hot Side Cold Side
Fluid L.O F.W
Flow rate (m³/h) 474 279
Inlet temperature (°C) 60.4 36.0
Outlet temperature (°C) 45.0 46.6
Pressure drop (Allow./Calc) (kg/cm²) 0.9 / 0.8 0.8 / 0.1
Inlet Pressure (kg/cm².g) 6.9 4.0
Date 2023-02-24
Client 현대삼호중공업(주) Hull No. 8103
Project 13,200 TEU Class Container Carrier Model No. DX-17DLV - 1P - 9
Service Stern Tube L.O Cooler Quantity 1
[Process data] Hot Side Cold Side
Fluid L.O F.W
Flow rate (m³/h) 4 5
Inlet temperature (°C) 46.2 36.0
Outlet temperature (°C) 45.0 36.4
Pressure drop (Allow./Calc) (kg/cm²) 0.6 / 0.56 0.8 / 0.11
Inlet Pressure (kg/cm².g) 3.0 4.0
Date 2023-02-24
Client 현대삼호중공업㈜ Hull No. 8103
Project 13,200 TEU Class Container Carrier Model No. DX-20DSV - 1P - 57
Service M/E Jacket F.W Cooler Quantity 1
[Process data] Hot Side Cold Side
Fluid F.W (Jacket) F.W
Flow rate (m³/h) 293 279
Inlet temperature (°C) 90.0 46.6
Outlet temperature (°C) 74.6 62.8
Pressure drop (Allow./Calc) (kg/cm²) 0.8 / 0.76 0.8 / 0.69
Inlet Pressure (kg/cm².g) 5.0 4.0
ASSEMBLY DWG
SHEET NO. 1 OF 6
This procedure defines the process of test and inspection procedure of heat exchanger
1. MATERIAL INSPECTION.
1-1 Plate Material
a. After checking the mill sheet of maker, check the applicable code with material composition
b. Confirm the allowable clearance By measuring the cut size.
c. Confirm the surface condition and inspect for other defects.
4. DIMENSION INSPECTION
a.Dimension inspection procedure will be followed as per tolerances on the dwg.
b. The tolerance is below,
- THICKNESS TOLERANCE
∼ 200mm → + 0.8 mm
200mm ∼ → + 2.0 mm
- LENGTH TOLERANCE
∼ 2500 mm → ± 3 mm
2500 mm ∼ → ± 5 mm
5. PAINTING INSPECTION
Check the painting colour and painting thickness in accordance with painting procedure.
The thickness check method is by thickness gauge or suitable thickness measuring device.
6. FINAL INSPECTION
1) Confirm the packing condition to prevent contamination of jointing area, vent hole and gauge hole.
2) check the packing list and accessories for additional supply items.
3) Check the anti-resin condition of flange, bolts and nuts.
PT-DHP01, Rev.0
6 ▶ NDE (PT / RT) RT-DHP01, Rev.0
- - - -
8 ▶ RUST PREVENTION CHECK AND PAINTING IS-02 (Painting Procedure) , Rev.0 H - W PAINTING INSPECTION REPORT
SPARE PART
HULL NO. DESCRIPTION MODEL TYPE SKETCH REMARKS
PART MATERIAL Q'TY/SHIP
M36
TWO(2) YEARS
OPERATION SHEET NO. 1 OF 2
GASKET
Main L.O Cooler DX-30DL NBR 1 SET
31 SHEETS
8070/71/72/73/8
103/8104
GASKET
M/E Jacket F.W Cooler DX-20DS NBR 1 SET
3 SHEETS
GASKET
Stern Tube L.O Cooler DX-17DL NBR 1 SET
1 SHEETS
TOTAL
MILL SHEET
SHEET NO. 1 OF 12
ABS CERT.
SHEET NO. 1 OF 9
Report Details
ABS Stamping Maltese Cross
5387417 Yes
Report Findings
Statement/Observation
Finding No Asset Survey Task Date Created
1111.0 Nos.1 & 2 Central F.W. Coolers Certification - Nos.1 & 2 Central 26-Jul-2022
F.W. Coolers
Found
Hull No.: 8103 (HSHI)
NOTE: This Report evidences that the survey reported herein was carried out in compliance with one or more of the Rules, guides, standards or other criteria of the
American Bureau of Shipping and is issued solely for the use of the Bureau, its committees, its clients or other authorized entities. This Report is a representation
only that the vessel, structure, item of material equipment, machinery or any other item covered by this Report has been examined for compliance with, or has met
one or more of the Rules, guides, standards or other criteria of American Bureau of Shipping. The validity, applicability and interpretation of this Report is governed by
the Rules and standards of American Bureau of Shipping who shall remain the sole judge thereof. Nothing contained in this Report or in any notation made in
contemplation of this Report shall be deemed to relieve any designer, builder, owner, manufacturer, seller, supplier, repairer, operator or other entity of any warranty
express or implied.
1 of 2
logo
Work Order: 5387417-C
First Visit Date: 26-Jul-2022
Last Visit Date: 26-Jul-2022
Survey Kimhae, Korea
Location:
The two (2) sets of plate type heat exchanger were examined, hydrostatically tested (Report Nos. DQA-7PT-220726-01/02) and considered
satisfactory.
Description / Cooling Surface (m2) / Dwg. No. / Design Press. (bar) / Hydro-test Press. (bar) / Q'ty (set)
Nos. 1 & 2 Central F.W Coolers / 619 / DW21339-01-01-1/2 Rev. E / 5.0 (Hot Side), 5.0 (Cold Side) / 7.5 (Hot Side), 7.5 (Cold Side) / 2
Closing Paragraph:
The component/equipment was surveyed in accordance with the Rules, specifications, and approved drawings, as applicable, and is eligible
for installation on board an ABS classed vessel subject to satisfactory installation and testing, as necessary.
Attending Surveyor(s):
Chang, Kyoung-Suk
Signed-off Date: 27-Jul-2022
Reviewing Surveyor(s)
Work Order Reviewer: Lee, Sang-Weon
Work Order Credit Date: 08-Aug-2022
2 of 2
logo
Work Order: 5387417-B
First Visit Date: 26-Jul-2022
Last Visit Date: 26-Jul-2022
Survey Kimhae, Korea
Location:
Report Details
ABS Stamping Maltese Cross
5387417 Yes
Report Findings
Statement/Observation
Finding No Asset Survey Task Date Created
Found
Hull No.: 8103 (HSHI)
The one (1) set of plate type heat exchanger was examined, hydrostatically tested (Report No. DQA-7PT-220726-03) and considered
NOTE: This Report evidences that the survey reported herein was carried out in compliance with one or more of the Rules, guides, standards or other criteria of the
American Bureau of Shipping and is issued solely for the use of the Bureau, its committees, its clients or other authorized entities. This Report is a representation
only that the vessel, structure, item of material equipment, machinery or any other item covered by this Report has been examined for compliance with, or has met
one or more of the Rules, guides, standards or other criteria of American Bureau of Shipping. The validity, applicability and interpretation of this Report is governed by
the Rules and standards of American Bureau of Shipping who shall remain the sole judge thereof. Nothing contained in this Report or in any notation made in
contemplation of this Report shall be deemed to relieve any designer, builder, owner, manufacturer, seller, supplier, repairer, operator or other entity of any warranty
express or implied.
1 of 2
logo
Work Order: 5387417-B
First Visit Date: 26-Jul-2022
Last Visit Date: 26-Jul-2022
Survey Kimhae, Korea
Location:
satisfactory.
Description / Cooling Surface (m2) / Dwg. No. / Design Press. (bar) / Hydro-test Press. (bar) / Q'ty (set)
Main L.O. Cooler / 764 / DW21339-01-02 Rev. D / 6.9 (Hot Side), 5.0 (Cold Side) / 10.4 (Hot Side), 7.5 (Cold Side) / 1
Closing Paragraph:
The component/equipment was surveyed in accordance with the Rules, specifications, and approved drawings, as applicable, and is eligible
for installation on board an ABS classed vessel subject to satisfactory installation and testing, as necessary.
Attending Surveyor(s):
Chang, Kyoung-Suk
Signed-off Date: 27-Jul-2022
Reviewing Surveyor(s)
Work Order Reviewer: Lee, Sang-Weon
Work Order Credit Date: 08-Aug-2022
2 of 2
logo
Work Order: 5328084-A
First Visit Date: 16-Jun-2022
Last Visit Date: 16-Jun-2022
Survey Kimhae, Korea
Location:
Report Details
ABS Stamping Maltese Cross
5328084 Yes
Report Findings
Statement/Observation
Finding No Asset Survey Task Date Created
1099.0 Stern Tube L.O. Cooler Certification - Stern Tube L.O. 16-Jun-2022
Cooler
Found
Hull No.: 8103
The following plate type heat exchanger was examined, hydrostatically tested (Doc. No. DQA-7PT-220616-01) and considered satisfactory.
NOTE: This Report evidences that the survey reported herein was carried out in compliance with one or more of the Rules, guides, standards or other criteria of the
American Bureau of Shipping and is issued solely for the use of the Bureau, its committees, its clients or other authorized entities. This Report is a representation
only that the vessel, structure, item of material equipment, machinery or any other item covered by this Report has been examined for compliance with, or has met
one or more of the Rules, guides, standards or other criteria of American Bureau of Shipping. The validity, applicability and interpretation of this Report is governed by
the Rules and standards of American Bureau of Shipping who shall remain the sole judge thereof. Nothing contained in this Report or in any notation made in
contemplation of this Report shall be deemed to relieve any designer, builder, owner, manufacturer, seller, supplier, repairer, operator or other entity of any warranty
express or implied.
1 of 2
logo
Work Order: 5328084-A
First Visit Date: 16-Jun-2022
Last Visit Date: 16-Jun-2022
Survey Kimhae, Korea
Location:
Description / Dwg. No. / Cooling Surface (m2) / Design Press. (kgf/cm2) / Hydro-test Press. (kgf/cm2) / Q'ty (set)
Stern Tube L.O. Cooler / DW21339-01-03, Rev. C / 1.25 / 5.0 (Hot Side), 5.0 (Cold Side) / 7.5 (Hot Side), 7.5 (Cold Side) / 1
Closing Paragraph:
The component/equipment was surveyed in accordance with the Rules, specifications, and approved drawings, as applicable, and is eligible
for installation on board an ABS classed vessel subject to satisfactory installation and testing, as necessary.
Attending Surveyor(s):
Lee, Song-Keun
Signed-off Date: 17-Jun-2022
Reviewing Surveyor(s)
Work Order Reviewer: Kim, Tae-Gyoo
Work Order Credit Date: 17-Jun-2022
2 of 2
logo
Work Order: 5387417-A
First Visit Date: 26-Jul-2022
Last Visit Date: 26-Jul-2022
Survey Kimhae, Korea
Location:
Report Details
ABS Stamping Maltese Cross
5387417 Yes
Report Findings
Statement/Observation
Finding No Asset Survey Task Date Created
1113.0 M/E Jacket F.W. Cooler Certification - M/E Jacket F.W. 26-Jul-2022
Cooler
Found
Hull No.: 8103 (HSHI)
NOTE: This Report evidences that the survey reported herein was carried out in compliance with one or more of the Rules, guides, standards or other criteria of the
American Bureau of Shipping and is issued solely for the use of the Bureau, its committees, its clients or other authorized entities. This Report is a representation
only that the vessel, structure, item of material equipment, machinery or any other item covered by this Report has been examined for compliance with, or has met
one or more of the Rules, guides, standards or other criteria of American Bureau of Shipping. The validity, applicability and interpretation of this Report is governed by
the Rules and standards of American Bureau of Shipping who shall remain the sole judge thereof. Nothing contained in this Report or in any notation made in
contemplation of this Report shall be deemed to relieve any designer, builder, owner, manufacturer, seller, supplier, repairer, operator or other entity of any warranty
express or implied.
1 of 2
logo
Work Order: 5387417-A
First Visit Date: 26-Jul-2022
Last Visit Date: 26-Jul-2022
Survey Kimhae, Korea
Location:
The one (1) set of plate type heat exchanger was examined, hydrostatically tested (Report No. DQA-7PT-220726-04) and considered
satisfactory.
Description / Cooling Surface (m2) / Dwg. No. / Design Press. (bar) / Hydro-test Press. (bar) / Q'ty (set)
M/E Jacket F.W Cooler / 26.8 / DW21339-01-04 Rev. D / 5.0 (Hot Side), 5.0 (Cold Side) / 7.5 (Hot Side), 7.5 (Cold Side) / 1
Closing Paragraph:
The component/equipment was surveyed in accordance with the Rules, specifications, and approved drawings, as applicable, and is eligible
for installation on board an ABS classed vessel subject to satisfactory installation and testing, as necessary.
Attending Surveyor(s):
Chang, Kyoung-Suk
Signed-off Date: 27-Jul-2022
Reviewing Surveyor(s)
Work Order Reviewer: Lee, Sang-Weon
Work Order Credit Date: 08-Aug-2022
2 of 2