0% found this document useful (0 votes)
571 views1,091 pages

Project Evaluation Report 25th June 2024

Uploaded by

NAREN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
571 views1,091 pages

Project Evaluation Report 25th June 2024

Uploaded by

NAREN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1091

SME Name Not Evaluated Evaulated % Completion Grand Total

Dr. K. P. Shanmugapriya . 104 1 1% 105


Dr. K. A. Senthildevi . 77 3 4% 80
Dr. K. Kalaiselvi . 90 7 7% 97
C Sasikumar C 60 10 14% 70
G Sri Sakthinayaki G 60 10 14% 70
Dr. P. Komaladevi . 65 14 18% 79
Dr. A. Aruljothi . 86 19 18% 105
KA Poornima 85 20 19% 105
Dr. A. Sivakumar . 56 19 25% 75
Dr. T. K. Sumathi . 60 25 29% 85
Dr. R. Aravind . 59 26 31% 85
G Prabhu 70 35 33% 105
Dr. K. Punitha . 45 25 36% 70
Dr. K. Vasudevan . 57 33 37% 90
Dr. T. K. Shanmugam . 67 39 37% 106
Dr. G. A. Mylavathi . 57 43 43% 100
C Prabhu C 33 25 43% 58
Dr. M. Sathyapriya . 60 46 43% 106
Dr. N. P. Revathi . 55 45 45% 100
Dr. N. Sakthivel . 50 44 47% 94
Dr.V. Azhaharasan . 30 75 71% 105
Dr. P.E. Elango . 17 43 72% 60
B Logeswaran B 18 52 74% 70
Dr. D. Jayamma . 12 58 83% 70
P Kalaivani 10 50 83% 60
R Santhosh 13 72 85% 85
D Vinoth 75 100% 75
Dr. G. N. Prasaath . 90 100% 90
Dr. N. Prakash . 106 100% 106
Dr. N. V. Poovendhiran . 94 100% 94
Dr. R. Logambal . 90 100% 90
Dr. S. Krishnakumar . 90 100% 90
Dr. U. Jayaprakash . 80 100% 80
Dr. V. K. Narendirakumar . 100 100% 100
Dr. V. P. Ananthi . 60 100% 60
G Malathi G 90 100% 90
K Madheswaran 105 100% 105
N Balusamy 95 100% 95
P Kathirvel P 90 100% 90
P Mohanambal P 58 100% 58
P Senthilkumar 140 100% 140
R Krishnaveni R 60 100% 60
S Santhoshkumar 70 100% 70
S Senthilkumar 70 100% 70
S Umadevi S 70 100% 70
Sr. No. Year Month Program Student ID Student Name Subject
1 2024 Jun MBA (ITSM) 77221934865 Chitranshi Mahajan Project
2 2024 Jun MBA (BFM) 77221941233 Mayur Chavan Project
3 2024 Jun MBA (ITSM) 77221947789 Muskan Sabharwal Project
4 2024 Jun MBA (BFM) 77221948028 Nidhikumari Patel Project
5 2024 Jun MBA (ITSM) 77221951575 Rahul Kumar Project
6 2024 Jun MBA (BFM) 77221953129 Srirangarajupally Poojitha Project
7 2024 Jun MBA (OM) 77221953854 Vedant Pandya Project
8 2024 Jun MBA (BFM) 77221954633 Shivani Sharma Project
9 2024 Jun MBA (BFM) 77221956933 Gayatri Khamkar Project
10 2024 Jun MBA (OM) 77221957241 Sakiluddin Ahmed Project
11 2024 Jun MBA (OM) 77221961603 Venkata Naga Chaitanya Marla Project
12 2024 Jun MBA (ITSM) 77221965960 Kumar Krishanu Project
13 2024 Jun MBA (ITSM) 77221970396 Vipul Varshney Project
14 2024 Jun MBA (BFM) 77221974860 Siddesh Santosh Chavan Project
15 2024 Jun MBA (ITSM) 77221975411 Aniket Lokhande Project
16 2024 Jun MBA (BFM) 77221977785 Vinay Rajkumar Agrawal Project
17 2024 Jun MBA (OM) 77221978003 Harsh Hemantkumar Project
18 2024 Jun MBA (OM) 77221981093 Prathmesh Rajesh Jondhale Project
19 2024 Jun MBA (ITSM) 77221984536 Mayank Pasricha Project
20 2024 Jun MBA (BFM) 77221985802 Pratik Yadav Project
21 2024 Jun MBA (BFM) 77221987210 Kriti Project
22 2024 Jun MBA (ITSM) 77221988666 Umang Shekhawat Project
23 2024 Jun MBA (OM) 77221991023 Shubham Gupta Project
24 2024 Jun MBA (ITSM) 77221995758 Himanshu Prakash Project
25 2024 Jun MBA (BFM) 77221997587 Jyoti Project
26 2024 Jun MBA (OM) 77221998474 Anupam .. Project
27 2024 Jun MBA (ITSM) 77221998763 Luvin Thommana Project
28 2024 Jun MBA (OM) 77221744946 Megha Agarwal Project
29 2024 Jun MBA (ITSM) 77221746661 Mohammed Taher Project
30 2024 Jun MBA (ITSM) 77221751152 Omkar Sunil Kupade Project
31 2024 Jun MBA (BFM) 77221754155 Gurnoor Kaur Dang Project
32 2024 Jun MBA (OM) 77221757574 Abhishek Barman Project
33 2024 Jun MBA (BFM) 77221763878 Naman Goyal Project
34 2024 Jun MBA (OM) 77221768374 Shahid Shaikh Project
35 2024 Jun MBA (BFM) 77221771502 Tushar Banka Project
36 2024 Jun MBA (OM) 77221775072 Tanmoy Mondal Project
37 2024 Jun MBA (OM) 77221779613 Ayush Srivastava Project
38 2024 Jun MBA (ITSM) 77221781138 Sarang Wamorkar Project
39 2024 Jun MBA (ITSM) 77221785822 Prateek Saxena Project
40 2024 Jun MBA (BFM) 77221789628 Gourav Bamotra Project
41 2024 Jun MBA (BFM) 77221799052 Juhi Rajivbhai Desai Project
42 2024 Jun MBA (ITSM) 77221810487 Atul Kumar Singh Project
43 2024 Jun MBA (OM) 77221811753 Ramandeep Sharma Project
44 2024 Jun MBA (OM) 77221812581 Raunak Dwivedi Project
45 2024 Jun MBA (ITSM) 77221812628 Arzoo Malik Project
46 2024 Jun MBA (BFM) 77221813027 Swehal Singh Project
47 2024 Jun MBA (ITSM) 77221815535 Abhijeet Anilrao Tiwaskar Project
48 2024 Jun MBA (BFM) 77221819013 Harsh Patriya Project
49 2024 Jun MBA (ITSM) 77221821181 KANUMURI PRUDHVI RAJ Project
50 2024 Jun MBA (OM) 77221831520 Amit Upadhyay Project
51 2024 Jun MBA (OM) 77221831616 Rajeev Singh Tiwari Project
52 2024 Jun MBA (BFM) 77221831936 Vivian Fernandes Project
53 2024 Jun MBA (OM) 77221836842 Neru Kumar Vijaywargi Project
54 2024 Jun MBA (OM) 77221837130 Ritu Jalan Project
55 2024 Jun MBA (OM) 77221838773 Shivam Shrivastav Project
56 2024 Jun MBA (ITSM) 77221842730 Nitish Kumar Jha Project
57 2024 Jun MBA (OM) 77221847665 Himanshu Bhaisora Project
58 2024 Jun MBA (OM) 77221850015 Shantanu Tandon Project
59 2024 Jun MBA (ITSM) 77221853952 Nidhin Varghese Reji Project
60 2024 Jun MBA (OM) 77221856481 Aditya Bhardwaj Project
61 2024 Jun MBA (OM) 77221430599 Koushik Prasad Project
62 2024 Jun MBA (ITSM) 77221433437 Atul Kumar Project
63 2024 Jun MBA (BFM) 77221433722 Mansi Jain Project
64 2024 Jun MBA (BFM) 77221435167 Akriti Priya Project
65 2024 Jun MBA (OM) 77221435948 Anish Puthran Project
66 2024 Jun MBA (OM) 77221437876 Manish Tiwari Project
67 2024 Jun MBA (OM) 77221443120 Sangeeth A Project
68 2024 Jun MBA (OM) 77221445364 Aluri Srilatha Project
69 2024 Jun MBA (BFM) 77221449184 Umang Sharma Project
70 2024 Jun MBA (BFM) 77221451133 Ishita Agarwal Project
71 2024 Jun MBA (OM) 77221451379 Bhakti Narsinghani Project
72 2024 Jun MBA (ITSM) 77221454883 Shubham S Patil Project
73 2024 Jun MBA (ITSM) 77221461910 Taruna Kerekar Project
74 2024 Jun MBA (BFM) 77221462918 Shailendra Singh Ranawat Project
75 2024 Jun MBA (OM) 77221464412 Annpurna Kumari Project
76 2024 Jun MBA (ITSM) 77221471290 Swapragati Pandey Project
77 2024 Jun MBA (BFM) 77221477522 Anmol Shah Project
78 2024 Jun MBA (OM) 77221478915 Mayuri Ghule Project
79 2024 Jun MBA (BFM) 77221484754 Ayushi Kumari Project
80 2024 Jun MBA (BFM) 77221484832 V R LAKSHMI SANDHYA PURANAPANDA Project
81 2024 Jun MBA (OM) 77221487693 Taha Firestonewala Project
82 2024 Jun MBA (BFM) 77221490248 Harshit Jain Project
83 2024 Jun MBA (ITSM) 77221490960 Suraj Kumar Project
84 2024 Jun MBA (OM) 77221491834 Gabrial Fernandes Project
85 2024 Jun MBA (BFM) 77221495623 Sakshi Salunke Project
86 2024 Jun MBA (OM) 77221501913 Pritam Hanumant Tembare Project
87 2024 Jun MBA (ITSM) 77221501922 Yukti Sharma Project
88 2024 Jun MBA (OM) 77221503833 Manish Singh Bora Project
89 2024 Jun MBA (BFM) 77221505624 Avinash Pandey Project
90 2024 Jun MBA (ITSM) 77221506316 Shaik Ruksana Sulthana Project
91 2024 Jun MBA (ITSM) 77221507126 Rupam Kumari Project
92 2024 Jun MBA (BFM) 77221507403 Ekjot Kaur Virk Project
93 2024 Jun MBA (BFM) 77221509746 Vivek Verma Project
94 2024 Jun MBA (BFM) 77221510607 Yatin Poojary Project
95 2024 Jun MBA (BFM) 77221515035 Shraddha Mirzolkar Project
96 2024 Jun MBA (BFM) 77221519759 Rupal Sadhwani Project
97 2024 Jun MBA (OM) 77221524695 Ganesh Angrod Project
98 2024 Jun MBA (OM) 77221529842 Ayushi Singh Project
99 2024 Jun MBA (ITSM) 77221530863 Almas G S Project
100 2024 Jun MBA (OM) 77221538548 Shivangi Thapa Project
101 2024 Jun MBA (BFM) 77221538931 Naresh Balani Project
102 2024 Jun MBA (BFM) 77221539065 Ashutosh Kumar Project
103 2024 Jun MBA (BFM) 77221539723 Vinod Kumar T Project
104 2024 Jun MBA (BFM) 77221543017 Subham Singh Project
105 2024 Jun MBA (ITSM) 77221547747 Pavithra V Project
106 2024 Jun MBA (OM) 77221550716 Karthik Somasundaram T Project
107 2024 Jun MBA (ITSM) 77221551555 Aditya Arora Project
108 2024 Jun MBA (OM) 77221553476 Geetanjali Nagar Project
109 2024 Jun MBA (BFM) 77221554478 Rasika Shinde Project
110 2024 Jun MBA (ITSM) 77221564420 Shubhangi Sharma Project
111 2024 Jun MBA (ITSM) 77221565256 Lalit Bohra Project
112 2024 Jun MBA (BFM) 77221567811 Vivek Kumar Yadav Project
113 2024 Jun MBA (OM) 77221570811 Akash Kumar Mishra Project
114 2024 Jun MBA (OM) 77221570941 Vijendra Singh Jhala Project
115 2024 Jun MBA (BFM) 77221574257 Anjali Solanki Project
116 2024 Jun MBA (OM) 77221574837 BHUVANAKUMAR NAMBURI Project
117 2024 Jun MBA (BFM) 77221576519 Ajay Shinde Project
118 2024 Jun MBA (ITSM) 77221577543 Shrikant Kumbhar Project
119 2024 Jun MBA (OM) 77221579562 Manoj Sambavar Project
120 2024 Jun MBA (OM) 77221581219 Nikheel Deepak Patil Project
121 2024 Jun MBA (ITSM) 77221583571 Supratik Mazumdar Project
122 2024 Jun MBA (BFM) 77221597472 Akul Bansal Project
123 2024 Jun MBA (OM) 77221600102 Avinash Kumar Shivhare Project
124 2024 Jun MBA (BFM) 77221601083 Sachin Sharma Project
125 2024 Jun MBA (BFM) 77221601366 Deepak Thakur Project
126 2024 Jun MBA (OM) 77221601900 Shashi Bhushan Choudhary Project
127 2024 Jun MBA (BFM) 77221602011 Rahul Mande Project
128 2024 Jun MBA (OM) 77221604032 Shreyas Pathak Project
129 2024 Jun MBA (BFM) 77221610095 Harsh Amish Vaidya Project
130 2024 Jun MBA (BFM) 77221610615 Sujoy Samanta Project
131 2024 Jun MBA (BFM) 77221610857 Gopal Kabre Project
132 2024 Jun MBA (BFM) 77221612032 Tushar Gupta Project
133 2024 Jun MBA (BFM) 77221613200 Yash Agrawal Project
134 2024 Jun MBA (BFM) 77221615321 Viral Rathod Project
135 2024 Jun MBA (BFM) 77221616000 Kinjal Parmar Project
136 2024 Jun MBA (BFM) 77221618677 Naveen Kheria Project
137 2024 Jun MBA (OM) 77221621553 Shannen Swizel Borges Project
138 2024 Jun MBA (BFM) 77221621918 Garima Mathur Project
139 2024 Jun MBA (ITSM) 77221625880 Tanmay Chhonker Project
140 2024 Jun MBA (BFM) 77221628002 Soumya Goswami Project
141 2024 Jun MBA (BFM) 77221628290 Yamini Sunil Nikam Project
142 2024 Jun MBA (BFM) 77221630252 Kausalya M Project
143 2024 Jun MBA (BFM) 77221631800 Meenal Verma Project
144 2024 Jun MBA (BFM) 77221637155 Krishnakumar Vasudevan Project
145 2024 Jun MBA (BFM) 77221342328 Rashmi Kumari Saha Project
146 2024 Jun MBA (OM) 77221344919 Naresh Kumar Project
147 2024 Jun MBA (BFM) 77221345989 Tejasmita Sahoo Project
148 2024 Jun MBA (BFM) 77221350283 Shanaya Dharamdasani Project
149 2024 Jun MBA (OM) 77221351486 Khushbu Harsh Project
150 2024 Jun MBA (OM) 77221353881 Rahib Farooqui Project
151 2024 Jun MBA (OM) 77221356546 Anurag Mishra Project
152 2024 Jun MBA (OM) 77221359501 Amit Mishra Project
153 2024 Jun MBA (BFM) 77221360489 Siddharth Project
154 2024 Jun MBA (OM) 77221369932 Ravatee Raman Project
155 2024 Jun MBA (BFM) 77221370637 Arvind Singh Yadav Project
156 2024 Jun MBA (BFM) 77221383687 Akanksha Singh Project
157 2024 Jun MBA (BFM) 77221384488 Krishna Nelli Project
158 2024 Jun MBA (OM) 77221388174 Shubham Kaushik Project
159 2024 Jun MBA (BFM) 77221388690 Neha Yadav Project
160 2024 Jun MBA (ITSM) 77221393826 Vishvak Sampath Kumar Project
161 2024 Jun MBA (ITSM) 77221397009 Mir Nur Alam Project
162 2024 Jun MBA (OM) 77221400777 Sonali Harish Chavan Project
163 2024 Jun MBA (BFM) 77221402076 Saloni Pareshbhai Pawar Project
164 2024 Jun MBA (ITSM) 77221409506 Mummidi Veera Sai Rahul Project
165 2024 Jun MBA (BFM) 77221414101 Sruthi Jayan Project
166 2024 Jun MBA (OM) 77221417750 Arvind Kumar Project
167 2024 Jun MBA (BFM) 77221424377 Anushree Ramteke Project
168 2024 Jun MBA (ITSM) 77221424683 Pankaj Verma Project
169 2024 Jun MBA (OM) 77221425017 Aarushi Garg Project
170 2024 Jun MBA (ITSM) 77221861377 Sarika Singh Project
171 2024 Jun MBA (OM) 77221861781 Inderjyot Kaur Ranjit Singh Virdi Project
172 2024 Jun MBA (ITSM) 77221865455 Megha Khanna Project
173 2024 Jun MBA (OM) 77221866633 Vikrant Kale Project
174 2024 Jun MBA (OM) 77221866903 Sridhar Gopal Varkhedkar Project
175 2024 Jun MBA (BFM) 77221871816 Keshav Kumar Project
176 2024 Jun MBA (ITSM) 77221873698 Talat Jahan Wasiullah Project
177 2024 Jun MBA (ITSM) 77221874508 Sagar Pathade Project
178 2024 Jun MBA (OM) 77221875489 Mritunjay Kumar Project
179 2024 Jun MBA (BFM) 77221875992 Priyank Uday Gaitonde Project
180 2024 Jun MBA (OM) 77221882535 Nithila K J Devis Project
181 2024 Jun MBA (OM) 77221883227 Nora Navmani Nathan Project
182 2024 Jun MBA (ITSM) 77221884594 KODURU ANIL KUMAR Project
183 2024 Jun MBA (BFM) 77221888216 Niral Furia Project
184 2024 Jun MBA (ITSM) 77221890896 Himanshu Shashikant Golatkar Project
185 2024 Jun MBA (BFM) 77221891184 Mohammad Sameer Mohammad Irfan Project
186 2024 Jun MBA (OM) 77221896887 Arun Project
187 2024 Jun MBA (ITSM) 77221897684 Tanvi Satish Naik Project
188 2024 Jun MBA (BFM) 77221899950 Shradha Bisht Project
189 2024 Jun MBA (BFM) 77221899990 Anupam Sen Project
190 2024 Jun MBA (ITSM) 77221908896 Rohan Bhavsar Project
191 2024 Jun MBA (OM) 77221913033 Anjali Jadon Project
192 2024 Jun MBA (OM) 77221915199 Hrishikesh Kulkarni Project
193 2024 Jun MBA (OM) 77221916739 Ayush Sharma Project
194 2024 Jun MBA (BFM) 77221916843 Diksha Singhal Project
195 2024 Jun MBA (BFM) 77221917354 Anand J S Project
196 2024 Jun MBA (BFM) 77221917414 Sanidhy Nipsaiya Project
197 2024 Jun MBA (BFM) 77221917754 Nishchal Verma Project
198 2024 Jun MBA (BFM) 77221919192 Tanya Singh Project
199 2024 Jun MBA (BFM) 77221919639 Sri Keerthy Vangala Project
200 2024 Jun MBA (OM) 77221925401 Sneha Pansare Project
201 2024 Jun MBA (BFM) 77221644503 Priyanka Suresh Patil Project
202 2024 Jun MBA (BFM) 77221644597 Rajat Mahendra Chopda Project
203 2024 Jun MBA (OM) 77221645117 Abdullah Farooq Munshi Project
204 2024 Jun MBA (BFM) 77221652028 Dheeraj Daga Project
205 2024 Jun MBA (BFM) 77221653835 Barkha Sarawgi Project
206 2024 Jun MBA (BFM) 77221658452 Ayushi Nagpal Project
207 2024 Jun MBA (BFM) 77221664849 Sai Srikanth Uppuluri Project
208 2024 Jun MBA (OM) 77221666583 Ahraz Momin Project
209 2024 Jun MBA (OM) 77221667185 Deepmani Mishra Project
210 2024 Jun MBA (BFM) 77221669205 Sheldon D'souza Project
211 2024 Jun MBA (BFM) 77221671377 Shruti Chokhani Project
212 2024 Jun MBA (BFM) 77221671476 Vishal Lohia Project
213 2024 Jun MBA (BFM) 77221673105 Sandeep Veggalam Project
214 2024 Jun MBA (BFM) 77221675134 Neha Babulal Kashyap Project
215 2024 Jun MBA (BFM) 77221677673 Pankaj Kumar Jha Project
216 2024 Jun MBA (ITSM) 77221681752 Devang Sumant Shinde Project
217 2024 Jun MBA (BFM) 77221688956 Himani Agrawal Project
218 2024 Jun MBA (BFM) 77221693254 Abhijeet Basudev Karmokar Project
219 2024 Jun MBA (BFM) 77221696812 VINAY MANCHALA Project
220 2024 Jun MBA (OM) 77221696853 Raj Gautam Project
221 2024 Jun MBA (OM) 77221698825 Prabhat Kumar Project
222 2024 Jun MBA (BFM) 77221701146 Neha Jain Project
223 2024 Jun MBA (BFM) 77221704827 Nidhi Patil Project
224 2024 Jun MBA (BFM) 77221707090 Mukul Wadhwa Project
225 2024 Jun MBA (BFM) 77221707474 Vinit Chandrahas Surve Project
226 2024 Jun MBA (OM) 77221708643 Deepika Joshi Project
227 2024 Jun MBA (OM) 77221715605 Vedant Gandhi Project
228 2024 Jun MBA (BFM) 77221724000 Nayan Suthar Project
229 2024 Jun MBA (ITSM) 77221725029 Rasika Revankar Project
230 2024 Jun MBA (BFM) 77221725443 Zalak Anil Prajapati Project
231 2024 Jun MBA (OM) 77221730278 Kunal Singh Project
232 2024 Jun MBA (BFM) 77221730809 Riya Kejriwal Project
233 2024 Jun MBA (OM) 77221733773 Mahesh Kumar Project
234 2024 Jun MBA (ITSM) 77122890371 Mahipalsingh Patil Project
235 2024 Jun MBA (ITSM) 77122890469 Rahul Naresh Parkhi Project
236 2024 Jun MBA (ITSM) 77122891220 Rahul Kumar Project
237 2024 Jun MBA (OM) 77122891256 Pradnya More Project
238 2024 Jun MBA (BFM) 77122891338 Shyam Nath K Project
239 2024 Jun MBA (ITSM) 77122891589 Shikhar Lal Project
240 2024 Jun MBA (BFM) 77122891661 Akhil Kumar Project
241 2024 Jun MBA (ITSM) 77122891953 Ridhi Garg Project
242 2024 Jun MBA (ITSM) 77122892022 Rishab Rawat Project
243 2024 Jun MBA (ITSM) 77122892103 Ranadip Das Project
244 2024 Jun MBA (BFM) 77122892245 Shraddha Ganesh Doiphode Project
245 2024 Jun MBA (BFM) 77122892252 Deepanshu Pandey Project
246 2024 Jun MBA (OM) 77122892487 Prithwiraj Datta Project
247 2024 Jun MBA (OM) 77122892742 Arjun Bandyopadhyay Project
248 2024 Jun MBA (OM) 77122892757 Gulshan Yadav Project
249 2024 Jun MBA (ITSM) 77122892849 Gaurav Ganesh Shinde Project
250 2024 Jun MBA (BFM) 77122893174 Panchami B S Project
251 2024 Jun MBA (ITSM) 77122893295 Rakesh Kumar Project
252 2024 Jun MBA (OM) 77122893411 Rajesh Kumar Project
253 2024 Jun MBA (OM) 77122893448 Achche Lal Yadav Project
254 2024 Jun MBA (ITSM) 77122893491 Hitesh Bhandari Project
255 2024 Jun MBA (BFM) 77122893514 Vaishali Raghav Project
256 2024 Jun MBA (OM) 77122893723 Tadigadapa Venkata Shanmukha Sai Kumar Project
257 2024 Jun MBA (ITSM) 77122893850 Soham Nath Choudhury Project
258 2024 Jun MBA (OM) 77122894163 Shamika Deshpande Project
259 2024 Jun MBA (BFM) 77122894200 B Sushmita Project
260 2024 Jun MBA (BFM) 77122894378 Deepali Fernandes Project
261 2024 Jun MBA (ITSM) 77122894438 Dipti Kokate Project
262 2024 Jun MBA (BFM) 77122894492 Moumita Mandal Project
263 2024 Jun MBA (BFM) 77122894764 Vineet Khanna Project
264 2024 Jun MBA (OM) 77122894830 Mritunjay Narayan Project
265 2024 Jun MBA (ITSM) 77122895004 Shrinkhala Sharma Project
266 2024 Jun MBA (OM) 77122895136 Shyam Kumar Shukla Project
267 2024 Jun MBA (OM) 77122895219 Shipra Agrawal Project
268 2024 Jun MBA (BFM) 77122895955 Kashish Project
269 2024 Jun MBA (ITSM) 77122895962 Kolappan B Project
270 2024 Jun MBA (ITSM) 77122896048 Syed Imtiyaz Project
271 2024 Jun MBA (BFM) 77122896193 Mahesh Aananda Waghode Project
272 2024 Jun MBA (BFM) 77122896513 Pooja Raval Project
273 2024 Jun MBA (ITSM) 77122896584 Ram Sankar V Project
274 2024 Jun MBA (ITSM) 77122896804 Shivi Tiwari Project
275 2024 Jun MBA (OM) 77122896954 Vedprakash Tiwari Project
276 2024 Jun MBA (ITSM) 77122897583 Vishal Vishwas Gore Project
277 2024 Jun MBA (OM) 77122898050 Abhinay Kumar Project
278 2024 Jun MBA (BFM) 77122898122 Tanya Tiwari Project
279 2024 Jun MBA (BFM) 77122898354 Priti Motilal Maurya Project
280 2024 Jun MBA (ITSM) 77122898531 Taniya Singh Project
281 2024 Jun MBA (BFM) 77122898635 Parv Gupta Project
282 2024 Jun MBA (BFM) 77122898660 Suresh Kumar Project
283 2024 Jun MBA (BFM) 77122898822 Bhaktipradha Shetty Project
284 2024 Jun MBA (ITSM) 77122898898 Akshay Anvekar Project
285 2024 Jun MBA (BFM) 77122899219 Rajat Jhawar Project
286 2024 Jun MBA (ITSM) 77122899369 Mallu Uday Kumar Reddy Project
287 2024 Jun MBA (BFM) 77122899782 Raima Saha Project
288 2024 Jun MBA (ITSM) 77122900083 Priyay Adhikari Project
289 2024 Jun MBA (BFM) 77122900105 Isha Mahavir Jain Project
290 2024 Jun MBA (OM) 77122900181 Suresh Chandra Kholiya Project
291 2024 Jun MBA (BFM) 77122900411 Parag Shashank Gavandalkar Project
292 2024 Jun MBA (OM) 77122900650 Yash Agrawal Project
293 2024 Jun MBA (ITSM) 77122900701 Ankita Jayswal Project
294 2024 Jun MBA (BFM) 77122900943 Aarcee Chauhan Project
295 2024 Jun MBA (ITSM) 77122900952 Deepak Bhandari Project
296 2024 Jun MBA (ITSM) 77122900953 Mayur Baravkar Project
297 2024 Jun MBA (OM) 77122901082 Girish Dewangan Project
298 2024 Jun MBA (BFM) 77122901322 Harshita Tondwal. Project
299 2024 Jun MBA (ITSM) 77122901528 Padmamalini J Project
300 2024 Jun MBA (ITSM) 77122901920 Mohammad Aatir Khan Project
301 2024 Jun MBA (OM) 77122864761 Shirish Patil Project
302 2024 Jun MBA (OM) 77122864872 Akshar Jayesh Daruwala Project
303 2024 Jun MBA (ITSM) 77122865505 Shivam Singh Project
304 2024 Jun MBA (OM) 77122865598 Rakesh Kumar Project
305 2024 Jun MBA (ITSM) 77122865645 Sakshi Suryavanshi Project
306 2024 Jun MBA (ITSM) 77122865671 Prachi Agarwal Project
307 2024 Jun MBA (ITSM) 77122865710 Shivam Khandelwal Project
308 2024 Jun MBA (ITSM) 77122865915 Snehal Patil Project
309 2024 Jun MBA (BFM) 77122866177 Ruhina Mohsin Shaikh Project
310 2024 Jun MBA (OM) 77122866502 Chandan Singh Tomar Project
311 2024 Jun MBA (OM) 77122866544 Parag Jain Project
312 2024 Jun MBA (OM) 77122866693 Pragati Saini Project
313 2024 Jun MBA (BFM) 77122866712 Prachi Gandhi Project
314 2024 Jun MBA (OM) 77122866750 Shailvi Gupta Project
315 2024 Jun MBA (BFM) 77122867070 Vighnesh Majalkar Project
316 2024 Jun MBA (OM) 77122867098 Lalit Kishor Agrawal Project
317 2024 Jun MBA (ITSM) 77122867878 Juilee Sonalkar Project
318 2024 Jun MBA (OM) 77122867974 Kartik Kumar Mandal Project
319 2024 Jun MBA (OM) 77122868012 Deepak Singh Project
320 2024 Jun MBA (BFM) 77122868240 Vaibhav Chaturvedi Project
321 2024 Jun MBA (BFM) 77122868289 Saloni Patel Project
322 2024 Jun MBA (BFM) 77122868539 Fairy Shah Project
323 2024 Jun MBA (BFM) 77122868590 Aradhya Singh Project
324 2024 Jun MBA (BFM) 77122868619 Kuldeep Singh Project
325 2024 Jun MBA (BFM) 77122868675 Kalpesh Bhosale Project
326 2024 Jun MBA (BFM) 77122868716 Mehta Jalak Raju Prema Project
327 2024 Jun MBA (OM) 77122868888 Heramb Chavan Project
328 2024 Jun MBA (OM) 77122868914 Ashna Walia Project
329 2024 Jun MBA (ITSM) 77122868926 Sumit Kumar Singh Project
330 2024 Jun MBA (OM) 77122869017 Ankush Sood Project
331 2024 Jun MBA (ITSM) 77122869043 Sauvik Roy Choudhury Project
332 2024 Jun MBA (OM) 77122869082 Pradip Jagdale Project
333 2024 Jun MBA (ITSM) 77122869468 Agnel Loyd Christopher Project
334 2024 Jun MBA (BFM) 77122869747 Rashi Jain Project
335 2024 Jun MBA (BFM) 77122869876 Omkar Vijay Narkar Project
336 2024 Jun MBA (OM) 77122871005 Bikram Panda Project
337 2024 Jun MBA (ITSM) 77122871229 Harshita Sharma Project
338 2024 Jun MBA (BFM) 77122871278 Saifunnisha Armaan Mohammed Khan Project
339 2024 Jun MBA (OM) 77122871380 Hemavathi P Project
340 2024 Jun MBA (OM) 77122871595 Patel Chiragkumar Babulal Project
341 2024 Jun MBA (OM) 77122871886 Dhananjay Bhoir Project
342 2024 Jun MBA (ITSM) 77122872013 Tarun Saxena Project
343 2024 Jun MBA (BFM) 77122872036 Piyush Bansal Project
344 2024 Jun MBA (BFM) 77122872240 Kanishka Jain Project
345 2024 Jun MBA (OM) 77122872430 Surbhi Gautam Project
346 2024 Jun MBA (BFM) 77122872685 Deepshikha Prashanto Ghosh Project
347 2024 Jun MBA (BFM) 77122872910 Sakshi Pal Project
348 2024 Jun MBA (ITSM) 77122873246 Hanshal Arora Project
349 2024 Jun MBA (ITSM) 77122873490 Profal Bhalla Project
350 2024 Jun MBA (OM) 77122873506 Nirav Panchal Project
351 2024 Jun MBA (BFM) 77122873534 Babitha Babu Project
352 2024 Jun MBA (BFM) 77122873794 Preeti Das Project
353 2024 Jun MBA (BFM) 77122874940 Riya Negi Project
354 2024 Jun MBA (OM) 77122875126 Rishabh Singh Project
355 2024 Jun MBA (ITSM) 77122875775 Sandesh Tapre Project
356 2024 Jun MBA (OM) 77122876293 Oyorika Choudhury Project
357 2024 Jun MBA (ITSM) 77122876333 Shilpi Shukla Project
358 2024 Jun MBA (OM) 77122876542 Granthali Gosavi Project
359 2024 Jun MBA (BFM) 77122876886 Himanshu Kaushik Project
360 2024 Jun MBA (ITSM) 77122877214 Shivam Yadav Project
361 2024 Jun MBA (BFM) 77122877229 Afthab Khan Lohani Project
362 2024 Jun MBA (ITSM) 77122877436 Manya Maheshwari Project
363 2024 Jun MBA (BFM) 77122877551 Nithya G Project
364 2024 Jun MBA (ITSM) 77122833396 Swapnal Thube Project
365 2024 Jun MBA (OM) 77122833670 Nidhi Nihalani Project
366 2024 Jun MBA (OM) 77122833772 Lakshya Mahna Project
367 2024 Jun MBA (ITSM) 77122834002 Sayali Pawar Project
368 2024 Jun MBA (OM) 77122835108 Kalyan Chakravarthi Medithi Project
369 2024 Jun MBA (OM) 77122835344 Shubham Sanjay Inamdar Project
370 2024 Jun MBA (ITSM) 77122835521 Shahbaz Ahmad Project
371 2024 Jun MBA (BFM) 77122835596 Aarti Shivchand Shahu Project
372 2024 Jun MBA (ITSM) 77122836397 Amit Kumar Verma Project
373 2024 Jun MBA (ITSM) 77122836722 Ankita Patil Project
374 2024 Jun MBA (BFM) 77122837139 Saiyam Khera Project
375 2024 Jun MBA (OM) 77122837186 Sandeep Shrivastav Project
376 2024 Jun MBA (ITSM) 77122837402 Neha Sapkale Project
377 2024 Jun MBA (ITSM) 77122837437 Shachi Singh Project
378 2024 Jun MBA (OM) 77122837721 Pranav Naphade Project
379 2024 Jun MBA (ITSM) 77122838478 Aditya Pratap Singh Project
380 2024 Jun MBA (ITSM) 77122838529 Vinit Rungta Project
381 2024 Jun MBA (OM) 77122838911 Anuj Pandey Project
382 2024 Jun MBA (BFM) 77122839038 Arko Goswami Project
383 2024 Jun MBA (OM) 77122839459 Manisha Upadhyay Project
384 2024 Jun MBA (ITSM) 77122839578 Arun Kumar M Project
385 2024 Jun MBA (ITSM) 77122840129 Jayant Dhoundiyal Project
386 2024 Jun MBA (BFM) 77122841160 Aishwarya Dalvi Project
387 2024 Jun MBA (ITSM) 77122841267 Suru Mounika Project
388 2024 Jun MBA (OM) 77122841305 G Krishna Project
389 2024 Jun MBA (OM) 77122841464 Deepshikha Prasad Project
390 2024 Jun MBA (BFM) 77122842276 Priyanka Anute Project
391 2024 Jun MBA (OM) 77122842379 Anuradha V Project
392 2024 Jun MBA (OM) 77122842688 Sagar Chandra Project
393 2024 Jun MBA (ITSM) 77122843207 Jagrite Jain Project
394 2024 Jun MBA (BFM) 77122843300 Rohan Gupta Project
395 2024 Jun MBA (BFM) 77122843709 Isha Qureshi Project
396 2024 Jun MBA (ITSM) 77122843943 Sujit Suryavanshi Project
397 2024 Jun MBA (BFM) 77122844264 Puneet Kumar Dubey Project
398 2024 Jun MBA (ITSM) 77122844318 Gaznat Pathan Project
399 2024 Jun MBA (BFM) 77122844360 Darshna Koshti Project
400 2024 Jun MBA (OM) 77122844596 Md Sadiq Farhan Project
401 2024 Jun MBA (BFM) 77122844626 Sonal Singh Project
402 2024 Jun MBA (BFM) 77122844707 Ajay Sharma Project
403 2024 Jun MBA (ITSM) 77122844879 Ishika Gupta Project
404 2024 Jun MBA (ITSM) 77122844888 Ritika Sen Project
405 2024 Jun MBA (ITSM) 77122844889 Gaurav Bhushan Project
406 2024 Jun MBA (ITSM) 77122845205 Neha Prabhakar Dubey Project
407 2024 Jun MBA (BFM) 77122845276 Chandni Pania Project
408 2024 Jun MBA (BFM) 77122845777 Deepika Anantharam Project
409 2024 Jun MBA (OM) 77122845781 Amit Shah Project
410 2024 Jun MBA (OM) 77122846032 Ankit Joshi Project
411 2024 Jun MBA (BFM) 77122846033 Bhavsar Kunika Dharmeshbhai Project
412 2024 Jun MBA (ITSM) 77122846227 Megha Rishi Project
413 2024 Jun MBA (OM) 77122846960 Jagruti Bandbe Project
414 2024 Jun MBA (BFM) 77122847004 Tushar Kaundal. Project
415 2024 Jun MBA (ITSM) 77122847142 Vipul Dilip Dhande Project
416 2024 Jun MBA (ITSM) 77122847248 Oruganti Venkata Yamini Project
417 2024 Jun MBA (ITSM) 77122847618 Anisha Paul Project
418 2024 Jun MBA (BFM) 77122847753 Srishti Sharma Project
419 2024 Jun MBA (BFM) 77122847806 Vipul Bhosale Project
420 2024 Jun MBA (BFM) 77122847920 Puneet Gupta Project
421 2024 Jun MBA (BFM) 77122848000 Akash Joshi Project
422 2024 Jun MBA (BFM) 77122848308 Sandeep V Project
423 2024 Jun MBA (BFM) 77122848874 Diksha Bansal Project
424 2024 Jun MBA (OM) 77122848881 Sandip Dhara Project
425 2024 Jun MBA (OM) 77122849731 Niladrinath Das Project
426 2024 Jun MBA (OM) 77122850113 Chiragkumar Vaghela Project
427 2024 Jun MBA (BFM) 77122850356 Singhi Hitanshu Rajendra Sita Project
428 2024 Jun MBA (BFM) 77122850384 Sanket Shirodkar Project
429 2024 Jun MBA (OM) 77122850413 Jitendra Singh Project
430 2024 Jun MBA (BFM) 77122850416 Yash Yadav Project
431 2024 Jun MBA (BFM) 77122850422 Manpreet Kaur Chandel Project
432 2024 Jun MBA (ITSM) 77122850457 Ayushi Agrawal Project
433 2024 Jun MBA (ITSM) 77122850658 Arvind Kumar Project
434 2024 Jun MBA (BFM) 77122850876 Viraj Raut Project
435 2024 Jun MBA (BFM) 77122851025 Priyanshi Shrivastava Project
436 2024 Jun MBA (ITSM) 77122851313 Meenakshi M Project
437 2024 Jun MBA (BFM) 77122851564 Mahima Sharma Project
438 2024 Jun MBA (ITSM) 77122851616 Vikas Rohliwal Project
439 2024 Jun MBA (ITSM) 77122851910 Dipendra Maheta Project
440 2024 Jun MBA (BFM) 77122852045 Suyash Rastogi Project
441 2024 Jun MBA (OM) 77122852162 Pooja Prakash Chaudhari Project
442 2024 Jun MBA (BFM) 77122852495 Rushali Shingare Project
443 2024 Jun MBA (ITSM) 77122853068 Parvatham Hari Chandana Project
444 2024 Jun MBA (BFM) 77122853192 Dheeraj Kumar Dhiwar Project
445 2024 Jun MBA (ITSM) 77122853658 Aman Dubey Project
446 2024 Jun MBA (OM) 77122823814 Sunidhi Satti Project
447 2024 Jun MBA (BFM) 77122824056 Jaisheela Sane Project
448 2024 Jun MBA (ITSM) 77122824472 Aman Srivastav Project
449 2024 Jun MBA (ITSM) 77122824573 Aarthi M Project
450 2024 Jun MBA (ITSM) 77122824901 Tanuja Patil Project
451 2024 Jun MBA (OM) 77122825510 Vinayak Arrawatia Project
452 2024 Jun MBA (ITSM) 77122826200 Mukesh Tripathi Project
453 2024 Jun MBA (OM) 77122826241 Mayank Sharma Project
454 2024 Jun MBA (BFM) 77122826338 Amanpreet Kaur Anand Project
455 2024 Jun MBA (ITSM) 77122826757 Nikhil Srivastva Project
456 2024 Jun MBA (ITSM) 77122826820 Akshat Gupta Project
457 2024 Jun MBA (BFM) 77122826969 Anshul Sharma Project
458 2024 Jun MBA (BFM) 77122826979 Anjali Pandey Project
459 2024 Jun MBA (BFM) 77122827002 Garv Gupta Project
460 2024 Jun MBA (ITSM) 77122827220 Mayur Mahale Project
461 2024 Jun MBA (ITSM) 77122827648 Vishwa Popat Project
462 2024 Jun MBA (OM) 77122828360 Bhavesh Pardeshi Project
463 2024 Jun MBA (BFM) 77122828377 Deepika Singh Project
464 2024 Jun MBA (OM) 77122828399 Shivani Srivastava Project
465 2024 Jun MBA (ITSM) 77122828431 Yogeshwar Krushna Choudhari Project
466 2024 Jun MBA (ITSM) 77122828465 Amit Kumar Sahu Project
467 2024 Jun MBA (OM) 77122828891 Subham Dey Project
468 2024 Jun MBA (BFM) 77122829069 Parshant Kumar Project
469 2024 Jun MBA (OM) 77122829275 Ishika Patel Project
470 2024 Jun MBA (OM) 77122829464 Akhila M Project
471 2024 Jun MBA (OM) 77122829941 Deepak Project
472 2024 Jun MBA (BFM) 77122830148 Hrushikesh Sahane Project
473 2024 Jun MBA (BFM) 77122830225 Shubham Kumar Pandey Project
474 2024 Jun MBA (OM) 77122830639 Chintanbhai Anilbhai Parekh Project
475 2024 Jun MBA (ITSM) 77122831489 Nimai Nagar Project
476 2024 Jun MBA (BFM) 77122831995 Pooja Poojary Project
477 2024 Jun MBA (OM) 77122832338 Chaitanya Zodekar Project
478 2024 Jun MBA (ITSM) 77122832563 Nouam Jugalkishor Chopra Project
479 2024 Jun MBA (ITSM) 77122832752 Divyam Raj Project
480 2024 Jun MBA (ITSM) 77122833073 Pradip Yashawanta Patil Project
481 2024 Jun MBA (OM) 77122833319 Sandip Borade Project
482 2024 Jun MBA (ITSM) 77122877599 Thangadurai S Project
483 2024 Jun MBA (ITSM) 77122877607 Rahul Kashyap Project
484 2024 Jun MBA (OM) 77122877769 Gudelu Pavan Shankar Project
485 2024 Jun MBA (BFM) 77122877801 Saleha Ansari Project
486 2024 Jun MBA (BFM) 77122877826 Shreya Gaikwad Project
487 2024 Jun MBA (ITSM) 77122878655 Kathan Dhebar Project
488 2024 Jun MBA (ITSM) 77122878786 Alwin Martis Project
489 2024 Jun MBA (BFM) 77122878820 Deepanshu Baghan Project
490 2024 Jun MBA (OM) 77122879273 Shivangi Nagar Project
491 2024 Jun MBA (OM) 77122879661 Akash Choudhary Project
492 2024 Jun MBA (OM) 77122879695 Dimple Panchal Project
493 2024 Jun MBA (ITSM) 77122879798 Jasmeet Singh Project
494 2024 Jun MBA (BFM) 77122879823 V Sasikumar P Varathan Project
495 2024 Jun MBA (OM) 77122879865 Srishti Johari Project
496 2024 Jun MBA (BFM) 77122880273 Nirali Lalwani Project
497 2024 Jun MBA (ITSM) 77122880484 Vikas Kumar Project
498 2024 Jun MBA (ITSM) 77122880908 Shubham Satkar Project
499 2024 Jun MBA (ITSM) 77122880945 Rajat Shukla Project
500 2024 Jun MBA (ITSM) 77122881130 Mohamed Navarin Anwar P Project
501 2024 Jun MBA (BFM) 77122881352 Shubham Dubey Project
502 2024 Jun MBA (ITSM) 77122881677 Shubham Petkar Project
503 2024 Jun MBA (OM) 77122881736 Parminder Singh Project
504 2024 Jun MBA (BFM) 77122881784 Abhishek Kushwaha Project
505 2024 Jun MBA (OM) 77122881799 Rachna Project
506 2024 Jun MBA (OM) 77122882033 Rupinderjeet Kaur Project
507 2024 Jun MBA (BFM) 77122882204 Ishika Jain Project
508 2024 Jun MBA (BFM) 77122882347 Riya Sandeep Shinde Project
509 2024 Jun MBA (BFM) 77122882361 Prasanna T Project
510 2024 Jun MBA (ITSM) 77122882383 Akash Mandal Project
511 2024 Jun MBA (BFM) 77122882393 Deepak Kumar Tiwari Project
512 2024 Jun MBA (BFM) 77122882450 Ankit Singha Project
513 2024 Jun MBA (BFM) 77122882725 Ridhi Soni Project
514 2024 Jun MBA (OM) 77122882739 Tarun Kumar Project
515 2024 Jun MBA (ITSM) 77122882986 Rohit Khosla Project
516 2024 Jun MBA (OM) 77122883299 Ananthabalaji R Project
517 2024 Jun MBA (ITSM) 77122883769 Susmit Mallick Project
518 2024 Jun MBA (BFM) 77122883824 Divyansh Bhardwaj Project
519 2024 Jun MBA (BFM) 77122883874 Ishika Jumnani Project
520 2024 Jun MBA (BFM) 77122883947 Drishti Shukla Project
521 2024 Jun MBA (OM) 77122883988 Shristi Srivastava Project
522 2024 Jun MBA (ITSM) 77122883992 Rahul Premchand Gupta Project
523 2024 Jun MBA (OM) 77122884175 Amit Kumar Project
524 2024 Jun MBA (ITSM) 77122884242 Kritika Subhash Bujone Project
525 2024 Jun MBA (OM) 77122884478 Pradeep Rathi Project
526 2024 Jun MBA (BFM) 77122884511 Saurabh Gupta Project
527 2024 Jun MBA (ITSM) 77122884579 Harshal Sakharlal Wagh Project
528 2024 Jun MBA (ITSM) 77122884754 Anuja Kishor Nikumbh Project
529 2024 Jun MBA (BFM) 77122884898 Nikhil Raja Project
530 2024 Jun MBA (ITSM) 77122884955 Mohammed Zaydth J Project
531 2024 Jun MBA (OM) 77122885129 Ritesh Mishra Project
532 2024 Jun MBA (OM) 77122885894 Rohit Kale Project
533 2024 Jun MBA (OM) 77122885973 Rajat Agarwal Project
534 2024 Jun MBA (BFM) 77122886792 Jinal Patel Project
535 2024 Jun MBA (ITSM) 77122887325 Vishwa Parekh Project
536 2024 Jun MBA (ITSM) 77122887995 Ankita Kedare Project
537 2024 Jun MBA (OM) 77122888080 Krutika Bhavesh Soni Project
538 2024 Jun MBA (ITSM) 77122888126 Neha Sonawane Project
539 2024 Jun MBA (OM) 77122888145 Ashwin Gaikwad Project
540 2024 Jun MBA (OM) 77122888478 Varun Rai. Project
541 2024 Jun MBA (BFM) 77122888507 Ravindra Gupta Project
542 2024 Jun MBA (ITSM) 77122888684 Pragati Jawalkar Project
543 2024 Jun MBA (ITSM) 77122889043 Nikita Tuli Project
544 2024 Jun MBA (BFM) 77122889738 Ami Panchal Project
545 2024 Jun MBA (ITSM) 77122889862 Tandeep Singh Project
546 2024 Jun MBA (ITSM) 77122853818 Ankita Laxman Junjar Project
547 2024 Jun MBA (OM) 77122853969 Mallikarjun Ningannavar Project
548 2024 Jun MBA (ITSM) 77122854047 Imran Shaikh Project
549 2024 Jun MBA (BFM) 77122854273 Aman Goel Project
550 2024 Jun MBA (ITSM) 77122854274 Balaji Dasari Project
551 2024 Jun MBA (ITSM) 77122854397 Kanchustambham Bala Satya Sai Durga Project
552 2024 Jun MBA (ITSM) 77122854454 Akshat Tripathi Project
553 2024 Jun MBA (ITSM) 77122855023 Subham Mukherjee Project
554 2024 Jun MBA (OM) 77122855332 Chandrasekhar Singadhasari Project
555 2024 Jun MBA (BFM) 77122855650 Sumit Ambre Project
556 2024 Jun MBA (BFM) 77122855736 Pankaj Chavan Project
557 2024 Jun MBA (OM) 77122855861 Mamata Choudhary Project
558 2024 Jun MBA (BFM) 77122856006 Neha Jhawar Project
559 2024 Jun MBA (BFM) 77122856121 Prajwalini Dhal Project
560 2024 Jun MBA (ITSM) 77122856348 Aman Varshney Project
561 2024 Jun MBA (BFM) 77122856457 Rookshad Sumariwalla Project
562 2024 Jun MBA (OM) 77122856463 Maddi Rohitha Project
563 2024 Jun MBA (ITSM) 77122856834 Anshi Singh Project
564 2024 Jun MBA (BFM) 77122857082 Rohan Rajendra Chauhan Project
565 2024 Jun MBA (ITSM) 77122857388 Hiloni Shah Project
566 2024 Jun MBA (OM) 77122857465 Ballari Chaudhury Project
567 2024 Jun MBA (ITSM) 77122857487 Rhythm Verma Project
568 2024 Jun MBA (BFM) 77122857525 Ishan Verma Project
569 2024 Jun MBA (BFM) 77122857776 Salman Naik Project
570 2024 Jun MBA (BFM) 77122857981 Rakshathraj Poojary Project
571 2024 Jun MBA (OM) 77122858188 Ankit Jain Project
572 2024 Jun MBA (OM) 77122858217 Sandra Victor Project
573 2024 Jun MBA (BFM) 77122858237 Shivangini Jindal Project
574 2024 Jun MBA (OM) 77122858337 Fakhri Chunawala Project
575 2024 Jun MBA (BFM) 77122858347 Mona Gupta Project
576 2024 Jun MBA (OM) 77122858410 Shreya Acharya Project
577 2024 Jun MBA (ITSM) 77122858442 Astha Shrivastava Project
578 2024 Jun MBA (ITSM) 77122858864 Rishabh Gupta Project
579 2024 Jun MBA (OM) 77122858952 Vijaykumar Tarapara Project
580 2024 Jun MBA (OM) 77122859332 Adhvaryu Parth Rajeshbhai Project
581 2024 Jun MBA (OM) 77122859363 Akhilesh Sharma Project
582 2024 Jun MBA (BFM) 77122859369 Diwakar Dwarah Project
583 2024 Jun MBA (BFM) 77122859480 Dishank Gupta Project
584 2024 Jun MBA (ITSM) 77122859704 Jadhav Charudatta Brijesh Project
585 2024 Jun MBA (BFM) 77122859878 Basab Guria Project
586 2024 Jun MBA (ITSM) 77122860409 Gangumalla VG Macharayya Project
587 2024 Jun MBA (ITSM) 77122860431 Manas Mangaonkar Project
588 2024 Jun MBA (ITSM) 77122860590 Harsh Awasthi Project
589 2024 Jun MBA (OM) 77122860738 Riya Gupta Project
590 2024 Jun MBA (BFM) 77122861005 Pradeep Harishchandra Jiandani Project
591 2024 Jun MBA (BFM) 77122861201 Ajit Kumar Project
592 2024 Jun MBA (BFM) 77122861217 Sakshi Vishnu Soni Project
593 2024 Jun MBA (OM) 77122861816 Anoop M Project
594 2024 Jun MBA (OM) 77122861855 Tarique Aziz Project
595 2024 Jun MBA (OM) 77122861863 Rahul Kumar Shah Project
596 2024 Jun MBA (BFM) 77122861958 Zeba Khan Project
597 2024 Jun MBA (OM) 77122862107 Kranti Paidi Project
598 2024 Jun MBA (ITSM) 77122862372 Tati Sai Sailusha Project
599 2024 Jun MBA (BFM) 77122862477 Chetanya Sobti Project
600 2024 Jun MBA (ITSM) 77122862782 Aarthi Angeline P Project
601 2024 Jun MBA (OM) 77122863322 Botta Gowtham Project
602 2024 Jun MBA (BFM) 77122863427 Parth Dhanani Project
603 2024 Jun MBA (OM) 77122863469 Yash Soni Project
604 2024 Jun MBA (ITSM) 77122863632 Swamini Pimpale Project
605 2024 Jun MBA (OM) 77122863954 Shipra Singh Project
606 2024 Jun MBA (ITSM) 77122864011 Himanshu Singhal Project
607 2024 Jun MBA (BFM) 77122864249 Tanvi Keer Project
608 2024 Jun MBA (BFM) 77122864472 Pratik Chande Project
609 2024 Jun MBA (OM) 77122339407 Kamini Jasrotia Project
610 2024 Jun MBA (OM) 77122339536 Riya Kumar Project
611 2024 Jun MBA (OM) 77122339612 Sakshi Sehgal Project
612 2024 Jun MBA (ITSM) 77122340607 Mehul Nisar Project
613 2024 Jun MBA (ITSM) 77122341401 Ashwini Ramkisan Doble Project
614 2024 Jun MBA (ITSM) 77122341534 Krishnakanth T N Project
615 2024 Jun MBA (ITSM) 77122341997 Varnika Jain Project
616 2024 Jun MBA (OM) 77122342314 Kevinkumar Patel Project
617 2024 Jun MBA (OM) 77122342770 Tauseef Deshpande Project
618 2024 Jun MBA (OM) 77122343324 Kundan Kishore Project
619 2024 Jun MBA (ITSM) 77122343384 Paulrichi Magimaidas Project
620 2024 Jun MBA (ITSM) 77122343626 Ayon Mukherjee Project
621 2024 Jun MBA (ITSM) 77122343807 Sayalee Joshi Project
622 2024 Jun MBA (OM) 77122324215 Barri Prasanna Kumar Project
623 2024 Jun MBA (OM) 77122324232 Gaurav Devray Pai Project
624 2024 Jun MBA (OM) 77122324793 Puspendu Dhara Project
625 2024 Jun MBA (ITSM) 77122325171 Abhijeet Kumar Gupta Project
626 2024 Jun MBA (ITSM) 77122325180 Namrata Brahmbhatt Project
627 2024 Jun MBA (OM) 77122325365 Sudeep Menon U Project
628 2024 Jun MBA (ITSM) 77122325390 Dhruv Mahajan Project
629 2024 Jun MBA (ITSM) 77122325413 PRATHIKSHA D SHETTY Project
630 2024 Jun MBA (ITSM) 77122325419 Komala Patel S Project
631 2024 Jun MBA (OM) 77122325432 Saket Suman Project
632 2024 Jun MBA (ITSM) 77122325588 Amrita Sinha Project
633 2024 Jun MBA (ITSM) 77122326377 Rajashree Mohanty Project
634 2024 Jun MBA (OM) 77122326476 Viral Bhadgavkar Project
635 2024 Jun MBA (OM) 77122326876 Shivdas Madham Project
636 2024 Jun MBA (ITSM) 77122327297 Amit Sharma Project
637 2024 Jun MBA (OM) 77122327338 Susmita Basak Project
638 2024 Jun MBA (OM) 77122327688 Sanket Ambike Project
639 2024 Jun MBA (OM) 77122328231 Akshay Deep Project
640 2024 Jun MBA (OM) 77122328246 Harish Kathayat Project
641 2024 Jun MBA (OM) 77122328311 Ratnesh Kumar Project
642 2024 Jun MBA (OM) 77122328681 Vraj Shah Project
643 2024 Jun MBA (ITSM) 77122328764 Saumya Awasthi Project
644 2024 Jun MBA (ITSM) 77122328861 Franky Crasto Project
645 2024 Jun MBA (ITSM) 77122329341 Renugadevi JS Project
646 2024 Jun MBA (ITSM) 77122329928 Ian Pinto Project
647 2024 Jun MBA (ITSM) 77122330728 Sagar Vasoya Project
648 2024 Jun MBA (ITSM) 77122331256 Swati Kumari Project
649 2024 Jun MBA (ITSM) 77122331313 Dhanshri Govind Bhole Project
650 2024 Jun MBA (ITSM) 77122331527 Srinivasa R Project
651 2024 Jun MBA (ITSM) 77122297974 Anurag Jha Project
652 2024 Jun MBA (ITSM) 77122298175 Atika Mehta Project
653 2024 Jun MBA (OM) 77122298389 Sundararajan Muthiah Project
654 2024 Jun MBA (OM) 77122298470 Geeta Ubale Project
655 2024 Jun MBA (ITSM) 77122298819 Hardik Soni Project
656 2024 Jun MBA (ITSM) 77122299165 Pooja Rani .. Project
657 2024 Jun MBA (ITSM) 77122299183 Pratibha Dubey Project
658 2024 Jun MBA (OM) 77122299243 Reddivari Srikanth Reddy Project
659 2024 Jun MBA (OM) 77122299464 Mohd Wasim Akhtar Project
660 2024 Jun MBA (ITSM) 77122299785 Alka Yadav Project
661 2024 Jun MBA (ITSM) 77122299809 Nandita Dhar Project
662 2024 Jun MBA (ITSM) 77122300032 Pulkit Gupta Project
663 2024 Jun MBA (ITSM) 77122300232 Harsh Madhukar Project
664 2024 Jun MBA (ITSM) 77122300368 Gagandeep Nagda Project
665 2024 Jun MBA (ITSM) 77122300447 Abhijit Chandra Project
666 2024 Jun MBA (OM) 77122301172 Laxmi Das Project
667 2024 Jun MBA (OM) 77122301249 Tahura Project
668 2024 Jun MBA (ITSM) 77122301548 Avinash Arya Project
669 2024 Jun MBA (ITSM) 77122301829 P Kartik Project
670 2024 Jun MBA (OM) 77122301934 Shashank Chandrakant Deshpande Project
671 2024 Jun MBA (OM) 77122302061 Anurag Sharma Project
672 2024 Jun MBA (ITSM) 77122302381 Divyank Sharma Project
673 2024 Jun MBA (OM) 77122302436 Shaikh Raees Maniyar Project
674 2024 Jun MBA (OM) 77122303292 Rutvik Rasikkumar Patel Project
675 2024 Jun MBA (OM) 77122303397 Aman Dagur Project
676 2024 Jun MBA (ITSM) 77122303567 Giribabu Vadika Project
677 2024 Jun MBA (ITSM) 77122304039 Oisika Bhanja Project
678 2024 Jun MBA (ITSM) 77122304093 Shefali Karmarkar Project
679 2024 Jun MBA (ITSM) 77122304443 Atul Suresh Dubey Project
680 2024 Jun MBA (ITSM) 77122305024 K Rajesh Kumar Project
681 2024 Jun MBA (ITSM) 77122306012 Sahil Patil Project
682 2024 Jun MBA (ITSM) 77122306092 Moiz Shaikh Project
683 2024 Jun MBA (ITSM) 77122306188 Ranjan Shetty Project
684 2024 Jun MBA (ITSM) 77122306212 Aditi Dani Project
685 2024 Jun MBA (OM) 77122306460 Ruchika Shrivastva Project
686 2024 Jun MBA (OM) 77122306484 Sagar Sharad Medhe Project
687 2024 Jun MBA (ITSM) 77122307351 Anshika Srivastava Project
688 2024 Jun MBA (ITSM) 77122308069 Justin Job P Project
689 2024 Jun MBA (ITSM) 77122308274 Krishnakant Agarwal Project
690 2024 Jun MBA (ITSM) 77122309017 Aswathi Nambisan Project
691 2024 Jun MBA (OM) 77122309096 Puspalata Behera Project
692 2024 Jun MBA (OM) 77122309495 Dinesh Manwani Project
693 2024 Jun MBA (ITSM) 77122309612 Saily Nagarkar Project
694 2024 Jun MBA (ITSM) 77122310207 Harshada Kardile Project
695 2024 Jun MBA (OM) 77122310477 Neel Warge Project
696 2024 Jun MBA (OM) 77122310486 Parth Upadhyay Project
697 2024 Jun MBA (OM) 77122312187 Chanchal Project
698 2024 Jun MBA (OM) 77122312642 Sahiba Arora Project
699 2024 Jun MBA (ITSM) 77122312714 Sharanya KN Project
700 2024 Jun MBA (ITSM) 77122313000 Safi Uzzaman Project
701 2024 Jun MBA (OM) 77122313162 Amit Gokul Anand Project
702 2024 Jun MBA (OM) 77122313211 Kartikeya Bhimta Project
703 2024 Jun MBA (ITSM) 77122313321 Rakshita Naik Project
704 2024 Jun MBA (OM) 77122313931 Ashish Prakash Naidu Project
705 2024 Jun MBA (ITSM) 77122314183 Sushmita Shekar Kanchan Project
706 2024 Jun MBA (ITSM) 77122314408 Harsh Ballav Project
707 2024 Jun MBA (OM) 77122314490 Peter G Project
708 2024 Jun MBA (ITSM) 77122314712 Ritesh Kumar Project
709 2024 Jun MBA (ITSM) 77122314924 SRIRANGAM VENKATA SAI DEEPAK KUMAR Project
710 2024 Jun MBA (OM) 77122315465 Seema Mittal Project
711 2024 Jun MBA (ITSM) 77122315540 Shubham Mishra Project
712 2024 Jun MBA (ITSM) 77122315845 Abhinav Jha Project
713 2024 Jun MBA (ITSM) 77122315999 Harshal Chaudhari Project
714 2024 Jun MBA (ITSM) 77122316076 Lanka Sujitha Project
715 2024 Jun MBA (ITSM) 77122316082 Sumit Kumar Project
716 2024 Jun MBA (OM) 77122291218 Shuvojit Ghosh Project
717 2024 Jun MBA (ITSM) 77122291494 Prathmesh Vibhute Project
718 2024 Jun MBA (OM) 77122291583 Majesh Nair Project
719 2024 Jun MBA (ITSM) 77122293164 Deeksha Relhan Project
720 2024 Jun MBA (OM) 77122293783 Chandan Lal Sharma Project
721 2024 Jun MBA (ITSM) 77122293895 Samarth Saxena Project
722 2024 Jun MBA (ITSM) 77122294003 Aishwarya K Project
723 2024 Jun MBA (ITSM) 77122294333 Sayali Agale Project
724 2024 Jun MBA (ITSM) 77122295054 Gurkirat Anand Project
725 2024 Jun MBA (OM) 77122295628 Vijay Hiraman Jungade Project
726 2024 Jun MBA (ITSM) 77122295939 Shekhar Panwar Project
727 2024 Jun MBA (OM) 77122296175 Asutosh Agarwal Project
728 2024 Jun MBA (OM) 77122296213 Gaurav Kavathankar Project
729 2024 Jun MBA (OM) 77122296261 Ajay Kumar A S Project
730 2024 Jun MBA (ITSM) 77122296693 Rohit Patil Project
731 2024 Jun MBA (ITSM) 77122297151 Himanshu Gautam Project
732 2024 Jun MBA (OM) 77122297710 Gopi Prasad H V Project
733 2024 Jun MBA (OM) 77122297855 Rahul Khabya Project
734 2024 Jun MBA (ITSM) 77122331647 Snehal Prabhakar Bhange Project
735 2024 Jun MBA (ITSM) 77122331973 Prateek Bhatnagar Project
736 2024 Jun MBA (OM) 77122332093 Karan Patel Project
737 2024 Jun MBA (OM) 77122332324 Anchit Project
738 2024 Jun MBA (ITSM) 77122332336 Subrata Mondal Project
739 2024 Jun MBA (OM) 77122332513 Aayushi Choksi Project
740 2024 Jun MBA (ITSM) 77122332851 Rohan Dhandhukiya Project
741 2024 Jun MBA (OM) 77122333117 Abhinav Kumar Chaudhri Project
742 2024 Jun MBA (ITSM) 77122333458 Ayush Agrawal Project
743 2024 Jun MBA (ITSM) 77122333479 Aditya Athwasiya Project
744 2024 Jun MBA (OM) 77122333531 Ashvio Saldanha Project
745 2024 Jun MBA (ITSM) 77122334673 Ambika Bajpai Project
746 2024 Jun MBA (ITSM) 77122335196 Vikas Londhe Project
747 2024 Jun MBA (ITSM) 77122335582 Arya Dipak Hegishte Project
748 2024 Jun MBA (OM) 77122336259 Pranshu Pandey Project
749 2024 Jun MBA (ITSM) 77122336338 Soumya Shukla Project
750 2024 Jun MBA (OM) 77122336530 Shubham Santosh Gaikwad Project
751 2024 Jun MBA (OM) 77122338366 Shashikant Sharma Project
752 2024 Jun MBA (OM) 77122338769 Anirban Kumar Sinha Project
753 2024 Jun MBA (ITSM) 77122339063 Akarsh Gupta Project
754 2024 Jun MBA (OM) 77122316372 Dnyanada Athavale Project
755 2024 Jun MBA (ITSM) 77122316405 Justin Sebastian Kappithanparmpil Project
756 2024 Jun MBA (ITSM) 77122316541 Anuja Dnyaneshwar Patil Project
757 2024 Jun MBA (ITSM) 77122316703 Varnindra Patel Project
758 2024 Jun MBA (OM) 77122316715 Sachin Kumar Verma Project
759 2024 Jun MBA (OM) 77122316769 Kajal Choursiya Project
760 2024 Jun MBA (OM) 77122316855 Tushar Ahirrao Project
761 2024 Jun MBA (ITSM) 77122317069 Indu Yadav Project
762 2024 Jun MBA (OM) 77122317269 Danish Faraz Project
763 2024 Jun MBA (ITSM) 77122318187 Gayatri Singh Project
764 2024 Jun MBA (OM) 77122318227 Achint Pathak Project
765 2024 Jun MBA (ITSM) 77122318575 Nishchay Anand Project
766 2024 Jun MBA (OM) 77122318786 Ankit Pandey Project
767 2024 Jun MBA (ITSM) 77122318903 Busipalli Devakiran Reddy Project
768 2024 Jun MBA (OM) 77122319454 Shweta Bhardwaj Project
769 2024 Jun MBA (ITSM) 77122319934 Dhanya Sudhish Panikkassery Project
770 2024 Jun MBA (OM) 77122320179 Vivek Singh Project
771 2024 Jun MBA (ITSM) 77122322571 Akshay Dinesh Badgujar Project
772 2024 Jun MBA (ITSM) 77122323138 Mahalakshmi Kannan Project
773 2024 Jun MBA (OM) 77122323228 Shabana Khan Project
774 2024 Jun MBA (OM) 77122323534 Monika Sateesh Singh Project
775 2024 Jun MBA (ITSM) 77122323579 Supriya Singh Project
776 2024 Jun MBA (OM) 77122324111 Santosh Kumar Singh Project
777 2024 Jun MBA (ITSM) 77122415558 Ashwini Parche Project
778 2024 Jun MBA (OM) 77122415898 Monica Randhir Project
779 2024 Jun MBA (ITSM) 77122416156 Animesh Omar Project
780 2024 Jun MBA (ITSM) 77122416364 Pratik Rajesh Balasaria Project
781 2024 Jun MBA (OM) 77122416457 Deepali Dandage Project
782 2024 Jun MBA (OM) 77122416524 Munjal Raval Project
783 2024 Jun MBA (OM) 77122416764 Srishti Kaushik Project
784 2024 Jun MBA (ITSM) 77122416874 Ajay Singh Project
785 2024 Jun MBA (OM) 77122416878 Amit Kumar Project
786 2024 Jun MBA (OM) 77122417207 Sanket Mehta Project
787 2024 Jun MBA (OM) 77122417440 Soumyaranjan Pati Project
788 2024 Jun MBA (ITSM) 77122417744 Ankita Sagane Project
789 2024 Jun MBA (ITSM) 77122419896 Vansh Duggal Project
790 2024 Jun MBA (OM) 77122420139 Vikas Vyas Project
791 2024 Jun MBA (ITSM) 77122420552 Himani Parihar Project
792 2024 Jun MBA (ITSM) 77122420799 Anushka Damle Project
793 2024 Jun MBA (ITSM) 77122421153 Parvati Rawat Project
794 2024 Jun MBA (OM) 77122421554 Sidhant Singh Rathore Project
795 2024 Jun MBA (OM) 77122422294 Lakshmi Narayana Bashima Project
796 2024 Jun MBA (OM) 77122422447 Samradhi Sudhakar Salian Project
797 2024 Jun MBA (ITSM) 77122422596 Srishty Bhushan Project
798 2024 Jun MBA (OM) 77122422692 Panchal Sohagbhai Ashokbhai Project
799 2024 Jun MBA (ITSM) 77122423628 Suraj Pratap Singh Project
800 2024 Jun MBA (OM) 77122423965 Aneri Shah Project
801 2024 Jun MBA (OM) 77122424066 Raju Ketha Project
802 2024 Jun MBA (OM) 77122424249 Pratibha Agarwal Project
803 2024 Jun MBA (ITSM) 77122394054 Manisha Project
804 2024 Jun MBA (ITSM) 77122394849 Raghav Kansal Project
805 2024 Jun MBA (OM) 77122395264 Rishi Bajpai Project
806 2024 Jun MBA (OM) 77122395274 Bhargav Kamat Project
807 2024 Jun MBA (ITSM) 77122395635 Sonia Arya Project
808 2024 Jun MBA (ITSM) 77122395997 Priyanshi Saxena Project
809 2024 Jun MBA (OM) 77122396147 Nachiketh V Project
810 2024 Jun MBA (OM) 77122396226 Chandramani Kumar Project
811 2024 Jun MBA (ITSM) 77122396330 Harsha Parghi Project
812 2024 Jun MBA (ITSM) 77122396519 Immanuel C V Project
813 2024 Jun MBA (ITSM) 77122396661 Ayush Lonari Project
814 2024 Jun MBA (OM) 77122396779 Akash Asim Project
815 2024 Jun MBA (OM) 77122397107 Badal Binay Ray Project
816 2024 Jun MBA (ITSM) 77122397164 Binit Kumar Project
817 2024 Jun MBA (ITSM) 77122397839 Sachin Sharma Project
818 2024 Jun MBA (OM) 77122398215 Gauravh Bhasiin Project
819 2024 Jun MBA (ITSM) 77122398367 Nausheen Riyaz Bangi Project
820 2024 Jun MBA (OM) 77122398638 R. Satish Project
821 2024 Jun MBA (ITSM) 77122399031 Tejaswini Bhagwan Kothawade Project
822 2024 Jun MBA (ITSM) 77122399306 Rahul Verma Project
823 2024 Jun MBA (OM) 77122399542 Tejas Rohit Project
824 2024 Jun MBA (OM) 77122399722 Nitin Kumar Project
825 2024 Jun MBA (ITSM) 77122400261 Tejas Rajesh Rathod Project
826 2024 Jun MBA (ITSM) 77122400298 Ashish Singh Project
827 2024 Jun MBA (OM) 77122400313 Bhavik Shah Project
828 2024 Jun MBA (OM) 77122400434 Chirashri Chanakya Project
829 2024 Jun MBA (OM) 77122400590 Deepshikha Tiwari Project
830 2024 Jun MBA (OM) 77122400827 Harshwardhan Deoras Project
831 2024 Jun MBA (ITSM) 77122400940 Shivangi Singhal Project
832 2024 Jun MBA (ITSM) 77122401591 Rakhee Jain Project
833 2024 Jun MBA (OM) 77122401667 Sandeep Kumar Gupta Project
834 2024 Jun MBA (ITSM) 77122401811 Dev Krishna Ranjan Project
835 2024 Jun MBA (OM) 77122401950 Sanjiv Kumar Shah Project
836 2024 Jun MBA (OM) 77122402245 Kamana Shukla Project
837 2024 Jun MBA (ITSM) 77122402655 Pooja Pandey Project
838 2024 Jun MBA (OM) 77122402678 Snehal Chaudhari Project
839 2024 Jun MBA (OM) 77122402927 KORUMILLI SUGUNA Project
840 2024 Jun MBA (ITSM) 77122403063 Bhushan Dhale Project
841 2024 Jun MBA (ITSM) 77122403400 Gokul G Project
842 2024 Jun MBA (OM) 77122403404 Ashish Mathew Project
843 2024 Jun MBA (ITSM) 77122403467 Mishika Singh Project
844 2024 Jun MBA (OM) 77122403472 Sanjal Shah Project
845 2024 Jun MBA (ITSM) 77122403730 Ananya Sethi Project
846 2024 Jun MBA (ITSM) 77122404081 Sakshi Goel Project
847 2024 Jun MBA (ITSM) 77122404129 Aditya Arun Prakash Malviya Project
848 2024 Jun MBA (OM) 77122404290 Shivam Mathuria Project
849 2024 Jun MBA (OM) 77122404594 Dhanesh Kumar Sharma Project
850 2024 Jun MBA (ITSM) 77122405046 Sini Ryan Project
851 2024 Jun MBA (OM) 77122405282 Harshita Chaurasia Project
852 2024 Jun MBA (OM) 77122351248 Vishal Seth Project
853 2024 Jun MBA (ITSM) 77122351422 MD Afreen Project
854 2024 Jun MBA (ITSM) 77122351669 Kiran Jadhav Project
855 2024 Jun MBA (OM) 77122352036 Rasmi Ranjan Das Project
856 2024 Jun MBA (OM) 77122352083 Rahul Dixit Project
857 2024 Jun MBA (OM) 77122352150 Ashesh Dutta Project
858 2024 Jun MBA (OM) 77122352294 Adarsh Unni Project
859 2024 Jun MBA (OM) 77122352467 Sanath Mahesh Talekar Project
860 2024 Jun MBA (ITSM) 77122352496 Rushi Kadam Project
861 2024 Jun MBA (ITSM) 77122352607 Aasma Desai Project
862 2024 Jun MBA (ITSM) 77122353382 Kunal Kwatra Project
863 2024 Jun MBA (OM) 77122354340 Ashita Project
864 2024 Jun MBA (OM) 77122354677 Asif Nawaz Shah Project
865 2024 Jun MBA (ITSM) 77122354707 Animash Neogi Project
866 2024 Jun MBA (ITSM) 77122355057 Suman Yadav Project
867 2024 Jun MBA (ITSM) 77122355175 Rajan Kulshreshtha Project
868 2024 Jun MBA (OM) 77122355363 Vaishnavi Suresh Patil Project
869 2024 Jun MBA (OM) 77122355488 Dhvanil Bhavsar Project
870 2024 Jun MBA (OM) 77122355909 Prakriti Project
871 2024 Jun MBA (OM) 77122356879 Sagar Gunjal Project
872 2024 Jun MBA (OM) 77122357847 Rajarshi Raha Project
873 2024 Jun MBA (OM) 77122357935 Ananya Talwar Project
874 2024 Jun MBA (ITSM) 77122358017 Shailendra Kapoor Project
875 2024 Jun MBA (ITSM) 77122358219 Ifrah Gulzar Project
876 2024 Jun MBA (OM) 77122358603 Neha Bagri Project
877 2024 Jun MBA (ITSM) 77122358666 Malay Gupta Project
878 2024 Jun MBA (OM) 77122359236 Jatin Mhatre Project
879 2024 Jun MBA (ITSM) 77122359301 Shweta Dhale Project
880 2024 Jun MBA (ITSM) 77122359813 Eshita Gala Project
881 2024 Jun MBA (OM) 77122360315 Parth Kalia Project
882 2024 Jun MBA (OM) 77122360372 Suryakant Shinde Project
883 2024 Jun MBA (ITSM) 77122360443 Nishtha Bareja Project
884 2024 Jun MBA (OM) 77122361688 Manonita Jain Project
885 2024 Jun MBA (ITSM) 77122361711 Raghul D Project
886 2024 Jun MBA (OM) 77122362079 Mehulbhai Bhagvansang Jadav Project
887 2024 Jun MBA (OM) 77122362339 Bushra Anwar Project
888 2024 Jun MBA (OM) 77122362365 Akshay Thampan Project
889 2024 Jun MBA (OM) 77122362403 Shramika Krishna Chiluka Project
890 2024 Jun MBA (ITSM) 77122362816 Antas Gupta Project
891 2024 Jun MBA (ITSM) 77122362960 Nikita Kolekar Project
892 2024 Jun MBA (ITSM) 77122363128 DEEPAK KATHI Project
893 2024 Jun MBA (ITSM) 77122363605 Ashish Kumar Kushwaha Project
894 2024 Jun MBA (OM) 77122363820 Lavleen Kumari Project
895 2024 Jun MBA (OM) 77122363851 Lovkesh Kumar Project
896 2024 Jun MBA (ITSM) 77122363898 Bhagyesh Shukla Project
897 2024 Jun MBA (ITSM) 77122364168 Deven Karande Project
898 2024 Jun MBA (OM) 77122364870 Nisha Poojari Project
899 2024 Jun MBA (ITSM) 77122365062 Nikhil Dalvi Project
900 2024 Jun MBA (ITSM) 77122365344 Vyshak U V Project
901 2024 Jun MBA (OM) 77122366073 Venkata Lakshmi Bhanumathi Boddupalli Project
902 2024 Jun MBA (OM) 77122366146 Shreya Khare Project
903 2024 Jun MBA (OM) 77122366148 Aqiv Ali Project
904 2024 Jun MBA (OM) 77122366278 Samriddhi Adhikari Project
905 2024 Jun MBA (OM) 77122366444 Shivshankar Yadav Project
906 2024 Jun MBA (OM) 77122366491 Prathamesh Kayangude Project
907 2024 Jun MBA (OM) 77122366677 Puja Acharya Project
908 2024 Jun MBA (OM) 77122366736 Amrita Kumari Project
909 2024 Jun MBA (ITSM) 77122367037 Harman Singh Project
910 2024 Jun MBA (OM) 77122367744 Pratik Patil Project
911 2024 Jun MBA (OM) 77122367788 Aditya Ganesan Project
912 2024 Jun MBA (ITSM) 77122368252 Vrushali Nagorao Sarnaik Project
913 2024 Jun MBA (OM) 77122368329 Shubhankar Project
914 2024 Jun MBA (ITSM) 77122368462 Faizan Ahmed Khan Project
915 2024 Jun MBA (OM) 77122368526 Aaryan Dube Project
916 2024 Jun MBA (ITSM) 77122368929 Rakeshkumar Verma Project
917 2024 Jun MBA (OM) 77122369402 Ameya Jadhav Project
918 2024 Jun MBA (OM) 77122369494 Neha Kumari Project
919 2024 Jun MBA (OM) 77122370083 Tapas Kr Roy Project
920 2024 Jun MBA (ITSM) 77122370279 Pratyush Shrawan Mishra Project
921 2024 Jun MBA (OM) 77122371078 Priyanka Jha Project
922 2024 Jun MBA (OM) 77122371309 Janhavi Salvi Project
923 2024 Jun MBA (ITSM) 77122371411 Ankita Nandy Project
924 2024 Jun MBA (ITSM) 77122371416 Yogesh Hotchandani Project
925 2024 Jun MBA (ITSM) 77122372132 Niharika Jain Project
926 2024 Jun MBA (ITSM) 77122372182 Akshata Dnyaneshwar Nagawade Project
927 2024 Jun MBA (ITSM) 77122372248 Yogesh Naik Project
928 2024 Jun MBA (OM) 77122372341 Sumit Chettri Project
929 2024 Jun MBA (ITSM) 77122372385 Mohini Avinash Chaudhari Project
930 2024 Jun MBA (OM) 77122372613 Abhimanyu Singh Project
931 2024 Jun MBA (ITSM) 77122374383 Sindhuja D Project
932 2024 Jun MBA (OM) 77122374614 Divyant Yadav Project
933 2024 Jun MBA (OM) 77122374721 Tippireddy Geetha Ajay Kumar Reddy Project
934 2024 Jun MBA (ITSM) 77122375201 Sai Sailusha Kalicheti Project
935 2024 Jun MBA (ITSM) 77122375717 Arijit Saha Ray Project
936 2024 Jun MBA (OM) 77122375892 Roshin Joshua Paul Project
937 2024 Jun MBA (ITSM) 77122376912 Akshay Edur Project
938 2024 Jun MBA (ITSM) 77122376923 Sanchita Bhostekar Project
939 2024 Jun MBA (OM) 77122376957 Khushboo Malhotra Project
940 2024 Jun MBA (OM) 77122377550 Subrata Biswas Project
941 2024 Jun MBA (ITSM) 77122377748 Krithika K Project
942 2024 Jun MBA (OM) 77122377907 Vishnupriya Taninki Project
943 2024 Jun MBA (OM) 77122378063 Yadvender Singh Project
944 2024 Jun MBA (OM) 77122378117 Hiten Kadu Project
945 2024 Jun MBA (OM) 77122378262 Tamal Das Project
946 2024 Jun MBA (OM) 77122343833 Sushil Singh Project
947 2024 Jun MBA (ITSM) 77122343843 Shivani Surve Project
948 2024 Jun MBA (ITSM) 77122344178 Manish Kumar Project
949 2024 Jun MBA (OM) 77122345354 Akhilesh Prajapati Project
950 2024 Jun MBA (ITSM) 77122345430 Kota Sai Akhil Project
951 2024 Jun MBA (OM) 77122345518 Mohan Kumar C Project
952 2024 Jun MBA (ITSM) 77122345739 Saroj Kumar Meher Project
953 2024 Jun MBA (OM) 77122345762 Sudhanshu Tiwari Project
954 2024 Jun MBA (OM) 77122345786 Pawan Tiwari Project
955 2024 Jun MBA (ITSM) 77122345970 Swarupanand Mishra Project
956 2024 Jun MBA (ITSM) 77122346168 Manisha Mohanty Project
957 2024 Jun MBA (ITSM) 77122346696 Harsh Samnani Project
958 2024 Jun MBA (OM) 77122346945 Harshit Kumar Project
959 2024 Jun MBA (OM) 77122347363 Nikunj Dattatraya Jagtap Project
960 2024 Jun MBA (ITSM) 77122347385 Harsha Gondhalekar Project
961 2024 Jun MBA (OM) 77122347386 Sushil Kumar Pandey Project
962 2024 Jun MBA (OM) 77122347585 Sarthak Mishra Project
963 2024 Jun MBA (OM) 77122348724 Jitin Mohan Sharma Project
964 2024 Jun MBA (OM) 77122348773 Akash Rana Project
965 2024 Jun MBA (ITSM) 77122349144 Krishna Daga Project
966 2024 Jun MBA (ITSM) 77122349372 Saadiya Dafedar Project
967 2024 Jun MBA (ITSM) 77122349520 Chandru V Project
968 2024 Jun MBA (OM) 77122349920 Tanvi Kochhar Project
969 2024 Jun MBA (OM) 77122350211 Simjumon Cyriac Project
970 2024 Jun MBA (ITSM) 77122350561 Harihara Narayanan M Project
971 2024 Jun MBA (ITSM) 77122350751 Shivam Kaushlendra Project
972 2024 Jun MBA (ITSM) 77122350796 Alok Vyas Project
973 2024 Jun MBA (OM) 77122350832 Mohd Imran Ansari Project
974 2024 Jun MBA (OM) 77122350886 Deepanshi Garg Project
975 2024 Jun MBA (ITSM) 77122405990 Aditi Mittal Project
976 2024 Jun MBA (OM) 77122406194 Rishabh Mathur Project
977 2024 Jun MBA (ITSM) 77122407340 Vaishali Project
978 2024 Jun MBA (ITSM) 77122407415 Mohd Ahmad Project
979 2024 Jun MBA (OM) 77122407435 Manal Desai Project
980 2024 Jun MBA (ITSM) 77122407708 Shukanksh Upmanyu Project
981 2024 Jun MBA (OM) 77122407753 Punith Kumar Bellakki Project
982 2024 Jun MBA (ITSM) 77122407993 Gifty Joyner Bhimavarapu Project
983 2024 Jun MBA (OM) 77122408206 Aafiya Mulla Project
984 2024 Jun MBA (ITSM) 77122408665 B. S. Rachana Project
985 2024 Jun MBA (OM) 77122408978 Snehal Khule Project
986 2024 Jun MBA (OM) 77122409226 Manjunatha R T Project
987 2024 Jun MBA (ITSM) 77122409238 Amruthavalli M Project
988 2024 Jun MBA (OM) 77122409390 Sambeet Moharana Project
989 2024 Jun MBA (ITSM) 77122410005 Prashansha Kesarwani Project
990 2024 Jun MBA (OM) 77122410140 Bimla Project
991 2024 Jun MBA (OM) 77122410386 Kiran A S Project
992 2024 Jun MBA (ITSM) 77122410443 Suvadip Dutta Project
993 2024 Jun MBA (ITSM) 77122410741 Samir Kumar Bastia Project
994 2024 Jun MBA (ITSM) 77122411158 Akash Bhandari Project
995 2024 Jun MBA (OM) 77122411253 Mihir Verma Project
996 2024 Jun MBA (OM) 77122411432 Pranjul Tiwari Project
997 2024 Jun MBA (ITSM) 77122411579 Prathmesh Chopade Project
998 2024 Jun MBA (OM) 77122411766 Siddhant Dilip Dhanwate Project
999 2024 Jun MBA (ITSM) 77122412587 Marina Abraham Project
1000 2024 Jun MBA (OM) 77122412712 Kamlesh Dhuria Project
1001 2024 Jun MBA (ITSM) 77122413124 Seema Project
1002 2024 Jun MBA (OM) 77122413869 Abhinand CK Project
1003 2024 Jun MBA (OM) 77122413948 Moumita Dhang Project
1004 2024 Jun MBA (ITSM) 77122414262 Gundla Rajashekar Project
1005 2024 Jun MBA (ITSM) 77122414377 Saksham Sethi Project
1006 2024 Jun MBA (OM) 77122414418 Sumit Kumar Diwakar Project
1007 2024 Jun MBA (OM) 77122415163 Rama Dhekane Project
1008 2024 Jun MBA (OM) 77122415184 Mohammad Imran Abdul Sadique Project
1009 2024 Jun MBA (ITSM) 77122380566 Bhushan Gokul Patil Project
1010 2024 Jun MBA (ITSM) 77122380656 Dipak Bhagat Project
1011 2024 Jun MBA (OM) 77122380926 Ashwini Palande Project
1012 2024 Jun MBA (ITSM) 77122380938 Deepak Lahane Project
1013 2024 Jun MBA (ITSM) 77122381703 Rohan Mehndiratta Project
1014 2024 Jun MBA (ITSM) 77122382158 Himanshu Gambhir Project
1015 2024 Jun MBA (ITSM) 77122382619 Bhanu Pratap Shukla Project
1016 2024 Jun MBA (ITSM) 77122382766 Pooja Gautam Project
1017 2024 Jun MBA (ITSM) 77122382794 Deepak Shindekar Project
1018 2024 Jun MBA (OM) 77122383371 Rohit Gajarmal Project
1019 2024 Jun MBA (ITSM) 77122383406 Medha Chavan Project
1020 2024 Jun MBA (OM) 77122383523 Anmol Gogia Project
1021 2024 Jun MBA (OM) 77122384476 Raval Mohabe Project
1022 2024 Jun MBA (OM) 77122384537 Aprajit Vinod Umathe Project
1023 2024 Jun MBA (ITSM) 77122385046 Darshan Patil Project
1024 2024 Jun MBA (OM) 77122385445 Lavina Sangal Project
1025 2024 Jun MBA (ITSM) 77122385598 Shaiphali Bhadani Project
1026 2024 Jun MBA (OM) 77122385868 Ruksar Ansari Project
1027 2024 Jun MBA (ITSM) 77122386067 Sachin Kumar Project
1028 2024 Jun MBA (OM) 77122387301 Sajal Gupta Project
1029 2024 Jun MBA (OM) 77122387454 Karthikeyan P Project
1030 2024 Jun MBA (ITSM) 77122387864 Mishika Arora Project
1031 2024 Jun MBA (ITSM) 77122388293 Jidnasa Pillai Project
1032 2024 Jun MBA (OM) 77122388430 Ankush Kumar Project
1033 2024 Jun MBA (OM) 77122388434 Mahesh S Project
1034 2024 Jun MBA (OM) 77122388489 Yeshwanth B Project
1035 2024 Jun MBA (ITSM) 77122388726 Nripendra Project
1036 2024 Jun MBA (ITSM) 77122388824 Viraj Khadye Project
1037 2024 Jun MBA (ITSM) 77122389212 Rachita Chilate Project
1038 2024 Jun MBA (OM) 77122389495 Jyoti Bikash Sarma Project
1039 2024 Jun MBA (ITSM) 77122389789 Mohammed Souban Alkhama Project
1040 2024 Jun MBA (ITSM) 77122389813 Deepak Jhinku Gupta Project
1041 2024 Jun MBA (ITSM) 77122390235 Drashti Modi Project
1042 2024 Jun MBA (ITSM) 77122390934 Shine Nagpal Project
1043 2024 Jun MBA (ITSM) 77122390944 Arpit Lalani Project
1044 2024 Jun MBA (ITSM) 77122391554 Yasmeen Khan Project
1045 2024 Jun MBA (ITSM) 77122391730 Puja Kamatham Project
1046 2024 Jun MBA (ITSM) 77122391768 Vijaya Chavan Project
1047 2024 Jun MBA (ITSM) 77122392544 Atul Babar Project
1048 2024 Jun MBA (OM) 77122392591 Rajesh Thombare Project
1049 2024 Jun MBA (ITSM) 77122167884 Sai Raghu Mohan Chinta Project
1050 2024 Jun MBA (OM) 77122168033 Sidak Singh Maini Project
1051 2024 Jun MBA (OM) 77122168237 Aldrin Josey Veliparambil Project
1052 2024 Jun MBA (ITSM) 77122168415 Komal Dwivedi Project
1053 2024 Jun MBA (OM) 77122169372 Shubham Dubey Project
1054 2024 Jun MBA (ITSM) 77122169748 Kajal Singh Project
1055 2024 Jun MBA (ITSM) 77122169762 Siddharth Verma Project
1056 2024 Jun MBA (OM) 77122169849 Abhishek Sharma Project
1057 2024 Jun MBA (ITSM) 77122169906 Kirti Dangare Project
1058 2024 Jun MBA (ITSM) 77122170559 Shriyali Pahariya Project
1059 2024 Jun MBA (OM) 77122170613 Nishaben Chauhan Project
1060 2024 Jun MBA (ITSM) 77122170663 Varsha Sharma Project
1061 2024 Jun MBA (ITSM) 77122170842 Manish Pralhad Patil Project
1062 2024 Jun MBA (OM) 77122172061 Rakesh Kumar Project
1063 2024 Jun MBA (OM) 77122172214 Somya Ranjan Patnaik Project
1064 2024 Jun MBA (ITSM) 77122173178 Dhanashree Sanjay Pathare Project
1065 2024 Jun MBA (ITSM) 77122173246 Manjunatha B M Project
1066 2024 Jun MBA (ITSM) 77122174352 Misbah Khan Project
1067 2024 Jun MBA (ITSM) 77122174411 Saikiran Dargumahanthi Project
1068 2024 Jun MBA (OM) 77122174507 Sujan Mondal Project
1069 2024 Jun MBA (OM) 77122174517 Alok Kumar Gupta Project
1070 2024 Jun MBA (OM) 77122174610 T Prashant Pavithran Project
1071 2024 Jun MBA (ITSM) 77122153721 Shubhi Srivastava Project
1072 2024 Jun MBA (ITSM) 77122154219 Uddhav Shashikant Mhatre Project
1073 2024 Jun MBA (ITSM) 77122154415 Nikhil Bajirao Shete Project
1074 2024 Jun MBA (ITSM) 77122154530 Shantanu Pandere Project
1075 2024 Jun MBA (OM) 77122154593 Sai Raga Chandrika Nadimpalli Project
1076 2024 Jun MBA (OM) 77122155040 Sudip Chakraborty Project
1077 2024 Jun MBA (ITSM) 77122155448 Anurag Tripathi Project
1078 2024 Jun MBA (OM) 77122155620 Divyansh Sharma Project
1079 2024 Jun MBA (ITSM) 77122155687 Akshaya G Project
1080 2024 Jun MBA (OM) 77122155729 Debabrata Misra Project
1081 2024 Jun MBA (OM) 77122155990 Atul Agnihotri Project
1082 2024 Jun MBA (OM) 77122156518 Alok Kumar Project
1083 2024 Jun MBA (OM) 77122156589 Divya Pratap Rana Project
1084 2024 Jun MBA (ITSM) 77122156743 Mohit Mahajan Project
1085 2024 Jun MBA (ITSM) 77122157707 Gopi Nadh Panuganti Project
1086 2024 Jun MBA (ITSM) 77122157967 Manisha Dhal Project
1087 2024 Jun MBA (ITSM) 77122158004 Devraj Paul Project
1088 2024 Jun MBA (ITSM) 77122158163 Sonali Das Project
1089 2024 Jun MBA (ITSM) 77122158284 Shraddha Singh Project
1090 2024 Jun MBA (OM) 77122158287 Urmila Rawat Project
1091 2024 Jun MBA (OM) 77122158309 Anjana Dhingra Project
1092 2024 Jun MBA (OM) 77122158318 Aditya Subhash Sakunde Project
1093 2024 Jun MBA (ITSM) 77122158630 Sanjana Vijaysingh Chouhan Project
1094 2024 Jun MBA (ITSM) 77122158636 Kushagra Singh Project
1095 2024 Jun MBA (ITSM) 77122158944 Jay Prakash Bind Project
1096 2024 Jun MBA (OM) 77122158948 Omprakash Baskaran Project
1097 2024 Jun MBA (ITSM) 77122159417 Vamsi Krishna Kharidu Project
1098 2024 Jun MBA (OM) 77122160360 Jigarkumar Patel Project
1099 2024 Jun MBA (ITSM) 77122119638 Sumanta Nag Project
1100 2024 Jun MBA (OM) 77122120093 Neeraj Kumar Project
1101 2024 Jun MBA (ITSM) 77122120897 Royston Anil Felix? Lobo? Project
1102 2024 Jun MBA (ITSM) 77122121242 Himanshu Bansal Project
1103 2024 Jun MBA (OM) 77122121351 Paras Deval Project
1104 2024 Jun MBA (OM) 77122121353 Dhruvil Desai Project
1105 2024 Jun MBA (ITSM) 77122123445 Kunal Kumar Singh Project
1106 2024 Jun MBA (ITSM) 77122123948 Al Muheeb Project
1107 2024 Jun MBA (ITSM) 77122124033 Shruti Ganesh Patole Project
1108 2024 Jun MBA (OM) 77122124336 Sandeep Sharma Project
1109 2024 Jun MBA (OM) 77122124845 Nayan Pathak Project
1110 2024 Jun MBA (OM) 77122125516 Ritu Haldkar Project
1111 2024 Jun MBA (OM) 77122125967 Pritikumari Mithlesh Tiwari Project
1112 2024 Jun MBA (ITSM) 77122126062 Niyati Raval Project
1113 2024 Jun MBA (ITSM) 77122126205 Krishna Arora Project
1114 2024 Jun MBA (ITSM) 77122126288 Urmik Thakkar Project
1115 2024 Jun MBA (ITSM) 77122126554 Bhakti Kardekar Project
1116 2024 Jun MBA (OM) 77122126723 Ashish Suri Project
1117 2024 Jun MBA (ITSM) 77122126725 Jasmeet Singh Project
1118 2024 Jun MBA (ITSM) 77122126908 Pradeep Kumar Upadhyay Project
1119 2024 Jun MBA (OM) 77122127042 Swastik Choudhary Project
1120 2024 Jun MBA (ITSM) 77122127085 Bhavana Khandare Project
1121 2024 Jun MBA (ITSM) 77122127677 Komal Project
1122 2024 Jun MBA (ITSM) 77122127945 Adarsh Philip Mathews Project
1123 2024 Jun MBA (OM) 77122127961 Sagar Sharma Project
1124 2024 Jun MBA (ITSM) 77122127987 Barun Kumar Bag Project
1125 2024 Jun MBA (ITSM) 77122128034 Ipsita Mishra Project
1126 2024 Jun MBA (ITSM) 77122128149 Nikhil B C Project
1127 2024 Jun MBA (ITSM) 77122128245 Hemant Kumar Project
1128 2024 Jun MBA (ITSM) 77122128571 Kunal Jondhalekar Project
1129 2024 Jun MBA (OM) 77122128673 Himanshu Chugh Project
1130 2024 Jun MBA (OM) 77122129072 Mahima Mishra Project
1131 2024 Jun MBA (ITSM) 77122129318 Subham Singh Project
1132 2024 Jun MBA (ITSM) 77122130529 Palak Jain Project
1133 2024 Jun MBA (OM) 77122130655 V Manasa Project
1134 2024 Jun MBA (ITSM) 77122130918 Smrutishree Sharma Project
1135 2024 Jun MBA (ITSM) 77122130947 Vijetha Medi Project
1136 2024 Jun MBA (ITSM) 77122131439 Charu Jain Project
1137 2024 Jun MBA (OM) 77122131471 Shiv Kumar Project
1138 2024 Jun MBA (OM) 77122131727 Mukesh Kumar Rana Project
1139 2024 Jun MBA (OM) 77122132386 Bhawesh Kumar Bandhe Project
1140 2024 Jun MBA (ITSM) 77122132499 Haleema Beg Project
1141 2024 Jun MBA (OM) 77122133170 Kartik Mishra Project
1142 2024 Jun MBA (ITSM) 77122133208 Avinash Ishwarlal Chaurasia Project
1143 2024 Jun MBA (ITSM) 77122133415 Kalpesh Pimpalekar Project
1144 2024 Jun MBA (ITSM) 77122133974 Mohit Kaul Project
1145 2024 Jun MBA (ITSM) 77122134003 Snehal Sunil Bhosale Project
1146 2024 Jun MBA (OM) 77122134109 Rahul Bhamare Project
1147 2024 Jun MBA (ITSM) 77122134190 Sujeet Kumar Project
1148 2024 Jun MBA (ITSM) 77122134845 Sephali Majhi Project
1149 2024 Jun MBA (OM) 77122134876 Apurva Pratap Singh Project
1150 2024 Jun MBA (OM) 77122134880 Santosh Hanamantrao Rakshale Project
1151 2024 Jun MBA (OM) 77122134981 Debaranjan Deb Project
1152 2024 Jun MBA (ITSM) 77122135360 Chinmay Patil Project
1153 2024 Jun MBA (OM) 77122135387 Devasheesh Jaiswal Project
1154 2024 Jun MBA (OM) 77122136334 Krishna Kumar Rai Project
1155 2024 Jun MBA (OM) 77122136489 Soudeep Biswas Project
1156 2024 Jun MBA (ITSM) 77122136514 Tanushri Srivastava Project
1157 2024 Jun MBA (ITSM) 77122136720 Riya Aggarwal Project
1158 2024 Jun MBA (OM) 77122136747 Omkar Raut Project
1159 2024 Jun MBA (OM) 77122137022 Latha K S Project
1160 2024 Jun MBA (OM) 77122137075 Kitu Bera Project
1161 2024 Jun MBA (OM) 77122137322 Antara Indulkar Project
1162 2024 Jun MBA (OM) 77122137535 Nisha S Project
1163 2024 Jun MBA (OM) 77122138264 Ravinder Bhatia Project
1164 2024 Jun MBA (OM) 77122138592 Rajesh Yadav Project
1165 2024 Jun MBA (OM) 77122138632 Rahul Das Project
1166 2024 Jun MBA (OM) 77122139090 Sesha Narayana rao K Project
1167 2024 Jun MBA (ITSM) 77122139575 Ayush Singh Project
1168 2024 Jun MBA (ITSM) 77122139590 Pranshu Vaktawat Project
1169 2024 Jun MBA (ITSM) 77122139734 Saumya Singhani Project
1170 2024 Jun MBA (OM) 77122140005 Ashishkumar Ahir Project
1171 2024 Jun MBA (OM) 77122140906 Mercy Margaret Asha A Project
1172 2024 Jun MBA (ITSM) 77122141334 Hari Ramanan Project
1173 2024 Jun MBA (ITSM) 77122141365 Jyothsna Vidavaluru Project
1174 2024 Jun MBA (ITSM) 77122141585 Ayushi Johri Project
1175 2024 Jun MBA (OM) 77122142369 Dipensingh Gurkha Project
1176 2024 Jun MBA (OM) 77122143973 Ankit Dixit Project
1177 2024 Jun MBA (ITSM) 77122144067 Aman Rajput Project
1178 2024 Jun MBA (OM) 77122144601 Ankit Mishra Project
1179 2024 Jun MBA (ITSM) 77122103809 Aditi Sharma Project
1180 2024 Jun MBA (ITSM) 77122104047 Saumya Swain Project
1181 2024 Jun MBA (OM) 77122104086 Ankur Tyagi Project
1182 2024 Jun MBA (ITSM) 77122104368 Lovelit Singh Bhamra Project
1183 2024 Jun MBA (OM) 77122104415 Meghal Kumar Panchal Project
1184 2024 Jun MBA (OM) 77122105442 Gourav Goel Project
1185 2024 Jun MBA (OM) 77122105707 Priti Gohit Project
1186 2024 Jun MBA (ITSM) 77122106002 Saloni Chaudhary Project
1187 2024 Jun MBA (ITSM) 77122106018 Aniket Bhutada Project
1188 2024 Jun MBA (ITSM) 77122106205 Rashmi Project
1189 2024 Jun MBA (OM) 77122106328 Abhishek Arun Joshi Project
1190 2024 Jun MBA (ITSM) 77122106576 Stuti Sinha Project
1191 2024 Jun MBA (OM) 77122106857 Ashok Kumar Basari Project
1192 2024 Jun MBA (ITSM) 77122107470 K Ayushi Naidu Project
1193 2024 Jun MBA (ITSM) 77122107551 Mayank Agarwal Project
1194 2024 Jun MBA (ITSM) 77122107988 Nishtha Project
1195 2024 Jun MBA (ITSM) 77122108019 Manoj Motisagar Jain Project
1196 2024 Jun MBA (OM) 77122109013 Bimal Rout Project
1197 2024 Jun MBA (OM) 77122109051 Maitrak Thakore Project
1198 2024 Jun MBA (ITSM) 77122109150 Anuja Kadam Project
1199 2024 Jun MBA (ITSM) 77122109607 Prerna Gupta Project
1200 2024 Jun MBA (ITSM) 77122109752 Pujita Basu Project
1201 2024 Jun MBA (OM) 77122110128 Krupesh Bhor Project
1202 2024 Jun MBA (ITSM) 77122111091 Maya Palve Project
1203 2024 Jun MBA (ITSM) 77122111632 Ruchi Chaudhary Project
1204 2024 Jun MBA (ITSM) 77122111893 Soumyaranjan Das Project
1205 2024 Jun MBA (OM) 77122111929 Leeladhar Shettigar Project
1206 2024 Jun MBA (ITSM) 77122112597 Pratiksha Sinha Project
1207 2024 Jun MBA (ITSM) 77122112602 Gaurao Khadse Project
1208 2024 Jun MBA (ITSM) 77122112940 Sachin Sawant Project
1209 2024 Jun MBA (OM) 77122113122 Tushar Ashok Sawalwade Project
1210 2024 Jun MBA (OM) 77122113395 Manjunath Pattan Project
1211 2024 Jun MBA (OM) 77122113412 Kaustav Basu Project
1212 2024 Jun MBA (OM) 77122113754 Vaibhav Sharma Project
1213 2024 Jun MBA (ITSM) 77122113774 Sharada B S Project
1214 2024 Jun MBA (OM) 77122114703 Chintan Ghorpade Project
1215 2024 Jun MBA (ITSM) 77122114857 Jarugu Madhu Project
1216 2024 Jun MBA (ITSM) 77122115204 Gaurav Rasotia Project
1217 2024 Jun MBA (ITSM) 77122115299 Mayur Deval Project
1218 2024 Jun MBA (ITSM) 77122115348 Lakshay Arora Project
1219 2024 Jun MBA (OM) 77122115622 Raksha Chettri Project
1220 2024 Jun MBA (ITSM) 77122115676 Nishtha Dabaas Project
1221 2024 Jun MBA (OM) 77122115806 Hemant Kumar Project
1222 2024 Jun MBA (ITSM) 77122115915 Shweta Avinash Thakare Project
1223 2024 Jun MBA (OM) 77122117013 Subhadip Guha Thakurta Project
1224 2024 Jun MBA (OM) 77122117073 Divy Malik Project
1225 2024 Jun MBA (OM) 77122117227 Bharathi Chandrasekaran Project
1226 2024 Jun MBA (OM) 77122117334 Deepankar Gupta Project
1227 2024 Jun MBA (OM) 77122118650 Neelam Mahajan Project
1228 2024 Jun MBA (OM) 77122118732 Sridhara M L Project
1229 2024 Jun MBA (OM) 77122160786 Chandan Kumar Bera Project
1230 2024 Jun MBA (OM) 77122160901 Sourav Tiwari Project
1231 2024 Jun MBA (ITSM) 77122161272 Shaunak Bhattacharya Project
1232 2024 Jun MBA (ITSM) 77122161304 Padma Priya L Project
1233 2024 Jun MBA (ITSM) 77122161388 Mayuri Pawar Project
1234 2024 Jun MBA (OM) 77122161446 Nancia Pingle Project
1235 2024 Jun MBA (ITSM) 77122161840 Naman Saxena Project
1236 2024 Jun MBA (ITSM) 77122162183 Sahil Bansal Project
1237 2024 Jun MBA (ITSM) 77122162621 Vinay Tivrekar Project
1238 2024 Jun MBA (OM) 77122163129 Mayank Gandotra Project
1239 2024 Jun MBA (OM) 77122163261 Priyanshi Bhatt Project
1240 2024 Jun MBA (OM) 77122163467 Amit Kumar Project
1241 2024 Jun MBA (ITSM) 77122163597 Deepanshu Project
1242 2024 Jun MBA (ITSM) 77122163712 Arnab Adak Project
1243 2024 Jun MBA (OM) 77122164548 Deepak Maurya Project
1244 2024 Jun MBA (ITSM) 77122164779 Sujoy Das Project
1245 2024 Jun MBA (ITSM) 77122164835 Mrityunjoy Chowdhury Project
1246 2024 Jun MBA (OM) 77122165139 Ravikiran Somase Project
1247 2024 Jun MBA (ITSM) 77122165219 Dhyanikumar Palan Project
1248 2024 Jun MBA (ITSM) 77122165523 Ankit Shukla Project
1249 2024 Jun MBA (OM) 77122165528 Sarvesh Sanap Project
1250 2024 Jun MBA (ITSM) 77122165802 Srinivas Chowdary Project
1251 2024 Jun MBA (OM) 77122166064 Ram Kondiba Kokare Project
1252 2024 Jun MBA (ITSM) 77122166407 Priya Dubey Project
1253 2024 Jun MBA (OM) 77122167144 Chaitanya Khanapurkar Project
1254 2024 Jun MBA (ITSM) 77122167331 Richa Sharma Project
1255 2024 Jun MBA (ITSM) 77122144972 Akhil Manchanda Project
1256 2024 Jun MBA (ITSM) 77122145165 Parminder Sirohi Project
1257 2024 Jun MBA (ITSM) 77122145437 Soujanya Nakka Project
1258 2024 Jun MBA (OM) 77122145618 Naresh M Project
1259 2024 Jun MBA (OM) 77122146123 Rafe Ali Project
1260 2024 Jun MBA (OM) 77122146842 Nandini G Project
1261 2024 Jun MBA (ITSM) 77122146852 Raghvendra Uttam Project
1262 2024 Jun MBA (ITSM) 77122146854 Sanjithaa Sree B R Project
1263 2024 Jun MBA (OM) 77122147197 Hanshul Project
1264 2024 Jun MBA (ITSM) 77122147203 Akshay Arya Project
1265 2024 Jun MBA (OM) 77122147571 Archana Madhusmita Barik Project
1266 2024 Jun MBA (ITSM) 77122147679 Mayuri Naik Project
1267 2024 Jun MBA (ITSM) 77122147981 Saurabh Keshari Project
1268 2024 Jun MBA (ITSM) 77122148286 Kamakshi Arora Project
1269 2024 Jun MBA (OM) 77122148745 Astha Goswami Project
1270 2024 Jun MBA (ITSM) 77122149041 Khushi Yadav Project
1271 2024 Jun MBA (OM) 77122149083 Ruchika Project
1272 2024 Jun MBA (OM) 77122149098 Sangeetha Rajagopalan Project
1273 2024 Jun MBA (ITSM) 77122149137 Vamsi Kothamasu Project
1274 2024 Jun MBA (ITSM) 77122149560 Moiz Esmail Bootwala Project
1275 2024 Jun MBA (OM) 77122149601 Hardik Singhal Project
1276 2024 Jun MBA (OM) 77122149828 Krishan Gupta Project
1277 2024 Jun MBA (ITSM) 77122150151 Shreya Thukral Project
1278 2024 Jun MBA (ITSM) 77122150324 Swati Garg Project
1279 2024 Jun MBA (ITSM) 77122150552 Yatish Salian Project
1280 2024 Jun MBA (ITSM) 77122151251 Mandar Kulkarni Project
1281 2024 Jun MBA (OM) 77122151517 Aditya Singh Project
1282 2024 Jun MBA (OM) 77122151637 Bhavya Khullar Project
1283 2024 Jun MBA (OM) 77122152035 Brijesh Menon Project
1284 2024 Jun MBA (OM) 77122152294 Mohit Kumar Tiwari Project
1285 2024 Jun MBA (OM) 77122152489 Sagar Wadhe Project
1286 2024 Jun MBA (OM) 77122153497 Mohd Munaf Salim Memon Project
1287 2024 Jun MBA (OM) 77122153663 Monika Sharma Project
1288 2024 Jun MBA (ITSM) 77122583846 Joy Chakraborti Project
1289 2024 Jun MBA (ITSM) 77122583911 Aman Kumar Maurya Project
1290 2024 Jun MBA (ITSM) 77122584004 Ankush Dwivedi Project
1291 2024 Jun MBA (OM) 77122584901 Neeta Budhiraja Project
1292 2024 Jun MBA (OM) 77122585341 Prashant Manori Project
1293 2024 Jun MBA (ITSM) 77122585936 Mihir Sanghvi Project
1294 2024 Jun MBA (ITSM) 77122585952 Shivansh Tiwari Project
1295 2024 Jun MBA (OM) 77122586244 Sriram Suresh Iyer Project
1296 2024 Jun MBA (ITSM) 77122586567 Vedanabhatla Jayanth Kumar Project
1297 2024 Jun MBA (OM) 77122587134 Jaydip Pitroda Project
1298 2024 Jun MBA (ITSM) 77122587240 Aman Kulange Project
1299 2024 Jun MBA (ITSM) 77122587337 Akarsh Shetty Project
1300 2024 Jun MBA (OM) 77122588020 Kedar Aradhye Project
1301 2024 Jun MBA (ITSM) 77122588199 Ayushi Dwivedi Project
1302 2024 Jun MBA (ITSM) 77122588668 Goutham Kunthe Project
1303 2024 Jun MBA (ITSM) 77122588758 Divya Mohile Project
1304 2024 Jun MBA (ITSM) 77122589177 Ria Mehra Project
1305 2024 Jun MBA (ITSM) 77122589415 Prashant Rahadve Project
1306 2024 Jun MBA (ITSM) 77122589536 Anchal Agarwal Project
1307 2024 Jun MBA (ITSM) 77122589554 Saniya Bi Hanif shaikh Project
1308 2024 Jun MBA (ITSM) 77122590025 Akshita Sharma Project
1309 2024 Jun MBA (OM) 77122590059 Sapan Chakraborty Project
1310 2024 Jun MBA (OM) 77122590187 Parth Gajera Project
1311 2024 Jun MBA (ITSM) 77122590742 Srijana Saru Project
1312 2024 Jun MBA (ITSM) 77122590761 Rohinaz Mahedavi Project
1313 2024 Jun MBA (ITSM) 77122591001 Tripti Tyagi Project
1314 2024 Jun MBA (OM) 77122591005 Arshadkhan N Draxi Project
1315 2024 Jun MBA (OM) 77122591263 Shanteri Nayak Project
1316 2024 Jun MBA (ITSM) 77122591325 Diksha Rani Project
1317 2024 Jun MBA (ITSM) 77122591517 Madhuri Bisht Project
1318 2024 Jun MBA (OM) 77122591846 Vedanshi Tyagi Project
1319 2024 Jun MBA (ITSM) 77122592027 Sumit Jha Project
1320 2024 Jun MBA (OM) 77122592326 Aditi Ashok Thakare Project
1321 2024 Jun MBA (OM) 77122592420 Drashti Varshney Project
1322 2024 Jun MBA (OM) 77122592576 Shubham Yadav Project
1323 2024 Jun MBA (OM) 77122592789 Avijeet Mondal Project
1324 2024 Jun MBA (ITSM) 77122592841 Dudekula Babavali Project
1325 2024 Jun MBA (OM) 77122593565 Roshan Kumar Janghel Project
1326 2024 Jun MBA (ITSM) 77122593775 Mohammad Aatif Khan Project
1327 2024 Jun MBA (OM) 77122593855 Arun K Project
1328 2024 Jun MBA (OM) 77122594434 Abhishek Singh Project
1329 2024 Jun MBA (OM) 77122594535 Basudev Sahoo Project
1330 2024 Jun MBA (ITSM) 77122594998 Pooja Rai Project
1331 2024 Jun MBA (ITSM) 77122595073 Gauri Kumbhar Project
1332 2024 Jun MBA (OM) 77122595376 Ejaz Ansari Project
1333 2024 Jun MBA (ITSM) 77122596044 Chinmay Chiplunkar Project
1334 2024 Jun MBA (ITSM) 77122596132 Mothiram Kosuri Project
1335 2024 Jun MBA (ITSM) 77122596178 Sri Nishitha Lavu Project
1336 2024 Jun MBA (OM) 77122596414 Dipankar Karmakar Project
1337 2024 Jun MBA (ITSM) 77122596477 Ankita Beri Project
1338 2024 Jun MBA (ITSM) 77122596497 Muskan Chawla Project
1339 2024 Jun MBA (ITSM) 77122596793 Isha Maneesh Bendre Project
1340 2024 Jun MBA (OM) 77122597691 Arpita Goswami Project
1341 2024 Jun MBA (ITSM) 77122597731 Sara Jaipuria Project
1342 2024 Jun MBA (OM) 77122551871 Aniket Singh Project
1343 2024 Jun MBA (ITSM) 77122551991 Aditya Pawar Project
1344 2024 Jun MBA (ITSM) 77122552086 Pratibha Dubey Project
1345 2024 Jun MBA (ITSM) 77122552210 Mohammad Zaid Project
1346 2024 Jun MBA (OM) 77122552284 Aakash Agarwal Project
1347 2024 Jun MBA (ITSM) 77122552671 Komal Garg Project
1348 2024 Jun MBA (OM) 77122552926 Roshan Nair Project
1349 2024 Jun MBA (ITSM) 77122553366 Akshay Bhardwaj Project
1350 2024 Jun MBA (OM) 77122553540 Varun Project
1351 2024 Jun MBA (OM) 77122553597 Pankaj Singh Warti Project
1352 2024 Jun MBA (OM) 77122554037 Kaushal Sharma Project
1353 2024 Jun MBA (ITSM) 77122554111 Ritika Kalra Project
1354 2024 Jun MBA (OM) 77122554145 Chirag Raj Singh Thakur Project
1355 2024 Jun MBA (ITSM) 77122554609 Shubham Tiwari Project
1356 2024 Jun MBA (ITSM) 77122554809 Ruchira Jadhav Project
1357 2024 Jun MBA (OM) 77122555355 Ajish Pratheepkumar Project
1358 2024 Jun MBA (ITSM) 77122556928 Mayur Manoj Gudi Project
1359 2024 Jun MBA (OM) 77122557181 Braj Mohan Thakur Project
1360 2024 Jun MBA (ITSM) 77122557373 Mohammed Amir Faizan Mohammed Talib Project
1361 2024 Jun MBA (ITSM) 77122557474 Chetan Bisht Project
1362 2024 Jun MBA (OM) 77122557850 Parmeet Singh Matta Project
1363 2024 Jun MBA (ITSM) 77122557892 Shilpi Singh Project
1364 2024 Jun MBA (ITSM) 77122557955 Rahul Ramane Project
1365 2024 Jun MBA (ITSM) 77122558018 Amruta Naik Project
1366 2024 Jun MBA (ITSM) 77122558266 Trupti Arun Bhamare Project
1367 2024 Jun MBA (ITSM) 77122559090 Ankita Gupta Project
1368 2024 Jun MBA (ITSM) 77122559338 Punit Project
1369 2024 Jun MBA (OM) 77122559536 Manjari Rohatgi Project
1370 2024 Jun MBA (ITSM) 77122559936 Sanchi Bansal Project
1371 2024 Jun MBA (ITSM) 77122560377 Ravi Shankar Singh Project
1372 2024 Jun MBA (OM) 77122560815 Saikat Karmakar Project
1373 2024 Jun MBA (OM) 77122560932 Mitali Santosh Wade Project
1374 2024 Jun MBA (ITSM) 77122562015 Namrita Vashisht Project
1375 2024 Jun MBA (OM) 77122562151 Chopade Sarthak Yogesh Project
1376 2024 Jun MBA (OM) 77122562263 Avinash Chandra Shukla Project
1377 2024 Jun MBA (ITSM) 77122562411 Mohammad Salman Aejaz Mohammad Kaleem Sabir Project
1378 2024 Jun MBA (ITSM) 77122562873 Arkendu Pal Project
1379 2024 Jun MBA (ITSM) 77122563693 Harsh Shah Project
1380 2024 Jun MBA (ITSM) 77122563965 Vikas Bhardwaj Project
1381 2024 Jun MBA (ITSM) 77122564038 Jhasaketan Behera Project
1382 2024 Jun MBA (ITSM) 77122564341 Kareenaben Kambliya Project
1383 2024 Jun MBA (ITSM) 77122564454 Amit Joshi Project
1384 2024 Jun MBA (ITSM) 77122565282 Pragya Upadhyay Project
1385 2024 Jun MBA (ITSM) 77122565582 Ismail J Ahmed Project
1386 2024 Jun MBA (ITSM) 77122565695 Vishal Patil Project
1387 2024 Jun MBA (ITSM) 77122566074 Veeru Ravindra Sharma Project
1388 2024 Jun MBA (ITSM) 77122566413 Neil Vincent Almeida Project
1389 2024 Jun MBA (ITSM) 77122511306 Nelli Roshini Project
1390 2024 Jun MBA (ITSM) 77122511564 Ankit Singhal Project
1391 2024 Jun MBA (ITSM) 77122511658 Kalpesh Shantaram Khalane Project
1392 2024 Jun MBA (ITSM) 77122511914 Elias Barnabas Project
1393 2024 Jun MBA (ITSM) 77122511950 Vijay Kamble Project
1394 2024 Jun MBA (OM) 77122512060 Sherwin Mendes Project
1395 2024 Jun MBA (ITSM) 77122512657 Srinivas Rao Ravinuthala Project
1396 2024 Jun MBA (OM) 77122512886 Rajiv Ranjan Project
1397 2024 Jun MBA (OM) 77122512967 Shah Parth Grajesh Project
1398 2024 Jun MBA (ITSM) 77122513345 Sayali Kamble Project
1399 2024 Jun MBA (ITSM) 77122513469 Sebastian Thomas Dcosta Project
1400 2024 Jun MBA (ITSM) 77122514719 Shubham Raghunath Vaze Project
1401 2024 Jun MBA (ITSM) 77122515660 Hatim Patwa Project
1402 2024 Jun MBA (OM) 77122515825 Aparna Tomar Project
1403 2024 Jun MBA (OM) 77122515826 Jayanta Bora Project
1404 2024 Jun MBA (ITSM) 77122515828 Hitesh Sharma Project
1405 2024 Jun MBA (OM) 77122515947 Subrata Hazra Project
1406 2024 Jun MBA (ITSM) 77122516574 Gajanan Gaonkar Project
1407 2024 Jun MBA (OM) 77122516638 Nikhil Sharma Project
1408 2024 Jun MBA (ITSM) 77122516711 Anushka Dua Project
1409 2024 Jun MBA (ITSM) 77122516731 Prakash Indramohan Jha Project
1410 2024 Jun MBA (ITSM) 77122516787 Mayur Baviskar Project
1411 2024 Jun MBA (ITSM) 77122517228 Blessy Samuel Tharakan Rossamma Project
1412 2024 Jun MBA (ITSM) 77122518643 Shine Ramakrishnan Project
1413 2024 Jun MBA (ITSM) 77122518788 Devesh Kumar Yadav Project
1414 2024 Jun MBA (ITSM) 77122519068 Krishna A Project
1415 2024 Jun MBA (OM) 77122519986 Baljeet Singh Project
1416 2024 Jun MBA (OM) 77122520038 Ram Anuj Kumar Project
1417 2024 Jun MBA (OM) 77122520755 Pavnesh Pratap Singh Project
1418 2024 Jun MBA (OM) 77122520815 Ritika Sengar Project
1419 2024 Jun MBA (OM) 77122520917 Modassir Habib Project
1420 2024 Jun MBA (OM) 77122520970 Chetandeep Singh Saluja Project
1421 2024 Jun MBA (OM) 77122521416 Sunil Project
1422 2024 Jun MBA (ITSM) 77122521757 Rishabh Dubey Project
1423 2024 Jun MBA (OM) 77122522377 Dinakar B R Project
1424 2024 Jun MBA (OM) 77122522938 Youdishter Gupta Project
1425 2024 Jun MBA (OM) 77122523501 Samarth Ajmera Project
1426 2024 Jun MBA (ITSM) 77122524448 Mayur Shinde Project
1427 2024 Jun MBA (ITSM) 77122524686 Mannat Sachdeva Project
1428 2024 Jun MBA (OM) 77122524955 Manisha Joshi Project
1429 2024 Jun MBA (ITSM) 77122525007 Rinoj Rajan Nair Project
1430 2024 Jun MBA (ITSM) 77122525535 Jaisika Talwar Project
1431 2024 Jun MBA (ITSM) 77122525805 Sohini Guha Roy Project
1432 2024 Jun MBA (OM) 77122526149 Sanyam Malhotra Project
1433 2024 Jun MBA (OM) 77122526553 Shivangi Singh Project
1434 2024 Jun MBA (OM) 77122526696 Harsha Chawla Project
1435 2024 Jun MBA (ITSM) 77122526847 Shubham Goel Project
1436 2024 Jun MBA (OM) 77122527497 Kiran Kulkarni Project
1437 2024 Jun MBA (ITSM) 77122527758 Vaishnavi Tandel Project
1438 2024 Jun MBA (ITSM) 77122528483 Chinmayee S Project
1439 2024 Jun MBA (ITSM) 77122528503 Karnik Gajjar Project
1440 2024 Jun MBA (OM) 77122528717 Vishal Project
1441 2024 Jun MBA (OM) 77122529150 Rahul Kawadu Dadmal Project
1442 2024 Jun MBA (ITSM) 77122529832 Mehtab Khan Project
1443 2024 Jun MBA (OM) 77122530014 Shrikant Shelke Project
1444 2024 Jun MBA (OM) 77122530404 Sandhyashree S B Project
1445 2024 Jun MBA (ITSM) 77122530775 Jerlin R Project
1446 2024 Jun MBA (OM) 77122530925 Rajkumar Pramodbhai Patel Project
1447 2024 Jun MBA (ITSM) 77122530999 Prathiba C J Project
1448 2024 Jun MBA (ITSM) 77122531334 Kalyani Ahirrao Project
1449 2024 Jun MBA (ITSM) 77122532322 Neha Kishor Joshi Project
1450 2024 Jun MBA (OM) 77122532412 Pooja Kumari Project
1451 2024 Jun MBA (ITSM) 77122532464 Pinky Kukreti Project
1452 2024 Jun MBA (ITSM) 77122532574 Abubakar Ansari Project
1453 2024 Jun MBA (OM) 77122533059 Abhishek GC Project
1454 2024 Jun MBA (ITSM) 77122533194 Avadhut Mahajan Project
1455 2024 Jun MBA (ITSM) 77122533238 Nishita Warang Project
1456 2024 Jun MBA (ITSM) 77122534570 Arge Swapanali Jinendra Project
1457 2024 Jun MBA (OM) 77122534683 Niranjan Joshi Project
1458 2024 Jun MBA (ITSM) 77122534833 Shubham Kumar Jain Project
1459 2024 Jun MBA (ITSM) 77122534864 Arun Chandra V Project
1460 2024 Jun MBA (ITSM) 77122535136 Sumit Saha Project
1461 2024 Jun MBA (ITSM) 77122535646 Rohit Mandge Project
1462 2024 Jun MBA (OM) 77122535671 Francis William Pinto Project
1463 2024 Jun MBA (OM) 77122535722 Jasthi Sai Dheeraj Project
1464 2024 Jun MBA (ITSM) 77122535951 Sahil Rohilla Project
1465 2024 Jun MBA (ITSM) 77122536680 Rishabh Jain Project
1466 2024 Jun MBA (OM) 77122537352 Shraddha Patwardhan Project
1467 2024 Jun MBA (ITSM) 77122537630 Rahul Gautam Project
1468 2024 Jun MBA (ITSM) 77122537686 Devkaran Chomal Project
1469 2024 Jun MBA (OM) 77122537764 Sandip Baswaraj Dyade Project
1470 2024 Jun MBA (OM) 77122500025 Aditya Vala Project
1471 2024 Jun MBA (OM) 77122500481 Sai Nandini Vatsavai Project
1472 2024 Jun MBA (OM) 77122500697 Santri Kumar Project
1473 2024 Jun MBA (ITSM) 77122501114 Ali Asgar Tasnim Dalal Project
1474 2024 Jun MBA (ITSM) 77122501206 Parth Sanghavi Project
1475 2024 Jun MBA (OM) 77122501526 Akash Prajapati Project
1476 2024 Jun MBA (OM) 77122501899 Mohsin Khan Project
1477 2024 Jun MBA (ITSM) 77122502454 Kanika Pandey Project
1478 2024 Jun MBA (ITSM) 77122502890 Amrendra Dwivedi Project
1479 2024 Jun MBA (ITSM) 77122503188 Hitesh Patil Project
1480 2024 Jun MBA (OM) 77122503428 Priyanka Kamurle Project
1481 2024 Jun MBA (OM) 77122503436 Abhinav Dixit Project
1482 2024 Jun MBA (OM) 77122503752 Atul Balasaheb Sonawane Project
1483 2024 Jun MBA (ITSM) 77122504210 Pulkit Arya Project
1484 2024 Jun MBA (ITSM) 77122504877 Abhay Kumar Shah Project
1485 2024 Jun MBA (ITSM) 77122505032 Kanhaiya Nand Sharma Project
1486 2024 Jun MBA (ITSM) 77122505363 Harman Kaur Project
1487 2024 Jun MBA (ITSM) 77122505753 Naina Bhatt Project
1488 2024 Jun MBA (OM) 77122505987 Ummaleti SaiSangeeth Project
1489 2024 Jun MBA (ITSM) 77122506119 Sourav Choudhary Project
1490 2024 Jun MBA (ITSM) 77122506408 Navdeep Project
1491 2024 Jun MBA (ITSM) 77122506468 Akash T V Project
1492 2024 Jun MBA (ITSM) 77122506568 Godavarti Sai Rasagnya Project
1493 2024 Jun MBA (ITSM) 77122506597 Rushank Inamdar Project
1494 2024 Jun MBA (OM) 77122506824 Hitesh Charan Project
1495 2024 Jun MBA (OM) 77122507117 Sowmya Raju Iyer Project
1496 2024 Jun MBA (ITSM) 77122507849 Muskan Bhardwaj Project
1497 2024 Jun MBA (OM) 77122508595 Mainka Sharma Project
1498 2024 Jun MBA (ITSM) 77122508868 Neha Singh Project
1499 2024 Jun MBA (OM) 77122509225 Rahul Rai Project
1500 2024 Jun MBA (OM) 77122509339 Nidharshana Sylaja S Project
1501 2024 Jun MBA (OM) 77122509886 Swapnil Sambhaji Patil Project
1502 2024 Jun MBA (OM) 77122510072 Palak Girath Project
1503 2024 Jun MBA (ITSM) 77122566610 Aishwarya Ramesh Patil Project
1504 2024 Jun MBA (ITSM) 77122566830 Siddhesh Damble Project
1505 2024 Jun MBA (OM) 77122566956 Ranjan Kumar Yadav Project
1506 2024 Jun MBA (ITSM) 77122567374 Rahul M S Project
1507 2024 Jun MBA (OM) 77122567707 Shuvra Kamal Mandal Project
1508 2024 Jun MBA (ITSM) 77122568380 Vrushabh Ghongadi Project
1509 2024 Jun MBA (ITSM) 77122568668 Harsh Saxena Project
1510 2024 Jun MBA (OM) 77122568766 Himanshu Santosh Malusare Project
1511 2024 Jun MBA (ITSM) 77122569040 Gauri Shanware Project
1512 2024 Jun MBA (OM) 77122569331 Siddharth Bajpai Project
1513 2024 Jun MBA (ITSM) 77122569657 Ajinkya Patil Project
1514 2024 Jun MBA (ITSM) 77122569807 Kumar Rishav Project
1515 2024 Jun MBA (ITSM) 77122569970 Sheetal Gupta Project
1516 2024 Jun MBA (ITSM) 77122570272 Amrit Raj Project
1517 2024 Jun MBA (OM) 77122570447 Alisha Nair Project
1518 2024 Jun MBA (OM) 77122570488 Siddhant Shelar Project
1519 2024 Jun MBA (ITSM) 77122570768 Smit Bhatt Project
1520 2024 Jun MBA (ITSM) 77122571057 Shaheda Sultana Project
1521 2024 Jun MBA (OM) 77122571333 Sumantra Basu Project
1522 2024 Jun MBA (ITSM) 77122572260 Shrikant Jain Project
1523 2024 Jun MBA (OM) 77122572404 Prakash Singh Project
1524 2024 Jun MBA (OM) 77122572438 Jitender Project
1525 2024 Jun MBA (OM) 77122573881 Urvashi Gupta Project
1526 2024 Jun MBA (ITSM) 77122574350 Rachit Verma Project
1527 2024 Jun MBA (OM) 77122574802 Akash Kumar Shrivastava Project
1528 2024 Jun MBA (ITSM) 77122574839 Abhinav Kanoje Project
1529 2024 Jun MBA (ITSM) 77122575165 Rohit Bhamre Project
1530 2024 Jun MBA (OM) 77122575461 Mohak Project
1531 2024 Jun MBA (OM) 77122575742 Rakesh Kumar Project
1532 2024 Jun MBA (ITSM) 77122576111 Karishma Khan Project
1533 2024 Jun MBA (ITSM) 77122576508 Dinesh Parmar Project
1534 2024 Jun MBA (OM) 77122576984 M Krishna Sagar Project
1535 2024 Jun MBA (OM) 77122577567 Janardhan Choudhari Project
1536 2024 Jun MBA (ITSM) 77122577847 Vinayak Khatri Project
1537 2024 Jun MBA (ITSM) 77122578170 Prakash Narayan Yadav Project
1538 2024 Jun MBA (ITSM) 77122578191 Aayushi Agrawal Project
1539 2024 Jun MBA (ITSM) 77122579027 Yashank Pathak Project
1540 2024 Jun MBA (OM) 77122579304 Chetan Ashokrao Indurkar Project
1541 2024 Jun MBA (ITSM) 77122579417 Aniket Bhoite Project
1542 2024 Jun MBA (ITSM) 77122580271 Rajat Malhotra Project
1543 2024 Jun MBA (ITSM) 77122580334 Tanishq Bhise Project
1544 2024 Jun MBA (OM) 77122580572 Vishal Jha Project
1545 2024 Jun MBA (OM) 77122581835 Mahak Khatri Project
1546 2024 Jun MBA (OM) 77122582196 Ram Thakur Project
1547 2024 Jun MBA (OM) 77122582501 Gourab Das Project
1548 2024 Jun MBA (ITSM) 77122582689 Sujato Chatterjee Project
1549 2024 Jun MBA (ITSM) 77122583037 Lovkesh Handa Project
1550 2024 Jun MBA (OM) 77122583074 Partha Chakraborty Project
1551 2024 Jun MBA (ITSM) 77122583112 Sneha Sequeira Project
1552 2024 Jun MBA (OM) 77122537914 Anisha Singh Project
1553 2024 Jun MBA (ITSM) 77122538739 Pratik Kumar Gupta Project
1554 2024 Jun MBA (OM) 77122539189 Ajay Prakash P Project
1555 2024 Jun MBA (OM) 77122539584 Balakrishnan Panneer Selvam Project
1556 2024 Jun MBA (ITSM) 77122539751 Yash Bansal Project
1557 2024 Jun MBA (OM) 77122539987 Nitin Paliwal Project
1558 2024 Jun MBA (ITSM) 77122540130 Abhishek Shetvernekar Project
1559 2024 Jun MBA (OM) 77122540345 Monika Gaur Project
1560 2024 Jun MBA (OM) 77122540936 Pragya Sharma Project
1561 2024 Jun MBA (ITSM) 77122541801 Ashish Chandraprakash Kandwal Project
1562 2024 Jun MBA (OM) 77122541853 Amit Chandrashekhar Project
1563 2024 Jun MBA (ITSM) 77122542045 Shubham Shukla Project
1564 2024 Jun MBA (ITSM) 77122542539 Anshika Rajput Project
1565 2024 Jun MBA (OM) 77122542540 Praveen Kaur Project
1566 2024 Jun MBA (ITSM) 77122542773 Aparna Pandey Project
1567 2024 Jun MBA (OM) 77122543071 Ashiti Hiteshbhai Yadav Project
1568 2024 Jun MBA (ITSM) 77122543153 Aishwariya R Project
1569 2024 Jun MBA (OM) 77122544116 Piyush Dubey Project
1570 2024 Jun MBA (OM) 77122544169 Boyina Krishnasanthosh Project
1571 2024 Jun MBA (OM) 77122544602 Amit Dhawade Project
1572 2024 Jun MBA (OM) 77122545315 Poonam Jayani Project
1573 2024 Jun MBA (OM) 77122545391 Pritam Kalambe Project
1574 2024 Jun MBA (ITSM) 77122545799 Ankur Shrivastava Project
1575 2024 Jun MBA (ITSM) 77122545909 Mridul Joshi Project
1576 2024 Jun MBA (OM) 77122546125 Dinesh Godara Project
1577 2024 Jun MBA (OM) 77122546234 Nitin Gawande Project
1578 2024 Jun MBA (ITSM) 77122546283 Meena Kuniyal Project
1579 2024 Jun MBA (OM) 77122546347 Manikandan M. Project
1580 2024 Jun MBA (ITSM) 77122546731 Mohammed Shariq Sadiq Project
1581 2024 Jun MBA (ITSM) 77122546741 Rakesh Keshari Project
1582 2024 Jun MBA (OM) 77122547595 Himani Gupta Project
1583 2024 Jun MBA (ITSM) 77122547839 Sahil Kaushik Project
1584 2024 Jun MBA (OM) 77122548185 Neha Jeevankishor Rajbhar Project
1585 2024 Jun MBA (ITSM) 77122548829 Geeta Sanwal Project
1586 2024 Jun MBA (ITSM) 77122548842 Deepak Kurup Project
1587 2024 Jun MBA (ITSM) 77122549225 Rajat Kulkarni Project
1588 2024 Jun MBA (ITSM) 77122549339 Pooja Deepak Antapurkar Project
1589 2024 Jun MBA (ITSM) 77122550050 Tanisha Singh Project
1590 2024 Jun MBA (ITSM) 77122550250 Jyeshta Jaya Chaithanya Project
1591 2024 Jun MBA (ITSM) 77122550400 Siv Ram S Project
1592 2024 Jun MBA (OM) 77122550417 Mritika Nagpal Project
1593 2024 Jun MBA (ITSM) 77122550418 Ranjit Kumar Ray Project
1594 2024 Jun MBA (ITSM) 77122550534 Vibhutikumari Patel Project
1595 2024 Jun MBA (ITSM) 77122550719 Mohd. Atyab Siddiqui Project
1596 2024 Jun MBA (OM) 77122550991 Sunil Kumar Ghongade Project
1597 2024 Jun MBA (ITSM) 77122551520 Anshuman Singh Project
1598 2024 Jun MBA (ITSM) 77122551561 Aachal Patil Project
1599 2024 Jun MBA (OM) 77122551573 Shivani Rai Project
1600 2024 Jun MBA (ITSM) 77122225804 Vijay Kaavil Project
1601 2024 Jun MBA (ITSM) 77122226201 Anish Sehgal Project
1602 2024 Jun MBA (OM) 77122226422 Sarang Kudle Project
1603 2024 Jun MBA (ITSM) 77122226578 Keval Joshi Project
1604 2024 Jun MBA (OM) 77122226632 Ashwveer Singh Project
1605 2024 Jun MBA (OM) 77122226831 Naveen Kumar Project
1606 2024 Jun MBA (ITSM) 77122226974 Sakhlain Ahmed Nawab Project
1607 2024 Jun MBA (ITSM) 77122227145 Swati Verma Project
1608 2024 Jun MBA (ITSM) 77122227186 Singh Varun Rajendra Project
1609 2024 Jun MBA (ITSM) 77122227574 Jatin Project
1610 2024 Jun MBA (OM) 77122227902 Rahul Mehta Project
1611 2024 Jun MBA (OM) 77122228396 Vijay Sangale Project
1612 2024 Jun MBA (ITSM) 77122228838 Shubham Singhal Project
1613 2024 Jun MBA (ITSM) 77122229411 Riyanshi Mittal Project
1614 2024 Jun MBA (ITSM) 77122229668 Gayathry V Project
1615 2024 Jun MBA (OM) 77122230528 Shashiranjan Kumar Project
1616 2024 Jun MBA (ITSM) 77122231105 Ramesh Shiraskar Project
1617 2024 Jun MBA (ITSM) 77122231750 Yamuna V Project
1618 2024 Jun MBA (OM) 77122232117 Anamika Jain Project
1619 2024 Jun MBA (OM) 77122232497 Shantanu Yogendra Misra Project
1620 2024 Jun MBA (ITSM) 77122232587 Irien Biswas Project
1621 2024 Jun MBA (ITSM) 77122233914 Karamveer Singh Project
1622 2024 Jun MBA (OM) 77122234189 Kalyani Saldanha Project
1623 2024 Jun MBA (OM) 77122234462 Anirban Bagchi Project
1624 2024 Jun MBA (OM) 77122234930 Devendra Kshirsagar Project
1625 2024 Jun MBA (ITSM) 77122208766 Ankit Mishra Project
1626 2024 Jun MBA (ITSM) 77122208821 Md Mansoor Alam Project
1627 2024 Jun MBA (OM) 77122209450 Salman Bin Ashraf M Project
1628 2024 Jun MBA (OM) 77122209505 Khyati Dogra Project
1629 2024 Jun MBA (ITSM) 77122209676 Sanmit Tadmare Project
1630 2024 Jun MBA (OM) 77122210117 Avinash Anburajan Project
1631 2024 Jun MBA (ITSM) 77122210184 Sathiya Narayanan KK Project
1632 2024 Jun MBA (OM) 77122210281 Santosh Shaw Project
1633 2024 Jun MBA (ITSM) 77122210368 Riddhika Rawat Project
1634 2024 Jun MBA (OM) 77122210692 Lakshminarayanan S Project
1635 2024 Jun MBA (OM) 77122210788 Akhilesh Kumar Project
1636 2024 Jun MBA (OM) 77122211310 Gaurav Dutta Project
1637 2024 Jun MBA (ITSM) 77122211738 Saili Bakalkar Project
1638 2024 Jun MBA (ITSM) 77122212405 Mayank Sharma Project
1639 2024 Jun MBA (ITSM) 77122212410 Mohd Shuaib Project
1640 2024 Jun MBA (ITSM) 77122212412 Kashika Sharma Project
1641 2024 Jun MBA (ITSM) 77122212557 Gaurav Patil Project
1642 2024 Jun MBA (OM) 77122212836 Jhalak Agrawal Project
1643 2024 Jun MBA (ITSM) 77122212970 Vijay Jain Project
1644 2024 Jun MBA (OM) 77122213468 Murli Dhar Suthar Project
1645 2024 Jun MBA (ITSM) 77122213652 Lakshya Sharma Project
1646 2024 Jun MBA (OM) 77122214694 Mayank Bahuguna Project
1647 2024 Jun MBA (OM) 77122215493 Komal Sudam Thorat Project
1648 2024 Jun MBA (OM) 77122215871 Yogesh Singh Yadav Project
1649 2024 Jun MBA (OM) 77122215969 Hitendra Kumar Singh Project
1650 2024 Jun MBA (ITSM) 77122216247 Nidhi Sunil Chawan Project
1651 2024 Jun MBA (ITSM) 77122216450 Shabaz Shaikh Project
1652 2024 Jun MBA (ITSM) 77122216543 Satyam Bhardwaj Project
1653 2024 Jun MBA (OM) 77122216596 Ritik Verma Project
1654 2024 Jun MBA (ITSM) 77122216896 Manasi Mahajan Project
1655 2024 Jun MBA (OM) 77122183818 Tushar Omprakash Project
1656 2024 Jun MBA (ITSM) 77122184026 Sushant Prason Project
1657 2024 Jun MBA (OM) 77122184210 Jeevitha Ananthula Project
1658 2024 Jun MBA (OM) 77122185260 Nadia Divina Braganza Project
1659 2024 Jun MBA (OM) 77122185317 Amit Kumar Project
1660 2024 Jun MBA (ITSM) 77122185442 Kanika Bansal Project
1661 2024 Jun MBA (ITSM) 77122185665 Parvinder Singh Project
1662 2024 Jun MBA (ITSM) 77122186506 Akash Kotian Project
1663 2024 Jun MBA (OM) 77122186568 Atharva Subodh Joshi Project
1664 2024 Jun MBA (OM) 77122186899 Shivaniben Patel Project
1665 2024 Jun MBA (OM) 77122186988 SATYANARAYAN PRASAD Project
1666 2024 Jun MBA (OM) 77122187025 Sandeep Kumar Project
1667 2024 Jun MBA (ITSM) 77122187027 Minnakuri Pradeep Project
1668 2024 Jun MBA (ITSM) 77122187105 Harshda Bhutal Project
1669 2024 Jun MBA (OM) 77122187540 Pritam acharya Project
1670 2024 Jun MBA (ITSM) 77122187567 Love Kumar Chopra Project
1671 2024 Jun MBA (ITSM) 77122187964 Apurwa Loya Project
1672 2024 Jun MBA (ITSM) 77122188573 Yash Sharma Project
1673 2024 Jun MBA (OM) 77122188783 Intezar Mehndi Sayed Project
1674 2024 Jun MBA (ITSM) 77122188901 Pratham Tiwari Project
1675 2024 Jun MBA (ITSM) 77122189077 Krushnarth Chondikar Project
1676 2024 Jun MBA (OM) 77122189734 Sanjay Thakare Project
1677 2024 Jun MBA (ITSM) 77122189954 Shiv Goyal Project
1678 2024 Jun MBA (ITSM) 77122190010 Utkarsh Sachan Project
1679 2024 Jun MBA (OM) 77122190095 Ashish Sharma Project
1680 2024 Jun MBA (ITSM) 77122190317 Suraj Ramdev Yadav Project
1681 2024 Jun MBA (ITSM) 77122190473 Vasu Dev Bhanu Project
1682 2024 Jun MBA (ITSM) 77122190703 Vinod Sharma Project
1683 2024 Jun MBA (OM) 77122191402 Deep Gaur Project
1684 2024 Jun MBA (OM) 77122191640 Kamsu Jyothsna Project
1685 2024 Jun MBA (ITSM) 77122191805 Shikha Singh Project
1686 2024 Jun MBA (ITSM) 77122192056 Asthir Kushwaha Project
1687 2024 Jun MBA (OM) 77122192609 Amarjeet Kumar Project
1688 2024 Jun MBA (OM) 77122193691 Jayasankar Project
1689 2024 Jun MBA (ITSM) 77122193801 Shikha Thakur Project
1690 2024 Jun MBA (ITSM) 77122193979 Vemula Saithilak Project
1691 2024 Jun MBA (OM) 77122194724 Apeksha M Jain Project
1692 2024 Jun MBA (ITSM) 77122194769 Shivin Kapoor Project
1693 2024 Jun MBA (OM) 77122195090 Lalit Mohan Project
1694 2024 Jun MBA (OM) 77122195290 Paka Madhu Pranith Bhargav Project
1695 2024 Jun MBA (ITSM) 77122195645 Patole Prashant Sanjay Project
1696 2024 Jun MBA (OM) 77122196170 Kishan Panchal Project
1697 2024 Jun MBA (OM) 77122196419 Ashok Kumar Project
1698 2024 Jun MBA (ITSM) 77122196445 Megha Goel Project
1699 2024 Jun MBA (OM) 77122197720 Prateek Kumar Project
1700 2024 Jun MBA (ITSM) 77122198106 Veeresh T S Project
1701 2024 Jun MBA (OM) 77122198387 Pranav Takale Project
1702 2024 Jun MBA (OM) 77122198705 Amit Dubey Project
1703 2024 Jun MBA (ITSM) 77122198839 Deepesh Nagpal Project
1704 2024 Jun MBA (OM) 77122198920 Rachit Kandhway Project
1705 2024 Jun MBA (OM) 77122199332 Usha Rawat Project
1706 2024 Jun MBA (ITSM) 77122200647 Shreya Sharma Project
1707 2024 Jun MBA (ITSM) 77122200703 Satya Priya Mishra Project
1708 2024 Jun MBA (OM) 77122200948 Ranjan Maity Project
1709 2024 Jun MBA (OM) 77122201112 Kumar Manavalan Project
1710 2024 Jun MBA (ITSM) 77122175699 Savit Kumar Chugh Project
1711 2024 Jun MBA (ITSM) 77122176123 Prince Kumar Singh Project
1712 2024 Jun MBA (ITSM) 77122176129 Samrat Singh Project
1713 2024 Jun MBA (OM) 77122176426 Gargi Project
1714 2024 Jun MBA (ITSM) 77122176638 Bhavika Oberoi Project
1715 2024 Jun MBA (OM) 77122176647 Sumedha Sharma Project
1716 2024 Jun MBA (ITSM) 77122176648 Meenu Rani Project
1717 2024 Jun MBA (OM) 77122176725 Vishakha Khot Project
1718 2024 Jun MBA (ITSM) 77122176819 Shashank Wartikar Project
1719 2024 Jun MBA (OM) 77122176948 Akhilkrishnan Radhakrishnan Nair Project
1720 2024 Jun MBA (OM) 77122177082 Smita Mishra Project
1721 2024 Jun MBA (OM) 77122178048 Pankaj Pandey Project
1722 2024 Jun MBA (OM) 77122178489 Priyanka Mane Project
1723 2024 Jun MBA (ITSM) 77122179072 Deepank Gupta Project
1724 2024 Jun MBA (OM) 77122179136 Devireddi Lohit Shivganesh Project
1725 2024 Jun MBA (OM) 77122179451 Rathish Rajendran Project
1726 2024 Jun MBA (OM) 77122180043 Rahul Yadav Project
1727 2024 Jun MBA (ITSM) 77122180258 Sourabh Project
1728 2024 Jun MBA (ITSM) 77122180645 Appala Venkatabalalalithajyothi Project
1729 2024 Jun MBA (ITSM) 77122180766 Vibhav Pandey Project
1730 2024 Jun MBA (ITSM) 77122181010 Sriyanka Singh Project
1731 2024 Jun MBA (ITSM) 77122181390 Prasenjit Kar Project
1732 2024 Jun MBA (OM) 77122181739 Nutan Kalvikatte Project
1733 2024 Jun MBA (OM) 77122182236 Chithra L Kamath Project
1734 2024 Jun MBA (ITSM) 77122182334 Roshi Ahuja Project
1735 2024 Jun MBA (ITSM) 77122182686 Kurban Mansoori Project
1736 2024 Jun MBA (ITSM) 77122182768 Prithviraj Datta Project
1737 2024 Jun MBA (ITSM) 77122182806 Tanu Gandhi Project
1738 2024 Jun MBA (OM) 77122183428 Navpreet Kaur Project
1739 2024 Jun MBA (ITSM) 77122217579 Sanya Project
1740 2024 Jun MBA (OM) 77122217710 Priyanka Pal Project
1741 2024 Jun MBA (ITSM) 77122217818 Chinmay Khanapurkar Project
1742 2024 Jun MBA (ITSM) 77122218210 Prachi More Project
1743 2024 Jun MBA (ITSM) 77122218536 Jitanshu Sharma Project
1744 2024 Jun MBA (OM) 77122219229 Heeral Anil Kanadia Project
1745 2024 Jun MBA (OM) 77122219693 Alok Kumbhar Project
1746 2024 Jun MBA (ITSM) 77122220114 Anirudh Banerjee Project
1747 2024 Jun MBA (ITSM) 77122220806 Sonia Tyagi Project
1748 2024 Jun MBA (OM) 77122220991 Utkarsh Srivastava Project
1749 2024 Jun MBA (ITSM) 77122221451 Jiby Jose K Project
1750 2024 Jun MBA (ITSM) 77122222100 Sharad Kumar Project
1751 2024 Jun MBA (OM) 77122222127 Prathamesh Nitin Diwadkar Project
1752 2024 Jun MBA (ITSM) 77122222521 Aaryan Parashar Project
1753 2024 Jun MBA (OM) 77122223327 Rojalin Pradhan Project
1754 2024 Jun MBA (ITSM) 77122224112 Preetha Rai Project
1755 2024 Jun MBA (ITSM) 77122224829 Sanket Kharche Project
1756 2024 Jun MBA (OM) 77122224993 Aditya Dongare Project
1757 2024 Jun MBA (ITSM) 77122225179 Shrishti Mathur Project
1758 2024 Jun MBA (ITSM) 77122225197 Siddhi Vartak Project
1759 2024 Jun MBA (ITSM) 77122225372 Shenbaga Vyashni R Project
1760 2024 Jun MBA (ITSM) 77122225503 Anurag Bajpai Project
1761 2024 Jun MBA (ITSM) 77122201491 Priyanka Maske Project
1762 2024 Jun MBA (OM) 77122201736 Mandar Deshpande Project
1763 2024 Jun MBA (OM) 77122202228 MujeebKhan Pathan Project
1764 2024 Jun MBA (ITSM) 77122202800 Rohit Singh Project
1765 2024 Jun MBA (OM) 77122202963 Malladi Surendra Varma Project
1766 2024 Jun MBA (OM) 77122203108 D Parthiban Project
1767 2024 Jun MBA (OM) 77122203722 Chitresh Kaple Project
1768 2024 Jun MBA (OM) 77122203776 Sneha Project
1769 2024 Jun MBA (OM) 77122204274 Sundip Sundas Project
1770 2024 Jun MBA (OM) 77122204523 Rishabh Gupta Project
1771 2024 Jun MBA (OM) 77122204945 Sujitkumar Malage Project
1772 2024 Jun MBA (ITSM) 77122205054 Shivam Khanolkar Project
1773 2024 Jun MBA (OM) 77122205919 Seema Singh Project
1774 2024 Jun MBA (ITSM) 77122205961 Amol Patil Project
1775 2024 Jun MBA (ITSM) 77122206734 Nandini Project
1776 2024 Jun MBA (OM) 77122206770 Rajnish Kumar Singh Project
1777 2024 Jun MBA (OM) 77122207078 Vimal Kumar Project
1778 2024 Jun MBA (ITSM) 77122207865 Azaruddin Sherif Project
1779 2024 Jun MBA (ITSM) 77122207978 Charudatta Jog Project
1780 2024 Jun MBA (ITSM) 77122208144 Akshay Gupta Project
1781 2024 Jun MBA (ITSM) 77122284050 Komal Mehta Project
1782 2024 Jun MBA (OM) 77122284556 Akilkhan Pathan Project
1783 2024 Jun MBA (OM) 77122284629 Shourja Seal Project
1784 2024 Jun MBA (OM) 77122284816 Nikita Sheoran Project
1785 2024 Jun MBA (ITSM) 77122284870 Srushti Korgaonkar Project
1786 2024 Jun MBA (OM) 77122284911 Shriraj Nilegaonkar Project
1787 2024 Jun MBA (ITSM) 77122285063 Arzoo Balbale Project
1788 2024 Jun MBA (OM) 77122285465 Arya Sanjay Singh Project
1789 2024 Jun MBA (OM) 77122285883 Bhanupartap Singh Project
1790 2024 Jun MBA (OM) 77122286780 Mansi Tripathi Project
1791 2024 Jun MBA (ITSM) 77122286871 Ravi Ranjan kumar Thakur Project
1792 2024 Jun MBA (ITSM) 77122287351 Deepanshu Chopra Project
1793 2024 Jun MBA (ITSM) 77122287370 Ejaj Ahemad Project
1794 2024 Jun MBA (ITSM) 77122288582 Prageet Sharma Project
1795 2024 Jun MBA (ITSM) 77122288613 S M Tafzeel Mohamid Project
1796 2024 Jun MBA (OM) 77122289025 Anisha Jha Project
1797 2024 Jun MBA (ITSM) 77122289219 Omkar Patil Project
1798 2024 Jun MBA (OM) 77122289494 Pragati Mishra Project
1799 2024 Jun MBA (ITSM) 77122289684 Harsh Jain Project
1800 2024 Jun MBA (ITSM) 77122290029 Suvam Das Project
1801 2024 Jun MBA (OM) 77122290575 Pankaj Bankhede Project
1802 2024 Jun MBA (ITSM) 77122290593 Rajit Mahala Project
1803 2024 Jun MBA (ITSM) 77122290634 Rithika Maheshwari Project
1804 2024 Jun MBA (OM) 77122290790 Shruti Garg Project
1805 2024 Jun MBA (OM) 77122290845 Diksha Project
1806 2024 Jun MBA (OM) 77122290950 Akash Sharma Project
1807 2024 Jun MBA (ITSM) 77122291156 Jitender Singh Project
1808 2024 Jun MBA (ITSM) 77122268760 Sathishkumar S Project
1809 2024 Jun MBA (ITSM) 77122269065 Ravi Narayan Srivastava Project
1810 2024 Jun MBA (OM) 77122269955 Aman Gupta Project
1811 2024 Jun MBA (ITSM) 77122269999 Prasad Kulkarni Project
1812 2024 Jun MBA (OM) 77122270037 Pooja Surve Project
1813 2024 Jun MBA (ITSM) 77122270523 Deeksha Gangwar Project
1814 2024 Jun MBA (ITSM) 77122270791 Surya Ashutosh Ponna Project
1815 2024 Jun MBA (OM) 77122270799 Farah Najamal Husen Mahedi Project
1816 2024 Jun MBA (ITSM) 77122271200 Vanshaj Sharma Project
1817 2024 Jun MBA (OM) 77122271402 Vishnu H Project
1818 2024 Jun MBA (ITSM) 77122271636 Palak Virendra Sharma Project
1819 2024 Jun MBA (ITSM) 77122271754 Huzefa Kapadia Project
1820 2024 Jun MBA (ITSM) 77122272100 Rajesh Kumar Project
1821 2024 Jun MBA (OM) 77122272256 Pragati Gauravkumar Patel Project
1822 2024 Jun MBA (OM) 77122272930 Bhaskar Kambli Project
1823 2024 Jun MBA (OM) 77122273160 Swarnima Satam Project
1824 2024 Jun MBA (ITSM) 77122273206 Disha Sen Project
1825 2024 Jun MBA (ITSM) 77122273528 Ritika Lakhyani Project
1826 2024 Jun MBA (ITSM) 77122273687 Gaurang Shet Verenkar Project
1827 2024 Jun MBA (OM) 77122273693 Nimisha Prasad Project
1828 2024 Jun MBA (OM) 77122273757 Vaibhav Chauda Project
1829 2024 Jun MBA (OM) 77122274437 Kumar Satyam Anand Project
1830 2024 Jun MBA (ITSM) 77122274698 Harshit Balothiya Project
1831 2024 Jun MBA (ITSM) 77122274966 Shristi Dubey Project
1832 2024 Jun MBA (ITSM) 77122275374 Samiksha Rajesh Godha Project
1833 2024 Jun MBA (ITSM) 77122275406 A Aman Singh Project
1834 2024 Jun MBA (OM) 77122243931 Baishakhi Mukherjee Project
1835 2024 Jun MBA (OM) 77122244245 Kesha Rawal Project
1836 2024 Jun MBA (OM) 77122244486 Tushar Rane Project
1837 2024 Jun MBA (OM) 77122244698 Jagadeeswari Chadalawada Project
1838 2024 Jun MBA (OM) 77122245271 Kaveri Koditkar Project
1839 2024 Jun MBA (ITSM) 77122245558 Ritika Project
1840 2024 Jun MBA (ITSM) 77122245861 Surbhi Soni Project
1841 2024 Jun MBA (OM) 77122245956 Amit Dhattrwal Project
1842 2024 Jun MBA (ITSM) 77122246047 Isha Chafekar Project
1843 2024 Jun MBA (OM) 77122246330 Anmol Singh Project
1844 2024 Jun MBA (ITSM) 77122247211 Savit Khanna Project
1845 2024 Jun MBA (OM) 77122247515 Tejal Chinchore Project
1846 2024 Jun MBA (OM) 77122247543 Priyanka Dhivare Project
1847 2024 Jun MBA (ITSM) 77122247584 Yamini Kathuria Project
1848 2024 Jun MBA (ITSM) 77122247595 Udit Popli Project
1849 2024 Jun MBA (OM) 77122247992 Neeraj Kumar Project
1850 2024 Jun MBA (OM) 77122248406 Debasish Tripathy Project
1851 2024 Jun MBA (OM) 77122248655 Pankaj Kaushik Project
1852 2024 Jun MBA (OM) 77122249195 Saurabh Raturi Project
1853 2024 Jun MBA (OM) 77122249294 Prachi Sinha Project
1854 2024 Jun MBA (OM) 77122249511 Kuldeep Singh Project
1855 2024 Jun MBA (ITSM) 77122250596 Shaikh Meheraj Akbar Project
1856 2024 Jun MBA (ITSM) 77122250916 Juhi Vichare Project
1857 2024 Jun MBA (ITSM) 77122251055 Rohit Patwal Project
1858 2024 Jun MBA (ITSM) 77122252550 Muskan Jain Project
1859 2024 Jun MBA (OM) 77122255061 Prasoon Dwivedi Project
1860 2024 Jun MBA (ITSM) 77122255068 Anjali Rawat Project
1861 2024 Jun MBA (ITSM) 77122255250 Pratiksha Arun Zankar Project
1862 2024 Jun MBA (ITSM) 77122255381 Harsimran Singh Project
1863 2024 Jun MBA (ITSM) 77122255392 Sarthak Gupta Project
1864 2024 Jun MBA (OM) 77122256663 Piyush Ranjan Singh Yadav Project
1865 2024 Jun MBA (OM) 77122256894 Shane Nigel Dsouza Project
1866 2024 Jun MBA (ITSM) 77122257508 Kaustav Das Project
1867 2024 Jun MBA (OM) 77122257601 Ripunjay Srivastava Project
1868 2024 Jun MBA (ITSM) 77122257699 Ritika Patil Project
1869 2024 Jun MBA (OM) 77122257754 Sourav Nayak Project
1870 2024 Jun MBA (OM) 77122258657 Trupti Ubale Project
1871 2024 Jun MBA (ITSM) 77122258873 Snehasish Nayak Project
1872 2024 Jun MBA (ITSM) 77122258914 Fahim Anwar Khan Project
1873 2024 Jun MBA (ITSM) 77122259462 Shaikh Mohd Maqbool Project
1874 2024 Jun MBA (OM) 77122259568 Jonnala N Chaithanya Krishna Project
1875 2024 Jun MBA (ITSM) 77122259745 Amrit Singh Project
1876 2024 Jun MBA (ITSM) 77122259859 Priyanka Bhimrao Shelke Project
1877 2024 Jun MBA (ITSM) 77122235137 Swapnil Borase Project
1878 2024 Jun MBA (OM) 77122235517 Mirza Akbar Hussain Project
1879 2024 Jun MBA (ITSM) 77122235696 Ashish Kumar Project
1880 2024 Jun MBA (ITSM) 77122235806 Rajashri Kalita Project
1881 2024 Jun MBA (OM) 77122235836 Sudhir Pobatti Project
1882 2024 Jun MBA (ITSM) 77122235848 Mankriti Kaur Suri Project
1883 2024 Jun MBA (OM) 77122236113 Siddhi Pachupate Project
1884 2024 Jun MBA (OM) 77122236160 Phalguni Lakhyani Project
1885 2024 Jun MBA (OM) 77122236739 Gayathri Devi l Project
1886 2024 Jun MBA (ITSM) 77122237029 Mahesh Bijalwan. Project
1887 2024 Jun MBA (ITSM) 77122237106 Shivanshu Saini Project
1888 2024 Jun MBA (ITSM) 77122237283 Abhijit Bhagat Project
1889 2024 Jun MBA (OM) 77122237290 Darshit Rajeshkumar Mistry Project
1890 2024 Jun MBA (OM) 77122237822 Vivian Valerence Noronha Project
1891 2024 Jun MBA (OM) 77122239842 Mitesh Ravindra Bhoir Project
1892 2024 Jun MBA (OM) 77122239898 Anish Project
1893 2024 Jun MBA (ITSM) 77122239973 Kumar Gautam Rana Project
1894 2024 Jun MBA (ITSM) 77122240111 NILESHKUMAR MAHENDRAKUMAR NAYI Project
1895 2024 Jun MBA (ITSM) 77122240364 Mayur Shinde Project
1896 2024 Jun MBA (OM) 77122240890 Jatin Mane Project
1897 2024 Jun MBA (ITSM) 77122240901 Rinku Kanyal Project
1898 2024 Jun MBA (OM) 77122241051 Anush Anand Project
1899 2024 Jun MBA (ITSM) 77122241219 Swarnim Tripathi Project
1900 2024 Jun MBA (ITSM) 77122241447 Usman Khan Project
1901 2024 Jun MBA (OM) 77122241610 Sneha Mahambre Project
1902 2024 Jun MBA (OM) 77122241657 Rahul Kadam Project
1903 2024 Jun MBA (OM) 77122241664 Venkatesh Arora Project
1904 2024 Jun MBA (OM) 77122241670 Abhishek Project
1905 2024 Jun MBA (ITSM) 77122242087 Divya Sree Karamala Project
1906 2024 Jun MBA (ITSM) 77122242117 Anushka Avneesh Kapur Project
1907 2024 Jun MBA (OM) 77122242508 Jay Mangroliya Project
1908 2024 Jun MBA (ITSM) 77122242563 Shakaib Anwar Project
1909 2024 Jun MBA (ITSM) 77122242739 Srishty Jha Project
1910 2024 Jun MBA (OM) 77122242762 Kunal Kanti Dey Project
1911 2024 Jun MBA (ITSM) 77122242818 Namrata Roy Project
1912 2024 Jun MBA (OM) 77122243636 Girish Raveendran Project
1913 2024 Jun MBA (OM) 77122276000 Alok Singh Project
1914 2024 Jun MBA (ITSM) 77122276318 S B L Sriram Project
1915 2024 Jun MBA (ITSM) 77122276332 Sumeet Kumar Biswal Project
1916 2024 Jun MBA (OM) 77122276411 Mokshada Deven Hiran Project
1917 2024 Jun MBA (OM) 77122276859 Yogesh Visal Project
1918 2024 Jun MBA (OM) 77122276897 Dimpyj Ghatora Project
1919 2024 Jun MBA (ITSM) 77122277030 Kiran Gohil Project
1920 2024 Jun MBA (ITSM) 77122277081 Vibhor Bhatnagar Project
1921 2024 Jun MBA (ITSM) 77122277149 Deepak Behera Project
1922 2024 Jun MBA (ITSM) 77122277247 Subhranil Pal Project
1923 2024 Jun MBA (ITSM) 77122277536 Adil Ali Project
1924 2024 Jun MBA (OM) 77122278294 Hemendra Dange Project
1925 2024 Jun MBA (OM) 77122278401 Saurav Datta Project
1926 2024 Jun MBA (ITSM) 77122278546 Guduru Chaitra Chowdary Project
1927 2024 Jun MBA (ITSM) 77122278648 Simran Manav Project
1928 2024 Jun MBA (OM) 77122278746 Shamik Wadkar Project
1929 2024 Jun MBA (ITSM) 77122279230 Aishwarya Rajendra Patil Project
1930 2024 Jun MBA (ITSM) 77122279509 Aniket Kailas Rathod Project
1931 2024 Jun MBA (OM) 77122280036 Rao Vikram Singh Project
1932 2024 Jun MBA (ITSM) 77122280078 Bhavya Project
1933 2024 Jun MBA (OM) 77122280697 Jyoti Yadav Project
1934 2024 Jun MBA (OM) 77122280886 Keerthan Poojari Project
1935 2024 Jun MBA (OM) 77122281201 Sagar Saxena Project
1936 2024 Jun MBA (ITSM) 77122281437 Bhumika Agarwal Project
1937 2024 Jun MBA (ITSM) 77122282048 Purnima Garg Project
1938 2024 Jun MBA (OM) 77122282342 Vivek Kumar Project
1939 2024 Jun MBA (ITSM) 77122282479 Yash Pandey Project
1940 2024 Jun MBA (OM) 77122282489 Rajendra Kumar Parte Project
1941 2024 Jun MBA (ITSM) 77122283168 Noor Khurana Project
1942 2024 Jun MBA (OM) 77122283363 Esha Pujari Project
1943 2024 Jun MBA (ITSM) 77122283391 Gayatri Sewatkar Project
1944 2024 Jun MBA (OM) 77122283957 Pranali Pawar Project
1945 2024 Jun MBA (OM) 77122260329 Amit Sharma Project
1946 2024 Jun MBA (OM) 77122260467 Sundara Subrahmanyam Project
1947 2024 Jun MBA (OM) 77122260850 Swapnil Gedam Project
1948 2024 Jun MBA (OM) 77122261168 Asifali Siddhapura Project
1949 2024 Jun MBA (ITSM) 77122262155 Akshada Dadasaheb Margale Project
1950 2024 Jun MBA (OM) 77122262494 Mukesh Kanwar Project
1951 2024 Jun MBA (ITSM) 77122262560 Dhananjay Patil Project
1952 2024 Jun MBA (OM) 77122263206 Tanishq Bhargava Project
1953 2024 Jun MBA (OM) 77122263273 Abhishek Patil Project
1954 2024 Jun MBA (ITSM) 77122263287 Kiren Balaji N Project
1955 2024 Jun MBA (ITSM) 77122263291 Apurva Pandey Project
1956 2024 Jun MBA (ITSM) 77122263795 Parva Mihir Shah Project
1957 2024 Jun MBA (OM) 77122264026 Swapnali Shankar Kamble Project
1958 2024 Jun MBA (ITSM) 77122264033 Nishtha Trehan Project
1959 2024 Jun MBA (OM) 77122264670 Jagadeeshwaran P Project
1960 2024 Jun MBA (OM) 77122264722 Mazharul Hannan Mondal Project
1961 2024 Jun MBA (OM) 77122264897 Rishab Sardana Project
1962 2024 Jun MBA (OM) 77122265096 Amirajsinh Raj Project
1963 2024 Jun MBA (ITSM) 77122265249 Harsh Mukesh Shah Project
1964 2024 Jun MBA (OM) 77122265520 Aditya Patel Project
1965 2024 Jun MBA (ITSM) 77122265575 Sudhanshu Shailendra Shukla Project
1966 2024 Jun MBA (OM) 77122265590 Vedashri Wairkar Project
1967 2024 Jun MBA (OM) 77122266132 Ajinkya Papal Project
1968 2024 Jun MBA (ITSM) 77122266479 Maansi Gupta Project
1969 2024 Jun MBA (OM) 77122266712 Saksham Sharma Project
1970 2024 Jun MBA (OM) 77122266757 Krish Patel Project
1971 2024 Jun MBA (OM) 77122266820 Himanshu Vyas Project
1972 2024 Jun MBA (ITSM) 77122266845 Sarabjeet Singh Project
1973 2024 Jun MBA (OM) 77122267649 Gouranga Das Project
1974 2024 Jun MBA (OM) 77121824080 Prathik Puthran Project
1975 2024 Jun MBA (ITSM) 77121846350 Mehaben Patel Project
1976 2024 Jun MBA (ITSM) 77121848172 Abhishek Sheshadri Project
1977 2024 Jun MBA (ITSM) 77121878877 Karina Kashyap Project
1978 2024 Jun MBA (OM) 77121883502 Avnish Negi Project
1979 2024 Jun MBA (OM) 77121904514 Mahesh Ambati Project
1980 2024 Jun MBA (ITSM) 77121916585 Vaibhav Vivek Mawade Project
1981 2024 Jun MBA (ITSM) 77121927319 Linu P Saji Project
1982 2024 Jun MBA (OM) 77121934333 Nisha Rawlani Project
1983 2024 Jun MBA (OM) 77121938530 Priyanka Pandey Project
1984 2024 Jun MBA (ITSM) 77121948281 Anurag Kaushik Project
1985 2024 Jun MBA (ITSM) 77121948642 Prachi Sharma Project
1986 2024 Jun MBA (OM) 77121952827 Zeeba Thakur Project
1987 2024 Jun MBA (OM) 77121970014 Kamal Kishore Koranga Project
1988 2024 Jun MBA (ITSM) 77121974725 Ashish Kumar Singh Project
1989 2024 Jun MBA (OM) 77121978514 Ranbir Singh Project
1990 2024 Jun MBA (ITSM) 77121980611 Poonam Bhavsar Project
1991 2024 Jun MBA (OM) 77121981206 Bhargavkumar Patel Project
1992 2024 Jun MBA (OM) 77121994351 Shreedhar Bulchandani Project
1993 2024 Jun MBA (OM) 77121999000 Balamurugan M Project
1994 2024 Jun MBA (OM) 77122100198 Mihir Naik Project
1995 2024 Jun MBA (OM) 77122100200 Gaurav Joshi Project
1996 2024 Jun MBA (OM) 77122100484 Sayali Raut Project
1997 2024 Jun MBA (ITSM) 77122100657 Anuja Nalawade Project
1998 2024 Jun MBA (ITSM) 77122100911 Ishan Srivastava Project
1999 2024 Jun MBA (ITSM) 77122101683 Madhu Mishra Project
2000 2024 Jun MBA (ITSM) 77122101867 Helna Jacob Project
2001 2024 Jun MBA (OM) 77122102633 Sangeetha Nath Project
2002 2024 Jun MBA (OM) 77122102887 Amit Kumar Jha Project
2003 2024 Jun MBA (ITSM) 77122102981 Raghavesh Tripathi Project
2004 2024 Jun MBA (OM) 77122103331 Mayank Garg Project
2005 2024 Jun MBA (ITSM) 77122103560 Siddharth Tiwari Project
2006 2024 Jun MBA (OM) 77122103636 Abdul Qadir Shaikh Project
2007 2024 Jun MBA (OM) 77121435904 Anil Kumar Indolia Project
2008 2024 Jun MBA (OM) 77121445079 Anu Chauhan Project
2009 2024 Jun MBA (ITSM) 77121475958 Sakhare Sagar Ramchandra Project
2010 2024 Jun MBA (OM) 77121488657 Nirav Senghani Project
2011 2024 Jun MBA (ITSM) 77121490013 Sourabh Kulkarni Project
2012 2024 Jun MBA (OM) 77121497712 Subhajit Dey Project
2013 2024 Jun MBA (ITSM) 77121500886 Alka Singh Project
2014 2024 Jun MBA (OM) 77121501558 Siddharth Mone Project
2015 2024 Jun MBA (OM) 77121504550 Sagar Sharma Project
2016 2024 Jun MBA (OM) 77121513953 Abhay Kumar Project
2017 2024 Jun MBA (ITSM) 77121526732 NAGMOTI NITIN SHANMUKHAPPA Project
2018 2024 Jun MBA (OM) 77121536632 Kranti Pawar Project
2019 2024 Jun MBA (OM) 77121547599 Harish Gharal Project
2020 2024 Jun MBA (OM) 77121564911 Krishna Prasath R Project
2021 2024 Jun MBA (ITSM) 77121574403 Ankita Chaudhary Project
2022 2024 Jun MBA (OM) 77121575694 Saransh Mehta Project
2023 2024 Jun MBA (OM) 77121576007 Prasann Vani Project
2024 2024 Jun MBA (OM) 77121586900 Satyam Malik Project
2025 2024 Jun MBA (OM) 77121590971 Lucky Kumar Project
2026 2024 Jun MBA (OM) 77121597394 Moksh Chopra Project
2027 2024 Jun PGDBM - ITSM77120548906 Payal Singh Project
2028 2024 Jun PGDBM - ITSM77120552813 Mohammad Danish Project
2029 2024 Jun PGDBM - ITSM77120570084 Prahlad Bhatia Project
2030 2024 Jun PGDBM - ITSM77120594833 Piyush Barai Project
2031 2024 Jun PGDBM - ITSM77120598481 Hansita Sharma Project
2032 2024 Jun PGDBM - ITSM77120631505 B G Hanu Srilekha Project
2033 2024 Jun PGDBM - ITSM77120672807 Sudha Kumari Sharma Project
2034 2024 Jun PGDBM - ITSM77120696795 Dinesh Kumar V Project
2035 2024 Jun PGDBM - ITSM77120706814 Swapnil Sharma Project
2036 2024 Jun PGDBM - ITSM77120745756 Shagun Agarwal Project
2037 2024 Jun PGDBM - ITSM77120859704 Praveen Kumar Project
2038 2024 Jun PGDBM - ITSM77120882469 Pankaj Sharma Project
2039 2024 Jun PGDBM - ITSM77120910296 Abhishek Kumar Project
2040 2024 Jun PGDBM - ITSM77120939253 Anjali Bitten Project
2041 2024 Jun PGDBM - ITSM77120988440 Shweta Arora Project
2042 2024 Jun MBA (OM) 77121100583 Saumya Chandra Project
2043 2024 Jun MBA (OM) 77121107628 Bhavesh Dilip Punjabi Project
2044 2024 Jun MBA (OM) 77121109389 Rutuja Desai Project
2045 2024 Jun MBA (OM) 77121123049 Rajat Varshney Project
2046 2024 Jun MBA (OM) 77121123397 Prateek Tiwari Project
2047 2024 Jun MBA (OM) 77121129744 Narayanan P Project
2048 2024 Jun MBA (OM) 77121130105 Santhosh Kumar Jeyabalan Project
2049 2024 Jun MBA (ITSM) 77121146548 Saumya Kondaparthy Project
2050 2024 Jun MBA (OM) 77121169981 Nikhil Kumar Singh Project
2051 2024 Jun MBA (OM) 77121177129 Dennis Arther Project
2052 2024 Jun MBA (OM) 77121181286 Sajit Nair Project
2053 2024 Jun MBA (OM) 77121183625 Mitali Kansal Project
2054 2024 Jun MBA (OM) 77121193682 Chirag Pachouri Project
2055 2024 Jun MBA (OM) 77121197025 Shreya Shekhar Project
2056 2024 Jun MBA (OM) 77121199886 S Nakkiran Project
2057 2024 Jun MBA (OM) 77121203569 Nandini Porwal Project
2058 2024 Jun MBA (ITSM) 77121206492 Nouman Aziz Project
2059 2024 Jun MBA (OM) 77121206509 Anikate Rastogi Project
2060 2024 Jun MBA (OM) 77121209921 Pratik Jadhav Project
2061 2024 Jun MBA (OM) 77121212042 John Wesly E Project
2062 2024 Jun MBA (OM) 77121225640 Nikhil Yadav Project
2063 2024 Jun MBA (OM) 77121227969 Vikram Singh Project
2064 2024 Jun PGDBM - ITSM77119189238 Amit Singh Project
2065 2024 Jun PGDBM - ITSM77119870569 Shirin Shaikh Project
2066 2024 Jun PGDBM - ITSM77119921496 Yogesh Girmal Project
2067 2024 Jun PGDBM - ITSM77120102868 Sachin Ashokrao Keshwatkar Project
2068 2024 Jun PGDBM - ITSM77120104216 Rupali Verma Project
2069 2024 Jun PGDBM - ITSM77120124017 Rajiba Lochan Tripathy Project
2070 2024 Jun PGDBM - ITSM77120157317 Mohit Kapri Project
2071 2024 Jun PGDBM - ITSM77120164679 Aditi Chandrachud Project
2072 2024 Jun PGDBM - ITSM77120168241 Sumanta Bhattacharya Project
2073 2024 Jun PGDBM - ITSM77120226549 Aditi Project
2074 2024 Jun PGDBM - ITSM77120235950 Yatin Kalra Project
2075 2024 Jun PGDBM - ITSM77120314789 Gaurav Rohilla Project
2076 2024 Jun PGDBM - ITSM77120360468 Ankita Jadhav Project
2077 2024 Jun PGDBM - ITSM77120424054 Rajat Dessai Project
2078 2024 Jun PGDBM - ITSM77120433998 Shubham Patil Project
2079 2024 Jun PGDBM - ITSM77120442508 Rathin Pal Project
2080 2024 Jun PGDBM - ITSM77120448722 Iju Thomas Koshy Project
2081 2024 Jun PGDBM - ITSM77120449873 Aakriti Raheja Project
2082 2024 Jun PGDBM - ITSM77120466357 Anupam Gupta Project
2083 2024 Jun MBA (OM) 77121616766 Abhilash Nair Project
2084 2024 Jun MBA (ITSM) 77121619843 Ayushi Saini Project
2085 2024 Jun MBA (ITSM) 77121626600 Harshita Tripathi Project
2086 2024 Jun MBA (OM) 77121626848 Santhosh S Project
2087 2024 Jun MBA (ITSM) 77121627881 Prateek Srivastava Project
2088 2024 Jun MBA (ITSM) 77121646198 Gajendra Bhatt Project
2089 2024 Jun MBA (OM) 77121660898 Meenakshi Sharma Project
2090 2024 Jun MBA (OM) 77121662533 Vivek Kumar Yadav Project
2091 2024 Jun MBA (OM) 77121699482 Mohit Bhalla Project
2092 2024 Jun MBA (ITSM) 77121725844 Shritee Sisodiya Project
2093 2024 Jun MBA (ITSM) 77121730018 Pournima Kardak Project
2094 2024 Jun MBA (OM) 77121733127 Abhik Sarkar Project
2095 2024 Jun MBA (ITSM) 77121734377 Anoop Rai Project
2096 2024 Jun MBA (ITSM) 77121741287 Dipak Darade Project
2097 2024 Jun MBA (OM) 77121748590 Anurag Priyo Majumder Project
2098 2024 Jun MBA (ITSM) 77121749556 Gopal Sharma Project
2099 2024 Jun MBA (OM) 77121776192 Mukul Sinha Project
2100 2024 Jun MBA (OM) 77121781563 Hemlata Project
2101 2024 Jun MBA (OM) 77121790319 Ankit Kumar Project
2102 2024 Jun MBA (OM) 77121791477 Mallesh Bye Project
2103 2024 Jun MBA (OM) 77121803020 Siddharth Mohile Project
2104 2024 Jun MBA (OM) 77121803255 Mahak Arora Project
2105 2024 Jun MBA (OM) 77121812606 Beauty Singh Project
2106 2024 Jun MBA (OM) 77121817679 Yogita Shirke Project
2107 2024 Jun MBA (ITSM) 77121822072 Rabia Project
2108 2024 Jun MBA (OM) 77121823371 Himanshu Mathur Project
2109 2024 Jun MBA (OM) 77121234530 Shlok Banavali Project
2110 2024 Jun MBA (ITSM) 77121235061 Rishabh Mishra Project
2111 2024 Jun MBA (OM) 77121235118 Aarryan Ranisati Project
2112 2024 Jun MBA (ITSM) 77121239164 Aakash Dhuri Project
2113 2024 Jun MBA (OM) 77121243346 Aniket Bharadwaj Project
2114 2024 Jun MBA (OM) 77121243542 Hemant Kumar Project
2115 2024 Jun MBA (OM) 77121254029 Debarsish Hazarika Project
2116 2024 Jun MBA (OM) 77121256912 Snehal Vilas Sawant Project
2117 2024 Jun MBA (OM) 77121281667 Naman Vohra Project
2118 2024 Jun MBA (OM) 77121288277 Abhishek Yeole Project
2119 2024 Jun MBA (OM) 77121291782 Yash Parashar Project
2120 2024 Jun MBA (OM) 77121292700 Mallika Bhattacharjee Project
2121 2024 Jun MBA (ITSM) 77121301404 Mohd Owais Khan Project
2122 2024 Jun MBA (OM) 77121304274 Rahulkumar Chauhan Project
2123 2024 Jun MBA (OM) 77121315820 Sachin Belure Project
2124 2024 Jun MBA (OM) 77121318001 Adarsh R Project
2125 2024 Jun MBA (OM) 77121318925 Alkesh Arun Banavali Project
2126 2024 Jun MBA (ITSM) 77121334972 Suvojyoti Mitra Project
2127 2024 Jun MBA (ITSM) 77121341553 Prasanna Phadtare Project
2128 2024 Jun MBA (OM) 77121350740 Arnab Chatterjee Project
2129 2024 Jun MBA (OM) 77121364506 Manish Tiwari Project
2130 2024 Jun MBA (ITSM) 77121366301 Pritha Chakraborty Project
2131 2024 Jun MBA (ITSM) 77121389847 Tushar Project
2132 2024 Jun MBA (OM) 77121431841 Devanshu Chaudhari Project
2133 2024 Jun MBA (ITSM) 77122961974 MADUPU RAMCHANDAR RAO Project
2134 2024 Jun MBA (ITSM) 77122962005 Vaibhav Sharma Project
2135 2024 Jun MBA (ITSM) 77122962613 Atharva Inamdar Project
2136 2024 Jun MBA (OM) 77122963198 Ketan Salvi Project
2137 2024 Jun MBA (BFM) 77122963297 Akshay Uttam Dhotre Project
2138 2024 Jun MBA (OM) 77122963362 Saumyabrata Mazumder Project
2139 2024 Jun MBA (BFM) 77122963844 Ritika Ravi Viyanwar Project
2140 2024 Jun MBA (BFM) 77122964271 Dipu Gupta Project
2141 2024 Jun MBA (BFM) 77122964404 Divyeshkumar Lad Project
2142 2024 Jun MBA (BFM) 77122964438 Murari Thakur Project
2143 2024 Jun MBA (BFM) 77122964475 Harsh Ajay Project
2144 2024 Jun MBA (BFM) 77122964482 Ayush Soni Project
2145 2024 Jun MBA (BFM) 77122964991 Nandita Chinke Project
2146 2024 Jun MBA (OM) 77122965193 Ritika Patil Project
2147 2024 Jun MBA (BFM) 77122965195 Vanita Project
2148 2024 Jun MBA (ITSM) 77122965297 Ankita Bhattacharya Project
2149 2024 Jun MBA (BFM) 77122965370 Muskan Goel Project
2150 2024 Jun MBA (BFM) 77122965385 Bhagyashri Jire Project
2151 2024 Jun MBA (ITSM) 77122965485 Afroz Mohd Mansoori Project
2152 2024 Jun MBA (ITSM) 77122965698 Shubham Rajesh Khanvilkar Project
2153 2024 Jun MBA (ITSM) 77122965930 Kanchan Yadav Project
2154 2024 Jun MBA (BFM) 77122965948 Sachin Nagpal Project
2155 2024 Jun MBA (BFM) 77122966065 Mangesh Anil Yende Project
2156 2024 Jun MBA (ITSM) 77122966077 Mohammad Fahad Siddique Project
2157 2024 Jun MBA (OM) 77122966125 Ashish Lad Project
2158 2024 Jun MBA (ITSM) 77122966282 Noor Mohammed Imdadulla Project
2159 2024 Jun MBA (OM) 77122966448 Disha Patni Project
2160 2024 Jun MBA (BFM) 77122966807 Vaibhav Kumar Kelode Project
2161 2024 Jun MBA (OM) 77122966964 Chinmay Narkar Project
2162 2024 Jun MBA (OM) 77122967182 Ramesh Kumar Project
2163 2024 Jun MBA (BFM) 77122967445 Vishal Kumar Singh Project
2164 2024 Jun MBA (BFM) 77122967932 Prachi Lad Project
2165 2024 Jun MBA (OM) 77122968574 Padmanava Mandal Project
2166 2024 Jun MBA (BFM) 77122968663 Kuhu Aggarwal Project
2167 2024 Jun MBA (ITSM) 77122968846 Chandrakanth Reddy M Project
2168 2024 Jun MBA (ITSM) 77122969005 Amruta Mishra Project
2169 2024 Jun MBA (BFM) 77122969077 Anju Jadhao Project
2170 2024 Jun MBA (ITSM) 77122969410 Varsharani Patil Project
2171 2024 Jun MBA (ITSM) 77122970119 Sindhu Reddy K Project
2172 2024 Jun MBA (OM) 77122945128 Krishna Agrawal Project
2173 2024 Jun MBA (BFM) 77122945220 Sandeep Tandekar Project
2174 2024 Jun MBA (BFM) 77122945226 Mudit Aggarwal Project
2175 2024 Jun MBA (BFM) 77122945335 Anubhav Upadhyay Project
2176 2024 Jun MBA (BFM) 77122945353 Shubham Gurav Project
2177 2024 Jun MBA (BFM) 77122945383 Abhinash Choudhury Project
2178 2024 Jun MBA (OM) 77122945864 Hemanjali Chutia Project
2179 2024 Jun MBA (BFM) 77122946136 Jahnvi Sheth Project
2180 2024 Jun MBA (OM) 77122946187 Yogharaj K Project
2181 2024 Jun MBA (ITSM) 77122946259 Sayali Katkar Project
2182 2024 Jun MBA (OM) 77122946332 Bhawna Malik Project
2183 2024 Jun MBA (ITSM) 77122946474 Dipankar Roy Project
2184 2024 Jun MBA (OM) 77122946737 Devesh Dubey Project
2185 2024 Jun MBA (OM) 77122946834 Vedant Haval Project
2186 2024 Jun MBA (BFM) 77122947012 Akhil Muralidharan Pillai Project
2187 2024 Jun MBA (OM) 77122947259 Abhay Raina Project
2188 2024 Jun MBA (OM) 77122947328 Kanchan Kumar Prashar Project
2189 2024 Jun MBA (BFM) 77122947344 Rishikesh Anand Project
2190 2024 Jun MBA (OM) 77122947555 Karthik A S Project
2191 2024 Jun MBA (ITSM) 77122947562 Sonam Ramesh Tiwari Project
2192 2024 Jun MBA (BFM) 77122948112 Diwaker Sharma Project
2193 2024 Jun MBA (ITSM) 77122948184 Mathur Rohan Sanjay Project
2194 2024 Jun MBA (BFM) 77122948205 Gilchrist Joquim Gonsalves Project
2195 2024 Jun MBA (OM) 77122948669 Prateek Agnihotri Project
2196 2024 Jun MBA (BFM) 77122948835 Mahima Chaurasiya Project
2197 2024 Jun MBA (ITSM) 77122948914 Shristy Project
2198 2024 Jun MBA (OM) 77122949041 Aahana Samadder Project
2199 2024 Jun MBA (BFM) 77122949185 Vandana Project
2200 2024 Jun MBA (OM) 77122950288 Bhojak Hitarth Maitreykumar Project
2201 2024 Jun MBA (ITSM) 77122950291 Mahima Sengar Project
2202 2024 Jun MBA (BFM) 77122950405 Kiran Rajendra Ban Project
2203 2024 Jun MBA (ITSM) 77122951029 Prachi Mishra Project
2204 2024 Jun MBA (ITSM) 77122951089 V S D Subramanyam Kasichayanula Project
2205 2024 Jun MBA (BFM) 77122951156 Rupa Kumari Project
2206 2024 Jun MBA (BFM) 77122951199 Sagar Waghela Project
2207 2024 Jun MBA (ITSM) 77122951264 Ankita Rani Project
2208 2024 Jun MBA (ITSM) 77122951356 Abhinav Pratap Singh Project
2209 2024 Jun MBA (BFM) 77122951907 Mayur Hadavale Project
2210 2024 Jun MBA (ITSM) 77122952354 Shital Sanjay Ramane Project
2211 2024 Jun MBA (OM) 77122952634 Aslam Nasruddin Shaikh Project
2212 2024 Jun MBA (BFM) 77122952881 Jyoti Poptani Project
2213 2024 Jun MBA (BFM) 77122911464 Divya Arora Project
2214 2024 Jun MBA (BFM) 77122911563 Manasi Paner Project
2215 2024 Jun MBA (OM) 77122911677 Simran Bageja Project
2216 2024 Jun MBA (BFM) 77122912384 Shivam Lal Project
2217 2024 Jun MBA (OM) 77122912917 Mayank Prabhakar Project
2218 2024 Jun MBA (BFM) 77122913014 Kritika Garg Project
2219 2024 Jun MBA (ITSM) 77122913111 Nadar Nancy Sam Project
2220 2024 Jun MBA (ITSM) 77122913313 Sejal Mulik Project
2221 2024 Jun MBA (OM) 77122913505 Rushikesh Chaudhary Project
2222 2024 Jun MBA (BFM) 77122913510 Shivani Ramesh Tripathi Project
2223 2024 Jun MBA (BFM) 77122913529 Prachi Pawar Project
2224 2024 Jun MBA (ITSM) 77122913708 Nikhil Rajendra Saxena Project
2225 2024 Jun MBA (OM) 77122913795 Aachal Ranoliya Project
2226 2024 Jun MBA (ITSM) 77122913858 Jairaj Sirmukaddam Project
2227 2024 Jun MBA (BFM) 77122914512 Ankur Mishra Project
2228 2024 Jun MBA (ITSM) 77122914877 Siddhant Gawai Project
2229 2024 Jun MBA (OM) 77122914894 Royston Delwin Dmello Project
2230 2024 Jun MBA (BFM) 77122914984 Nikita Kharade Project
2231 2024 Jun MBA (ITSM) 77122915146 Vikas Singh Project
2232 2024 Jun MBA (ITSM) 77122915147 UJJWAL KUMAR TIWARY Project
2233 2024 Jun MBA (OM) 77122916038 Jagadish Project
2234 2024 Jun MBA (BFM) 77122916144 Prashant Tiwari Project
2235 2024 Jun MBA (BFM) 77122916534 Tanya Chhabra Project
2236 2024 Jun MBA (ITSM) 77122916805 Sachin Kallappa Hanchinal Project
2237 2024 Jun MBA (ITSM) 77122916881 Mukul Ghare Project
2238 2024 Jun MBA (ITSM) 77122917013 Swati Sreeram Project
2239 2024 Jun MBA (ITSM) 77122917017 Divya Project
2240 2024 Jun MBA (ITSM) 77122917416 Nikita Singla Project
2241 2024 Jun MBA (ITSM) 77122917762 Aniket Project
2242 2024 Jun MBA (OM) 77122918035 Syed Waseem Project
2243 2024 Jun MBA (ITSM) 77122918082 Ashma Chawla Project
2244 2024 Jun MBA (BFM) 77122918269 Vivek Yerme Project
2245 2024 Jun MBA (ITSM) 77122918369 Sachin Bharat Project
2246 2024 Jun MBA (ITSM) 77122918372 Amit Prasad Project
2247 2024 Jun MBA (ITSM) 77122918462 Ashi Kothari Project
2248 2024 Jun MBA (OM) 77122918605 Vivek Anand Project
2249 2024 Jun MBA (ITSM) 77122919114 Dhanisha Harjai Project
2250 2024 Jun MBA (OM) 77122919140 Srota Dawn Project
2251 2024 Jun MBA (ITSM) 77122919623 Nagasai Narendra Kumar Narahari Project
2252 2024 Jun MBA (ITSM) 77122920102 Vishaka Kochhar Project
2253 2024 Jun MBA (OM) 77122920631 Rahul Gupta Project
2254 2024 Jun MBA (BFM) 77122920776 Kaustubh Dhanaji Kadav Project
2255 2024 Jun MBA (ITSM) 77122920818 Sneha Dodiya Project
2256 2024 Jun MBA (ITSM) 77122921321 Dhiraj Venkatrao Jadhav Project
2257 2024 Jun MBA (BFM) 77122921525 Sonu Paliwal Project
2258 2024 Jun MBA (OM) 77122921759 Rashmi Gupta Project
2259 2024 Jun MBA (OM) 77122921935 Vibhor Shrivastava Project
2260 2024 Jun MBA (OM) 77122922155 Rushil Nileshbhai Zalavadia Project
2261 2024 Jun MBA (OM) 77122922301 Rupam Pandey Project
2262 2024 Jun MBA (BFM) 77122922427 Vartika Pandey Project
2263 2024 Jun MBA (ITSM) 77122922735 Alisha Gupta Project
2264 2024 Jun MBA (OM) 77122922835 Akash Ojha Project
2265 2024 Jun MBA (OM) 77122923179 Debabrata Thakur Project
2266 2024 Jun MBA (ITSM) 77122924036 Shreya Malik Project
2267 2024 Jun MBA (BFM) 77122924049 Shubham Choudhary Project
2268 2024 Jun MBA (BFM) 77122924303 Paridhi Agrawal Project
2269 2024 Jun MBA (BFM) 77122924705 Balneesh Kohli Project
2270 2024 Jun MBA (ITSM) 77122925046 Samreen Khan Project
2271 2024 Jun MBA (BFM) 77122925072 Palak Sharma Project
2272 2024 Jun MBA (OM) 77122925204 Hrushikesh Sunil Jadhav Project
2273 2024 Jun MBA (ITSM) 77122925524 MD ASHIF Ali Project
2274 2024 Jun MBA (OM) 77122925530 Dhananjay Kumar Project
2275 2024 Jun MBA (OM) 77122925897 Faiz Kundiwala Project
2276 2024 Jun MBA (OM) 77122925920 Sabaa Shaikh Project
2277 2024 Jun MBA (ITSM) 77122926025 K Swetha Project
2278 2024 Jun MBA (ITSM) 77122926066 Veronica Gloria Rocque Project
2279 2024 Jun MBA (BFM) 77122926800 Swapnali Kapratwar Project
2280 2024 Jun MBA (ITSM) 77122927403 Mohammed Misam Rizvi Project
2281 2024 Jun MBA (ITSM) 77122927412 Kanisetty Lakshmi Prasanna Project
2282 2024 Jun MBA (OM) 77122927565 Devansh Sharma Project
2283 2024 Jun MBA (ITSM) 77122928272 Pradeep Kumar Project
2284 2024 Jun MBA (BFM) 77122928911 Palak Project
2285 2024 Jun MBA (BFM) 77122928958 Navtej Kumar Project
2286 2024 Jun MBA (OM) 77122929053 Omkar Surve Project
2287 2024 Jun MBA (ITSM) 77122929171 Rushabh Gandhi Project
2288 2024 Jun MBA (OM) 77122929198 Kunal Singh Project
2289 2024 Jun MBA (ITSM) 77122929413 Akshay Jagtap Project
2290 2024 Jun MBA (BFM) 77122929482 Rahul Sinha Project
2291 2024 Jun MBA (ITSM) 77122929486 Nirwan Bhardwaj Project
2292 2024 Jun MBA (ITSM) 77122929617 Praful Bodkhe Project
2293 2024 Jun MBA (OM) 77122929963 Lagnajit Jena Project
2294 2024 Jun MBA (OM) 77122930147 Radhika Ambekar Project
2295 2024 Jun MBA (BFM) 77122930446 Lakshay Singh Project
2296 2024 Jun MBA (OM) 77122930613 Mohammed Rayan Project
2297 2024 Jun MBA (OM) 77122930706 Ajinkya Ambekar Project
2298 2024 Jun MBA (ITSM) 77122931018 Likitha M Project
2299 2024 Jun MBA (ITSM) 77122931037 Abu Talha I Project
2300 2024 Jun MBA (OM) 77122931194 Sanjoy Kundu Project
2301 2024 Jun MBA (ITSM) 77122931427 Omkar Nanda Project
2302 2024 Jun MBA (ITSM) 77122931691 Maitreyee Konnur Project
2303 2024 Jun MBA (BFM) 77122932430 Heena Shaukat Shaikh Project
2304 2024 Jun MBA (OM) 77122932512 Nidhi Rawat Project
2305 2024 Jun MBA (BFM) 77122932584 Vidhushi Sharma Project
2306 2024 Jun MBA (ITSM) 77122932603 Piyush Navin Bhanushali Project
2307 2024 Jun MBA (ITSM) 77122933016 Charanpreet Singh Project
2308 2024 Jun MBA (ITSM) 77122933311 Priyanka Raha Project
2309 2024 Jun MBA (OM) 77122933392 Vikas Pandey Project
2310 2024 Jun MBA (ITSM) 77122933426 Manal Mestry Project
2311 2024 Jun MBA (ITSM) 77122933727 Manik Girdhar Project
2312 2024 Jun MBA (ITSM) 77122933781 Harshit Gupta Project
2313 2024 Jun MBA (BFM) 77122934312 Ajay A Project
2314 2024 Jun MBA (OM) 77122934321 Navin V Project
2315 2024 Jun MBA (ITSM) 77122934548 Prakash Singh Rawat Project
2316 2024 Jun MBA (ITSM) 77122934549 Ishu Awasthi Project
2317 2024 Jun MBA (OM) 77122934647 Harsh Abrol Project
2318 2024 Jun MBA (BFM) 77122934666 Nishant Choradia Project
2319 2024 Jun MBA (OM) 77122934761 Nitin Kumar Tiwari Project
2320 2024 Jun MBA (ITSM) 77122934833 Vinky Kundnani Project
2321 2024 Jun MBA (BFM) 77122935668 Sagar Ravindra Bhavsar Project
2322 2024 Jun MBA (ITSM) 77122936045 Kismat Kamlesh Gowani Project
2323 2024 Jun MBA (ITSM) 77122902192 Dhanya Lakshmi S Project
2324 2024 Jun MBA (ITSM) 77122902422 Mayuresh Arvind Patil Project
2325 2024 Jun MBA (OM) 77122902429 Anoop Rai P Project
2326 2024 Jun MBA (BFM) 77122903195 Puneet Sharma Project
2327 2024 Jun MBA (BFM) 77122903284 Nilesh Pandey Project
2328 2024 Jun MBA (BFM) 77122903292 Mahima Baser Project
2329 2024 Jun MBA (ITSM) 77122903434 Prashant Kumar Jha Project
2330 2024 Jun MBA (OM) 77122903544 Gagan Rastogi Project
2331 2024 Jun MBA (OM) 77122904254 Debasis Sahoo Project
2332 2024 Jun MBA (OM) 77122904649 Aman Chouksey Project
2333 2024 Jun MBA (OM) 77122904697 Manish Hegishte Project
2334 2024 Jun MBA (ITSM) 77122905128 Sai Likitha Reddy C Project
2335 2024 Jun MBA (OM) 77122905143 Arkodeep Dasgupta Project
2336 2024 Jun MBA (BFM) 77122905257 Damaraju Manogjna Project
2337 2024 Jun MBA (OM) 77122905637 Hitesh Sharma Project
2338 2024 Jun MBA (OM) 77122905747 Apurva Sushir Project
2339 2024 Jun MBA (OM) 77122905919 Himanshu Sharma Project
2340 2024 Jun MBA (ITSM) 77122905949 Tanishi Jain Project
2341 2024 Jun MBA (ITSM) 77122905977 Aditi Rajesh Vadhavkar Project
2342 2024 Jun MBA (BFM) 77122906259 Gurmehar Kaur Project
2343 2024 Jun MBA (OM) 77122906922 Ashish Gupta Project
2344 2024 Jun MBA (BFM) 77122908068 Juili Kahane Project
2345 2024 Jun MBA (BFM) 77122908275 Jagruti Sadanand Khanolkar Project
2346 2024 Jun MBA (BFM) 77122908329 Xian Fernandes Project
2347 2024 Jun MBA (BFM) 77122908343 Farah Buhariwala Project
2348 2024 Jun MBA (BFM) 77122908728 Ankur Mishra Project
2349 2024 Jun MBA (BFM) 77122908729 Yash Tawade Project
2350 2024 Jun MBA (ITSM) 77122908949 Riya Gangwar Project
2351 2024 Jun MBA (BFM) 77122909360 Deepa Saini Project
2352 2024 Jun MBA (BFM) 77122909484 Shailesh Pandurang Tamhankar Project
2353 2024 Jun MBA (ITSM) 77122909555 Priya Gupta Project
2354 2024 Jun MBA (ITSM) 77122910041 Ajay Tripathi Project
2355 2024 Jun MBA (ITSM) 77122910178 Mohammed Rayyan M Project
2356 2024 Jun MBA (ITSM) 77122910410 Akshat Sharma Project
2357 2024 Jun MBA (ITSM) 77122910432 Ayswarya R Project
2358 2024 Jun MBA (OM) 77122910641 Manu Thomas Project
2359 2024 Jun MBA (ITSM) 77122910690 Vipul Anand Project
2360 2024 Jun MBA (BFM) 77122953164 Shruti Goyal Project
2361 2024 Jun MBA (BFM) 77122953335 Akansha Chand Project
2362 2024 Jun MBA (BFM) 77122953442 Ayushi Verma Project
2363 2024 Jun MBA (ITSM) 77122953603 Shahnawaz Project
2364 2024 Jun MBA (BFM) 77122953820 Rashmi Katiyar Project
2365 2024 Jun MBA (OM) 77122954171 Sukhamoy Dey Project
2366 2024 Jun MBA (ITSM) 77122954278 Deep Kamal Kumar Shah Project
2367 2024 Jun MBA (OM) 77122955026 Gunjan Sirola Project
2368 2024 Jun MBA (ITSM) 77122955099 Abhinav Malik Project
2369 2024 Jun MBA (OM) 77122955132 Rajat Kumar Project
2370 2024 Jun MBA (ITSM) 77122955524 Neelesh Chaturvedi Project
2371 2024 Jun MBA (OM) 77122955850 Yashpal Tomar Project
2372 2024 Jun MBA (ITSM) 77122956192 Durugkar Akanksha Samir Project
2373 2024 Jun MBA (OM) 77122956288 Parag Sudhakar Mahashabde Project
2374 2024 Jun MBA (ITSM) 77122956582 Swati Rastogi Project
2375 2024 Jun MBA (ITSM) 77122957280 Kumar Gaurav Project
2376 2024 Jun MBA (OM) 77122957328 Abdul Ghafoor Mohammad Project
2377 2024 Jun MBA (ITSM) 77122957491 Mohd Zaid Project
2378 2024 Jun MBA (OM) 77122957636 Nand Patel Project
2379 2024 Jun MBA (OM) 77122957670 Sagar Prakash Gujarathi Project
2380 2024 Jun MBA (ITSM) 77122957672 Aditya Kumar Project
2381 2024 Jun MBA (OM) 77122957841 Kajal Kumari Project
2382 2024 Jun MBA (OM) 77122958419 Lucky Project
2383 2024 Jun MBA (OM) 77122958507 Omkar Singh Project
2384 2024 Jun MBA (OM) 77122958703 Megha Sharma Project
2385 2024 Jun MBA (OM) 77122958722 Sanket Shah Project
2386 2024 Jun MBA (OM) 77122959352 Smarojoy Chowdhury Project
2387 2024 Jun MBA (ITSM) 77122959354 Abhiruchi Joshi Project
2388 2024 Jun MBA (BFM) 77122959490 Abhishek Project
2389 2024 Jun MBA (BFM) 77122959648 Reddipalli Karuna Kumar Project
2390 2024 Jun MBA (OM) 77122959827 V Spoorthi Project
2391 2024 Jun MBA (ITSM) 77122959877 Lipakshi Project
2392 2024 Jun MBA (OM) 77122960057 Sanjukta Sarkar Project
2393 2024 Jun MBA (BFM) 77122960235 Diksha Pandey Project
2394 2024 Jun MBA (OM) 77122960425 Rohit Sunil Jadhav Project
2395 2024 Jun MBA (ITSM) 77122960589 Vedika Parmar Project
2396 2024 Jun MBA (OM) 77122960788 Sonali Yogesh Pawar Project
2397 2024 Jun MBA (ITSM) 77122960868 Kumar Satyajeet A Project
2398 2024 Jun MBA (ITSM) 77122960964 Mohsin Khurshid Naqshi Project
2399 2024 Jun MBA (ITSM) 77122961005 Shekhar Kumar Sinha Project
2400 2024 Jun MBA (ITSM) 77122936106 Vardaan Pandit Project
2401 2024 Jun MBA (BFM) 77122936151 Saheena Khan Project
2402 2024 Jun MBA (OM) 77122936621 Shalvika Gadkari Project
2403 2024 Jun MBA (BFM) 77122936790 Krishna Jayakumar Project
2404 2024 Jun MBA (OM) 77122936886 Akshay Dani Project
2405 2024 Jun MBA (BFM) 77122937005 Sweety Project
2406 2024 Jun MBA (BFM) 77122937480 Paresh Pawar Project
2407 2024 Jun MBA (OM) 77122937746 Ashish Jha Project
2408 2024 Jun MBA (OM) 77122938118 Dhwani Chandan Project
2409 2024 Jun MBA (OM) 77122938378 Kalpesh Patil Project
2410 2024 Jun MBA (OM) 77122938423 Akshit Kanda Project
2411 2024 Jun MBA (ITSM) 77122938767 Azimuddin Abdul Kadir Pawaskar Project
2412 2024 Jun MBA (ITSM) 77122938822 Shivani Project
2413 2024 Jun MBA (OM) 77122939093 Vinyas Megalen Saldanha Project
2414 2024 Jun MBA (BFM) 77122939148 Ritu Sharma Project
2415 2024 Jun MBA (ITSM) 77122939380 Sohan Vinod Chaudhari Project
2416 2024 Jun MBA (ITSM) 77122939404 Muhammad Ali Dsouza Project
2417 2024 Jun MBA (ITSM) 77122939465 Rajesh Tripathi Project
2418 2024 Jun MBA (ITSM) 77122939499 Hetavi Singh Project
2419 2024 Jun MBA (OM) 77122939858 Chetan Zuge Project
2420 2024 Jun MBA (OM) 77122939870 Kaivalya Shastri Project
2421 2024 Jun MBA (BFM) 77122940031 Gunjan Tripathi Project
2422 2024 Jun MBA (ITSM) 77122940452 Bhagyashree Tulaskar Project
2423 2024 Jun MBA (BFM) 77122940454 Sidhartha Das Project
2424 2024 Jun MBA (OM) 77122940498 Samrat Kumar Project
2425 2024 Jun MBA (BFM) 77122940614 Harsh Bharwani Project
2426 2024 Jun MBA (ITSM) 77122940639 Prerna Prakash Project
2427 2024 Jun MBA (BFM) 77122940695 Rishabh Khanted Project
2428 2024 Jun MBA (ITSM) 77122940966 Sachin Chaudhari Project
2429 2024 Jun MBA (BFM) 77122940994 Riya Zarkar Project
2430 2024 Jun MBA (ITSM) 77122941077 Shreyas Pande Project
2431 2024 Jun MBA (ITSM) 77122941081 Namrata Tidake Project
2432 2024 Jun MBA (ITSM) 77122941259 Mansi Malik Project
2433 2024 Jun MBA (OM) 77122941331 Ashish Sophat Project
2434 2024 Jun MBA (BFM) 77122941346 Pratibha Hooda Project
2435 2024 Jun MBA (OM) 77122941474 Aftab Altaf Khakoo Project
2436 2024 Jun MBA (BFM) 77122941652 Sahil Arora Project
2437 2024 Jun MBA (BFM) 77122941740 Nissi Babu Thankachan Project
2438 2024 Jun MBA (BFM) 77122941948 Madhu Pimprikar Project
2439 2024 Jun MBA (BFM) 77122942774 Shraddha Gupta Project
2440 2024 Jun MBA (ITSM) 77122942818 Shravan Bagrecha Project
2441 2024 Jun MBA (OM) 77122942848 Kiran Jadhav Project
2442 2024 Jun MBA (OM) 77122943207 Deepanshu Matlani Project
2443 2024 Jun MBA (BFM) 77122943395 Amisha Verma Project
2444 2024 Jun MBA (BFM) 77122943431 Samraghi Mondal Project
2445 2024 Jun MBA (BFM) 77122943614 Sonam Balani Project
2446 2024 Jun MBA (OM) 77122943756 Faheem Kondkari Project
2447 2024 Jun MBA (OM) 77122943982 Rahul Mane Project
2448 2024 Jun MBA (BFM) 77122944095 Sonali Prusty Project
2449 2024 Jun MBA (ITSM) 77122944403 Roshan Indap Project
2450 2024 Jun MBA (BFM) 77122815411 Sushant Mishra Project
2451 2024 Jun MBA (OM) 77122815447 Rohitkumar Yadav Project
2452 2024 Jun MBA (ITSM) 77122815599 Aritra Kissen Mitra Project
2453 2024 Jun MBA (OM) 77122815816 Yuvraj Singh Project
2454 2024 Jun MBA (OM) 77122815817 Dheeraj Rawat Project
2455 2024 Jun MBA (OM) 77122815945 Nanthakumar K Project
2456 2024 Jun MBA (OM) 77122816817 Aditya Narain Singh Project
2457 2024 Jun MBA (BFM) 77122816997 Sagar Sawant Project
2458 2024 Jun MBA (BFM) 77122817102 Gayatri Wadher Project
2459 2024 Jun MBA (BFM) 77122817279 Pranav Sureka Project
2460 2024 Jun MBA (ITSM) 77122817284 Anu Malik Project
2461 2024 Jun MBA (OM) 77122817316 Yukta Berry Project
2462 2024 Jun MBA (BFM) 77122817632 Krupaben Mehta Project
2463 2024 Jun MBA (ITSM) 77122817786 Anny Francis Project
2464 2024 Jun MBA (OM) 77122817793 Gauri Tonpe Project
2465 2024 Jun MBA (BFM) 77122817948 Shaifali Verma Project
2466 2024 Jun MBA (OM) 77122818185 Siddharth Phalaskar Project
2467 2024 Jun MBA (BFM) 77122818325 Ashish Shah Project
2468 2024 Jun MBA (ITSM) 77122818461 Mainak Ghosh Project
2469 2024 Jun MBA (ITSM) 77122818634 Guzzula Abi Dimple Project
2470 2024 Jun MBA (ITSM) 77122818723 Purva Chavan Project
2471 2024 Jun MBA (ITSM) 77122819026 Abhijay Singh Chauhan Project
2472 2024 Jun MBA (OM) 77122819285 Yash Panchal Project
2473 2024 Jun MBA (ITSM) 77122819444 Shreya Sharma Project
2474 2024 Jun MBA (ITSM) 77122819454 Shivani Kelloru Project
2475 2024 Jun MBA (OM) 77122819966 Atharva Joshi Project
2476 2024 Jun MBA (BFM) 77122820596 Mohammed Zartab Khan Project
2477 2024 Jun MBA (ITSM) 77122820624 Anurag Kumar Dubey Project
2478 2024 Jun MBA (ITSM) 77122820972 Shrey Sharma Project
2479 2024 Jun MBA (ITSM) 77122821505 Rohit Renose Project
2480 2024 Jun MBA (ITSM) 77122821671 Disha Tyagi Project
2481 2024 Jun MBA (OM) 77122821972 Arijit Das Project
2482 2024 Jun MBA (BFM) 77122821978 Priya Jain Project
2483 2024 Jun MBA (BFM) 77122821985 Anjali Pal Project
2484 2024 Jun MBA (ITSM) 77122822220 Karthik Sreenivasareddy Project
2485 2024 Jun MBA (ITSM) 77122822409 Neelam Balasaheb Gangad Project
2486 2024 Jun MBA (BFM) 77122822492 Saksham Singla Project
2487 2024 Jun MBA (ITSM) 77122823035 Dip Kumar Manna Project
2488 2024 Jun MBA (ITSM) 77122823198 Polepalli Bhavani Project
2489 2024 Jun MBA (BFM) 77122823624 Vikas Bisht Project
2490 2024 Jun MBA (OM) 77122795836 Pravesh Pagey Project
2491 2024 Jun MBA (ITSM) 77122796046 Vikas Kr Verma Project
2492 2024 Jun MBA (ITSM) 77122796174 Nasrin V S Project
2493 2024 Jun MBA (ITSM) 77122796247 Pooja Dhondappa Kamble Project
2494 2024 Jun MBA (ITSM) 77122796365 Vaishnavi Anand Project
2495 2024 Jun MBA (ITSM) 77122796649 Ankita Srivastava Project
2496 2024 Jun MBA (BFM) 77122796729 Nibi Rani Project
2497 2024 Jun MBA (ITSM) 77122796807 Apoorva Sanjay Bidyanta Project
2498 2024 Jun MBA (ITSM) 77122797181 Mahesh Andhare Project
2499 2024 Jun MBA (OM) 77122797448 M Kartik kumar Project
2500 2024 Jun MBA (ITSM) 77122797652 Robbin Jacob Vattakkattu Project
2501 2024 Jun MBA (BFM) 77122797675 Hitesh Patil Project
2502 2024 Jun MBA (BFM) 77122798471 Dipti Rajput Project
2503 2024 Jun MBA (BFM) 77122798829 Gaurav Bhati Project
2504 2024 Jun MBA (BFM) 77122798950 Rajendra Kumar Soni Project
2505 2024 Jun MBA (BFM) 77122798977 Suman Project
2506 2024 Jun MBA (OM) 77122799258 Ashish Kumar Project
2507 2024 Jun MBA (OM) 77122799347 Suraj Kank Project
2508 2024 Jun MBA (OM) 77122799461 Apoorva Chawla Project
2509 2024 Jun MBA (ITSM) 77122799463 Kandala Pushyami Project
2510 2024 Jun MBA (ITSM) 77122799562 Shraddha Sonawane Project
2511 2024 Jun MBA (ITSM) 77122799583 Aniket Shende Project
2512 2024 Jun MBA (OM) 77122799715 Sameer Kapoor Project
2513 2024 Jun MBA (BFM) 77122799756 Akanksha Joshi Project
2514 2024 Jun MBA (OM) 77122800175 Pooja Shukla Project
2515 2024 Jun MBA (OM) 77122800184 Anjali Badola Project
2516 2024 Jun MBA (ITSM) 77122800536 Samata Bhikavale Project
2517 2024 Jun MBA (OM) 77122800753 Vijay Kumar Yadav Project
2518 2024 Jun MBA (OM) 77122800763 Rahul Singh Project
2519 2024 Jun MBA (BFM) 77122800897 Divya Deep Gera Project
2520 2024 Jun MBA (BFM) 77122801623 Deepika Kokal Project
2521 2024 Jun MBA (OM) 77122801855 Aditya Sharma Project
2522 2024 Jun MBA (ITSM) 77122802730 Mahalakshmi B Project
2523 2024 Jun MBA (ITSM) 77122802771 Manoranjan Singh Project
2524 2024 Jun MBA (BFM) 77122802866 Amit Abrol Project
2525 2024 Jun MBA (BFM) 77122803069 Yash Chukka Project
2526 2024 Jun MBA (ITSM) 77122803361 Ishwar Sakhale Project
2527 2024 Jun MBA (OM) 77122803385 Vinay Kumar Project
2528 2024 Jun MBA (BFM) 77122804044 Chanchal Tak Project
2529 2024 Jun MBA (OM) 77122804225 Riddhi Chavda Project
2530 2024 Jun MBA (ITSM) 77122804512 Siddique Mali Project
2531 2024 Jun MBA (OM) 77122804695 Rohit Sabharwal Project
2532 2024 Jun MBA (ITSM) 77122804761 Shivangi Singh Project
2533 2024 Jun MBA (BFM) 77122805163 Gurpreet Khaneja Project
2534 2024 Jun MBA (ITSM) 77122805182 Parvinder Singh Project
2535 2024 Jun MBA (ITSM) 77122768312 Samnit Mehandiratta Project
2536 2024 Jun MBA (ITSM) 77122768350 Deepak Mishra Project
2537 2024 Jun MBA (BFM) 77122768759 Mehul Bhadra Project
2538 2024 Jun MBA (BFM) 77122769160 Manju Dwarasila Project
2539 2024 Jun MBA (ITSM) 77122769619 Ankleshwariya Sakshi Project
2540 2024 Jun MBA (BFM) 77122769651 Saswat Satchidananda Project
2541 2024 Jun MBA (OM) 77122770250 Pooja Sahu Project
2542 2024 Jun MBA (ITSM) 77122770488 Dev Darshan Tiwari Project
2543 2024 Jun MBA (OM) 77122771510 Anuj Kumar Project
2544 2024 Jun MBA (BFM) 77122771644 Neha Shaw Project
2545 2024 Jun MBA (ITSM) 77122771688 Swetha P Project
2546 2024 Jun MBA (ITSM) 77122771809 Pramod Kumar Bhavaraju Project
2547 2024 Jun MBA (OM) 77122771953 Krishnamurthi Pashupati Project
2548 2024 Jun MBA (BFM) 77122771958 Vaibhav Gupta Project
2549 2024 Jun MBA (OM) 77122772060 Jyoti Rawat Project
2550 2024 Jun MBA (BFM) 77122772246 Srashty Sharma Project
2551 2024 Jun MBA (BFM) 77122772504 Anish Khanna Project
2552 2024 Jun MBA (ITSM) 77122772606 Neelam Sharma Project
2553 2024 Jun MBA (BFM) 77122772749 Viken Jariwala Project
2554 2024 Jun MBA (BFM) 77122772964 Anubhav Sangal Project
2555 2024 Jun MBA (ITSM) 77122773353 Mahak Pathak Project
2556 2024 Jun MBA (OM) 77122773459 Mohammed Ehtesham Uddin Kashif Project
2557 2024 Jun MBA (ITSM) 77122773895 Shivain Bhat Project
2558 2024 Jun MBA (OM) 77122774046 Gourav Shaw Project
2559 2024 Jun MBA (OM) 77122774381 Nikhil Kumar Yadav Project
2560 2024 Jun MBA (BFM) 77122774490 Priyanshu Lashkari Project
2561 2024 Jun MBA (BFM) 77122774643 Mayank Saluja Project
2562 2024 Jun MBA (BFM) 77122774941 Shristi Gupta Project
2563 2024 Jun MBA (BFM) 77122775381 Dipak Dutta Project
2564 2024 Jun MBA (OM) 77122775611 Abhrajyoti Das Project
2565 2024 Jun MBA (BFM) 77122775784 Anjaneya Sahu Project
2566 2024 Jun MBA (BFM) 77122775785 Sarah Julian Vaz Project
2567 2024 Jun MBA (ITSM) 77122775964 Snehaben Bhut Project
2568 2024 Jun MBA (OM) 77122775986 Dhruv Chaudhary Project
2569 2024 Jun MBA (OM) 77122776152 Venkatesh Mondi Project
2570 2024 Jun MBA (ITSM) 77122776168 Nishant Vajpai Project
2571 2024 Jun MBA (BFM) 77122776253 Saurabh Raj Project
2572 2024 Jun MBA (OM) 77122776431 Akash Nadmane Project
2573 2024 Jun MBA (BFM) 77122776630 Parth Sharma Project
2574 2024 Jun MBA (BFM) 77122776907 Maryann Adrian Gomes Project
2575 2024 Jun MBA (BFM) 77122777126 Rohit Singh Rawat Project
2576 2024 Jun MBA (ITSM) 77122777184 Shweta Malviya Project
2577 2024 Jun MBA (OM) 77122777451 Saptarshi Mukherjee Project
2578 2024 Jun MBA (ITSM) 77122777511 Sunitha Sharma Project
2579 2024 Jun MBA (OM) 77122777626 Mihir Panelia Project
2580 2024 Jun MBA (OM) 77122778282 Alefiya Makharia Project
2581 2024 Jun MBA (ITSM) 77122778381 Aditya Nimje Project
2582 2024 Jun MBA (OM) 77122778880 Animesh Sharma Project
2583 2024 Jun MBA (OM) 77122779096 Naveen D N Project
2584 2024 Jun MBA (ITSM) 77122779434 Purushottam Sharma Project
2585 2024 Jun MBA (BFM) 77122779559 Anjali Kumari Project
2586 2024 Jun MBA (OM) 77122779825 Sushant Patil Project
2587 2024 Jun MBA (ITSM) 77122779844 Neetika Project
2588 2024 Jun MBA (ITSM) 77122780073 Arpita Prajapati Project
2589 2024 Jun MBA (OM) 77122780400 Kavitha Choudhry Project
2590 2024 Jun MBA (OM) 77122780412 Asutosh Khadanga Project
2591 2024 Jun MBA (ITSM) 77122780934 Naaz Tabarak Husain Project
2592 2024 Jun MBA (ITSM) 77122781134 Rakshit Vyas Project
2593 2024 Jun MBA (ITSM) 77122781357 Yash Agrawal Project
2594 2024 Jun MBA (ITSM) 77122782555 Amruta Shinde Project
2595 2024 Jun MBA (ITSM) 77122782574 Rohan Pinto Project
2596 2024 Jun MBA (BFM) 77122782598 Tejaswini Velani Project
2597 2024 Jun MBA (OM) 77122782709 Pawan Kumar Project
2598 2024 Jun MBA (ITSM) 77122782719 Ajay Malik Project
2599 2024 Jun MBA (BFM) 77122783027 Akhil Badge Project
2600 2024 Jun MBA (OM) 77122783060 V Vaishnavi Project
2601 2024 Jun MBA (BFM) 77122783631 Nikhil Kotiyal Project
2602 2024 Jun MBA (BFM) 77122784410 Saanjh Verma Project
2603 2024 Jun MBA (ITSM) 77122784520 Utkarsha Amarchand Gawand Project
2604 2024 Jun MBA (BFM) 77122784739 Aayushi Naidu Project
2605 2024 Jun MBA (OM) 77122784839 Pramod Sharma Project
2606 2024 Jun MBA (OM) 77122785292 Dhruv Pavan Gosain Project
2607 2024 Jun MBA (ITSM) 77122785546 Anshika Shukla Project
2608 2024 Jun MBA (ITSM) 77122785943 Antony Benat G Project
2609 2024 Jun MBA (OM) 77122786383 Mohamed Isaac Project
2610 2024 Jun MBA (ITSM) 77122760368 Misgan Baig Project
2611 2024 Jun MBA (ITSM) 77122760407 Prachi Priyadarshee Project
2612 2024 Jun MBA (OM) 77122760613 Naynesh Kumar Patel Project
2613 2024 Jun MBA (BFM) 77122760747 Aditya Singh Thakur Project
2614 2024 Jun MBA (BFM) 77122760828 Krishan Yogi Project
2615 2024 Jun MBA (BFM) 77122760930 Yukti Srivastava Project
2616 2024 Jun MBA (BFM) 77122760973 Devendra Dubey Project
2617 2024 Jun MBA (BFM) 77122760984 Rajesh Dobhal Project
2618 2024 Jun MBA (OM) 77122761529 Parth Kochhar Project
2619 2024 Jun MBA (ITSM) 77122761822 Vaibhav Lakhera Project
2620 2024 Jun MBA (OM) 77122762318 Yashita Chaudhary Project
2621 2024 Jun MBA (BFM) 77122762530 Pooja Sharma Project
2622 2024 Jun MBA (ITSM) 77122762964 Asmita Meshram Project
2623 2024 Jun MBA (ITSM) 77122763231 Varsha Kochhar Project
2624 2024 Jun MBA (ITSM) 77122763431 Vinay Kulkarni Project
2625 2024 Jun MBA (BFM) 77122763542 Harshil Garg Project
2626 2024 Jun MBA (BFM) 77122763561 Khushi Singh Project
2627 2024 Jun MBA (BFM) 77122763605 Garima Tiwari Project
2628 2024 Jun MBA (ITSM) 77122763710 Sunish Swamidhas Project
2629 2024 Jun MBA (ITSM) 77122763731 Harshita Banwani Project
2630 2024 Jun MBA (BFM) 77122763745 Jaykumar More Project
2631 2024 Jun MBA (BFM) 77122764056 Khushbu Ramchandani Project
2632 2024 Jun MBA (BFM) 77122764146 Isha Ajmera Project
2633 2024 Jun MBA (ITSM) 77122764448 Harshit Srichandani Project
2634 2024 Jun MBA (ITSM) 77122764633 Shubham Goel Project
2635 2024 Jun MBA (ITSM) 77122764842 Kshitijnoor Singh Project
2636 2024 Jun MBA (ITSM) 77122764931 Maninder Singh Project
2637 2024 Jun MBA (ITSM) 77122765021 Divya Kamath Project
2638 2024 Jun MBA (BFM) 77122765339 Vivek Rai Project
2639 2024 Jun MBA (ITSM) 77122765351 Ekta Project
2640 2024 Jun MBA (BFM) 77122765493 Raghav Heda Project
2641 2024 Jun MBA (BFM) 77122766107 Akash Kumar Rout Project
2642 2024 Jun MBA (BFM) 77122766141 Ameya Gundigaonkar Project
2643 2024 Jun MBA (BFM) 77122766157 Pranjal Khandelwal Project
2644 2024 Jun MBA (BFM) 77122766235 Sabiha Talat Project
2645 2024 Jun MBA (ITSM) 77122766314 Navdeep Project
2646 2024 Jun MBA (ITSM) 77122766454 Shruti Chandratre Project
2647 2024 Jun MBA (OM) 77122766562 Prasanna Saindane Project
2648 2024 Jun MBA (BFM) 77122766611 Rahul Wasan Project
2649 2024 Jun MBA (BFM) 77122766715 Piyush Bhore Project
2650 2024 Jun MBA (BFM) 77122766958 Harshita Yampalla Project
2651 2024 Jun MBA (OM) 77122767390 Mrunal Gurav Project
2652 2024 Jun MBA (BFM) 77122767521 Swati Tanwar Project
2653 2024 Jun MBA (ITSM) 77122767568 Muskan Dahanwal Project
2654 2024 Jun MBA (OM) 77122767649 Dhruvilkumar Purani Project
2655 2024 Jun MBA (ITSM) 77122806235 Heena Kapoor Project
2656 2024 Jun MBA (BFM) 77122806847 Arnab Choudhury Project
2657 2024 Jun MBA (OM) 77122806883 Syed Ali Rizvi Project
2658 2024 Jun MBA (BFM) 77122807391 Satyam Nain Project
2659 2024 Jun MBA (ITSM) 77122807501 Maheswari Parida Project
2660 2024 Jun MBA (ITSM) 77122807726 Sonal Khamkar Project
2661 2024 Jun MBA (OM) 77122807790 Akshatha P B Project
2662 2024 Jun MBA (BFM) 77122808358 Piyali Manna Project
2663 2024 Jun MBA (BFM) 77122808389 Manu Jain Project
2664 2024 Jun MBA (ITSM) 77122808556 Agrim Gupta Project
2665 2024 Jun MBA (BFM) 77122808650 Panchali Ghosh Project
2666 2024 Jun MBA (OM) 77122809094 Mrunal Ingle Project
2667 2024 Jun MBA (BFM) 77122809163 Himanshu Ahuja Project
2668 2024 Jun MBA (ITSM) 77122809250 Vasanthapriya S Project
2669 2024 Jun MBA (OM) 77122809774 Gaurav Dey Project
2670 2024 Jun MBA (BFM) 77122810768 Ajith Jude J Project
2671 2024 Jun MBA (BFM) 77122810977 Yasin Motorwala Project
2672 2024 Jun MBA (OM) 77122811080 Baljeet Kaur Project
2673 2024 Jun MBA (ITSM) 77122811349 Arijit Dutta Project
2674 2024 Jun MBA (BFM) 77122811418 Rajiv Shah Project
2675 2024 Jun MBA (BFM) 77122811497 Santosh Pathak Project
2676 2024 Jun MBA (OM) 77122811731 Mohit Saxena Project
2677 2024 Jun MBA (ITSM) 77122811827 Femi Elie Jenson Project
2678 2024 Jun MBA (ITSM) 77122812003 Sonal Chavan Project
2679 2024 Jun MBA (OM) 77122812200 Devender Joshi Project
2680 2024 Jun MBA (BFM) 77122812828 Sudha More Project
2681 2024 Jun MBA (OM) 77122812837 Shubham Popli Project
2682 2024 Jun MBA (OM) 77122812971 Raut Omkar Dnyaneshwar Project
2683 2024 Jun MBA (ITSM) 77122813452 Aketi Bhaskara Rao Project
2684 2024 Jun MBA (OM) 77122813476 Harsh Patel Project
2685 2024 Jun MBA (BFM) 77122813854 Dhruvil Patel Project
2686 2024 Jun MBA (OM) 77122813920 Venkatesh Suresh Baliwada Project
2687 2024 Jun MBA (BFM) 77122814133 Singh Sheetal Sanjay Kumar Project
2688 2024 Jun MBA (ITSM) 77122814599 Niketa Kadam Project
2689 2024 Jun MBA (BFM) 77122815160 Prathamesh Kadge Project
2690 2024 Jun MBA (BFM) 77122815322 Aniket Balkrishna Kajale Project
2691 2024 Jun MBA (ITSM) 77122815341 Nikhil Jagtap Project
2692 2024 Jun MBA (ITSM) 77122786688 Sanket Chaudhari Project
2693 2024 Jun MBA (ITSM) 77122787119 Ruzario Alphonso Project
2694 2024 Jun MBA (OM) 77122787191 Aman Gupta Project
2695 2024 Jun MBA (OM) 77122787353 Soumyajyoti Chakraborty Project
2696 2024 Jun MBA (ITSM) 77122787549 Amit Deshpande Project
2697 2024 Jun MBA (BFM) 77122788386 Ashutosh Dixit Project
2698 2024 Jun MBA (BFM) 77122788392 Debangshu Samanta Project
2699 2024 Jun MBA (OM) 77122788579 Baiju Joshi Project
2700 2024 Jun MBA (OM) 77122788720 Madhavarao K N Project
2701 2024 Jun MBA (OM) 77122789051 Udhaya Shankar U S Project
2702 2024 Jun MBA (BFM) 77122789312 Kanchan Chauhan Project
2703 2024 Jun MBA (ITSM) 77122789342 Dilip Deepak Jaiswar Project
2704 2024 Jun MBA (ITSM) 77122789478 Ankit Kumar Project
2705 2024 Jun MBA (ITSM) 77122790167 Abu Hammad Project
2706 2024 Jun MBA (ITSM) 77122790175 Himani Pandey Project
2707 2024 Jun MBA (BFM) 77122790212 Sayam Mehta Project
2708 2024 Jun MBA (BFM) 77122790326 Siddhesh Rajendra Shinde Project
2709 2024 Jun MBA (ITSM) 77122790508 Chirag Solanki Project
2710 2024 Jun MBA (ITSM) 77122790618 Rahul Koul Project
2711 2024 Jun MBA (OM) 77122790727 Subhajyoti Bose Project
2712 2024 Jun MBA (OM) 77122790854 Taksheela Diwakar Shetty Project
2713 2024 Jun MBA (ITSM) 77122790996 Durgesh Khuspe Project
2714 2024 Jun MBA (ITSM) 77122791038 Divyanshi Verma Project
2715 2024 Jun MBA (ITSM) 77122791089 Shubham Sachan Project
2716 2024 Jun MBA (ITSM) 77122791159 Shikhar Bhatnagar Project
2717 2024 Jun MBA (OM) 77122791693 Abhishek Bade Project
2718 2024 Jun MBA (OM) 77122791808 Ayushman Dhar Project
2719 2024 Jun MBA (OM) 77122791916 B Rakesh Kumar Patro Project
2720 2024 Jun MBA (OM) 77122791945 Rahul Raj Project
2721 2024 Jun MBA (OM) 77122792231 Jomy Jose Angamalini Project
2722 2024 Jun MBA (BFM) 77122792571 Monika Jain Project
2723 2024 Jun MBA (OM) 77122792590 Deeksha Poddar Project
2724 2024 Jun MBA (BFM) 77122792692 Yash Pratap Singh Project
2725 2024 Jun MBA (ITSM) 77122793313 Shaily Rani Project
2726 2024 Jun MBA (ITSM) 77122793674 Romisha Chakraborty Project
2727 2024 Jun MBA (ITSM) 77122793687 Ranjan Shit Project
2728 2024 Jun MBA (BFM) 77122793778 Vikshitha Amin Project
2729 2024 Jun MBA (ITSM) 77122793878 Amit Kundar Project
2730 2024 Jun MBA (ITSM) 77122794490 Balpreet Singh Project
2731 2024 Jun MBA (ITSM) 77122794612 Suraj Kailash Vishwakarma Project
2732 2024 Jun MBA (BFM) 77122795428 Mahak Verma Project
2733 2024 Jun MBA (OM) 77122795550 Tanmay Somani Project
2734 2024 Jun MBA (OM) 77122795694 Vinay Ganapati Hegde Project
2735 2024 Jun MBA (ITSM) 77122668867 Abhishek Hanchate Project
2736 2024 Jun MBA (ITSM) 77122669254 Ashwini Kumar Project
2737 2024 Jun MBA (ITSM) 77122669275 Rushi Ranade Project
2738 2024 Jun MBA (ITSM) 77122669290 Idris Vohra Project
2739 2024 Jun MBA (ITSM) 77122669596 Harsreen Kour Project
2740 2024 Jun MBA (ITSM) 77122669878 Amartya Rawat Project
2741 2024 Jun MBA (ITSM) 77122670880 Shreya Aggarwal Project
2742 2024 Jun MBA (ITSM) 77122671686 Mohit Bhagat Project
2743 2024 Jun MBA (ITSM) 77122671853 Sahaya Mary Reshma Roy S Project
2744 2024 Jun MBA (ITSM) 77122671923 Prafull Bhanudas Bhor Project
2745 2024 Jun MBA (OM) 77122672658 Pradeep Pujari Project
2746 2024 Jun MBA (OM) 77122673491 Gautam Pradhan Project
2747 2024 Jun MBA (ITSM) 77122673615 Aman Choube Project
2748 2024 Jun MBA (ITSM) 77122674020 Nikita Singh Project
2749 2024 Jun MBA (ITSM) 77122674416 Hitesh Jeswani Project
2750 2024 Jun MBA (ITSM) 77122674940 Devesh Mathur Project
2751 2024 Jun MBA (ITSM) 77122676118 Abhinav Srivastava Project
2752 2024 Jun MBA (OM) 77122676280 Arpit Madaan Project
2753 2024 Jun MBA (OM) 77122676915 Ribson Gleen Gonsalves Project
2754 2024 Jun MBA (OM) 77122677056 Abhimanyu Mishra Project
2755 2024 Jun MBA (OM) 77122677256 Alok Ranjan Singh Project
2756 2024 Jun MBA (OM) 77122677276 Suyash Shrivastava Project
2757 2024 Jun MBA (OM) 77122677823 Mohsin Shaikh Project
2758 2024 Jun MBA (OM) 77122678727 Satish Giduturi Project
2759 2024 Jun MBA (OM) 77122678862 Saksham Kumar Jaiswal Project
2760 2024 Jun MBA (ITSM) 77122679040 Pranay Chander Project
2761 2024 Jun MBA (ITSM) 77122679593 Priyanka Kumari Project
2762 2024 Jun MBA (ITSM) 77122679740 Shamli Jayprakash Pakhare Project
2763 2024 Jun MBA (OM) 77122679858 Sunny Maheshawari Project
2764 2024 Jun MBA (ITSM) 77122679931 Mohammed Sayeed Project
2765 2024 Jun MBA (OM) 77122680159 Riju Paramanick Project
2766 2024 Jun MBA (OM) 77122680164 Bipin Kumar Project
2767 2024 Jun MBA (ITSM) 77122680424 Darshan Pradeep Patil Project
2768 2024 Jun MBA (ITSM) 77122681080 Gimol Francis Project
2769 2024 Jun MBA (OM) 77122681566 Sakshi Thapliyal Project
2770 2024 Jun MBA (ITSM) 77122681575 Dhivya Sri S Project
2771 2024 Jun MBA (OM) 77122682003 Rahul Project
2772 2024 Jun MBA (ITSM) 77122682008 Kedarisetty Snigdha Project
2773 2024 Jun MBA (ITSM) 77122643655 Jagyanseni Behera Project
2774 2024 Jun MBA (OM) 77122643915 Anupam Patel Project
2775 2024 Jun MBA (OM) 77122643969 Sahil Shailesh Save Project
2776 2024 Jun MBA (OM) 77122643986 Pearl Matta Project
2777 2024 Jun MBA (ITSM) 77122644571 Toshi Jaiswal Project
2778 2024 Jun MBA (OM) 77122645578 Abhinandan Mukhopadhyay Project
2779 2024 Jun MBA (ITSM) 77122645771 Mehar Narang Project
2780 2024 Jun MBA (OM) 77122645844 Mayank Tomar Project
2781 2024 Jun MBA (ITSM) 77122645882 Ravinder Kumar Bijarnia Project
2782 2024 Jun MBA (OM) 77122647955 Alok Nath Gupta Project
2783 2024 Jun MBA (OM) 77122648207 Prathamesh Thakur Project
2784 2024 Jun MBA (ITSM) 77122648422 SRI SAI VISWANADHA AKHIL DUVVURI Project
2785 2024 Jun MBA (OM) 77122648525 Poonam Sanjay Bhosale Project
2786 2024 Jun MBA (ITSM) 77122648732 Ayushi Johri Project
2787 2024 Jun MBA (OM) 77122648897 Muramshetty Sharanya Project
2788 2024 Jun MBA (ITSM) 77122649155 Kalpesh Desai Project
2789 2024 Jun MBA (ITSM) 77122649201 Ankit Sahai Project
2790 2024 Jun MBA (OM) 77122649306 Murli Project
2791 2024 Jun MBA (ITSM) 77122649472 Nikhil Kumar Gorain Project
2792 2024 Jun MBA (ITSM) 77122649515 Alluri Harshitha Project
2793 2024 Jun MBA (ITSM) 77122649555 Shakthisri Murugesh Kounder Project
2794 2024 Jun MBA (ITSM) 77122649809 Naren Viswanathan Project
2795 2024 Jun MBA (OM) 77122649874 Omkar Shejwal Project
2796 2024 Jun MBA (OM) 77122652089 Sriakhil Korada Project
2797 2024 Jun MBA (ITSM) 77122652614 Rahul Kamble Project
2798 2024 Jun MBA (OM) 77122652665 Abhijit Mund Project
2799 2024 Jun MBA (OM) 77122653786 DASARI TAVITI NAIDU Project
2800 2024 Jun MBA (OM) 77122654127 Aswin Thiyagarajan N Project
2801 2024 Jun MBA (OM) 77122654323 Shardul Salvi Project
2802 2024 Jun MBA (OM) 77122654392 Pavitra Manoharan Project
2803 2024 Jun MBA (OM) 77122654532 Amlan Saha Project
2804 2024 Jun MBA (OM) 77122654686 Krishna Nayak Project
2805 2024 Jun MBA (ITSM) 77122654730 Sourabh Rathore Project
2806 2024 Jun MBA (ITSM) 77122655274 Rajat Parmar Project
2807 2024 Jun MBA (ITSM) 77122655683 Syed Tajuddin Project
2808 2024 Jun MBA (ITSM) 77122655800 Ishhaq Shaikh Project
2809 2024 Jun MBA (OM) 77122609441 Aparna Sharma Project
2810 2024 Jun MBA (OM) 77122609961 Shweta Nagargoje Project
2811 2024 Jun MBA (OM) 77122610039 Nayanika Lahkar Project
2812 2024 Jun MBA (ITSM) 77122610505 Appam Samshitha Roy Project
2813 2024 Jun MBA (ITSM) 77122610674 Pratik Kawadkar Project
2814 2024 Jun MBA (ITSM) 77122611036 Ashutosh Dixit Project
2815 2024 Jun MBA (ITSM) 77122612356 Milan Project
2816 2024 Jun MBA (OM) 77122612710 Anshu Kataria Project
2817 2024 Jun MBA (OM) 77122612865 Yug Patel Project
2818 2024 Jun MBA (OM) 77122612919 Harpreet Singh Project
2819 2024 Jun MBA (OM) 77122613268 Surath Chandra Maiti Project
2820 2024 Jun MBA (ITSM) 77122613359 Myron Cecil Dsouza Project
2821 2024 Jun MBA (ITSM) 77122613850 Lopamudra Mahapatra Project
2822 2024 Jun MBA (OM) 77122614229 Piyush Bharadwaj Project
2823 2024 Jun MBA (ITSM) 77122614262 Aishvi Parikh Project
2824 2024 Jun MBA (OM) 77122615014 Manu B Project
2825 2024 Jun MBA (OM) 77122615505 Subhasish Biswas Project
2826 2024 Jun MBA (ITSM) 77122615803 Pratheesh Krishnan KG Project
2827 2024 Jun MBA (ITSM) 77122616111 Indrajeet Project
2828 2024 Jun MBA (OM) 77122616482 Rahul Dandapat Project
2829 2024 Jun MBA (OM) 77122616633 Rohan Satyewan Gawas Project
2830 2024 Jun MBA (OM) 77122616813 R Umesh kumar Project
2831 2024 Jun MBA (OM) 77122617617 Rajashri B Project
2832 2024 Jun MBA (ITSM) 77122618056 Bhupendra Singh Chauhan Project
2833 2024 Jun MBA (OM) 77122618312 Samriddhi Aggarwal Project
2834 2024 Jun MBA (ITSM) 77122619170 Priyanka Lenka Project
2835 2024 Jun MBA (OM) 77122619509 Soniya Waldia Project
2836 2024 Jun MBA (OM) 77122619566 Abubakar Siddiq Fruitwala Project
2837 2024 Jun MBA (ITSM) 77122619869 Devanshi Shah Project
2838 2024 Jun MBA (OM) 77122619886 Kajal Thakur Project
2839 2024 Jun MBA (OM) 77122620331 Shivam Surolia Project
2840 2024 Jun MBA (ITSM) 77122620559 Aman Malhotra Project
2841 2024 Jun MBA (ITSM) 77122620569 Ankit Kumar Project
2842 2024 Jun MBA (ITSM) 77122621067 Samvit Sutodiya Project
2843 2024 Jun MBA (ITSM) 77122621202 Anjana Assary Project
2844 2024 Jun MBA (ITSM) 77122621268 Shubham Badriprasad Dubey Project
2845 2024 Jun MBA (OM) 77122621275 Amey Deshpande Project
2846 2024 Jun MBA (ITSM) 77122621423 Jagruti Shelar Project
2847 2024 Jun MBA (OM) 77122621435 Kirti Jain Project
2848 2024 Jun MBA (OM) 77122622152 Shraddha Ajit Sawant Project
2849 2024 Jun MBA (OM) 77122622728 Shalini Singh Project
2850 2024 Jun MBA (ITSM) 77122623173 Kriti Jain Project
2851 2024 Jun MBA (OM) 77122623180 Simone Kompi Project
2852 2024 Jun MBA (ITSM) 77122623378 Dolly Jiwani Project
2853 2024 Jun MBA (OM) 77122623694 Prasanna Kumar Project
2854 2024 Jun MBA (OM) 77122624076 Raj Jha Project
2855 2024 Jun MBA (ITSM) 77122624328 Shweta Shinde Project
2856 2024 Jun MBA (OM) 77122624371 Kedar Anil Deshmukh Project
2857 2024 Jun MBA (OM) 77122624841 Mrinmay Baidya Project
2858 2024 Jun MBA (ITSM) 77122625377 Shahil Project
2859 2024 Jun MBA (ITSM) 77122626091 Satyanarayan Maharajan Project
2860 2024 Jun MBA (ITSM) 77122626116 Basit Hussain Project
2861 2024 Jun MBA (ITSM) 77122626336 Vishay Project
2862 2024 Jun MBA (ITSM) 77122626728 Arunshi Gupta Project
2863 2024 Jun MBA (OM) 77122626805 Raj Gangar Project
2864 2024 Jun MBA (OM) 77122626814 Shikha Project
2865 2024 Jun MBA (ITSM) 77122627651 Amit Singha Project
2866 2024 Jun MBA (OM) 77122627870 Arindam Maity Project
2867 2024 Jun MBA (ITSM) 77122628101 Swetha S S Project
2868 2024 Jun MBA (ITSM) 77122628597 Nency Badiyani Project
2869 2024 Jun MBA (OM) 77122628660 Prashant Dalal Project
2870 2024 Jun MBA (ITSM) 77122629003 Sreejith B Project
2871 2024 Jun MBA (ITSM) 77122629382 Arusula Sakshi Yadav Project
2872 2024 Jun MBA (OM) 77122629618 Abhishek Sandbhor Project
2873 2024 Jun MBA (OM) 77122629857 Ravi Manchanda Project
2874 2024 Jun MBA (OM) 77122630011 Asma Alam Project
2875 2024 Jun MBA (ITSM) 77122630078 Mithil Chanderia Project
2876 2024 Jun MBA (ITSM) 77122630394 Siva Kumar D J Project
2877 2024 Jun MBA (OM) 77122630483 Kartik Chandra Mahato Project
2878 2024 Jun MBA (OM) 77122630519 Maharaja Aman Hitendrabhai Project
2879 2024 Jun MBA (OM) 77122630843 Ruchin Suthar Project
2880 2024 Jun MBA (OM) 77122630880 Chanderkanta Project
2881 2024 Jun MBA (OM) 77122630906 Suyash Sharma Project
2882 2024 Jun MBA (ITSM) 77122631686 Kaustubh Ghag Project
2883 2024 Jun MBA (OM) 77122598311 Haribaskar P Project
2884 2024 Jun MBA (OM) 77122598801 Recha Project
2885 2024 Jun MBA (OM) 77122598860 Prutha Mude Project
2886 2024 Jun MBA (ITSM) 77122599227 Gautam Kumar Project
2887 2024 Jun MBA (OM) 77122599348 Md Shahid Iqbal Project
2888 2024 Jun MBA (ITSM) 77122599472 Rishabh Sharma Project
2889 2024 Jun MBA (ITSM) 77122599488 Senapathi Hemanth Sandhya Project
2890 2024 Jun MBA (ITSM) 77122599618 PRATHA SHIREESHA Project
2891 2024 Jun MBA (OM) 77122600573 Jyotsna Das Project
2892 2024 Jun MBA (ITSM) 77122600745 Sakshi Sharma Project
2893 2024 Jun MBA (ITSM) 77122601363 Umang Khandelwal Project
2894 2024 Jun MBA (OM) 77122601475 Janane Pillay Project
2895 2024 Jun MBA (ITSM) 77122601734 Abdul Ahad U Project
2896 2024 Jun MBA (OM) 77122601819 Subhajit Goswami Project
2897 2024 Jun MBA (ITSM) 77122602654 Rohit Rajouriya Project
2898 2024 Jun MBA (OM) 77122602783 Mayur Padwal Project
2899 2024 Jun MBA (ITSM) 77122603284 Priyanka Bhatia Project
2900 2024 Jun MBA (ITSM) 77122603779 Suyog Neware Project
2901 2024 Jun MBA (OM) 77122603933 Kunal Saroha Project
2902 2024 Jun MBA (ITSM) 77122604041 Vaishnavi Dhembre Project
2903 2024 Jun MBA (OM) 77122604453 Vilakshan Jain Project
2904 2024 Jun MBA (OM) 77122604460 Aditya Grover Project
2905 2024 Jun MBA (OM) 77122604540 Praveen P K Project
2906 2024 Jun MBA (ITSM) 77122604814 Nandini B Nair Project
2907 2024 Jun MBA (ITSM) 77122605221 Sri Sai Amareswara Rao Kode Project
2908 2024 Jun MBA (OM) 77122605777 Santanu Kar Project
2909 2024 Jun MBA (ITSM) 77122606612 Rashmi Rama Project
2910 2024 Jun MBA (ITSM) 77122606879 Syed Moinuddin S Project
2911 2024 Jun MBA (OM) 77122607180 Mohammed Javed Haque Project
2912 2024 Jun MBA (OM) 77122607188 Dishank Srivastav Project
2913 2024 Jun MBA (OM) 77122607746 Vanshika Shah Project
2914 2024 Jun MBA (OM) 77122607789 Pratik Ulhas Upadhye Project
2915 2024 Jun MBA (ITSM) 77122608593 Shivam Kothari Project
2916 2024 Jun MBA (ITSM) 77122608798 Sanjyot Agureddy Project
2917 2024 Jun MBA (ITSM) 77122608862 Akash Kapoor Project
2918 2024 Jun MBA (ITSM) 77122609090 Roudrav Agarwall Project
2919 2024 Jun MBA (ITSM) 77122609204 Mirika Maharishi Project
2920 2024 Jun MBA (ITSM) 77122609275 Pranav Kurup Project
2921 2024 Jun MBA (OM) 77122609301 Amit Puri Project
2922 2024 Jun MBA (OM) 77122655967 Lavanya Joshi Project
2923 2024 Jun MBA (ITSM) 77122656439 Smriti Agarwal Project
2924 2024 Jun MBA (ITSM) 77122656908 Ashutosh Sharma Project
2925 2024 Jun MBA (ITSM) 77122657117 Akshada Patel Project
2926 2024 Jun MBA (OM) 77122657159 Sanman Golapkar Project
2927 2024 Jun MBA (OM) 77122657353 Sidharth Nayak Project
2928 2024 Jun MBA (OM) 77122657596 Shakil Ahmad Siddiqui Project
2929 2024 Jun MBA (OM) 77122657631 Sachin Dilip Nalawade Project
2930 2024 Jun MBA (ITSM) 77122657764 Swati Nallani Chakravarthula Project
2931 2024 Jun MBA (ITSM) 77122658103 Soujanya A Project
2932 2024 Jun MBA (ITSM) 77122658169 Nitesh Kumar Yeddu Project
2933 2024 Jun MBA (ITSM) 77122658856 Abhishek Sharma Project
2934 2024 Jun MBA (OM) 77122659413 Amarjeet Kumar Project
2935 2024 Jun MBA (OM) 77122660121 Meet Shah Project
2936 2024 Jun MBA (OM) 77122660223 Ganesh Pramod Hardikar Project
2937 2024 Jun MBA (OM) 77122660244 Taha Sapatwala Project
2938 2024 Jun MBA (OM) 77122660328 Avinash Kumar Rai Project
2939 2024 Jun MBA (ITSM) 77122660349 Wala Shubham Jayantibhai Project
2940 2024 Jun MBA (ITSM) 77122660556 Ritesh Maheshdhune Project
2941 2024 Jun MBA (ITSM) 77122660796 Kritank Raj Project
2942 2024 Jun MBA (OM) 77122661260 Dharmendra Kumar Tiwari Project
2943 2024 Jun MBA (OM) 77122661298 Mohammad Rizwan Qureshi Project
2944 2024 Jun MBA (OM) 77122661837 Komal Maheshwari Project
2945 2024 Jun MBA (ITSM) 77122661961 Shiwani Singh Project
2946 2024 Jun MBA (OM) 77122662595 Karthik Ragavan Project
2947 2024 Jun MBA (OM) 77122663215 Vikas Anand Bhatia Project
2948 2024 Jun MBA (ITSM) 77122663466 Vishwajit Mohite Project
2949 2024 Jun MBA (ITSM) 77122663498 Yash Gupta Project
2950 2024 Jun MBA (OM) 77122663882 Monika Khanduri Project
2951 2024 Jun MBA (ITSM) 77122663949 Vandana Pal Project
2952 2024 Jun MBA (ITSM) 77122664028 Sakshi Gupta Project
2953 2024 Jun MBA (ITSM) 77122664623 Sandeep Kumar Dogra Project
2954 2024 Jun MBA (OM) 77122664638 Pragyanshu Kaushal Project
2955 2024 Jun MBA (OM) 77122665835 Sindhu Dinakar Project
2956 2024 Jun MBA (ITSM) 77122665988 Ravi kumar Maurya Project
2957 2024 Jun MBA (OM) 77122666265 Bindu Acharya Project
2958 2024 Jun MBA (OM) 77122666431 Sudip Adhikari Project
2959 2024 Jun MBA (ITSM) 77122666573 Sidharth Bajpai Project
2960 2024 Jun MBA (OM) 77122666773 Akash Thachar Project
2961 2024 Jun MBA (OM) 77122667078 Roshni Gupta Project
2962 2024 Jun MBA (ITSM) 77122667294 Priyanka R Project
2963 2024 Jun MBA (OM) 77122667597 Vijay Maan Project
2964 2024 Jun MBA (ITSM) 77122667693 Aditi Agarwal Project
2965 2024 Jun MBA (OM) 77122667928 Yuvraj Noel Pathak Project
2966 2024 Jun MBA (OM) 77122667961 Srinu Babu Vasamsetti Project
2967 2024 Jun MBA (ITSM) 77122668187 Pooja Rajurkar Project
2968 2024 Jun MBA (OM) 77122668381 Vikas Project
2969 2024 Jun MBA (OM) 77122668464 Pranav Tyagi Project
2970 2024 Jun MBA (OM) 77122668679 Kushagra Rastogi Project
2971 2024 Jun MBA (OM) 77122668695 Arun Kumar Project
2972 2024 Jun MBA (OM) 77122668771 Sarabjeet Singh Project
2973 2024 Jun MBA (ITSM) 77122631688 Raja Roy Project
2974 2024 Jun MBA (OM) 77122632150 Dhwani Tiwari Project
2975 2024 Jun MBA (OM) 77122632804 Pranay Sawant Project
2976 2024 Jun MBA (ITSM) 77122632809 Anshu Sharma Project
2977 2024 Jun MBA (OM) 77122633384 Divyeshkumar Patel Project
2978 2024 Jun MBA (ITSM) 77122633639 Aman Rajain Project
2979 2024 Jun MBA (OM) 77122634184 Baskaran Raja Project
2980 2024 Jun MBA (ITSM) 77122634530 Pooja Singh Project
2981 2024 Jun MBA (ITSM) 77122634725 Shreya Ajab Chilhate Project
2982 2024 Jun MBA (ITSM) 77122634911 Vaibhav Upadhyay Project
2983 2024 Jun MBA (ITSM) 77122635135 Yashvi Panchani Project
2984 2024 Jun MBA (ITSM) 77122635157 Asish Kumar Das Project
2985 2024 Jun MBA (OM) 77122635327 Divya Sharma Gautam Project
2986 2024 Jun MBA (ITSM) 77122635454 Sunil Mishra Project
2987 2024 Jun MBA (OM) 77122635979 Manthan Garg Project
2988 2024 Jun MBA (ITSM) 77122636093 Salama Shaikh Project
2989 2024 Jun MBA (ITSM) 77122636569 Mohit Gupta Project
2990 2024 Jun MBA (OM) 77122637121 Varad Khairnar Project
2991 2024 Jun MBA (ITSM) 77122637499 Ekta Project
2992 2024 Jun MBA (ITSM) 77122638140 Neha Bamburgekar Project
2993 2024 Jun MBA (OM) 77122638185 Deepak Kumar Project
2994 2024 Jun MBA (OM) 77122638513 Anup David Minj Project
2995 2024 Jun MBA (ITSM) 77122638539 Sandeep Sadashiv Auti Project
2996 2024 Jun MBA (ITSM) 77122638655 Sheeba Sharma Project
2997 2024 Jun MBA (OM) 77122639123 MANOHAR M Project
2998 2024 Jun MBA (OM) 77122639516 Prerna Handuja Project
2999 2024 Jun MBA (ITSM) 77122639824 Prajwal Acharya Project
3000 2024 Jun MBA (ITSM) 77122639973 Pooja Singh Project
3001 2024 Jun MBA (OM) 77122640057 Sai Sri Harsha Bara Project
3002 2024 Jun MBA (ITSM) 77122640219 Vivek Patnaik Project
3003 2024 Jun MBA (OM) 77122640479 Krishna Kiran Bhalerao Project
3004 2024 Jun MBA (OM) 77122641228 Akshay Dilipbhai Patel Project
3005 2024 Jun MBA (OM) 77122641472 Heena Singh Project
3006 2024 Jun MBA (OM) 77122641615 Ritwik Ghose Project
3007 2024 Jun MBA (OM) 77122642886 Singh Vivekkumar Radhanath Project
3008 2024 Jun MBA (OM) 77122643550 Mayank Patil Project
3009 2024 Jun MBA (ITSM) 77122488982 Arpita Singh Project
3010 2024 Jun MBA (ITSM) 77122489315 Vandana Prajapati Project
3011 2024 Jun MBA (ITSM) 77122489663 Vijayalaxmee Angadi Project
3012 2024 Jun MBA (OM) 77122489850 Aakash Srivastava Project
3013 2024 Jun MBA (ITSM) 77122490082 Kartikeya Bisht Project
3014 2024 Jun MBA (ITSM) 77122490550 Balaji K Project
3015 2024 Jun MBA (OM) 77122491190 Arvind Nishad Project
3016 2024 Jun MBA (ITSM) 77122491245 Rahul Thakur Project
3017 2024 Jun MBA (ITSM) 77122491264 Neville Paul Gonsalves Project
3018 2024 Jun MBA (ITSM) 77122491428 Shikha Verma Project
3019 2024 Jun MBA (OM) 77122492101 Vishal Chinta Project
3020 2024 Jun MBA (ITSM) 77122492311 Stuti Agarwal Project
3021 2024 Jun MBA (OM) 77122492558 Saurav Aggarwal Project
3022 2024 Jun MBA (ITSM) 77122493018 Abha Arya Project
3023 2024 Jun MBA (OM) 77122493234 Anamika Bandal Project
3024 2024 Jun MBA (ITSM) 77122494099 Sumit Gupta Project
3025 2024 Jun MBA (OM) 77122494557 Kishore S Project
3026 2024 Jun MBA (OM) 77122494664 Chiragraj Parmar Project
3027 2024 Jun MBA (OM) 77122494668 Tanmay Akhil Jain Project
3028 2024 Jun MBA (ITSM) 77122495535 Kanwarpreet Singh Project
3029 2024 Jun MBA (OM) 77122495607 Sagar Singh Sisodiya Project
3030 2024 Jun MBA (OM) 77122495997 Rohan Doshi Project
3031 2024 Jun MBA (ITSM) 77122496135 Shivangi Singh Project
3032 2024 Jun MBA (ITSM) 77122496263 Mrityunjay Tripathi Project
3033 2024 Jun MBA (ITSM) 77122496792 Jayashree C Project
3034 2024 Jun MBA (OM) 77122496796 Krishan Shaw Project
3035 2024 Jun MBA (ITSM) 77122496970 Rinky Keswani Project
3036 2024 Jun MBA (OM) 77122497040 Surojit Mallik Project
3037 2024 Jun MBA (OM) 77122497142 Suyog Jadhav Project
3038 2024 Jun MBA (ITSM) 77122497221 Udhay S Yargambalimath Project
3039 2024 Jun MBA (OM) 77122497344 Kamlesh Singh Project
3040 2024 Jun MBA (OM) 77122497574 Annraj Singh Project
3041 2024 Jun MBA (OM) 77122497747 Varun Sai Mallineni Project
3042 2024 Jun MBA (OM) 77122497811 Chandrajeet Sharma Project
3043 2024 Jun MBA (OM) 77122498539 Akshay Atul Mathur Project
3044 2024 Jun MBA (ITSM) 77122498601 Yogesh Shrivastava Project
3045 2024 Jun MBA (ITSM) 77122498624 Rishita Jain Project
3046 2024 Jun MBA (ITSM) 77122498955 Aanshi Mendiratta Project
3047 2024 Jun MBA (ITSM) 77122498977 Sanjokta Choudhary Project
3048 2024 Jun MBA (OM) 77122499128 Shriya Vaidya Project
3049 2024 Jun MBA (ITSM) 77122499147 Chirag Thakkar Project
3050 2024 Jun MBA (OM) 77122499260 Shubham Verma Project
3051 2024 Jun MBA (OM) 77122499334 Aditya Jain Project
3052 2024 Jun MBA (ITSM) 77122499727 Santhana Gopala Krishnan G Project
3053 2024 Jun MBA (ITSM) 77122499784 Mufaddal Kapadia Project
3054 2024 Jun MBA (OM) 77122461963 Saloni Suryakant Rane Project
3055 2024 Jun MBA (OM) 77122462198 Jitesh Kotian Project
3056 2024 Jun MBA (ITSM) 77122462301 Uday Pratap Singh Project
3057 2024 Jun MBA (OM) 77122462334 Sudhir Kumar Tripathi Project
3058 2024 Jun MBA (OM) 77122462416 Reema Khan Project
3059 2024 Jun MBA (ITSM) 77122462574 Mrunal Patil Project
3060 2024 Jun MBA (OM) 77122462762 Yedu Krishnan A Project
3061 2024 Jun MBA (OM) 77122462783 Afiya Lulania Project
3062 2024 Jun MBA (ITSM) 77122463576 M Abhishek Project
3063 2024 Jun MBA (ITSM) 77122464350 Divya Singh Project
3064 2024 Jun MBA (ITSM) 77122464525 Akshita Project
3065 2024 Jun MBA (ITSM) 77122464764 Sampada Rajendra Punde Project
3066 2024 Jun MBA (ITSM) 77122465730 Komal Panchal Project
3067 2024 Jun MBA (ITSM) 77122465957 Shekhar Umesh Nadhe Project
3068 2024 Jun MBA (ITSM) 77122466131 Dacha Haren Project
3069 2024 Jun MBA (OM) 77122466970 Radhe Shyam Yadav Project
3070 2024 Jun MBA (ITSM) 77122467189 Akshada Uday Bhavar Project
3071 2024 Jun MBA (OM) 77122467314 Md Shazid Project
3072 2024 Jun MBA (OM) 77122468029 Varun K Augustine Project
3073 2024 Jun MBA (OM) 77122468745 Krutika More Project
3074 2024 Jun MBA (OM) 77122468754 Rakesh Kumar Project
3075 2024 Jun MBA (OM) 77122468849 Chandan Maity Project
3076 2024 Jun MBA (OM) 77122469016 Deepak Sati Project
3077 2024 Jun MBA (OM) 77122469153 Aditya Bharat Hiray Project
3078 2024 Jun MBA (ITSM) 77122469617 Amit Jha Project
3079 2024 Jun MBA (OM) 77122469864 Ankit Shukla Project
3080 2024 Jun MBA (OM) 77122470004 Deepak Prakash Mahajan Project
3081 2024 Jun MBA (OM) 77122470073 Simarleen Kaur Gandhi Project
3082 2024 Jun MBA (OM) 77122470709 Unnikrishnan Manu Krishnan Bindu Project
3083 2024 Jun MBA (ITSM) 77122470857 Mukul Raj Project
3084 2024 Jun MBA (OM) 77122470861 Mansi Mahajan Project
3085 2024 Jun MBA (ITSM) 77122470933 Shivangi Kulshreshtha Project
3086 2024 Jun MBA (ITSM) 77122471595 Abhishek Project
3087 2024 Jun MBA (OM) 77122471974 Zishan Khan Project
3088 2024 Jun MBA (ITSM) 77122472329 Akanksha Shinde Project
3089 2024 Jun MBA (ITSM) 77122472553 Nikhil Kulkarni Project
3090 2024 Jun MBA (ITSM) 77122472697 Akshay Patil Project
3091 2024 Jun MBA (OM) 77122472743 Ajay Patel Project
3092 2024 Jun MBA (OM) 77122472782 Mitali Singh Project
3093 2024 Jun MBA (OM) 77122473031 Anurag Kumar Singh Project
3094 2024 Jun MBA (ITSM) 77122473188 Abhilash Bhopale Project
3095 2024 Jun MBA (OM) 77122473693 Hardik Chavan Project
3096 2024 Jun MBA (OM) 77122473812 Tarun Kumar Vaishnav Project
3097 2024 Jun MBA (ITSM) 77122474237 Ashutosh Nautiyal Project
3098 2024 Jun MBA (ITSM) 77122433504 Akshay Bhatia Project
3099 2024 Jun MBA (OM) 77122433528 Rutuja Tarange Project
3100 2024 Jun MBA (ITSM) 77122433585 Murali Krishna Bandi Project
3101 2024 Jun MBA (ITSM) 77122433646 Robin Singh Baghel Project
3102 2024 Jun MBA (ITSM) 77122434042 Ronak Gupta Project
3103 2024 Jun MBA (ITSM) 77122434217 Aditya Manan Project
3104 2024 Jun MBA (ITSM) 77122435200 Nikita Jindal Project
3105 2024 Jun MBA (OM) 77122435854 Vikas Likhitkar Project
3106 2024 Jun MBA (OM) 77122435900 Tanoy Dutta Project
3107 2024 Jun MBA (OM) 77122436272 Neha Singh Project
3108 2024 Jun MBA (OM) 77122436380 Rakshit Srivastava Project
3109 2024 Jun MBA (OM) 77122436661 Sagar Anilkumar Adichwal Project
3110 2024 Jun MBA (OM) 77122437731 Anshika Sharma Project
3111 2024 Jun MBA (ITSM) 77122437809 Pushpa Nagar Project
3112 2024 Jun MBA (ITSM) 77122437815 Rahul Sharma Project
3113 2024 Jun MBA (OM) 77122437900 Bhuvaneswari R Project
3114 2024 Jun MBA (OM) 77122438116 Amit Vishwas Shinde Project
3115 2024 Jun MBA (ITSM) 77122438302 Vipin Kumar Tiwari Project
3116 2024 Jun MBA (OM) 77122438448 Dileep Raj A N Project
3117 2024 Jun MBA (ITSM) 77122438549 Vaitheeswari A Project
3118 2024 Jun MBA (OM) 77122438649 Utkarsh Dwivedi Project
3119 2024 Jun MBA (ITSM) 77122438725 Seema Singh Project
3120 2024 Jun MBA (ITSM) 77122438776 Pranshu Rai Project
3121 2024 Jun MBA (OM) 77122438949 Amit Kumar Singh Project
3122 2024 Jun MBA (ITSM) 77122439264 Algoo Kanojiya Project
3123 2024 Jun MBA (OM) 77122439710 Rajat Rajiv Naik Project
3124 2024 Jun MBA (ITSM) 77122439961 Himanshu Singh Project
3125 2024 Jun MBA (OM) 77122440206 Sneha Das Project
3126 2024 Jun MBA (ITSM) 77122440589 Kunal Mehta Project
3127 2024 Jun MBA (OM) 77122440994 Janhavi Chavan Project
3128 2024 Jun MBA (OM) 77122441883 Subhasree Veenadhari Pudipeddi Project
3129 2024 Jun MBA (ITSM) 77122441997 Biswa Mohan Behera Project
3130 2024 Jun MBA (OM) 77122442372 Aniket Parmar Project
3131 2024 Jun MBA (OM) 77122442383 Sapna Soni Project
3132 2024 Jun MBA (ITSM) 77122442445 Varsha Yadav Project
3133 2024 Jun MBA (OM) 77122442450 Reshma Lotankar Project
3134 2024 Jun MBA (ITSM) 77122442471 Venu Gopal Project
3135 2024 Jun MBA (ITSM) 77122442526 Dheeraj Kumar Project
3136 2024 Jun MBA (OM) 77122442824 Rubi Kumari Prasad Project
3137 2024 Jun MBA (ITSM) 77122443020 Harshita Dakhode Project
3138 2024 Jun MBA (OM) 77122443049 Rajendra Shrikant Sutar Project
3139 2024 Jun MBA (OM) 77122443546 Ramkishore B Project
3140 2024 Jun MBA (OM) 77122443647 Aman Mishra Project
3141 2024 Jun MBA (ITSM) 77122443803 Aqueel Alam Khan Project
3142 2024 Jun MBA (ITSM) 77122443888 Sumit Kumar Project
3143 2024 Jun MBA (OM) 77122444415 Prashant Kulbhushan Rana Project
3144 2024 Jun MBA (OM) 77122444470 Pushpal Mondal Project
3145 2024 Jun MBA (ITSM) 77122444495 Hari Hara Sudhan V Project
3146 2024 Jun MBA (OM) 77122444772 Kashika Bajpai Project
3147 2024 Jun MBA (ITSM) 77122445017 Mayank Rathi Project
3148 2024 Jun MBA (OM) 77122445088 Sachin Giri Project
3149 2024 Jun MBA (ITSM) 77122445110 Swapnil Choramale Project
3150 2024 Jun MBA (OM) 77122445291 Ankita Bakshi Project
3151 2024 Jun MBA (OM) 77122445472 Pravin Dharge Project
3152 2024 Jun MBA (OM) 77122445519 Omprakash Ingle Project
3153 2024 Jun MBA (OM) 77122445842 Hritik Sanjay Hasnale Project
3154 2024 Jun MBA (OM) 77122445960 Roopasree Dundigalla Project
3155 2024 Jun MBA (ITSM) 77122446019 Kumari Pinki Project
3156 2024 Jun MBA (ITSM) 77122446083 Krishna Mohan Pothana Project
3157 2024 Jun MBA (OM) 77122446208 Gangadhar Chavatagi Project
3158 2024 Jun MBA (OM) 77122446294 Harender Project
3159 2024 Jun MBA (ITSM) 77122446362 Shivani Singh Project
3160 2024 Jun MBA (ITSM) 77122446743 Shiv Gopal Mishra Project
3161 2024 Jun MBA (ITSM) 77122446805 Akshit Mishra Project
3162 2024 Jun MBA (OM) 77122446826 Hari Krishna Doranala Project
3163 2024 Jun MBA (OM) 77122447088 Yash Aggarwal Project
3164 2024 Jun MBA (ITSM) 77122447338 Pradeepa K Project
3165 2024 Jun MBA (ITSM) 77122447672 Deb Kumar Manna Project
3166 2024 Jun MBA (ITSM) 77122447876 Akshita Jain Project
3167 2024 Jun MBA (ITSM) 77122447931 Ajinkya Bhagat Project
3168 2024 Jun MBA (OM) 77122448367 Preetam Project
3169 2024 Jun MBA (OM) 77122448434 Rana Ruchikkumar Piyushbhai Project
3170 2024 Jun MBA (ITSM) 77122448599 Niraj Dedhia Project
3171 2024 Jun MBA (ITSM) 77122448931 Rishu Mankotia Project
3172 2024 Jun MBA (OM) 77122450663 Ginni Sapra Project
3173 2024 Jun MBA (ITSM) 77122450716 Shweta Yeshwant Nimje Project
3174 2024 Jun MBA (ITSM) 77122424514 Dhanrajbharthi Goswami Project
3175 2024 Jun MBA (OM) 77122424699 N Sanjay Project
3176 2024 Jun MBA (OM) 77122424786 Lovekush Verma Project
3177 2024 Jun MBA (ITSM) 77122424921 Shailesh Bhat Project
3178 2024 Jun MBA (ITSM) 77122425207 Gurminder Singh Parmar Project
3179 2024 Jun MBA (ITSM) 77122425379 Adesh Kumar Tripathi Project
3180 2024 Jun MBA (OM) 77122425741 Nishtha Pandey Project
3181 2024 Jun MBA (ITSM) 77122425793 Gaurav Maurya Project
3182 2024 Jun MBA (OM) 77122426408 Rakesh Shende Project
3183 2024 Jun MBA (OM) 77122426609 Arpit Shah Project
3184 2024 Jun MBA (OM) 77122426973 Vipulkumar Amarsing Damania Project
3185 2024 Jun MBA (OM) 77122427053 Hanuman Uttam Mhaske Project
3186 2024 Jun MBA (ITSM) 77122427143 Srikanth Sakaray Project
3187 2024 Jun MBA (ITSM) 77122428314 Puja Das Project
3188 2024 Jun MBA (ITSM) 77122428776 Prasang Srivastava Project
3189 2024 Jun MBA (OM) 77122429190 Susmita Bhattacharjee Project
3190 2024 Jun MBA (OM) 77122429475 Debadatta Dutta Project
3191 2024 Jun MBA (ITSM) 77122429536 Saniya Mazhar Project
3192 2024 Jun MBA (ITSM) 77122430124 Malikbir Singh Project
3193 2024 Jun MBA (ITSM) 77122430145 Sai Vineeth Nagamalla Project
3194 2024 Jun MBA (OM) 77122430214 Shubham Kapoor Project
3195 2024 Jun MBA (OM) 77122430292 Amit Pragjibhai Narodiya Project
3196 2024 Jun MBA (OM) 77122430293 Jinesh Jain Project
3197 2024 Jun MBA (ITSM) 77122430385 Yashashree Malondkar Project
3198 2024 Jun MBA (ITSM) 77122430834 Mohd Almas Project
3199 2024 Jun MBA (OM) 77122430895 Shassank Rajkumar Project
3200 2024 Jun MBA (OM) 77122430932 Roshan Nakti Project
3201 2024 Jun MBA (OM) 77122430985 Devender Kumar Project
3202 2024 Jun MBA (ITSM) 77122431136 Akash Khelbude Project
3203 2024 Jun MBA (ITSM) 77122431853 Vikalp Bajirao Prajapati Project
3204 2024 Jun MBA (OM) 77122431888 Sujoy Das Project
3205 2024 Jun MBA (ITSM) 77122432097 Pratichee Prasad Project
3206 2024 Jun MBA (ITSM) 77122432399 Jiju George Project
3207 2024 Jun MBA (ITSM) 77122432532 Puja Poste Project
3208 2024 Jun MBA (OM) 77122475247 Sayli Gaikwad Project
3209 2024 Jun MBA (OM) 77122475306 Muskan Singh Project
3210 2024 Jun MBA (OM) 77122475577 Reshu Jain Project
3211 2024 Jun MBA (ITSM) 77122475880 Akshita Sharma Project
3212 2024 Jun MBA (OM) 77122476085 Saurabh Gulati Project
3213 2024 Jun MBA (OM) 77122476107 Sameer Jivani Project
3214 2024 Jun MBA (ITSM) 77122476297 Shruti Anand Project
3215 2024 Jun MBA (OM) 77122477801 Alok Pandey Project
3216 2024 Jun MBA (ITSM) 77122478242 Vaishali Kshirsagar Project
3217 2024 Jun MBA (OM) 77122478258 Sivasankar S.K Project
3218 2024 Jun MBA (ITSM) 77122478852 Amit Ganguly Project
3219 2024 Jun MBA (OM) 77122479013 Sumeet Sawant Project
3220 2024 Jun MBA (ITSM) 77122479186 PRADEEP SINGH RANA Project
3221 2024 Jun MBA (OM) 77122480061 Aheli Dhar Project
3222 2024 Jun MBA (ITSM) 77122480171 Ridhanshi Bhatia Project
3223 2024 Jun MBA (OM) 77122480204 Shibu Ram Project
3224 2024 Jun MBA (ITSM) 77122480934 Rutuja Kadam Project
3225 2024 Jun MBA (OM) 77122480976 Pardeep Kumar Project
3226 2024 Jun MBA (ITSM) 77122480979 Aniruddha Gurav Project
3227 2024 Jun MBA (ITSM) 77122481079 Syed Amaan Ali Project
3228 2024 Jun MBA (ITSM) 77122481783 Sujeet Kumar Patel Project
3229 2024 Jun MBA (OM) 77122482156 Henil Rabadiya Project
3230 2024 Jun MBA (OM) 77122482191 Varsha Project
3231 2024 Jun MBA (ITSM) 77122482209 Saurabh Dhake Project
3232 2024 Jun MBA (ITSM) 77122482424 Karan Singla Project
3233 2024 Jun MBA (OM) 77122482773 Shaikh Huzefa Shoeb Project
3234 2024 Jun MBA (ITSM) 77122483496 RUDRARAJU NARAYANA VARMA Project
3235 2024 Jun MBA (OM) 77122483565 Pankul Bansal Project
3236 2024 Jun MBA (ITSM) 77122483825 Rajat Murthy Project
3237 2024 Jun MBA (ITSM) 77122483841 Ritika Gupta Project
3238 2024 Jun MBA (ITSM) 77122484236 Sangeeta Vishwakarma Project
3239 2024 Jun MBA (OM) 77122484410 Pramod Project
3240 2024 Jun MBA (ITSM) 77122484740 Koustubh Sawant Project
3241 2024 Jun MBA (ITSM) 77122484889 Vaibhav Kashyap Project
3242 2024 Jun MBA (OM) 77122485013 Priya Nandini Mummaleti Project
3243 2024 Jun MBA (ITSM) 77122485193 Tushar Giradkar Project
3244 2024 Jun MBA (ITSM) 77122485690 Himani Gupta Project
3245 2024 Jun MBA (ITSM) 77122485691 Sakshi Shailendra Shukla Project
3246 2024 Jun MBA (OM) 77122485931 Vinod M G Project
3247 2024 Jun MBA (OM) 77122486266 Divya Tiwari Project
3248 2024 Jun MBA (OM) 77122486332 Chiragkumar Thakkar Project
3249 2024 Jun MBA (OM) 77122486598 Sahana M Setty Project
3250 2024 Jun MBA (OM) 77122486907 Piyush Shahane Project
3251 2024 Jun MBA (ITSM) 77122486927 Suresh Kumar Adari Project
3252 2024 Jun MBA (OM) 77122487622 Blane Jude Davy Project
3253 2024 Jun MBA (OM) 77122488150 Arsh Arya Project
3254 2024 Jun MBA (OM) 77122488675 Harshada Bhagwan Patil Project
3255 2024 Jun MBA (ITSM) 77122488684 Hasit Soni Project
3256 2024 Jun MBA (OM) 77122451296 Jishnu Viswanath Project
3257 2024 Jun MBA (OM) 77122451389 Shankar Tareni Jena Project
3258 2024 Jun MBA (ITSM) 77122451470 Abhishek Kumar Project
3259 2024 Jun MBA (ITSM) 77122451503 Ishana Gohri Project
3260 2024 Jun MBA (OM) 77122451628 Rahul Project
3261 2024 Jun MBA (ITSM) 77122451870 Ashutosh Prasad Bhatt Project
3262 2024 Jun MBA (OM) 77122451903 Ravali Jerripothu Project
3263 2024 Jun MBA (OM) 77122452545 Joyce More Project
3264 2024 Jun MBA (ITSM) 77122452856 Pragati Gupta Project
3265 2024 Jun MBA (ITSM) 77122452962 Divyansh Rohmetra Project
3266 2024 Jun MBA (OM) 77122453274 Sunil Bhamare Project
3267 2024 Jun MBA (OM) 77122453407 Poonam Yadav Project
3268 2024 Jun MBA (OM) 77122453827 Arun Maurya Project
3269 2024 Jun MBA (OM) 77122454656 Srashti Dhiman Project
3270 2024 Jun MBA (ITSM) 77122455087 Mayur Kala Project
3271 2024 Jun MBA (OM) 77122455091 Ujjwal Bhadauria Project
3272 2024 Jun MBA (OM) 77122455142 Prashant Jakhale Project
3273 2024 Jun MBA (ITSM) 77122455229 Sanjay Kumar Project
3274 2024 Jun MBA (ITSM) 77122455381 Pranjali Tiwari Project
3275 2024 Jun MBA (ITSM) 77122455873 Prachi Project
3276 2024 Jun MBA (OM) 77122456160 Ajay Chavan Project
3277 2024 Jun MBA (ITSM) 77122456175 Rohit Vishwakarma Project
3278 2024 Jun MBA (OM) 77122456181 Satyavrat Kashyap Project
3279 2024 Jun MBA (OM) 77122456182 Akash Chaturvedi Project
3280 2024 Jun MBA (ITSM) 77122456681 Ayush Gour Project
3281 2024 Jun MBA (OM) 77122456805 Saurabh Kumar Singh Project
3282 2024 Jun MBA (OM) 77122457269 Gokulnathan M Project
3283 2024 Jun MBA (ITSM) 77122457291 Anuja Dadheech Project
3284 2024 Jun MBA (OM) 77122458281 Pradip Kumar Chowbey Project
3285 2024 Jun MBA (ITSM) 77122458573 Atharv Kulkarni Project
3286 2024 Jun MBA (OM) 77122458805 Sonu Sharma Project
3287 2024 Jun MBA (OM) 77122459039 Hasti Salia Project
3288 2024 Jun MBA (ITSM) 77122459285 Devender Singh Gusain Project
3289 2024 Jun MBA (ITSM) 77122460341 Harsha Roy Project
3290 2024 Jun MBA (OM) 77122460472 Vijul Bhardwaj Project
3291 2024 Jun MBA (ITSM) 77122460735 Nitanshu Malhotra Project
3292 2024 Jun MBA (OM) 77122460850 Rapti Chatterjee Project
3293 2024 Jun MBA (ITSM) 77122460873 Lipika Dua Project
3294 2024 Jun MBA (ITSM) 77221219531 Ruchi Thakur Project
3295 2024 Jun MBA (ITSM) 77221219718 Prashant Salian Project
3296 2024 Jun MBA (BFM) 77221221101 Prerna Jain Project
3297 2024 Jun MBA (BFM) 77221223655 Farah Project
3298 2024 Jun MBA (ITSM) 77221223824 Apoorv Garg Project
3299 2024 Jun MBA (BFM) 77221231372 Sanjana Tarkase Project
3300 2024 Jun MBA (ITSM) 77221235582 Rachna Jadhav Project
3301 2024 Jun MBA (OM) 77221241559 Pankaj Saini Project
3302 2024 Jun MBA (BFM) 77221242601 Abhishek Nirmal Project
3303 2024 Jun MBA (ITSM) 77221252240 Imran Mahamad Project
3304 2024 Jun MBA (OM) 77221256211 Hanut Thakur Project
3305 2024 Jun MBA (BFM) 77221257509 Shubham Chare Project
3306 2024 Jun MBA (ITSM) 77221259508 Neha Khandekar Project
3307 2024 Jun MBA (BFM) 77221263783 Sreeraj Nair Project
3308 2024 Jun MBA (BFM) 77221263992 Harshini Rathod Project
3309 2024 Jun MBA (BFM) 77221267373 Pillai Mithunraj Project
3310 2024 Jun MBA (ITSM) 77221269792 Shreyan Chakraborty Project
3311 2024 Jun MBA (BFM) 77221280990 Prisha Shukla Project
3312 2024 Jun MBA (OM) 77221283360 Debdyuti Dutta Project
3313 2024 Jun MBA (ITSM) 77221286741 Gaurav Kumar Sharma Project
3314 2024 Jun MBA (OM) 77221287718 Aditya Songadkar Project
3315 2024 Jun MBA (ITSM) 77221288801 Anurag Palande Project
3316 2024 Jun MBA (BFM) 77221289617 Khushboo Baheti Project
3317 2024 Jun MBA (BFM) 77221292587 Neha Joshi Project
3318 2024 Jun MBA (ITSM) 77221293955 Prakhar Singh Project
3319 2024 Jun MBA (ITSM) 77221299762 Mansi Nigaltiya Project
3320 2024 Jun MBA (ITSM) 77221302981 Raju Gurav Project
3321 2024 Jun MBA (OM) 77221303710 Shipra Mishra Project
3322 2024 Jun MBA (BFM) 77221304304 Ranjana Shankaran Project
3323 2024 Jun MBA (BFM) 77221308277 Shubham Goyal Project
3324 2024 Jun MBA (ITSM) 77221311237 Sandeep Mehta Project
3325 2024 Jun MBA (BFM) 77221312459 Rounak Agarwal Project
3326 2024 Jun MBA (BFM) 77221312579 Meena Kumari Sharma Project
3327 2024 Jun MBA (ITSM) 77221312627 Aayushi Singh Project
3328 2024 Jun MBA (BFM) 77221316952 Neha Gupta Project
3329 2024 Jun MBA (BFM) 77221321255 Khyati Bhulla Project
3330 2024 Jun MBA (OM) 77221323318 Shubham Kesalkar Project
3331 2024 Jun MBA (ITSM) 77221323823 Prateek Agrawal Project
3332 2024 Jun MBA (BFM) 77221326305 Jyoti Project
3333 2024 Jun MBA (OM) 77221328526 Pushpak Dinesh Patil Project
3334 2024 Jun MBA (BFM) 77221328570 KALWALA SAI PRANATHI Project
3335 2024 Jun MBA (ITSM) 77221329518 Ajay Pratap Singh Project
3336 2024 Jun MBA (BFM) 77221334379 Kajal Ratra Project
3337 2024 Jun MBA (ITSM) 77221334784 Swati Tawade Project
3338 2024 Jun PGDBM - ITSM77220367947 Anuja Shivaji Ingale Project
3339 2024 Jun PGDBM - ITSM77220501163 Amit Panja Project
3340 2024 Jun PGDBM - ITSM77220529277 Babul Pardeshi Project
3341 2024 Jun PGDBM - ITSM77220548812 Sakshi Project
3342 2024 Jun PGDBM - ITSM77220624948 Susmita Dey Project
3343 2024 Jun PGDBM - ITSM77220633364 Abhijeet Shrivastava Project
3344 2024 Jun PGDBM - ITSM77220665805 Abhijeet Project
3345 2024 Jun PGDBM - ITSM77220757192 Ankit Singh Project
3346 2024 Jun PGDBM - ITSM77220758675 Nikhil Vashishtha Project
3347 2024 Jun PGDBM - ITSM77220781628 Christina Raju Project
3348 2024 Jun PGDBM - ITSM77220805874 Anish Sharma Project
3349 2024 Jun PGDBM - ITSM77220861021 Tanmay Surepally Project
3350 2024 Jun PGDBM - ITSM77220896185 Gayathri Mekala Project
3351 2024 Jun PGDBM - ITSM77220956131 Damini Jain Project
3352 2024 Jun MBA (OM) 77122979165 Arpit Bhardwaj Project
3353 2024 Jun MBA (OM) 77122979180 Chandra Shakher Vashistha Project
3354 2024 Jun MBA (ITSM) 77122979392 Purva Pardhi Project
3355 2024 Jun MBA (ITSM) 77122979461 Rooshali Gupta Project
3356 2024 Jun MBA (ITSM) 77122979823 Tapan Panda Project
3357 2024 Jun MBA (BFM) 77122980087 Akshatha Nayak Project
3358 2024 Jun MBA (ITSM) 77122980191 Urvil Mendpara Project
3359 2024 Jun MBA (OM) 77122980376 Gudipati Venkatesh Project
3360 2024 Jun MBA (BFM) 77122980386 Aarti Tiwari Project
3361 2024 Jun MBA (BFM) 77122980450 Prarthana Vishnubhai Parmar Project
3362 2024 Jun MBA (OM) 77122980604 Babasaheb Pandit Matre Project
3363 2024 Jun MBA (ITSM) 77122980659 Khushdeep Kaur Pawar Project
3364 2024 Jun MBA (OM) 77122980747 Krishna S Project
3365 2024 Jun MBA (ITSM) 77122980867 Smitakshi Chattopadhyay Project
3366 2024 Jun MBA (OM) 77122981006 Saurabh Bansal Project
3367 2024 Jun MBA (ITSM) 77122981459 Riddhesh Shah Project
3368 2024 Jun MBA (BFM) 77122981491 Radhika Bhatia Project
3369 2024 Jun MBA (BFM) 77122981516 Sakshi Kabra Project
3370 2024 Jun MBA (ITSM) 77122981849 Vinayak Sinha Project
3371 2024 Jun MBA (BFM) 77122981977 Rutvi Shah Project
3372 2024 Jun MBA (ITSM) 77122982693 Priyadarshini Iyer Project
3373 2024 Jun MBA (ITSM) 77122982861 Mrunal Rameshrao Shinde Project
3374 2024 Jun MBA (BFM) 77122982971 Divya Aggarwal Project
3375 2024 Jun MBA (ITSM) 77122983033 Aniket Avhad Project
3376 2024 Jun MBA (BFM) 77122983080 Shalini B V Project
3377 2024 Jun MBA (OM) 77122983103 MOHAMMAD RAIS TIGADI Project
3378 2024 Jun MBA (BFM) 77122983155 Chehak Jain Project
3379 2024 Jun MBA (BFM) 77122983330 Deepak Solanki Project
3380 2024 Jun MBA (OM) 77122983514 Ronit Singh Project
3381 2024 Jun MBA (BFM) 77122983520 Ronak Manish Chauhan Project
3382 2024 Jun MBA (BFM) 77122983578 T.Shilpa Project
3383 2024 Jun MBA (OM) 77122983612 Atanu Ajit kumar Das Project
3384 2024 Jun MBA (ITSM) 77122983707 Ketaki Sawant Project
3385 2024 Jun MBA (BFM) 77122983964 Darshankumar Sagar Project
3386 2024 Jun MBA (ITSM) 77122983969 Pratima G Project
3387 2024 Jun MBA (OM) 77122984060 Shubham Kumar Project
3388 2024 Jun MBA (OM) 77122984140 Agnelo Adwin Anthony Fernandes Project
3389 2024 Jun MBA (ITSM) 77122984236 Sunil Mahadeshwar Project
3390 2024 Jun MBA (BFM) 77122984412 Ryan Savio Nazareth Project
3391 2024 Jun MBA (OM) 77122984435 Charmi Somaiya Project
3392 2024 Jun MBA (BFM) 77122984459 Khushboo Jaiswal Project
3393 2024 Jun MBA (OM) 77122984489 Sandeep Gupta Project
3394 2024 Jun MBA (OM) 77122984759 Vinayak Gopal Podjale Project
3395 2024 Jun MBA (ITSM) 77122984798 Nileshkumar Gawande Project
3396 2024 Jun MBA (OM) 77122984882 Hardik Agarwal Project
3397 2024 Jun MBA (ITSM) 77122985140 Muskan Katthal Project
3398 2024 Jun MBA (OM) 77122985284 Nishtha Juneja Project
3399 2024 Jun MBA (OM) 77122985559 Ameer Hamza Khan Project
3400 2024 Jun MBA (OM) 77122985619 Ayush Kunkulol Project
3401 2024 Jun MBA (OM) 77122985641 Subhodip Ganguly Project
3402 2024 Jun MBA (BFM) 77122985773 Chandra Jeet Yadav Project
3403 2024 Jun MBA (OM) 77122985925 Akash Chaudhary Project
3404 2024 Jun MBA (BFM) 77122986036 Pragati Maheshwari Project
3405 2024 Jun MBA (BFM) 77122986799 Raksha S Project
3406 2024 Jun MBA (BFM) 77122986908 Meghna Kumar Bachani Project
3407 2024 Jun MBA (BFM) 77122987216 Dipti Dinesh Singh Project
3408 2024 Jun MBA (BFM) 77122987556 Jyoti Devi Prajapat Project
3409 2024 Jun MBA (OM) 77122987667 Shivani Tanwar Project
3410 2024 Jun MBA (ITSM) 77122987755 Prabhleen Kaur Project
3411 2024 Jun MBA (ITSM) 77122987919 Rutuja Shinde Project
3412 2024 Jun MBA (ITSM) 77122988344 Nikhil Patil Project
3413 2024 Jun MBA (BFM) 77122988570 Riya Atul Shah Project
3414 2024 Jun MBA (OM) 77122988622 Bhavik Gwalani Project
3415 2024 Jun MBA (ITSM) 77122989094 Ankush Seth Project
3416 2024 Jun MBA (BFM) 77122989302 Nikhil Pashte Project
3417 2024 Jun MBA (OM) 77122990125 Pooja Gehlot Project
3418 2024 Jun MBA (BFM) 77122990391 Bharath Kumar Project
3419 2024 Jun MBA (ITSM) 77122990524 Sakshi Singh Project
3420 2024 Jun MBA (BFM) 77122990660 Sanket Jadyar Project
3421 2024 Jun MBA (BFM) 77122990720 Kajal Vishwakarma Project
3422 2024 Jun MBA (ITSM) 77122991877 Lokesh Harchandani Project
3423 2024 Jun MBA (ITSM) 77122991978 Harshal Bagve Project
3424 2024 Jun MBA (OM) 77122992200 Vimal Kumar Project
3425 2024 Jun MBA (ITSM) 77122992279 Ankita Gawde Project
3426 2024 Jun MBA (ITSM) 77122992606 Yogeshkumar Dabhi Project
3427 2024 Jun MBA (OM) 77122992619 Manoj Mahadev Patil Project
3428 2024 Jun MBA (OM) 77122992907 Yash Pachpute Project
3429 2024 Jun MBA (OM) 77122992966 Mihir Nileshbhai Panchal Project
3430 2024 Jun MBA (BFM) 77122992968 Preeti Sanjay Yadav Project
3431 2024 Jun MBA (OM) 77122993008 Ankita Jadhav Project
3432 2024 Jun MBA (OM) 77122993139 Priyanka Nadar Project
3433 2024 Jun MBA (ITSM) 77122993320 Umakant Pimple Project
3434 2024 Jun MBA (ITSM) 77122993389 Vijay Kumar Mulchand Gupta Project
3435 2024 Jun MBA (OM) 77122993456 Sanjeet Kumar Project
3436 2024 Jun MBA (BFM) 77122993536 Saransh Khandelwal Project
3437 2024 Jun MBA (OM) 77122993633 Adesh Gaikar Project
3438 2024 Jun MBA (BFM) 77122994019 Aniket Project
3439 2024 Jun MBA (OM) 77122994178 Tanushree Sonar Project
3440 2024 Jun MBA (OM) 77122994602 Himani Bansal Project
3441 2024 Jun MBA (ITSM) 77122995241 Sivasakthi S Project
3442 2024 Jun MBA (ITSM) 77122995362 Purvakshi Gupta Project
3443 2024 Jun MBA (ITSM) 77122995411 Nandani Rai Project
3444 2024 Jun MBA (BFM) 77122995442 Shaikh Ayaan Nabil Project
3445 2024 Jun MBA (BFM) 77122995654 Parul Bajaj Project
3446 2024 Jun MBA (ITSM) 77122995929 Palak Jain Project
3447 2024 Jun MBA (ITSM) 77122996023 Shubham Kumar Project
3448 2024 Jun MBA (BFM) 77122996031 Ritu Ashok Kanerkar Project
3449 2024 Jun MBA (ITSM) 77122996297 Reshma Raul Project
3450 2024 Jun MBA (ITSM) 77122996642 Aditya Jain Project
3451 2024 Jun MBA (ITSM) 77122996672 Nitesh Singh Sajwan Project
3452 2024 Jun MBA (BFM) 77122996792 Komal Rajesh Patwa Project
3453 2024 Jun MBA (ITSM) 77122996839 Ajay Pawar Project
3454 2024 Jun MBA (ITSM) 77122996867 Swaminathan Ganapathy Project
3455 2024 Jun MBA (ITSM) 77122996925 Kalpesh Wagh Project
3456 2024 Jun MBA (ITSM) 77122997134 Vaishali Menghani Project
3457 2024 Jun MBA (ITSM) 77122997376 Sayali Panchal Project
3458 2024 Jun MBA (ITSM) 77122997611 Amarnath V Project
3459 2024 Jun MBA (BFM) 77122998063 Vedika Kangane Project
3460 2024 Jun MBA (BFM) 77122998153 Muskan Ramnani Project
3461 2024 Jun MBA (OM) 77122998197 Gursimran Kaur Project
3462 2024 Jun MBA (ITSM) 77122970351 Saurabh Bhattacharya Project
3463 2024 Jun MBA (OM) 77122970560 Riya Sardar Project
3464 2024 Jun MBA (ITSM) 77122970686 Farhan Malwankar Project
3465 2024 Jun MBA (ITSM) 77122970790 Yogita Sharma Project
3466 2024 Jun MBA (OM) 77122970979 Aditya Sharma Project
3467 2024 Jun MBA (OM) 77122970996 Nisha Kumari Project
3468 2024 Jun MBA (OM) 77122971114 Mallu Saidi Reddy M Project
3469 2024 Jun MBA (BFM) 77122971691 Shubham Bansal Project
3470 2024 Jun MBA (OM) 77122971731 Punit Dharmendra Shah Project
3471 2024 Jun MBA (ITSM) 77122971994 Rejin Muthirakalayil Project
3472 2024 Jun MBA (OM) 77122972042 Anuradha Devra Project
3473 2024 Jun MBA (OM) 77122972332 Nikita Deshwal Project
3474 2024 Jun MBA (BFM) 77122972821 Rushikesh Gurav Project
3475 2024 Jun MBA (OM) 77122973143 ParthKumar Patel Project
3476 2024 Jun MBA (OM) 77122973351 Sana Kausar Project
3477 2024 Jun MBA (BFM) 77122973658 Prerna Bhardwaj Project
3478 2024 Jun MBA (ITSM) 77122974280 Mahipal Akula Project
3479 2024 Jun MBA (BFM) 77122974428 Mrunal Vane Project
3480 2024 Jun MBA (BFM) 77122974659 Pooja Jaiswal Project
3481 2024 Jun MBA (BFM) 77122974978 Manisha Sharma Project
3482 2024 Jun MBA (ITSM) 77122975181 Aman Agarwal Project
3483 2024 Jun MBA (OM) 77122975734 Sagar Rochani Project
3484 2024 Jun MBA (OM) 77122975808 Anjali Salla Project
3485 2024 Jun MBA (OM) 77122976260 Abhay Joshi Project
3486 2024 Jun MBA (ITSM) 77122976409 Shivam Dutta Project
3487 2024 Jun MBA (BFM) 77122976463 Sumedh Nitnavre Project
3488 2024 Jun MBA (OM) 77122976634 Ameya Pantvaidya Project
3489 2024 Jun MBA (ITSM) 77122976745 Shivani Sawant Project
3490 2024 Jun MBA (ITSM) 77122976827 Naba Aafreen Project
3491 2024 Jun MBA (ITSM) 77122976883 Tanya Jain Project
3492 2024 Jun MBA (OM) 77122977070 Dilip Singh Project
3493 2024 Jun MBA (OM) 77122977282 Ratnesh Lalit Gupta Project
3494 2024 Jun MBA (OM) 77122977726 Shivanshu Singh Project
3495 2024 Jun MBA (ITSM) 77122978067 Abhilash Raveendran Project
3496 2024 Jun MBA (OM) 77122978226 Chandani Dubey Project
3497 2024 Jun MBA (BFM) 77221100309 Sagar Gopalani Project
3498 2024 Jun MBA (BFM) 77221103451 Divya Balkrishna Sawant Project
3499 2024 Jun MBA (ITSM) 77221109233 Aditya Shinde Project
3500 2024 Jun MBA (BFM) 77221114816 Sapna Songara Project
3501 2024 Jun MBA (OM) 77221115906 Arnab Indu Project
3502 2024 Jun MBA (OM) 77221116125 Sanjeet Hegde Project
3503 2024 Jun MBA (OM) 77221118048 Samrat Ashok Kashid Project
3504 2024 Jun MBA (BFM) 77221120023 Mohini Kundu Project
3505 2024 Jun MBA (BFM) 77221120412 Bhakti Sawant Project
3506 2024 Jun MBA (ITSM) 77221123143 Ansh Gautam Project
3507 2024 Jun MBA (BFM) 77221123700 Asif Ahmed Project
3508 2024 Jun MBA (BFM) 77221126024 Akshay Narayan Khanolkar Project
3509 2024 Jun MBA (BFM) 77221126660 Archana Soude Project
3510 2024 Jun MBA (OM) 77221128740 Sunil Kumar Maharana Project
3511 2024 Jun MBA (BFM) 77221129013 Krishan Chander Jha Project
3512 2024 Jun MBA (BFM) 77221129171 Somya Agrawal Project
3513 2024 Jun MBA (BFM) 77221132113 Heena Kausher Project
3514 2024 Jun MBA (OM) 77221133385 Jasmeet Singh Kohli Project
3515 2024 Jun MBA (BFM) 77221139549 Abhishek Sati Project
3516 2024 Jun MBA (OM) 77221140629 Sunaid Imtiyaz Project
3517 2024 Jun MBA (OM) 77221141892 Vishal Kumar Gaurav Project
3518 2024 Jun MBA (BFM) 77221142979 Vedant Shah Project
3519 2024 Jun MBA (ITSM) 77221143739 Shilpa Singh Project
3520 2024 Jun MBA (OM) 77221144686 Rohit Saini Project
3521 2024 Jun MBA (BFM) 77221147205 HUDA IRFANA Project
3522 2024 Jun MBA (OM) 77221148675 Bithika Vora Project
3523 2024 Jun MBA (OM) 77221149096 Ravikumar Kamleshbhai Prajapati Project
3524 2024 Jun MBA (BFM) 77221150045 Mohammad Faizan Abdul Rashid Shaikh Project
3525 2024 Jun MBA (ITSM) 77221150288 Himanshu Khanna Project
3526 2024 Jun MBA (BFM) 77221153649 Nishtha Tandon Project
3527 2024 Jun MBA (OM) 77221155971 Pooja Mishra Project
3528 2024 Jun MBA (BFM) 77221156099 Anjali Baheti Project
3529 2024 Jun MBA (BFM) 77221157369 Garima Jain Project
3530 2024 Jun MBA (BFM) 77221157549 Tapan Jain Project
3531 2024 Jun MBA (BFM) 77221160523 Sandeep Banerjee Project
3532 2024 Jun MBA (ITSM) 77221163900 Shivam Wadhwa Project
3533 2024 Jun MBA (BFM) 77221167273 Riya Gambhir Project
3534 2024 Jun MBA (ITSM) 77221168554 Sachin Patil Project
3535 2024 Jun MBA (OM) 77221177057 Ashish Singh Chauhan Project
3536 2024 Jun MBA (BFM) 77221177448 Pankaj Rawat Project
3537 2024 Jun MBA (BFM) 77221183198 Neelakshi Sharma Project
3538 2024 Jun MBA (OM) 77221184187 Rajat Maniram Jibhakate Project
3539 2024 Jun MBA (OM) 77221188414 Mehul Meshram Project
3540 2024 Jun MBA (OM) 77221190095 Shree Jagtap Project
3541 2024 Jun MBA (ITSM) 77221192749 Rutuja Kadam Project
3542 2024 Jun MBA (OM) 77221193317 Shubham Darodkar Project
3543 2024 Jun MBA (OM) 77221198973 Pranal Shirsat Project
3544 2024 Jun MBA (OM) 77221200646 Sandhya Kachave Project
3545 2024 Jun MBA (OM) 77221205425 Nishant Sharma Project
3546 2024 Jun MBA (BFM) 77221208658 Manali Mengde Project
3547 2024 Jun MBA (BFM) 77122998260 Deeksha Verma Project
3548 2024 Jun MBA (ITSM) 77122998430 Shambhavi Kulkarni Project
3549 2024 Jun MBA (BFM) 77122998521 Garima Kumar Project
3550 2024 Jun MBA (BFM) 77122998714 Charu Project
3551 2024 Jun MBA (ITSM) 77122998934 Rajvi Sheth Project
3552 2024 Jun MBA (BFM) 77122999191 Devarshi Shah Project
3553 2024 Jun MBA (OM) 77122999304 Siteshkumar Pandey Project
3554 2024 Jun MBA (OM) 77122999664 Mrinal Thakur Project
3555 2024 Jun MBA (BFM) 77122999792 Tarun Duggal Project
3556 2024 Jun PGDBM - ITSM77219127104 Vikram Reddy S Project
3557 2024 Jun PGDBM - ITSM77219793743 Manjit Singh Project
3558 2024 Jun PGDBM - ITSM77220206163 Gourab Ghosh Project
3559 2024 Jun PGDBM - ITSM77220221455 Reetika Dubey Project
3560 2024 Jun PGDBM - ITSM77220268421 Arpit Shah Project
3561 2024 Jun PGDBM - ITSM77220277910 Afrin Sheikh Project
3562 2024 Jun PGDBM - ITSM77220297399 Julius Alexandar Etto Project
3563 2024 Jun PGDBM - ITSM77220307350 R Bala murali krishna Project
3564 2024 Jun PGDBM - ITSM77220356671 Ausaaf Ahmad Project
3565 2024 Jun MBA (ITSM) 77122749077 Devyani Ravindra Kurve Project
3566 2024 Jun MBA (BFM) 77122749988 Ayush Joshi Project
3567 2024 Jun MBA (OM) 77122750066 Rana Ajaykumar Laxmanbhai Project
3568 2024 Jun MBA (OM) 77122750429 Rajan Singh Project
3569 2024 Jun MBA (ITSM) 77122750470 Swapnil Honamode Project
3570 2024 Jun MBA (OM) 77122750671 Kamesh Shrivastava Project
3571 2024 Jun MBA (BFM) 77122750913 Sangita Kundu Project
3572 2024 Jun MBA (BFM) 77122751295 Pradeep Chouhan Project
3573 2024 Jun MBA (ITSM) 77122751879 Nikhat Mulani Project
3574 2024 Jun MBA (BFM) 77122752040 Maanya Jasuja Project
3575 2024 Jun MBA (BFM) 77122752368 Divya Arun Project
3576 2024 Jun MBA (OM) 77122752402 Ananda Sandhya Kuthuri Project
3577 2024 Jun MBA (ITSM) 77122752410 Kaushal Sharma Project
3578 2024 Jun MBA (ITSM) 77122752449 Jivantika Pandit Project
3579 2024 Jun MBA (ITSM) 77122752815 Mayank Tiwari Project
3580 2024 Jun MBA (OM) 77122752928 Harmeet Singh Bhatia Project
3581 2024 Jun MBA (ITSM) 77122752982 Rahul Aggarwal Project
3582 2024 Jun MBA (OM) 77122753172 Srikant Pande Project
3583 2024 Jun MBA (OM) 77122753497 Deepa Kumari Project
3584 2024 Jun MBA (ITSM) 77122753506 Gurpal Singh Virk Project
3585 2024 Jun MBA (BFM) 77122753861 Anand Kumar Singh Project
3586 2024 Jun MBA (OM) 77122754067 Manish Singhal Project
3587 2024 Jun MBA (ITSM) 77122754200 Mukta Srivastava Project
3588 2024 Jun MBA (OM) 77122754308 Shirish Kumar Project
3589 2024 Jun MBA (ITSM) 77122755036 Harshit Prasad Project
3590 2024 Jun MBA (OM) 77122755101 Prikshit Project
3591 2024 Jun MBA (OM) 77122755144 Badal Gandhi Project
3592 2024 Jun MBA (ITSM) 77122755294 Lokavarapu Manjusha Project
3593 2024 Jun MBA (ITSM) 77122755468 Nikhil Dorlikar Project
3594 2024 Jun MBA (ITSM) 77122756617 Virendra Amin Project
3595 2024 Jun MBA (BFM) 77122756847 Meet Shah Project
3596 2024 Jun MBA (OM) 77122757272 Sonal Singh Project
3597 2024 Jun MBA (OM) 77122757353 Himanshu Saxena Project
3598 2024 Jun MBA (OM) 77122757629 Somesh Patle Project
3599 2024 Jun MBA (OM) 77122757740 Sujan Bangera G Project
3600 2024 Jun MBA (BFM) 77122758269 Apurva Chavan Project
3601 2024 Jun MBA (ITSM) 77122758418 Chinmay Sukesh Gupta Project
3602 2024 Jun MBA (ITSM) 77122758722 Abhishek SIngh Panwar Project
3603 2024 Jun MBA (BFM) 77122758983 Manya Jain Project
3604 2024 Jun MBA (BFM) 77122758990 Sahil Mulla Project
3605 2024 Jun MBA (OM) 77122759662 Anil Semwal Project
3606 2024 Jun MBA (ITSM) 77122760094 Vishvendra Singh Chauhan Project
3607 2024 Jun MBA (OM) 77122726721 Kedar Bhavsar Project
3608 2024 Jun MBA (ITSM) 77122727002 Snehal Bhagwat Project
3609 2024 Jun MBA (ITSM) 77122727685 Sahil Arora Project
3610 2024 Jun MBA (ITSM) 77122728292 Himansu Sekhar Dash Project
3611 2024 Jun MBA (ITSM) 77122728526 Karthikeyan R Project
3612 2024 Jun MBA (OM) 77122728813 Devyani Pawar Project
3613 2024 Jun MBA (OM) 77122729034 Vishal Vaishya Project
3614 2024 Jun MBA (BFM) 77122729081 Hiren Bharatbhai Kevadiya Project
3615 2024 Jun MBA (OM) 77122729223 Diksha Kishor Nunse Project
3616 2024 Jun MBA (OM) 77122729274 Shalini Paliwal Project
3617 2024 Jun MBA (ITSM) 77122729298 Rebeka Bhattacharyya Project
3618 2024 Jun MBA (ITSM) 77122729362 Samuel Tigga Project
3619 2024 Jun MBA (ITSM) 77122729390 Pratik Ghosh Project
3620 2024 Jun MBA (BFM) 77122729817 Pankaj Rajkumar Yadav Project
3621 2024 Jun MBA (ITSM) 77122730012 Anwar Shaik Project
3622 2024 Jun MBA (OM) 77122730046 Vikash Prasad Project
3623 2024 Jun MBA (BFM) 77122730671 Anand Singh Project
3624 2024 Jun MBA (BFM) 77122730844 Aayush Parmar Project
3625 2024 Jun MBA (OM) 77122731163 Nirbhay Narayan Singh Project
3626 2024 Jun MBA (OM) 77122731620 Chaitanya Ankush Dhamdhere Project
3627 2024 Jun MBA (OM) 77122731843 Madhushree Chatterjee Project
3628 2024 Jun MBA (OM) 77122731866 Dona Das Project
3629 2024 Jun MBA (OM) 77122732019 Sonali Sarkar Project
3630 2024 Jun MBA (ITSM) 77122732113 Gudavalli Sasikanth Project
3631 2024 Jun MBA (BFM) 77122732218 Flory Robert Project
3632 2024 Jun MBA (OM) 77122732549 Yash Harde Project
3633 2024 Jun MBA (ITSM) 77122732564 Thyagarajan Chettiar Project
3634 2024 Jun MBA (BFM) 77122732700 Mannat Jalta Project
3635 2024 Jun MBA (ITSM) 77122732740 Sonal Shekhar Chiplunkar Project
3636 2024 Jun MBA (ITSM) 77122732825 Suresh Poojary Project
3637 2024 Jun MBA (OM) 77122732845 Ramyaa B Project
3638 2024 Jun MBA (OM) 77122732848 Bal Gangadhar Rai Project
3639 2024 Jun MBA (BFM) 77122732852 Tutika Devipriya Project
3640 2024 Jun MBA (BFM) 77122732960 Chetan Jain Project
3641 2024 Jun MBA (ITSM) 77122733027 Prateek Maheshwari Project
3642 2024 Jun MBA (OM) 77122733101 Divyani Rane Project
3643 2024 Jun MBA (ITSM) 77122733574 Vaishali Khandelwal Project
3644 2024 Jun MBA (ITSM) 77122733605 Neha Patel Project
3645 2024 Jun MBA (ITSM) 77122733611 Shikha Kuppili Project
3646 2024 Jun MBA (ITSM) 77122733910 Pandey Tatva Prakash Project
3647 2024 Jun MBA (BFM) 77122734076 Dipesh Jaiswar Project
3648 2024 Jun MBA (OM) 77122734146 Hanumant Naidu Project
3649 2024 Jun MBA (ITSM) 77122734420 Sarvesh Tare Project
3650 2024 Jun MBA (BFM) 77122734447 Anushka Jain Project
3651 2024 Jun MBA (BFM) 77122734469 Tarun Sharma Project
3652 2024 Jun MBA (OM) 77122734556 Akanksha Motewar Project
3653 2024 Jun MBA (ITSM) 77122734772 Mohit Saini Project
3654 2024 Jun MBA (ITSM) 77122734785 Sumit Project
3655 2024 Jun MBA (OM) 77122734972 Vanshika Gautam Project
3656 2024 Jun MBA (OM) 77122735005 Saurabh Patil Project
3657 2024 Jun MBA (ITSM) 77122735476 Suraj Khaire Project
3658 2024 Jun MBA (OM) 77122735628 Abinash Kar Project
3659 2024 Jun MBA (BFM) 77122735702 Rahul Arora Project
3660 2024 Jun MBA (ITSM) 77122735736 Suhita Mitra Project
3661 2024 Jun MBA (BFM) 77122735883 Swati Bisht Project
3662 2024 Jun MBA (BFM) 77122736114 Prashant Grewal Project
3663 2024 Jun MBA (ITSM) 77122736310 Gerald Albert Dsouza Project
3664 2024 Jun MBA (ITSM) 77122736332 Namitha Dileep Project
3665 2024 Jun MBA (ITSM) 77122736505 Arpita Gupta Project
3666 2024 Jun MBA (ITSM) 77122695197 Earimmel Rajan Sarish Project
3667 2024 Jun MBA (ITSM) 77122695208 Saurabh Sawant Project
3668 2024 Jun MBA (ITSM) 77122695465 Mohammad Nadeem Akhter Project
3669 2024 Jun MBA (ITSM) 77122695619 Barath R Project
3670 2024 Jun MBA (OM) 77122696209 Navneet Balveer Singh Project
3671 2024 Jun MBA (ITSM) 77122697001 Anupam Dey Project
3672 2024 Jun MBA (OM) 77122697115 Yogiraj Jadhav Project
3673 2024 Jun MBA (ITSM) 77122697136 Koshy Mathew Project
3674 2024 Jun MBA (ITSM) 77122697771 Rohit Kumar Shaw Project
3675 2024 Jun MBA (OM) 77122698545 Mujaffarali Shaikh Project
3676 2024 Jun MBA (ITSM) 77122698564 Shyamsundar Biradar Project
3677 2024 Jun MBA (OM) 77122698849 Arnab Das Project
3678 2024 Jun MBA (OM) 77122699364 Afreen Kundiwala Project
3679 2024 Jun MBA (ITSM) 77122699785 Dipak Kawade Project
3680 2024 Jun MBA (OM) 77122699795 Manmohan Project
3681 2024 Jun MBA (OM) 77122699819 Vanama Teja Project
3682 2024 Jun MBA (OM) 77122699848 Sunil Kumar Project
3683 2024 Jun MBA (ITSM) 77122699988 Jitendra Dharma Chavan Project
3684 2024 Jun MBA (OM) 77122700199 Amol Somnath Dhakane Project
3685 2024 Jun MBA (ITSM) 77122700334 Dharmendra kumar Soni Project
3686 2024 Jun MBA (OM) 77122700340 Shubham Soni Project
3687 2024 Jun MBA (OM) 77122700376 Kishore Kumar Chandwani Project
3688 2024 Jun MBA (ITSM) 77122700765 Jangam Chandra Shekhar Project
3689 2024 Jun MBA (ITSM) 77122701044 Ganti Bala Subrahmanyam Project
3690 2024 Jun MBA (OM) 77122701142 Tanya Gabriel D Cunha Project
3691 2024 Jun MBA (OM) 77122701518 Shaikh Mohammed Samin Mohammed Imran Project
3692 2024 Jun MBA (OM) 77122702000 Costka Robinson R Project
3693 2024 Jun MBA (ITSM) 77122702002 Shivendra Tiwari Project
3694 2024 Jun MBA (OM) 77122702078 Gorle Suresh Project
3695 2024 Jun MBA (OM) 77122702191 Divya Dhiman Project
3696 2024 Jun MBA (ITSM) 77122702196 Aman Rawat Project
3697 2024 Jun MBA (ITSM) 77122702264 Deepak Thakur Project
3698 2024 Jun MBA (OM) 77122702729 Ayush Nigam Project
3699 2024 Jun MBA (OM) 77122702786 Hemanth Janaki Project
3700 2024 Jun MBA (OM) 77122702827 Anil Kumar Singh Project
3701 2024 Jun MBA (ITSM) 77122703808 Suresh Kumar Project
3702 2024 Jun MBA (ITSM) 77122703912 Suddula Sandhya Project
3703 2024 Jun MBA (OM) 77122703936 Prabhu K Project
3704 2024 Jun MBA (OM) 77122704320 Vysagh Karatte Gireesan Project
3705 2024 Jun MBA (ITSM) 77122705323 Pranav Thanedar Project
3706 2024 Jun MBA (ITSM) 77122705964 Prajakta Patil Project
3707 2024 Jun MBA (ITSM) 77122705999 Adithya Raj R Project
3708 2024 Jun MBA (OM) 77122706219 Pallavi Khullar Project
3709 2024 Jun MBA (OM) 77122706257 Prasad Shimpi Project
3710 2024 Jun MBA (ITSM) 77122706372 Disha Mathur Project
3711 2024 Jun MBA (ITSM) 77122706392 Nishita Rangoonwala Project
3712 2024 Jun MBA (OM) 77122706438 Shivani Thakur Project
3713 2024 Jun MBA (ITSM) 77122706888 Rohan Bhandari Project
3714 2024 Jun MBA (OM) 77122706917 K R Vandana Project
3715 2024 Jun MBA (ITSM) 77122707061 Akanchha Project
3716 2024 Jun MBA (ITSM) 77122707508 Someet Kumar Behera Project
3717 2024 Jun MBA (ITSM) 77122707540 Prajakta Dhatrak Project
3718 2024 Jun MBA (OM) 77122707819 Chirag Jhawar Project
3719 2024 Jun MBA (OM) 77122707953 Priyanka Kumari Project
3720 2024 Jun MBA (ITSM) 77122708089 Ruchira Kadam Project
3721 2024 Jun MBA (ITSM) 77122708630 Pulak Basu Project
3722 2024 Jun MBA (OM) 77122708839 Chandradevi L Project
3723 2024 Jun MBA (OM) 77122708956 Sushank Pawar Project
3724 2024 Jun MBA (ITSM) 77122709212 Mohit Pathak Project
3725 2024 Jun MBA (ITSM) 77122709813 Atul Tukaram Walke Project
3726 2024 Jun MBA (OM) 77122710979 Gaurav Prakash Badgujar Project
3727 2024 Jun MBA (OM) 77122712067 Harsha Vardhan Velecheti Project
3728 2024 Jun MBA (ITSM) 77122712164 Pooja Jagdish Katke Project
3729 2024 Jun MBA (OM) 77122712256 Kiran Shashank Desai Project
3730 2024 Jun MBA (ITSM) 77122713348 Mayank Sharma Project
3731 2024 Jun MBA (ITSM) 77122713449 Pratiksha Gajanan Ugale Project
3732 2024 Jun MBA (ITSM) 77122713683 Abhishek Jha Project
3733 2024 Jun MBA (OM) 77122713751 Vinod Kumar Joshi Project
3734 2024 Jun MBA (ITSM) 77122713892 Amol Joshi Project
3735 2024 Jun MBA (OM) 77122713911 Dipto Mukherjee Project
3736 2024 Jun MBA (OM) 77122714463 Savitha N Project
3737 2024 Jun MBA (OM) 77122714582 Dhaval Patel Project
3738 2024 Jun MBA (OM) 77122715249 Tanish Pradip Shinde Project
3739 2024 Jun MBA (OM) 77122715548 Akanksha Srivastava Project
3740 2024 Jun MBA (ITSM) 77122716676 Loonkaran Gupta Project
3741 2024 Jun MBA (OM) 77122716711 Praveen Patil Project
3742 2024 Jun MBA (OM) 77122682347 Yashanki Project
3743 2024 Jun MBA (OM) 77122682462 Rahul Singh Rajput Project
3744 2024 Jun MBA (OM) 77122682497 Arpit Priyadarshi Project
3745 2024 Jun MBA (OM) 77122683026 Shraddha Gaikwad Project
3746 2024 Jun MBA (ITSM) 77122683709 Yogita Mohote Project
3747 2024 Jun MBA (ITSM) 77122683724 Sateesh S Project
3748 2024 Jun MBA (OM) 77122683869 Manas Ranjan Mahanta Project
3749 2024 Jun MBA (OM) 77122684450 Subham Sinha Project
3750 2024 Jun MBA (ITSM) 77122684590 Poornima B M Project
3751 2024 Jun MBA (ITSM) 77122685522 Tanuj Patil Project
3752 2024 Jun MBA (OM) 77122685934 Sparsh Sharma Project
3753 2024 Jun MBA (OM) 77122686020 Sanket Ghadigaonkar Project
3754 2024 Jun MBA (ITSM) 77122686164 Manali Mahendra Dere Project
3755 2024 Jun MBA (ITSM) 77122686176 K Rajakumaran Project
3756 2024 Jun MBA (OM) 77122686285 Bhusan Gore Project
3757 2024 Jun MBA (ITSM) 77122686722 Ashish Chaudhary Project
3758 2024 Jun MBA (ITSM) 77122686877 Prashansa Ruptake Project
3759 2024 Jun MBA (ITSM) 77122688867 Deepak Anand Project
3760 2024 Jun MBA (OM) 77122689624 Durgesh Prakash Sonar Project
3761 2024 Jun MBA (OM) 77122689709 Prathamesh Shashikant Rewale Project
3762 2024 Jun MBA (OM) 77122690521 Radhika Project
3763 2024 Jun MBA (ITSM) 77122690755 Subhash Dattu Autee Project
3764 2024 Jun MBA (OM) 77122690762 Janita Jabarson Nadar Project
3765 2024 Jun MBA (ITSM) 77122690970 Kajal Jain Project
3766 2024 Jun MBA (OM) 77122691253 Umesh Chavhan Project
3767 2024 Jun MBA (ITSM) 77122691305 Anushtup Mitra Project
3768 2024 Jun MBA (OM) 77122691408 Akash Saini Project
3769 2024 Jun MBA (OM) 77122691770 Suresh Arumugam Project
3770 2024 Jun MBA (OM) 77122692732 Harshit Jain Project
3771 2024 Jun MBA (OM) 77122692882 Gauri Ahire Project
3772 2024 Jun MBA (OM) 77122693356 Orison Saluzino Rodrigues Project
3773 2024 Jun MBA (OM) 77122693503 Ujjwal Jain Project
3774 2024 Jun MBA (ITSM) 77122694162 Irshad Ahmed Project
3775 2024 Jun MBA (ITSM) 77122694467 Pulletikurthi Mallikharjuna Vaishnavi Project
3776 2024 Jun MBA (OM) 77122694979 Rishabh Mandal Project
3777 2024 Jun MBA (BFM) 77122736677 Kiran Parihar Project
3778 2024 Jun MBA (BFM) 77122736741 Rakshita Gaur Project
3779 2024 Jun MBA (OM) 77122737147 Anand Gupta Project
3780 2024 Jun MBA (BFM) 77122737308 Amarpreet Kaur Saggu Project
3781 2024 Jun MBA (OM) 77122737390 Abinash Kumar Project
3782 2024 Jun MBA (OM) 77122737419 R K Harish Kumar Project
3783 2024 Jun MBA (BFM) 77122737642 Harshith Jain Project
3784 2024 Jun MBA (BFM) 77122737756 Karan Kumar Bhutani Project
3785 2024 Jun MBA (BFM) 77122737899 Manthan Naik Project
3786 2024 Jun MBA (OM) 77122738020 Anandha Kumaran R S Project
3787 2024 Jun MBA (BFM) 77122738249 Vivek Ranjan Project
3788 2024 Jun MBA (OM) 77122738393 Lakshdeep Singla Project
3789 2024 Jun MBA (BFM) 77122738499 Nilesh Narayan Tiwari Project
3790 2024 Jun MBA (ITSM) 77122738573 Gaurav Kumbharde Project
3791 2024 Jun MBA (ITSM) 77122738852 Binal Savla Project
3792 2024 Jun MBA (OM) 77122738991 Gaurav Jain Project
3793 2024 Jun MBA (BFM) 77122739559 Yashvi Kadam Project
3794 2024 Jun MBA (BFM) 77122739696 Kartik Sheth Project
3795 2024 Jun MBA (BFM) 77122739899 Chinnagudaba Akhil Project
3796 2024 Jun MBA (BFM) 77122739964 Tanvi Sharma Project
3797 2024 Jun MBA (ITSM) 77122740147 Diksha Sharma Project
3798 2024 Jun MBA (ITSM) 77122740374 Chandani Kumari Project
3799 2024 Jun MBA (OM) 77122740550 Jyot Patel Project
3800 2024 Jun MBA (ITSM) 77122740751 Neeraj Vishwakarma Project
3801 2024 Jun MBA (OM) 77122740928 Yogesh Kumar Swain Project
3802 2024 Jun MBA (OM) 77122741112 Priyanka Khandelwal Project
3803 2024 Jun MBA (BFM) 77122741617 Purvesh Ambekar Project
3804 2024 Jun MBA (ITSM) 77122741742 Mani Kishore Kosti Project
3805 2024 Jun MBA (OM) 77122741806 Sanchit Kharbanda Project
3806 2024 Jun MBA (BFM) 77122742100 Deepshikha Gouda Project
3807 2024 Jun MBA (ITSM) 77122742415 Sanjay Kumar Mohanty Project
3808 2024 Jun MBA (BFM) 77122742757 Pinky Gupta Project
3809 2024 Jun MBA (BFM) 77122742928 Puchakayala Prabandha Project
3810 2024 Jun MBA (BFM) 77122742947 Nishita Mohan Sartandel Project
3811 2024 Jun MBA (OM) 77122743088 Shashikant Namdev Sapat Project
3812 2024 Jun MBA (ITSM) 77122743132 Abhyudai Singh Project
3813 2024 Jun MBA (ITSM) 77122743143 Harshita Shah Project
3814 2024 Jun MBA (BFM) 77122743248 Mansi Garg Project
3815 2024 Jun MBA (OM) 77122743274 Sushil Yadav Project
3816 2024 Jun MBA (OM) 77122743416 Rahul Kumar Sharma Project
3817 2024 Jun MBA (ITSM) 77122743653 Mehul Bhandari Project
3818 2024 Jun MBA (ITSM) 77122743875 Suvigya Tiwari Project
3819 2024 Jun MBA (OM) 77122744114 Ipshita Saxena Project
3820 2024 Jun MBA (BFM) 77122745077 Dinesh Rabindranath Sabat Project
3821 2024 Jun MBA (OM) 77122745321 Prakash Kumar Ray Project
3822 2024 Jun MBA (ITSM) 77122745380 Kajal Lembhe Project
3823 2024 Jun MBA (BFM) 77122745387 Harish Behare Project
3824 2024 Jun MBA (ITSM) 77122745419 Tridib Mandal Project
3825 2024 Jun MBA (ITSM) 77122745935 Dharmi Hitenbhai Diwan Project
3826 2024 Jun MBA (OM) 77122746106 Nitin Sharma Project
3827 2024 Jun MBA (BFM) 77122746242 Bhavika Soni Project
3828 2024 Jun MBA (BFM) 77122746516 Shubham Taral Project
3829 2024 Jun MBA (OM) 77122746590 Avanish Ameeker Project
3830 2024 Jun MBA (BFM) 77122746983 Jnana Ranjan Nayak Project
3831 2024 Jun MBA (BFM) 77122747069 Lavanya Muthyala Project
3832 2024 Jun MBA (OM) 77122747270 Harshada Pankaj Mishra Project
3833 2024 Jun MBA (OM) 77122747646 Shailendra Verma Project
3834 2024 Jun MBA (ITSM) 77122747759 Nikhil Srivastava Project
3835 2024 Jun MBA (BFM) 77122747784 Mukul Babbar Project
3836 2024 Jun MBA (BFM) 77122748387 Michelle Khanna Project
3837 2024 Jun MBA (ITSM) 77122748450 Apoorv Sharma Project
3838 2024 Jun MBA (OM) 77122717044 Devendra Bhaskar Hakim Project
3839 2024 Jun MBA (OM) 77122717098 Kavita Dherange Project
3840 2024 Jun MBA (OM) 77122717333 Rupali Patil Project
3841 2024 Jun MBA (OM) 77122717767 Jogesh Patil Project
3842 2024 Jun MBA (OM) 77122717778 Hari Bardhan Shukla Project
3843 2024 Jun MBA (OM) 77122717879 Akash Mishra Project
3844 2024 Jun MBA (ITSM) 77122718378 Vishal Choudhary Project
3845 2024 Jun MBA (OM) 77122718700 MALAYA KUMAR MOHARANA Project
3846 2024 Jun MBA (OM) 77122718960 Piyush Bhandari Project
3847 2024 Jun MBA (OM) 77122719088 MERUVA DEEPTHI PRIYA Project
3848 2024 Jun MBA (OM) 77122720245 Sujeet Kumar Gupta Project
3849 2024 Jun MBA (ITSM) 77122720312 Nachiketa Panda Project
3850 2024 Jun MBA (OM) 77122720622 Ashish Sharma Project
3851 2024 Jun MBA (ITSM) 77122720960 Karuna S Kashyap Project
3852 2024 Jun MBA (ITSM) 77122721388 Manvi Saini Project
3853 2024 Jun MBA (OM) 77122721992 Pratikhya Panigrahi Project
3854 2024 Jun MBA (ITSM) 77122722128 Switee Gunjal Project
3855 2024 Jun MBA (OM) 77122723369 Digvijay Singh Project
3856 2024 Jun MBA (OM) 77122723376 Kewal Sharma Project
3857 2024 Jun MBA (ITSM) 77122723594 Nanda Kumar P Project
3858 2024 Jun MBA (ITSM) 77122723618 Arti Yadav Project
3859 2024 Jun MBA (ITSM) 77122724305 Afsha Jabeen Bangi Project
3860 2024 Jun MBA (ITSM) 77122724417 Hritika Ramayane Project
3861 2024 Jun MBA (ITSM) 77122724477 Shweta Gupta Project
3862 2024 Jun MBA (ITSM) 77122724709 Arunojoy Das Project
3863 2024 Jun MBA (OM) 77122724833 Yashpal Singh Sinsinwar Project
3864 2024 Jun MBA (OM) 77122724960 Kalpna Srivastava Project
3865 2024 Jun MBA (ITSM) 77122725035 Nikhil Trivedi Project
3866 2024 Jun MBA (OM) 77122725288 A M Richardson Project
3867 2024 Jun MBA (ITSM) 77122726403 Muskaan Raj Project
3868 2024 Jun MBA (OM) 77122726404 Deepandar Singh Rathore Project
Faculty ID Faculty Name Evaluation Date Status Attempts Evaluated
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER102 S Umadevi S 2024-06-23 23:04:49 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER102 S Umadevi S 2024-06-24 11:32:13 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER102 S Umadevi S 2024-06-24 11:38:17 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-24 11:42:51 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-24 14:49:25 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-24 15:00:49 Submitted 2 Y
TEEGRADER102 S Umadevi S 2024-06-24 17:38:24 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-24 17:57:36 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER102 S Umadevi S 2024-06-24 18:11:36 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER102 S Umadevi S 2024-06-24 18:35:23 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-24 19:37:57 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-24 19:51:34 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER102 S Umadevi S 2024-06-24 20:06:59 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-24 21:03:59 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER102 S Umadevi S 2024-06-24 21:16:11 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER102 S Umadevi S 2024-06-24 21:31:54 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-24 21:41:08 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER102 S Umadevi S 2024-06-20 20:38:09 Submitted 2 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
NGASCEIA00061 S Senthilkumar 2024-06-22 19:20:27 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-19 16:05:47 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-22 19:39:48 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-20 20:39:25 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-22 19:42:33 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-19 20:29:09 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-19 20:43:28 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
NGASCEIA00061 S Senthilkumar 2024-06-22 19:54:32 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-22 20:36:43 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER102 S Umadevi S 2024-06-19 22:07:34 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-19 22:29:43 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
NGASCEIA00061 S Senthilkumar 2024-06-22 20:49:03 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
NGASCEIA00061 S Senthilkumar 2024-06-23 07:04:15 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER102 S Umadevi S 2024-06-19 22:57:53 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-20 09:37:10 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-23 07:09:07 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-20 09:52:34 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-20 10:04:50 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-20 12:35:29 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER102 S Umadevi S 2024-06-20 12:44:43 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-20 12:59:16 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER102 S Umadevi S 2024-06-20 13:56:19 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-20 13:45:33 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER108 P Mohanambal P 2024-06-20 14:36:16 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 14:41:53 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-20 19:47:07 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-20 20:33:11 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-20 20:48:04 Submitted 2 Y
TEEGRADER107 R Krishnaveni R 2024-06-20 21:04:28 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 14:48:19 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 14:53:47 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-20 21:39:53 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER108 P Mohanambal P 2024-06-20 15:01:47 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-20 21:57:58 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER108 P Mohanambal P 2024-06-20 16:06:49 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-20 22:09:47 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 16:12:29 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 16:17:58 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-21 10:26:34 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 16:22:55 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER107 R Krishnaveni R 2024-06-21 10:42:38 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 18:29:41 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-21 10:56:05 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER107 R Krishnaveni R 2024-06-21 19:42:12 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 18:36:52 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER108 P Mohanambal P 2024-06-20 18:44:46 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 18:50:46 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 18:57:34 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-21 19:58:49 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-21 20:27:47 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-21 21:42:00 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-21 21:53:04 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER107 R Krishnaveni R 2024-06-21 22:09:29 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-21 22:22:53 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-22 08:22:11 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-22 08:34:59 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-22 08:45:27 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER107 R Krishnaveni R 2024-06-22 10:45:47 Submitted 2 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER107 R Krishnaveni R 2024-06-22 10:56:04 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-22 11:08:01 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER107 R Krishnaveni R 2024-06-22 11:20:17 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-22 11:28:57 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-17 20:03:10 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-22 18:54:41 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-17 20:31:37 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-22 19:19:08 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER102 S Umadevi S 2024-06-19 15:14:27 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-19 15:27:21 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER107 R Krishnaveni R 2024-06-22 19:38:59 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-17 21:01:55 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-22 19:47:21 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-22 20:55:46 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-18 18:34:01 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-22 21:04:34 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-18 18:57:30 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-22 21:14:54 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-22 21:22:51 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-22 21:31:13 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-23 10:07:38 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-23 10:19:20 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-23 10:33:46 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-21 15:32:56 Submitted 2 Y
NGASCEIA00047 S Santhoshkumar 2024-06-21 10:39:32 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-18 21:02:39 Submitted 2 Y
NGASCEIA00047 S Santhoshkumar 2024-06-21 06:24:16 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
NGASCEIA00047 S Santhoshkumar 2024-06-21 10:51:22 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-21 17:16:30 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-21 07:07:00 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-21 07:06:09 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-21 11:00:26 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-21 07:23:08 Submitted 2 Y
TEEGRADER107 R Krishnaveni R 2024-06-19 20:28:51 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-21 07:31:06 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-21 07:41:42 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-19 19:38:40 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-19 20:13:27 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-19 22:09:21 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-19 20:45:43 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-21 07:50:21 Submitted 2 Y
TEEGRADER107 R Krishnaveni R 2024-06-19 21:36:54 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-21 07:58:09 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 13:53:47 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 13:58:14 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-19 21:52:09 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 14:09:20 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER107 R Krishnaveni R 2024-06-23 19:42:45 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 14:16:50 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER108 P Mohanambal P 2024-06-20 14:25:15 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-20 05:41:23 Submitted 2 Y
TEEGRADER108 P Mohanambal P 2024-06-20 14:30:45 Submitted 2 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER107 R Krishnaveni R 2024-06-20 10:56:19 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER102 S Umadevi S 2024-06-20 16:18:16 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER102 S Umadevi S 2024-06-20 16:26:28 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-20 17:53:36 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-23 07:36:17 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER102 S Umadevi S 2024-06-20 18:10:27 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-23 07:40:18 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-20 18:27:21 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-20 19:39:59 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER102 S Umadevi S 2024-06-20 19:50:29 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER102 S Umadevi S 2024-06-20 20:02:53 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-20 20:34:06 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 2 N
TEEGRADER102 S Umadevi S 2024-06-20 21:22:19 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-20 21:37:30 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER102 S Umadevi S 2024-06-20 21:51:34 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-20 22:04:41 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-20 22:20:32 Submitted 2 Y
TEEGRADER102 S Umadevi S 2024-06-20 22:30:35 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-20 22:44:55 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-20 22:56:38 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-20 23:06:28 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-20 23:13:46 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-23 22:41:46 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-23 22:55:06 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-21 17:08:40 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-21 07:17:16 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-18 22:14:50 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 20:30:08 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 20:44:21 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 22:31:13 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 22:04:57 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-18 22:27:18 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-18 22:40:02 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 21:57:05 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 21:37:24 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 21:47:35 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 22:15:37 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 21:08:20 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 20:54:52 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
NGASCEIA00061 S Senthilkumar 2024-06-22 17:46:39 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-22 17:56:46 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-22 17:59:30 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-19 11:35:19 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-19 12:28:00 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-22 18:05:12 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-22 18:09:02 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-22 18:38:02 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-22 18:44:26 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-19 12:48:43 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-19 13:02:48 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-22 18:47:19 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
NGASCEIA00061 S Senthilkumar 2024-06-22 18:51:05 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-19 14:00:28 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-22 19:03:09 Submitted 1 Y
TEEGRADER102 S Umadevi S 2024-06-19 15:44:11 Submitted 1 Y
NGASCEIA00052 KA Poornima 2024-06-18 21:13:29 Submitted 1 Y
NGASCEIA00052 KA Poornima 2024-06-19 19:41:21 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
NGASCEIA00052 KA Poornima 2024-06-20 07:45:57 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
NGASCEIA00052 KA Poornima 2024-06-20 08:27:22 Submitted 2 Y
NGASCEIA00052 KA Poornima 2024-06-20 20:25:13 Submitted 1 Y
NGASCEIA00052 KA Poornima 2024-06-20 21:41:56 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
NGASCEIA00052 KA Poornima 2024-06-21 07:20:22 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 1 N
NGASCEIA00052 KA Poornima 2024-06-21 07:47:07 Submitted 2 Y
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 1 N
NGASCEIA00052 KA Poornima 2024-06-22 12:27:29 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
NGASCEIA00052 KA Poornima 2024-06-22 13:25:04 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 2 N
NGASCEIA00052 KA Poornima 2024-06-22 15:22:00 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 2 N
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 2 N
NGASCEIA00052 KA Poornima Submitted 2 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 2 N
NGASCEIA00052 KA Poornima Submitted 2 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 2 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 3 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER039 Dr. R. Logambal . 2024-06-22 17:17:48 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER039 Dr. R. Logambal . 2024-06-22 17:19:30 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER105 C Prabhu C Submitted 1 N
TEEGRADER105 C Prabhu C Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-17 22:18:38 Submitted 1 Y
TEEGRADER105 C Prabhu C Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-17 22:25:52 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-18 18:57:53 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-18 19:20:25 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-18 19:33:19 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER105 C Prabhu C Submitted 1 N
TEEGRADER105 C Prabhu C Submitted 1 N
TEEGRADER105 C Prabhu C Submitted 2 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 2 N
TEEGRADER105 C Prabhu C Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER105 C Prabhu C Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-18 19:48:14 Submitted 1 Y
TEEGRADER105 C Prabhu C Submitted 1 N
TEEGRADER105 C Prabhu C Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER105 C Prabhu C Submitted 1 N
TEEGRADER105 C Prabhu C Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-18 19:53:14 Submitted 1 Y
TEEGRADER105 C Prabhu C Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-18 20:00:42 Submitted 1 Y
TEEGRADER105 C Prabhu C Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-18 20:05:06 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER105 C Prabhu C Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-18 20:12:00 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER105 C Prabhu C Submitted 1 N
TEEGRADER104 C Sasikumar C 2024-06-18 21:10:19 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-18 20:17:58 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-18 20:23:36 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-18 20:36:45 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-19 19:02:07 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-21 08:05:46 Submitted 2 Y
TEEGRADER104 C Sasikumar C Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-18 21:07:11 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-18 21:23:33 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-21 08:08:00 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-18 21:26:58 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-21 08:11:00 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-18 21:31:29 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-21 08:13:08 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-14 20:37:56 Submitted 2 Y
TEEGRADER106 B Logeswaran B 2024-06-23 18:32:42 Submitted 1 Y
TEEGRADER106 B Logeswaran B 2024-06-23 18:27:09 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-15 13:03:07 Submitted 1 Y
TEEGRADER106 B Logeswaran B 2024-06-22 21:38:56 Submitted 1 Y
TEEGRADER106 B Logeswaran B 2024-06-22 21:43:26 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-15 13:13:46 Submitted 1 Y
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-15 13:40:26 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-15 13:57:08 Submitted 2 Y
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER106 B Logeswaran B 2024-06-22 21:30:08 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-15 14:08:07 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-15 14:15:56 Submitted 2 Y
TEEGRADER106 B Logeswaran B 2024-06-22 21:20:18 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-15 14:25:03 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-15 14:36:40 Submitted 1 Y
TEEGRADER106 B Logeswaran B 2024-06-21 21:57:54 Submitted 1 Y
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER106 B Logeswaran B 2024-06-21 21:50:11 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-15 14:45:16 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-15 15:43:43 Submitted 1 Y
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-15 15:50:55 Submitted 1 Y
TEEGRADER106 B Logeswaran B 2024-06-21 21:40:59 Submitted 2 Y
TEEGRADER106 B Logeswaran B 2024-06-20 19:54:38 Submitted 2 Y
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER106 B Logeswaran B 2024-06-20 19:47:17 Submitted 1 Y
TEEGRADER106 B Logeswaran B 2024-06-20 20:00:05 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-15 15:59:58 Submitted 1 Y
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-15 17:34:21 Submitted 1 Y
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-15 17:45:37 Submitted 2 Y
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER106 B Logeswaran B 2024-06-20 19:40:23 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-15 17:57:42 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-15 18:16:59 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-15 18:24:51 Submitted 2 Y
NGASCEIA00066 K Madheswaran 2024-06-15 18:57:33 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER106 B Logeswaran B 2024-06-20 21:02:24 Submitted 2 Y
TEEGRADER106 B Logeswaran B 2024-06-20 19:32:46 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-15 19:14:29 Submitted 1 Y
TEEGRADER106 B Logeswaran B 2024-06-20 20:55:57 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-15 19:33:09 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-15 20:04:53 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-15 20:25:04 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER106 B Logeswaran B 2024-06-20 19:21:20 Submitted 2 Y
TEEGRADER106 B Logeswaran B 2024-06-20 19:13:22 Submitted 1 Y
TEEGRADER106 B Logeswaran B 2024-06-20 19:05:54 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER105 C Prabhu C 2024-06-18 20:07:28 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-16 21:04:03 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-16 21:14:40 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-16 21:21:38 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-16 21:30:04 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-17 10:18:49 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER105 C Prabhu C 2024-06-19 13:03:29 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-17 10:49:24 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-17 11:10:28 Submitted 1 Y
TEEGRADER106 B Logeswaran B 2024-06-23 21:33:26 Submitted 1 Y
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-13 23:33:43 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-13 23:57:41 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-14 13:04:47 Submitted 1 Y
TEEGRADER106 B Logeswaran B 2024-06-23 18:09:20 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-14 13:19:51 Submitted 1 Y
TEEGRADER106 B Logeswaran B 2024-06-23 18:17:05 Submitted 1 Y
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-14 13:33:44 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-14 13:44:35 Submitted 1 Y
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 3 N
NGASCEIA00066 K Madheswaran 2024-06-14 14:07:38 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-14 14:17:50 Submitted 1 Y
TEEGRADER106 B Logeswaran B 2024-06-23 18:21:18 Submitted 2 Y
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER106 B Logeswaran B 2024-06-23 18:45:24 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-14 14:27:45 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-14 14:39:58 Submitted 1 Y
TEEGRADER106 B Logeswaran B 2024-06-23 18:53:42 Submitted 2 Y
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER106 B Logeswaran B 2024-06-23 20:01:52 Submitted 1 Y
TEEGRADER106 B Logeswaran B 2024-06-23 20:18:27 Submitted 2 Y
TEEGRADER106 B Logeswaran B 2024-06-23 20:25:01 Submitted 1 Y
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER106 B Logeswaran B 2024-06-23 20:12:39 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-14 14:54:03 Submitted 1 Y
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER106 B Logeswaran B 2024-06-23 19:06:11 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-14 15:01:56 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-14 20:18:56 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-14 20:30:44 Submitted 1 Y
TEEGRADER106 B Logeswaran B 2024-06-23 18:36:21 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-19 19:24:40 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-19 19:30:21 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-21 08:15:25 Submitted 2 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-21 08:19:54 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-19 19:50:04 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-19 19:54:22 Submitted 2 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-21 08:22:26 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 2 N
TEEGRADER104 C Sasikumar C Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-19 19:58:51 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-21 08:25:00 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-21 08:34:53 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-19 20:02:40 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-19 20:13:03 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-19 20:17:00 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-19 20:22:08 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-21 09:32:45 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-19 20:27:02 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-21 09:35:19 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 2 N
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-21 09:38:03 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-21 09:41:54 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-21 19:47:39 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-19 20:31:12 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-21 19:51:04 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-21 19:54:17 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-21 19:56:41 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-19 21:11:58 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-19 21:18:34 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-21 19:58:47 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-21 20:01:18 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-21 20:36:29 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-19 21:23:01 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-19 21:26:35 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-21 20:38:35 Submitted 1 Y
NGASCEIA00052 KA Poornima 2024-06-17 08:38:23 Submitted 1 Y
NGASCEIA00052 KA Poornima 2024-06-17 13:28:53 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-21 20:40:42 Submitted 1 Y
NGASCEIA00052 KA Poornima 2024-06-17 18:43:54 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-21 21:21:22 Submitted 1 Y
NGASCEIA00052 KA Poornima 2024-06-17 19:46:10 Submitted 1 Y
NGASCEIA00052 KA Poornima 2024-06-18 10:28:15 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 1 N
NGASCEIA00052 KA Poornima 2024-06-18 11:19:47 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 2 N
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
NGASCEIA00052 KA Poornima 2024-06-18 12:05:59 Submitted 3 Y
NGASCEIA00052 KA Poornima 2024-06-18 13:50:19 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
NGASCEIA00052 KA Poornima 2024-06-18 14:21:11 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-17 11:37:55 Submitted 1 Y
TEEGRADER105 C Prabhu C 2024-06-18 20:22:03 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-17 11:45:36 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-17 11:51:59 Submitted 2 Y
NGASCEIA00066 K Madheswaran 2024-06-17 11:58:40 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-17 12:04:37 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-17 12:10:32 Submitted 1 Y
TEEGRADER105 C Prabhu C 2024-06-19 13:51:33 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER105 C Prabhu C 2024-06-19 14:23:06 Submitted 2 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-17 12:19:42 Submitted 3 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER105 C Prabhu C 2024-06-20 12:34:13 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-17 12:28:25 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 2 N
NGASCEIA00066 K Madheswaran 2024-06-17 12:39:45 Submitted 1 Y
TEEGRADER105 C Prabhu C Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-17 12:46:53 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER105 C Prabhu C Submitted 1 N
TEEGRADER105 C Prabhu C Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER105 C Prabhu C Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER105 C Prabhu C Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-17 13:14:54 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-17 13:23:06 Submitted 1 Y
TEEGRADER105 C Prabhu C Submitted 1 N
TEEGRADER105 C Prabhu C Submitted 1 N
TEEGRADER105 C Prabhu C Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-17 13:34:51 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-17 13:42:27 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-17 13:48:04 Submitted 3 Y
NGASCEIA00066 K Madheswaran 2024-06-17 20:34:52 Submitted 1 Y
TEEGRADER105 C Prabhu C Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER105 C Prabhu C Submitted 1 N
TEEGRADER105 C Prabhu C Submitted 1 N
TEEGRADER105 C Prabhu C Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER105 C Prabhu C Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-17 20:40:41 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-17 20:54:25 Submitted 1 Y
TEEGRADER105 C Prabhu C 2024-06-22 15:11:31 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER105 C Prabhu C Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-17 21:03:57 Submitted 1 Y
TEEGRADER105 C Prabhu C Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-17 22:10:50 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . 2024-06-23 17:32:10 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-23 17:48:52 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-23 18:07:35 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 2 N
TEEGRADER032 Dr. N. Sakthivel . 2024-06-23 19:52:42 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-23 20:11:24 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-23 21:35:13 Submitted 2 Y
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . 2024-06-17 18:52:34 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-17 19:13:24 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-17 20:28:44 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-14 09:34:00 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-13 16:47:25 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-19 19:35:17 Submitted 2 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-13 16:53:04 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-13 20:13:38 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-13 20:18:18 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-19 20:03:45 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-13 20:39:13 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-14 16:13:59 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-20 16:39:30 Submitted 2 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-21 09:42:39 Submitted 2 Y
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . 2024-06-21 14:26:03 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-21 16:30:41 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-22 11:02:01 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-22 11:15:46 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-22 11:34:16 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-22 11:58:26 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 3 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 2 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . 2024-06-19 21:02:41 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . 2024-06-19 04:08:27 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . 2024-06-19 04:15:47 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 2 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . 2024-06-19 04:28:41 Submitted 2 Y
TEEGRADER025 Dr. K. Vasudevan . 2024-06-19 04:46:57 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . 2024-06-13 10:40:41 Submitted 2 Y
TEEGRADER025 Dr. K. Vasudevan . 2024-06-19 04:58:17 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . 2024-06-19 19:33:59 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-14 10:00:01 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . 2024-06-19 19:48:31 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . 2024-06-19 20:00:58 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . 2024-06-19 20:38:02 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-14 10:20:49 Submitted 3 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-15 11:29:21 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-15 10:21:47 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-15 10:30:12 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-15 10:37:35 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-15 10:46:57 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-15 10:56:31 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-15 11:22:35 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-15 11:46:41 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . 2024-06-24 06:50:39 Submitted 2 Y
TEEGRADER025 Dr. K. Vasudevan . 2024-06-24 04:58:25 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-15 11:58:21 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-15 12:25:22 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-15 12:34:18 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-15 12:42:54 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . 2024-06-24 05:05:18 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . 2024-06-24 05:16:18 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-15 12:52:23 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-15 13:02:23 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . 2024-06-24 07:02:59 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . 2024-06-15 13:14:18 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-19 09:25:31 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . 2024-06-19 09:52:31 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . 2024-06-19 09:51:10 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-19 13:44:45 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . 2024-06-19 13:54:11 Submitted 2 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-19 14:13:54 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . 2024-06-19 14:25:42 Submitted 2 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-19 14:36:48 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-19 15:21:05 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-19 15:36:57 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-19 15:51:06 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . 2024-06-19 03:55:49 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . 2024-06-18 22:15:55 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . 2024-06-18 22:28:13 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . 2024-06-22 12:23:53 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-22 12:36:43 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . 2024-06-22 12:47:59 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . 2024-06-23 12:20:49 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . 2024-06-23 12:32:59 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . 2024-06-23 12:56:07 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . 2024-06-23 13:14:49 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-23 16:23:13 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-23 16:33:38 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 2 N
TEEGRADER030 Dr. N. P. Revathi . 2024-06-20 09:16:22 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-20 09:23:19 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . 2024-06-20 09:33:23 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 2 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 2 N
TEEGRADER030 Dr. N. P. Revathi . 2024-06-20 09:41:13 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . 2024-06-20 09:59:53 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . 2024-06-20 10:17:03 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . 2024-06-20 10:32:43 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . 2024-06-20 11:00:40 Submitted 2 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . 2024-06-20 16:26:06 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 2 N
TEEGRADER032 Dr. N. Sakthivel . 2024-06-17 18:25:46 Submitted 3 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-15 09:16:07 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER031 Dr. N. Prakash . 2024-06-15 09:30:22 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-14 20:32:26 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 2 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER031 Dr. N. Prakash . 2024-06-14 20:11:41 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER031 Dr. N. Prakash . 2024-06-14 19:58:25 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-19 09:42:22 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . Submitted 2 N
TEEGRADER037 Dr. P.E. Elango . 2024-06-19 10:00:02 Submitted 3 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-19 16:03:07 Submitted 2 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-20 11:35:54 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER037 Dr. P.E. Elango . 2024-06-20 11:51:19 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER037 Dr. P.E. Elango . 2024-06-20 12:03:22 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER031 Dr. N. Prakash . 2024-06-15 15:26:58 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-15 15:40:05 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 21:32:31 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 21:37:35 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-15 16:07:45 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-18 16:14:29 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 21:40:11 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 21:43:20 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-15 20:44:09 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-15 21:00:39 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-15 20:13:02 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 21:45:55 Submitted 2 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 21:47:50 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-15 19:33:20 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-15 19:46:29 Submitted 3 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 21:50:28 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-15 19:59:55 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 21:54:37 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-17 12:45:24 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-17 13:03:02 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 22:18:25 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 22:21:29 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-17 13:16:02 Submitted 2 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-18 14:00:11 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 22:25:10 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 22:27:29 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 22:29:46 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 22:32:15 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-18 14:18:20 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-17 13:41:43 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 22:40:17 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-17 13:28:58 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 23:07:44 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 23:10:01 Submitted 3 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-18 13:50:26 Submitted 2 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 23:12:36 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-18 06:36:28 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-18 14:10:00 Submitted 2 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-18 13:52:02 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-18 06:39:28 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-19 19:25:58 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-18 06:42:26 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-19 20:35:50 Submitted 2 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-18 20:14:37 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-20 22:44:33 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-18 06:45:29 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-18 06:49:12 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-19 20:24:14 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-18 06:52:43 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 2 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 2 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 2 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 2 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER031 Dr. N. Prakash . 2024-06-18 15:27:14 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER031 Dr. N. Prakash . 2024-06-18 15:53:52 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER031 Dr. N. Prakash . 2024-06-18 13:01:34 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER031 Dr. N. Prakash . 2024-06-18 12:44:10 Submitted 2 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-18 16:06:07 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-18 12:29:29 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-18 12:35:38 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER031 Dr. N. Prakash . 2024-06-18 15:34:26 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-18 12:52:09 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . Submitted 1 N
TEEGRADER031 Dr. N. Prakash . 2024-06-18 15:44:22 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-18 12:07:24 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-14 12:07:38 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-14 12:10:31 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-14 12:15:11 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-16 14:57:37 Submitted 2 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-16 15:06:08 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-16 15:14:43 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-16 15:22:07 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-16 15:27:34 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-18 15:14:42 Submitted 3 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-16 15:31:23 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-16 15:37:09 Submitted 2 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-18 15:39:28 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-16 15:42:23 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-18 15:59:53 Submitted 3 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-16 15:53:07 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-19 07:46:19 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-16 16:03:12 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-16 16:08:23 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-16 16:14:00 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-19 10:34:55 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-16 21:17:59 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-16 21:22:00 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-19 10:45:25 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-17 22:34:03 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-20 07:05:45 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-20 07:27:18 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-18 20:53:09 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-16 21:26:26 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-19 07:29:59 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-16 21:30:33 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-20 07:17:03 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-16 21:36:10 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-16 21:46:36 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-20 20:03:07 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-17 22:13:13 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-16 21:55:52 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-17 21:59:40 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-19 12:18:55 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-16 22:00:47 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-16 22:05:16 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-20 20:09:37 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-16 22:10:39 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 10:45:06 Submitted 2 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 10:50:18 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 10:55:43 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-23 21:56:00 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . Submitted 3 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . 2024-06-24 06:48:46 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . Submitted 2 N
TEEGRADER032 Dr. N. Sakthivel . 2024-06-24 18:20:03 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . 2024-06-24 18:34:05 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-24 18:44:05 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . Submitted 2 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . 2024-06-24 19:50:58 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-24 21:20:04 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . 2024-06-24 21:51:50 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-24 22:16:03 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-24 22:35:47 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-24 22:46:55 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . 2024-06-24 23:02:12 Submitted 1 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-25 06:45:19 Submitted 1 Y
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER030 Dr. N. P. Revathi . Submitted 1 N
TEEGRADER032 Dr. N. Sakthivel . 2024-06-25 07:14:06 Submitted 3 Y
TEEGRADER032 Dr. N. Sakthivel . 2024-06-25 07:27:43 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-19 13:27:56 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-18 06:55:42 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-18 19:43:13 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-18 20:26:57 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-18 07:00:39 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-19 19:36:45 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-18 07:04:40 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-20 06:53:59 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-18 07:08:36 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-19 19:57:30 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . 2024-06-18 21:59:55 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . 2024-06-20 04:43:44 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-18 19:55:26 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . 2024-06-20 04:59:01 Submitted 2 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-19 13:39:24 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . 2024-06-20 09:52:06 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . 2024-06-21 15:26:06 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-19 20:46:41 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-19 19:47:09 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-18 20:02:39 Submitted 2 Y
TEEGRADER035 Dr. P. Komaladevi . 2024-06-25 03:19:38 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . 2024-06-25 03:48:17 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-18 20:40:41 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . 2024-06-25 04:05:42 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-19 18:57:20 Submitted 3 Y
TEEGRADER035 Dr. P. Komaladevi . 2024-06-25 04:29:14 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-19 19:08:27 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . 2024-06-25 05:04:30 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . 2024-06-25 05:31:11 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-19 19:16:55 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-14 22:16:27 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . 2024-06-25 05:46:50 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . 2024-06-25 05:56:23 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . 2024-06-25 06:09:29 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-19 07:18:12 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-17 22:23:45 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 12:47:35 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-19 07:06:23 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-19 12:35:51 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-19 10:57:30 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-19 06:55:57 Submitted 2 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-14 08:00:30 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-14 08:12:33 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 12:49:58 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-14 08:32:07 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 12:52:46 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 12:55:13 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 17:32:36 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-14 08:45:35 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 17:51:07 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-14 09:40:43 Submitted 2 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 21:11:28 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-14 09:56:09 Submitted 2 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 21:14:39 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 17:58:13 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-14 14:05:51 Submitted 3 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-14 14:26:36 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 18:03:20 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 18:11:42 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 18:35:15 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-14 11:47:14 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-14 11:33:03 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-17 16:45:21 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 21:18:10 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-17 16:23:02 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-17 16:02:15 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-17 15:20:43 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-17 15:01:04 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-17 14:48:24 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-17 15:33:37 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-17 15:46:14 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-17 16:12:59 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-17 16:32:50 Submitted 1 Y
TEEGRADER033 Dr. N. V. Poovendhiran . 2024-06-17 21:30:02 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-15 21:58:29 Submitted 2 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-15 22:14:07 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 2 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-15 22:22:07 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-15 22:31:21 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 2 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 09:02:59 Submitted 2 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 09:14:00 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 09:24:08 Submitted 2 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 09:43:09 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 10:37:26 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 11:03:41 Submitted 2 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 2 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-13 21:41:19 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-13 22:12:32 Submitted 2 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 2 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-14 23:26:51 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-13 22:51:49 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-14 10:38:12 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-14 10:52:41 Submitted 2 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-14 11:01:56 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 2 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-14 23:28:50 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-14 11:24:03 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-14 11:34:16 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-14 12:07:48 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-14 12:20:01 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-16 21:45:15 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-16 22:04:24 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-16 22:14:22 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-16 22:28:22 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-16 22:39:22 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-17 10:29:36 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-17 13:07:33 Submitted 2 Y
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-17 13:39:51 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-17 13:51:07 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-17 14:20:50 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-17 14:33:06 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 2 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-17 14:46:45 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-17 17:10:52 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-17 17:32:18 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-17 19:15:50 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 2 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-17 19:28:32 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 2 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-17 19:39:52 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 2 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-20 22:45:36 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-17 19:54:50 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-17 20:14:18 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-17 20:28:53 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-17 20:43:36 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-17 21:15:39 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . 2024-06-19 06:54:29 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-17 21:28:51 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-17 21:46:19 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-17 22:00:48 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-17 22:18:29 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-17 22:30:05 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-18 09:15:19 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-18 10:52:58 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-18 12:54:37 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-18 13:10:14 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . 2024-06-19 07:03:54 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . 2024-06-25 05:50:09 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-18 14:03:52 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-18 14:24:16 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-18 14:36:09 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-19 21:14:34 Submitted 2 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-18 20:33:09 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-23 18:06:45 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-23 18:56:56 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-23 22:27:43 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-23 23:05:31 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-24 17:42:31 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-24 18:26:24 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-24 19:41:25 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-24 20:21:22 Submitted 2 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-24 22:46:22 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 3 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 2 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-14 12:35:09 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-14 12:59:33 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 2 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 2 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-14 13:34:30 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 2 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-14 23:31:15 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-14 14:51:26 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-14 23:20:09 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 2 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-14 23:21:59 Submitted 2 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-14 22:36:41 Submitted 2 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-14 23:17:53 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-15 21:29:16 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-15 21:49:48 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-18 21:01:44 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-19 21:36:29 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-19 22:07:49 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-19 21:50:12 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-20 20:20:16 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 2 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 3 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-19 22:23:15 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-20 21:03:30 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-19 22:40:59 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 2 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 2 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-20 21:17:18 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-20 21:31:38 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 2 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-20 21:41:53 Submitted 2 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-20 21:52:22 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-20 22:12:50 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-13 11:49:45 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-13 10:46:24 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-14 23:23:11 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-13 21:06:19 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
NGASCEIA00049 P Kalaivani 2024-06-23 21:23:26 Submitted 1 Y
NGASCEIA00049 P Kalaivani 2024-06-23 21:42:26 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
NGASCEIA00049 P Kalaivani 2024-06-23 21:57:21 Submitted 2 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 2 N
NGASCEIA00049 P Kalaivani 2024-06-23 22:37:45 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 2 N
NGASCEIA00049 P Kalaivani 2024-06-23 22:50:27 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 2 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 3 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
NGASCEIA00049 P Kalaivani 2024-06-23 23:04:14 Submitted 1 Y
NGASCEIA00049 P Kalaivani 2024-06-23 23:15:44 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
NGASCEIA00049 P Kalaivani 2024-06-24 13:15:44 Submitted 1 Y
NGASCEIA00049 P Kalaivani 2024-06-24 13:26:53 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 2 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
NGASCEIA00049 P Kalaivani 2024-06-24 16:54:47 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
NGASCEIA00049 P Kalaivani 2024-06-24 17:11:38 Submitted 1 Y
NGASCEIA00049 P Kalaivani 2024-06-24 17:24:18 Submitted 1 Y
NGASCEIA00049 P Kalaivani 2024-06-24 18:03:29 Submitted 1 Y
NGASCEIA00049 P Kalaivani 2024-06-24 18:15:06 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
NGASCEIA00049 P Kalaivani 2024-06-24 18:26:34 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
NGASCEIA00049 P Kalaivani 2024-06-24 19:14:22 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-14 11:35:46 Submitted 2 Y
NGASCEIA00056 P Senthilkumar 2024-06-14 11:49:35 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
NGASCEIA00056 P Senthilkumar 2024-06-14 11:58:57 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
NGASCEIA00056 P Senthilkumar 2024-06-14 12:08:00 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
NGASCEIA00056 P Senthilkumar 2024-06-14 12:18:30 Submitted 2 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-17 20:56:20 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-17 18:04:45 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 18:11:47 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 20:01:15 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 20:03:30 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-17 20:31:08 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-17 20:34:03 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 20:38:33 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 20:41:19 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 20:50:49 Submitted 2 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 21:02:51 Submitted 2 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-18 20:05:08 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-19 12:58:04 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-19 13:49:38 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-19 19:32:52 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-19 19:59:10 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-17 21:05:43 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-20 11:58:24 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-20 14:43:55 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-17 21:07:34 Submitted 1 Y
NGASCEIA00049 P Kalaivani 2024-06-18 13:16:45 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-20 15:14:57 Submitted 2 Y
NGASCEIA00049 P Kalaivani 2024-06-18 13:55:52 Submitted 1 Y
NGASCEIA00049 P Kalaivani 2024-06-19 10:28:39 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-20 15:28:06 Submitted 2 Y
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-20 15:43:45 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-21 15:49:26 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-21 16:05:44 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-22 09:37:06 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-22 10:02:12 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-22 10:25:59 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-22 14:33:05 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-22 14:47:01 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-22 15:01:59 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-24 17:43:40 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-24 17:55:46 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-23 07:36:42 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-23 08:21:43 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-23 10:37:18 Submitted 2 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-23 10:51:05 Submitted 2 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-23 11:46:09 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-13 11:37:19 Submitted 2 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-23 11:56:02 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-13 11:41:53 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-13 11:46:35 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-23 23:17:52 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-23 23:36:33 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-23 23:49:42 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-24 00:06:43 Submitted 3 Y
NGASCEIA00058 N Balusamy 2024-06-13 11:58:36 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-13 12:02:34 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-24 06:01:19 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-13 12:09:08 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-24 06:27:01 Submitted 2 Y
NGASCEIA00058 N Balusamy 2024-06-13 12:13:04 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-24 19:08:20 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-24 19:19:00 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-24 22:07:06 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-24 22:19:08 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-24 22:33:23 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-24 22:43:42 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-13 13:46:39 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-13 13:52:56 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-13 13:57:01 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-13 14:10:33 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-13 14:17:04 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-13 14:20:27 Submitted 2 Y
NGASCEIA00058 N Balusamy 2024-06-13 18:38:45 Submitted 2 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-13 18:42:14 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-15 13:32:19 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-15 13:35:38 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-15 13:40:27 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-15 13:45:18 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-15 13:49:00 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-15 13:52:51 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-15 13:55:31 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-15 14:00:21 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-15 14:02:54 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-15 14:12:10 Submitted 3 Y
NGASCEIA00058 N Balusamy 2024-06-15 14:15:42 Submitted 3 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 2 N
NGASCEIA00058 N Balusamy 2024-06-17 09:14:39 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 3 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 09:40:47 Submitted 2 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 09:44:22 Submitted 2 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 09:48:32 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 2 N
NGASCEIA00058 N Balusamy 2024-06-17 09:58:52 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-17 10:03:09 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 10:07:26 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 10:22:40 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 19:28:00 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 19:35:10 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 19:47:55 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-18 10:03:48 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-18 17:52:19 Submitted 2 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 20:02:59 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 20:20:50 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-18 18:06:00 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-19 10:35:28 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-19 10:54:16 Submitted 2 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 20:28:58 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 20:33:24 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 20:42:24 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-19 12:09:46 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-19 13:04:25 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-19 17:36:37 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-19 17:55:46 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-19 18:24:03 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 20:47:50 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-19 18:42:12 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-20 15:40:22 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-20 16:05:47 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-20 17:31:54 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-20 17:46:17 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-13 09:58:26 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-13 10:25:56 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-20 17:59:37 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-13 10:30:14 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-20 18:37:49 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-13 10:36:33 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-13 10:39:37 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-13 11:27:38 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-13 11:33:58 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
NGASCEIA00049 P Kalaivani 2024-06-19 10:48:56 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
NGASCEIA00049 P Kalaivani 2024-06-19 11:29:10 Submitted 2 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 2 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 2 N
NGASCEIA00049 P Kalaivani 2024-06-19 22:22:35 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
NGASCEIA00049 P Kalaivani 2024-06-19 22:40:41 Submitted 2 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
NGASCEIA00049 P Kalaivani 2024-06-19 22:56:49 Submitted 1 Y
NGASCEIA00049 P Kalaivani 2024-06-19 23:07:19 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 2 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
NGASCEIA00049 P Kalaivani 2024-06-19 23:22:52 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
NGASCEIA00049 P Kalaivani 2024-06-20 05:49:55 Submitted 1 Y
NGASCEIA00049 P Kalaivani 2024-06-20 11:58:42 Submitted 3 Y
NGASCEIA00049 P Kalaivani 2024-06-20 14:02:26 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 2 N
NGASCEIA00049 P Kalaivani 2024-06-20 16:28:34 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
NGASCEIA00049 P Kalaivani 2024-06-20 20:35:17 Submitted 1 Y
NGASCEIA00049 P Kalaivani 2024-06-20 20:49:48 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 2 N
NGASCEIA00049 P Kalaivani 2024-06-20 21:07:42 Submitted 1 Y
NGASCEIA00049 P Kalaivani 2024-06-20 21:16:19 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
NGASCEIA00049 P Kalaivani 2024-06-20 21:28:21 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
NGASCEIA00049 P Kalaivani 2024-06-20 21:38:58 Submitted 1 Y
NGASCEIA00049 P Kalaivani 2024-06-20 21:57:25 Submitted 1 Y
NGASCEIA00049 P Kalaivani 2024-06-21 06:05:06 Submitted 1 Y
NGASCEIA00049 P Kalaivani 2024-06-21 10:15:21 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
NGASCEIA00049 P Kalaivani 2024-06-23 21:10:05 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 10:25:11 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 10:34:50 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-17 10:43:47 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 10:47:02 Submitted 3 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 10:49:13 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-17 10:51:27 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 10:54:50 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 11:07:08 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 11:23:22 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 11:27:54 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-17 11:31:24 Submitted 3 Y
NGASCEIA00058 N Balusamy 2024-06-17 11:35:32 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-17 11:39:17 Submitted 2 Y
NGASCEIA00058 N Balusamy 2024-06-17 11:43:02 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 2 N
NGASCEIA00058 N Balusamy 2024-06-17 17:44:54 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-17 17:47:25 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 17:49:35 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 17:51:42 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 17:53:43 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 17:56:50 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 17:59:45 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 2 N
TEEGRADER047 Dr. T. K. Shanmugam . Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-17 18:02:29 Submitted 1 Y
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 3 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 2 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 2 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 2 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 2 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 2 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 2 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 2 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 2 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 15:56:46 Submitted 1 Y
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 16:11:18 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 16:20:15 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 16:30:07 Submitted 1 Y
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 19:13:00 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 19:29:23 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 19:40:04 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 19:58:44 Submitted 1 Y
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 20:08:53 Submitted 1 Y
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 20:20:21 Submitted 1 Y
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 2 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-17 10:29:46 Submitted 1 Y
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 2 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-17 10:39:54 Submitted 1 Y
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-17 10:50:56 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-17 11:05:47 Submitted 1 Y
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-17 11:22:04 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-17 11:32:44 Submitted 1 Y
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-17 11:41:48 Submitted 1 Y
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-17 11:51:54 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-17 12:00:24 Submitted 1 Y
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-17 12:07:56 Submitted 1 Y
TEEGRADER020 Dr. K. Kalaiselvi . 2024-06-17 17:24:04 Submitted 1 Y
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . 2024-06-23 16:06:49 Submitted 1 Y
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 2 N
TEEGRADER020 Dr. K. Kalaiselvi . 2024-06-17 18:41:14 Submitted 1 Y
TEEGRADER020 Dr. K. Kalaiselvi . 2024-06-17 19:10:50 Submitted 2 Y
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . 2024-06-23 17:22:51 Submitted 1 Y
TEEGRADER020 Dr. K. Kalaiselvi . 2024-06-23 21:22:37 Submitted 1 Y
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 2 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . 2024-06-24 16:25:30 Submitted 2 Y
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 2 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 3 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 11:13:20 Submitted 2 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 11:24:24 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 11:31:40 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 11:46:48 Submitted 2 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 12:06:37 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 12:16:37 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 12:32:01 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 12:53:55 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 14:31:23 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 14:49:49 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 14:58:09 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 15:11:38 Submitted 1 Y
TEEGRADER017 Dr. K. A. Senthildevi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-16 15:42:19 Submitted 1 Y
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 3 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 2 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 2 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 2 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 2 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . 2024-06-18 15:00:49 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . 2024-06-18 21:09:07 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 2 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . 2024-06-18 21:42:50 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . 2024-06-18 21:55:30 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 2 N
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-22 10:48:39 Submitted 2 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-22 09:07:32 Submitted 2 Y
TEEGRADER022 Dr. K. Punitha . 2024-06-19 20:11:15 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-22 17:30:46 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-22 17:39:53 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-24 17:54:06 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-24 18:36:23 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 2 N
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-22 17:59:06 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . Submitted 2 N
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-24 19:25:27 Submitted 1 Y
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 3 N
TEEGRADER022 Dr. K. Punitha . 2024-06-17 10:20:01 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . 2024-06-17 10:39:52 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-20 18:18:02 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-20 18:48:03 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . 2024-06-17 11:03:54 Submitted 2 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-20 19:07:17 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . 2024-06-17 11:57:30 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-20 18:38:50 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . 2024-06-17 12:08:46 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . 2024-06-18 10:09:21 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-20 19:13:33 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-20 19:38:55 Submitted 2 Y
TEEGRADER022 Dr. K. Punitha . 2024-06-18 10:17:05 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . 2024-06-18 11:23:58 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . 2024-06-18 11:50:07 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . 2024-06-18 12:24:13 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . 2024-06-19 05:44:24 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-20 19:45:51 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-20 22:47:39 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-20 22:54:31 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-20 19:25:03 Submitted 2 Y
TEEGRADER022 Dr. K. Punitha . 2024-06-19 05:55:10 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-20 19:31:33 Submitted 2 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-21 10:42:19 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-21 10:51:13 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-21 11:27:22 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . 2024-06-19 06:05:45 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-21 11:50:03 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-21 17:55:31 Submitted 2 Y
TEEGRADER022 Dr. K. Punitha . 2024-06-19 06:15:36 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-21 18:07:49 Submitted 2 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-21 18:18:42 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-21 18:34:33 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . 2024-06-19 06:21:48 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-22 08:38:30 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-22 12:37:33 Submitted 1 Y
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 3 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 2 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 2 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 2 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 2 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 2 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . 2024-06-19 13:40:02 Submitted 2 Y
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-19 22:38:02 Submitted 1 Y
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . 2024-06-15 06:53:16 Submitted 2 Y
TEEGRADER025 Dr. K. Vasudevan . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 2 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . 2024-06-17 11:55:17 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . 2024-06-17 12:15:59 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . 2024-06-17 12:32:40 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . 2024-06-18 06:50:42 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . Submitted 2 N
TEEGRADER025 Dr. K. Vasudevan . 2024-06-18 07:05:14 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . 2024-06-18 07:22:40 Submitted 1 Y
TEEGRADER025 Dr. K. Vasudevan . 2024-06-18 07:47:22 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . 2024-06-18 08:31:54 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . 2024-06-18 13:51:52 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . Submitted 2 N
TEEGRADER027 Dr. M. Sathyapriya . Submitted 1 N
TEEGRADER025 Dr. K. Vasudevan . 2024-06-18 14:30:02 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . 2024-06-19 07:10:45 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . 2024-06-19 07:17:14 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . 2024-06-19 07:23:44 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-22 12:03:43 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . 2024-06-19 07:28:57 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-22 11:22:04 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER022 Dr. K. Punitha . 2024-06-19 07:35:05 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-22 12:56:19 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-22 13:04:22 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-22 08:58:36 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . 2024-06-19 19:49:37 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-22 12:46:21 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER022 Dr. K. Punitha . 2024-06-19 19:56:16 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-22 10:54:28 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-22 13:15:28 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . 2024-06-19 20:03:02 Submitted 2 Y
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-22 11:11:31 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . 2024-06-19 20:16:56 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . Submitted 2 N
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-22 13:29:00 Submitted 1 Y
TEEGRADER022 Dr. K. Punitha . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . 2024-06-22 11:05:32 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-19 22:26:16 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-20 14:00:56 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-20 15:03:53 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . 2024-06-22 11:24:58 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . 2024-06-22 11:41:21 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-20 16:10:34 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-20 18:26:13 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . 2024-06-22 12:07:01 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . 2024-06-22 12:31:14 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-20 20:00:20 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-20 20:34:10 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . 2024-06-22 12:50:14 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-20 22:10:29 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-21 19:50:45 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 2 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-21 21:00:29 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-21 21:21:00 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-22 11:44:25 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-22 12:56:48 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-23 16:17:26 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 2 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
NGASCEIA00059 D Vinoth 2024-06-24 16:21:58 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 16:27:01 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
NGASCEIA00059 D Vinoth 2024-06-24 16:33:38 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-17 11:46:31 Submitted 2 Y
NGASCEIA00059 D Vinoth 2024-06-24 16:39:32 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
NGASCEIA00059 D Vinoth 2024-06-24 16:48:12 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 16:52:18 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 16:59:07 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-17 13:51:52 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 17:05:52 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 18:41:06 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 18:48:27 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
NGASCEIA00059 D Vinoth 2024-06-24 18:52:49 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 18:58:11 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 19:02:44 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 19:08:16 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 19:14:30 Submitted 2 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-18 20:24:09 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-18 20:33:22 Submitted 2 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-18 20:45:17 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-18 12:20:17 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-18 13:01:35 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-18 13:55:05 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-18 14:29:14 Submitted 1 Y
TEEGRADER048 Dr. T. K. Sumathi . 2024-06-18 19:45:09 Submitted 2 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-13 19:55:14 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-13 20:08:25 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-13 21:34:34 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-13 21:47:20 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-13 22:06:23 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-17 19:11:50 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-18 17:36:05 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-18 13:17:55 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-18 13:27:41 Submitted 2 Y
NGASCEIA00059 D Vinoth 2024-06-18 13:37:32 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-18 13:44:54 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-18 13:51:51 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-18 14:35:04 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-18 14:42:20 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-15 19:33:49 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-18 14:51:06 Submitted 2 Y
NGASCEIA00059 D Vinoth 2024-06-18 14:58:27 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-18 15:14:09 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-18 15:21:47 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-18 15:29:04 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-22 13:10:07 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-22 13:17:45 Submitted 2 Y
NGASCEIA00059 D Vinoth 2024-06-22 13:23:35 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-15 20:36:44 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-22 13:33:10 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-22 13:39:22 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-22 13:45:59 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-22 13:52:23 Submitted 2 Y
NGASCEIA00059 D Vinoth 2024-06-22 14:32:12 Submitted 1 Y
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 2 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER021 Dr. K. P. Shanmugapriya . Submitted 1 N
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-18 22:07:56 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-18 22:21:59 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-19 21:45:35 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-19 21:57:28 Submitted 2 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-19 22:04:45 Submitted 1 Y
TEEGRADER027 Dr. M. Sathyapriya . 2024-06-19 22:20:02 Submitted 2 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-13 19:55:21 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-13 20:14:07 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-13 20:55:26 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-13 20:53:18 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-13 21:38:41 Submitted 1 Y
TEEGRADER031 Dr. N. Prakash . 2024-06-13 21:53:55 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-18 19:56:07 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-18 20:13:00 Submitted 2 Y
NGASCEIA00059 D Vinoth 2024-06-24 19:19:58 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-17 18:13:25 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-17 20:03:19 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 19:26:16 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-17 22:41:23 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-18 13:08:33 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 19:31:18 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . 2024-06-18 14:08:35 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . 2024-06-18 14:53:29 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-18 13:52:03 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-18 15:25:34 Submitted 2 Y
TEEGRADER007 Dr. A. Sivakumar . 2024-06-18 17:17:50 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-19 18:57:16 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-19 19:48:26 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . 2024-06-18 17:40:15 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-19 20:18:21 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . 2024-06-20 14:13:33 Submitted 3 Y
TEEGRADER007 Dr. A. Sivakumar . 2024-06-21 14:35:09 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . 2024-06-21 15:33:47 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . 2024-06-21 15:57:52 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . 2024-06-21 16:23:08 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . 2024-06-21 16:50:15 Submitted 2 Y
TEEGRADER007 Dr. A. Sivakumar . 2024-06-22 09:45:54 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . 2024-06-22 10:06:13 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-19 21:47:08 Submitted 2 Y
TEEGRADER007 Dr. A. Sivakumar . 2024-06-22 10:27:05 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-22 14:38:55 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-15 23:42:07 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-22 14:46:59 Submitted 2 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-16 12:54:33 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-22 14:53:01 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-22 15:01:54 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-22 15:08:45 Submitted 2 Y
NGASCEIA00059 D Vinoth 2024-06-22 15:14:44 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 10:14:34 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 10:22:31 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 10:29:51 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 10:35:28 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-16 14:05:17 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 10:45:56 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 10:59:30 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 15:48:09 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 15:54:12 Submitted 2 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-16 19:05:51 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-16 20:15:25 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 16:00:24 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 16:08:35 Submitted 2 Y
TEEGRADER014 Dr. G. A. Mylavathi . 2024-06-16 22:21:04 Submitted 1 Y
TEEGRADER014 Dr. G. A. Mylavathi . Submitted 1 N
NGASCEIA00059 D Vinoth 2024-06-24 16:16:44 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 19:34:48 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 19:50:48 Submitted 3 Y
NGASCEIA00064 R Santhosh 2024-06-18 21:38:35 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 2 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 2 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 2 N
NGASCEIA00064 R Santhosh 2024-06-18 21:45:17 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00064 R Santhosh 2024-06-18 21:50:48 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 21:57:09 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 22:03:54 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00064 R Santhosh 2024-06-18 22:15:08 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00064 R Santhosh 2024-06-19 22:09:39 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 3 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-20 17:02:37 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-20 20:15:49 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-20 20:18:41 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-19 22:24:50 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-20 00:13:15 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-20 20:22:05 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-20 00:24:20 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-20 00:34:33 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-18 15:02:26 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-21 13:23:22 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-19 19:29:36 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-19 21:14:56 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-19 19:59:00 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-21 13:30:45 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-18 17:38:28 Submitted 2 Y
TEEGRADER103 G Malathi G 2024-06-20 23:06:04 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-17 21:10:44 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 13:00:54 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-18 17:19:33 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 13:11:08 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-18 15:45:18 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-18 16:24:52 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-20 16:13:58 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-18 16:03:48 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-18 16:15:08 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-21 11:55:06 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-18 19:18:32 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 13:22:18 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-21 12:02:22 Submitted 3 Y
NGASCEIA00064 R Santhosh 2024-06-18 13:31:18 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-21 12:20:02 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-18 19:43:59 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-21 12:36:07 Submitted 2 Y
NGASCEIA00064 R Santhosh 2024-06-18 13:39:57 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-18 20:39:26 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-21 13:40:28 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-18 22:22:46 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 13:53:33 Submitted 2 Y
TEEGRADER103 G Malathi G 2024-06-21 13:48:28 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 14:09:24 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 14:48:56 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-20 16:26:13 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-20 21:09:43 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 14:30:32 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 15:51:13 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-20 22:48:43 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 16:03:25 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-18 20:56:05 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-20 22:28:46 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-22 20:51:54 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-22 20:57:59 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-13 12:37:54 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-22 21:04:48 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-13 12:37:24 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-22 21:10:14 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER103 G Malathi G 2024-06-13 12:36:53 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-22 21:18:08 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-20 21:24:54 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 2 N
TEEGRADER103 G Malathi G 2024-06-13 14:18:20 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-20 22:31:05 Submitted 2 Y
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER103 G Malathi G 2024-06-13 19:54:02 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-21 22:00:47 Submitted 2 Y
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 2 N
TEEGRADER103 G Malathi G 2024-06-13 20:09:36 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-21 23:59:40 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-22 00:13:14 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER103 G Malathi G 2024-06-13 20:38:16 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-22 00:23:16 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 2 N
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER103 G Malathi G 2024-06-13 21:03:10 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER103 G Malathi G 2024-06-14 19:15:04 Submitted 2 Y
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER103 G Malathi G 2024-06-14 19:39:30 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-22 21:41:51 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-22 21:47:46 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-14 20:04:00 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-14 20:37:47 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-14 23:16:30 Submitted 2 Y
TEEGRADER103 G Malathi G 2024-06-15 09:40:25 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-22 22:00:33 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER103 G Malathi G 2024-06-15 10:02:57 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-15 10:17:54 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-22 22:06:32 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-22 22:15:29 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-22 22:23:02 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 2 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-22 22:42:54 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-15 10:36:11 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER103 G Malathi G 2024-06-16 11:47:05 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-15 10:51:35 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-16 12:21:20 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-22 22:50:04 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER103 G Malathi G 2024-06-15 22:23:29 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-22 22:59:06 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-22 23:05:17 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-15 23:12:06 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER103 G Malathi G 2024-06-16 00:16:26 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-22 23:16:39 Submitted 2 Y
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER103 G Malathi G 2024-06-16 10:32:13 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-16 13:01:10 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-22 23:25:32 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-16 17:32:57 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-16 17:48:17 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER103 G Malathi G 2024-06-16 18:02:07 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-22 23:36:49 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-16 22:19:53 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-22 23:46:09 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER103 G Malathi G 2024-06-16 19:51:00 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 21:30:47 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-17 07:21:42 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 2 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER103 G Malathi G 2024-06-17 08:26:53 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-21 05:37:33 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-17 08:36:12 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-21 05:53:35 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 2 N
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER039 Dr. R. Logambal . 2024-06-22 17:34:00 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-22 17:45:56 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-22 17:55:56 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 2 N
TEEGRADER039 Dr. R. Logambal . 2024-06-22 18:05:46 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER103 G Malathi G 2024-06-13 12:38:20 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER039 Dr. R. Logambal . 2024-06-22 18:19:30 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-13 12:38:41 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-22 18:33:01 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-22 19:20:13 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-22 19:44:31 Submitted 2 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-22 19:54:34 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-22 20:12:00 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-22 20:27:21 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER039 Dr. R. Logambal . 2024-06-22 20:37:55 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-22 20:45:45 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER103 G Malathi G 2024-06-13 12:38:59 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER103 G Malathi G 2024-06-20 20:01:19 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G 2024-06-19 19:51:24 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G 2024-06-19 20:21:40 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 16:13:10 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G 2024-06-19 20:50:16 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-20 21:46:05 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 16:23:41 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-18 21:24:43 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 16:32:57 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-20 19:29:27 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 16:58:27 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-18 22:08:41 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 17:09:46 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-18 23:12:37 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 17:18:05 Submitted 3 Y
NGASCEIA00064 R Santhosh 2024-06-18 17:29:50 Submitted 2 Y
TEEGRADER101 G Sri Sakthinayaki G 2024-06-14 19:10:52 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 17:42:05 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G 2024-06-18 13:32:08 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G 2024-06-18 13:59:39 Submitted 2 Y
NGASCEIA00064 R Santhosh 2024-06-18 17:52:45 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G 2024-06-18 14:18:59 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G 2024-06-18 16:16:22 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G 2024-06-18 21:43:43 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G 2024-06-19 22:21:56 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00064 R Santhosh 2024-06-18 18:05:21 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00064 R Santhosh 2024-06-18 18:17:52 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 2 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00064 R Santhosh 2024-06-18 18:33:53 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00064 R Santhosh 2024-06-18 18:46:26 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 18:53:14 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 19:19:09 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-21 06:05:50 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-17 09:41:01 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-21 06:20:11 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-17 09:51:17 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-21 06:39:41 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-22 16:15:38 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-17 10:39:01 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-17 10:58:28 Submitted 2 Y
TEEGRADER103 G Malathi G 2024-06-17 14:25:37 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-17 14:38:53 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00064 R Santhosh 2024-06-17 21:39:49 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-17 15:19:29 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-22 16:32:45 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 10:30:50 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 10:45:20 Submitted 2 Y
NGASCEIA00064 R Santhosh 2024-06-18 10:58:30 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 11:19:28 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-17 16:52:49 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-17 18:49:29 Submitted 2 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-22 16:49:54 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 11:30:28 Submitted 2 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-22 17:02:27 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-17 17:57:13 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-22 17:17:53 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 11:42:04 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-22 17:46:39 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 11:54:58 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-22 18:07:19 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 12:04:56 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 12:24:47 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 12:31:46 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-17 18:06:43 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-22 18:17:28 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-17 19:18:28 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-22 18:51:23 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-22 19:15:53 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-22 19:31:01 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-22 19:58:04 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 12:39:11 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-17 20:01:15 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-17 20:44:20 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-22 20:14:18 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-22 20:36:28 Submitted 2 Y
TEEGRADER103 G Malathi G 2024-06-19 18:09:38 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-18 15:32:58 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-18 14:39:06 Submitted 1 Y
TEEGRADER103 G Malathi G 2024-06-19 18:23:05 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-18 12:49:50 Submitted 2 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-21 21:05:23 Submitted 1 Y
TEEGRADER106 B Logeswaran B 2024-06-24 20:00:04 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER106 B Logeswaran B 2024-06-24 19:09:48 Submitted 1 Y
TEEGRADER106 B Logeswaran B 2024-06-24 18:42:21 Submitted 1 Y
TEEGRADER106 B Logeswaran B 2024-06-24 19:21:24 Submitted 1 Y
TEEGRADER106 B Logeswaran B 2024-06-24 19:17:50 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-21 21:14:41 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-21 21:24:17 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-21 21:37:28 Submitted 3 Y
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER106 B Logeswaran B 2024-06-24 19:02:03 Submitted 2 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-21 21:44:46 Submitted 2 Y
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER106 B Logeswaran B 2024-06-24 18:51:03 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-21 21:53:51 Submitted 1 Y
TEEGRADER106 B Logeswaran B 2024-06-23 21:10:36 Submitted 1 Y
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER106 B Logeswaran B 2024-06-23 21:24:36 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER106 B Logeswaran B 2024-06-23 21:16:35 Submitted 1 Y
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER106 B Logeswaran B 2024-06-23 21:41:18 Submitted 1 Y
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 2 N
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-12 22:58:06 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-12 23:27:20 Submitted 1 Y
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-13 22:50:02 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-13 23:11:43 Submitted 1 Y
TEEGRADER020 Dr. K. Kalaiselvi . Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-19 00:09:17 Submitted 2 Y
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-23 22:15:12 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-19 00:18:12 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-23 22:24:58 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . Submitted 2 N
TEEGRADER012 Dr. D. Jayamma . Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-19 05:13:40 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-19 05:22:33 Submitted 2 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-20 22:44:39 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-19 05:32:23 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . Submitted 2 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-19 05:42:12 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-19 05:58:18 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-19 06:05:55 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-19 06:14:06 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-19 06:20:52 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 2 N
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-19 18:43:17 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-19 18:51:36 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-19 22:23:14 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu 2024-06-18 20:57:57 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-18 21:10:52 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 20:31:06 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 20:35:53 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-18 21:21:04 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 20:40:46 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-17 07:40:31 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-18 21:34:05 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-17 10:00:53 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 20:45:55 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-18 21:51:29 Submitted 2 Y
NGASCEIA00067 G Prabhu 2024-06-18 22:05:14 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-17 10:07:02 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 20:50:40 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-17 10:16:13 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 20:55:40 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 21:00:50 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-18 22:17:18 Submitted 2 Y
NGASCEIA00059 D Vinoth 2024-06-24 21:05:18 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
NGASCEIA00067 G Prabhu 2024-06-19 17:35:10 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-17 10:27:53 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-19 17:44:02 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-17 10:47:01 Submitted 2 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-17 23:30:44 Submitted 2 Y
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 3 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-17 23:44:28 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
NGASCEIA00067 G Prabhu 2024-06-19 17:55:25 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-17 23:55:56 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 00:08:47 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-19 18:05:28 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 00:20:26 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
NGASCEIA00067 G Prabhu 2024-06-19 18:29:48 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-20 23:37:01 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-22 18:11:39 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 06:07:23 Submitted 2 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 06:16:48 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-22 18:20:58 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 06:26:23 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 06:39:09 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-22 18:33:06 Submitted 3 Y
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 06:49:18 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-22 18:45:18 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-22 18:57:02 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 07:12:41 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 07:24:35 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-22 19:10:09 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-22 19:38:56 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-22 20:08:40 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 2 N
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 19:43:59 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 19:50:00 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 19:58:26 Submitted 2 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 20:03:48 Submitted 2 Y
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 20:13:56 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-17 05:40:40 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 2 N
TEEGRADER104 C Sasikumar C 2024-06-20 23:33:11 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 2 N
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 2 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-17 05:41:18 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-17 06:08:32 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
NGASCEIA00067 G Prabhu 2024-06-18 17:47:31 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-18 17:55:34 Submitted 2 Y
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 1 N
NGASCEIA00067 G Prabhu 2024-06-18 18:05:19 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-18 18:15:25 Submitted 1 Y
TEEGRADER104 C Sasikumar C Submitted 2 N
NGASCEIA00059 D Vinoth 2024-06-24 19:34:50 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 19:39:41 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-18 18:24:55 Submitted 2 Y
NGASCEIA00067 G Prabhu 2024-06-18 18:53:00 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-18 19:41:51 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-18 19:50:32 Submitted 2 Y
NGASCEIA00067 G Prabhu 2024-06-18 20:10:59 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 19:45:39 Submitted 2 Y
NGASCEIA00067 G Prabhu 2024-06-18 20:19:37 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 19:49:38 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 19:53:15 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 19:59:18 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 20:03:29 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 20:07:44 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-18 20:30:12 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-18 20:38:58 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-17 06:58:35 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 20:12:31 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 20:16:49 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 20:21:30 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-17 07:14:03 Submitted 1 Y
NGASCEIA00059 D Vinoth 2024-06-24 20:26:31 Submitted 1 Y
NGASCEIA00067 G Prabhu 2024-06-18 20:49:01 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-17 07:26:52 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-20 22:35:11 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-19 20:59:50 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 2 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-20 00:22:22 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-19 21:11:25 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-19 21:29:05 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-19 21:43:04 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-20 21:13:04 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-19 21:57:09 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER106 B Logeswaran B 2024-06-16 08:45:30 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-19 22:11:44 Submitted 2 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-19 22:21:18 Submitted 1 Y
TEEGRADER106 B Logeswaran B 2024-06-24 18:27:50 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-21 19:20:41 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-21 19:29:29 Submitted 1 Y
TEEGRADER106 B Logeswaran B 2024-06-16 10:11:44 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER106 B Logeswaran B 2024-06-24 18:34:18 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-21 19:37:44 Submitted 1 Y
TEEGRADER106 B Logeswaran B 2024-06-24 19:31:50 Submitted 2 Y
TEEGRADER106 B Logeswaran B 2024-06-24 19:36:37 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER106 B Logeswaran B 2024-06-24 19:49:42 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-21 19:47:44 Submitted 2 Y
TEEGRADER106 B Logeswaran B 2024-06-24 19:44:09 Submitted 3 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-21 19:53:56 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-21 20:50:07 Submitted 1 Y
TEEGRADER016 Dr. G. N. Prasaath . 2024-06-21 20:55:47 Submitted 2 Y
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 20:52:37 Submitted 3 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 20:59:22 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 21:11:28 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 21:21:24 Submitted 2 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 21:32:33 Submitted 1 Y
TEEGRADER007 Dr. A. Sivakumar . Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 2 N
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-21 10:11:36 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-21 10:42:10 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 21:41:41 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 21:54:00 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 22:03:08 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 23:10:56 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 23:18:05 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 23:24:39 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 23:35:42 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-21 10:52:53 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 23:43:44 Submitted 1 Y
TEEGRADER012 Dr. D. Jayamma . 2024-06-23 21:31:51 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-23 21:54:25 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
TEEGRADER012 Dr. D. Jayamma . 2024-06-23 22:05:12 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-18 23:50:11 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-19 00:00:34 Submitted 3 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-17 20:05:11 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-17 20:35:59 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-18 11:48:50 Submitted 2 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-18 11:58:06 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-18 12:07:55 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-20 19:57:42 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-18 13:05:18 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-18 13:43:04 Submitted 2 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-18 14:02:59 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-18 14:12:37 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-18 08:38:17 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-18 08:57:04 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-18 15:47:33 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-18 20:05:59 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 07:50:00 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 08:36:41 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 09:00:41 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-18 09:09:42 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-18 11:22:14 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-18 11:55:54 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-18 12:31:11 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-18 20:54:27 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-18 21:07:10 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-18 21:17:06 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-18 21:26:09 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 09:32:10 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 09:45:52 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 12:01:44 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-18 21:45:20 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 12:14:19 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-18 21:56:21 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-18 22:06:45 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 12:23:21 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 12:36:04 Submitted 2 Y
TEEGRADER099 P Kathirvel P 2024-06-18 22:16:16 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 12:54:09 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-18 22:35:53 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 13:04:39 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-17 08:37:55 Submitted 2 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 14:47:28 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 14:54:32 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 15:04:52 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-16 21:55:47 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 15:20:05 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-16 21:49:34 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 15:27:27 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-16 21:20:54 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 15:33:32 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 15:40:49 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-13 21:50:36 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 15:45:47 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-13 21:10:00 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 15:50:27 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-16 21:13:10 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-16 21:01:31 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-19 14:18:23 Submitted 2 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-16 20:00:24 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-16 19:43:15 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-16 19:22:47 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-16 19:16:46 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-19 14:24:19 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-19 14:29:03 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-14 22:13:20 Submitted 2 Y
NGASCEIA00056 P Senthilkumar 2024-06-19 14:36:26 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-19 14:40:37 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-19 14:45:38 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-19 14:50:16 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-19 14:55:45 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-19 14:59:59 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-19 15:04:10 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-14 22:04:48 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-14 21:52:19 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-14 21:53:12 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-14 21:28:05 Submitted 2 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 11:28:10 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 11:38:13 Submitted 2 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 11:45:59 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-19 21:20:30 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-16 22:29:51 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-19 21:13:50 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-19 19:52:00 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 12:00:24 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 12:15:57 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 12:21:13 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 12:27:49 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-17 20:49:12 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-19 19:42:40 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 12:33:08 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-19 19:34:34 Submitted 2 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 12:38:59 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 12:45:48 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 10:18:32 Submitted 2 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 10:12:03 Submitted 2 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 12:52:25 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 12:57:12 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 14:12:53 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 14:20:02 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 09:44:26 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 14:25:34 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 10:06:06 Submitted 2 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 14:30:46 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 14:35:19 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 10:00:21 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 14:40:40 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 14:47:53 Submitted 3 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-19 18:52:28 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-19 19:24:21 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 11:41:53 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 11:49:55 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-19 19:15:21 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 14:53:28 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-13 20:10:46 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 14:58:51 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 15:03:32 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 15:10:25 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 21:30:47 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 15:14:44 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 21:25:00 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 15:54:30 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 16:01:12 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 21:19:25 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 16:08:07 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 16:14:22 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-19 18:16:44 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-19 18:11:16 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-19 18:07:00 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 21:46:15 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 21:13:50 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 16:20:01 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 16:25:52 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 21:51:17 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 16:33:15 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 21:05:47 Submitted 2 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 20:58:12 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 10:27:37 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 20:52:13 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 20:44:07 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 10:32:27 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 10:38:43 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 10:45:21 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 19:53:39 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 19:48:02 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 10:51:14 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 10:57:16 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 11:03:26 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 11:08:12 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 11:13:32 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 19:42:02 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-14 12:26:47 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-14 12:46:22 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-14 12:56:09 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-17 21:01:08 Submitted 2 Y
NGASCEIA00056 P Senthilkumar 2024-06-14 14:35:49 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-17 21:25:40 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-17 21:43:50 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-17 08:31:42 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-14 14:43:35 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 09:52:02 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 12:42:35 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-14 14:51:49 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 21:57:23 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-14 14:59:09 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 22:03:08 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-14 15:10:17 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 22:11:32 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-16 21:41:21 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-14 15:19:00 Submitted 2 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-19 22:09:13 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-14 16:02:04 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-14 16:08:34 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-14 16:16:39 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-19 22:03:40 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-19 21:58:34 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-14 16:23:12 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-19 21:51:04 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-19 21:46:58 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-14 16:31:43 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 10:36:24 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 10:44:49 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 10:52:03 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-19 21:26:28 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 12:36:09 Submitted 2 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-17 09:33:56 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-13 19:59:28 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-16 19:51:37 Submitted 2 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-16 20:06:16 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-15 11:01:26 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 10:33:26 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-14 19:53:58 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-14 19:34:54 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-14 19:12:53 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 10:52:01 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 11:06:00 Submitted 2 Y
TEEGRADER099 P Kathirvel P 2024-06-17 11:35:32 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 11:54:50 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-14 18:51:58 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-14 18:31:07 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-14 18:23:04 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-13 21:58:32 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 12:07:02 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 12:19:23 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 12:29:20 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 12:40:47 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 12:52:09 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-13 21:23:47 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-13 20:57:03 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-17 15:21:37 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 13:03:50 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 13:14:56 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 14:00:42 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-17 08:19:30 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 14:14:42 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 14:25:36 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-17 15:23:56 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 14:53:17 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 14:37:41 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 14:59:03 Submitted 2 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 15:04:40 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 15:10:34 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 14:57:51 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 15:08:04 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-17 15:34:20 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 15:17:01 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 16:12:16 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-17 15:55:48 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 16:27:04 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 16:41:17 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-17 16:06:29 Submitted 2 Y
TEEGRADER099 P Kathirvel P 2024-06-17 17:01:59 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-17 16:19:36 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 17:22:26 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 19:23:19 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-17 16:36:19 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 19:39:13 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-18 07:21:31 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-18 07:33:38 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-18 07:46:19 Submitted 2 Y
TEEGRADER099 P Kathirvel P 2024-06-18 08:28:44 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 12:49:48 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 11:44:56 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 11:53:24 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 12:07:00 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 11:57:57 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-13 21:39:19 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 12:01:58 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-13 21:31:32 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 11:58:55 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 10:45:32 Submitted 3 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 10:38:19 Submitted 2 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-18 10:30:38 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 12:23:27 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-17 08:20:03 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 12:27:55 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-17 21:48:32 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-16 21:27:45 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 12:32:45 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-17 21:34:36 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-17 21:20:36 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 12:37:42 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 12:42:12 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-17 21:16:33 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-17 21:12:48 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 12:47:03 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 12:51:52 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-17 21:06:36 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-17 09:49:20 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 12:57:31 Submitted 1 Y
TEEGRADER052 Dr. V. K. Narendirakumar . 2024-06-17 09:43:02 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-20 20:05:57 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 13:15:50 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-20 20:13:26 Submitted 2 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 14:25:08 Submitted 2 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 14:32:01 Submitted 2 Y
NGASCEIA00056 P Senthilkumar 2024-06-18 14:39:41 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 2 N
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 03:12:58 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 03:22:56 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER038 Dr. R. Aravind . Submitted 2 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 03:33:25 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 03:43:39 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 03:47:29 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 05:16:53 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 05:23:51 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 05:30:33 Submitted 2 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 05:42:00 Submitted 2 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 05:49:00 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 06:16:43 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-24 20:32:50 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 06:22:51 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 06:33:41 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-25 07:18:49 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 06:39:24 Submitted 2 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 06:56:57 Submitted 2 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 07:03:12 Submitted 3 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 07:12:56 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 07:32:34 Submitted 2 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-25 07:28:00 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-25 07:36:39 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-25 07:46:53 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-16 20:31:09 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 18:59:03 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-17 19:51:33 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 19:04:18 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 19:19:44 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-17 20:14:34 Submitted 1 Y
TEEGRADER047 Dr. T. K. Shanmugam . 2024-06-18 09:42:35 Submitted 2 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 18:49:45 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 15:19:40 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER039 Dr. R. Logambal . 2024-06-18 15:35:01 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 15:59:14 Submitted 2 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER039 Dr. R. Logambal . 2024-06-18 18:39:55 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 15:47:02 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 2 N
TEEGRADER038 Dr. R. Aravind . Submitted 2 N
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER039 Dr. R. Logambal . 2024-06-18 16:18:17 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER039 Dr. R. Logambal . 2024-06-18 18:20:09 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-19 19:31:15 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 14:48:21 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 19:58:47 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 14:30:36 Submitted 2 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 14:14:43 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 14:11:31 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER039 Dr. R. Logambal . 2024-06-18 20:04:32 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 13:21:54 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 20:19:51 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 12:40:38 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER039 Dr. R. Logambal . 2024-06-18 12:47:11 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER039 Dr. R. Logambal . 2024-06-18 00:16:02 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-17 22:50:09 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-18 00:45:13 Submitted 2 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-18 01:09:00 Submitted 2 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-18 01:16:51 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-18 01:22:17 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER037 Dr. P.E. Elango . 2024-06-22 10:50:28 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . Submitted 3 N
TEEGRADER037 Dr. P.E. Elango . 2024-06-22 11:00:26 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-22 11:43:33 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-22 12:18:48 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-22 12:30:59 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-22 12:39:11 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . Submitted 2 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER037 Dr. P.E. Elango . 2024-06-22 13:28:44 Submitted 2 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-22 14:08:05 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER037 Dr. P.E. Elango . 2024-06-22 14:16:29 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER037 Dr. P.E. Elango . 2024-06-22 14:51:04 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-17 10:29:38 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-22 15:05:12 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-22 15:17:46 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-17 10:45:25 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-22 15:29:14 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-17 10:58:09 Submitted 3 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-22 15:36:51 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-17 11:27:20 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-22 16:11:02 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-17 12:21:05 Submitted 3 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-17 12:35:28 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-22 16:23:43 Submitted 2 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-17 13:22:44 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-17 15:54:16 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-22 16:36:19 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 18:59:05 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-22 16:44:44 Submitted 2 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-22 16:55:28 Submitted 3 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 19:32:15 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . Submitted 2 N
TEEGRADER039 Dr. R. Logambal . 2024-06-17 14:18:08 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-19 18:46:24 Submitted 2 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-17 15:27:44 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . Submitted 1 N
TEEGRADER037 Dr. P.E. Elango . Submitted 1 N
TEEGRADER039 Dr. R. Logambal . 2024-06-17 14:31:09 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-17 18:48:55 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . Submitted 1 N
TEEGRADER039 Dr. R. Logambal . 2024-06-19 19:04:11 Submitted 2 Y
TEEGRADER037 Dr. P.E. Elango . Submitted 1 N
TEEGRADER039 Dr. R. Logambal . 2024-06-17 19:06:35 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . Submitted 1 N
TEEGRADER039 Dr. R. Logambal . 2024-06-17 19:19:43 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-17 19:50:43 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-17 20:10:18 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-17 20:25:54 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 19:25:01 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . Submitted 1 N
TEEGRADER037 Dr. P.E. Elango . Submitted 1 N
TEEGRADER039 Dr. R. Logambal . 2024-06-17 21:06:19 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-17 21:25:31 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . Submitted 1 N
TEEGRADER037 Dr. P.E. Elango . Submitted 1 N
TEEGRADER037 Dr. P.E. Elango . Submitted 1 N
TEEGRADER039 Dr. R. Logambal . 2024-06-17 21:49:31 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-17 22:09:17 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . Submitted 1 N
TEEGRADER037 Dr. P.E. Elango . Submitted 1 N
TEEGRADER037 Dr. P.E. Elango . Submitted 1 N
TEEGRADER037 Dr. P.E. Elango . Submitted 1 N
TEEGRADER039 Dr. R. Logambal . 2024-06-17 22:24:17 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-17 22:37:30 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . Submitted 2 N
TEEGRADER037 Dr. P.E. Elango . Submitted 1 N
TEEGRADER039 Dr. R. Logambal . 2024-06-17 22:43:42 Submitted 2 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-19 10:23:32 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-20 12:54:19 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 3 N
TEEGRADER037 Dr. P.E. Elango . 2024-06-20 15:13:48 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-20 15:27:54 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-20 15:43:37 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER037 Dr. P.E. Elango . 2024-06-20 15:59:06 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . Submitted 2 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 2 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER037 Dr. P.E. Elango . 2024-06-20 16:18:23 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-20 21:33:48 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-20 21:42:49 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . Submitted 2 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER037 Dr. P.E. Elango . 2024-06-20 22:36:40 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-20 22:50:29 Submitted 2 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-20 22:59:56 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 2 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER037 Dr. P.E. Elango . 2024-06-21 09:53:02 Submitted 3 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-21 10:18:33 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER037 Dr. P.E. Elango . 2024-06-21 10:41:59 Submitted 2 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-21 10:53:24 Submitted 1 Y
TEEGRADER035 Dr. P. Komaladevi . Submitted 1 N
TEEGRADER037 Dr. P.E. Elango . 2024-06-21 13:49:50 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-22 10:21:52 Submitted 1 Y
TEEGRADER037 Dr. P.E. Elango . 2024-06-22 10:35:31 Submitted 2 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-18 01:28:30 Submitted 2 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-18 01:34:14 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-18 01:38:31 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-18 01:44:35 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-18 01:50:01 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-18 01:53:38 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-19 06:42:02 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-19 06:51:35 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-19 06:58:16 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-19 07:03:21 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-19 07:08:11 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-19 07:14:26 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-19 07:21:42 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-19 07:26:09 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-19 07:29:14 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-19 21:32:59 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-19 21:59:32 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER038 Dr. R. Aravind . Submitted 2 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-19 22:30:23 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-19 22:44:20 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 02:14:30 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 02:22:30 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 02:33:03 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 02:38:29 Submitted 2 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 02:48:22 Submitted 1 Y
TEEGRADER050 Dr. U. Jayaprakash . 2024-06-20 02:56:11 Submitted 2 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER039 Dr. R. Logambal . 2024-06-17 23:01:42 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-17 23:24:53 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-19 10:32:19 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-19 19:56:44 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-17 23:07:55 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-19 21:03:16 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-17 23:33:31 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-17 23:37:32 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-19 21:13:34 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-20 07:35:26 Submitted 3 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-17 23:51:43 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 19:50:17 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-17 23:57:53 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 08:38:49 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-20 07:53:33 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 00:03:16 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 08:56:38 Submitted 2 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-20 19:49:23 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-20 20:27:54 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-20 20:41:03 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-19 19:16:10 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-21 11:33:29 Submitted 2 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 09:00:29 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 09:13:49 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-21 12:26:02 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 09:52:43 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 10:13:20 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-21 12:38:34 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 00:06:27 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-21 12:49:58 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 10:52:21 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 11:25:31 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-21 15:19:40 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . 2024-06-21 16:20:31 Submitted 1 Y
TEEGRADER039 Dr. R. Logambal . 2024-06-18 11:11:41 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER039 Dr. R. Logambal . 2024-06-19 21:28:56 Submitted 1 Y
TEEGRADER038 Dr. R. Aravind . Submitted 1 N
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
NGASCEIA00056 P Senthilkumar 2024-06-23 19:34:04 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-23 19:39:23 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
NGASCEIA00056 P Senthilkumar 2024-06-21 14:50:08 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER107 R Krishnaveni R 2024-06-17 11:55:41 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-21 14:55:50 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER107 R Krishnaveni R 2024-06-17 12:48:44 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-21 15:01:15 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER099 P Kathirvel P 2024-06-20 19:23:12 Submitted 2 Y
TEEGRADER099 P Kathirvel P 2024-06-20 19:33:14 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-21 06:50:34 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER099 P Kathirvel P 2024-06-20 19:46:02 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-18 16:03:28 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER107 R Krishnaveni R 2024-06-18 16:31:45 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER099 P Kathirvel P 2024-06-20 19:55:10 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-20 20:04:51 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER107 R Krishnaveni R 2024-06-18 21:25:53 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-20 20:12:39 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-20 20:19:47 Submitted 2 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER099 P Kathirvel P 2024-06-20 20:54:35 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-20 21:01:26 Submitted 2 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER099 P Kathirvel P 2024-06-20 21:13:30 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-20 21:23:15 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-18 22:00:58 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER099 P Kathirvel P 2024-06-20 21:31:26 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-19 05:18:39 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-21 07:03:24 Submitted 2 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER099 P Kathirvel P 2024-06-21 07:12:48 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00052 KA Poornima Submitted 1 N
NGASCEIA00064 R Santhosh 2024-06-19 23:18:44 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-19 23:31:47 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-19 23:43:26 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-19 23:52:12 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-20 00:02:00 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . 2024-06-13 21:07:00 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . 2024-06-19 05:56:44 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . 2024-06-19 06:24:11 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . 2024-06-19 06:45:59 Submitted 2 Y
TEEGRADER006 Dr. A. Aruljothi . 2024-06-19 07:04:39 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00064 R Santhosh 2024-06-25 13:57:21 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-25 14:18:05 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-25 14:05:19 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-20 22:18:30 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-25 14:30:45 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-20 22:20:59 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-20 22:24:09 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 2 N
NGASCEIA00064 R Santhosh Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00064 R Santhosh Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00064 R Santhosh Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-20 22:27:28 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-20 22:30:34 Submitted 1 Y
NGASCEIA00064 R Santhosh Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-20 22:44:05 Submitted 2 Y
NGASCEIA00064 R Santhosh Submitted 1 N
NGASCEIA00064 R Santhosh Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-20 22:55:08 Submitted 1 Y
NGASCEIA00064 R Santhosh Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-20 22:57:49 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-20 23:00:08 Submitted 1 Y
NGASCEIA00049 P Kalaivani 2024-06-24 21:49:01 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00049 P Kalaivani 2024-06-25 11:07:28 Submitted 1 Y
NGASCEIA00049 P Kalaivani 2024-06-25 11:22:55 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00064 R Santhosh Submitted 1 N
NGASCEIA00049 P Kalaivani 2024-06-25 11:31:37 Submitted 1 Y
NGASCEIA00064 R Santhosh Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00064 R Santhosh Submitted 1 N
NGASCEIA00049 P Kalaivani 2024-06-25 11:46:27 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00049 P Kalaivani 2024-06-25 12:02:02 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-15 12:40:12 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-18 20:21:04 Submitted 2 Y
NGASCEIA00064 R Santhosh Submitted 1 N
TEEGRADER108 P Mohanambal P 2024-06-18 20:35:25 Submitted 1 Y
NGASCEIA00064 R Santhosh Submitted 1 N
TEEGRADER108 P Mohanambal P 2024-06-19 13:38:39 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-19 13:46:53 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-19 13:53:01 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-19 14:11:01 Submitted 2 Y
NGASCEIA00049 P Kalaivani 2024-06-25 13:26:34 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-19 14:20:45 Submitted 2 Y
NGASCEIA00049 P Kalaivani 2024-06-25 13:37:52 Submitted 1 Y
NGASCEIA00049 P Kalaivani 2024-06-25 13:48:59 Submitted 1 Y
NGASCEIA00049 P Kalaivani 2024-06-25 14:00:14 Submitted 1 Y
NGASCEIA00049 P Kalaivani Submitted 1 N
NGASCEIA00049 P Kalaivani Submitted 2 N
TEEGRADER108 P Mohanambal P 2024-06-19 14:27:41 Submitted 1 Y
NGASCEIA00064 R Santhosh Submitted 1 N
TEEGRADER006 Dr. A. Aruljothi . 2024-06-13 21:25:13 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . 2024-06-20 07:10:08 Submitted 1 Y
NGASCEIA00049 P Kalaivani Submitted 1 N
TEEGRADER108 P Mohanambal P 2024-06-19 14:37:27 Submitted 2 Y
TEEGRADER006 Dr. A. Aruljothi . 2024-06-20 07:20:05 Submitted 3 Y
NGASCEIA00049 P Kalaivani Submitted 1 N
TEEGRADER108 P Mohanambal P 2024-06-19 15:21:20 Submitted 1 Y
NGASCEIA00049 P Kalaivani Submitted 1 N
TEEGRADER006 Dr. A. Aruljothi . 2024-06-20 07:28:57 Submitted 1 Y
NGASCEIA00049 P Kalaivani Submitted 1 N
NGASCEIA00049 P Kalaivani Submitted 1 N
TEEGRADER006 Dr. A. Aruljothi . 2024-06-21 05:44:53 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . 2024-06-21 06:05:28 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-19 15:31:43 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . 2024-06-22 19:02:28 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . 2024-06-24 17:58:40 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-19 15:38:34 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-19 15:46:24 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-19 15:52:19 Submitted 1 Y
NGASCEIA00049 P Kalaivani Submitted 1 N
TEEGRADER108 P Mohanambal P 2024-06-19 15:59:27 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-19 16:07:52 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . 2024-06-24 18:18:01 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . 2024-06-24 18:34:49 Submitted 2 Y
TEEGRADER108 P Mohanambal P 2024-06-20 00:36:30 Submitted 1 Y
NGASCEIA00049 P Kalaivani Submitted 2 N
TEEGRADER108 P Mohanambal P 2024-06-20 00:52:34 Submitted 1 Y
NGASCEIA00049 P Kalaivani Submitted 1 N
TEEGRADER108 P Mohanambal P 2024-06-20 01:02:15 Submitted 3 Y
TEEGRADER108 P Mohanambal P 2024-06-20 01:13:07 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . 2024-06-24 18:49:47 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . 2024-06-24 19:09:10 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . 2024-06-24 19:23:37 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-20 09:47:46 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-20 09:53:04 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . 2024-06-24 19:38:23 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
NGASCEIA00056 P Senthilkumar 2024-06-20 10:02:53 Submitted 2 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER006 Dr. A. Aruljothi . Submitted 2 N
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
NGASCEIA00056 P Senthilkumar 2024-06-20 10:09:51 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
NGASCEIA00056 P Senthilkumar 2024-06-20 10:18:59 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-20 10:24:18 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 01:41:09 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-20 00:52:31 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00064 R Santhosh 2024-06-20 18:35:29 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-20 18:45:57 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-20 20:24:24 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00064 R Santhosh 2024-06-20 21:43:10 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-20 21:26:31 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00058 N Balusamy 2024-06-20 21:28:59 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-20 22:11:35 Submitted 2 Y
NGASCEIA00058 N Balusamy 2024-06-20 21:31:25 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-20 21:46:44 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-20 22:12:53 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-20 22:29:58 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00064 R Santhosh 2024-06-20 22:37:30 Submitted 1 Y
NGASCEIA00058 N Balusamy 2024-06-20 22:15:24 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00064 R Santhosh 2024-06-20 22:46:34 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-20 22:57:50 Submitted 1 Y
NGASCEIA00064 R Santhosh 2024-06-20 23:22:11 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 2 N
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00064 R Santhosh 2024-06-20 23:31:27 Submitted 1 Y
TEEGRADER101 G Sri Sakthinayaki G Submitted 1 N
NGASCEIA00056 P Senthilkumar 2024-06-20 10:50:12 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-20 12:51:23 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
NGASCEIA00056 P Senthilkumar 2024-06-20 12:54:30 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 02:25:33 Submitted 2 Y
TEEGRADER108 P Mohanambal P 2024-06-20 09:40:12 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 09:48:34 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-20 12:58:00 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-20 13:01:58 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 2 N
NGASCEIA00056 P Senthilkumar 2024-06-20 13:24:08 Submitted 2 Y
NGASCEIA00056 P Senthilkumar 2024-06-20 13:29:20 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-20 13:36:39 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 12:20:31 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-20 13:47:12 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-20 13:53:29 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-20 14:03:36 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 12:26:37 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-20 15:54:55 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 12:33:33 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 12:39:55 Submitted 2 Y
NGASCEIA00056 P Senthilkumar 2024-06-20 15:59:55 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER108 P Mohanambal P 2024-06-20 12:46:46 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-20 16:07:43 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 12:53:41 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 12:59:28 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-20 16:12:23 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
NGASCEIA00056 P Senthilkumar 2024-06-20 16:16:35 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 13:04:54 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-20 16:20:33 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-20 16:24:42 Submitted 2 Y
NGASCEIA00056 P Senthilkumar 2024-06-21 09:49:26 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-21 14:11:27 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
NGASCEIA00056 P Senthilkumar 2024-06-23 19:29:27 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
TEEGRADER108 P Mohanambal P 2024-06-20 13:37:10 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-21 14:23:01 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-21 14:27:53 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 13:43:04 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 13:48:00 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-16 12:21:09 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 2 N
TEEGRADER107 R Krishnaveni R 2024-06-16 16:03:50 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-16 19:01:41 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-17 09:33:55 Submitted 1 Y
TEEGRADER107 R Krishnaveni R 2024-06-17 11:12:39 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-21 14:34:30 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-20 10:28:33 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
NGASCEIA00056 P Senthilkumar 2024-06-20 10:32:52 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-20 10:37:55 Submitted 1 Y
TEEGRADER006 Dr. A. Aruljothi . Submitted 1 N
NGASCEIA00056 P Senthilkumar 2024-06-20 10:42:02 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 01:52:45 Submitted 1 Y
TEEGRADER108 P Mohanambal P 2024-06-20 02:02:39 Submitted 1 Y
NGASCEIA00056 P Senthilkumar 2024-06-20 10:45:29 Submitted 1 Y
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00067 G Prabhu Submitted 1 N
NGASCEIA00066 K Madheswaran 2024-06-19 21:31:28 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-19 21:35:55 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-19 21:40:15 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-19 21:44:29 Submitted 1 Y
NGASCEIA00066 K Madheswaran 2024-06-19 21:49:30 Submitted 1 Y
NGASCEIA00052 KA Poornima Submitted 1 N
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
TEEGRADER104 C Sasikumar C 2024-06-20 19:08:07 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-21 06:31:41 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-22 15:25:43 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
NGASCEIA00061 S Senthilkumar 2024-06-22 15:28:55 Submitted 1 Y
TEEGRADER104 C Sasikumar C 2024-06-20 19:21:26 Submitted 1 Y
TEEGRADER104 C Sasikumar C 2024-06-20 19:41:37 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
TEEGRADER104 C Sasikumar C 2024-06-20 20:24:41 Submitted 1 Y
TEEGRADER104 C Sasikumar C 2024-06-20 20:36:10 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-22 15:37:09 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
TEEGRADER060 Dr.V. Azhaharasan . Submitted 3 N
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
NGASCEIA00061 S Senthilkumar 2024-06-22 15:53:42 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
NGASCEIA00061 S Senthilkumar 2024-06-22 16:09:29 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-22 16:14:13 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 1 N
NGASCEIA00061 S Senthilkumar 2024-06-22 17:44:07 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-17 05:34:20 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-17 05:34:58 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-17 05:35:35 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
TEEGRADER104 C Sasikumar C 2024-06-20 22:42:43 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-17 05:36:11 Submitted 2 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-17 05:37:09 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-17 05:37:42 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-17 05:38:22 Submitted 1 Y
TEEGRADER104 C Sasikumar C 2024-06-20 22:50:33 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
TEEGRADER104 C Sasikumar C Submitted 1 N
TEEGRADER104 C Sasikumar C 2024-06-20 23:24:26 Submitted 1 Y
TEEGRADER045 Dr. S. Krishnakumar . 2024-06-17 05:39:22 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
NGASCEIA00061 S Senthilkumar 2024-06-20 05:13:29 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-22 19:59:33 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-22 20:11:16 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-22 20:26:41 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-23 20:19:02 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 05:18:31 Submitted 2 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 05:33:34 Submitted 1 Y
TEEGRADER106 B Logeswaran B Submitted 1 N
NGASCEIA00061 S Senthilkumar 2024-06-20 18:01:48 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 05:40:14 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-23 20:28:36 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-23 20:40:49 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-23 20:47:40 Submitted 1 Y
TEEGRADER106 B Logeswaran B Submitted 1 N
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-23 20:54:49 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 07:09:54 Submitted 1 Y
TEEGRADER106 B Logeswaran B Submitted 1 N
TEEGRADER106 B Logeswaran B Submitted 1 N
NGASCEIA00061 S Senthilkumar 2024-06-20 07:07:54 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 07:08:29 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 18:21:03 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 18:28:54 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 18:35:34 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-23 21:06:18 Submitted 1 Y
TEEGRADER106 B Logeswaran B Submitted 1 N
NGASCEIA00061 S Senthilkumar 2024-06-20 18:39:45 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-23 21:18:08 Submitted 1 Y
TEEGRADER106 B Logeswaran B Submitted 1 N
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-23 21:28:19 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-24 06:10:40 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 18:48:21 Submitted 3 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 18:56:14 Submitted 1 Y
TEEGRADER106 B Logeswaran B Submitted 1 N
TEEGRADER106 B Logeswaran B Submitted 1 N
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-24 06:17:43 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 19:03:28 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-24 06:26:49 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-24 06:36:23 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-24 06:43:17 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-24 06:57:13 Submitted 1 Y
TEEGRADER106 B Logeswaran B Submitted 1 N
NGASCEIA00061 S Senthilkumar 2024-06-20 19:10:26 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-24 07:04:42 Submitted 1 Y
TEEGRADER106 B Logeswaran B Submitted 1 N
TEEGRADER106 B Logeswaran B Submitted 1 N
NGASCEIA00061 S Senthilkumar 2024-06-20 19:29:11 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-24 07:16:33 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-24 19:12:09 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 19:33:06 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 19:37:31 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-24 19:21:06 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 19:49:02 Submitted 1 Y
TEEGRADER106 B Logeswaran B Submitted 1 N
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-24 19:32:28 Submitted 1 Y
TEEGRADER106 B Logeswaran B Submitted 1 N
TEEGRADER106 B Logeswaran B Submitted 1 N
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-24 19:46:32 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-24 19:57:42 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-24 20:09:14 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-20 00:00:21 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-20 00:15:07 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-20 00:07:21 Submitted 2 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-20 00:15:14 Submitted 2 Y
TEEGRADER099 P Kathirvel P 2024-06-17 20:08:48 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-20 00:21:08 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 20:00:42 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-20 00:24:42 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-20 00:28:02 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 19:49:31 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-20 00:29:59 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-17 14:48:02 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-19 21:43:45 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-20 00:33:24 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-19 21:57:12 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-19 22:08:46 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-19 22:57:18 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-20 01:00:25 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 06:20:47 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-24 14:43:51 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 06:30:10 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 06:39:01 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-18 20:08:06 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-18 20:16:40 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 06:49:46 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 06:56:34 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 07:03:39 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-18 20:27:31 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 07:09:14 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 07:16:33 Submitted 2 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-18 20:55:55 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-18 21:03:03 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 07:24:36 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 07:29:12 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 07:34:11 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-18 21:11:46 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-18 21:25:36 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 07:40:39 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 11:29:18 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-18 21:36:38 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-18 21:44:33 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-19 14:22:49 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 12:27:04 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 12:45:18 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-19 15:36:56 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-19 15:45:15 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 13:47:57 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-19 15:53:01 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 17:42:23 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-19 15:59:21 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-19 16:04:17 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-19 19:22:16 Submitted 2 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 17:49:17 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 18:02:17 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-19 19:29:48 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-19 19:37:15 Submitted 2 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 18:13:01 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 18:20:03 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-19 19:46:19 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-19 19:56:18 Submitted 2 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 18:53:17 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 19:01:24 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-19 20:09:04 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 19:07:47 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-19 20:18:31 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-19 20:33:05 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-19 20:41:02 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 19:22:34 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-20 11:35:29 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 19:38:57 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 19:50:36 Submitted 2 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 19:56:23 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 20:01:48 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 20:06:52 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-20 11:46:35 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 20:11:44 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-19 07:57:19 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-19 08:07:22 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-19 20:22:16 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-19 20:33:35 Submitted 2 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-19 22:28:43 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 13:15:54 Submitted 2 Y
TEEGRADER099 P Kathirvel P 2024-06-19 21:12:32 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-19 21:28:12 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 13:29:31 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 13:36:16 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-19 21:39:21 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-20 06:58:06 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 13:42:51 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 13:47:31 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-20 07:15:01 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 13:54:03 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 13:59:13 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 14:03:42 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-20 07:25:06 Submitted 2 Y
TEEGRADER099 P Kathirvel P 2024-06-20 07:31:47 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-20 07:40:24 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 14:09:30 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-20 07:47:31 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-25 14:17:09 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-20 07:55:12 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-19 23:50:17 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-20 08:02:25 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-20 08:10:35 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-20 08:17:27 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-20 18:51:41 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-20 19:04:14 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-20 19:14:52 Submitted 2 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-19 23:53:08 Submitted 1 Y
TEEGRADER053 Dr. V. P. Ananthi . 2024-06-19 23:57:15 Submitted 1 Y
TEEGRADER099 P Kathirvel P 2024-06-18 10:44:27 Submitted 1 Y
TEEGRADER106 B Logeswaran B Submitted 1 N
TEEGRADER106 B Logeswaran B Submitted 2 N
NGASCEIA00061 S Senthilkumar 2024-06-20 20:02:05 Submitted 1 Y
TEEGRADER106 B Logeswaran B Submitted 1 N
NGASCEIA00061 S Senthilkumar 2024-06-20 20:06:06 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 20:14:55 Submitted 1 Y
TEEGRADER106 B Logeswaran B Submitted 1 N
TEEGRADER106 B Logeswaran B 2024-06-24 20:06:24 Submitted 1 Y
TEEGRADER106 B Logeswaran B 2024-06-24 20:14:39 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 21:13:34 Submitted 1 Y
TEEGRADER105 C Prabhu C 2024-06-19 15:33:45 Submitted 2 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 22:47:56 Submitted 1 Y
TEEGRADER105 C Prabhu C 2024-06-19 15:49:50 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-25 06:52:16 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-25 07:03:50 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 22:50:49 Submitted 1 Y
TEEGRADER105 C Prabhu C 2024-06-20 12:54:37 Submitted 1 Y
TEEGRADER105 C Prabhu C 2024-06-21 13:05:25 Submitted 1 Y
TEEGRADER105 C Prabhu C 2024-06-21 13:41:50 Submitted 2 Y
TEEGRADER105 C Prabhu C 2024-06-21 13:50:35 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-25 07:12:10 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-25 07:40:53 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 22:54:15 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-25 07:47:48 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 23:07:32 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 23:11:03 Submitted 1 Y
TEEGRADER105 C Prabhu C 2024-06-21 13:58:41 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-25 07:59:26 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 23:14:38 Submitted 1 Y
TEEGRADER105 C Prabhu C 2024-06-21 14:09:57 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
TEEGRADER105 C Prabhu C 2024-06-21 14:20:42 Submitted 1 Y
TEEGRADER105 C Prabhu C 2024-06-22 02:36:08 Submitted 1 Y
TEEGRADER105 C Prabhu C 2024-06-22 14:30:03 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 23:20:17 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
TEEGRADER105 C Prabhu C 2024-06-22 14:41:07 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 23:37:11 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 23:48:04 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . Submitted 2 N
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
NGASCEIA00061 S Senthilkumar 2024-06-20 23:33:04 Submitted 1 Y
TEEGRADER105 C Prabhu C 2024-06-22 14:59:41 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-21 00:01:23 Submitted 2 Y
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
TEEGRADER105 C Prabhu C 2024-06-23 10:12:33 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
NGASCEIA00061 S Senthilkumar 2024-06-20 23:57:39 Submitted 1 Y
TEEGRADER105 C Prabhu C 2024-06-24 19:24:44 Submitted 1 Y
TEEGRADER105 C Prabhu C 2024-06-24 20:45:41 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 23:54:18 Submitted 1 Y
TEEGRADER105 C Prabhu C 2024-06-25 01:53:14 Submitted 1 Y
TEEGRADER105 C Prabhu C 2024-06-25 02:23:57 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-21 06:17:21 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-21 06:24:22 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
TEEGRADER105 C Prabhu C Submitted 2 N
TEEGRADER105 C Prabhu C Submitted 1 N
TEEGRADER060 Dr.V. Azhaharasan . Submitted 1 N
NGASCEIA00047 S Santhoshkumar 2024-06-20 20:16:22 Submitted 2 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 20:23:02 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 20:30:14 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 20:37:51 Submitted 2 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 20:41:35 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 21:07:58 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-20 11:53:44 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 21:14:22 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 21:20:21 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 21:26:07 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 21:31:17 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-20 12:07:08 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 21:39:47 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-20 12:12:56 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-20 12:20:56 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 21:43:54 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-20 12:31:52 Submitted 2 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 21:47:54 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 21:53:30 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-20 12:40:58 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-20 12:49:09 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-20 12:55:31 Submitted 2 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-22 18:50:46 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-22 19:07:31 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-22 19:28:55 Submitted 1 Y
NGASCEIA00047 S Santhoshkumar 2024-06-20 21:58:46 Submitted 2 Y
NGASCEIA00061 S Senthilkumar 2024-06-19 05:43:27 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-22 19:44:02 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 04:40:57 Submitted 1 Y
TEEGRADER060 Dr.V. Azhaharasan . 2024-06-22 19:51:47 Submitted 1 Y
NGASCEIA00061 S Senthilkumar 2024-06-20 05:08:55 Submitted 1 Y
Remarks

Only secondary theoretical data are collected and presented , their no evidence for data analysis

Commodity trading and investment awareness are presented clear

Financial performance of HDFC Bank is sufficient, to be strengthened the objectives and suggestions are linked to in the future Study
No proper structure of research report preparation
Proper structure of the research report is not followed
No structured format of report and no tools used
Secondary theoretical aspects only described, in future to use more statistical tools, designing researach methodology, no evidence for data analysis etc.
To strengthen recommendation tools and research methodology

Concept of the research is not elaborate , apply advance tools, suggestion are not adequate data analysis part is not adequate

Improper structure of the research report and few content only presented
Future research should examine the long-term impact of these tactics and explore new technical breakthroughs to maximize resource allocation
This report presented only secondary data derived based on that all content are described , it is a case study

This report explores the role of IMC planning through literature review and no proper report structure
Research methodology are not framed and tools are not used

in future study to use more statistical tools ,structured methodology and follow proper report content

Three tools used as mentioned but only one tool percentage is used no proof for data analysis with tabular format
No evidence for data analysis and strengthen recommendations and implications in future study

The study covers only theoretical aspects there is no proper objectives methodology tools data collection data analysis recommendation and conculsions

Satisfactory
Their is no proof for tools used and analysis part and theoretical aspects are missing
Satisfactory
The project was gathered information from the books and websites, no practical aspects
Satisfactory
Suggested to use more statistical tools, to add more questions related to strategic workforce management
Theoretical aspects only recorded , no tools used

Satisfactory
Satisfactory

In this study used advanced statistical tools no summarized findings and suggestion are limited
Study objectives are not clearly framed tools not used and no evidence for data analysis

Satisfactory

Satisfactory

suggestion
To strengthen recommendations
Good
Advanced tools to be used and need to increase suggestion that help to society, it is included in future research
The study covers only theoretical aspects, need to add more tools, offered valuable suggestions
This research is to analyse the advantages, difficulties, and optimal strategies related to the adoption and utilization of e-procurement systems, but to be use
Research methodology is to be improved in future study based on sampling type, size, research type, tools used
The study covers only theoretical aspects, No proof for tools used , data analysis and summary drawn

use innovative techniques, proper alignment, tools not used and improve the concept in future research
Recommendations and techniques are used well but need to improve some areas

various tools are used to analyse the data


set more objectives
Conclusions and recommendations are generally good and could improve some area
The conclusions and recommendations are clearand well supported by findings
The research project is good but may require further clarification
A research project that are well designed but require to give further clarification
hypothesis test needed
set hypothsis for testing data
The research project is good but may require further clarification

test the hypothsis for this study


The research project is good but may require further clarification

set hypothsis and test it


The research project data collection methods are appropriate for the study
set more objectives and test the hypothesis
set hypothesis and need to test it
Need to give techniques and tools for analysis of data
use more tools to analyse the data

The data collection methods could be improved for greater reliability


frame hypothesis and test it
The recommendations and conclusions are good but could focus on tools and techniques

Conclusions ,data analysis are good but could concentrate on tools and techniques
use more techniques to analyse the data

more tools used to analyse the data


set hypothesis and test it
more tools are used to analyse the data
Require to concentrate on data analysis and need more bibliography
Need to concentrate on data analysis ,tools and techniques
The research project is good but may require further clarification
The research project is good but may require further improvement

The research project is good but may improve some tools and techniques
The research project are generally good but should focus on recommendations and conclusion
The research project is good but may require further clarification
The research project is good but may require to focus on tools and data analysis
The recommendations and conclusion of the study are well presented but require to focus on further clarity

The research project is good but may require further improvement

The recommendations and conclusion are well presented but required to improve use of techniques
The research project is good but may require further clarification

The research project is good but may require improve clarification of the study
Recommendation and data analysis are well presented but could focus on some technical areas
This study covers all the objectives but their suggestion are not related few objectives
A research project are good but should concentrate on innovative techniques in further study
The study covers all the aspects but some of the places having drawbacks
The research project is good but may require further clarification

This covers sustainability Integration in Operations and offered recommendations based on theoretical concept
The study covers all the aspects by the way of collecting theoretical aspects but need to use statistical tools based on that revel recommendations

The research project is good but may require further clarification


To be used more tools and techniques to analysis the problem
The research project is good but may require further improvement
Recommendation and conclusions are well explained but require to give more bibliography reference for further studies
Required to use more tools and techniques for data analysis
The research project is good but may require further clarity
The study focused all the content but to increase the sample size as more
The research project are generally good but could concentrate on recommendations and understanding of the study
The research project is good but may require further clarification
The research project is good but may require further improvement
A research project is presented well but could improve conclusions and data analysis in further studies
The research project is good but may require further clarification
The research project is good but may require further improvement
Investors trading pattern and preferences towards derivatives market in Surat City good research work.
and pension sector need to improve strong in-depth knowledge about study work and usefulness suggestions are required
The study are concluded direct impact of logistics on consumer satisfaction but to increase sample size and implement advance tools.
Research work on E- banking need to improve conceptualization key areas of subject and use atleast any 2 specific tools for data analysis refer more article

Recruitment process for V-konnect associates need to improve statement of the problem, use significant approach for analysis of data and more recommend
Behaviour in finance the Indian banking sector need to improve statement of problem clearly defined and well clearly derived the project recommendation t
Good research work on sharekan Ltd investors awareness towards derivatives market
Research work done clearly but it need to clearly presented the project report
Microfinance with respect to poverty alleviation and socio economic empowerment need to improve project report
Objectives, methodology and findings & conclusion are clearly explained.
Need relevant answer and there is no clarity of the study
Objectives, methodology, analysis and findings and conclusions are clearly explained.
Good presentation but need more explanation.
Recommendation are well explained but could concentrate on innovation techniques
There is only advantages and disadvantages of 3PL .This not correct format of research project
The research project is good but may require further clarification
The objectives and data analysis are not clear and there is no techniques and tools are used
Objectives and Methodologies are explained elaborately.
A Techniques and tools are efficient but require to focus on some areas
Wonderful presentation, Objectives and analysis are elaborately explained.
biliography is missing
hypothsis is missing
The research project is good but may require further clarification
set hypothsis for testing

To require more improvement for this project


using various analytical tools for analyse the data

varoius tools are used to analyse the data


The recommendations and objectives are well presented but need to improve data analysis
strong bibliography is needed

To more focus on Analysis of data, tools and techniques


The study covers the few area not concentrated the methodology framing, tools used and analysis part, it as like secondary data presentation

The study reveals innovative adaptive practice by way of collecting theory aspects , no standardized format of project
This study covered all the aspects of the research but only basic tool is used and to be offered recommendation for all objectives
Satisfactory

This study covers the information driven from materials and experts no statistical tools are not used recommendations are based on secondary data gathered
Satisfactory
special reference to SBI needed to add more statistical tool recommendations are not adequate in future study
Research done on importance of Negotiation Skills and on identification of key skills only but increasing sample size , no proof for data analysis and recom

To be add innovative techniques , tools offered valuable suggestion linked with objectives
This study focused secondary data no proof for tools used but tools listed and clear suggestions are not given

Second hand information only presented and not proper research report format
To be presenting the data is methodically structured

To be present at research report format , no proper alignment no tools used


No proof for data analysis and tool used to be wrote proper suggestions
Research report content is not presented all tools not used
All research report content is not presented and content copied from another source
Not covered all research content theoretical aspects only presented from some any sources to copied
No Proper alignment and presentation , only secondary information is presented and no tools used
to be improve methodology tools, implementation recommendation at future study
Report preparation not clear and not included all content , content is copied from another source no data collection
Research design tools used and offered valuable suggestion are to be improve
In this study mainly covered theoretical frames to be improve the tools used methodology framework in future research
Good research work on study of fintech innovation the future banking
Good research work frauds and scams on banking sector in India suggest to improve project report
The study provided recommendations for improving brand reputations and implementations of sustainable supply chain practices
Working capital management need to improve scope of objectives clearly and use any one special technique for data analysis
Analytical study of financial derivatives need to improve in-depth knowledge about research topic use significant innovative technology
Suggest to improve capital adequacy,asset quality, liquidity of banking model camel
Uk e-commerce market in depth knowledge needed about research topic some significant approach also used for research
To be concentrate research methodology and tools used for data analysis
Finding are not summarized and few recommendations only given to the objective
Day to day banking operations for Kotak Mahindra Bank statement of the problem not clearly defined,data collection was poor, no specific tools used for an
Foreign direct indepth knowledge needed about the given topic
Future derivatives in india first clearly defined the objectives of scope, use any significant approach for analysis of data and solving the problem finally ref
Performance evaluation for mutual fund padamic covid time Research work good suggest to improve mutual fund fourd detection ya technique also
Good research work on digital transmission in SBI suggest to refer more articles, journal and weblinks
Good research work need to focus on use any significant innovative technologies to slove the problem

Good
Satisfactory
Satisfactory
The study is to evaluate and analyze the operational strategies that FedEx employs, but not used advanced tools and findings are not summarized
Productive implementation technique and TQM are evaluated through customer satisfaction, employee participation, etc but in analysis part some content a
Satisfactory
Good
Good
Satisfactory
study covers online pharmacies business model and their future scope in the form of theoretical
The study examine the government policies, regulations and incentives schemes but not collect primary data and analysis
Satisfactory

Satisfactory
The study analysis various aspects of blood bank operations and identified several challenges and potentials but data collection and analysis is missing
Satisfactory
The study covers supply chain management and operation management in India through the background of related theory aspects
agricultural creation.
The project aims to introduce a new human resource management system designed to execute all specified tasks within the office with minimal time, effort

AI technologies have rapidly integrated into various industries, promising efficiency, innovation, and cost-effectiveness.

Cyber attacks targeting the Internet of Things (IoT) represent a critical and evolving threat landscape. These attacks exploit vulnerabilities in IoT devices, o
The project entitled as CERT Technologies and the importance of evaluating software service delivery effectiveness. It may include background informatio
The project entitled as IVR systems were increasingly used in healthcare settings for Covid-19-related inquiries, appointment scheduling, and disseminating

The project as IT support ensures that network infrastructure, including servers, routers, and firewalls, are configured securely to prevent unauthorized acc

external attackers, insiders, malware, and natural disasters.

The future of OCR technology using is promising and has great potential for further advancements and innovation is expected to grow in the future.
Need proper documentation format and the student must include statement of the problem, research design, research gap, scope of the study, use two or mo

This project relates to marketing management subject.

good

good
alignment properly
alignment properly
alignment proper

alignment proper

alignment proper

alignment proper

alignment proper

alignment properly

Project has covered many things, some notable results are also there and recommendations may be much better.
alignment properly

alignment properly
alignment properly

good

alignment properly

good

alignment properly

good
“Optimizing Demand Forecasting for Customized Brass Products: A Study of Advanced Models in the Brass Industry”, information are provided to the pro
"STUDY ON OPEARTIONS MANAGEMENT RSPL LTD.", information are provided to the projects are in good manner.
alignment properly
“Study on Examine the unique challenges and strategies involved in anaging operations for e-commerce fulfillment with Reference to Meesho." informatio
SUPPLY CHAIN MANAGEMENT IN FMCG SECTOR IN INDIA", information are provided to the projects are in good manner.
need some link pages and bibliography

average
average

"IMPACT OF OPERATIONS MANAGEMENT ON RETAILING IN INDIA”, information are provided to the projects are in good manner.
good
good
“A STUDY OF CONSUMER BEHAVIOR TOWARDS RELIANCE JIO” information are provided to the projects are in good manner.
good
alignment properly
"Analyzing the Indian Electric Vehicle Market and Engineering a Cutting-Edge Sports EV", information are provided to the projects are in good manner.

"Impact of Digitalization on Banking Industry", information are provided to the projects are in very good manner.
alignment properly
good

alignment was good


“AN ORGANIZED METHOD FOR MANAGEMENT OPERATIONAL RISK IN THE INDIAN BANKING SECTOR”, information are provided to the p
"Product diversification in Monte Carlo Industry", information are provided to the projects are in good manner.

"CUSTOMER RELATIONSHIP MANAGEMENT IN MANIPAL HOSPITALS ORGANIZATION", information are provided to the projects are in good
“Optimizing Efficiency in Oil and Gas Construction Projects in India: A Lean Construction Approach” information are provided to the projects are in good
alignment properly

alignment properly

proper alignment
"A Study of Enterprise Resource Planning System", information are provided to the projects are in good manner.

proper alignment
alignment properly
proper alignment
alignment properly

“Analytical study to reduced operation cost of product by driving improvement through Lean Six sigma tool.”, information are provided to the projects are
"IMPLEMENTING SUSTAINABLE OPERATIONAL PRACTICES IN TESLA", information are provided to the projects are in good manner.

alignment properly
“A BASIC EXAMINATION OF MODIFYING WORLDWIDE HUMAN ASSET PRACTICES” information are provided to the projects are in very good

good
proper alignment
good

"STUDY OF OVERALL EQUIPMENT EFFICIENCY (OEE) OF VISHVA ELECTROTECH LTD. (POLAR)", information are provided to the projects a
"COMPARATIVE STUDY OF CSR IN MEL AND INDIA", information are provided to the projects are in good manner.
"Impact of Electric Vehicle on Environment and Economy", information are provided to the projects are in average manner.

the project topic is in current market points more of suggestion that keep more adequate information not only in website more form customer points of view

alignment properly
alignment properly

alignment properly

good
proper alignment

the overall project points are ok the points written is more realistic in current situation of problem so this will help to rectify

good

alignment properly
“STUDY ON THE ROLE OF CUSTOMER FEEDBACK IN SHAPING OPERATION STRATEGIES”, information are provided to the projects are in go

overall of the project mention security ways to provide good wi-fi connection, specify new techniques
project to clear in content and specify clear objectives and new tools to test the data
good
"OPPORTUNITIES AND CHALLENGES IN SUSTAINABLE SUPPLY CHAIN", information are provided to the projects are in good manner. Need to im
average
“A STUDY ON IMPLEMENTATION OF QUALITY MANAGEMENT“, information are provided to the projects are in very good manner.

good
average

good
average
“A STUDY ON LOGISTICS & SUPPLY CHAIN MANAGEMENT PRACTICES ADOPTED BY DINSHAW’S DAIRY FOODSLTD.” information are

“THE ROLE OF MERCHANDISER IN MANAGING THE SUPPLY CHAIN", information are provided to the projects are in good manner.
average
average
"The impact of inventory management on the supply chain within HCL Company", information are provided to the projects are in very good manner.

"Problems encountered in planning, operating, and controlling production of goods and services.", information are provided to the projects are in average m
"A STUDY ON THE IMPLEMENTATION OF LEAN SIX SIGMA PRACTICES IN CAPGEMINI", information are provided to the projects are in very
“Gen Z Perspective of E-commerce Logistic Service Quality on Home Delivery during Pandemic: Customer Satisfaction and Loyal", information are provi

"STUDY ON OPERATIONS PLANNING AND SCHEDULING SYSTEM WITH REFERENCE OF TATA MOTORS LTD.", information are provided
average

"Total productive Maintenance (TPM) Implementation : Case study of Parker Hanifin India Pvt Ltd", information are provided to the projects are in good m
good
average
good
AND BANK TERMINALS” information are provided to the projects are in very good manner.
good
aliggnment properly

alignment properly
alignment properly

good

alignment properly
good
good
good

alignment properly

alignment properly
alignment properly

good

alignment properly

alignment properly

technologies are being adopted and utilized across various business operations.

applications, and devices aimed at assisting parents in child-rearing activities.

The project entitled as AI technologies are revolutionizing how businesses operate, particularly in optimizing customer experiences, enhancing operational
Its importance continues to grow as businesses increasingly rely on data to navigate and succeed in a data-driven world.

The project entitled as "Empowering Rural Entrepreneurs: Leveraging the National Optical Fiber Network (NOFN) to Drive Digital India's Rural Economy

The project entitled as impact of cloud computing adoption on organizational efficiency and cost savings reveals significant advantages and transformative
of business operations, decision-making, and stakeholder engagement

The Project entitled as AI improves decision making processes, automates repetitive tasks and optimizes human resource roles thus resulting in better opera
alignment properly
the project are ok with the topic but tools and objective framing and more methodology parts of answer are little missing
alignment properly

excellent bibliography
alignment properly
alignment properly
alignment properly
THE TABLE OF CONTENT SHOULD IN page number required more alignment required

the project should concentrate with the objective and conclusion what find the topic and more points of answer project to find

alignment proprly

the project to be cover with the problems and should in full coverage to present of six sigma techniques to be concluded
alignment properly

alignment properly

alignment properly
alignment properly
alignment properly

alignment properly

alignment properly
alignment properly
alignment proper

alignment properly

alignment proper
The overall usability bibliography part and conclusion may more depth source to use

alignment proper

alignment proper

The overall grade is average. Application of statistical tools is very less in number and only descriptive tools are applied.
The overall grade is below average. No conclusions are given in the report and only moderate level of linkage between objectives and recommendations of
Good. The overall grade is good. The application of statistical tools and innovative approach need to be given more focus.

The overall grade is below average due to no data analysis, no recommendations and no linkage of recommendations to the objectives of the project.
The overall grade is Average. No Scope and Coverage are mentioned in the report. Data analysis part needs to give more attention.
The grade is average. Needs improvement in application of innovative techniques & approach and Conclusions are not given in the report.

.This project fulfils all the criteria of a good project. All objectives are well correlated with findings of the project and recommendations are well supported
The overall ranking of the project is GOOD. Project is with only with less number of objectives and more focus may be given in data analysis part.
The Project is satisfactory. There is no adequate reference and linkage between objectives and recommendatios.
good, presents a blockchain-enhanced privacy-preserving e-ticketing system for IoT devices, offering users the ability to purchase tickets anonymously whi
good
Overall, Objectives, findings, recommendations are well connected. Research methodology is commendable. But reference for topic is limited.
good
good
good
Overall, Needs to give more focus on linkage between objectives and scope. Less level of innovation.
good
though some aspects.
Good. Needs to more focus on objectives, scope and linkage between recommendations and objectives and reference materials.
Good. Overall, the project is good. but it is done only with objectives and less correlation between objectives and scope of the project.

Good. Overall, the grade is good. but needs to give more focus on innovation in data analysis , research methods & methodology.
Average due to lack of conclusion and moderate linkage between scope, objectives, and recommendations. Innovation in research approach is not up to the
The overall grade is good. Lack of innovative techniques and approach. lack of reference materials. More focus may be given on application of statistical to
below average performance. Data collection techniques are not given, conclusion is part is not up-to to the expectations. Reference part is not satisfactory.
Good. The overall grade is good. needs more attention towards scope and coverage part.
Good. The overall grade is good. Conclusion part needs more focus. Less clarity in objectives of the project.

Need to improve clear articulate your ideas of this project.

Need to improve data Analysis tools and Innovative techniques also.


Need to improve clear articulate your ideas of this project.

Need to use more Analytics tools in data analysis part.


Need to improve clear articulate your ideas of this project.

improving quality of decision-making moved forward efficiency with competitive advantage


Need to improve data Analysis methods, techniques and Innovative approach also.
Need to improve data Analysis tools and Innovative techniques also.
in transactions, fostering innovation, and reshaping the regulatory landscape.
Need to include more contents and improve proper documents format of the project.
Need to improve data Analysis methods, techniques and Innovative approach also.
Need to include more contents and improve proper documents format of the project.
The information technology is creating a chance for retailers to reach more customers, and the availability of this allows them to generate more revenue.
incorporate artificial intelligence (AI) and machine learning capabilities to automate routine tasks, analyse data patterns, and provide predictive insights
Importance of Vendor Selection in Software Procurement adequate.
Investigate how engagement with audio surveys evolves over time and identify factors that influence sustained participation.
analysis is a hypothetical interpretation based on the structure of the questionnaire.
The process of selecting the best possible site for a manufacturing operation is referred to as "Facility Selection," and the word "Facility Selection" refers to
AI and machine learning can help develop new medicines and therapies.
Create Internet of Things products especially suited to meet the needs of Indian customers.
transaction, instead it is traded on a recognized stock exchange. In addition, the exchange standardizes futures contract.
Need to improve clear articulate your ideas of this project.
Need to improve data Analysis methods, techniques and Innovative approach also.
and converted into a data set.
by fusing mathematical and computational neuroscience techniques.
strides towards creating a more efficient, sustainable, and resilient urban mobility ecosystem
The e-Billing system has the capacity to illustrate and analyze the basic billing system and the main functionalities.
Need to include more contents, methodology, data Analysis and Innovative approach also.
Need to include more contents, methodology, data Analysis and Innovative approach also.
Integrating AI into renewable energy research and applications offers the promise of greater efficiency, reliability, and cost-effectiveness.
Data analysis in ITSM aims to enhance service quality, optimize resource allocation, minimize downtime andalign IT services with business objective.

Need to include more contents and improve proper documents format also.

organizational structures of SMEs in Turkey.


making, strategy preparation and research

ntegrating sustainable IT service management (ITSM) practices has emerged as a way to reduce environmental impact while promoting green IT initiatives.

overview of the current landscape, exploring the extent of awareness, identifying usage patterns of digital payment system
Cloud computing allows you to pay for computer resources on demand over the internet, such as processing power, storage, and software pplications. I

The purpose of Aadhaar in India started with a basic need to provide access to public services and overnment benefits.
cost hold resources, and effectiveness.

and enhancing collaboration across various departments.


AI automates routine decision-making processes, streamlining operations and freeing human capital to focus on more complex strategic issues.
SCM involves the flow of goods, information, and finances from the origin point to the final consumer.
the study on the impact of Virtual Reality (VR) technology on employee training and development provides compelling evidence of the transformative pote
Fragmented healthcare systems often lack interoperability, hindering seamless data sharing between providers.
Need to improve data Analysis tools and some Chart Title are missing of this project.

Need to improve data Analysis methods, techniques and Innovative approach also.

Need to improve data Analysis tools and Innovative techniques also.

This is not a project report. It is just a conceptual paper on social media marketing.
The project needs more focus on data collection, data analysis and recommendations and linkage of recommendations with objectives.

Needs more concentration on data collection. data analysis and conclusion sections of the project rport.
Good. The project fulfills all the aspects moderately. Recommendations may be separately shown.

The overall grade is below average. No recommendations, conclusions and implementation scheme are given in the project.

Needs improvement in all aspects. No focus is given on data analysis tools and techniques and sampling design.

Good. needs improvement in data collection, data analysis and reference materials review.
The overall grade is below average due to less clarity in objectives, scope and coverage, no recommendations, no linkage between recommendations and ob
Actually, this is not a project report on port management in operations management. It is a conceptual paper on port management

Cryptocurrency is just a representation that is digital of and intangible assets which may be used in a number of software and networking sites.
the project seeks to understand how remote work affects IT employees and to suggest ways to improve this work model
The main supporting technology for cloud computing is virtualization.

The analysis reveals that e-commerce businesses employ various criteria to measure the success of their data analytics initiatives.

Operations management studies both manufacturing and services.

ITSM is all about ensuring the smooth delivery and management of IT services for a business.

IT service automation leverages a combination of automation tools, technologies, and best practices to automate repetitive, manual tasks, allowing IT profe

tasks, businesses can streamline workflows, reduce operational costs, and free up employees to focus on more strategic initiatives.

Increased efficiency before and after BI tool implementation

The project objectives, scope, coverage, recommendations and conclusions are well connected. The data source, data collection and analysis are relevant.
Environment

STRATEGIES IN BANKING WITH REFERENCES To AXIS BANK GOOD RESEARCH WORK


Advisory Platfo

ENGINE OPTIMIZATION need to improve subject knowledge of study work.

A study work on IOT implementation for industrial efficiency to improve research work all the areas usefulness implementation and conclusion etc
Customized Online Examination System it is improved to write online examination its help to improve online examinations

Effects of Hybrid Work Model on Employees and Staff’s Work Productivity good one need more no of publications and scope of object.
The results embodied in this project have not been submitted to any other University
SERVICES PROCUREMENT OF TRANSITION to manage railways its help to organize Indian railways

engagement.
digital transformation endeavors in the IT

Strategies for Advancement need to improve digital transformation strategies


A study work on digital payment research work is good

TATA CONSULTANCY SERVICES good research


Prospect and impacts on SEO first clearly define the problem and in-depth knowledge needed for research topic

on Service Delivery and management research work was good.


THE INFORMATION TECHNOLOGY INDUSTRIES with in the rajasthan state need to improve main key ares of the study work
Research on the role in IT substantial environmental practice work was good.

Need to improve fast food management research work first clearly understand the research work and how to collect the data for analysis of study work
Good research work on implementation of ERP system in medium scale industries

Research work on consumer buying and process of IT solutions in B2B with reference to the small medium scale enterprises was good

Crypto currency real time updates and dashborad need to improve suggestions implementation and mainly focus on data collection crypto currency real tim
A study on cybersecurity in helthcare system good reserch work

Good research work on empowering substantial urban life

It's not a project report, it's like a class assignment

Android app used for any devices but our research work only focus on mobile phone media player suggest to focus on other devices
A study of roles and responsibilities various team members in IT project good ,suggest to focus recommendation to releted study work work

A study on outsourcing in digital transformation initiatives agent on demand in depth knowledge needed about scope of the study work

Good research work on digital transformation of banking sector

A study on pioneering IT projects for social media marketing need to improve clear definition of statement of problem and do research work
Need to improve innovation technique in AI adoption for small apperal industry in india

Good research work on security implications of UPI and digital payment platform in finance sector

Suggest it's not clearly predict the stock market using any tool included stock dekho
A study on historical development and future prediction of digital payment including emergency tecnology blockchain and crypto currency research work w
Good research work on improving transparency, trust, troubleshooting in ML was good

Enhancing IT services delivery through itil aligned process implementation needed to improve subject knowledge on study work refer more articles, journa
Good research on AI adoption in CRM banking sector customer queries service

Sale's force customer relationship management and retention need to focus the area of culture also effect the examing

Good research work on real time data analytics for smart grid optimization

A study on leveraging generative AI for efficient IT security policy management need to improve use innovation technique to solve the problem for given t
Good research work on Remote work impact on organisational culture
A study on blockchain and crypto currency need to improve scope of the objectives and data collection it's base for research work
Need to improve data collection and scope of the objectives it's base for research work and choose which technique is best for analysis of data related to the

PROCESS AUTOMATION IN MODERN BUSINESS PROCESSE need to improve suggestions and future work on robotics automatic
A study on web based applications customer support need to improve scope of the topic and usefulness of research work

Good research work on IOT application in agriculture sector


Need to improve study on e-commerce all the aspects objectives analysis of data, innovation technique, recommendation and implementation

ON THE BARRIERS AND FACILITATORS OF AI ADOPTION IN THE HRLTH CARE sector in India
Need to improve research work on problem statement and purpose of the research on the specific area.

First clearly defined the statement of problem and do the research work

Waterfall, quality is managed through detailed planning and extensive testing at the end of the development phase. In Agile, continuous integration and test

Need to improve the problem statement and data collection methodology first and then do research work on cybersecurity in financial security with threats,

A study work on essential to achieve early break even retail management need to improve and identify the purpose of research work on particular topic and
Analytical study on impact of green cloud computing.good research work
Impact on online retailing on the brand loyalty of filpkart first clearly defined the problem statement scope of the objectives not clearly defined and also nee
ERP implementation in manufacturing sector data collection was not clearly mentioned and which tool used for analysis of data, suggestions are not enough
A study on information technology connected to cybersecurity issues in india suggest to focus on any specific technique used for analysis of data in given s

Need to improve scope of the study work and way of execution of suggestions on analysis and management of working capital with reference to om namos

Ethical impact on future in digital marketing in an AI environment study work need to improve data collection use various data resources and provide some

Everything is a service Xaas study work need to improve use any specific tools for analysis of data and problem solving skills

Cloud computing security and it's risk management need to improve scope of the study and data collection methodology first then use significant approach
Need to improve all the areas of research work problem statement, data collection, analysis techniques, recommendation, conclusion and bibliography

Behaviour identification using ANN first clearly defined the problem statement and data collection it's base for research work and in-depth knowledge need

Good. The overall grade is good. Needs improvement in reference materials and conclusions. There is a limited linkage between objectives and recommend

Good. The overall grade is GOOD. There is a clarity in objectives. Implementation scheme of recommendations needs improvements.

No much clarity in objectives, no data analysis part. Recommendations and bibliography parts are not properly given in the report.

The overall grade is below average. No recommendations are given and no linkage between objectives and recommednations.
The project does not fulfill the basic requirements of project.

Good. The project fulfills basic requirements of a good project.


Good. The overall grade is GOOD. All basic requirements of the project are fulfilled.

Below Average. No Recommendations are given, No Scope and coverage of the project are provided. No linkage between recommendations and objectives
Good. The overall grade is GOOD. Needs improvements in the aspects of linkage between objectives and recommendations of the project.
The overall grade is GOOD. The project on climate change and agricultural productivity is commendable. The project fulfills all aspects of the project.
This is not a project report and it is like conceptual paper on fuel drain system. As per rubrics given, no mark is awarded.

The overall grade is GOOD. Needs improvement in recommendations part and their linkage with objectives of the project.
Average. The overall grade is average. Data analysis part needs improvement in terms of application of more and advanced statistical tools.

Average. No advanced tools applied for data analysis. Less clarity in objectives and scope. No conclusion is drwan.
Good. The overall grade is GOOD. The project lacks in application of innovative techniques, reference materials and data analysis part.

Good research work on talent acquisition in mindtree with it service management in AI suggest to added bibliography contents
Good study work on Artificial intelligence application in business intelligence was good. Suggest to any one specific tools use to analysis the data.

industry a case study of Tesla need to focus on what is differ from other industry compare to Tesla

Suggest title of the research work not presented. What is your study work title.

Good research work on ICT teaching and learning process for government high school in odisha State
Objectives and scope of the study is limited though remaining part of the research was carried out . They need sales floor performance
GOOD ONLY GIVEN THE REASON BEHIND THIS IS ONLY ONE OBJECTIVE AND NO RESEARCH MEHODOLOGY
A Analytical study of stock investment and Market analysis only study work taken into two wheeler vehicle analysis only need to study work on all the ind
THE TOPIC IS RELEVANT. THE OBJECTIVES, RESEARCH METHODOLOGY, TOOLS USED FOR ANALYSIS ARE GOOD
Buyer attitude on online shopping need to improve suggestions that are good/usefulness for society implementation
TITLE CHOSEN IS NOT RELEVANT AND THE TOOLS GIVEN IS NOT APPLIED
TOPIC IS NICE. THE OBJECTIVES GIVEN, METHODOLOGY USED IS RIGHT
Impact of AI and ML in the automobile industry was good research work.
Good research work IOT for home automation topic
Need to improve scope of the study on IT industry response during covid time
the topic chosen for the project is good and the objectives and scope also clear
implementation of 5s in RDPL is very good with many objectives and tools used for anlaysing the data is also good
A study on comparative analysis of legacy software and web application with web3 conclusion is very important need to focus it conclusion derived only th
right from choosing the topic to conclusion drawn is very good
Realm of business planning medical service exchange with utilization of data innovation need to improve data collection methodology and use one specific
topic is good but the questionnaire is too large and recommendaions is not sufficient
Good research work on role in information technology in banking industry with reference to SBI suggest to collect data from relevant data sources
methodology used for data collection and conclusions drawn is right
with 2 objectives project description is good
Statement of the problem defined clearly first and go for research work on effect on e-commerce in offline shopping
A study on blockchain and crypto currency need to improve the scope of the objectives and recommendations
no scope for data analysis and tools used for data collection
right from the topic to objectives framed, tools used and conclusions drawn is very good
objectives framed, data analysed, findings given are right
Need to improve on data collection, analysis and way of implementation provided solution and reference area of consumer adoption on digital wallet study
Good research work on study on agile project management in IT development.

A study work on digital revolution and information technology in india with reference to TCS need to improve data can be where and which way to collect

Impact on digital marketing in real estate industry not covered all the boundaries of given topic suggest to refer more articles journal
In Research work first define the problem statement based on the problem do research work bibliography also needed for research work , it's not a project c
Research tilte itself say what the study work saying first of all select correct tilte based on study work and refer more journals, magazines etc
Cloud computing security and it's risk management need to improve problem statement first and it's covered all the boundaries of security levels

Project report on payroll management system for BIPS system need to improve all the areas of research work and reduce the diagrams.

Good research work of customer relationship management system

A study on agile methodologies for the qualit software at LG software India pvt ltd study work focus on key conceptualization key areas and recommendati
A strategic study in building a coliving brand as a premier accommodation brand need to improve scope of the objective work

@Amazon need to improve all the area of research work


a study work Comparative Analysis of Data Visualization Tools for Business Intelligence improve scope of the research work data collection and other ares

SAFEGUARDING PATIENT HEALTH RECORDS


A study on organisational culture in IT and BPO sector need to focus on geography factor also for research work in future
Strategic implementation of AI and ML learning for business process automation need to focus on innovation technique included for data analysis

Good research work on digital payment during covid time in india


Cryptographic technique and hardware security module in modern security your research work only foucs on cryptographic techniques modern security lev
Good research work on transforming ITSM in tech Mahindra in the digital era work.
A study on analytical study of inventory management of mother dairy need to improve knowledge of subject anduseful suggestions of mother dairy
Good research work of A study on mobile device security
A study on enhancing logistics efficiency an analytical study of we express ERP solutions focus on objective of study work clearly and analysis techniques
Good research work application of IOT in agriculture A bliss to framers
A study on digital marketing and it's impact on revenue good research work suggest to refer more articles journal and magazines
Good study work on cybersecurity measures in modern IT infrastructure

A commendable effort was made in the study, though deeper insights into practical implications could have been derived through additional recommendatio
There is a definite need for improvement in clarifying the objectives to provide a clearer direction for the study. Additionally, refining the methodology wil

The study requires improvement in the analytical part, necessitating the use of additional tools for a more comprehensive analysis. Furthermore, recommend

The study would benefit from enhancing its analytical approach by incorporating additional tools to achieve a more comprehensive analysis. Furthermore, r

The bibliography provided is basic, but it contains several omissions and inaccuracies, which may impact the thoroughness and credibility of the research.

Overall, the project demonstrates a foundational understanding and effort to address training effectiveness at RINL-VSP. However, there are notable areas f
The project showcases a strong understanding of operation management in India's textile industry, though improvements in methodology and bibliography

Overall, the project displays a foundational understanding of risk management in the oil and gas sector, with clear objectives and basic recommendations. H
The project shows potential in financial feasibility analysis for development drilling projects but requires clearer objectives, improved linkage between obje
Overall, the project shows clear objectives and comprehensive coverage, but it needs a more robust methodology, deeper analysis, and stronger linkage betw

A commendable effort was made, but there is a need for clearer articulation of objectives, sampling framework, and more precise recommendations.
Good attempt was made few areas need more clarity with specific recommendations related to objectives

The business idea presented would benefit from additional clarity in defining its objectives, conducting a thorough analysis, and providing well-developed r

The project work was presented well needs few suggestions to be given in a practical way
The project needs clarity in its methodology, and the recommendations could be more specific in addressing the objectives in a practical way. This implies
More clarity is needed in the methodology, analysis, and bibliography sections. This entails providing a more detailed explanation of the research methods u
More clarity is needed in the methodology, analysis, and bibliography sections. This entails providing a more detailed explanation of the research methods u

The recommendations, analysis, and conclusions require clarity to enhance understanding and effectiveness in implementing Total Quality Management. Cl
The usage of statistical tools other than percentage analysis is recommended to provide a more robust and practical approach. Incorporating tools such as re
A good attempt was made at defining objectives and methodology; however, there is a need for more emphasis on innovation. Incorporating innovative app

The operations management concepts could have been addressed more effectively. Further clarity is needed in the conclusion and methodology sections to

New attempt was made .few areas needs clarity for better understanding

To give more Bibliography clearly


to give Clarity of objectives scope and coverage

to concentrate on Recommendations, usefulness implementation scheme


to use some more tools for analysis
to concentrate more on Clarity of objectives scope and coverage
give Clarity of objectives scope and coverage and Analysis of data, tools and techniques

need to use various tools for analysis data and interpretation

Recommendations, usefulness implementation scheme

to use various tools for analysis the data

to concentrate Clarity of objectives scope and coverage and use some more tools for analysis
to give Clarity of objectives scope and coverage and Recommendations, usefulness implementation scheme

to concentrate Recommendations, usefulness implementation scheme

to apply various tools and concentrate conclusion


to give Recommendations, usefulness implementation scheme
concentrate in Recommendations, usefulness implementation scheme and Analysis of data, tools and techniques
to give Recommendations, usefulness implementation scheme

give suggestion ,recommendation and include Bibliography

concentrate Recommendations, usefulness implementation scheme

to concentrate on Recommendations, usefulness implementation scheme and


to concentrate on Recommendations, usefulness implementation scheme
need concentration on Analysis of data, tools and techniques and Recommendations, usefulness implementation scheme

neat and clear content


concentration needed on Recommendations, usefulness implementation scheme and tools used for analysis
to give Recommendations, usefulness implementation scheme and Innovative techniques
2. concentrate Analysis of data, tools and techniques
use various tools for analysis the data , Recommendations, usefulness implementation scheme
to use various tools,and Recommendations, usefulness implementation scheme
to concentrate more objectives and various kinds of charts
concentrate on Recommendations, usefulness implementation scheme
concentrate on Recommendations, usefulness implementation scheme
give recommendation to the further researcher
good performande
good performance

to concentrate Understanding of the subject and conceptualization of the Key areas

to concentrate on Recommendations, usefulness implementation scheme


data may be analyzed with various tools like charts , percentage ,with interpretation

in future, researcher can be study the influence of project management in various industry like government sector. need to improve bibliography
need to improve the conclusion and bibliography

good, AI and ML related concepts are given. need to improve project conclusion and bibliography
need to improve the project objectives, bibliography. in future, a study on organizational culture for other industry
the researcher should be more concentrate about the literature review and bibliography and comparison charts with precise value

good project. need to improve your conclusion and bibliography

need to improve the project scope, coverage and data collection

in future, researcher can be used various business analysis tools to generate report
in future, can be study on increasing the customer satisfaction. and also mention website links
A good attempt was made at defining objectives and methodology; More clarity is demanded
Objectives has to be defined clearly and conceptualization clarity is also demanded

Good attempt was made .Few metrics like methodology and suggestions needs improvement

An average attempt was made at defining objectives and methodology; however, there is a need for more emphasis on innovation. Incorporating innovative
A good attempt was made at defining objectives and methodology; however, there is a need for more emphasis on innovation. Incorporating innovative app
Needs clarity in all aspects methodology,more tools can be used,suggestions could be also improved

Objectives need to be defined clearly, and the methodology requires more data. Suggestions could also be more appropriate and targeted.

There is a good effort overall, but more concentration is needed in the methodology part. Additionally, the recommendations could have been more specific

Recommendations could have been specific and conclusion could have been drawn better

A very commendable effort was made, though further use of an additional statistical tool is necessary to deepen the understanding of the study.

The analysis and recommendations would benefit from improvement to enhance clarity and deepen understanding.
to give coclusion
adequate Recommendations, usefulness implementation scheme needed
to give some more objectives and use various tools for analysis the data

use some more Innovative techniques

concentrate Recommendations, usefulness implementation scheme

give Recommendations, usefulness implementation scheme


give Recommendations, usefulness implementation scheme and use various tools for analysis the data

improve Recommendations, usefulness implementation scheme


apply some more tools for analysis the data

use some of the Innovative techniques/approach to problem scheme


improve the Recommendations, usefulness implementation scheme
improve Innovative techniques
The project was approached diligently, but there were opportunities for improvement in areas such as conceptualization, methodology, and innovations. The
The project presentation was inadequate, particularly in the methodology section where clarity was lacking. The candidate also failed to adequately explain
The conclusion lacked clarity and did not effectively summarize the findings. Furthermore, the recommendations were weak and did not robustly support th
A commendable effort has been made, although recommendations could have been more specific, particularly by focusing on strategy formulation or policy

Need improvement of recommendations and also clear tools


Need conclusion and review of literature is not drawn

Need more improvements of the recommendations

Improve for the data tools and techniques and drawn clear objectives and conclusion

improve only review of literature

Need improve their frame work of analysis


need improve the review of literature and data analysis
Need improvement of the objectives ,conclusion, review of literature
improvement of the tools used and the objectives

need proper alignment

Need hypothesis only over all presentation is very good


Need to improve the conclusion
Need improvement of the conclusion and suggestions
Need improvement of the data analysis

Need conclusion and lot of objectives is there so, reduce the objectives

need conclusion
Need objectives and to concentrate methodology
Each and every objectives should be very clear and the methodology should be applied very clear.

Need to concentrate on Understanding of the subject and conceptualization of the Key areas

Need to concentrate on Linking of recommendations to the objectives

Need to concentrate Understanding of the subject and conceptualization of the Key areas
“Automated Deployment of a website on server using Jenkins: DEVOPS” information are provided to the projects are in avarage manner. Need to improv

Clear objectives with comprehensive coverage of objectives with lack of the innovative approach to the solution of the problem
The objectives are very clear and adequate analysis of data
Enough understanding of the subject but analysis of data is minimally done with less number of tools and techniques
Better clarity of objectiveswith lacking of conceptualization of the key areas
clear objectives of the scope and extensive coverage and Some attempt of innovative techniques but Basic recommendations are given

Well understanding of the subject with least conceptualization of the Key areas
Limited clarity of objectives and Very basic analysis of data with no tools and techniques

hypotheses missing and suggestions are need to further research


Lack of innovation in the solution of the problem
report writing is not properly followed its missing for your report
To improve their report writing and every project should have a conclusion its useful for the further research
Basic understanding of the subject and lacking in the conceptualization of the key areas
Some attempt of innovation are made to the solution of the problem
Clarity of objectives is moderate and incomplete coverage
Moderate understanding of the subject and very minimum level of conceptualization of the Key areas
Moderate understanding of the subject and less conceptualization of the key areas
Enough understanding of the subject but minimal conceptualization of the key areas
Adequate understanding of the subject and less concepts applied, Minor attempt of innovative approach to problem scheme
Clear objectives and scope wih comprehensive coverage and basic techniques with minor attempts of innovation
objectives and scope are vague and insufficient coverage
Used innovative techniques/approach to problem scheme better
objectives and scope are clear and comprehensive coverage but Basic study methodology used with some limitations
Adequate clarity of objectives and scope and enough coverage but Basic analysis of data with less tools
The study on the comparative analysis on digital workspace strategies among the employees was analyzed and given suggestion for the improvement measu
The study on the Impact of Cloud Computing on the E-Learning Sector was well analyzed and provided with good suggestions
A Study on the impact of Cloud Computing for a Frictionless Customer Experience in Retail Banking sector was a useful one with essential findings and su
stakeholders can work together to foster a responsible AI ecosystem
The Adoption And Strategy of Cloud Computing in organizations were found to be useful study with good findings and suggestions stated

The study on the Impact of artificial intelligence on the customer service at Tata consultancy services were well stated with its recommendations and sugge

The study on the IT Potential of Small and Medium Enterprises (SME) case study on Blue Pebble pvt.ltd was expected to be elaborately discussed and need
The study on facility monitoring system of TATA technologies was well analyzed, interpreted and provided with suggestions stated well
The study on the analytical study of HR practices at Infosys provides with an enhancing organizational efficiency
The study was found to be useful stating the growth of blockchain and cryptocurrencies in finance with needy suggestions provided

The study on the employee welfare schemes at Hindustan Unilever were a good choice on the problem chosen and provided with good findings and sugges
The project maintains an average level of clarity in defining objectives, scope, and coverage, with some room for improvement in precision.
The study was directed to assess the viability of data innovation administrations in advanced education focused on south africa was well analyzed and interp

An Analytical Study on Adoption of Digital Payments System were found to be a useful study and provided with good findings
The study on the open banking and API integration: assessing impacts on financial services and customer experience was good analyzed, interpreted and g
The study on automated trading undertaken at KSV SOFT-TECH, Indore was an useful one helpful in initiating an automated trading approach
A Study on the Impact of Augmented Reality (AR) and Virtual Reality (VR) on the Education System was well undergone and provided with good suggest
The study on the impact of information technology on supply chain performance in hindustan unilever limited was good analyzed, interpreted and given wi
The study on the Generative AI and the future of work in IT industry was an useful one given with innovative suggestions
Lack of Clarity of objectives scope and coverage and also lack of Understanding of the subject and conceptualization of the Key areas
Lack of recommended survey and data collection process are inappropriate
Need more essential implementation of content and necessitate come clarity of the report
The study on the technological developments in CRM and the implementation of it by SME's were done good with suggestions provided
A Study on The evolution of the online grocery shopping experience was made into a useful contribution for the development of grocery markets and custo
Need more Clarity of objectives scope and coverage and minimum tools of research analysis
Need some valid reference and lack of explanation of the project report
The study on Artificial intelligence (AI) helping Project Manager in IT Project Management was stated good with needed points to consider while using AI
The study provides on the needs and the impact of AI on Job Roles in a clear sketch and provided with needed suggestions
The study covers the effect of information technology on human asset management, an analysis made in Herat City found to be useful for the further develo
Need more clarity in reporting the plan of research
Required more evaluation sources of research and also need highly innovative and unique approach of the study
lack of strategy, techniques and methodology in an appropriate manner of the research study
The study on the Credit Card Default Prediction Technique at HSBC was an useful study to the banking customers and the recent needs
The study on advertising on the radio was found to be useful for the recent needs and to increase the marketing and to reach the customers
The impact of digital transformation and technology devlopment at ienergizer were analysed, interpreted and provided with good findings and suggestions
The study signifies that India is entering a new, advanced phase by leading the way in IoT innovations and achieving high standards in this field.
A comparative study on corporate social responsibility with special refrence to selected bluechip fmcg companies of india was done good with findings and
Standard justification of the data analysis explained well and contented.
The study on the ITIL-based IT Service Management Framework to Improve Security and Risk Management was good analyzed, interpreted and given with
The Study on 360 Degree Appraisal at Infosys was stated good and need to be improved with pictorial representations over the analysis
The study on the future of cryptocurrencies in digital payments: a study of upi was a useful study providing its findings and suggestions good for the further
The study focuses on the Outsourcing of Information Systems in International Financial Institutions which stated with needed points to incorporate for the d
The study on the AI and its impact on Humanity, Jobs & how we can manage its growth ethically were discussed good

The impact of the study on the analytical Study of migrating from On-Prem to Cloud - XYZ Banking Company provided with good findings and suggestion

The advent of quantum computing marks a transformation in cybersecurity, challenging traditional cryptographic frameworks and broadening the horizons

Need more techniques are used and suggestions are clearly defined

Need more suggestions for further research

Introduction is not clearly defined and need improvements for further research

need hypotheses only .otherwise its clearly defined

need improvement for the further study


hypotheses missing otherwise overall its enough

report writing is very good

Need more review of literature with relevant objectives


need hypothesis for further research
hypotheses only missing otherwise very good

conclusion is need more improvement

improvement of the bibliography relates with objectives


need improvement of bibliography and also conclusion

Need improve the report writing and data analsis


need improvement for the further research
need review of literature and data analysis

Needs improvement
need objectives
Need more improvement and recommendations is missing
Sampling techniques are need improvement

Hypotheses are missing need more references

This is not an MBA project It's a Computer Science Project. There is no research.
The project shows potential but is hindered by a very basic and incorrect bibliography, which undermines its reliability and scholarly rigor. Strengthening th

The project demonstrates strong scholarly rigor with a comprehensive and accurately cited bibliography, ensuring credibility and reliability in its research fi
The project shows promising recommendations and a reasonable implementation plan but is hindered by a basic and inaccurate bibliography, undermining i
The project demonstrates a sufficient effort in compiling relevant sources, although there are opportunities to improve accuracy and completeness in citation

The project exhibits potential but is hindered by a weak bibliography, impacting the overall reliability and robustness of the research findings. Strengthenin
The project shows a reasonable effort in compiling relevant sources but could benefit from additional attention to detail in ensuring all essential references a
The project demonstrates a basic understanding of the subject matter but lacks depth in analysis and critical evaluation, particularly evident in the weak bibl
The project demonstrates a basic grasp of the subject matter with room for improvement in enhancing the breadth and accuracy of cited sources to strengthe

The project demonstrates a solid foundation with adequate bibliography, albeit some inaccuracies need rectification for improved reliability and completene

The project demonstrates a reasonable effort in compiling sources; however, enhancing accuracy and completeness in citations would strengthen its scholar

The project displays a basic understanding and linkage between objectives and recommendations, yet it is hindered by a rudimentary bibliography with nota
: The project demonstrates a basic understanding and clear linkage of recommendations to objectives regarding the COVID-19 pandemic's impact on the ph

While the project shows a solid grasp of Lean Six Sigma's role in promoting innovation, it would benefit from better alignment of recommendations with ob
The project shows a clear understanding of the challenges in managing outbound logistics for Elite Foods, with identifiable recommendations and apparent

The project presents sound recommendations and a reasonable implementation plan, yet it requires improvement in bibliography to address several omissio

The project on implementing Lean Six Sigma for yield improvement in product manufacturing shows a weak bibliography and lacks sufficient linkage, imp
Good explanation about the objectives, scope and coverage and it linked to the recommendations as well.

Problem area is need of an hour but no evidence of analysis part. There is no recommendations and suggestions found in the project

The study is based on Fintech but hypothesis was framed technological, economic, regulatory environment and behavioral and traditional banking. There is
Project title, study methodology for data collection and extensive analysis were made in the project. But recommendations, conclusion and bibliography are

Analysis not shown in the study. Otherwise the study has been conducted elaborately.
Overall study is carried out in a specific manner such ass operational efficiency, cost control.

Analysis were made in detailed manner but the minimum usage of innovative approach to the problem scheme
The project provides valuable insights into the impact of electric vehicles on green supply chains, yet improvements in methodology, analytical depth, and b

The project on after-sales services at Empire Motors Private Limited demonstrates a solid understanding with clear conclusions and recommendations. How

The project on the evolution of internet banking in India, focusing on UPI payments, displays clear objectives and scope with comprehensive coverage. How

The project shows fundamental shortcomings including weak conclusions, lack of innovative problem-solving approaches, and inadequate recommendation
The project on e-supply chain management lacks thorough analysis, offering basic conclusions and inappropriate recommendations, indicating notable defic
The project demonstrates a basic understanding with weak methodology, rudimentary analysis, and lacks innovation in proposing recommendations. Streng
The project is commendable for its comprehensive bibliography and clear linkage between recommendations and objectives. However, further developmen

The project demonstrates a strong understanding of risk perceptions and portfolio management among equity investors, supported by clear conclusions and
The project displays a strong understanding of the subject matter but is hindered by basic or incorrect bibliography and linkage issues, which compromise it
The project demonstrates potential with clear linkage between recommendations and objectives, yet improvements are needed in methodology and impleme

The project shows potential but is hindered by a weak bibliography and disconnected recommendations, which undermine its overall scholarly rigor and im
The project shows potential but is hampered by a weak bibliography, which undermines its academic rigor and reliability. Strengthening the bibliography w

The project demonstrates clear objectives and comprehensive coverage, but its overall effectiveness is hindered by a weak methodology, inadequate analysi
Need to include more contents and improve proper documents format of the project.

Need proper documents format and improve data Analysis methods, techniques and Innovative approach also.

Need to improve clear articulate your ideas of this project.

Need to improve data Analysis methods and Innovative approach also.

need improvement in using tools for innovative techniques


the project gives report on financial risks associated with money laundering activities need to concentrate on innovative techniques
Need to improve data Analysis methods and Innovative approach also
the project report gives a study on career success of IT professionals working in US need technological suggestions

the report gives a study on semiconductors but research findings, tools and technological analysis is missing

the project report contains cloud computing and security concepts need more concentration on research
the cloud computing and its outsourcing need to concentrate in research area
the report needs to be improve in research area

the project report contains a decision making strategy on real time KPI dashboard

Need to improve data Analysis methods, techniques and Innovative approach also.
Need to improve data Analysis methods, techniques and Innovative approach also
the document presents a detailed and structured approach to analyzing the ERP implementation at Ashok Leyland Limited, with valuable insights and recom
report is comprehensive covering all aspects of the project from objectives to recommendations but need innovative techniques
Need to use more Analytics tools in data analysis part.
the assessment of the project gives the impact of project activities and outcomes but need to be improved in research concepts
Need proper documents format of the project
document presents a comprehensive and well-structured analysis of cybersecurity and ethical hacking in the context of IoT
Need to improve clear articulate your ideas of this project
over all comment are satisfactory.
the report gives a study of consumer behaviour through mobile phones
the report gives a user friendly framework for hospital management system
Need to include more contents and improve proper documents format of the project.
Need to improve proper documents format.
Need to improve data Analysis tools and Innovative techniques also
Need to improve data Analysis tools and Innovative techniques also
Need to improve data Analysis methods, techniques and Innovative approach also

the report provides the challenges faced in IT project management


Clarity is missing in objectives, no research techniques used
the report provides automation of dairy system
employment consulting agencies.need to improve in research part
Need to use more Analytics tools in data analysis part.
the project report shows the impact on customer buying behaviour
the report gives a study of IT risk management but need improvement in research
the project report gives study on Customer relationship management but need to improve in research criteria
the project report gives a study approach on cyber security breaches
Need proper documents format of the project

the report gives a study on implementation on AI on CRM

the study gives a comprehensive study of mutual fund investment and analysis in various aspects
Need to improve clear articulate your ideas of this project

the project report gives a study on enhancing cybersecurity through AI techniques


the project provides the study of role of AI in digital marketing
need improvement in research area
Need to include more contents and improve proper documents format of the project.
the report gives a study on challenges in digital marketing platform but needs improvement in data analysis and providing future recommendations
the project report gives a study on impact of social media in buying behaviour.suggested to use innovative techniques
This project aims to explore the dynamic interplay between innovation, technology, and regulation in the insurance sector.

the project in digital marketing in an AI environment needed clarity in drawing conclusions and research

Need to improve data Analysis methods, techniques and Innovative approach also

Need to improve clear articulate your ideas of this project.


Need to improve clear articulate your ideas of this project.

Need to improve data Analysis methods and Innovative approach also.

Need to use more Analytics tools in data analysis part.

Need to improve data Analysis methods, techniques and Innovative approach also.
Need to improve clear articulate your ideas of this project.
Need to use more Analytics tools in data analysis part.
Need to improve data Analysis methods, techniques and Innovative approach also.

Need to improve clear articulate your ideas of this project.

Need to improve set Clarity of objectives, scope, coverage, data Analysis methods and Innovative approach also.
Need to improve clear articulate your ideas of this project
Need to improve data Analysis tools and Innovative techniques also
Need to use more Analytics tools in data analysis part.

the tools used for data analysis is standard suggested to use new tools
Need to improve proper documents format and font size
the study gives a report on deepfake technology and how the privacy is getting affected

Need to improve proper documents format.


the report generically involved study about ecommerce technology need to be specific
the report summarizes the study on cyber security issues in india
the project report summarized the activities of online food delivery system but need improvement in research areas
Need to improve data Analysis methods, techniques and Innovative approach also
the report gives a study on cloud migration challenges and opportunities in enterprise systems

Need to use more Analytics tools in data analysis part


need improvement in research areas for data collection and analysis

the report should have explored in the areas of research


Need to improve proper documents format and font size

the report gives a study on cloud technologies in health care


Need to improve proper documents format and font size.

the report gives a study on IoT implications in ecommerce

The overall remark of this project is "Below Average". Except objectives of the study other research related components are not given.
in future to develop various social applications by using cloud computing services
can mention some other types objectives ,new technology can be applied to detect the problems of crypto money
Very good effort, in future, researcher, can be study on AI in automated agriculture
The overall remark of this project is "Good". Though the project has some positives as per research, Methodology, Tools for analysis, Findings and recomm
The student has not consider and follow the concept of research methodology while constructing this document. Because all the necessary research compo
research, to add some other modules and also specify conclusion
need to improve project data collection, conclusion and bibliography. researcher can b used recent front-end and back-end software
The project seems only theoretical concepts are drawn. In this project except objectives no proper research components are considered while constructing b
The overall remark of the project is "Good". The student might have framed another two more objectives relating to the study and may have used one or tw
in future, can also be used for some technology in power management, give more website links
very good project. mentioned recent technology,student -friendly project . need to improve your project write-up
For every research project objectives are the key element. But in this project no clarity in the objectives. Only less recommendations have been connected w

very good project write-up. need to improve your conclusion and bibliography

very good project write-up. need to improve your conclusion and bibliography
need to improve data collection, conclusion and bibliography
can mention some other types objectives ,new technology can be applied to detect the problems of crypto money
in future to develop various social applications by using cloud services and also improve scope and coverage of project
in future, information security concepts applied to various government sector

in future, can applied recent technology for implementing the billing software

student must be improve scope, statement of the problem, methodology, findings and suggestion.
the student more concentration to scope, statement, reviews, findings and suggestion.

over all project work is good. but, need to improvement the objectives and scope and statement of the problem and findings & suggestions.
in future, Researcher should concentrate the cloud adaptation on various MSME. and also should be give many online link regarding this project
the student must be improve scope, statement, findings and suggestions.

all the aspects of the project work is good. but, overall conclusion is missing.
all the aspect of project work is good.
missing of statement of the problems, scope, reviews, data analysis, finding & suggestion and conclusion
in future, researcher digital transformation could be used recent techniques for data collection and implementation techniques
over all project work is good, but more improvement in objectives.
all the aspects of project work is good. the student more concentrate the statement of problem.
over all aspect of the project work is good.

over all project report is good. but, statement of the problem is missing.
over all project work is good. but, scope and statement of the problem is missing
over all project report is good. but, scope, statement of the problem is missing.
the student must concentrate the data collection and data analysis, finding and suggestion.
all the points of project work is good. but, need more concentration about objective, scope and statement of the problem.
The project involves switching from a conventional on-premises infrastructure to an AWS cloud-based environment to increase the company's IT agility,sca
A comprehensive guide on Oracle Netsuite ERP: a unified system that can manage both internal and external resources in a company.
This paper mainly focuses on challenges faced by cyber security on the latest technologies . It also focuses on latest about the cyber security techniques
Objectives are clear with minimal attempts of applying innovative techiniques
Objective are clear but lack in the quality of data and less innovative techniques are used
The study methodlogy is adequate but Lack of innovative approah to the problem scheme
Inadequate clarity of objectives with limited coverage
Limited understanding of the subject and lacking of conceptualization, and no innovative approach
The entire project was good. to need some more website links
The entire project was good to need more references on this project
The total project was well analysis and executed are good
The entire project was good, the data collection are well the suggestion is to need more number of references.
The total project was well written and data collection methods are good
Good
Good
The student must be include the review of literature, statement of the problems and bibliography.
The student must include the proper introduction, reviews, sampling design and conclusion.
The student explained well introduction, reviews, data analysis, findings and conclusion.
the student well explained the overall concept of the project. but, need more clarity about findings and suggestion part.
the student explained well about introduction, reviews, data collection, data analysis and conclusion. but, need more clarity about the findings and suggestio
the student explained well about introduction, conclusion, review of literature. but need more clarification about the finding and suggestion, data collection
all the points are explained well( Introduction, Conclusion, objective, methodology, data collection ). but need improvement in reviews, findings and sugge
needed to cited journals and articles and website links should be mentioned.
Good explanation relating to the all aspects of the project. But missing of Reviews, finding and suggestions.
need more explanation relating to the analysis of data.
all the aspect of project is well. ( introduction, reviews, data analysis, findings & suggestions and conclusion)
the student explained good. but, need more explanation relating to the objectives, reviews, findings and suggestions.
need more explanation relating to introduction, conclusion, reviews, data analysis.
the student elaborately explained the all the aspects of the project report.
the student prepare the project work in to ms-power point. Need more expiation about introduction, reviews and conclusion.
all the aspects of project is good. but, reviews, finding and suggestions are missing.
mention with clarity about how to collect data,problem specification, methodology. And also need to improve your write-up about your project
all the aspects of the project is good. but, the student improve to the suggestion and findings.
overall project is good. need more improvements in introduction, conclusion, objectives, data analysis and bibliography.
all the aspects of the project is good. but, need more improvement in conclusion part.
objectives, data collection and analysis, research methodology, findings and conclusion and bibliography.
all the aspects of project is good. but, the student more concentrate the reviews and conclusion part.

Good but need to cover few more objectives


Need clarity in providing objectives and data analysis tools
need improvement in data analysis step
the assessment of the project gives the impact of project activities and outcome
Need improvement in research methodology
needs improvement in providing conclusions and research methodology
Learning Approach
Need to improve scope of the research work and use new technology for analysis of data then the meet to the efficiency and effective results
A study on IT budgeting and cost management strategies need to improve conceptual key ares
A study on core banking solutions need to improve banking operations process
Newly developed digital banking platform in india fintech sector improve banking operations process in research work
Need to improve research work focus on clear idea about scope of the objective and data collection methods
It provides an overview of the types of BPO services are good
This project is designed to enhance the efficiency, transparency, and security of securities transactions by transitioning from physical to electronic records.
the student must understand the concept of the research work. introduction, objectives, scope, statement, review, data collection and analysis, findings and s
in future, research will improve your write-up about your project. and also need more reputed journals and website links
in future, researcher, can be study on AI adaption in the various sector in various country
the student must improve review, scope, findings, suggestion and conclusion.
in future, to analytical study of navigating the social impact of other machine languages can be mention
Researcher should concentrate the invocative techniques. And also give more clarity of conclusion
over all project work is good. but statement of the problem and suggestion is missing.
Need proper documentation format and the student must include scope of the study, research design, statement of the problem, need of the study, sample siz
As it is research oriented project, the student is required proper project documentation format. The student must specifically mention the importance of the s
A few concepts can be developed for the online digital payments system that the Indian economy would eventually assemble.
very good effort, in future, can be more concentrated with safety, cyber security, and public acceptance.
The student should construct the project document with need for the study, statement of the problem, objectives of the study, methodology, hypothesis, tool
A study of worklife balance in IT sector, information are provided to the projects are in good manner.
in future, Researcher should concentrate the invocative techniques for digital payment system
The student should construct the project document with need for the study, statement of the problem, objectives of the study, methodology, hypothesis, tool
A few ideas can be established for the future assembly of the insurance sector
The student made good attempt in constructing the project. The project has all the necessary research oriented requirements but with some limitations. The
Need proper documentation format. It should contain proper objectives, scope, statement of the problem, methodology, tools for analysis, chapterization sch
The project must have components of research methodology. In this project report, methodology, tools for analysis, limitations of the study and also recomm
Being a research oriented project it should have clarity in objectives, methodology and recommendations or suggestions are clearly connected with objectiv
The Structuraisation of this project is not good. Methodology, Tools for analysis, chapterization scheme, limitations of the study, findings and suggestions a
Even though the project has all the components of research, it has some limitations. The student fails to write review of literature in the project and no evide
Topic selected by student is novel. Objectives were framed good but lack in justification for selection of sample area and sample for the study in methodolo
The student has made some possible things in his project. But there is less concentration in the methodology, tools used for the analysis, findings, suggestio

This project shows good in all aspects with some notable comments. The comments are: i) Limitations of the study has not been given ii) Very basic tools o
the student shout improve the all the aspects of the project. all the points are explained. but, simple explanation. need more improvement.
needed to cited journals and articles and website links should be mentioned. you should be specify conclusion part
all the aspect is very good. but missing of conclusion, findings and suggestions.
in future, new technology can be applied to detect the impact, analysis of e-banking in various countries and also mention bibliography
the student more concentrate the objectives, scope, data collection and analysis, findings and suggestions and conclusion part.
the student should concentrate the objectives, reviews, finding and suggestion and conclusion part. need more improvements in report preparation.
all the aspects of project is good. but, findings, suggestions and conclusion part is missing.
all the aspects of project report is good.
all the aspects of project work and project report is good.
the student must understand the basic research process. the student more concentrate the objectives, reviews, data collection and analysis and conclusion p
the study is missing.
all the aspect of project work is good.
give elaborate explanation about contents like methodology, analysis techniques and website links for this project. In future comparative study of network s
over all project work is good. but, reviews, scope and findings and suggestion is missing.
research work is good. but, objectives, scope and findings and suggestion part is lack.
over all project work is good. but, scope of the study and findings & suggestion is need to be improved.
all the aspects of project work is good. need to be improve scope and statement of the problem.
your research is very good effort. but you’re not explained effectively. in future need to improve your write-up about your project
in future, researcher do your project about understanding of cloud computing in the digital era.
over all project work is good. but, statement of the problem is missing.
the student need to improve the objectives, scope , statement of the problem , findings and suggestions.
the methodology of data collection could be explained briefly and many recent techniques could be used for data security like IOT and AI and DS

the student more concentrate on introduction, objectives, reviews, findings and suggestions.
need to give more data of the planning and business organization of project
the duration of serverless usage for those who have adopted need some more ideas
This research explains the importance of the blooming aviation industry containing drones, aerospace and aerial mobility solutions that is widely being use

This project's main goal is to compare and contrast the different security concepts that are applied in cloud computing settings.
This study is done to find the effectiveness of e-Recruitment in the multinational organization based on collecting quality resumes, sourcing quality candida
The aim of this researching will be create a picture that is transparent of cryptocurrency try influencing different guidelines in India in order that the country

In this research This comprehensive way to deal with IT foundation tends to prompt functional necessities as well as decisively position the association for

digital marketing for the recycled goods are good


the block chain in banking system and its challenges are need some more points
notable paradigm shift, offering numerous innovative prospects is good response

Crime and accidentals spots along with road safety Management are required some concept
the retail and productivity of information technoloy is nice project ideas
Way of presentation was poor. There is no evidence of data collection and data analysis. No proper research process followed. Basically, objectives followe
Objectives attained through proper methodology, but the way of presentation was not good.
Clarity was lacking in objectives. Report writing procedure not followed in this project report, However, objectives are achieved through research methodol
Objectives are framed with care and it is achieved through proper methodology, but, the research format is not good.
Confused with many materials with research report. However objectives framed and achieved with moderate methodology.
Good objectives formed achieved through proper research methodology, but the way of presentation needs improvement.
This project work contains simple objective with simple methodology. Objectives match with data collection and analysis.
Objectives framed with necessary care, and research methodology was followed but the way of presentation was not good.
Excellent objectives matched with the research methodology. Proper research procedure followed.

Way of presentation was poor. This project does not satisfy the standard of report writing. However, analysis support objectives and findings.

Presentation needs improvement. However, objectives followed with moderate methodology.


Good research work, presentation was good. Sufficient objectives with proper methodology.
Way of presentation was not good, however research objectives achieved with proper methodology.
Weak presentation, Research process does not satisfy the standard.
Adequate objectives with proper research methodology. Identified correct analysis resulting with good findings and conclusions.
Excellent in framing objectives and the way of achieving the objectives. proper research methodology were followed in this report.
Good project work and report writing. Objectives matched with research methodology, Proper data collection and analysis were done.
Predictive intelligence represents a model shift in ITSM giving power to an organization to move beyond reactive approaches towards the proactive problem
Research process followed correctly. Objectives matched with data collection and data analysis.
The aim of this study is very effective and add more real time applications based on this study
Lack of clarity in objectives. Moderate research techniques followed in this project.
Objectives matched with research methodology, but the way of presentation was not good. Needs improvement in presentation.
Research objectives not found in this project. General study was carried out with the research process. Methodology part also weak.
This study investigates the significance of AWS adoption in the context of cloud computing for SMEs, with the goal of elucidating the motives, challenges,
Good research work, well prepared objectives with proper research methodology.
Excellent objective framing with proper research methodology. Report writing satisfying the standard.
Excellent research work carried out with well structured objectives and proper research methodology.
The goal of this thorough study is to look into how performance review methods are used across industries, with a focus on how AI is used in the telecom in
Lack of clarity in objectives and the way of presentation also not good but the researcher followed moderate research process.
The aim of this study is to provide more detailed and thorough analysis of the impact of generative AI in the IT sector.

Research objectives matched with data collection and analysis. Report writing contains all the chapters.
Objectives matched with methodology. Interpretation part was missing. Report writing process needs improvement.
The aim of the project is very effective which is helpful in current situation.
Give more introduction and more content of this study.
Research objectives correlate with research methodology. Data collection and analysis were done properly.
The aim of this project is well and The contribution of neighbourhood school management is significantly expected quality and standard training.
Excellent research work, well prepared objectives achieved through proper research methodology.
Objectives are matched with data collection and analysis. Way of writing research report was not correct.
Student must include review of literature part, research methodology part(statement of the problem, research design, data collection methods, limitations of
The student must include statement of the problem, research design, need of the study,research gap, use two or more analytical tools and concentrate on the
Presentation format was not good,
The student must include research design, need of the study,research gap, limitations of the study, proper data analysis with use of two or more analytical to
Sufficient findings and recommendations were framed.
Need proper documentation format and the student must include research design, need of the study,research gap, accurate bibliography with proper citation

Well framed objectives with sufficient data collection and analysis.


Need proper documentation format and the student must include need of the study,research gap, proper data analysis with use of two or more analytical too
The Review of Literature, Research Methodology, Data Analysis and interpretation and questionnaire has not been explained clearly.

Objectives matched with methodology and data analysis.

The sampling design, Research design, data analysis tools and interpretation, need for the study, chapter scheme, pilot study and data analysis tools and inte

Simple objective with proper data collection and analysis


The Review of Literature, Research Methodology, The Statement of the problem, Need for the study, Chapter Scheme has not been explained clearly.

Basic objectives with proper data collection and analysis


The Statement of the problem, need for the study, Review of Literature, Research Methodology, Data Analysis and interpretation, Chapter Scheme and pilo
The sampling design, Research design, data analysis tools and interpretation, need for the study, chapter scheme, pilot study and questionnaire has not been

Good development of objectives, data collection and analysis, but the way of presentation was not in format.

The Research Methodology, Data Analysis and interpretation, the questionnaire, linking of recommendations to the objectives and bibliography has not bee

Clear objectives and correct methodologies adopted.

Objectives not mentioned, methodology and analysis are weak.

Clear objectives with proper methodology , data collection and analysis.


The sampling design, Research design, data analysis tools and interpretation, need for the study, chapter scheme, pilot study and questionnaire has not been

The Research Methodology, Data Analysis and interpretation, the questionnaire, linking of recommendations to the objectives and bibliography has not bee
Objectives, methodology, data collection and analysis are correct
Very basic objectives with correct methodology adopted and properly analyzed the data.
No evidence of objectives data collection and analysis
Clarity in objectives, proper coverage and proper methodology for data collection and analysis.
The Research gap, Statement of the problem, Need for the study, Chapter Scheme and pilot study has not been explained clearly.

Minimal clarity in objectives, no methodology for data collection and analysis


No evidence for data collection and analysis

The Research gap, sampling design, Statement of the problem, need for the study, Chapter Scheme, pilot study and data analysis tools and interpretation ha

The Research Methodology, Data Analysis and interpretation, the questionnaire, linking of recommendations to the objectives and The Statement of the pro

The sampling design, Research design, data analysis tools and interpretation, need for the study, chapter scheme, Statement of the problem and pilot study h
There is no evidence for data collection and analysis, way of presentation deviate from research process.

Objectives matched with methodology and the research carried out with proper data collection and analysis.
Way of presentation was very poor, no evidence of data collection and analysis.
Data analysis part was missing but the results exhibited. Except data analysis part remaining research process followed.

The sampling design, Research design, data analysis tools and interpretation, need for the study, chapter scheme, pilot study and questionnaire has not been
Outstanding objectives with proper data collection and analysis

The Review of Literature, Research Methodology, The Statement of the problem, Need for the study, Chapter Scheme, pilot study and questionnaire has no
The Review of Literature, Research Methodology, the questionnaire, Statement of the problem, Need for the study, Chapter Scheme and conclusion has not
Basic objective with moderate match with data collection and analysis.

Objectives matched with data collection and analysis but the way of presentation needs improvement.

The Introduction of the study, Review of Literature, Research Methodology, Data analysis and interpretation, Conclusion, bibliography and questionnaire h

The researcher adopted innovative tools and techniques in this research. Objectives are matched with data collection and analysis.
Research process followed, detailed analysis missing. Objectives matched with methodology.
The Review of Literature, Research Methodology, the questionnaire, Statement of the problem, Need for the study, Chapter Scheme and conclusion has not
Excellent framing of objectives with proper methodology. Followed proper research process in data collection and analysis.
Overall research methodology was good. Framed objectives matched with data analysis and recommendations.

This research have clear cut objectives and methodology. Overall all the steps in research process was carried out.

The Research gap, Statement of the problem, Need for the study, Chapter Scheme, pilot study and questionnaire has not been explained clearly.
Excellent project work with clear objectives and proper methodology.
The Review of Literature, Research Methodology, The Statement of the problem, Need for the study, Chapter Scheme, pilot study and questionnaire has no

Way of presentation was poor and not followed research process. Methodology not good.

Need Clarity of objectives, scope and data collection process


Excellent project work. All research process followed properly. Clear cut objectives with proper methodology.

Data Analysis part was missing, objectives matched with findings and recommendations.
Recommended survey and data collection process are inappropriate
No evidence of research work

Required more evaluation sources of research, necessitate some clarity in locating materials of the study

Need proper documentation format and the student must include statement of the problem, research design, research gap, use two or more analytical tools a
The student must include statement of the problem, research design, research gap, scope of the study, limitations of the study and use two or more analytica
Need proper documentation format and the student must include research design, research gap, use two or more analytical tools and bibliography with prop
Proper objectives framed, with correct methodology.

Need proper documentation format and the student must include review of literature, research gap, scope of the study, use two or more analytical tools, reco
Adequate objectives with proper methodology for data analysis and interprretation
Need proper project format. The student must include statement of the problem, research design, research gap, data collection methods, statistical tools used
The student must include statement of the problem, need of the study, scope of the study research gap and use two or more analytical tools.
The student can include scope of the study, research gap, use two more analytical tools and concentrate on the application of project findings in the relevan
The student can include research gap, limitations of the study, use two more analytical tools, accurate bibliography with proper citation clearly and concent
The student can include research design,statement of the problem, research gap, data collection tools, use two more analytical tools, accurate bibliography w
The student must include objectives of the study, scope of the study, proper review of literature part, statement of the problem, research design,research gap

The student must include review of literature part, statement of the problem, need of the study,research gap, limitations of the study, use two or more analy
The student must include statement of the problem, scope of the study, need of the study,research gap, use two or more analytical tools and accurate bibliog

Basic objectives were developed with weak data collection and analysis.

Way of presentation not satisfying the standard. Research process steps not properly followed in this report.
The overall Project is good. It lacks in analysis part. Though the project mentioned three tools only ratio is used, that also has many flaws in interpretation s
The overall study is good. But proper alignment isrequired. Theoretical Datas mentioned in the study needs to improved.
when they fall short of initial time, cost, and quality benchmarks.
The overall Study explained is very good. Case study mentioned is good but need improvement.
Excellent objective forming and implementation. Proper research process was followed. Good project work.
This research delivers holistic journey to unravel the complexities surrounding bug occurrence and mitigation strategies during the delivery stage of softwa
Good objective formation with proper methodology, but the way of presentation is not good.
This research gives a structural foundation for the implementation of Green Cloud computing just like a better technique of I . t outsourcing (IT outsourcin
Entire research process was not correct in this project.
The scope of this project is to explore the potential of the Internet of Things (IoT) to revolutionize banking security.
Though objectives are achieved with data collection and analysis, way of presentation is not good.
The benefits of biometric authentication in digital payments include enhanced security through reliable user verification and improved user convenience, lea
Objectives achieved through proper data collection and analysis procedure, Way of presentation needs improvement.
This study is crucial for informing policies and strategies to promote financial inclusion and economic growth, given India's increasing reliance on digital fi
Issue which are occurring consistently and their root causes.
The overall project needs to improved only with better understanding of the concept and proper chapters relating only to spectrum technologies not some pa
The topic chosen is good but the required information are not added properly.
Selection of Topic in Logistics is appreciable. Still needs lot of improvement. i suggest rather than using only simple percentage analysis , various tools hav
The overall research work is good but there are many flaws throughout the research work. Review of literature is good. The Plant Location overview sectio
The vision and mission of this study is more deeply embedded in its operations and strategic objectives.
The study topic chosen was good, but failed to complete the mission. Proper Methodology and Analysis part was totally missing. The study consists mostly
The overall study conducted was very good . Though it still needs to be improved.
The overall report totally needs to be improved. Only theory session copied from the website is presented. There is no analysis part in the study.
The overall completion of the study is good. There are some minor flaws like proper alignment, unnecessary theoretical data and many .

This research identifies several prevalent ransomware families, which have been particularly destructive, often demanding exorbitant ransoms and causing p

The aim of this study is showed up for county financial of Asia with big target growth of outlying industry with the release of the first five 12 period plan.
In this project some of the main components are not listed such as data collection ,data analysis , recommendations and mainly objective of this study are no

The concept of this study is good but want to add more details related to this study.

the cloud computing on small business is well done project.

Lack of essential implementation of content, data collection process are inappropriate


No evidence of data analysis. It affects the overall project quality, only the results were shown.
lack of Clarity of objectives scope and coverage, some study methodology for data collection missing
Excellent project work done with clear cut objectives and proper research methodology.
In this project report are poor performance of the study area.
In this report are irrelevant content, very lowest performance of the report level
Way of presentation was not in proper procedure. Objectives achieved with proper findings and methodology.
Presentation was not good. Importance should be given to alignment and line spacing. Data analysis part was missing. Objectives matched with methodolog
Way of presentation was not good, Basic requirement only fulfilled.
Way of presentation was not up to the standard. However objectives are matched with methodology.

Objectives clearly stated and it correlates with findings and recommendations.


Need more relevant problems identified and need significant objectives investigated empirically.
In this project E-commerce industry encompasses a wide range of activities, including online retailing, online auctions, digital products downloads, electron
Now a days, the digitization of financial services has led to the proliferation of personal data collection, storage, and processing are very effective process.
This study will be very helpful to know about the impact of cloud computing on different companies and what type of Amazon cloud service is used by diff
Information Technology (IT) plays a pivotal role in enabling this agility, providing the tools and frameworks necessary for businesses to remain competitiv
No evidence of objectives, data collection, recommendations and bibliography. Researcher exhibit inventory management system followed by their compan
Overall Research process followed with proper methodology.
Lack of essential implementation of content, Need some replicate, generalize content of the report
This paper is the learn of information protection techniques useful for shielding and data that are securing cloud around the world. It covers the potential ri
Highly innovative and unique approach of the study, need some valid observation of the study
Clear cut objectives matched with research methodology. Proper method followed for data collection and analysis.
Necessitate some clarity in report writing, recommended survey and data collection process are inappropriate
As we are moving forward in the digital world, are we prepared for an innovative, futuristic transformation that could permanently and Digital payments ha
Need valid complete observation of the study, need usage of techniques and observation an appropriate manner.
The development of data technologies in economic sector has actually really resulted in modifications that may be crucial to raise the financial field in Asia
Lack of experimental study framework attained through this research
In recent decades, the entire economic landscape has been significantly impacted by digital advertising and artificial intelligence (AI) and Customer retentio

The emergence of generative AI extends the scope of conventional machine learning and AI, which primarily focuses on recognition and reasoning abilitie
Well defined objectives followed by proper research methodology. Sufficient care were provided for data collection and analysis.
Lack of consolidated and complete one and also need innovative unique approach of study.
Objectives are achieved with proper research methodology. Proper data collection with data analysis.
Lack of Clarity of objectives scope and coverage, Analysis of data, tools and techniques.
Description of content is highly purposeful and consolidated
Need some replicate & generalize content and data collection process are inappropriate
Need some valid content & complete observation of the choosen topic
The institutions that are financial seemingly on rapid track as a result of it based items. People have become so much more demanding and it's also the emp
Research carried out with moderate methodology. Way of presentation was not proper.
Moderate research work however objectives correlates with methodology and recommendations.
Need more clarity in reporting the plan of research
Need more clarity in reporting the plan of research and informative points inappropriate writing
Good research work carried out with proper methodology. Recommendations based on findings were missing.
Objectives matched with findings and suggestions but the methodology was not followed properly. Way of presentation needs improvement.
Well structured objectives with proper research methodology. Proper data collection and analysis were followed.
Good research work carried out with proper methodology . Data collection and analysis was done effectively, but the way of presentation needs improveme

Expand the bibliography to include diverse and pertinent sources, rectifying omissions for a more thorough exploration of challenges in agent retention and
“ELEVATING SUSTAINABLE PRACTICES IN INTERNATIONAL LOGISTICS: A CASE STUDY OF SUSTAINABLE INITIATIVES AT MAERSK

AI, And Automation", information are provided to the projects are in good manner.
Project Titled "Procurement Challenges & Way Forward (Havells)", information are provided to the projects are in poor manner. Need to improve research
“SUPPLY CHAIN MANAGEMENT IN HOSPITALS: ENSURING EFFICIENCY AND RESILIENCE" information are provided to the projects are in ve
"“OPERATIONAL MANAGEMENT PRACTISES EMPLOYED BY ACCENTURE”, information are provided to the projects are in very good manner.
Enhance the bibliography by including diverse and accurate sources to strengthen the research on fintech innovations' impact on traditional banking. Verify
Improving the bibliography with essential references and correct citations will bolster the comparative study on portfolio management, ensuring a robust an
Enhance the bibliography by correcting inaccuracies and including comprehensive sources to ensure the reliability and credibility of the study on the workf

“Lean Manufacturing Principles: Enhancing Operational Efficiency at Dell Technologies", information are provided to the projects are in good manner.
Strengthening the bibliography with accurate and diverse sources is critical to bolster the credibility of research on mutual fund performance in India. Ensur

"A REPORT ON DETAILED TOTAL QUALITY MANAGEMENT (TQM)", information are provided to the projects are in good manner.
Enhance the bibliography by including essential references and ensuring proper citation practices to strengthen the credibility and reliability of the study on
“PROCESS IMPROVEMENT IN MANUFACTURING SERVICE ORGANIZATION A SIX SIGMA APPROACH”, information are provided to the proj

"Lean Manufacturing Principles: Implementation and Impact on Operational Efficiency", information are provided to the projects are in good manner.

“KANBAN CONTROLLED PULL SYSTEM IMPLEMENTATION: AN ANALYTICAL APPROACH", information are provided to the projects are in g

"AN INVESTIGATION OF TASKS THE BOARD PUBLICIZING PRACTICES WITH UNIQUE REFERENCE TO FLIPKART ORGANIZATION", in

this project is need to clear in Objective to improve the sales and services
this project should clear in objective and mainly conclusion of maintaining skill inventory and relationships with individuals

overall of this project mention the clear points about security to provide the cloud computing
overall mention the objective of the project using block chain techniques

The Research gap, Statement of the problem, Need for the study, Chapter Scheme, pilot study and questionnaire has not been explained clearly.

concentrate on Recommendations, usefulness implementation scheme

Research Methodology, the Statement of the problem, Need for the study, Chapter Scheme and questionnaire has not been explained clearly.

focus on the Understanding of the subject and conceptualization of the Key areas

The Review of Literature, Research Methodology, Data Analysis and interpretation and questionnaire has not been explained clearly.
The sampling design, Research design, data analysis tools and interpretation, need for the study, chapter scheme, pilot study and questionnaire has not been
The Research Methodology, the questionnaire, Statement of the problem, Need for the study, Chapter Scheme and conclusion has not been explained clearl

The Research gap, Statement of the problem, Need for the study, Chapter Scheme and pilot study has not been explained clearly.

The sampling design, Research design, data analysis tools and interpretation, need for the study, chapter scheme, pilot study and questionnaire has not been
The Research gap, sampling design, Statement of the problem, need for the study, Chapter Scheme, pilot study and data analysis tools and interpretation ha

The Research Methodology, Data Analysis and interpretation, the questionnaire, linking of recommendations to the objectives and bibliography has not bee
The sampling design, Research design, data analysis tools and interpretation, need for the study, chapter scheme, pilot study and data analysis tools and inte

The Statement of the problem, need for the study, Review of Literature, Research Methodology, Data Analysis and interpretation, Chapter Scheme and pilo

The Research Methodology, the questionnaire, Statement of the problem, Need for the study, Chapter Scheme and conclusion has not been explained clearl

The Research gap, Statement of the problem, Need for the study, Chapter Scheme and pilot study has not been explained clearly.

The Research Methodology, Data Analysis and interpretation, the questionnaire, linking of recommendations to the objectives and bibliography has not bee

good
Average
scope and statement of the problem is missing.
the student must be understand the layout of the research work. need more explanation regarding to the all the aspects of project work. otherwise presentatio
Good
all the aspect of research work is good. but, statement of the problem and conclusion is missing.
Research Methodology, Analysis of data, Sampling design and Research gap has not been explained clearly.
Average
Research Methodology, Data Analysis and interpretation, the questionnaire, linking of recommendations to the objectives and bibliography has not been ex
all the aspect of research work is good. but, need more concentration about the review and findings.
Average
Below average, Synopsis only uploaded
Review of Literature, The Statement of the problem, Need for the study, Chapter Scheme has not been explained clearly.
all the aspects of research work is good. but review of literature is missing.
Research Methodology, Data Analysis and interpretation, the questionnaire, linking of recommendations to the objectives and bibliography has not been ex
the student need to improve the aspects of introduction, objectives, scope and statement of problems
need to improve objectives, scope, statement, review and findings .
Very good
all the aspects of research work is good. but, need to improve statement of problems and scope.

Average
Review of Literature, Research Methodology, The Statement of the problem, Need for the study, Chapter Scheme has not been explained clearly.
Good
Research Methodology, Data Analysis and interpretation, the questionnaire, linking of recommendations to the objectives and bibliography has not been ex
The Statement of the problem, Need for the study, Chapter Scheme has not been explained clearly.

The Research Methodology, Data Analysis and interpretation need more information.
Good
The Review of Literature, Data Analysis and interpretation need to improve.
The Findings, Suggestions and Conclusion were not clearly explained.
Good

The questionnaire, linking of recommendations to the objectives and bibliography has not been explained clearly.

Good
The Need for the study, Statement of the problem, need for the study, Review of Literature, Research Methodology, Research gap, Data Analysis and inter
Below average, needs to study on various tools to decentralize the data and give your result
The Research Methodology, Data Analysis and interpretation, the questionnaire, linking of recommendations to the objectives and bibliography has not bee
The Review of Literature, Research Methodology, The Statement of the problem, Need for the study, Chapter Scheme and questionnaire has not been expla
Very good
The Research Methodology, Data Analysis and interpretation, the questionnaire, linking of recommendations to the objectives and bibliography has not bee
The Review of Literature, Statement of the problem, Need for the study, Chapter Scheme has not been explained clearly.
Good

The Review of Literature, Statement of the problem, Need for the study, Chapter Scheme has not been explained clearly.
Good
Good
The Research Methodology, Data Analysis and interpretation, the questionnaire, linking of recommendations to the objectives and bibliography has not bee
The Review of Literature, Research Methodology, Data Analysis and interpretation and questionnaire has not been explained clearly.
Below average
Average
Average

The Research Methodology, the questionnaire, linking of recommendations to the objectives and conclusion has not been explained clearly.

The Research Methodology, Data Analysis and interpretation, the questionnaire, linking of recommendations to the objectives and bibliography has not bee

The Review of Literature, Statement of the problem, Need for the study, Chapter Scheme has not been explained clearly.
The Research Methodology, Data Analysis and interpretation, the questionnaire, linking of recommendations to the objectives and bibliography has not bee

The questionnaire, linking of recommendations to the objectives and bibliography has not been explained clearly.

The questionnaire, linking of recommendations to the objectives and bibliography has not been explained clearly.

needs improvements in data collection and analysis areas and also while selecting the tools.

Research Methodology, the questionnaire, linking of recommendations to the objectives and bibliography has not been explained clearly.

Statement of the problem, Need for the study, Chapter Scheme has not been explained clearly.
Good
Average

Average
Average

over all project report is good. but, statement of the problem is missing.
over all aspect of project work is good. need more clarity about scope and statement of the problem.
Very good
Good
Good
Good
Good
need more explanation regarding the objectives, scope, statment, review, finding & suggestions.
Good
all the aspects of project work is good. but, findings are missing.
all the aspects of project work is good.
all the aspects of project work is good. but, need more concentration about scope and statement of the problem.
the student concentrate the objectives and findings of the study.
the student more concentrate the introduction, findings, suggestions and conclusion.
below average
Average
Statement of the problem, Need for the study, Chapter Scheme has not been explained clearly.
the student must be understand the research work. the student improve the all the aspects of project report .
need more explanation regarding to the review, scope, statement, findings, suggestions and conclusion.
reviews and conclusion is missing. need more concentrate the introduction.
Review of Literature, Research Methodology and Findings of the study need to improve.
need more explanation relating to the scope, statement and findings.
Good
Review of Literature, Research Methodology and Findings of the study need to improve.

The sampling design, Research design, data analysis tools and interpretation, need for the study, chapter scheme, pilot study and questionnaire has not been
Overall, the project demonstrates clear objectives and relevant recommendations, but it requires improvement in methodology robustness, depth of analysis

The sampling design, Research design, data analysis tools and interpretation, need for the study, chapter scheme, pilot study and questionnaire has not been
Overall, the project demonstrates an adequate understanding of the topic, supported by a generally sufficient bibliography, though there are some notable om
Overall, the study on Non-Performing Assets with special reference to Axis Bank demonstrates a foundational understanding, but it requires improvement i

The assessment of microfinance lending shows a strong foundation with a well-constructed bibliography, though addressing minor omissions would bolster
The Research Methodology, Data Analysis and interpretation, the questionnaire, linking of recommendations to the objectives and bibliography has not bee
Overall, the analysis of the HDFC Limited and HDFC Bank merger shows a solid foundation with sound recommendations and a reasonable implementatio

in future, can applied recent technology for implementing the inventory control. researcher, refer many reputed journals and website link.
Overall, the project demonstrates a fundamental understanding and clear recommendations, but it requires significant improvement in methodological rigor
The study on the impact of digital banking on traditional banks exhibits a solid foundation with clear objectives and a well-constructed bibliography, but it
"Quality Control Techniques Japanese Techniques", information are provided to the projects are in average manner. Need to improve research work focus

To enhance the bibliography, ensure all relevant sources are included and verify accuracy through rigorous fact-checking. Align recommendations closely w
Enhance coherence by refining the linkage between sections, ensuring all recommendations are clearly connected to the objectives. Additionally, detail and
Researcher, in future can implement this to Government sector like, Ration Shop, Banking Sector,..etc. And also refer many reputed journals
"HOTEL MANAGEMENT OPERATIONS", information are provided to the projects are in good manner.
Expand the bibliography by including diverse and authoritative sources related to the evolution of the Indian banking sector and bank risks. Ensure thoroug
“A study on leveraging technology for procurement optimization”, information are provided to the projects are in good manner.
Interrelationships", information are provided to the projects are in very good manner.

"A systematic review of total quality management-based case studies across industries", information are provided to the projects are in good manner.
Expand the bibliography by incorporating diverse and authoritative sources to enrich the study of mergers and acquisitions in the Indian banking sector. Tho
"Cold Chain Market. Industrial Growth & Opportunities In India", information are provided to the projects are in good manner.
Expand and diversify the bibliography to include a wider range of sources, ensuring thorough coverage and credibility in the comparative analysis of consu

Expand and refine the bibliography to encompass a broader range of accurate sources, thereby bolstering the credibility and depth of the research. Verify ea
Addressing the basic and incorrect bibliography will enhance the credibility of research on Small Finance Banks in India, ensuring a solid foundation of rel

The Research Methodology, the questionnaire, linking of recommendations to the objectives and conclusion has not been explained clearly.
The Review of Literature, Statement of the problem, Need for the study, Chapter Scheme has not been explained clearly.

The Research Methodology, the questionnaire, linking of recommendations to the objectives and conclusion has not been explained clearly.
The Research Methodology, the questionnaire, linking of recommendations to the objectives and conclusion has not been explained clearly.
The Review of Literature, Statement of the problem, Need for the study, Chapter Scheme has not been explained clearly.

give some more recommendation for further researcher

The Research Methodology, the questionnaire, Statement of the problem, Need for the study, Chapter Scheme and conclusion has not been explained clearl
The Research gap, Statement of the problem, Need for the study, Chapter Scheme and pilot study has not been explained clearly.

Research Methodology, the Statement of the problem, Need for the study, Chapter Scheme and questionnaire has not been explained clearly.
The Research Methodology, the questionnaire, Statement of the problem, Need for the study, Chapter Scheme and conclusion has not been explained clearl
The Research gap, Statement of the problem, Need for the study, Chapter Scheme, pilot study and questionnaire has not been explained clearly.
The questionnaire, linking of recommendations to the objectives and bibliography has not been explained clearly.
The Review of Literature, Research Methodology, Data Analysis and interpretation and questionnaire has not been explained clearly.
more recommendation may given for further researcher
The Research gap, Statement of the problem, Need for the study, Chapter Scheme, pilot study and questionnaire has not been explained clearly.
to use various tools for analysis the data

need recommendation for the further researcher

project well designed, need some of recommendations for the further researcher
The Review of Literature, Statement of the problem, Need for the study, Chapter Scheme has not been explained clearly.
The Research Methodology, Data Analysis and interpretation, the questionnaire, linking of recommendations to the objectives and bibliography has not bee
WELL WRITTEN
MAY BE FINELY PRESENTED
FINE BUT NEED TO PRESENT WHAT THE STUDENT NEED TO SHOW, COMPLETELY WITH THE POJECT
FINE BUT THEORY MOSTLY COVER IN THIS PROJECT BUT DATA IS NOT PRESENTED COMPLETELY
WELL PRESENTED BUT SOME IMPORTANT POINTS WERE MISSING

FINE PROJECT
WELL PRESENTED
WELL PRESENTED
WELL PRESENTED
Methodology and Analysis are entirely Missing.
Objectives ,Methodology and Analysis are clearly explained.
WELL WRITTEN
WELL PRESENTED
The project is thoroughly organized and complies with the objectives established in terms of the current situation's applicability.
outstanding performance on task maps closely aligns with the objective and was thoroughly presented at work effectively.
It's a good idea, but there are some areas where the objective is still unclear.
Objectives and Reports clearly explained.
Objectives and Methodology are clearly explained.
objectives and Methodologies are clearly explained
Wonderful presentation.
Objectives and methodology should be clearly defined.
Objectives and Analysis are clearly explained.
Very nice presentation about the report.
Methodology and analysis are clearly explained
Good presentation, but some points were less relevant to the outputs.
Extremely well-written, with goals and their respective outcomes clearly laid out and with immensely useful advice.
superbly presented, with data carefully examined to ensure that the stated goal is met
Objectives and analysis are clearly defined & explained.
well analyzed, but presentation need more precise and clear outreach when the reader looks at the project, but overall, the project is good
report is an inappropriate .
wonderful presentation
The project is presented well, and all of the objectives are met.
presented is good, although some points are not aligned with the purpose and objective.
Objectives and methodology are clearly explained.
superbly done, and every goal has been accomplished
very nice presentation.
EXCELLENT work have been done and all the objectives have attained their goals
"CONSUMER SATISFACTION TOWARDS E-COMMERCE WEBSITES (MEESHO – FLIPKART – AMAZON)", information are provided to the proj
To need a Clarity of objectives scope and coverage
To need a proper objectives ,scope and coverage
To more concentrate objectives ,scope and coverage
An Analytical study on "Internet of Things (IoT) and Its Applications in Smart Cities", information are provided to the projects are in good manner.
To more concentrate Clarity of objectives scope and coverage
“The Future of Mobile Payments: Exploring the Landscape of New FinTech Players”, information are provided to the projects are in good manner.
To concentrate more in Analysis of data, tools and techniques
This project information are provided to the projects are in good manner.
To more concentrate on methodology
To need a Analysis of data, tools and techniques
“A STUDY ON WOMEN WORKING IN NIGHTSHIFTS WITH SPECIAL REFERENCE TO IT SECTOR, GURUGRAM” information are provided to t
To more focus on Analysis of data, tools and techniques
An Analytical Study on "Data breaching and Privacy Concerns" information are provided to the projects are in good manner.
To need more concentration on Analysis of data, tools and techniques
"RISK MANAGEMENT IN OUTSOURCING", information are provided to the projects are in very good manner.
"Artificial Intelligence and Machine Learning in Business Management", information are provided to the projects are in good manner.
To concentrate more to objectives ,scope and coverage
"CLOUD COMPUTING A BETTER MEANS OF IT OUTSOURCING", information are provided to the projects are in good manner.
“An agile and pragmatic solution to increase Food & Beverage (F&B) profitability in hotels” information are provided to the projects are in good manner.
"A STUDY ON THE MARKETING STRATEGY USED BY APPLE", information are provided to the projects are in average manner.
"A Comprehensive Analysis on Impact of Emerging Technologies on IT Audit Practice" information are provided to the projects are in good manner.
To need a concentration on Analysis of data, tools and techniques
To need more concentration about Clarity of objectives scope and coverage
"Navigating Cyber Threats in BFSI: A Strategic Approach to Cybersecurity", information are provided to the projects are in good manner.
To need a concentration on Analysis of data, tools and techniques
To need a clarity of Linking of recommendations to the objectives
To need concentrate the data collection, tools and techniques
To more concentrate about Analysis of data, tools and techniques
To need a concentration about Analysis of data, tools and techniques
To need a clarity about Analysis of data, tools and techniques
To more focus on Clarity of objectives scope and coverage
FRAMEWORK AND IMAGINATIVE EXECUTION CONDUCT AMONG REPRESENTATIVES” information are provided to the projects are in good
“The Impact of 5G Technology on Industry Transformation: Opportunities and Challenges" information are provided to the projects are in good manner.
Project information are provided to the projects are in average manner.
"The role of ITSM in Digital Transformation", information are provided to the projects are in good manner.
To concentrate overall of the project
To more concentrate Analysis of data, tools and techniques
To need concentrate Clarity of objectives scope and coverage
"A STUDY ON CUSTOMER SATISFACTION TOWARDS SONY MOBILE", information are provided to the projects are in very good manner.
"AI Integration in Information Technology and Systems Management", information are provided to the projects are in good manner.
“The study on big data analytics for Business insights”, information are provided to the projects are in very good manner.
"Implementation of ITIL Framework in Project Management", information are provided to the projects are in good manner.
To concentrate more Analysis of data, tools and techniques
To concentrate more Innovative techniques/approach to problem scheme
To need concentrate on Analysis of data, tools and techniques
To concentrate all over the project
“PROCEDURES FOR COMPELLING GATHERING KEY ADMINISTRATION IN THE WEB OF THING", information are provided to the projects are
“WORKPLACE STRESS AMONG INFORMATION TECHNOLOGY (IT) PROFESSIONALS: AN EXAMINATION OF SELECTED IT COMPANIES
To concentrate on objectives,scope and coverage
“Transitioning Work Processes from Sheets to a Data Management System For A Forbes Company”, information are provided to the projects are in very g
To concentrate Innovative techniques and approach to problem scheme
To concentrate Clarity of objectives scope and coverage
"THE ROLE AND IMPACT OF PROCESS AUTOMATION ON DIGITAL TRANSFORMATION IN FINANCE SECTOR" information are provided to
"Integrated Efficiency: Exploring WMS/ERP Fusion for Supply Chain Excellence", information are provided to the projects are in good manner.
To need more concentration to Understanding of the subject and conceptualization of the Key areas
To concentrate Clarity of objectives scope and coverage
To need a concentrate about Clarity of objectives scope and coverage
To concentrate Understanding of the subject and conceptualization of the Key areas
"An Analysis of India’s Fintech Industry’s Potential", information are provided to the projects are in very good manner.
To concentrate more Clarity of objectives scope and coverage
Investigation and Action Plan", information are provided to the projects are in good manner.
To need a Understanding of the subject and conceptualization of the Key areas
To concentrate Clarity of objectives scope and coverage
Competitiveness", information are provided to the projects are in very good manner.
To concentrate the Clarity of objectives scope and coverage
To concentrate Recommendations, usefulness implementation scheme
"Talent Management in Virtual Teams: Maximizing Human Capital in Digital Workspaces", information are provided to the projects are in good manner.
"STUDY ON THE IMPACT OF INFORMATION TECHNOLOGY IN SUPPLY CHAIN INDUSTRY", information are provided to the projects are in go
Private Funds", information are provided to the projects are in good manner.
ENVIRONMENT", information are provided to the projects are in good manner.
"An Analytical Study of Trajectory of Fashion Trend Forecasting @ Shree Anndata Enterprises", information are provided to the projects are in good mann
To need a Clarity of objectives scope and coverage
"Role of the IT services in supporting remote work" information are provided to the projects are in good manner.
To more concentrate about the Analysis of data, tools and techniques
To concentrate Clarity of objectives scope and coverage
To concentrate about Understanding of the subject and conceptualization of the Key areas
Behavior", information are provided to the projects are in very good manner.
To concentrate more in the Clarity of objectives scope and coverage
“A STUDY OF CUSTOMER BEHAVIOUR TOWARDS SOCIAL MEDIA MARKETING”, information are provided to the projects are in good manner
To concentrate Analysis of data, tools and techniques
To concentrate more in Clarity of objectives scope and coverage
"TO WHAT EXTENT SHOULD THE AVAILABILITY OF THE INTERNET AND INFORMATION TECHNOLOGIES MAKE WORKIN
To concentrate more in Understanding of the subject and conceptualization of the Key areas
To more concentrate Clarity of objectives scope and coverage
“A STUDY ON DIGITAL MARKETING & ITS EFFECTS ON BUSINESS WITH REFRENCE TO BRANEX", information are provided to the projects
“CYBER CRIMES IN FINANCIAL SECTOR”, information are provided to the projects are in good manner.
“The role of IT in crisis management: A study on the COVID-19 pandemic”, information are provided to the projects are in good manner.
"IoT Technology and Application Enabled Below the Line (BTL) Marketing Agemcy", information are provided to the projects are in good manner.
"The role of IT in improving and bringing transformation in Healthcare", information are provided to the projects are in good manner.
To need more Recommendations, usefulness implementation scheme
To concentrate more in Clarity of objectives scope and coverage
HEALTHCARE PROFESSIONALS IN THE PHARMACEUTICAL INDUSTRY", information are provided to the projects are in good manner.
To concentrate more in analysis of data, tools and techniques
"A STUDY OF THE IMPACT OF DIGITALIZATION ON CUSTOMERS IN THE RESTAURANT INDUSTRY IN INDIA", information are provided to
"AI-DRIVEN PERSONALIZED EDUCATION: ADAPTIVE SYSTEMS FOR CUSTOMIZED LEARNING", information are provided to the projects are
To need a proper Analysis of data, tools and techniques
"The Usage of Blockchain in Financial Institutions", information are provided to the projects are in good manner.
“Enhancing PLM in the Cement Industry: A Case Study of KESORAM CEMENT LTD” information are provided to the projects are in average good man
To concentrate Understanding of the subject and conceptualization of the Key areas
To need a proper use of Analysis of data, tools and techniques
To more concentrate Recommendations and usefulness of implementation scheme
"Enhancing Website Usability- A Comprehensive Study", information are provided to the projects are in good manner.
"STUDY OF POTENTIAL OF ARTIFICIAL INTELLIGENCE FOR TRANSFORMATION OF THE EDUCATION SYSTEM IN INDIA", information a
To need a Analysis of data, tools and techniques
To more concentrate on framing of Clarity of objectives scope and coverage
To need a concentration about Clarity of objectives scope and coverage
To need more Clarity of objectives scope and coverage
To need a proper Analysis of data, tools and techniques
"A Comparative Study of Non-Performing property (NPAs) between Public and Private Sector Finance companies in India concerning county financial of I
Need to concentrate objectives and methodology
To concentrate the Understanding of the subject and conceptualization of the Key areas
To concentrate Innovative techniques and conclusion
Project title to mention clearly and information are provided to the projects are in good manner.
To concentrate more Innovative techniques/approach to problem scheme
“MEASURE THE EFFECTIVENESS OF A DIGITAL MARKETING CAMPAIGN", information are provided to the projects are in good manner.
"A report throughout the Integration of Cloud Computing in online Work Environments", information are provided to the projects are in good manner.
INFORMATION TECHNOLOGY INDUSTRY IN INDIA", information are provided to the projects are in good manner.
To more concentrate on Analysis of data, tools and techniques
“DEVELOP A WEB BASED APPLICATION FOR CUSTOMER SUPPORT AND ANALYSE THE CUSTOMER STASTIFICATION", information are
“HARNESSING INFORMATION TECHNOLOGY AND ITSM FOR FINANCIAL MARKET TRANSFORMATION”, information are provided to the p
Need to concentrate Understanding of the subject and conceptualization of the Key areas
"A study on Ethical Considerations of GenAI in IT Service Management", information are provided to the projects are in good manner.
To equip the concentration about Linking of recommendations to the objectives and Bibliography
CONVENTIONAL SHOPPING FOR LIFESTYLE PRODUCTS: A STUDY AMONG YOUNG COMMUNITY" information are provided to the projects
To concentrate more in objectives and methodology
“TechFin’s: A new Digital Banking Platform in the Fintech Industry in India”, information are provided to the projects are in good manner.
CASE STUDY REPORT ON “A COMPREHENSIVE ANALYSIS OF E-BUSINESS ONLINE SHOPPING WITH SPECIAL REFERENCE TO FLIPKA
Need concentrate Analysis of data, tools and techniques
"INNOVATIVE RISK MANAGEMENT THROUGH ARTIFICIAL INTELLIGENCE IN FINANCE", information are provided to the projects are in very
To concentrate Analysis of data, tools and techniques and the key areas
To concentrate more Understanding of the subject and conceptualization of the Key areas
To concentrate Conclusion and bibliography
"STUDY OF AGILE METHODOLOGIES IN INDIAN IT SECTOR WITH SPECIAL REFERENCE TO TCS AT TATA CONSULTANCY SERVICE",
"A Study on The Impact of Covid-19 On Payment Systems", information are provided to the projects are in very good manner.
To add more objectives ,scope and analysis of data and techniques
"An Analytical Study of - The Rising Tide of Cyber Crime: Exploring the Correlation with Advancements in Information Technology", information are pro
"CULTIVATION PREDICTION BASED ON DATA SCIENCE TECHNIQUE ", information are provided to the projects are in good manner.
To concentrate more Analysis of data, tools and techniques
To more concentrate Analysis of data, tools and techniques
To more focus on Understanding of the subject and conceptualization of the Key areas
To more concentrate on Clarity of objectives scope and coverage
"Impact of E-Commerce on Retailers in India", information are provided to the projects are in good manner.
"AI-DRIVEN FRAUD DETECTION IN BANKING: AN ANALYTICAL STUDY OF TRANSACTION SECURITY AND RISK MANAGEMENT", info
"Impact Of Cyber Incidents On Defense Personnel: A Study of Perceived Stress Caused by Online Frauds Among Defense Personnel", information are prov
“MOBILE DEVICES SECURITY: ADDRESSING THREATS IN THE ERA OF BRING YOUR OWN DEVICE” information are provided to the project
"Innovating India’s Social Media Marketing with Advanced IT Solutions: Creating Informative NetFusion" information are provided to the projects are in
“The Significance of Search Engine Marketing (SEM) in the Digital Era” information are provided to the projects are in good manner.
To need a Clarity of objectives scope and coverage
Very nice presentation.
“The Future of E-Commerce: Emerging Technologies and Business Models”, information are provided to the projects are in good manner.
"Cyber Security Risk Management In Organizations: Strategies For Optimum Utilization Of Future Technologies", information are provided to the projects
To examine the various types of software utilized by businesses to support virtual team collaboration, information are provided to the projects are in good m
Student can add some contents like to be included in a better way.
student can add some contents in a better way
Concept explained is right but still some contents like to be included in a better way
Student can add some contents like to be included in a better way.
"Optimizing IT Service Management at JP Morgan", information are provided to the projects are in good manner.
A PROJECT REPORT ON “IMPLEMENTATION CHALLENGES OF ERP SYSTEMS IN SMALL AND MEDIUM ENTERPRISES" information are p
"A STUDY ON PREDICTIVE ANALYTICS", information are provided to the projects are in very good manner.
An Analytical Study of Importance of Privilege Access Management in Current Cyber World. information are provided to the projects are in very good ma
wonderful presentation.
concept explained is right but still some contents like to be included in a better way.
Objectives, Methodology and findings are very clearly defined.
Objectives and Methodology are clearly explained
Methodology and Analysis are clearly explained.
Automation serialization in the pharmaceutical industry, information are provided to the projects are in good manner.
"Sustainability and Green IT: Strategies for Reducing IT’s Environmental Impact" information are provided to the projects are in good manner.
WELL PRESENTED
Wonderful presentation about the project.
very nice presentation about the project report
Objectives and methodology are clearly explained
PRESENTATION IS OK
Need more explanation for this report
Need more explanation for this project.
GOOD AND WELL EXPLAINED
fine but need to concentrate more in each category
Tools for Analysis is missing
not presented as a project report but seems like a project presented
over all the project is worthwhile, whose recommendation is useful to all the firms under consideration
OVER ALL THE PROECT IS WELL PRESENTED
Need more explanation for this project
objectives and methodologies are clearly explained
GOOD
Wonderful Presentation.
wonderful presentation
ok
Objectives and Methodologies are clearly explained.
Wonderful presentation
FINE
concept explained is right but still some contents like to be included in a better way
GOOD
very nice presentation
Very nice presentation
very well written
very poor
Objectives , Methodology, Analysis, Findings and Conclusions are clearly Explained.
objectives and analysis are clearly explained.
Objectives and Analysis are clearly explained.
Objectives and analysis are clearly explained.
"Automation of Daily Workflow in E-Commerce (Nat Habit) Using Python, Google Cloud, SQL, Server and Cronta", information are provided to the proje
To more concentrate on Analysis of data, tools and techniques
To need a concentration about overall of the project
For this project information are provided to the projects are in good manner.
To concentrate about Analysis of data, tools and techniques
"Enhancing Cybersecurity Measures for Online Banking and Its Impact on Customer Satisfaction and Retention" information are provided to the projects ar
To need concentrate about the Understanding of the subject and conceptualization of the Key areas
SERVICE MANAGEMENT BEST PRACTICES” information are provided to the projects are in good manner.
STRATEGIES ON AMAZON", information are provided to the projects are in good manner.
"THE IMPACT OF ARTIFICIAL INTELLIGENCE ON BUSINESS OPERATIONS", information are provided to the projects are in good manner.
"Social Media Analytics for Brand Management for Myntra", information are provided to the projects are in good manner.
"A Comprehensive View of Home Energy Management", information are provided to the projects are in good manner.
To need a concentration about Clarity of objectives scope and coverage
“Digital transformation: Opportunities, Challenges and Roadmap for Micro, Small and Medium Businesses in India.”, information are provided to the proj
To need concentrate about conclusion and bibliography
“ANALYSIS OF USING IoT TECHNOLOGY IN TRANSFORMATION OF CITY AND INDUSTRIES" information are provided to the projects are in g
"A Study on Use of AI in Construction Industry", information are provided to the projects are in good manner.
To concentrate about Understanding of the subject and conceptualization of the Key areas
"CLOUD COMPUTING", information are provided to the projects are in average manner. Need to improve research work focus on clear idea about scope o
“CAFÉ ORDERING SYSTEM”, information are provided to the projects are in good manner.
To need more concentration about Innovative techniques/approach to problem scheme
To concentrate about Analysis of data, tools and techniques
"Information Technology in Banking", information are provided to the projects are in good manner.
"A study on Impact of green Cloud computing on IT industry", information are provided to the projects are in good manner.
To concentrate about Linking of recommendations to the objectives and Bibliography
To need a conclusion
“Cybersecurity Challenges: Strengthening Legal Enforcement, Raising Awareness, and Enhancing Organizational Practices", information are provided to t

To need a Study methodology for data collection and Analysis of data, tools and techniques
OF DIGITAL TRANSACTIONS BY CONSUMERS USING Extended UTAUT - 2 model”, information are provided to the projects are in good manner.

To need a Analysis of data, tools and techniques

To need a Clarity of objectives scope and coverage


To need Analysis of data, tools and techniques
To need more tools to analyse.

Lack of significant objectives investigated empirically and need clarity idea of the study.

Lack of research area writing, lack of clear idea of the report of the study

The research design and data analysis explained well and clarity defined terms of the research.
Lack of essential implementation of content of the research

Need some valid content and complete, lack of the measurement of the study.

Need more experimental study framework attained through this research


The research design and data analysis explained well but need measurement of the study
Lack of clearly defined terms and concepts, identification of problems

Need some replicate and generalize content of research and need data collection process are inappropriate
Standardized and ethical content throughout description and consolidated completed one

The research design and data analysis explained well and contended
USD 2 billion
Need some vivid measurement objectives and required more evaluation sources
Need more clarity in reporting the plan of research
The introduction provides a clear and comprehensive overview of cloud computing, defining its key features and benefits. It effectively sets the stage for ex
Need valid points, measurement of objectives, scope of the study and required more evaluation sources
Need some valid content and complete observation of the selected topic.
Recommended survey and data collection processes are inappropriate
Necessitate some clarity of objectives and scope of the study
To need identification of problem and reporting plan of the study
the study provides a detailed and insightful analysis of consumers' online shopping and purchasing behavior. It effectively combines theoretical perspective
the study provides a detailed and insightful analysis of AI's impact on corporate product development and R&D. It effectively combines theoretical perspec
Overall, implementing ITIL 4 in modern organizations presents both challenges and opportunities. The challenges include cultural change, legacy system in
The study was focusing towards providing security to the banking sector by the way of identifying the measures to consider safe banking
Lack of consolidated and completed one and also need some valid content
The study on the CRM practices was good analyzed, given with supportive suggestions
Need more clarity in reporting plan of the research
Lack of linking of recommendations to the objectives and most of the objectives not related to this project
The objective states the importance of Business Intelligence in the field of decision-making processes in the industry in all functional areas
The study on the block chain and cryptocurrency was good analyzed, interpreted and given with supportive suggestions
Need proper documentation format and student need to add clear review of literature part, statement of the problem, research design, research gap, populati
The student must include research design, research gap, population, sampling method sample size, two or more analytical tools and concentrate on the appli

Need proper documentation format and the student must include research design, research gap, population, sampling method sample size, two or more analy
The student must include statement of the problem, research gap, need of the study, two or more analytical tools and concentrate on the application of proje

Good work and the overall appearance of the project is in general appropriate. The student can use two more analytical tools and concentrate on the applica
Need proper documentation format and the student must include review of literature, statement of the problem, need of the study, research gap, population,

Need proper documentation format and the student must include research design, research gap, population, sampling method sample size, two or more analy

The student must include proper review of literature part, statement of the problem, research design,research gap,population, sampling method, sample size
The student must include review of literature part, statement of the problem, research design, research gap, data collection methods, population,sampling m
The student must include statement of the problem, research design, need of the study, population, sampling method and size, limitations of the study, use
This project relates to healthcare informatics and management.
The student must include research design, statement of the problem, research gap, two or more analytical tools and concentrate on the application of project
This project relates to marketing management subject.
Student must include proper review of literature part, research design, statement of the problem, need of the study, research gap, population, sampling meth
This project relates to Information Technology Enabled Services subject
Good work. The student can include scope of the study, research gap, use two more analytical tools and accurate bibliography with proper citation clearly.
Need proper documentation format and the student must include statement of the problem, research design, research gap, population,sampling method, sam
Student must include proper review of literature part, research design, statement of the problem, need of the study, research gap, population, sampling meth

The student must include research gap, population, some more questions in the questionnaires and concentrate on the application of project findings in the r

Student uploaded assignment questions with answers.

Limited clarity in objectives and scope, data collection not in clear, then analysis part of work very poor stage of report writing.
In this report very clear research data and used some tools, there are some many techniques by researcher.

In this report are three objectives and relevant scope of the study, analysis part of research very well including data collection.
In this report are two objectives primary and secondary based on research, there are many techniques used by researcher and relevant conclusion writing.

Customer Experience Management with Integration of IT and IoT Technologies.

and files within an organization supported by a set of technical and practical standards.
, the quality of teaching is a critical factor in student success and overall school performance.
used different types of techniques of this project
within the dynamic landscape of the Information Technology (IT) industry.
much more publication it helps quality of the project.

revolutionized the banking sector in India and catalyzed a wave of transformative changes.
information is essential to success.

years.

and it will provide more meaningful insight about the digital marketing.
Student needs to add Need of the study, Research gap, sampling methodology and size, proper data interpretation and accurate bibliography with proper cit
them to perform tasks that typically require human intelligence.

Very good work and the overall appearance of the project is in general appropriate. The student can add questionnaire and concentrate on the application of
implementation.
Student needs to add statement of the problem,sampling method and size, data collection methods, limitations of the study and use at least 2 analytical tool
"The Future of Payment Systems and Their Changing Trends in Indian Market,"
The Student needs to include review of literature part, research methodology part,one or two statistical tools and more references in bibliography with prope
The advent of information technology in the financial industry has brought about crucial improvements to enhance the banking sector in India and facilitate
Good work and the student can include statement of the problem, need of the study, and use at least two analytical statistical tools.
Good work.The student can add need of the study, research gap and concentrate on the application of project findings in the relevant field.
health and overall well-being.
Good work. The student can add research gap, some more questions in questionnaire and concentrate on the application of project findings in the relevant fi
This project title relates to Human resource management subject.
for systematically managing an organization's sensitive data.
This project relates to accounting subject.
decision-making.
to control and adapt to their natural environments
This project relates to human resource management subject.

Student must include review of literature part, statement of the problem, research design, data collection methods, population, sampling method, sample siz

Good work and the overall appearance of the project is in general appropriate. The student can concentrate on the application of project findings in the relev
Good work and the overall appearance of the project is in general appropriate. The student can add research gap, some more questions in the questionnaires

Student must include statement of the problem, need of the study, research design,research gap and use two or more analytical tools.

Student needs to add review of literature, statement of the problem, research gap and use at least 2 analytical tools with proper interpretation.

The student needs to add statement of the problem, research gap and use at least two analytical tools with proper interpretation and accurate bibliography w
Research gap and use at least two analytical tools with proper interpretation and accurate bibliography with proper citation.
Student needs to give proper documentation format, need of the study, research gap, limitations of the study and use at least two analytical tools with prope
The Student must give proper documentation format and include Statement of the problem, Research design, Research gap, Need of the study, limitations o
Need proper documentation format and student must include proper review of literature part, statement of the problem, population, sampling method, samp

Student needs to add clear review of literature part, Statement of the problem, research design, population, sampling technique and size, data collection me
Need proper documentation format and student needs to add clear review of literature part, Statement of the problem, research design, population, sampling

Student needs to add review of literature part, Statement of the problem, research design, Need of the study, population, sampling technique and size, data c
Student must include clear statement of the problem, research design, need of the study, population, sampling technique and size, data collection methods, s

Student must include clear statement of the problem, research design, research gap, population, sampling technique and size, data collection methods, statis
The Student must include Statement of the problem, Research design, Research gap, Need of the study, two or more analytical study, accurate bibliography

This project relates to the human resource management subject.


The gig economy presents a major advantage for MSMEs in terms of cost-effectiveness. By adopting a gig-based approach, these enterprises can significan
in emerging markets

possible.
more effectively.
transcended agricultural communities, addressing the broader needs of both rural and urban dwellers.

The ever-evolving retail landscape demands a deep understanding of customer behavior.

look at the cloud and functionality associated with it security that is concerning.
Six Sigma seeks to increase the efficiency of process creation.
Six Sigma seeks to increase the efficiency of process creation.

publication it helps quality of the project.


invaluable support, guidance, and contributions of several individuals.
more publication it helps quality of the project.

research is all about how AI affects jobs and the job market
over the internet.

over the internet.


verify transactions in the secure and transparent manner.

India's financial capital, Mumbai, serves as a hotspot for fintech innovation.


traditionally associated with human intelligence
assumptions about remuneration systems and benefits from the association.
In this report five objectives and scope of study very clear data, analysis part of research various methods used by researcher.
In this report are some objectives are relevant topic added more points of research data, research tools used by researcher and analysis part of work very we
In this research are relevant objectives with project and various methods used by researcher, some techniques used and analysed

Well Answered. Covered all the points and data collection methods very clear data provided
Well research data, important of study,research area very clear explanation of the report

Well defined and meaningful definition of the project, Highly innovative and unique approach of the study.

In this project some objectives relevant on the project, various tools used by researcher and also need some valid content & complete.

In this report are relevant to objectives, importance of the study and researcher used some technical tools methodology

In this report complete study of the report, need some objectives and unique approach of study.

In this report some points are missing in this study. Researcher find it and concluded the study of the project

Researcher find it need some valid content and complete one. in this study consolidated and some points missing only.
In this report usage of strategy, technique and methodology in an appropriate manner and informative points were discussed.

Explored thorough and complete study of the report and also highly innovative & unique approach of the study

Well defined and usage of strategy, techniques, methodology in an appropriate of the manner.

In this report about the experimental study framework attained through this research and recommended survey & data collection process are inappropriate

Lack of essential implementation of the research work and need some replicate & generalize content.

The survey and data collection process are not clearly mentioned and lack of research writing work.
In this report evaluation of hypotheses are descriptive and lack of survey of study
Recommended survey & Data collection processes are inappropriate and also lack of research area of the study.
Need some valid content and complete observation of the chosen study area.
Lack of identification of the problem & meaningful explanation of the content.

Required more evaluation sources, need some vivid measurement objectives.


Lack of strategy, techniques & methodology in an appropriate manner
Lack of the research area and need some measurement of the study and also valid content.

The student must include need of the study, research gap, some socio economic characteristics of the respondents in the questionnaire and can use some mo
This project relates to healthcare management.
Wipro's policy is to comply fully with all laws and regulations that apply to government contracting and transactions. It is also necessary to strictly adhere t
This project involves adopting new technologies like artificial intelligence,blockchain, and biometrics to strengthen security, simplify procedures, and enha
This project relates to finance management subject.
Data security is critical to protecting digital information from unauthorized access, modification, or destruction.
The student must include statement of the problem, research gap, need of the study, sampling method and size, data collection methods, statistical tools use
This project relates to human resource management subject.
The challenge lies in ensuring accurate data conversion and validation during the migration process.
This paper explores the impact of data media on consumer behavior and psychology, particularly concerning social media and digital platforms.
Need proper documentation format and page number in each pages and student must include proper review of literature part, statement of the problem, rese
Need proper documentation format and student must include proper review of literature part, research problem, research gap, population and use two or mo
The student uploaded operations management notes of Bangladesh Open University.
The student must include review of literature part, Statement of the problem, research design, research gap, population, sampling technique and size, limita
This analysis shows that majority of the employees in Infosys are satisfied from the analysis we can say that 89% of employees believe that the selection
This project relates to marketing management subject.
Student must include need of the study, research gap, population, sampling technique and size, limitations of the study and atleast two more analytical tools
Digital payments app or internet banking access, at the merchants accepting UPI e-Prepaid Vouchers.
The principal objective of this project is to analyze how effective management of information systems can contribute to organizational success.
Overall Remarks includes the financial industry is recognizing the transformative impact of blockchain technology to generate new revenue, deliver process
Need proper documentation format and the student must include statement of the problem, research design, research gap, population,sampling method, sam
A major function that technology covers for customer service is automating standard processes between customer service agents and their customers
This project relates to human resource management subject.
Need proper documentation format and the student must include need of the study, research gap, sample size and use atleast two more analytical tools and a
Product Based companies are the ones that produce high-end products in order to satisfy their customers’ requirements. These companies are focused on int
Need proper documentation format and the student must include need of the study, research gap, population, sample size, technique and use atleast two mor
The student must include scope of the study, need of the study, research gap, population, sampling method and size and use atleast two or more analytical to
Our AI CRM software helps you connect with customers in a whole new way. Salesforce is a customer relationship management (CRM) platform that help
This project relates to human resource management subject.
It reduces the administrative expenses greatly. It enables data management, which helps in taking vital choices. It bolsters HR strategies and hones the orga
The student must include research gap, population, sampling method and size and use atleast two or more analytical tools and accurate bibliography with pr
The student must include statement of the problem, research gap, need of the study, population, sampling method and size, use at least two or more analytic
AI for corporate banking automates tasks, boosts customer services through chatbots, detects fraud, optimizes investment, and predicts market trends. This
This paper will review the research that analyzes how digital payment as a new demand factor influences consumer intention, psychology
Need proper documentation format and the student must include statement of the problem, research gap, need of the study, population, sampling method an

Student must include review of literature part, research methodology part(statement of the problem, research design, data collection methods, limitations of

To resubmission of the project is required


To resubmission of the project is required

To more focus on analysis of data, tools and techniques

A research project are good but also improve some arears


To more focus on analysis of data, tools and techniques

The research project are good but require some more clarity
To more concentrate on Linking of recommendations to the objectives and Bibliography
Findings , suggestion and Conclusion are elaborately explained.
Analysis are elaborately explained.
Very nice presentation but need more explanation about the report.

To need more concentration about all over the project.


Recommendations and findings are good but also improve in specific areas

The overall study was good but require further clarification

analysis and findings are explained elaborately.


Wonderful presentation about the project.

The techniques, tools and data collection are well presented but could improve some analysis
Student can add some contents like to be included in a better way.
Very nice presentation, Objectives and analysis are explained elaboratly.

objectives are clearly defined, need more explanation.


wonderful presentation.

very nice presentation.


very nice presentation, but need more explanation about the project.
The techniques and tools are good but need to improve for greater reliability

student can add some contents like to be included in a better way.


The various recommendations and objectives of the study are clearly defined but need to improve in uses of technique and tools
Objectives, analysis and findings are clearly explained.

Nice presentation but need more explanation.

the study of block chain and currency are good ideas are required more concept of the project
good projet of erp system implementation is clear concept
the concept of cloud computing are need some more concept of project
the value of ecommer artificial intelligence is good concept of this project
the study of construction of a gsm based home automation is good ideas
threats, with a focus on emerging technologies like deepfaking.
Researcher provided the impact of Ai in digital marketing with good coverage
The purpose of this study is also to elaborate on why HR Analytics is useful. This study was conducted to provide Indian IT firms with information on the
Research work is not fulfilling the contents required for an project
This research bring focused on the amount of threat tests which include the information privacy, data ethics, information availability, shared believe and dat

. In recent times, the utilization of virtual money has actually gained popularity across numerous types of systems and techniques. This research investigates
This thesis seeks to address issues related to the applicability of Scrum, a type of agile development methodology, to the context of real-world website deve

This paper will investigate the impact of BI tools on organizational success, including improved customer satisfaction, increased revenue, and enhanced bus
Need improvement of the objectives and analysis of data

Need improvement of the data analysis and review of literature, and objectives.
need improve the proper alignment

Need hypothesis

Introduction is needed

Need hypothesis, review of literature, objectives


add some more clear objectives
give clear objectives in report

give clear and adequate methodology should be used in future

set more objectives used for studies


use some other tools for this study
set more objective and used more tools for analysis of data
good methods for used based on objecives
Improve the hypothesis and data analysis
set one or more objective for your study
Improve the objectives and proper alignment and analysis of data
Need proper alignment and review of literature are need improved
Improve the review of literature and hypothesis

more tools are to be used in this study

This project proposes a flood warning system that can detect the water level and measure the speed of the rise of water level. To give the society an earlier
and how it impacts customer satisfaction and loyalty.

used innovative tools for data analysis


This research study delves into the applications, impacts, and challenges of implementing AR in the retail sector.

write proper objectives in your study


The study has shed light on the transformative potential of technology in driving social change and enhancing the lives of those who benefit from it.
Project study year was 2019 which is significantly old
more objective needed
The focus is on enhancing means, making use of energy that is renewable, and reducing carbon footprints to promote a far more sustainable IT landscaping
This study aims to shed light on the variables that influence small and medium-sized enterprises' adoption of cloud computing.
more tools are needed
good presentations and tools are used
good and use innovative tools for analysis of data

set clear objective and various tools are used


give more objective points
This report has been written to analyze the key opportunities for the growth of the healthcare market in India.
objectives.
good and give more bibliography reference

set one or more additional objective

additional bibliography is needed


use various tools for analyse the data
organizations aiming to adopt environmentally friendly IT strategies.
Project highlights the importance of Big Data in Healthcare
The research aims to find some of the impact of the digital strategy by the help of social media of the company GoKart team sports for managing their busin
To more concentrate on Analysis of data, tools and techniques
To need a Clarity of objectives scope and coverage
this study offers a succinct overview of artificial intelligence's position in the fashion industry.

To more concentrate on Innovative techniques/approach to problem scheme

To need more concentration about objectives, scope and coverage

To need a proper analysis of data, tools and techniques


To more concentrate Analysis of data, tools and techniques
set more objectives
give more description of hospital management system project

A study of change management in IT are presented good and predetermine objectives and goals of change management in IT.
and ability regarding the boat finance companies.

good thinking of recommendation system learning model


the concept of the project is good but add to give points

the cloud computing and a better means of its projet plame

multiplex theater of online booking system is well answered

the content of project plan is good response of data collection


add some key points of information technology od management

need to give more information of, objectives,methodology,and recommendation of project

To need a proper conclusion


To more focus on Analysis of data, tools and techniques

To more concentrate Innovative techniques/approach to problem scheme


add more objectives
more more innovative tools for analysis of data
various tools are used to analyse the data
To need a Understanding of the subject and conceptualization of the Key areas
To need more focus on Recommendations and usefulness of implementation scheme

To focus on Understanding of the subject and conceptualization of the Key areas


To more concentrate about framing of objectives, scope and coverage
To more focus on objectives, scope and coverage
hypothsis is missing
To focus on Analysis of data, tools and techniques
To more focus on Analysis of data, tools and techniques
To required Analysis of data, tools and techniques
bibliography and hypothsis is missing
To concentrate Understanding of the subject and conceptualization of the Key areas
hypothsis is missing
hypothsis is missing
To concentrate more in Analysis of data, tools and techniques

add bibliography in this project


To more focus on Recommendations, usefulness implementation scheme and Bibliography
hypothsis is missing
write strong bibliography for this study
To more focus on Understanding of the subject and conceptualization of the Key areas

To need a concentration on Linking of recommendations to the objectives


hypothsis is missing
To focus on Recommendations and usefulness implementation scheme
To more concentrate about the Clarity of objectives scope and coverage
To more concentrate objectives, scope and coverage
To more concentrate on objectives, scope and coverage

To need focus on entire project


various tools are used for analysis of data
To more concentrate about analysis of data, tools and techniques
To more focus on Innovative techniques, approach to problem scheme and conclusion
hypothsis is missing
set hypothsis for testing
The project has good clarification but also improve some areas

The research project is good but required more clarity


The research project are good but need to improve in some areas
The research project is good but may require further clarification
The research project is good but may require to improve in some areas
To need resubmission of the project
To need more Clarity of objectives, scope and coverage

To need concentration about Linking of recommendations to the objectives and Bibliography


To more focus on Analysis of data, tools and techniques

To more focus on objectives,scope and coverage


more objectives needed
good objectives and use various tools to analyse the data
To need concentration about Analysis of data, tools and techniques

good
alignment properly
alignment properly
alignment properly
alignment properly

some areas needs imrpovements like conclusions and recommendations might be much relatable and based on that conclusions may drawn
Satisfactory
Satisfactory

Satisfactory
needs improvements in some areas and Weak bibliography given seems maybe more detailing missing.
Topic and objectives and the target population differs mostly. hdfc and pnb are given in objectives but considered sbi and missed pnb. throughout the projec

topic to objectives are not covering exactly, missing many data and tools and Bibliography is almost absent
needs improvement while selectiong the more relevant objectives, tools and techniques for the same.
Good

Satisfactory

Satisfactory
Good

Good

Analysis of data, tools and techniques need to improve.

Review of Literature, Data Analysis and interpretation need to improve.


Research Methodology, Data Analysis and interpretation need more information.

understanding what actuallynthe topic requires is very important and while choosing objectives and tools it needs clear connection between them. recomme
Review of Literature, Research Methodology and Findings of the study need to improve.
Statement of the problem, Need for the study, Chapter Scheme has not been explained clearly.
Research Methodology, Sampling design, Research gap has not been explained clearly.
Data Analysis and interpretation, tools and techniques has not been explained clearly.
more innovative techniques are not enough utilised and needs to be improved all the way.

tools and techniques needs to be effective and weak linkage, Very basic bibliography.
Statement of the problem, Need for the study, Chapter Scheme has not been explained clearly.

The total project was good to need more references


The entire project was good to need more website links
The entire project was well. the suggestion is to add more web site links
The entire project was good to need more data collection
Need Improvement
Good

Satisfactory
Need Improvement
The whole project was good the suggestion is to add more website links
To need more references and website links on this project
The entire project was good and also document well written

The total project was good suggestion to add some another techniques
Good

Satisfactory
Good
Good
Need Improvement
Satisfactory
The entire his project was well to add more key area on this project

Satisfactory
To need more data collection and focusing key areas to add more website links on this project

The total was good the suggestion is include more pages in this document
The total project was well and include more references and website links
Good
Very Good

The entire project was well written the suggestion is to need more website links
Satisfactory
The total project was good and include more references and web site links
The entire project was good and document also good
The entire project was good and include various techniques to used in clear way
The whole project was good the suggestion is to add more website links
Good
The project was good to add more data collection

Satisfactory
The entire project was good to need more website links
The entire project was well written to need more website links
Satisfactory
Satisfactory
The total project was good to need more innovative techniques
Good

The total project was good and need more recommendations on this project

The total project was well to need more author references and focusing key area on this project
The entire project was very well and all the concepts are focusing good
The total project was well written the suggestion is to add more website links
VERY GOOD
not ompletely explained
AVLERAGE
ok
very nice presentation
OK BUT WHT NEW CAN BE ACHIEVED NOT MENTIONED
objectives and methodologies are clearly explained.
VERYGOOD
average because not perfectly presented
Record should be incomplete
good
report is clearly explained about the topic.
This Project has been done Well, But Minimum of need only included
good
Project need to added with some Needed aspects
Lot of needable contents should be added
Some Additional Needable Contents need to be added
average major points copied from internet
Given objectives and all the aspects are normally done
well presented and contributed more how a rural can grown in terms digitally
Moreover all the aspects needed for Research is fulfilled but need some recent tools and Reviews needed
Research aspects fulfilled by this project but some additional recent tools and studies need to be referred
The entire project was good to need more websites for references.
The total project are good suggestion is need more methods for data collection
Secondary data is only used no any other tools or research methodology is used
Research aspects fulfilled by this project but some additonal recent tools and studies need to be referred
Research work done clearly but it need to be clearly presented in the Project Report
The entire project was well written. To need more references and websites
Research aspects fulfilled by this project but some additional recent tools and studies need to be referred
All Research aspects need to be arranged in order and kept with its default format for view
The total project was good to need more references and website links.
This project suggestion is used many references and websites links
Research aspects fulfilled by this project but some additional recent tools and studies need to be referred
Research aspects fulfilled by this project but some additional recent tools and studies need to be referred
Research aspects fulfilled by this project but some additional recent tools and studies need to be referred
The entire project are good. to need more websites
The total project was well written and include some more references and web sites
Research aspects fulfilled by this project but some additional recent tools and studies need to be referred
Research aspects fulfilled by this project but some additional recent tools and studies need to be referrred
The entire project was well. suggestions is to add more references on this project.
The total project was well to add more website links in this project.
The total project was good. suggestion on this project is need more website and references
Research aspects fulfilled by this project but some additional recent tools and studies need to be referred
Research aspects fulfilled by this project but some additional recent tools and studied need to be referred
The entire project was good. to need more references on this project
The total project was well written. To need more websites references on this project
Research aspects fulfilled by this project but some additional recent tools and studies need to be referred
The total project was good need to more book references and website links
Research aspects fulfilled by this project but some additional recent tools and studies need to be referred
The total project was good . suggestion is need more references
The entire project was good and need more references and website links to be added
The entire project was well written document also good
Research work done clearly but it need to be clearly presented in the Project Report
Research work done clearly but it need to be clearly presented in the Project Report
The entire project was good suggestion is to add some references
The entire project was well document also good
Research work done clearly but it need to be clearly presented in the Project Report
Research aspects fulfilled by this project but some additional recent tools and studies need to be referred
The entire project was well written.
The total project was well written and document also good
All Research aspects need to be arranged in order and kept with its default format for view
Research work done clearly but it need to be clearly presented in the Project Report
The total project was good and well written the document.
Research work done clearly but it need to be clearly presented in the Project Report
The total project was good and suggestion is to need more websites links
The total project was good and need more key points on this project
The total project was good and include some website links
All Research aspects need to be arranged in order and kept with its default format for view
The Entire project was good to need more website links and references
Research work done clearly but it need to be clearly presented in the Project Report
Research aspects fulfilled by this project but some additional recent tools and studies need to be referred
Research work done clearly but it need to be clearly presented in the Project Report
Research work done clearly but it need to be clearly presented in the Project Report
Research work done clearly but it need to be clearly presented in the Project Report

Research work done clearly but it need to be clearly presented in the Project Report
Objectives are clearly explained.
wonderful presentation.
Objectives and methodologies are clearly defined.
Methodologies and Analysis are clearly explained.
AVERAGE
Average work and a few ideas that are not shown
Objectives and analysis are clearly explained.
Very nice presentation.
NICE PRESENTATION OF THE PROJECT, WITH JUST A FEW POINTS LEFT UNDERLINED WITHOUT ADDITIONAL WEIGHTAGE
presentation is ok but some what done that reflect some reality
wonderful presentation.
Objectives are clearly defined.
OK BUT NOT PRESENTED COMPLETE RISK THAT MAPS WHICH HAPPENS IN THE BANKING INDUSTRY
NOT COMPLETELY PRESENTED IN UNDERSTANDALE FORM
very nice presentation
WELL PRESESENTED AND ALL THE AIM HAVE REACHED ITS GOAL
FINELY WRITTEN BUT SOME POINTS PRESENTED ARE NOT SO CLEAR HOW THESE CAN BE ANALYZED
Overall, THE PROJECT IS GOOD
Objectives and methodologies are clearly defined.
Objectives and analysis are clearly explained.
Wonderful presentation.
nicely presented but some main points were not considered while reviewing
Student can some contents like to be included in a better way.
very good presentation of the project and mostly are are analysed but some minors left unexplained
sufficient points were given but some contents like to be included in a better way.
GOOD PROJECT BUT CANDIDATE IS NOT CONSIOUS
student can add some contents like to be included in a better way.
very nice presentation.
Wonderful presentation.
Methodologies and analysis are clearly defined.
Objectives are clearly explained.
very nice presentation about the project. objectives, methodology, analysis , findings and conclusion are elaborately explained.
VERY GOOD
AVERAGE
Objectives and Methodologies are clearly explained.

Satisfactory

Satisfactory
Satisfactory

“Study Of Growth Prospects Of Mutual Funds In India”, information are provided to the projects are in good manner.
SELECTED PUBLIC AND PRIVATE SECTOR COMMERCIAL BANK IN INDIA”, information are provided to the projects are in good manner.
Satisfactory
more suitable objective to solve the topic relevant and conclusion of what you get your research and suggestion of information required
Satisfactory
the project have to with more objective related to problems and tools have to specify and conclusion in project suggestion
The entire project was good to need more web site links in this project
The entire project was good the suggestion is to need more references
Satisfactory
the overall project should out come with the problems and tools aspect should follow the research norms to complete the desired output of the project
the bibliographer part of answer needed more with the analysis of the usage clear and review part are to future reference
the project points are ok the bibliography needed of problems of objective have to clearly state to know the finding
REGARDING SALARIED INDIVIDUALS are to more of investment option to the employees helpful
The whole project was good to add more innovative techniques in this project
The total project was good and also all the area focused well in the document
Good
The entire project was good suggestion is to add more website links in this project
satisfactory
Good
notable omissions or inaccuracies to clarify for the good result more
The whole project was good suggestion is implementation scheme where it is used in this project
Good
all the points of problem and scope are covered and to some technical part we to solve for a time saving

The project were cover a correct bath of topic and more accuracy we may use more advanced tools
The project points of coverage area ok with objective and scope more of testing points required more based on collected data
The overall study found that questions regarding more needed and bibliography part need to elaborate
Good

The overall usability bibliography and questions parts required some more stronger
Good
Satisfactory
Good
The overall report of home loans are well may use more tools to get a accuracy and conclusion
Good

The project were covered but some objectives to be in-depth of problems and tools of analysis

Good
The project more to concentrate on available sources of information and bibliography review of literature
Hhe project were covered all Port more explanation required for objective and conclusion
Good
the bibliographer part of answer needed more with the analysis of the usage clear and review part are to future reference
Good work and the overall appearance of the project is in specific appropriate. The student can concentrate on the application of project findings in the rele
Satisfactory
Need Improvement

Research aspects fulfilled by this project but some additional recent tools and studies need to be referred
Research work done clearly but it need to be clearly presented in the Project Report
Research work done clearly but it need to be clearly presented in the Project Report
Project does not shows all the aspects of Research clearly
Research work done clearly but it need to be clearly presented in the Project Report
Research work done clearly but it need to be clearly presented in the Project Report
The total project was good suggestion is to add more website links
All Research aspects need to be arranged in order and kept with its default format for view
Research work done clearly but it need to be clearly presented in the Project Report
Research work done clearly but it need to be clearly presented in the Project Report
Research aspects fulfilled by this project but some additional recent tools and studies need to be referred
The total project are good and document also well written
Research work done clearly but it need to be clearly presented in the Project Report
The complete project are good to need more key areas focused in the project
The complete the project are well written
Research work done clearly but it need to be clearly presented in the Project Report
The entirety project are well written to need more website links in this project
Research work done clearly but it need to be clearly presented in the Project Report
Research work done clearly but it need to be clearly presented in the Project Report
The over all project are good need more references on this project
The whole project are well written and document also good
The total project consistently deliver high-quality work
The entire project was good to add more references
The whole project was good to improve focusing key ares on this project
The entire project was well written the suggestion is to add implementation scheme.
Research aspects need to be fulfilled by this project and also some recent tools and studies need to be referred
Satisfactory
The entire project well document also well written
Needs Improvement
The entire project was good to add more references and web site links
Good
Evaluation Count Evaluation Score Reason Re-evaluation Score Marked For Revaluation
0 N
1 42 Average N
0 N
2 67 Good N
0 N
1 68 Good N
1 56 Average N
1 61 Good N
1 40 Average N
1 40 Below Average N
1 51 Good N
0 N
0 N
1 42 Average N
0 N
1 42 Average N
1 58 Good N
1 46 Average N
0 N
1 15 Below Average N
1 40 Average N
0 N
1 58 Good N
0 N
1 62 Good N
1 47 Average N
0 N
2 12 Below Average N
0 N
0 N
1 52 Average N
1 42 Average N
1 58 Good N
2 17 Below Average N
1 43 Below Average N
1 57 Good N
1 43 Average N
0 N
0 N
1 57 Average N
1 53 Average N
0 N
1 69 Good N
1 42 Average N
0 N
1 56 Average N
0 N
1 53 Average N
0 N
1 43 Average N
1 65 Good N
1 61 Good N
1 61 Good N
1 44 Average N
1 60 Good N
0 N
1 61 Good N
1 41 Average N
0 N
1 59 Average N
1 63 Good N
0 N
1 48 Average N
1 53 Good N
1 65 Good N
1 67 Good N
1 44 Average N
1 53 Good N
1 59 Good N
1 57 Good N
1 61 Good N
0 N
0 N
1 54 Good N
1 62 Good N
0 N
1 53 Good N
1 60 Good N
1 53 Good N
1 55 Good N
1 44 Average N
1 63 Very Good N
0 N
1 54 Good N
1 52 Good N
1 56 Good N
0 N
1 54 Good N
1 61 Very Good N
0 N
0 N
1 60 N
1 48 Average N
1 43 Average N
1 40 Below Average N
1 28 Below Average N
1 59 Good N
1 61 Good N
0 N
1 63 Good N
1 58 Good N
1 54 Good N
1 53 Good N
1 59 Good N
0 N
1 58 Good N
0 N
1 62 Good N
1 60 Good N
0 N
0 N
1 62 Good N
1 60 Good N
1 70 Good N
1 56 Good N
1 61 Good N
1 49 Good N
0 N
1 51 Good N
1 43 Average N
0 N
1 57 Good N
1 62 Good N
1 62 Good N
1 60 Good N
1 61 N
1 62 Good N
1 72 N
1 56 Good N
1 63 Good N
1 57 Good N
1 58 Good N
1 58 Good N
1 60 Good N
1 74 Very Good N
1 50 Average N
1 64 N
1 49 Average N
0 N
1 50 Average N
1 66 Good N
2 64 Good N
1 60 Good N
1 62 Good N
1 51 Good N
1 29 Below Average N
1 54 Good N
1 49 Good N
1 58 Good N
1 3 Wrong Answer N
1 46 Average N
1 18 Below Average N
1 51 Good N
1 60 Good N
1 54 Good N
1 55 Good N
1 55 Good N
1 60 Good N
1 57 Good N
0 N
0 N
3 40 Average N
1 47 Average N
0 N
1 59 Good N
1 56 Good N
1 57 Good N
0 N
1 40 Average N
0 N
1 46 Average N
0 N
1 49 Average N
1 63 Good N
1 51 Average N
0 N
0 N
1 48 Average N
1 54 Average N
1 60 Good N
1 47 Average N
0 N
1 63 Good N
0 N
1 49 Average N
1 40 Average N
0 N
1 50 Average N
1 54 Average N
0 N
1 40 Average N
1 40 Average N
1 41 Average N
1 14 Below Average N
1 18 Below Average N
1 19 Below Average N
1 52 Average N
1 15 Below Average N
1 50 Average N
1 55 Average N
1 80 Very Good N
1 69 Good N
1 71 Good N
1 53 Average N
1 50 Average N
1 58 Good N
1 40 Average N
1 55 Average N
1 66 Good N
1 30 Below Average N
2 61 Good N
2 60 Good N
1 67 Good N
2 74 Very Good N
1 69 Good N
0 N
1 63 Good N
1 58 Average N
1 55 Average N
1 60 Good N
1 59 Average N
1 57 Good N
1 65 Good N
1 64 Good N
1 56 Average N
1 49 Average N
1 41 Average N
1 51 Good N
0 N
1 56 Average N
1 42 Average N
1 51 Average N
1 45 Average N
4 40 Average N
1 43 Average N
0 N
0 N
0 N
1 44 Average N
0 N
1 43 Average N
1 51 Average N
1 48 Average N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
1 44 Average N
0 N
0 N
1 45 Average N
0 N
0 N
1 47 Average N
0 N
0 N
0 N
1 55 Good N
0 N
0 N
0 N
1 45 Average N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
1 41 Below Average N
0 N
0 N
0 N
1 0 Other subject File N
0 N
0 N
0 N
0 N
1 57 Good N
0 N
1 58 Good N
1 50 Good N
1 53 Good N
1 55 Good N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
1 56 Good N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
1 57 Good N
0 N
1 53 Good N
0 N
1 58 Good N
0 N
0 N
0 N
2 58 Good N
0 N
0 N
1 59 Good N
0 N
1 56 N
0 N
0 N
0 N
0 N
0 N
1 55 Good N
1 55 Good N
0 N
0 N
1 65 Very Good N
1 66 Very Good N
0 N
1 60 Good N
0 N
2 57 Good N
0 N
1 76 Very Good N
1 57 Good N
1 21 Below Average N
1 58 N
1 81 Excellent N
1 52 Good N
1 74 Very Good N
1 61 Good N
1 50 Good N
1 76 Very Good N
1 66 Good N
1 46 Average N
0 N
2 36 Average N
1 44 Average N
0 N
1 67 Good N
1 50 Good N
1 53 Good N
1 61 Good N
1 51 Good N
1 52 Good N
1 65 Good N
0 N
1 71 Very Good N
1 52 Good N
1 51 Good N
0 N
1 51 Good N
1 61 Good N
1 66 Good N
0 N
1 64 Good N
1 75 Good N
1 48 Average N
0 N
0 N
1 48 Average N
0 N
1 48 Average N
0 N
1 64 Good N
0 N
0 N
1 47 Average N
1 52 Good N
1 51 Good N
1 49 Average N
0 N
0 N
1 63 Good N
1 69 Good N
0 N
1 50 Good N
1 70 Very Good N
0 N
1 53 Good N
1 53 Good N
1 53 Good N
0 N
0 N
0 N
0 N
0 N
0 N
1 62 Good N
1 70 Very Good N
2 56 Average N
0 N
0 N
1 60 Good N
0 N
0 N
1 51 Good N
1 49 N
0 N
0 N
1 52 Good N
0 N
1 50 Good N
1 53 N
0 N
1 66 Good N
0 N
1 53 Good N
0 N
1 53 Good N
1 75 Very Good N
0 N
1 60 Good N
1 57 Good N
1 52 Good N
1 60 Good N
1 45 Average N
1 72 Very Good N
0 N
1 50 Good N
1 48 Average N
0 N
0 N
0 N
1 50 Good N
1 46 Average N
1 66 Good N
0 N
1 67 Good N
1 49 Average N
1 45 Average N
1 79 Very Good N
0 N
1 51 Average N
1 72 Very Good N
1 69 Good N
0 N
0 N
1 72 Very Good N
1 44 Average N
0 N
1 67 Good N
1 52 Good N
1 45 Average N
2 53 Good N
1 75 Very Good N
1 60 Good N
1 59 Good N
0 N
1 17 Below Average N
1 71 Excellent N
1 53 Good N
2 56 Good N
1 55 Good N
0 N
0 N
0 N
1 58 Good N
1 51 Average N
0 N
1 50 Average N
1 57 Good N
1 57 Good N
1 57 Good N
1 57 Good N
1 65 Very Good N
2 56 Good N
0 N
1 55 Good N
0 N
0 N
1 68 Very Good N
1 27 Below Average N
1 16 Below Average N
1 55 Good N
1 48 Average N
1 46 Average N
1 17 Below Average N
0 N
1 55 Good N
0 N
1 56 Good N
1 72 Very Good N
1 63 Good N
1 58 Good N
0 N
1 56 Good N
0 N
1 58 Good N
0 N
1 81 Excellent N
2 49 Average N
1 47 Average N
1 53 Good N
1 54 Good N
0 N
0 N
0 N
1 58 Good N
1 40 Average N
1 48 Average N
0 N
1 46 Average N
0 N
0 N
0 N
1 50 Average N
1 46 Average N
0 N
1 39 Average N
1 53 Good N
1 51 Average N
1 54 Good N
0 N
1 53 Good N
1 54 Good N
1 53 Good N
1 52 Good N
1 53 Average N
0 N
0 N
1 52 Average N
0 N
0 N
1 52 Good N
0 N
1 60 Good N
1 51 Good N
0 N
1 50 Good N
0 N
1 52 Good N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
1 51 Good N
1 51 Good N
0 N
0 N
0 N
0 N
0 N
1 52 Good N
0 N
1 52 Good N
1 53 Good N
1 58 Good N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
1 53 Good N
0 N
1 58 N
1 62 Good N
0 N
0 N
1 54 Good N
0 N
1 58 Good N
0 N
0 N
1 64 Average N
1 46 Below Average N
1 66 Good N
0 N
0 N
0 N
0 N
1 40 Below Average N
1 54 Average N
1 54 Average N
0 N
0 N
0 N
1 80 Excellent N
1 64 Good N
1 63 Good N
2 67 Good N
1 59 Good N
1 74 Very Good N
1 76 Very Good N
1 66 Good N
1 63 Good N
1 58 Good N
1 69 Very Good N
3 65 Good N
1 59 Good N
1 56 N
0 N
1 56 Good N
2 51 Average N
1 60 Good N
1 40 Below Average N
1 56 Good N
1 57 Good N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
1 53 Average N
0 N
0 N
0 N
1 61 Good N
1 51 Average N
0 N
0 N
0 N
0 N
0 N
0 N
1 52 Average N
1 63 Good N
0 N
1 74 Good N
1 61 Good N
1 56 Average N
1 66 Good N
1 50 Average N
1 53 Average N
1 49 Average N
1 68 Good N
1 58 Average N
1 60 Good N
1 69 Good N
1 70 Very Good N
1 59 Average N
1 72 Very Good N
1 70 Very Good N
1 56 Average N
1 51 Average N
1 54 Average N
1 62 Good N
1 60 Good N
1 65 Good N
1 65 Good N
1 52 Average N
1 50 Average N
1 57 Average N
1 66 Good N
0 N
1 35 Below Average N
0 N
0 N
1 56 Average N
1 66 Good N
0 N
0 N
2 62 Good N
0 N
2 61 Good N
1 61 Good N
0 N
1 59 Good N
2 55 Good N
0 N
1 62 Good N
2 58 Good N
1 57 Good N
1 61 Good N
1 59 Good N
1 62 Good N
0 N
1 58 Average N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
1 51 Average N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
1 7 Below Average N
1 40 Below Average N
0 N
1 43 Below Average N
0 N
1 65 Good N
0 N
0 N
1 40 Below Average N
0 N
0 N
0 N
1 45 Below Average N
0 N
1 50 Good N
1 40 Below Average N
1 9 Wrong Answer N
0 N
0 N
1 66 Good N
1 59 Good N
2 62 Good N
0 N
0 N
0 N
1 66 Good N
0 N
1 65 Good N
0 N
1 58 Good N
0 N
1 57 Good N
0 N
1 56 Good N
0 N
1 59 Good N
0 N
0 N
0 N
0 N
1 77 Very Good N
1 60 Good N
0 N
1 75 Good N
1 59 Good N
0 N
0 N
0 N
1 42 Average N
0 N
0 N
0 N
1 43 Average N
1 67 Good N
0 N
1 56 Good N
1 75 Good N
1 76 Good N
0 N
0 N
0 N
1 68 Good N
0 N
1 73 Very Good N
0 N
0 N
0 N
1 60 Good N
1 71 Good N
1 46 Below Average N
1 48 Average N
2 66 Good N
1 59 Good N
1 65 Good N
1 66 Good N
1 69 Good N
1 67 Good N
1 60 Good N
1 63 Good N
1 75 Very Good N
1 45 Average N
1 65 Good N
1 42 Below Average N
1 68 Good N
1 51 Average N
1 53 Average N
1 65 Good N
1 71 Very Good N
1 61 Good N
1 50 Average N
1 79 Very Good N
1 46 Below Average N
1 16 Below Average N
1 76 Excellent N
2 69 Very Good N
1 60 Good N
1 62 Good N
1 43 Below Average N
1 60 Good N
1 45 Below Average N
1 75 Very Good N
1 75 Very Good N
1 41 Below Average N
1 69 Very Good N
1 61 Good N
2 45 Average N
1 41 Average N
1 79 Very Good N
1 45 Below Average N
1 70 Good N
1 78 Very Good N
1 74 Very Good N
1 26 Below Average N
1 71 Very Good N
1 55 Average N
1 56 Good N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
1 79 Very Good N
0 N
0 N
1 63 Good N
0 N
1 78 Good N
0 N
0 N
0 N
0 N
1 66 Good N
1 74 Good N
1 46 Average N
1 44 Average N
0 N
0 N
1 65 Good N
1 61 Good N
0 N
1 77 Very Good N
2 40 Below Average N
1 64 Good N
1 67 Very Good N
1 76 Very Good N
1 81 Excellent N
1 80 Excellent N
1 54 Average N
1 68 Good N
1 52 Average N
1 76 Good N
1 53 Average N
1 75 Very Good N
1 45 Average N
1 70 Very Good N
1 49 N
2 78 Very Good N
1 67 Good N
3 64 Good N
1 74 Very Good N
2 69 Good N
1 53 Average N
1 75 Very Good N
1 44 Average N
1 53 Average N
1 68 Good N
1 55 Average N
2 48 Average N
1 68 Good N
1 80 Very Good N
1 57 Good N
2 67 Good N
1 57 Good N
1 65 Good N
2 47 Average N
1 62 Good N
1 67 Very Good N
1 52 Good N
1 48 Average N
1 30 Below Average N
1 80 Very Good N
1 53 Average N
1 52 Average N
1 59 Good N
1 57 Average N
1 76 Very Good N
1 54 Average N
1 59 Good N
0 N
0 N
1 61 Good N
0 N
2 25 Below Average N
0 N
1 49 Below Average N
1 9 Below Average N
0 N
0 N
0 N
1 60 Good N
1 66 Good N
0 N
1 46 Below Average N
1 69 Good N
1 63 Good N
1 0 Wrong Answer N
0 N
0 N
0 N
1 60 Good N
1 58 Average N
0 N
0 N
0 N
1 48 Average N
1 58 Good N
2 64 Good N
1 29 Below Average N
1 72 Good N
1 76 Very Good N
1 40 Below Average N
1 69 Good N
1 63 Very Good N
1 64 Good N
1 68 Very Good N
1 80 Very Good N
1 65 Good N
1 55 Good N
1 68 Good N
1 69 Good N
2 65 Good N
1 55 Average N
1 70 Very Good N
1 77 Good N
1 71 Good N
1 60 Good N
1 70 Very Good N
1 71 Very Good N
1 60 Good N
1 74 Very Good N
1 55 Average N
1 60 Good N
1 69 Good N
1 69 Very Good N
1 65 Good N
1 63 Good N
1 58 Average N
1 53 Average N
1 76 Very Good N
1 77 Very Good N
1 45 Average N
1 66 Good N
1 42 Below Average N
1 56 Good N
1 56 N
1 56 Good N
1 40 Average N
1 53 Average N
1 48 Average N
1 43 Below Average N
1 40 Average N
1 49 Below Average N
1 61 Good N
1 60 Good N
1 66 Good N
1 78 Very Good N
1 49 Average N
1 24 Below Average N
1 62 Good N
1 43 Below Average N
1 55 Average N
1 55 Average N
1 52 Good N
1 59 Average N
1 60 Good N
1 56 Average N
1 64 Good N
1 62 Good N
1 72 Good N
1 49 Average N
1 72 Good N
1 58 Average N
1 77 Very Good N
1 55 Average N
1 74 Very Good N
1 60 Good N
2 80 Excellent N
1 60 Good N
1 74 Very Good N
1 66 Good N
0 N
1 62 Very Good N
1 51 Average N
0 N
1 56 Good N
0 N
0 N
1 51 Good N
0 N
0 N
1 59 Good N
0 N
0 N
1 58 Good N
1 61 Very Good N
0 N
0 N
0 N
0 N
1 51 Good N
1 51 Average N
1 54 Good N
0 N
0 N
0 N
0 N
1 55 Good N
1 61 Good N
0 N
2 51 Good N
0 N
1 64 Good N
1 53 Good N
1 50 Good N
1 54 Good N
0 N
0 N
0 N
0 N
0 N
0 N
2 50 Average N
2 53 Good N
1 55 Good N
0 N
0 N
0 N
1 50 N
0 N
1 64 Good N
0 N
0 N
0 N
0 N
1 59 Good N
1 48 N
0 N
0 N
0 N
1 59 Good N
1 61 Good N
1 53 Good N
1 51 Good N
0 N
0 N
0 N
0 N
1 66 Very Good N
0 N
0 N
2 67 Very Good N
0 N
0 N
0 N
1 73 Very Good N
0 N
0 N
0 N
0 N
0 N
1 67 Very Good N
1 52 Good N
0 N
0 N
1 70 Very Good N
0 N
0 N
0 N
1 62 Good N
1 64 Good N
1 65 Good N
0 N
1 71 Very Good N
0 N
0 N
0 N
0 N
1 61 Good N
0 N
0 N
1 43 Average N
1 67 Good N
1 66 Good N
0 N
1 73 Very Good N
1 66 Good N
1 52 Good N
0 N
1 72 Very Good N
1 50 Good N
1 68 Good N
1 50 Good N
1 51 Good N
1 55 Good N
1 68 Good N
1 74 Very Good N
1 61 Good N
1 56 Good N
1 60 Good N
1 62 Good N
0 N
1 71 Very Good N
1 58 Good N
0 N
0 N
0 N
1 62 Good N
1 62 Good N
0 N
1 62 Good N
1 59 Good N
1 51 Good N
0 N
0 N
0 N
0 N
0 N
1 48 Average N
1 58 Good N
1 57 Good N
0 N
1 60 Good N
0 N
1 53 Good N
0 N
1 51 Good N
1 58 Good N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
2 56 Good N
1 51 Good N
0 N
0 N
0 N
1 61 Good N
0 N
0 N
0 N
2 50 Average N
1 56 Good N
2 51 Average N
0 N
0 N
2 50 Average N
0 N
0 N
1 51 Good N
0 N
0 N
1 54 Good N
0 N
1 67 Very Good N
0 N
1 58 Good N
0 N
0 N
0 N
0 N
1 51 Good N
1 55 Good N
1 54 Good N
0 N
0 N
1 69 Very Good N
0 N
1 43 Average N
0 N
0 N
0 N
1 53 Good N
0 N
1 54 Good N
1 47 Average N
0 N
0 N
1 52 Good N
1 54 Good N
0 N
0 N
0 N
0 N
1 44 Average N
1 58 Very Good N
2 56 Good N
2 58 Good N
1 27 Below Average N
2 50 Average N
1 54 Good N
0 N
0 N
0 N
1 50 Average N
1 50 Average N
0 N
0 N
1 69 Good N
0 N
1 40 Below Average N
0 N
0 N
1 73 Very Good N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
1 73 Very Good N
1 67 Good N
0 N
0 N
0 N
1 40 Below Average N
1 59 Average N
0 N
0 N
1 68 Good N
0 N
1 70 Very Good N
1 68 Very Good N
1 49 Average N
1 46 Average N
0 N
1 45 Average N
0 N
1 59 Good N
2 51 Good N
1 77 Very Good N
0 N
0 N
1 66 Good N
0 N
0 N
0 N
1 61 Good N
0 N
0 N
0 N
1 50 Good N
1 54 Average N
1 31 Below Average N
0 N
0 N
0 N
1 45 Average N
0 N
1 49 Average N
0 N
1 70 Very Good N
1 65 Good N
1 40 Below Average N
0 N
1 72 Very Good N
0 N
0 N
1 63 Good N
0 N
1 50 Average N
0 N
0 N
1 72 Very Good N
0 N
1 60 Good N
1 62 Good N
1 51 Average N
1 57 Good N
1 61 Good N
1 62 Good N
1 50 Average N
1 40 Average N
1 67 Good N
1 71 Very Good N
1 57 Average N
1 44 Average N
1 59 Good N
1 40 Average N
1 62 Good N
1 40 Average N
1 40 Average N
1 48 Average N
1 50 Average N
1 53 Average N
1 62 Good N
1 42 Average N
1 65 Good N
1 61 Good N
1 60 Good N
1 66 Good N
1 69 Good N
1 72 Very Good N
1 59 Average N
1 64 Good N
1 45 Below Average N
1 63 Good N
1 47 Average N
1 52 Good N
1 44 Average N
1 61 Good N
1 63 Good N
1 61 Good N
1 69 Very Good N
1 73 Very Good N
1 62 Good N
1 62 Good N
1 65 Good N
1 83 Very Good N
1 64 Good N
1 68 Good N
1 51 Average N
1 63 Good N
1 68 Good N
1 61 Good N
0 N
1 53 Average N
1 51 Average N
1 51 Good N
1 74 Very Good N
1 60 Good N
1 71 Very Good N
1 49 Average N
0 N
1 57 Average N
1 58 Good N
1 68 Very Good N
0 N
0 N
1 63 Good N
0 N
0 N
0 N
1 46 Below Average N
1 46 Below Average N
1 65 Good N
0 N
1 83 Excellent N
0 N
0 N
0 N
1 52 Good N
1 72 Very Good N
0 N
1 79 Excellent N
1 54 Good N
0 N
1 22 Below Average N
0 N
0 N
0 N
1 61 Good N
0 N
0 N
1 72 Very Good N
0 N
0 N
0 N
1 63 Good N
0 N
0 N
0 N
0 N
1 41 Below Average N
1 71 Very Good N
0 N
0 N
1 50 Below Average N
0 N
0 N
1 63 Good N
1 48 Average N
1 47 Average N
1 46 Average N
1 73 Very Good N
1 75 Good N
1 53 Good N
1 50 Good N
1 70 Good N
1 65 Good N
1 69 Good N
1 42 Average N
1 41 Average N
1 49 Average N
1 61 Good N
1 61 Good N
1 61 Good N
1 56 Average N
1 61 Good N
1 61 Very Good N
1 66 Good N
1 59 Average N
1 69 Good N
1 53 Average N
1 62 Good N
1 68 Very Good N
1 50 Average N
1 59 Average N
1 69 Very Good N
1 54 Average N
1 61 Good N
1 46 Average N
1 67 Good N
1 66 Good N
0 N
0 N
1 59 Good N
0 N
1 70 Very Good N
0 N
0 N
1 41 Average N
0 N
1 66 Good N
0 N
0 N
0 N
0 N
1 48 Average N
1 68 Good N
0 N
0 N
1 70 Very Good N
0 N
2 66 Good N
1 70 Good N
1 73 Very Good N
0 N
1 66 Good N
0 N
0 N
1 62 Good N
1 67 Good N
0 N
0 N
1 51 Average N
1 42 Below Average N
0 N
0 N
0 N
0 N
1 60 Good N
0 N
0 N
0 N
1 45 Average N
1 62 Good N
1 54 Average N
1 60 Good N
0 N
0 N
1 64 Good N
0 N
1 69 Very Good N
0 N
1 72 Very Good N
1 44 Below Average N
0 N
1 48 Average N
0 N
1 74 Excellent N
1 53 Average N
0 N
1 71 Very Good N
0 N
0 N
1 49 Below Average N
0 N
1 61 Good N
0 N
1 8 Below Average N
1 27 Below Average N
1 73 Very Good N
1 58 Average N
1 41 Below Average N
0 N
0 N
1 67 Good N
1 61 Good N
0 N
1 61 Good N
0 N
0 N
1 51 Average N
0 N
1 45 Below Average N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
1 43 Below Average N
0 N
0 N
0 N
1 58 Average N
0 N
0 N
1 63 Good N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
1 50 Average N
0 N
1 57 Very Good N
1 51 Good N
1 54 Good N
0 N
0 N
0 N
1 50 Average N
1 50 Good N
1 55 Good N
1 59 Very Good N
0 N
0 N
1 50 Good N
0 N
0 N
0 N
1 50 Good N
0 N
0 N
1 25 Below Average N
0 N
0 N
1 55 Good N
0 N
0 N
0 N
1 50 Good N
1 51 N
0 N
0 N
1 54 Good N
1 57 Good N
0 N
0 N
1 51 Good N
0 N
1 58 Very Good N
1 56 Good N
0 N
1 52 Good N
1 55 Good N
0 N
3 60 Good N
0 N
1 47 Average N
1 51 Average N
0 N
1 68 Good N
1 76 Good N
0 N
0 N
1 55 Average N
0 N
0 N
0 N
0 N
1 57 Good N
0 N
1 53 Good N
0 N
1 54 Good N
0 N
1 33 Below Average N
1 30 Below Average N
1 38 Average N
1 65 Very Good N
0 N
1 66 Very Good N
1 57 Good N
1 50 Average N
0 N
0 N
0 N
0 N
0 N
1 55 Good N
1 53 Good N
0 N
0 N
0 N
0 N
1 50 Good N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
1 56 Average N
0 N
1 50 Average N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
1 48 Average N
0 N
0 N
0 N
0 N
0 N
0 N
1 66 Good N
0 N
0 N
1 58 Good N
1 64 Good N
1 61 Good N
1 57 Good N
0 N
0 N
0 N
0 N
1 40 Average N
0 N
0 N
1 50 Average N
1 51 Average N
0 N
0 N
0 N
0 N
1 49 Average N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
1 65 Good N
0 N
0 N
0 N
1 54 Average N
1 55 Average N
1 60 Average N
1 52 Average N
1 52 Average N
1 50 Average N
1 40 Below Average N
1 55 Average N
1 67 Very Good N
1 70 Very Good N
1 56 Average N
1 55 Average N
1 63 Good N
1 65 Good N
1 46 Average N
1 55 Average N
1 53 Average N
0 N
1 60 Good N
1 36 Below Average N
1 58 Average N
1 47 Average N
1 59 Good N
1 57 N
1 57 Average N
1 50 Average N
1 51 Average N
1 32 Below Average N
0 N
1 53 Average N
0 N
1 62 Average N
1 46 Average N
0 N
3 62 Good N
1 59 Good N
1 44 Average N
1 46 Average N
1 52 Average N
1 56 Good N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
1 81 Good N
0 N
1 52 Average N
0 N
0 N
0 N
0 N
0 N
1 50 Average N
0 N
0 N
0 N
0 N
0 N
0 N
1 54 Average N
2 51 Average N
0 N
0 N
1 46 Below Average N
0 N
0 N
1 61 Good N
0 N
1 51 Average N
1 55 Average N
1 55 Average N
0 N
0 N
1 50 Average N
0 N
1 54 Average N
0 N
0 N
0 N
1 51 Average N
1 64 Good N
1 68 Good N
1 60 Good N
0 N
1 64 Good N
1 62 Good N
1 58 Good N
0 N
1 61 Good N
1 48 Average N
1 59 Good N
1 64 Good N
1 40 Average N
1 57 Good N
0 N
0 N
0 N
1 64 Good N
1 45 Average N
0 N
1 51 Average N
1 54 Good N
0 N
1 63 Good N
1 65 Very Good N
0 N
0 N
1 59 Good N
0 N
1 40 Below Average N
2 56 Good N
1 49 N
1 65 Very Good N
1 60 Good N
1 45 Below Average N
1 58 Good N
1 49 Average N
1 44 Below Average N
1 57 Good N
1 67 Very Good N
1 40 Average N
1 58 Good N
0 N
1 68 Very Good N
0 N
1 59 Good N
0 N
0 N
0 N
0 N
0 N
0 N
1 40 Average N
1 50 Average N
1 53 Good N
1 57 Good N
0 N
0 N
1 45 Average N
0 N
0 N
0 N
1 55 Average N
1 66 Good N
0 N
1 68 Good N
1 63 Very Good N
1 73 Very Good N
0 N
1 67 Good N
1 80 Very Good N
1 56 Good N
1 56 Good N
1 75 Very Good N
1 78 Very Good N
1 80 Very Good N
0 N
1 80 Very Good N
1 78 Very Good N
1 80 Very Good N
1 71 Good N
1 80 Very Good N
1 63 Good N
1 60 Good N
1 61 Very Good N
2 55 Average N
1 50 Average N
1 56 Average N
1 45 Average N
1 40 Average N
1 61 Good N
1 62 Good N
1 64 Good N
1 65 Good N
1 61 N
1 54 Good N
1 57 Good N
2 55 Average N
2 45 Below Average N
2 84 Very Good N
1 82 Very Good N
2 85 Very Good N
1 64 Good N
1 84 Very Good N
1 53 Good N
1 85 Very Good N
1 65 Good N
1 88 Excellent N
1 71 Good N
1 50 Average N
1 77 Very Good N
1 57 Good N
1 71 Very Good N
1 17 Below Average N
1 80 Very Good N
1 66 Good N
1 77 Very Good N
1 32 Below Average N
1 80 Very Good N
0 N
0 N
0 N
0 N
0 N
1 61 Good N
1 42 Average N
1 60 Average N
1 59 Average N
2 56 Average N
1 51 Average N
2 77 Very Good N
3 55 Good N
2 61 Good N
2 65 Good N
1 59 Good N
1 46 Average N
1 61 Very Good N
2 58 Good N
1 70 Good N
1 41 Average N
1 60 Good N
1 68 Good N
1 66 Very Good N
1 66 Very Good N
1 77 Very Good N
1 40 Below Average N
1 57 Average N
1 57 Good N
1 58 Good N
2 40 Below Average N
1 63 Very Good N
1 60 Good N
1 40 Below Average N
1 58 Good N
1 65 Good N
1 50 Average N
1 45 Below Average N
1 60 Good N
1 51 Average N
1 65 Good N
1 65 Good N
1 60 Good N
1 59 Good N
1 67 Good N
1 38 Below Average N
1 56 Good N
1 77 Very Good N
1 56 Good N
1 52 Average N
1 30 Below Average N
1 70 Very Good N
1 82 Very Good N
1 80 Very Good N
1 50 Average N
1 80 Very Good N
1 79 Very Good N
1 53 Good N
1 79 Very Good N
1 72 Good N
1 80 Very Good N
1 77 Very Good N
1 32 Below Average N
1 62 Very Good N
1 79 Very Good N
1 75 Very Good N
1 58 Good N
0 N
1 68 Good N
1 66 Very Good N
1 67 Very Good N
1 59 Good N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
1 60 Good N
0 N
0 N
1 59 Good N
1 62 Good N
2 63 Good N
0 N
0 N
1 54 Good N
0 N
1 64 Good N
0 N
0 N
0 N
0 N
1 62 Good N
1 65 Very Good N
0 N
1 70 Very Good N
1 60 Good N
1 66 Good N
1 56 Good N
1 42 Average N
1 66 Good N
1 40 Average N
1 57 Good N
1 52 Good N
1 63 Very Good N
1 42 N
1 62 Very Good N
1 53 Good N
1 60 Good N
1 73 Excellent N
1 62 Good N
1 49 Average N
1 66 Very Good N
1 56 Good N
1 70 Excellent N
1 53 Good N
1 40 Average N
1 68 Very Good N
1 78 Excellent N
3 71 Excellent N
1 64 Very Good N
1 67 Very Good N
1 52 Good N
1 54 Very Good N
2 65 Very Good N
2 44 Good N
1 63 Good N
3 70 Excellent N
1 81 Excellent N
1 80 Excellent N
1 62 N
1 50 Average N
1 59 Good N
1 40 Average N
1 55 Average N
2 55 Good N
1 62 Good N
1 40 Average N
1 60 Very Good N
1 61 Good N
1 75 Excellent N
2 52 Good N
1 16 Below Average N
1 58 Average N
2 49 Average N
1 40 Below Average N
2 59 Good N
1 55 Average N
0 N
0 N
1 61 Very Good N
1 47 Below Average N
1 40 Average N
0 N
1 65 Excellent N
0 N
1 40 Average N
0 N
2 57 Good N
1 40 Below Average N
0 N
0 N
1 49 Average N
1 52 Good N
1 51 Good N
0 N
0 N
0 N
0 N
0 N
0 N
1 63 Very Good N
0 N
1 40 Average N
0 N
0 N
0 N
1 63 Very Good N
0 N
2 47 Average N
0 N
0 N
2 69 Very Good N
1 54 Good N
0 N
0 N
1 43 Average N
1 62 Very Good N
1 57 Very Good N
2 29 Below Average N
1 61 Good N
1 65 Very Good N
0 N
3 45 Average N
1 45 Average N
0 N
1 50 Good N
1 52 Good N
1 41 Average N
0 N
1 60 Good N
2 49 Good N
0 N
1 57 Very Good N
1 31 Average N
1 61 Very Good N
0 N
0 N
1 53 Good N
0 N
0 N
1 74 Excellent N
0 N
1 52 Good N
1 42 Average N
2 51 Average N
0 N
1 61 Very Good N
0 N
1 0 Wrong Answer N
0 N
0 N
2 68 Excellent N
1 60 Very Good N
1 46 Average N
1 75 Excellent N
1 63 Very Good N
0 N
0 N
1 69 Excellent N
0 N
0 N
1 58 Good N
1 76 Excellent N
1 51 Good N
0 N
0 N
0 N
1 25 Below Average N
0 N
0 N
0 N
1 54 Good N
1 80 Excellent N
0 N
0 N
1 50 Good N
1 53 Good N
1 5 Wrong Answer N
0 N
1 56 Good N
0 N
0 N
0 N
0 N
1 45 Below Average N
1 53 Average N
1 56 Average N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
1 61 Good N
0 N
0 N
2 63 Excellent N
0 N
0 N
1 40 Below Average N
2 58 Very Good N
1 38 Below Average N
1 47 Below Average N
1 60 Good N
1 56 Average N
1 51 Average N
1 23 Below Average N
0 N
1 56 Average N
1 54 Average N
0 N
0 N
0 N
0 N
0 N
2 51 Average N
0 N
1 55 Good N
1 55 Average N
1 60 Good N
1 64 Good N
1 66 Very Good N
2 80 Excellent N
1 68 Good N
1 67 Very Good N
2 68 Very Good N
1 23 Below Average N
1 65 Good N
1 44 Average N
1 63 Good N
1 55 Good N
1 67 Good N
1 52 Good N
1 41 Below Average N
1 25 Below Average N
1 59 Good N
1 53 Good N
1 63 Good N
1 29 Below Average N
1 68 Very Good N
1 28 Below Average N
1 64 Good N
0 N
0 N
1 66 Good N
0 N
0 N
0 N
1 60 N
0 N
0 N
0 N
1 40 Average N
0 N
1 42 Good N
1 52 Good N
1 69 Good N
0 N
1 49 Average N
1 59 Good N
1 44 Average N
1 80 Excellent N
1 20 Wrong Answer N
1 11 Wrong Answer N
1 60 Very Good N
1 57 Good N
1 44 Good N
1 58 Very Good N
0 N
1 64 Good N
1 63 Very Good N
1 59 Good N
1 54 Good N
1 58 Good N
1 60 Good N
1 54 Good N
1 40 Below Average N
1 63 Very Good N
1 58 Good N
1 57 Good N
1 63 Very Good N
1 69 Very Good N
1 51 Good N
1 62 Good N
2 51 Good N
1 68 Very Good N
1 52 Good N
1 60 Good N
1 57 Good N
1 67 Very Good N
1 76 Excellent N
1 52 Good N
2 66 Very Good N
2 43 Average N
1 65 Very Good N
1 44 Average N
1 42 Average N
1 70 Very Good N
1 49 Good N
1 51 Good N
1 41 Average N
1 59 Good N
1 66 Excellent N
1 58 Good N
1 78 Excellent N
2 57 Very Good N
1 62 Very Good N
1 35 Below Average N
1 64 Good N
0 N
1 68 Good N
1 22 Below Average N
1 76 Good N
1 72 Very Good N
1 57 Good N
1 57 Good N
1 37 Average N
0 N
1 69 Good N
1 51 Good N
0 N
1 61 Good N
1 54 Good N
1 78 Very Good N
0 N
0 N
0 N
0 N
0 N
1 80 Excellent N
0 N
0 N
1 69 Good N
0 N
0 N
0 N
0 N
0 N
1 75 Very Good N
0 N
0 N
1 51 Good N
1 53 Good N
0 N
1 54 Good N
1 52 Good N
0 N
1 44 Average N
0 N
0 N
0 N
0 N
0 N
2 69 Very Good N
0 N
0 N
1 55 Good N
0 N
1 67 Very Good N
0 N
0 N
0 N
0 N
1 40 Average N
1 53 Good N
1 40 Average N
0 N
0 N
0 N
1 51 Good N
0 N
1 57 Good N
1 55 Good N
0 N
1 52 Good N
1 54 Good N
0 N
0 N
1 42 Average N
0 N
0 N
0 N
0 N
0 N
1 43 Average N
0 N
1 55 Good N
0 N
1 42 Average N
0 N
0 N
0 N
1 63 Good N
1 42 Average N
1 70 Very Good N
1 57 Good N
1 58 Good N
1 64 Good N
1 44 Average N
1 55 Average N
1 43 Average N
1 71 Very Good N
1 50 Average N
1 30 Below Average N
1 52 Good N
1 74 Very Good N
1 43 Average N
1 71 Very Good N
1 68 Good N
1 70 Very Good N
1 77 Very Good N
0 N
1 58 Average N
1 44 Average N
1 68 Good N
1 50 Good N
1 51 Good N
0 N
0 N
0 N
0 N
2 44 Average N
0 N
0 N
1 66 Good N
1 55 Good N
1 51 Good N
1 67 Good N
0 N
1 52 Good N
0 N
0 N
0 N
1 61 Good N
1 16 Below Average N
1 26 Below Average N
1 40 Average N
1 50 Good N
1 76 Very Good N
1 41 Average N
1 50 Good N
1 62 Good N
0 N
1 56 Good N
1 57 Good N
1 57 Good N
1 42 Average N
1 42 Average N
1 30 Below Average N
1 43 Average N
2 50 Average N
0 N
0 N
0 N
1 47 Average N
0 N
0 N
1 50 Good N
0 N
0 N
0 N
0 N
1 52 Good N
1 43 Average N
0 N
0 N
1 58 Good N
0 N
0 N
2 51 Good N
0 N
1 56 N
0 N
0 N
0 N
2 43 Average N
0 N
1 60 Good N
0 N
0 N
1 56 Good N
1 48 Average N
0 N
0 N
0 N
1 52 Average N
1 44 Average N
0 N
1 79 Very Good N
1 72 Good N
1 71 Very Good N
1 63 Good N
1 66 Good N
1 66 Good N
1 62 Good N
1 60 Good N
1 59 Good N
1 77 Very Good N
1 77 Very Good N
1 73 Very Good N
1 71 Good N
1 70 Good N
1 41 Below Average N
1 50 Average N
1 52 Good N
1 34 Average N
1 72 Very Good N
1 64 Good N
1 56 Good N
1 71 Very Good N
1 60 Good N
1 50 Good N
0 N
0 N
1 40 Average N
1 53 Good N
0 N
0 N
1 50 Good N
1 39 Average N
1 51 Good N
0 N
1 54 Good N
1 44 Average N
1 54 Good N
0 N
1 51 Good N
1 51 Good N
1 60 Very Good N
1 50 Average N
0 N
1 53 Good N
1 50 Good N
1 66 Very Good N
0 N
0 N
1 67 Good N
1 50 Average N
1 64 Good N
1 75 Very Good N
0 N
1 69 Good N
1 64 Very Good N
1 69 Good N
1 57 Good N
0 N
1 58 Good N
1 34 Below Average N
0 N
0 N
0 N
1 46 Average N
1 51 Good N
0 N
0 N
0 N
1 51 Good N
1 45 Average N
1 53 Good N
0 N
0 N
0 N
0 N
0 N
1 55 Good N
1 62 Very Good N
0 N
0 N
1 43 Average N
1 55 Good N
0 N
0 N
0 N
0 N
1 47 Average N
1 50 Good N
1 57 Good N
1 54 Good N
1 40 Average N
1 57 Good N
1 56 Good N
1 59 Good N
0 N
0 N
0 N
1 42 Average N
0 N
0 N
0 N
1 60 Good N
1 45 Average N
1 50 Good N
1 71 Good N
1 62 Average N
1 44 Below Average N
1 52 Average N
1 62 Average N
2 25 Copy Case-Internet/Course Book N
1 65 Average N
1 81 Very Good N
1 90 Excellent N
1 89 Excellent N
1 19 Below Average N
1 52 Very Good N
2 81 Very Good N
1 84 Very Good N
2 91 Excellent N
3 94 Excellent N
2 65 Good N
1 45 Good N
1 47 Good N
1 54 Good N
1 52 Very Good N
1 52 Good N
1 55 Good N
1 53 Good N
1 46 Good N
2 77 Good N
2 83 Very Good N
2 90 Excellent N
2 51 Good N
2 75 Good N
1 35 Below Average N
1 52 Good N
2 77 Good N
2 60 Good N
1 50 Good N
2 91 Excellent N
1 50 Good N
2 92 Excellent N
1 62 Good N
1 47 Good N
1 50 Good N
1 50 Good N
1 77 Good N
1 44 Good N
1 79 Good N
1 52 Good N
1 61 Good N
1 56 Good N
1 41 Good N
1 64 Good N
1 53 Good N
1 66 Good N
1 51 Good N
1 76 Very Good N
1 66 Good N
1 49 Good N
1 69 Good N
1 73 Good N
1 52 Average N
1 72 Good N
1 45 Good N
1 53 Good N
1 69 Good N
1 52 Good N
1 56 Good N
2 53 Good N
1 55 Good N
1 41 Good N
1 54 Good N
1 52 Good N
1 68 Good N
1 63 Good N
2 59 Average N
1 63 Good N
2 42 Good N
1 62 Very Good N
1 58 Good N
1 74 Very Good N
1 67 Good N
1 73 Very Good N
1 69 Good N
1 54 Good N
1 59 Good N
1 55 Good N
1 42 Good N
1 64 Good N
1 63 Good N
2 59 Good N
2 74 Very Good N
1 63 Very Good N
1 42 Good N
1 74 Good N
1 76 Good N
1 57 Good N
1 45 Good N
1 56 Good N
1 60 Good N
1 81 Very Good N
1 42 Good N
1 76 Good N
1 58 Good N
1 58 Good N
1 80 Very Good N
1 41 Good N
1 58 Good N
1 69 Good N
1 66 Good N
1 74 Good N
1 74 Good N
1 65 Good N
2 41 Good N
1 77 Good N
1 55 Good N
1 52 Good N
1 57 Good N
1 71 Very Good N
1 49 Good N
1 64 Good N
2 56 Good N
1 53 Good N
1 57 Average N
1 58 Good N
1 51 Good N
1 61 Good N
1 62 Good N
1 69 Good N
1 61 Good N
1 68 Good N
1 57 Good N
1 47 Good N
1 67 Good N
3 54 Good N
1 74 Good N
1 72 Good N
1 45 Good N
1 69 Good N
1 57 Average N
2 57 Good N
1 49 Good N
1 59 Good N
1 77 Very Good N
1 75 Very Good N
1 48 Good N
1 49 Good N
1 53 Good N
1 52 Good N
1 57 Good N
1 57 Average N
1 41 Average N
2 47 Good N
2 55 Very Good N
1 61 Good N
1 45 Good N
1 66 Good N
1 67 Good N
1 67 Good N
1 47 Good N
1 73 Good N
1 68 Good N
1 56 Very Good N
1 63 Good N
2 52 Good N
1 75 Very Good N
1 43 Good N
1 68 Good N
1 79 Very Good N
1 55 Very Good N
1 73 Very Good N
1 53 Good N
2 52 Good N
2 54 Good N
1 68 Good N
1 75 Very Good N
1 44 Good N
1 63 Good N
1 62 Good N
1 58 Good N
1 54 Good N
1 58 Good N
1 61 Very Good N
1 61 Good N
1 74 Good N
1 74 Very Good N
1 74 Good N
1 76 Good N
1 62 Good N
1 58 Good N
1 51 Good N
1 71 Good N
1 75 Very Good N
1 76 Good N
1 50 Good N
1 40 Below Average N
1 54 Good N
1 46 Good N
1 73 Good N
1 73 Good N
2 83 Very Good N
1 81 Very Good N
1 46 Good N
1 44 Good N
1 48 Good N
1 53 Very Good N
1 49 Good N
1 75 Good N
1 76 Good N
3 75 Very Good N
1 51 Very Good N
1 49 Good N
1 52 Very Good N
3 59 Good N
1 40 Average N
1 47 Good N
3 83 Very Good N
2 62 Good N
1 43 Average N
2 48 Average N
2 81 Good N
2 70 Good N
1 48 Average N
1 52 Very Good N
1 74 Good N
1 48 Good N
1 53 Good N
1 61 Average N
1 50 Very Good N
1 54 Very Good N
1 77 Good N
1 45 Good N
1 83 Very Good N
1 55 Very Good N
1 50 Good N
1 85 Very Good N
1 7 Wrong Answer N
1 58 Very Good N
1 52 Very Good N
1 52 Very Good N
1 52 Very Good N
1 66 Good N
1 57 Good N
1 28 Below Average N
1 68 Good N
1 56 Good N
1 82 Very Good N
1 59 Good N
1 84 Very Good N
1 70 Good N
1 73 Good N
1 74 Good N
1 71 Good N
1 41 Good N
1 68 Good N
1 49 Good N
1 76 Very Good N
1 78 Very Good N
1 59 Good N
1 54 Average N
1 63 Good N
1 59 Good N
1 53 Good N
1 61 Good N
1 75 Very Good N
1 52 Good N
1 50 Good N
1 74 Very Good N
1 69 Good N
1 29 Below Average N
1 71 Good N
2 12 Copy Case-Internet/Course Book N
1 41 Good N
3 15 Copy Case-Internet/Course Book N
1 41 Good N
1 46 Good N
1 55 Good N
0 N
0 N
0 N
2 59 Good N
0 N
0 N
1 51 Average N
0 N
0 N
0 N
1 64 Very Good N
0 N
1 55 Good N
0 N
1 56 Good N
0 N
1 57 Good N
1 61 Very Good N
1 52 Good N
0 N
1 56 Good N
1 62 Very Good N
0 N
0 N
0 N
1 65 Very Good N
1 61 Good N
1 56 Good N
2 51 Good N
1 61 Good N
1 47 Average N
1 55 Good N
1 54 Good N
1 56 Good N
1 56 Good N
1 60 Good N
1 63 Good N
1 60 Good N
1 63 Good N
1 56 Good N
1 68 Good N
1 58 Good N
1 44 Average N
1 70 Good N
1 69 Good N
1 47 Average N
1 66 Good N
0 N
1 40 Below Average N
1 56 Average N
0 N
1 73 Very Good N
1 43 Below Average N
0 N
0 N
0 N
0 N
0 N
0 N
0 N
1 50 Average N
0 N
1 20 Below Average N
1 40 Below Average N
1 27 Below Average N
1 0 Other subject File N
1 61 Good N
1 0 Other subject File N
1 41 Below Average N
0 N
1 0 Other subject File N
1 60 Good N
1 40 Below Average N
1 45 Below Average N
0 N
1 60 Good N
0 N
0 N
1 0 Only Questions written N
0 N
0 N
0 N
1 69 Very Good N
1 54 Average N
1 62 Very Good N
0 N
1 61 Very Good N
1 63 Very Good N
0 N
1 54 Average N
0 N
1 66 Good N
1 72 Very Good N
1 78 Very Good N
1 61 Good N
1 59 Good N
0 N
0 N
0 N
0 N
0 N
0 N
1 79 Very Good N
1 66 Good N
0 N
0 N
1 66 Good N
0 N
1 64 Good N
1 63 Good N
1 60 Good N
1 65 Good N
1 70 Very Good N
1 66 Good N
1 55 Average N
1 61 Good N
1 40 Below Average N
1 68 Good N
1 67 Good N
1 66 Good N
1 67 Good N
1 64 Good N
2 0 Other subject File N
1 66 Good N
1 0 Other subject File N
1 69 Good N
1 68 Good N
1 0 Other subject File N
0 N
1 42 Below Average N
1 44 Below Average N
1 48 Average N
0 N
0 N
1 70 Very Good N
2 70 Very Good N
0 N
1 52 Average N
0 N
1 53 Average N
0 N
1 41 Below Average N
1 49 Average N
1 47 Average N
1 57 Average N
1 51 Average N
0 N
0 N
1 40 Below Average N
1 15 Below Average N
0 N
0 N
0 N
1 41 Below Average N
1 42 Below Average N
0 N
0 N
0 N
0 N
1 40 Below Average N
1 55 Average N
0 N
0 N
1 0 Other subject File N
1 59 Good N
1 70 N
0 N
0 N
1 65 Good N
1 69 Good N
1 75 Good N
0 N
1 70 Good N
0 N
0 N
0 N
0 N
1 63 Good N
1 77 Good N
1 76 Good N
0 N
0 N
1 72 Good N
1 71 Good N
2 68 Good N
0 N
0 N
0 N
1 69 Good N
1 64 Good N
0 N
0 N
0 N
1 67 Good N
1 62 Good N
0 N
1 74 Good N
1 61 Good N
1 79 Very Good N
1 67 Very Good N
1 65 Very Good N
1 67 Very Good N
0 N
1 66 Very Good N
1 62 Very Good N
0 N
1 67 Very Good N
0 N
1 61 Very Good N
0 N
1 58 Good N
0 N
1 60 Good N
0 N
1 60 Good N
0 N
1 59 Good N
0 N
0 N
0 N
1 57 Good N
2 62 Very Good N
0 N
0 N
1 63 Very Good N
0 N
1 62 Very Good N
0 N
0 N
0 N
1 60 Very Good N
0 N
0 N
1 52 Good N
0 N
0 N
0 N
1 56 Good N
1 51 Good N
1 59 Good N
1 59 Good N
1 54 Good N
0 N
1 60 Good N
1 57 Good N
1 57 Good N
0 N
1 54 Average N
1 0 Other subject File N
1 56 Good N
1 58 Good N
1 0 Other subject File N
1 61 Good N
1 51 Average N
1 0 Other subject File N
1 60 Good N
1 60 Good N
1 46 Average N
1 50 Average N
1 0 Copy Case-Internet/Course Book N
1 41 Below Average N
1 59 Good N
1 0 Other subject File N
1 51 Average N
1 60 Good N
1 60 Good N
1 63 Good N
1 50 Average N
1 54 Good N
1 0 Other subject File N
1 42 Below Average N
1 56 Good N
1 40 Below Average N
1 40 Below Average N
1 65 Good N
1 0 Other subject File N
1 60 Good N
1 51 Average N
1 46 Average N
2 61 Good N
1 63 Good N
1 40 Below Average N
0 N
1 40 Below Average N
0 N
0 N
0 N
2 7 Below Average N
2 24 Below Average N
0 N
1 44 Good N
0 N
1 61 Good N
1 51 Good N
0 N
1 59 Good N
1 48 Good N
0 N
1 49 Very Good N
1 47 Good N
1 40 Good N
0 N
1 13 N
1 55 Good N
0 N
1 54 Good N
0 N
1 50 Good N
1 48 Good N
0 N
0 N
0 N
1 60 Good N
1 53 Good N
1 50 Good N
0 N
1 48 Good N
1 48 Very Good N
0 N
1 49 Good N
1 51 Good N
1 52 Good N
0 N
1 49 Good N
1 59 Good N
1 54 Good N
0 N
1 41 Good N
0 N
0 N
0 N
0 N
0 N
2 60 Good N
2 63 Good N
1 60 Good N
2 70 Very Good N
1 63 Good N
1 66 Very Good N
2 73 Very Good N
1 66 Good N
1 44 Average N
1 62 Good N
0 N
0 N
2 63 Good N
2 66 Good N
1 69 Good N
1 53 Good N
1 71 Good N
0 N
1 64 Very Good N
1 46 Average N
0 N
0 N
0 N
0 N
0 N
0 N
1 62 Very Good N
1 49 Average N
0 N
1 71 Very Good N
0 N
0 N
1 83 Excellent N
0 N
1 55 Good N
0 N
1 49 Average N
1 46 Average N
0 N
1 40 Average N
1 70 Very Good N
0 N
0 N
1 71 Very Good N
0 N
0 N
0 N
0 N
1 64 Good N
0 N
1 41 Average N
1 61 Good N
1 56 Good N
0 N
1 47 Average N
0 N
1 65 Good N
1 65 Good N
1 47 Average N
1 77 Very Good N
1 70 Very Good N
1 72 Good N
1 44 Average N
1 61 Good N
1 67 Good N
0 N
0 N
1 69 Good N
0 N
1 74 Very Good N
1 75 Very Good N
0 N
1 59 Good N
1 80 Very Good N
0 N
1 40 Average N
0 N
1 74 Very Good N
0 N
0 N
1 56 Good N
1 52 Average N
1 50 Good N
1 56 Good N
1 68 Very Good N
1 48 Average N
1 69 Very Good N
1 60 Good N
0 N
1 57 Good N
1 47 Average N
1 60 Good N
1 63 Good N
1 62 Good N
0 N
3 62 Good N
0 N
1 65 Good N
1 60 Good N
1 60 Good N
1 53 Good N
1 67 Very Good N
1 54 Good N
1 48 Good N
1 57 Good N
0 N
2 57 Good N
0 N
0 N
0 N
1 49 Good N
0 N
0 N
0 N
0 N
0 N
0 N
1 51 Good N
1 55 Good N
1 65 Good N
6 47 Average N
0 N
1 55 Good N
2 63 Good N
0 N
0 N
0 N
1 81 Excellent N
0 N
1 75 Very Good N
0 N
0 N
1 59 Good N
0 N
0 N
1 61 Very Good N
1 63 Good N
1 61 Very Good N
1 45 Below Average N
1 70 Very Good N
2 60 Good N
0 N
0 N
0 N
1 62 Good N
1 59 Good N
0 N
1 60 Very Good N
1 61 Good N
1 67 Good N
0 N
0 N
0 N
1 58 Good N
0 N
1 57 Good N
2 41 Good N
0 N
1 57 Good N
1 54 Good N
1 60 Good N
1 59 Good N
1 58 Good N
1 59 Good N
0 N
1 57 Good N
1 50 Good N
1 51 Good N
1 58 Good N
1 46 Good N
1 41 Good N
1 46 Good N
1 51 Average N
1 53 Very Good N
1 57 Good N
1 63 Very Good N
1 51 Good N
0 N
1 59 Good N
1 47 Very Good N
1 65 Very Good N
1 56 Good N
1 46 Good N
0 N
1 53 Good N
1 57 Good N
1 58 Good N
1 43 Good N
1 43 Good N
1 41 Good N
0 N
2 5 Below Average N
0 N
1 59 Good N
1 41 Good N
1 60 Good N
1 57 Good N
1 61 Good N
3 61 Good N
0 N
2 60 Good N
1 63 Good N
1 52 Good N
1 63 Good N
1 11 Below Average N
1 46 Good N
0 N
1 60 Good N
1 57 Good N
0 N
1 49 Good N
1 59 Good N
1 60 Good N
1 44 Good N
0 N
0 N
0 N
1 58 Good N
1 57 Good N
1 56 Good N
1 57 Good N
1 57 Good N
0 N
0 N
1 52 Good N
1 53 Average N
1 55 Average N
0 N
1 54 Average N
1 58 N
1 42 N
0 N
1 40 Average N
1 57 Good N
1 58 Good N
0 N
0 N
0 N
1 53 Average N
0 N
1 58 Average N
1 61 Good N
0 N
0 N
1 61 Good N
0 N
2 55 Good N
0 N
2 48 Average N
2 47 Average N
0 N
0 N
0 N
1 40 Average N
2 50 Good N
2 48 Average N
3 42 Good N
2 50 Good N
1 55 Good N
0 N
0 N
0 N
1 42 Average N
2 52 Good N
0 N
1 54 N
1 67 Good N
1 66 Good N
1 71 Good N
1 68 Good N
1 41 Average N
1 66 Good N
0 N
1 51 Average N
1 43 Average N
1 67 Good N
1 69 Good N
1 66 Good N
0 N
1 68 Good N
2 60 Good N
0 N
0 N
2 57 Average N
2 64 Good N
1 65 Good N
1 42 Below Average N
3 58 Good N
1 63 Good N
0 N
1 53 Good N
1 40 Average N
0 N
1 65 Good N
1 68 Good N
1 60 Good N
1 70 Very Good N
0 N
0 N
1 63 Good N
1 58 Average N
1 66 Good N
1 61 Good N
1 66 Good N
1 64 Good N
0 N
1 60 Good N
1 60 Good N
0 N
0 N
1 59 Good N
1 65 Good N
1 64 Good N
1 57 Average N
1 55 Average N
1 69 Good N
1 60 Good N
0 N
1 67 Good N
0 N
0 N
1 67 Good N
1 71 Very Good N
1 69 Good N
1 89 Very Good N
2 82 Very Good N
1 79 Average N
2 80 Very Good N
1 47 Good N
1 74 Good N
1 56 Very Good N
1 88 Very Good N
1 59 Average N
1 30 Below Average N
1 70 Good N
1 53 Very Good N
1 65 Good N
1 80 Good N
1 61 Good N
1 60 Good N
1 68 Good N
9 30 Copy Case-Internet/Course Book N
1 60 Good N
3 77 Good N
1 74 Very Good N
1 66 Good N
1 63 N
1 69 Good N
1 41 Average N
1 68 Good N
1 62 Good N
1 64 Good N
1 68 Good N
1 50 Average N
1 66 Good N
1 58 N
1 70 Very Good N
1 70 Very Good N
1 73 Very Good N
1 60 Good N
1 59 Good N
1 78 Very Good N
1 66 Good N
1 54 Good N
1 54 Good N
1 59 Good N
1 66 Good N
1 69 Very Good N
1 60 Good N
1 54 Good N
1 68 Very Good N
1 56 Good N
1 73 Very Good N
1 63 Good N
1 62 Good N
1 62 Good N
1 67 Good N
1 61 Good N
1 65 Very Good N
1 67 Very Good N
1 67 Good N
1 70 Very Good N
1 65 Good N
1 68 Good N
1 64 Good N
1 63 Good N
1 67 Good N
1 57 Average N
1 69 Very Good N
1 66 Good N
1 66 Good N
1 60 Very Good N
1 50 Good N
1 60 Good N
1 70 Very Good N
1 66 Good N
1 65 Good N
1 61 Good N
1 58 N
1 60 Good N
1 48 Good N
1 50 Good N
1 53 Good N
1 52 Good N
3 63 Average N
2 52 Average N
1 40 Good N
1 53 Good N
2 75 Good N
2 68 Good N
1 51 Good N
1 46 Good N
2 72 Good N
2 61 Average N
1 50 Good N
2 74 Good N
2 72 Good N
2 73 Good N
1 51 Very Good N
1 46 Good N
1 50 Very Good N
2 75 Good N
1 41 Good N
2 82 Very Good N
1 50 Good N
1 63 Below Average N
1 44 Good N
1 51 Very Good N
1 50 Very Good N
1 51 Good N
1 44 Good N
1 49 Good N
1 82 Very Good N
1 68 Average N
1 45 Good N
0 N
0 N
1 53 Average N
0 N
1 55 Average N
1 59 Average N
0 N
1 69 Good N
1 73 Good N
1 57 Average N
1 57 Good N
1 56 Average N
1 59 Good N
1 67 Good N
1 67 Good N
1 53 Average N
1 60 Very Good N
1 64 Good N
1 65 Very Good N
1 66 Good N
1 68 Good N
1 69 Good N
1 64 Good N
1 71 Very Good N
1 55 Average N
1 61 Good N
1 64 Good N
1 69 Good N
1 65 Good N
1 64 N
0 N
1 59 N
1 66 Good N
1 60 Good N
1 62 Good N
0 N
0 N
1 61 Good N
1 57 Good N
1 54 Average N
0 N
0 N
2 61 Good N
1 64 Very Good N
1 64 Good N
0 N
1 64 Good N
0 N
0 N
1 64 Good N
1 60 Good N
1 59 Good N
1 60 Good N
1 65 Very Good N
1 61 Good N
1 50 Average N
1 48 Below Average N
0 N
0 N
0 N
0 N
1 72 Very Good N
1 65 Good N
1 66 Very Good N
1 39 Below Average N
1 64 Good N
1 63 Good N
1 58 Good N
1 53 Average N
1 60 Good N
1 65 Good N
1 71 Very Good N
1 61 Good N
1 62 Good N
1 61 Good N
1 58 Good N
1 62 Good N
1 58 Good N
1 62 Good N
1 63 Good N
1 60 Good N
1 58 Good N
1 64 Good N
1 65 Good N
1 62 Good N
1 72 Good N
1 66 Good N
1 55 Good N
1 67 Good N
1 41 Average N
1 65 Good N
1 60 Good N
Re-evaluated Q1 Marks Q2 Marks Q3 Marks Q4 Marks Q5 Marks Q6 Marks Q7 Marks Q8 Marks Q9 Marks
N
N 6 10 0 5 6 4 6 3 2
N
N 7 14 11 7 9 7 6 3 3
N
N 7 14 11 6 11 7 6 3 3
N 5 12 8 6 8 6 5 3 3
N 7 12 11 6 9 6 5 2 3
N 5 10 0 5 5 5 5 2 3
N 3 10 0 6 6 5 5 2 3
N 6 9 5 6 9 4 6 3 3
N
N
N 7 8 6 4 5 5 4 0 3
N
N 6 0 3 6 9 6 6 3 3
N 6 12 8 5 8 7 6 3 3
N 7 10 0 6 6 6 5 3 3
N
N 0 0 0 4 5 3 0 0 3
N 7 0 0 7 9 6 6 3 2
N
N 7 12 8 6 8 6 5 3 3
N
N 7 14 8 7 8 6 6 3 3
N 6 9 0 6 9 6 5 3 3
N
N 0 0 0 4 3 0 5 0 0
N
N
N 4 10 9 5 8 5 5 3 3
N 6 12 0 4 8 0 6 3 3
N 5 10 9 7 9 6 6 3 3
N 0 0 0 6 3 3 3 0 2
N 3 10 6 3 5 5 5 3 3
N 6 12 8 6 8 5 6 3 3
N 6 8 0 5 8 5 5 3 3
N
N
N 6 10 8 6 8 6 7 3 3
N 4 10 8 5 8 6 6 3 3
N
N 7 14 12 7 11 7 5 3 3
N 3 10 0 5 8 6 5 2 3
N
N 5 12 9 5 8 5 6 3 3
N
N 4 10 8 5 8 6 6 3 3
N
N 5 6 0 6 9 5 6 3 3
N 7 12 11 6 11 6 6 3 3
N 6 12 9 6 8 7 7 3 3
N 6 12 9 6 9 7 6 3 3
N 5 10 0 5 8 5 5 3 3
N 7 10 8 6 9 7 7 3 3
N
N 7 10 9 6 9 7 7 3 3
N 4 10 0 6 8 6 4 0 3
N
N 7 12 8 6 8 7 6 3 2
N 6 14 9 6 9 6 7 3 3
N
N 5 7 7 6 7 5 6 3 2
N 5 8 9 6 8 6 5 3 3
N 7 14 9 7 9 6 7 3 3
N 7 14 11 7 9 6 7 3 3
N 5 4 6 6 6 6 5 3 3
N 6 10 5 6 8 6 6 3 3
N 6 9 10 7 9 6 6 3 3
N 5 10 9 6 9 6 6 3 3
N 6 12 9 7 9 6 6 3 3
N
N
N 5 9 9 6 9 5 5 3 3
N 7 12 9 6 9 7 6 3 3
N
N 5 9 7 6 9 6 5 3 3
N 4 12 9 7 9 6 7 3 3
N 5 9 8 6 8 6 5 3 3
N 6 9 9 6 8 5 6 3 3
N 6 12 6 5 2 2 5 3 3
N 6 12 9 7 10 7 6 3 3
N
N 5 12 8 6 5 6 6 3 3
N 5 7 7 6 9 6 6 3 3
N 6 12 8 6 6 6 6 3 3
N
N 6 12 5 6 8 6 6 3 2
N 6 10 7 7 10 6 8 3 4
N
N
N 6 9 10 6 11 6 6 3 3
N 5 8 7 6 7 6 5 3 1
N 3 9 7 5 6 4 5 3 1
N 4 7 5 4 6 5 5 2 2
N 4 3 4 3 4 3 3 2 2
N 6 12 9 6 9 6 6 3 2
N 7 12 9 7 9 6 6 3 2
N
N 7 14 9 6 9 6 6 3 3
N 7 12 8 6 9 5 6 3 2
N 6 12 6 6 6 6 6 3 3
N 4 8 9 6 9 6 6 3 2
N 6 12 8 6 8 7 6 3 3
N
N 6 12 8 6 8 6 6 3 3
N
N 6 14 9 6 9 6 6 3 3
N 6 12 9 7 8 6 6 3 3
N
N
N 6 12 11 7 8 6 6 3 3
N 6 12 9 6 9 6 6 3 3
N 7 14 11 7 11 7 6 3 4
N 6 10 8 6 8 6 6 3 3
N 6 12 6 6 11 7 7 3 3
N 4 8 8 5 9 6 5 2 2
N
N 5 12 6 5 8 4 5 3 3
N 5 10 0 6 6 5 5 3 3
N
N 6 12 8 6 7 6 6 3 3
N 7 14 8 5 8 7 7 3 3
N 6 12 9 6 11 6 6 3 3
N 6 12 9 6 9 6 7 3 2
N 7 10 8 5 11 7 7 3 3
N 7 12 9 6 9 7 6 3 3
N 7 14 12 7 11 7 7 3 4
N 6 9 9 6 9 6 6 3 2
N 7 13 9 6 10 6 6 3 3
N 6 12 6 6 9 7 6 3 2
N 6 12 8 6 8 6 6 3 3
N 5 12 9 6 9 6 6 3 2
N 6 12 9 6 9 6 6 3 3
N 7 17 13 8 12 7 5 2 3
N 5 10 7 5 9 5 5 0 4
N 7 14 8 6 8 7 7 4 3
N 6 11 10 5 8 2 4 1 2
N
N 5 14 10 5 8 3 3 0 2
N 5 14 12 6 10 7 6 2 4
N 7 15 12 6 6 7 8 3 0
N 6 14 9 6 9 6 5 1 4
N 5 16 12 5 8 6 4 2 4
N 7 10 8 4 6 5 5 3 3
N 4 4 5 3 5 4 2 1 1
N 6 10 8 5 8 6 5 3 3
N 6 8 8 5 8 5 4 2 3
N 6 12 8 8 6 6 6 3 3
N 3 0 0 0 0 0 0 0 0
N 4 8 5 5 6 6 6 3 3
N 0 4 0 4 3 5 2 0 0
N 5 10 8 5 8 4 5 3 3
N 6 12 9 6 9 6 6 3 3
N 7 10 8 5 8 5 5 3 3
N 6 7 9 6 9 6 6 3 3
N 5 9 8 6 9 6 6 3 3
N 7 12 9 7 8 6 6 3 2
N 6 10 9 6 9 5 6 3 3
N
N
N 4 4 7 3 9 4 5 2 2
N 5 6 8 6 6 5 5 3 3
N
N 5 9 10 6 10 6 6 3 4
N 6 12 5 6 9 6 6 3 3
N 6 9 9 7 8 6 6 3 3
N
N 6 9 3 4 4 5 5 2 2
N
N 5 10 5 5 6 5 5 2 3
N
N 7 12 0 5 8 5 6 3 3
N 7 14 8 6 9 7 6 3 3
N 4 10 8 5 8 5 5 3 3
N
N
N 5 10 5 5 8 5 5 2 3
N 4 12 8 5 8 5 6 3 3
N 7 14 6 6 11 6 5 2 3
N 7 12 8 5 8 4 0 0 3
N
N 7 14 9 6 8 7 6 3 3
N
N 6 10 8 6 8 5 3 0 3
N 2 10 0 6 8 6 5 0 3
N
N 7 10 0 6 9 6 6 3 3
N 7 8 9 6 8 6 6 2 2
N
N 7 8 0 5 8 5 4 0 3
N 5 10 0 6 8 5 3 0 3
N 3 10 0 6 9 2 6 2 3
N 0 0 0 2 5 4 0 0 3
N 3 4 0 2 3 3 0 0 3
N 2 4 0 2 3 3 2 0 3
N 5 12 9 6 9 6 2 0 3
N 2 0 0 3 3 4 0 0 3
N 7 12 8 5 5 5 4 2 2
N 7 12 8 5 6 6 5 3 3
N 8 17 12 8 12 8 7 4 4
N 7 16 10 6 9 7 7 4 3
N 7 14 11 7 11 7 7 4 3
N 4 14 10 5 8 4 5 1 2
N 5 12 10 5 7 6 3 0 2
N 5 16 10 5 8 5 5 0 4
N 5 12 7 5 4 3 0 0 4
N 5 10 8 6 8 6 6 3 3
N 6 14 11 7 11 5 6 3 3
N 3 8 6 3 2 4 2 0 2
N 8 14 10 5 10 6 5 1 2
N 5 15 10 5 11 6 6 0 2
N 7 16 9 7 10 7 5 3 3
N 8 16 11 8 10 7 7 4 3
N 6 16 11 7 10 7 7 1 4
N
N 6 12 9 7 9 7 7 3 3
N 5 12 9 6 8 6 6 3 3
N 4 10 9 6 8 6 6 3 3
N 7 14 8 5 8 6 6 3 3
N 5 14 9 6 9 5 5 3 3
N 5 12 9 6 8 5 6 3 3
N 6 12 9 7 11 7 7 3 3
N 6 12 8 7 11 7 7 3 3
N 6 12 8 5 8 6 6 2 3
N 7 8 5 6 8 5 4 3 3
N 5 8 0 5 5 6 6 3 3
N 6 10 9 4 6 5 5 3 3
N
N 6 12 9 5 8 5 5 3 3
N 6 8 0 6 5 5 6 3 3
N 5 10 8 5 8 5 5 2 3
N 5 10 0 6 8 5 5 3 3
N 6 5 5 3 5 5 5 3 3
N 6 6 6 4 6 5 4 3 3
N
N
N
N 5 7 5 5 5 5 5 3 4
N
N 6 5 6 5 5 4 6 3 3
N 7 7 7 6 7 4 5 4 4
N 7 7 6 5 6 5 6 3 3
N
N
N
N
N
N
N
N 6 7 5 6 5 4 6 3 2
N
N
N 7 6 5 4 6 4 6 4 3
N
N
N 7 7 5 5 5 5 6 4 3
N
N
N
N 7 7 7 7 7 6 7 4 3
N
N
N
N 6 6 6 6 6 5 6 2 2
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N 4 7 8 5 8 5 0 0 4
N
N
N
N 0 0 0 0 0 0 0 0 0
N
N
N
N
N 7 8 7 7 8 6 6 4 4
N
N 6 8 8 7 8 6 7 4 4
N 6 6 6 6 6 6 6 4 4
N 6 7 7 6 7 6 6 4 4
N 6 7 8 6 8 6 6 4 4
N
N
N
N
N
N
N
N
N 8 7 8 6 7 6 6 4 4
N
N
N
N
N
N
N
N
N
N
N
N 7 7 8 6 7 7 7 4 4
N
N 6 6 7 6 7 7 6 4 4
N
N 6 10 9 6 6 6 7 4 4
N
N
N
N 8 7 9 7 7 6 6 4 4
N
N
N 6 12 10 6 10 6 4 2 3
N
N 7 7 7 7 7 7 6 4 4
N
N
N
N
N
N 6 7 8 6 7 6 7 4 4
N 6 7 7 7 7 7 6 4 4
N
N
N 7 12 10 7 7 7 6 4 5
N 7 13 10 7 7 7 6 4 5
N
N 6 7 8 8 9 7 7 4 4
N
N 7 8 7 6 8 6 7 4 4
N
N 8 14 12 8 10 7 7 5 5
N 6 7 7 8 9 6 6 4 4
N 3 2 2 3 3 3 0 2 3
N 7 7 8 7 9 7 7 3 3
N 8 15 13 8 12 8 7 5 5
N 6 6 6 6 6 6 6 5 5
N 7 15 12 7 12 8 6 3 4
N 6 13 10 6 9 7 5 3 2
N 6 6 6 6 6 5 5 5 5
N 7 16 11 6 12 8 7 4 5
N 6 13 10 7 9 7 7 4 3
N 7 6 5 5 5 5 5 4 4
N
N 4 4 4 4 4 4 4 4 4
N 5 5 5 5 6 5 5 4 4
N
N 7 14 10 6 10 6 6 3 5
N 6 6 7 5 5 6 5 5 5
N 7 6 6 6 6 6 6 5 5
N 7 10 7 6 11 6 7 3 4
N 6 6 6 6 6 5 6 5 5
N 6 7 6 6 6 6 5 5 5
N 8 13 9 6 9 7 6 4 3
N
N 7 16 12 6 11 5 8 3 3
N 6 6 6 6 6 6 6 5 5
N 6 6 7 5 6 6 5 5 5
N
N 6 5 6 6 6 6 6 5 5
N 6 10 9 6 9 7 6 3 5
N 7 12 11 7 8 7 6 3 5
N
N 6 13 9 7 10 7 6 3 3
N 7 17 12 7 11 7 7 3 4
N 5 6 6 5 5 6 6 4 5
N
N
N 6 6 6 5 6 5 5 4 5
N
N 6 6 6 5 6 5 6 4 4
N
N 7 12 10 7 10 7 6 3 2
N
N
N 6 6 6 5 5 6 5 4 4
N 7 6 6 6 5 7 6 4 5
N 6 6 6 6 6 6 6 4 5
N 6 6 5 5 6 6 6 4 5
N
N
N 6 14 9 6 9 7 7 3 2
N 7 16 10 6 10 7 7 3 3
N
N 6 6 6 6 6 6 5 4 5
N 6 16 10 7 10 7 6 3 5
N
N 5 6 7 6 6 7 7 4 5
N 6 6 7 6 7 6 6 4 5
N 6 7 7 6 6 6 6 4 5
N
N
N
N
N
N
N 7 9 10 7 9 6 6 3 5
N 7 16 10 7 10 7 7 3 3
N 6 9 9 6 9 7 7 3 0
N
N
N 6 14 9 6 8 6 6 3 2
N
N
N 6 6 6 5 7 6 6 4 5
N 6 5 6 5 5 6 6 5 5
N
N
N 7 6 6 6 6 7 5 4 5
N
N 6 6 6 5 6 6 5 5 5
N 6 6 6 6 6 7 6 5 5
N
N 6 14 11 6 11 6 6 3 3
N
N 6 7 6 6 6 7 5 5 5
N
N 6 6 7 6 7 6 6 4 5
N 7 15 11 7 12 7 7 4 5
N
N 6 10 10 5 9 7 7 3 3
N 6 9 9 6 9 6 6 3 3
N 6 6 6 5 7 6 6 5 5
N 5 13 9 6 9 6 6 3 3
N 5 5 5 5 5 5 5 5 5
N 7 16 10 7 11 7 7 4 3
N
N 6 6 6 7 5 5 5 5 5
N 6 6 6 5 5 5 5 5 5
N
N
N
N 5 6 6 5 6 6 6 5 5
N 5 5 5 6 5 6 5 4 5
N 8 13 10 6 10 7 6 3 3
N
N 7 11 11 7 11 7 7 3 3
N 6 6 6 5 5 6 6 4 5
N 5 5 5 5 5 5 5 5 5
N 8 16 13 7 12 7 7 4 5
N
N 7 9 8 5 7 7 5 2 1
N 7 15 11 7 10 7 7 4 4
N 7 14 11 6 10 7 6 3 5
N
N
N 7 14 12 7 10 7 7 4 4
N 5 5 5 5 5 5 5 4 5
N
N 7 13 10 6 11 7 7 3 3
N 6 6 6 6 6 6 6 5 5
N 5 5 5 5 5 5 5 5 5
N 6 6 6 6 6 7 6 5 5
N 8 16 12 7 11 8 7 3 3
N 7 7 7 7 8 7 9 4 4
N 7 8 8 7 9 6 6 4 4
N
N 3 0 0 4 2 3 2 0 3
N 8 16 13 8 7 7 8 4 0
N 6 7 7 6 7 6 7 4 3
N 7 8 8 7 7 7 6 3 3
N 7 8 8 7 5 7 6 3 4
N
N
N
N 7 9 7 7 8 6 6 4 4
N 7 8 8 7 4 6 5 3 3
N
N 7 6 7 7 6 6 5 2 4
N 6 8 8 7 8 6 6 4 4
N 7 7 8 7 8 6 7 3 4
N 6 7 8 6 8 7 7 4 4
N 7 8 7 6 8 6 7 4 4
N 7 12 11 7 7 7 7 3 4
N 6 8 7 6 7 7 7 4 4
N
N 6 9 8 6 6 7 6 4 3
N
N
N 8 13 11 7 8 8 7 3 3
N 4 2 0 5 4 4 3 2 3
N 4 0 0 4 3 3 2 0 0
N 6 8 8 7 6 6 7 3 4
N 6 5 4 6 8 6 6 3 4
N 6 3 4 7 6 6 7 4 3
N 2 0 0 4 4 3 2 0 2
N
N 7 8 7 7 6 6 6 4 4
N
N 6 8 8 6 7 7 6 4 4
N 8 15 12 7 8 8 6 4 4
N 7 12 9 7 6 7 6 4 5
N 7 11 9 6 6 7 5 3 4
N
N 8 7 7 6 7 7 6 4 4
N
N 7 8 8 7 8 7 7 3 3
N
N 8 15 13 8 11 8 8 5 5
N 7 7 8 7 4 3 6 3 4
N 6 6 6 5 6 6 4 4 4
N 6 9 9 6 4 6 5 3 5
N 7 7 7 6 6 6 7 4 4
N
N
N
N 8 10 9 7 5 6 7 3 3
N 7 7 5 3 4 5 3 2 4
N 6 7 5 6 6 4 6 4 4
N
N 6 7 7 6 5 5 3 3 4
N
N
N
N 6 7 6 7 6 5 5 4 4
N 7 7 7 6 3 5 5 2 4
N
N 7 7 6 5 3 3 4 2 2
N 6 7 6 6 6 6 6 5 5
N 3 12 8 4 8 5 5 3 3
N 6 7 6 6 6 6 7 5 5
N
N 6 6 6 6 6 6 7 5 5
N 6 7 6 6 6 7 6 5 5
N 6 7 6 6 6 6 6 5 5
N 6 7 6 6 6 6 6 4 5
N 5 11 5 5 11 4 6 3 3
N
N
N 5 10 8 5 8 5 5 3 3
N
N
N 7 6 6 6 6 6 6 4 5
N
N 5 11 10 6 11 6 5 3 3
N 6 6 6 6 6 6 5 5 5
N
N 6 6 6 6 6 5 6 4 5
N
N 6 7 6 6 6 6 6 4 5
N
N
N
N
N
N
N
N
N
N 6 6 6 6 6 6 6 4 5
N 6 6 6 6 6 6 6 4 5
N
N
N
N
N
N 6 6 6 6 6 6 7 4 5
N
N 6 7 6 6 6 6 6 4 5
N 7 6 6 6 7 6 6 4 5
N 6 8 8 7 7 6 8 4 4
N
N
N
N
N
N
N
N
N
N 7 6 6 7 7 6 6 4 4
N
N 7 8 8 7 7 7 6 4 4
N 6 12 10 6 10 7 6 2 3
N
N
N 6 8 7 6 7 6 6 4 4
N
N 7 7 8 7 7 7 7 4 4
N
N
N 8 11 9 7 9 7 6 3 4
N 7 8 8 6 7 0 5 3 2
N 8 12 11 7 7 7 7 3 4
N
N
N
N
N 5 10 0 7 7 7 0 0 4
N 5 11 8 5 7 6 6 3 3
N 7 10 9 6 8 0 7 3 4
N
N
N
N 8 15 13 8 12 8 8 4 4
N 6 11 10 6 10 7 7 3 4
N 7 11 10 7 10 7 6 3 2
N 6 14 11 7 10 6 7 3 3
N 8 7 12 5 10 5 8 2 2
N 8 14 11 8 12 7 7 4 3
N 8 14 12 7 12 8 8 4 3
N 6 13 12 7 10 6 7 3 2
N 6 10 10 6 10 7 7 4 3
N 5 10 8 6 9 7 6 3 4
N 7 13 12 7 11 6 7 3 3
N 7 12 10 7 11 6 6 3 3
N 6 12 7 7 8 7 6 3 3
N 5 10 9 5 8 7 6 3 3
N
N 7 9 10 6 7 6 5 3 3
N 5 10 10 6 8 0 6 3 3
N 8 10 9 6 8 8 8 3 0
N 7 7 0 6 5 5 5 3 2
N 6 10 10 6 10 5 4 2 3
N 5 9 8 7 10 6 7 2 3
N
N
N
N
N
N
N
N
N
N
N
N 5 10 8 5 8 6 5 2 4
N
N
N
N 7 12 9 5 8 6 7 3 4
N 7 10 8 5 8 5 4 2 2
N
N
N
N
N
N
N 6 10 8 5 8 4 5 2 4
N 6 13 11 6 10 7 5 2 3
N
N 7 15 11 6 12 7 8 4 4
N 7 13 9 6 10 6 4 3 3
N 6 12 9 5 9 3 6 3 3
N 6 12 11 6 12 6 6 3 4
N 6 10 7 5 7 6 4 2 3
N 5 10 7 5 8 6 5 3 4
N 6 10 10 4 6 5 3 2 3
N 7 10 11 6 12 7 7 4 4
N 5 11 9 6 9 6 6 3 3
N 6 13 12 7 5 5 6 3 3
N 7 12 11 6 12 7 7 3 4
N 7 14 11 7 12 6 6 3 4
N 5 8 12 5 10 6 6 3 4
N 7 14 12 6 12 7 6 4 4
N 7 15 10 7 11 6 7 3 4
N 6 12 9 5 8 5 6 2 3
N 4 10 9 5 8 5 5 2 3
N 6 12 8 5 7 5 5 2 4
N 6 13 11 6 7 6 6 3 4
N 5 12 11 6 9 5 5 3 4
N 6 11 12 6 11 6 6 3 4
N 6 11 12 6 11 6 6 3 4
N 6 11 8 5 8 5 4 2 3
N 5 11 9 4 7 5 5 2 2
N 6 12 7 4 11 5 5 3 4
N 6 12 12 6 12 6 6 3 3
N
N 5 4 7 3 3 3 4 3 3
N
N
N 5 10 9 5 10 5 5 3 4
N 7 13 12 6 11 6 5 3 3
N
N
N 6 13 10 6 10 6 5 3 3
N
N 6 12 10 5 11 6 5 3 3
N 6 12 9 5 11 6 5 3 4
N
N 6 8 11 5 11 5 6 3 4
N 6 8 9 5 10 6 5 3 3
N
N 6 12 11 6 10 6 5 2 4
N 6 9 9 6 11 6 6 2 3
N 6 11 9 5 9 5 6 3 3
N 5 12 9 6 12 6 5 3 3
N 5 10 9 6 11 6 5 4 3
N 6 12 8 5 10 6 7 4 4
N
N 6 11 8 6 8 7 6 3 3
N
N
N
N
N
N
N
N
N 6 10 7 5 7 6 5 2 3
N
N
N
N
N
N
N
N
N 0 0 0 5 0 0 0 0 2
N 6 10 0 6 7 7 0 0 4
N
N 4 8 7 6 7 0 5 3 3
N
N 5 10 10 7 11 7 7 4 4
N
N
N 4 10 9 6 8 0 0 0 3
N
N
N
N 7 10 0 6 3 7 6 3 3
N
N 5 10 8 6 7 5 5 2 2
N 6 9 0 7 8 7 0 0 3
N 0 0 0 6 0 1 2 0 0
N
N
N 7 9 14 5 12 5 7 3 4
N 6 11 11 6 7 6 6 2 4
N 6 10 11 6 11 6 5 3 4
N
N
N
N 6 12 11 6 12 6 6 3 4
N
N 6 11 11 6 11 6 6 4 4
N
N 5 11 10 6 8 5 6 3 4
N
N 5 10 10 5 10 5 5 3 4
N
N 6 9 10 6 7 6 6 3 3
N
N 6 10 11 6 8 5 5 4 4
N
N
N
N
N 8 15 12 8 11 7 8 4 4
N 6 15 10 6 7 6 5 2 3
N
N 8 16 12 6 11 7 7 4 4
N 7 12 11 5 10 4 4 3 3
N
N
N
N 5 8 7 5 5 4 4 2 2
N
N
N
N 7 10 8 5 6 2 2 1 2
N 8 9 9 9 8 8 8 4 4
N
N 9 9 8 6 7 5 6 3 3
N 10 10 10 10 10 8 9 4 4
N 9 10 10 10 10 10 9 4 4
N
N
N
N 9 9 9 8 9 8 8 4 4
N
N 10 9 10 9 10 8 8 5 4
N
N
N
N 5 15 10 6 7 6 5 3 3
N 6 16 10 7 11 7 7 4 3
N 5 8 5 5 5 6 6 3 3
N 6 4 7 6 5 5 6 4 5
N 6 16 12 5 8 6 6 3 4
N 5 16 10 6 7 5 5 2 3
N 6 12 10 7 8 7 6 4 5
N 7 13 12 7 7 7 6 3 4
N 6 16 12 6 12 5 5 3 4
N 7 16 11 5 10 7 7 2 2
N 6 15 10 6 7 6 5 2 3
N 6 11 10 7 7 7 6 4 5
N 8 15 13 8 7 7 8 4 5
N 4 13 10 4 6 4 2 1 1
N 6 17 11 7 8 5 6 2 3
N 6 3 4 6 4 5 6 3 5
N 7 16 11 5 10 6 8 2 3
N 7 6 5 6 6 7 7 3 4
N 5 13 9 5 8 6 4 1 2
N 7 17 12 6 10 2 5 3 3
N 8 14 12 7 8 8 6 4 4
N 7 10 11 7 5 6 6 4 5
N 5 8 7 6 7 6 6 2 3
N 8 16 12 8 13 8 8 3 3
N 7 7 6 5 5 6 5 3 2
N 4 0 0 4 4 4 0 0 0
N 8 16 14 8 7 8 8 4 3
N 7 14 12 6 6 8 7 4 5
N 6 12 10 5 10 5 7 2 3
N 6 17 11 6 10 6 1 2 3
N 6 7 5 5 5 5 4 3 3
N 4 10 11 7 8 6 7 4 3
N 6 6 4 5 6 6 4 3 5
N 8 15 13 8 8 7 8 4 4
N 7 17 10 8 10 8 7 4 4
N 5 5 2 6 6 6 5 3 3
N 8 13 12 7 5 8 7 4 5
N 6 14 12 4 9 6 5 2 3
N 6 9 6 4 6 5 4 1 4
N 6 3 2 6 6 6 6 3 3
N 8 17 13 8 10 8 8 4 3
N 7 4 6 6 5 6 5 3 3
N 5 15 12 7 12 7 5 3 4
N 8 17 12 8 12 8 7 2 4
N 8 16 12 7 10 7 7 3 4
N 6 0 0 7 5 5 0 0 3
N 8 14 12 7 8 7 7 4 4
N 5 11 10 5 10 5 5 2 2
N 7 11 8 6 7 6 5 3 3
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N 7 17 12 7 13 8 7 4 4
N
N
N 6 15 10 6 9 5 6 3 3
N
N 8 18 10 8 10 8 8 4 4
N
N
N
N
N 6 15 10 6 10 7 7 1 4
N 8 16 13 8 10 6 6 4 3
N 4 11 6 5 6 5 5 2 2
N 4 7 8 5 7 5 5 2 1
N
N
N 8 15 10 6 12 6 5 1 2
N 5 16 10 6 7 5 6 2 4
N
N 7 18 10 8 12 8 7 4 3
N 4 12 5 4 6 4 2 1 2
N 7 14 11 7 6 7 7 3 2
N 7 13 11 7 6 7 7 4 5
N 8 16 12 9 8 8 7 3 5
N 9 16 13 8 12 8 8 4 3
N 8 17 13 8 11 8 8 4 3
N 7 10 9 7 7 6 5 1 2
N 7 12 12 8 9 7 7 3 3
N 6 9 7 5 8 6 6 3 2
N 8 16 11 7 12 8 6 4 4
N 6 8 9 6 8 6 6 2 2
N 8 14 13 8 10 7 8 4 3
N 4 12 7 5 10 5 0 0 2
N 8 12 11 8 11 7 7 3 3
N 4 8 10 4 7 5 5 3 3
N 8 15 12 8 10 9 8 4 4
N 6 17 12 7 10 2 6 3 4
N 7 11 11 7 9 7 6 3 3
N 8 14 12 8 11 7 7 4 3
N 8 13 12 8 10 6 6 3 3
N 5 10 8 5 7 8 7 1 2
N 8 15 12 8 10 8 8 3 3
N 5 7 6 5 8 4 5 2 2
N 5 16 12 5 7 5 0 1 2
N 6 16 11 6 10 6 6 3 4
N 4 11 10 5 8 6 5 2 4
N 4 10 8 5 9 5 4 1 2
N 6 15 11 6 10 7 6 4 3
N 9 16 13 8 12 8 8 3 3
N 5 14 11 5 10 4 4 2 2
N 7 12 12 8 10 7 6 3 2
N 6 12 10 6 12 5 4 0 2
N 8 13 11 7 9 6 6 3 2
N 6 6 4 6 8 6 7 2 2
N 7 12 10 6 10 6 5 2 4
N 8 17 11 6 8 5 5 3 4
N 7 10 4 6 9 6 6 2 2
N 4 8 10 5 8 5 2 2 4
N 4 10 5 4 5 2 0 0 0
N 9 15 13 8 11 8 8 4 4
N 6 8 8 7 8 6 5 3 2
N 4 14 10 5 8 4 4 0 3
N 7 11 10 6 9 6 6 2 2
N 6 13 7 6 8 6 5 3 3
N 8 16 13 8 11 8 7 3 2
N 6 10 9 6 8 5 5 2 3
N 7 10 11 6 11 5 5 2 2
N
N
N 7 9 11 7 9 5 6 3 4
N
N 4 5 3 4 0 3 3 2 1
N
N 8 13 9 7 9 0 0 0 3
N 2 0 0 2 0 2 2 1 0
N
N
N
N 7 10 9 6 10 6 6 3 3
N 5 11 13 7 10 7 7 3 3
N
N 5 10 9 6 8 5 0 0 3
N 7 13 12 8 10 6 7 3 3
N 7 13 10 7 11 0 7 4 4
N 0 0 0 0 0 0 0 0 0
N
N
N
N 7 13 10 6 7 6 5 3 3
N 7 11 9 7 8 5 5 3 3
N
N
N
N 5 10 9 6 8 0 5 3 2
N 7 12 8 5 8 7 6 3 2
N 8 12 10 6 10 6 6 3 3
N 6 0 0 5 4 5 3 2 4
N 8 16 12 7 12 8 6 3 0
N 8 18 10 7 12 6 7 4 4
N 7 4 0 6 5 7 5 3 3
N 8 16 10 6 12 5 6 3 3
N 8 13 11 7 7 6 5 3 3
N 7 16 11 6 10 5 6 0 3
N 7 12 10 8 11 7 7 3 3
N 8 18 12 8 12 8 7 3 4
N 6 12 13 7 7 7 6 3 4
N 3 8 8 6 6 8 10 3 3
N 6 16 11 6 8 8 6 3 4
N 9 8 10 9 8 9 9 4 3
N 6 16 11 7 10 6 5 1 3
N 5 7 7 8 4 7 9 4 4
N 8 16 9 8 8 8 7 3 3
N 8 17 12 8 12 8 7 1 4
N 4 14 11 8 13 5 8 4 4
N 5 12 10 6 10 6 7 2 2
N 7 14 11 6 10 7 7 4 4
N 7 15 12 8 10 4 7 4 4
N 8 15 10 7 10 1 5 2 2
N 8 14 12 7 11 7 7 4 4
N 5 11 10 6 8 6 5 2 2
N 7 12 11 7 8 6 4 3 2
N 7 14 11 6 9 8 7 4 3
N 7 13 12 7 11 7 7 4 1
N 5 13 10 7 9 8 7 4 2
N 4 14 10 6 9 8 6 2 4
N 5 14 11 5 7 4 6 2 4
N 7 2 7 8 7 7 8 3 4
N 8 14 11 8 11 8 8 4 4
N 8 13 12 9 11 7 9 4 4
N 7 10 7 6 6 4 4 1 0
N 7 16 10 7 8 6 7 2 3
N 5 6 6 5 5 5 4 3 3
N 5 14 10 6 8 5 5 1 2
N 8 12 10 7 7 0 7 1 4
N 6 14 10 5 11 5 2 0 3
N 4 10 7 5 5 4 4 1 0
N 6 8 10 6 8 7 5 3 0
N 4 12 8 5 6 4 4 2 3
N 5 5 6 6 7 4 4 3 3
N 5 6 6 5 5 5 4 2 2
N 6 7 7 6 5 7 5 3 3
N 7 11 12 6 7 7 4 3 4
N 7 12 8 6 5 7 6 4 5
N 7 14 10 7 7 7 7 4 3
N 8 16 11 8 11 8 8 4 4
N 6 10 8 7 7 6 2 1 2
N 6 0 0 5 3 5 0 2 3
N 4 15 10 7 7 7 7 3 2
N 6 5 5 7 6 4 5 3 2
N 6 10 7 5 8 6 6 3 4
N 5 14 10 5 7 5 4 2 3
N 5 10 7 6 8 5 5 2 4
N 7 10 9 6 8 6 6 3 4
N 7 10 10 7 9 6 6 3 2
N 6 9 10 6 8 6 6 3 2
N 7 16 12 6 7 6 4 2 4
N 7 14 8 7 8 7 6 2 3
N 7 17 12 5 8 8 7 4 4
N 7 5 4 6 7 6 6 3 5
N 8 14 10 8 12 6 7 3 4
N 6 14 8 6 8 5 6 2 3
N 8 17 12 7 10 8 7 4 4
N 5 8 13 5 9 6 5 2 2
N 6 18 13 7 8 7 7 4 4
N 5 15 10 5 8 5 5 3 4
N 8 17 12 8 12 8 7 4 4
N 6 13 10 5 12 5 5 2 2
N 8 15 12 7 10 7 7 4 4
N 8 12 13 7 5 6 6 4 5
N
N 4 12 11 7 9 7 6 3 3
N 4 6 8 7 8 6 7 3 2
N
N 6 10 9 6 8 6 6 3 2
N
N
N 6 6 8 6 8 6 6 3 2
N
N
N 5 12 8 6 8 7 7 3 3
N
N
N 7 10 8 6 9 7 6 3 2
N 7 12 8 7 9 6 6 3 3
N
N
N
N
N 7 4 8 7 8 6 5 3 3
N 2 6 12 7 8 7 6 3 0
N 7 10 6 5 8 6 6 3 3
N
N
N
N
N 4 10 9 6 8 6 6 3 3
N 6 11 11 6 9 6 6 3 3
N
N 4 10 9 6 9 7 0 3 3
N
N 7 14 8 7 9 7 6 3 3
N 6 8 8 5 8 6 6 3 3
N 6 6 6 6 8 6 7 3 2
N 6 12 8 6 6 5 6 2 3
N
N
N
N
N
N
N 7 8 8 7 6 6 6 2 0
N 6 10 8 5 6 6 6 3 3
N 4 8 9 6 9 7 5 3 4
N
N
N
N 6 6 8 6 8 6 6 2 2
N
N 6 12 9 7 9 6 7 4 4
N
N
N
N
N 5 12 9 6 9 7 5 3 3
N 2 10 8 5 8 6 3 3 3
N
N
N
N 7 12 9 6 8 6 5 3 3
N 5 12 9 6 11 6 6 3 3
N 4 10 8 5 10 5 5 3 3
N 2 10 8 6 9 5 5 3 3
N
N
N
N
N 7 14 9 6 9 7 7 3 4
N
N
N 7 12 11 7 11 7 5 3 4
N
N
N
N 7 14 11 7 11 8 8 4 3
N
N
N
N
N
N 5 14 9 7 11 7 7 3 4
N 2 10 9 6 8 6 5 3 3
N
N
N 8 14 9 7 11 8 7 3 3
N
N
N
N 7 12 11 7 9 2 8 3 3
N 7 12 9 8 8 7 6 3 4
N 6 13 12 7 10 6 6 3 2
N
N 8 14 13 7 10 7 6 3 3
N
N
N
N
N 6 13 10 7 10 5 6 3 1
N
N
N 6 5 5 5 7 4 5 3 3
N 7 13 13 6 10 7 5 3 3
N 6 12 10 8 10 8 6 3 3
N
N 6 14 14 7 12 7 7 3 3
N 5 13 12 7 10 7 7 3 2
N 6 15 3 5 8 5 5 3 2
N
N 7 12 12 7 12 7 7 4 4
N 5 12 5 6 9 2 5 3 3
N 7 16 11 8 9 7 5 3 2
N 5 11 4 5 8 6 5 3 3
N 3 5 8 6 10 7 6 3 3
N 4 14 6 6 8 5 6 3 3
N 6 13 11 7 11 7 7 3 3
N 6 9 14 8 13 8 9 3 4
N 5 12 12 6 8 6 6 3 3
N 5 8 8 7 7 8 6 3 4
N 5 12 10 6 10 5 6 3 3
N 5 10 10 6 12 6 6 3 4
N
N 7 9 13 8 12 8 8 3 3
N 7 12 7 6 8 6 6 3 3
N
N
N
N 6 7 11 7 11 7 6 3 4
N 7 10 10 6 10 6 7 3 3
N
N 7 15 6 6 9 6 7 3 3
N 8 10 10 6 9 6 6 3 1
N 4 10 10 5 10 3 6 2 1
N
N
N
N
N
N 7 4 10 6 10 3 6 2 0
N 4 11 10 6 11 7 6 2 1
N 7 11 10 6 10 4 6 3 0
N
N 8 10 10 6 10 7 5 3 1
N
N 4 5 10 6 10 6 6 2 4
N
N 6 5 7 7 10 5 6 3 2
N 6 11 9 6 9 6 6 3 2
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N 7 10 8 6 9 5 6 3 2
N 2 8 9 6 8 5 6 3 4
N
N
N
N 7 10 9 7 8 7 7 3 3
N
N
N
N 0 10 9 6 8 6 6 3 2
N 6 12 9 6 8 5 5 2 3
N 7 6 9 6 8 6 5 2 2
N
N
N 3 8 8 6 8 6 7 2 2
N
N
N 5 10 8 6 8 5 4 2 3
N
N
N 7 12 8 6 8 0 6 3 4
N
N 7 14 8 7 9 7 7 4 4
N
N 6 12 8 6 9 6 6 3 2
N
N
N
N
N 6 11 9 6 9 2 2 3 3
N 7 8 9 7 10 7 2 2 3
N 6 6 8 7 7 7 7 3 3
N
N
N 7 12 11 7 10 8 8 3 3
N
N 5 6 5 5 6 6 5 3 2
N
N
N
N 6 15 7 7 5 3 5 2 3
N
N 6 6 10 6 8 7 5 3 3
N 7 7 5 6 5 7 4 3 3
N
N
N 7 8 6 6 8 6 5 3 3
N 6 10 9 6 8 5 4 3 3
N
N
N
N
N 6 12 3 3 4 6 5 2 3
N 7 7 12 8 6 7 5 3 3
N 7 12 6 6 7 6 6 3 3
N 7 10 9 6 8 5 6 3 4
N 6 4 8 4 5 0 0 0 0
N 3 12 8 6 8 0 7 3 3
N 6 10 12 6 9 0 6 3 2
N
N
N
N 7 12 9 6 8 5 0 0 3
N 4 10 9 5 8 0 7 3 4
N
N
N 7 14 11 7 11 8 5 2 4
N
N 4 8 0 7 9 0 7 2 3
N
N
N 7 14 11 7 11 8 7 4 4
N
N
N
N
N
N
N
N
N 7 14 11 7 11 8 8 4 3
N 7 12 9 7 11 7 7 3 4
N
N
N
N 4 6 5 7 8 0 4 3 3
N 4 10 9 7 9 7 7 3 3
N
N
N 7 12 11 7 11 8 7 3 2
N
N 7 14 11 7 11 7 7 3 3
N 7 14 11 7 11 5 7 3 3
N 7 12 0 6 6 6 6 3 3
N 7 12 0 5 6 5 5 3 3
N
N 7 12 0 6 8 0 6 3 3
N
N 7 12 11 7 11 0 6 3 2
N 0 10 11 6 8 5 5 1 5
N 10 14 9 7 11 7 9 5 5
N
N
N 9 16 9 5 8 6 5 4 4
N
N
N
N 7 12 9 6 9 6 6 3 3
N
N
N
N 6 10 6 4 8 5 5 3 3
N 5 10 9 6 9 5 5 3 2
N 6 4 4 5 3 3 3 1 2
N
N
N
N 5 5 4 7 6 6 5 3 4
N
N 6 8 10 5 7 4 3 2 4
N
N 8 14 13 6 6 7 7 4 5
N 7 12 12 7 8 6 6 3 4
N 6 2 2 6 7 5 6 3 3
N
N 7 12 11 8 10 7 8 4 5
N
N
N 7 11 10 7 7 7 6 4 4
N
N 6 7 6 6 6 6 5 4 4
N
N
N 7 14 13 7 7 8 7 4 5
N
N 7 10 9 7 9 6 6 3 3
N 7 11 10 7 9 6 6 3 3
N 6 10 8 7 7 4 5 2 2
N 6 10 9 6 8 7 5 3 3
N 7 12 9 7 9 6 5 3 3
N 8 10 11 7 8 6 6 3 3
N 5 11 7 6 8 5 4 2 2
N 5 8 5 4 7 5 2 1 3
N 8 12 10 7 10 7 7 3 3
N 8 12 12 7 8 8 8 4 4
N 7 9 8 7 8 6 6 3 3
N 7 8 5 5 8 0 5 3 3
N 7 14 8 7 11 0 7 3 2
N 5 6 5 5 5 5 5 2 2
N 7 12 10 7 9 6 5 3 3
N 5 8 5 4 5 4 4 2 3
N 5 7 7 5 5 4 3 1 3
N 5 10 7 5 7 5 4 2 3
N 6 10 8 6 6 5 5 2 2
N 6 10 9 6 8 5 5 2 2
N 7 12 9 6 8 6 7 4 3
N 4 9 6 5 6 4 5 2 1
N 7 13 10 7 10 6 6 3 3
N 7 10 9 7 9 7 6 3 3
N 6 14 9 7 6 7 5 3 3
N 7 13 10 7 10 7 6 3 3
N 7 11 12 7 12 7 7 3 3
N 8 14 12 7 10 8 7 3 3
N 6 11 10 6 9 6 6 2 3
N 6 12 11 6 10 7 7 3 2
N 5 5 5 6 7 6 5 3 3
N 7 12 10 6 9 7 7 3 2
N 6 7 7 7 5 5 5 3 2
N 6 9 7 6 4 6 6 3 5
N 6 10 9 6 6 7 0 0 0
N 6 11 10 6 10 7 7 2 2
N 6 10 11 6 10 7 7 3 3
N 7 11 10 6 9 6 6 3 3
N 7 14 13 6 7 7 6 4 5
N 8 15 12 7 8 7 7 4 5
N 6 12 10 6 10 7 6 3 2
N 7 12 8 7 8 6 7 4 3
N 7 11 11 7 9 7 6 3 4
N 8 15 14 8 12 8 8 5 5
N 7 12 11 5 10 7 6 3 3
N 7 12 11 6 12 7 7 3 3
N 5 11 10 6 9 6 1 1 2
N 6 11 11 6 10 7 6 3 3
N 7 12 11 7 10 7 7 3 4
N 6 11 10 6 9 7 6 3 3
N
N 7 8 6 7 6 6 6 3 4
N 7 6 5 8 7 6 6 3 3
N 7 5 7 7 5 7 6 3 4
N 8 14 11 9 8 8 7 4 5
N 7 11 10 7 7 6 6 3 3
N 8 14 11 7 9 8 6 3 5
N 6 9 6 6 6 5 4 3 4
N
N 6 11 5 6 7 6 7 4 5
N 6 12 6 6 9 6 6 3 4
N 8 15 10 7 7 6 6 4 5
N
N
N 7 12 12 7 7 6 6 3 3
N
N
N
N 5 8 6 6 3 6 6 3 3
N 5 6 6 6 8 6 5 3 1
N 7 15 9 6 6 6 7 4 5
N
N 9 17 13 8 9 8 9 5 5
N
N
N
N 6 8 10 6 7 5 5 3 2
N 7 14 12 7 8 8 7 4 5
N
N 8 15 13 8 12 7 8 4 4
N 6 10 5 6 8 6 6 4 3
N
N 3 2 4 4 3 3 0 1 2
N
N
N
N 7 11 6 7 8 7 7 3 5
N
N
N 7 14 13 6 9 7 7 4 5
N
N
N
N 8 10 4 7 10 8 7 4 5
N
N
N
N
N 6 4 5 5 6 4 4 3 4
N 7 13 12 8 7 7 8 4 5
N
N
N 6 6 6 5 6 7 7 4 3
N
N
N 7 10 10 6 8 8 7 3 4
N 6 8 9 5 8 4 4 2 2
N 6 6 6 5 8 8 4 2 2
N 4 8 8 5 8 5 4 2 2
N 8 13 13 7 11 7 7 4 3
N 8 13 13 8 12 7 8 3 3
N 6 12 9 6 8 4 4 2 2
N 6 12 9 4 8 4 4 1 2
N 7 13 12 7 11 7 8 3 2
N 7 12 11 6 10 7 7 3 2
N 7 12 12 7 11 7 7 3 3
N 4 10 6 5 6 4 3 2 2
N 5 8 6 4 8 3 3 2 2
N 4 8 6 4 11 5 5 3 3
N 6 11 11 6 11 7 4 2 3
N 6 11 11 6 11 7 5 2 2
N 7 11 11 7 9 6 5 2 3
N 6 10 9 6 10 6 4 2 3
N 7 11 12 7 7 6 6 2 3
N 7 12 9 6 9 6 6 3 3
N 7 12 11 7 10 7 6 3 3
N 7 12 11 5 11 7 3 1 2
N 7 13 11 7 11 7 7 3 3
N 7 10 9 6 9 6 3 1 2
N 7 12 10 6 10 5 6 3 3
N 8 14 7 8 8 8 6 4 5
N 6 8 6 6 7 6 5 3 3
N 6 12 11 6 9 5 6 2 2
N 8 14 7 6 8 7 9 5 5
N 7 11 10 6 4 6 6 2 2
N 7 12 8 6 7 6 7 3 5
N 5 6 7 6 6 6 5 2 3
N 6 14 12 6 5 7 8 4 5
N 6 13 12 6 7 6 7 4 5
N
N
N 8 14 8 5 5 7 5 3 4
N
N 8 14 12 7 11 7 6 3 2
N
N
N 3 5 5 5 6 7 6 2 2
N
N 7 10 11 7 11 7 7 3 3
N
N
N
N
N 7 12 8 5 6 7 0 0 3
N 7 12 11 7 11 7 7 4 2
N
N
N 7 14 11 7 11 7 7 3 3
N
N 7 12 11 7 9 7 7 3 3
N 7 14 11 7 11 7 7 3 3
N 8 14 11 7 11 8 7 4 3
N
N 7 12 11 7 9 7 7 3 3
N
N
N 7 12 9 6 11 6 6 3 2
N 7 14 11 7 11 6 6 3 2
N
N
N 7 8 3 6 8 7 6 3 3
N 4 6 10 5 5 3 5 2 2
N
N
N
N
N 7 10 9 6 8 7 7 3 3
N
N
N
N 0 10 8 6 8 5 6 1 1
N 0 12 11 7 11 8 7 3 3
N 7 10 9 4 8 7 4 2 3
N 7 10 11 7 8 7 5 3 2
N
N
N 7 12 9 5 11 7 7 3 3
N
N 8 14 11 7 9 7 6 4 3
N
N 8 14 12 7 9 6 7 4 5
N 8 6 6 7 5 4 3 3 2
N
N 7 7 3 5 6 7 6 3 4
N
N 8 15 13 7 5 8 8 5 5
N 6 8 9 5 6 6 4 4 5
N
N 8 13 12 7 7 8 7 4 5
N
N
N 6 8 9 5 6 5 5 3 2
N
N 8 11 12 6 6 6 6 3 3
N
N 2 0 0 0 5 1 0 0 0
N 4 0 0 5 4 5 3 2 4
N 8 14 13 7 8 7 7 4 5
N 6 12 7 6 8 5 6 3 5
N 6 6 5 5 5 4 4 2 4
N
N
N 8 12 11 8 7 6 6 4 5
N 7 13 9 7 7 7 5 4 2
N
N 6 14 8 7 8 6 6 3 3
N
N
N 7 6 8 6 5 6 5 3 5
N
N 6 4 5 7 6 6 5 3 3
N
N
N
N
N
N
N
N 5 3 4 7 6 6 6 3 3
N
N
N
N 6 8 8 6 9 6 6 4 5
N
N
N 8 14 11 6 8 7 3 2 4
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N 4 8 8 6 8 6 5 3 2
N
N 6 8 8 5 9 7 7 3 4
N 6 10 8 6 9 0 7 3 2
N 4 8 9 6 9 6 6 3 3
N
N
N
N 5 6 8 7 8 6 6 2 2
N 3 8 8 6 6 6 7 3 3
N 7 12 9 5 8 5 5 2 2
N 5 12 11 7 11 6 3 1 3
N
N
N 5 6 8 6 6 6 7 3 3
N
N
N
N 5 8 6 7 8 5 5 3 3
N
N
N 6 4 5 3 3 3 0 0 1
N
N
N 6 10 8 6 8 5 6 3 3
N
N
N
N 5 10 8 7 8 0 6 3 3
N 5 6 8 6 8 6 6 3 3
N
N
N 4 10 9 7 6 7 5 2 4
N 4 14 9 6 8 6 6 2 2
N
N
N 5 10 8 5 6 6 6 2 3
N
N 4 8 11 7 9 7 6 3 3
N 7 12 8 7 9 0 7 3 3
N
N 7 10 9 7 9 4 4 1 1
N 7 0 11 7 11 7 6 3 3
N
N 8 13 11 6 13 7 0 0 2
N
N 6 11 9 5 9 6 0 0 1
N 6 9 12 6 11 6 1 0 0
N
N 6 10 12 7 13 7 8 3 2
N 7 14 13 8 13 8 8 4 1
N
N
N 7 1 13 7 9 6 7 3 2
N
N
N
N
N 7 10 8 6 9 6 6 3 2
N
N 0 10 9 7 9 7 5 3 3
N
N 7 8 8 6 9 6 6 2 2
N
N 2 6 6 5 6 4 2 1 1
N 0 4 6 6 6 3 3 1 1
N 7 8 6 5 6 0 3 1 2
N 7 10 11 7 11 6 6 3 4
N
N 5 12 11 7 11 7 7 3 3
N 4 12 9 7 9 6 6 2 2
N 7 8 6 6 8 6 6 3 0
N
N
N
N
N
N 6 12 8 6 8 6 5 2 2
N 3 14 8 6 8 5 5 2 2
N
N
N
N
N 7 8 9 6 8 5 4 1 2
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N 6 12 7 6 7 5 6 3 4
N
N 6 10 7 5 7 4 5 3 3
N
N
N
N
N
N
N
N 6 10 7 5 6 6 4 2 2
N
N
N
N
N
N
N 7 12 10 7 10 7 6 3 4
N
N
N 5 13 11 5 8 5 5 3 3
N 6 14 10 6 9 7 6 3 3
N 7 12 10 5 11 5 5 3 3
N 5 12 9 6 9 5 5 2 4
N
N
N
N
N 7 8 7 5 2 4 3 2 2
N
N
N 4 8 9 5 7 5 5 3 4
N 4 8 8 5 8 4 7 3 4
N
N
N
N
N 3 9 8 6 7 5 5 3 3
N
N
N
N
N
N
N
N 7 13 11 6 9 5 6 4 4
N
N
N
N 6 12 9 5 7 3 5 3 4
N 7 10 7 5 8 7 5 3 3
N 6 13 9 6 8 6 5 3 4
N 6 12 7 5 5 6 5 3 3
N 7 12 6 6 6 3 5 3 4
N 5 7 9 5 8 6 5 3 2
N 5 10 3 4 5 3 4 2 4
N 5 11 9 5 8 6 5 3 3
N 7 14 10 6 10 6 6 4 4
N 7 14 13 6 10 6 6 4 4
N 6 12 8 6 9 5 5 3 2
N 6 12 8 6 7 5 5 3 3
N 7 12 11 5 11 5 6 3 3
N 6 13 13 5 10 5 6 3 4
N 5 8 6 5 7 4 5 2 4
N 6 10 11 5 8 4 5 3 3
N 6 12 7 5 7 5 5 3 3
N
N 6 12 9 6 9 6 6 3 3
N 5 9 10 4 2 2 2 0 2
N 6 10 10 6 8 6 6 3 3
N 4 8 7 5 7 5 5 3 3
N 7 14 10 5 7 5 5 3 3
N 6 12 10 6 6 6 5 3 3
N 6 10 9 6 9 5 5 4 3
N 7 9 9 4 6 4 5 3 3
N 5 9 9 5 7 5 5 3 3
N 4 2 4 4 5 4 4 2 3
N
N 6 12 9 5 5 4 6 3 3
N
N 5 14 10 6 8 6 6 3 4
N 4 8 7 4 7 5 5 3 3
N
N 6 13 9 6 9 5 6 4 4
N 6 13 9 6 9 5 5 3 3
N 4 7 8 4 7 5 4 2 3
N 6 8 7 5 6 6 4 2 2
N 5 10 8 5 8 6 4 2 4
N 5 11 9 6 8 6 5 3 3
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N 9 15 13 8 12 8 8 4 4
N
N 6 10 8 6 7 5 5 3 2
N
N
N
N
N
N 7 12 8 5 9 2 3 1 3
N
N
N
N
N
N
N 6 13 9 6 6 2 6 3 3
N 6 10 8 6 7 2 7 3 2
N
N
N 6 10 8 5 7 6 3 1 0
N
N
N 7 12 8 6 10 6 6 3 3
N
N 6 10 7 5 8 5 5 3 2
N 6 12 7 5 8 6 5 3 3
N 6 13 8 5 7 5 5 3 3
N
N
N 6 8 8 5 7 6 4 3 3
N
N 6 10 10 5 7 5 5 2 4
N
N
N
N 4 10 8 5 7 7 5 2 3
N 8 12 10 6 10 6 6 3 3
N 8 14 12 6 10 6 6 3 3
N 7 10 11 6 10 6 5 2 3
N
N 6 14 9 7 8 6 6 4 4
N 7 12 12 5 10 5 5 3 3
N 7 11 10 6 8 5 5 3 3
N
N 5 12 12 6 10 5 6 3 2
N 4 8 9 4 8 5 5 3 2
N 5 14 10 6 8 6 5 3 2
N 7 13 10 6 8 6 6 4 4
N 3 7 7 4 6 4 4 2 3
N 6 11 10 5 8 5 5 3 4
N
N
N
N 7 12 12 5 10 6 6 3 3
N 4 9 7 5 6 5 4 2 3
N
N 3 11 10 6 8 6 4 2 1
N 6 9 10 5 8 5 5 3 3
N
N 7 14 10 7 8 6 5 3 3
N 8 13 10 6 10 6 6 3 3
N
N
N 6 11 10 6 8 5 6 3 4
N
N 6 6 3 4 3 7 5 2 4
N 7 8 11 5 10 6 6 2 1
N 3 5 7 5 10 7 6 3 3
N 7 12 11 7 11 4 7 3 3
N 7 10 8 6 8 6 7 4 4
N 6 10 4 5 6 5 4 2 3
N 8 11 11 6 10 0 6 3 3
N 6 6 9 6 10 3 5 3 1
N 7 8 4 6 6 0 7 3 3
N 6 14 9 8 8 0 7 3 2
N 8 12 11 6 11 7 7 3 2
N 4 4 8 4 8 3 5 3 1
N 4 13 11 7 11 0 7 2 3
N
N 8 12 12 7 11 5 7 4 2
N
N 8 10 11 6 11 4 5 3 1
N
N
N
N
N
N
N 4 0 8 5 9 4 5 3 2
N 4 5 7 5 10 7 6 3 3
N 4 7 9 6 10 6 7 2 2
N 6 10 11 6 9 2 7 3 3
N
N
N 5 0 9 6 10 5 6 2 2
N
N
N
N 4 12 9 5 8 5 6 3 3
N 7 14 10 6 10 6 7 3 3
N
N 7 14 11 7 10 6 7 3 3
N 8 11 11 7 10 5 6 3 2
N 7 14 11 7 12 7 7 4 4
N
N 7 15 11 8 12 0 7 4 3
N 8 16 12 8 12 8 8 4 4
N 5 12 9 6 8 5 5 3 3
N 7 10 8 6 9 5 5 3 3
N 8 15 12 7 12 7 6 4 4
N 8 16 12 8 12 8 8 3 3
N 8 16 12 8 12 8 8 4 4
N
N 8 16 12 8 12 8 8 4 4
N 8 16 12 8 12 8 8 3 3
N 8 16 12 8 12 8 8 4 4
N 7 14 12 7 11 7 7 3 3
N 8 16 12 8 12 8 8 4 4
N 8 9 7 7 8 7 7 5 5
N 6 7 8 7 9 8 7 4 4
N 8 8 8 7 8 7 6 5 4
N 6 10 8 6 8 5 6 3 3
N 6 10 7 6 7 5 4 2 3
N 7 11 9 6 7 5 5 3 3
N 5 9 8 4 8 5 3 1 2
N 5 9 5 4 5 4 3 2 3
N 6 12 9 6 9 6 7 3 3
N 5 12 11 5 10 7 7 3 2
N 6 13 10 6 11 6 6 3 3
N 6 12 10 7 11 7 6 3 3
N 5 12 11 6 10 5 6 3 3
N 5 10 8 7 6 6 6 3 3
N 7 10 8 6 10 5 5 3 3
N 6 10 8 5 8 6 6 3 3
N 5 10 6 5 6 4 3 3 3
N 9 15 13 8 13 9 9 4 4
N 8 17 13 8 13 8 8 3 4
N 8 17 13 8 14 8 9 4 4
N 7 15 10 6 11 5 7 3 0
N 8 18 13 8 13 7 8 5 4
N 4 11 10 5 9 3 6 4 1
N 8 18 13 8 14 8 8 4 4
N 7 10 10 7 10 7 7 3 4
N 9 18 13 9 14 9 8 4 4
N 7 14 11 7 12 7 7 3 3
N 4 10 8 5 8 4 5 3 3
N 8 16 12 8 11 7 8 3 4
N 5 12 11 6 8 5 5 3 2
N 7 14 12 7 12 6 8 3 2
N 0 3 3 3 4 2 2 0 0
N 7 17 13 8 13 8 8 3 3
N 6 14 10 7 11 6 7 3 2
N 8 17 12 8 12 6 7 3 4
N 3 5 5 4 5 3 3 2 2
N 8 17 12 8 13 8 8 4 2
N
N
N
N
N
N 5 12 11 6 8 6 6 3 4
N 3 7 8 5 6 5 5 2 1
N 7 13 8 6 7 6 6 3 4
N 7 12 9 6 8 6 5 3 3
N 5 12 8 6 8 5 6 3 3
N 6 12 7 4 8 3 5 3 3
N 7 16 11 8 12 8 7 4 4
N 6 8 11 6 10 5 4 2 3
N 6 15 11 6 6 6 5 3 3
N 6 16 11 6 10 6 5 3 2
N 6 10 11 6 9 5 6 3 3
N 5 12 9 5 7 5 2 0 1
N 8 7 8 6 7 8 8 4 5
N 6 8 7 8 6 7 6 5 5
N 7 14 10 7 11 7 7 3 4
N 3 8 8 4 7 3 5 2 1
N 5 11 10 6 10 5 6 3 4
N 7 14 11 7 11 7 5 3 3
N 8 11 11 7 11 7 5 3 3
N 8 12 11 7 11 5 6 3 3
N 8 16 12 8 12 8 7 3 3
N 4 6 7 4 5 5 4 2 3
N 8 12 8 6 9 6 4 2 2
N 6 10 9 5 10 4 6 3 4
N 8 9 10 6 9 4 7 3 2
N 7 2 7 5 5 5 3 3 3
N 7 10 11 7 10 7 6 3 2
N 6 10 10 5 11 6 7 3 2
N 6 2 3 5 5 6 5 4 4
N 8 11 8 5 10 6 6 3 1
N 7 12 9 6 8 8 8 4 3
N 5 7 8 5 8 5 7 3 2
N 7 6 6 5 8 5 3 3 2
N 7 12 8 7 6 7 7 3 3
N 7 8 8 5 8 4 5 3 3
N 7 14 11 7 11 0 7 4 4
N 7 14 10 7 9 6 6 3 3
N 7 12 8 6 9 6 6 3 3
N 4 9 10 6 10 7 6 3 4
N 8 14 9 7 9 5 7 4 4
N 2 5 7 4 5 5 5 3 2
N 7 11 11 6 10 1 6 3 1
N 8 17 12 8 13 4 8 4 3
N 8 8 11 7 8 6 6 2 0
N 5 10 7 6 9 5 5 2 3
N 4 4 5 5 5 0 3 2 2
N 7 16 12 8 12 0 8 3 4
N 8 16 13 8 13 8 8 4 4
N 8 16 12 8 12 8 8 4 4
N 5 9 8 5 8 5 5 2 3
N 8 16 12 8 13 8 8 4 3
N 8 16 12 8 12 8 8 4 3
N 7 11 9 5 9 5 4 2 1
N 8 16 12 8 12 8 8 4 3
N 7 14 11 7 11 7 8 4 3
N 8 15 14 8 12 8 8 4 3
N 8 15 11 8 12 8 8 4 3
N 4 5 5 3 6 3 3 3 0
N 6 11 10 5 9 7 7 4 3
N 8 16 12 8 12 8 8 4 3
N 7 15 12 8 12 7 8 3 3
N 4 9 11 6 10 5 7 3 3
N
N 4 14 12 7 12 7 6 3 3
N 8 12 10 8 8 8 6 3 3
N 9 11 10 7 9 7 8 3 3
N 7 10 10 6 8 6 6 3 3
N
N
N
N
N
N
N
N
N
N
N
N
N 8 10 7 7 10 6 7 2 3
N
N
N 7 10 8 6 11 6 6 2 3
N 7 10 10 5 10 7 7 3 3
N 6 12 10 7 10 6 6 3 3
N
N
N 6 10 8 5 10 6 4 2 3
N
N 7 11 7 9 9 8 7 3 3
N
N
N
N
N 7 12 9 7 7 6 5 4 5
N 8 14 12 6 7 7 5 3 3
N
N 8 14 13 8 8 7 6 3 3
N 8 8 9 6 9 6 7 3 4
N 9 12 9 7 9 6 7 3 4
N 7 13 11 7 7 7 3 1 0
N 5 5 6 6 6 5 4 2 3
N 8 13 11 7 9 7 5 2 4
N 4 4 6 5 8 4 4 2 3
N 5 10 9 5 12 6 5 3 2
N 4 10 8 6 9 5 5 3 2
N 8 12 8 6 11 6 5 3 4
N 3 6 6 5 8 5 5 2 2
N 5 12 11 6 12 5 6 3 2
N 4 10 8 5 11 5 5 2 3
N 5 12 11 6 9 5 6 3 3
N 8 16 11 7 11 7 7 3 3
N 8 13 10 5 6 7 7 3 3
N 4 10 8 4 8 4 5 3 3
N 8 10 10 7 10 7 6 4 4
N 5 10 8 6 9 5 6 3 4
N 7 14 12 7 9 7 7 4 3
N 4 10 9 6 9 5 5 3 2
N 4 8 6 4 7 4 4 3 0
N 6 15 11 6 11 7 6 3 3
N 8 16 12 7 13 7 7 4 4
N 8 16 12 8 11 6 5 3 2
N 8 11 11 6 8 7 6 3 4
N 6 14 11 6 9 7 7 3 4
N 5 8 10 5 10 5 5 2 2
N 4 12 8 5 8 6 5 3 3
N 6 12 11 7 11 6 6 3 3
N 0 8 6 5 8 5 6 3 3
N 7 12 10 6 10 7 6 2 3
N 7 14 11 7 11 7 7 3 3
N 8 16 12 8 13 8 8 4 4
N 8 16 12 8 13 8 8 4 3
N 7 10 9 6 10 6 8 3 3
N 4 8 8 5 9 5 5 3 3
N 7 12 8 7 8 6 5 3 3
N 7 9 4 7 8 0 5 0 0
N 7 8 9 6 8 5 6 3 3
N 5 12 9 6 8 5 5 3 2
N 7 10 7 8 9 7 8 3 3
N 7 5 7 5 5 3 4 2 2
N 6 12 11 6 9 5 5 3 3
N 6 10 10 5 10 6 6 4 4
N 8 15 12 8 12 8 7 3 2
N 4 8 8 6 9 5 6 3 3
N 0 0 4 3 4 4 1 0 0
N 6 10 9 6 9 5 6 3 4
N 6 8 6 6 6 6 5 3 3
N 4 9 0 5 6 5 5 3 3
N 7 12 9 7 8 5 5 3 3
N 6 9 10 6 8 5 5 3 3
N
N
N 6 12 11 6 8 6 6 3 3
N 6 9 2 5 8 5 5 3 4
N 4 6 6 4 6 5 4 2 3
N
N 7 14 11 6 9 6 6 3 3
N
N 4 6 5 4 6 5 4 3 3
N
N 6 10 9 6 8 6 6 3 3
N 4 8 6 4 6 4 4 2 2
N
N
N 4 8 8 5 8 5 5 3 3
N 5 10 8 5 8 5 5 3 3
N 4 10 8 5 8 5 5 3 3
N
N
N
N
N
N
N 6 12 9 6 11 7 6 3 3
N
N 5 6 6 4 6 4 4 3 2
N
N
N
N 7 12 9 6 9 7 6 4 3
N
N 0 8 8 6 8 6 5 3 3
N
N
N 7 12 11 7 11 7 7 4 3
N 6 10 9 5 8 5 5 3 3
N
N
N 5 8 8 4 6 5 4 3 0
N 4 10 11 7 9 7 7 4 3
N 4 12 9 6 8 6 6 3 3
N 0 3 6 4 5 4 4 1 2
N 6 12 11 6 8 6 6 3 3
N 7 14 9 6 9 7 7 3 3
N
N 3 4 3 6 11 6 6 3 3
N 6 10 3 6 5 5 5 2 3
N
N 5 8 8 5 8 5 5 3 3
N 4 10 9 5 8 5 5 3 3
N 6 8 6 4 6 0 5 3 3
N
N 7 12 9 6 9 6 5 3 3
N 6 10 3 5 9 5 5 3 3
N
N 4 10 9 6 11 6 5 3 3
N 5 4 3 4 3 4 3 3 2
N 6 10 9 6 11 7 6 3 3
N
N
N 6 10 8 5 8 5 5 3 3
N
N
N 8 14 11 8 11 7 7 4 4
N
N 7 10 8 5 8 5 5 2 2
N 7 6 6 4 7 4 4 2 2
N 5 10 8 6 11 3 3 3 2
N
N 6 12 9 6 9 7 6 3 3
N
N 0 0 0 0 0 0 0 0 0
N
N
N 7 12 11 7 12 8 5 3 3
N 7 12 6 6 11 6 6 3 3
N 6 8 8 5 6 4 4 2 3
N 7 14 12 8 12 8 7 4 3
N 5 12 11 6 11 7 5 3 3
N
N
N 6 14 11 7 11 7 7 3 3
N
N
N 7 12 8 6 9 5 5 3 3
N 7 14 12 8 12 8 7 4 4
N 5 10 8 4 8 5 5 3 3
N
N
N
N 3 4 3 3 3 2 3 2 2
N
N
N
N 7 12 8 6 8 4 5 2 2
N 8 16 12 8 12 8 8 4 4
N
N
N 5 10 6 5 8 5 5 3 3
N 6 12 6 4 8 5 6 3 3
N 0 0 0 0 3 2 0 0 0
N
N 5 12 8 5 9 5 6 3 3
N
N
N
N
N 6 7 8 5 8 0 5 3 3
N 5 9 8 5 9 5 6 3 3
N 6 10 9 6 8 6 6 3 2
N
N
N
N
N
N
N
N 6 11 10 6 9 6 6 4 3
N
N
N 7 10 11 6 9 7 6 3 4
N
N
N 5 9 9 5 8 0 0 1 3
N 5 12 11 6 8 5 5 3 3
N 0 4 3 6 9 6 6 1 3
N 3 9 5 5 8 5 5 3 4
N 7 10 9 6 9 6 6 3 4
N 6 10 9 6 8 6 6 3 2
N 5 7 8 5 8 6 6 3 3
N 0 4 3 3 5 4 0 0 4
N
N 6 7 10 6 9 6 6 3 3
N 5 9 9 5 8 6 6 3 3
N
N
N
N
N
N 6 8 6 6 9 5 5 3 3
N
N 5 12 9 5 8 5 5 3 3
N 7 12 9 5 6 5 6 3 2
N 7 10 8 6 10 6 7 3 3
N 8 12 10 6 10 7 6 3 2
N 7 14 8 7 10 7 6 3 4
N 8 16 12 8 13 8 8 3 4
N 8 10 10 8 12 6 7 4 3
N 6 12 11 7 11 7 7 3 3
N 7 12 9 7 12 8 7 3 3
N 3 4 3 2 3 3 2 1 2
N 7 10 11 8 10 8 6 3 2
N 3 7 6 5 8 5 5 2 3
N 7 12 10 6 10 6 6 3 3
N 6 10 8 6 8 5 6 3 3
N 8 12 10 7 10 7 7 3 3
N 8 10 6 4 8 7 6 2 1
N 5 8 6 2 8 4 3 1 4
N 6 4 4 4 0 0 5 0 2
N 6 12 8 6 8 7 6 3 3
N 4 12 8 5 8 6 5 2 3
N 7 12 10 6 10 6 7 2 3
N 7 0 0 5 2 3 6 4 2
N 7 14 11 7 10 6 7 4 2
N 4 6 0 3 4 4 4 2 1
N 7 12 9 7 9 7 6 3 4
N
N
N 6 12 10 7 10 8 7 3 3
N
N
N
N 7 10 10 5 10 7 5 3 3
N
N
N
N 4 4 4 6 7 5 5 2 3
N
N 5 4 6 5 5 5 6 3 3
N 6 8 8 7 6 5 5 3 4
N 9 8 10 9 10 8 8 4 3
N
N 5 10 8 4 8 4 4 3 3
N 5 12 9 6 11 6 5 3 2
N 4 8 6 4 8 5 5 2 2
N 8 16 12 8 12 8 8 4 4
N 2 6 8 0 0 3 0 0 1
N 0 0 3 2 0 2 2 0 2
N 5 12 9 5 11 6 6 3 3
N 4 12 8 6 11 5 5 3 3
N 4 8 6 4 9 4 4 3 2
N 6 12 9 6 9 5 5 3 3
N
N 7 8 10 7 10 7 6 4 5
N 7 12 11 6 11 7 6 3 0
N 6 12 9 6 9 6 6 2 3
N 6 10 10 5 8 5 5 2 3
N 6 12 8 6 10 5 5 3 3
N 6 12 8 6 10 7 6 3 2
N 7 8 7 6 8 7 6 3 2
N 0 10 8 5 12 5 0 0 0
N 8 12 9 6 11 5 6 3 3
N 6 10 9 6 9 6 6 3 3
N 6 8 8 6 10 6 6 3 4
N 7 14 9 6 9 6 6 3 3
N 7 14 11 6 12 7 7 3 2
N 6 10 8 5 8 5 5 2 2
N 6 10 10 7 10 8 5 3 3
N 5 12 8 5 8 5 4 2 2
N 8 10 12 7 12 6 6 4 3
N 5 10 8 6 8 5 6 2 2
N 8 12 9 5 8 7 6 3 2
N 4 10 10 6 9 6 6 3 3
N 7 15 10 5 10 7 6 4 3
N 8 16 12 8 12 7 7 3 3
N 6 10 8 6 8 5 5 2 2
N 6 12 11 6 13 6 6 3 3
N 4 6 8 5 8 5 5 1 1
N 7 14 11 6 9 5 7 3 3
N 6 10 6 4 6 4 4 2 2
N 4 8 6 4 6 4 4 3 3
N 6 13 12 6 12 8 8 2 3
N 4 8 8 5 8 5 5 3 3
N 4 10 8 5 8 5 5 3 3
N 3 12 3 3 5 4 5 3 3
N 5 10 9 6 9 7 7 3 3
N 7 12 11 8 11 6 4 3 4
N 5 12 9 7 8 5 6 3 3
N 8 16 12 7 12 8 7 4 4
N 5 14 9 5 9 5 5 3 2
N 8 14 8 6 6 6 7 3 4
N 5 6 3 6 6 5 0 1 3
N 7 10 11 6 10 7 7 3 3
N
N 7 16 8 6 10 8 6 3 4
N 6 5 0 1 3 2 2 1 2
N 7 16 11 7 11 7 8 4 5
N 7 15 11 7 11 7 7 3 4
N 6 12 8 5 8 6 6 3 3
N 6 12 8 6 8 6 6 3 2
N 4 6 8 5 6 5 0 1 2
N
N 6 17 10 6 9 7 6 3 5
N 6 12 9 6 9 7 0 0 2
N
N 8 8 9 5 10 6 7 4 4
N 7 8 8 6 8 6 6 3 2
N 8 16 12 7 11 8 7 4 5
N
N
N
N
N
N 7 17 14 8 10 8 8 3 5
N
N
N 7 16 11 7 11 6 6 3 2
N
N
N
N
N
N 7 16 11 6 11 8 7 4 5
N
N
N 5 9 8 5 9 5 5 3 2
N 5 9 9 6 8 5 6 3 2
N
N 5 9 9 6 8 6 6 3 2
N 4 9 9 5 8 5 6 3 3
N
N 4 8 6 4 6 5 5 3 3
N
N
N
N
N
N 6 13 10 8 12 7 7 3 3
N
N
N 6 10 9 6 8 5 5 3 3
N
N 7 13 13 7 8 6 7 3 3
N
N
N
N
N 3 6 6 4 6 5 4 3 3
N 6 10 8 5 8 5 5 3 3
N 4 6 6 4 6 4 4 3 3
N
N
N
N 4 10 8 5 8 5 5 3 3
N
N 7 10 8 6 8 6 6 3 3
N 5 12 8 5 9 5 5 3 3
N
N 6 10 8 5 8 4 5 3 3
N 6 10 8 6 9 5 5 2 3
N
N
N 5 8 6 4 6 4 4 2 3
N
N
N
N
N
N 5 8 6 4 6 4 4 3 3
N
N 6 10 9 6 8 5 5 3 3
N
N 5 8 6 4 6 4 4 2 3
N
N
N
N 8 10 10 5 10 7 7 3 3
N 7 8 5 5 6 5 2 1 3
N 7 14 11 7 11 7 7 3 3
N 5 10 9 6 9 6 6 3 3
N 6 10 10 5 10 5 6 3 3
N 7 15 11 7 11 0 7 3 3
N 5 8 8 4 6 4 4 2 3
N 7 12 9 6 8 1 7 3 2
N 4 8 6 4 8 4 5 2 2
N 7 15 11 7 11 7 7 3 3
N 5 7 5 6 8 6 7 3 3
N 6 7 5 4 3 3 0 0 2
N 5 10 8 5 8 5 5 3 3
N 7 16 12 8 11 7 7 3 3
N 5 8 6 4 6 4 4 3 3
N 7 15 11 7 11 7 7 3 3
N 5 14 11 7 11 7 7 3 3
N 9 14 9 6 10 7 8 4 3
N 8 16 12 8 12 8 7 3 3
N
N 7 10 9 6 8 6 5 3 4
N 4 8 8 4 6 4 4 3 3
N 7 14 12 6 9 7 6 3 4
N 5 10 8 4 8 4 5 3 3
N 5 10 8 4 8 5 5 3 3
N
N
N
N
N 4 8 6 4 6 5 5 3 3
N
N
N 7 11 10 6 10 7 8 4 3
N 6 12 8 5 8 5 5 3 3
N 4 10 8 5 8 5 5 3 3
N 7 12 12 6 10 8 7 3 2
N
N 5 10 8 5 8 5 5 3 3
N
N
N
N 7 10 10 6 9 6 7 3 3
N 5 4 3 0 0 2 2 0 0
N 4 5 4 2 2 2 5 2 0
N 3 8 6 4 6 4 4 2 3
N 5 8 8 5 8 5 5 3 3
N 8 15 14 9 11 2 8 4 5
N 4 8 6 4 6 4 4 2 3
N 4 10 8 4 8 5 5 3 3
N 8 12 10 6 8 6 6 3 3
N
N 6 12 9 5 9 4 5 3 3
N 8 12 7 5 6 6 7 3 3
N 7 9 10 5 8 5 6 3 4
N 5 8 6 4 6 4 4 2 3
N 4 8 6 4 6 4 4 3 3
N 4 4 2 8 4 0 4 1 3
N 5 7 6 5 7 0 6 3 4
N 5 6 8 5 7 5 6 3 5
N
N
N
N 6 10 9 5 8 0 4 2 3
N
N
N 4 10 8 5 7 5 5 3 3
N
N
N
N
N 4 10 9 5 8 5 5 3 3
N 4 8 6 4 6 4 5 3 3
N
N
N 6 12 9 5 9 5 6 3 3
N
N
N 4 10 8 5 8 5 5 3 3
N
N 6 11 10 5 8 5 5 3 3
N
N
N
N 4 8 8 4 6 4 4 2 3
N
N 6 12 9 5 9 7 6 3 3
N
N
N 7 10 7 6 8 6 6 3 3
N 7 10 8 5 8 2 4 2 2
N
N
N
N 6 8 8 5 8 5 5 3 4
N 8 8 6 4 6 5 4 2 1
N
N 8 16 12 8 12 8 8 4 3
N 7 15 11 7 11 7 7 4 3
N 8 15 10 7 9 8 7 3 4
N 9 12 9 6 9 5 5 3 5
N 7 12 10 6 10 8 6 3 4
N 8 14 11 5 8 8 6 3 3
N 6 11 9 6 9 7 6 3 5
N 7 12 9 6 8 6 6 3 3
N 6 12 9 6 9 5 5 3 4
N 8 16 12 8 12 8 7 3 3
N 8 16 12 8 12 8 7 3 3
N 8 14 12 8 11 7 7 3 3
N 8 14 11 7 11 7 7 3 3
N 7 14 11 7 11 7 7 3 3
N 5 7 6 5 7 5 2 1 3
N 5 8 5 6 9 5 5 3 4
N 4 10 9 5 8 5 5 3 3
N 4 6 5 4 5 3 3 2 2
N 8 14 12 8 12 7 7 2 2
N 8 14 11 7 11 0 7 3 3
N 6 12 9 5 8 5 5 3 3
N 7 15 11 7 11 7 7 3 3
N 7 10 8 5 8 7 7 3 5
N 4 10 8 4 8 5 5 3 3
N
N
N 4 6 6 4 6 4 4 3 3
N 6 8 9 6 8 5 6 3 2
N
N
N 5 8 8 5 8 5 5 3 3
N 6 8 8 6 8 0 0 0 3
N 4 8 9 6 8 5 5 3 3
N
N 7 8 9 5 6 6 6 3 4
N 6 6 6 4 8 4 4 3 3
N 6 10 8 5 6 6 7 3 3
N
N 8 6 7 5 10 5 6 3 1
N 5 6 11 7 9 5 6 2 0
N 5 14 8 6 9 6 5 3 4
N 5 9 7 6 8 7 5 2 1
N
N 4 10 8 6 8 5 6 3 3
N 6 6 8 7 8 6 6 3 0
N 8 11 10 7 11 7 7 4 1
N
N
N 7 12 10 7 10 7 7 3 4
N 7 6 6 5 8 6 6 3 3
N 6 14 10 6 9 7 6 3 3
N 7 17 11 7 11 7 8 3 4
N
N 7 13 10 7 11 7 7 3 4
N 7 12 11 7 10 6 5 3 3
N 7 13 11 7 11 7 7 3 3
N 7 10 8 6 8 6 6 3 3
N
N 7 12 8 6 6 7 6 3 3
N 5 8 8 6 5 0 0 0 2
N
N
N
N 5 10 8 5 8 0 4 3 3
N 6 8 8 5 8 5 5 3 3
N
N
N
N 6 12 9 5 8 0 5 3 3
N 6 10 8 4 8 0 4 2 3
N 6 10 8 5 8 5 5 3 3
N
N
N
N
N
N 7 6 10 7 8 5 6 3 3
N 7 10 12 7 10 4 6 3 3
N
N
N 4 8 8 4 8 0 5 3 3
N 6 10 9 5 8 6 5 3 3
N
N
N
N
N 4 8 8 5 6 5 5 3 3
N 4 10 8 5 8 5 5 2 3
N 7 12 9 5 8 5 5 3 3
N 7 8 9 5 9 5 5 3 3
N 3 8 8 4 6 2 4 2 3
N 7 10 6 6 10 6 6 3 3
N 5 10 9 5 9 6 6 3 3
N 7 12 7 6 10 5 6 3 3
N
N
N
N 5 5 5 7 6 7 3 2 2
N
N
N
N 5 10 12 6 8 7 6 3 3
N 4 8 8 4 6 4 5 3 3
N 4 10 8 4 8 5 5 3 3
N 7 12 10 7 11 8 8 4 4
N 7 14 10 5 8 5 6 4 3
N 5 10 5 5 8 5 4 2 0
N 6 10 8 4 7 5 6 3 3
N 7 13 10 7 8 6 6 2 3
N 3 3 3 5 3 4 0 2 2
N 6 14 9 6 9 8 6 4 3
N 8 16 12 8 12 8 8 4 5
N 9 18 13 9 14 8 9 5 5
N 9 17 13 9 13 9 9 5 5
N 4 0 3 2 3 2 2 1 2
N 5 10 8 5 8 5 5 3 3
N 8 16 13 8 13 8 7 4 4
N 9 16 13 8 13 8 8 4 5
N 9 19 14 9 13 9 8 5 5
N 9 19 14 10 14 9 9 5 5
N 7 14 11 7 6 4 8 4 4
N 5 8 6 5 8 5 4 2 2
N 4 10 5 4 8 5 5 3 3
N 7 10 8 5 8 5 5 3 3
N 5 10 8 5 8 5 5 3 3
N 5 10 8 5 8 5 5 3 3
N 7 10 8 6 8 5 5 3 3
N 5 10 8 5 8 6 5 3 3
N 3 10 5 4 8 5 5 3 3
N 8 16 13 7 11 7 7 4 4
N 9 16 13 8 12 8 8 4 5
N 9 19 14 8 14 8 8 5 5
N 5 10 8 4 8 5 5 3 3
N 8 14 11 8 13 7 6 4 4
N 5 8 5 3 5 2 2 2 3
N 6 10 8 5 8 5 4 3 3
N 8 14 12 7 12 8 8 4 4
N 5 13 11 4 9 5 6 3 4
N 4 10 8 4 8 5 5 3 3
N 9 19 13 8 14 9 9 5 5
N 7 10 5 4 8 6 4 3 3
N 9 19 14 9 13 9 9 5 5
N 6 12 10 6 10 6 6 3 3
N 4 10 9 5 5 5 5 2 2
N 4 10 8 5 8 5 5 2 3
N 4 10 8 5 8 5 5 2 3
N 8 16 12 7 12 6 8 4 4
N 4 10 8 4 5 5 4 2 2
N 8 17 12 7 12 8 7 3 5
N 6 10 8 5 8 5 5 2 3
N 7 15 10 7 10 0 6 3 3
N 6 8 11 6 9 5 5 3 3
N 7 10 0 6 4 3 5 4 2
N 6 12 10 7 10 6 7 3 3
N 7 10 8 6 6 5 5 3 3
N 8 12 10 8 10 6 7 3 2
N 7 8 8 5 8 5 4 3 3
N 7 16 12 7 12 7 7 4 4
N 8 16 10 7 11 0 6 4 4
N 5 10 8 5 8 5 4 2 2
N 6 12 11 7 11 7 7 4 4
N 8 14 11 7 11 7 7 4 4
N 5 8 8 5 8 6 6 3 3
N 7 16 11 7 11 7 7 3 3
N 5 8 8 5 6 5 4 2 2
N 4 10 8 5 9 6 5 3 3
N 7 13 10 7 11 7 7 3 4
N 6 10 8 5 8 5 4 3 3
N 6 10 11 5 9 6 4 2 3
N 7 8 9 4 8 6 5 3 3
N 7 10 9 6 8 5 5 2 3
N 6 8 6 5 6 2 4 2 2
N 7 10 8 5 8 5 5 3 3
N 5 10 8 5 8 5 5 3 3
N 6 15 9 7 10 7 7 3 4
N 6 10 10 7 10 7 6 4 3
N 8 11 8 6 9 6 5 3 3
N 6 12 10 6 10 7 6 3 3
N 8 10 5 5 5 3 2 2 2
N 7 12 9 7 9 6 6 3 3
N 5 12 9 5 9 6 6 3 3
N 7 16 11 7 11 7 7 3 5
N 8 12 10 7 10 7 7 3 3
N 7 16 11 7 12 7 7 3 3
N 7 14 10 7 10 7 7 3 4
N 6 10 9 6 9 4 6 2 2
N 7 11 9 6 8 6 6 3 3
N 6 10 9 6 8 5 5 3 3
N 6 10 3 4 8 2 4 3 2
N 6 13 10 6 10 7 6 3 3
N 7 11 10 6 9 7 6 3 4
N 6 12 9 6 8 6 6 3 3
N 7 16 11 7 11 7 7 4 4
N 7 12 9 6 9 6 6 4 4
N 4 8 8 5 6 3 4 2 2
N 7 16 11 7 12 7 7 4 3
N 8 16 12 7 11 7 8 3 4
N 7 12 8 5 9 5 5 3 3
N 6 10 6 5 6 4 4 2 2
N 5 11 9 5 9 6 5 3 3
N 7 11 10 5 9 6 6 3 3
N 8 16 12 8 12 8 8 4 5
N 3 8 5 4 6 5 5 3 3
N 7 16 12 7 12 7 8 4 3
N 7 11 11 6 8 5 4 3 3
N 6 12 11 5 8 5 5 3 3
N 8 16 13 8 12 8 7 4 4
N 3 7 8 5 6 5 2 2 3
N 6 11 9 6 9 6 5 3 3
N 6 14 10 7 10 7 7 4 4
N 7 12 10 7 9 7 7 3 4
N 7 16 11 7 11 8 7 3 4
N 7 16 11 7 11 7 7 4 4
N 7 10 10 7 11 7 7 3 3
N 2 8 6 5 6 5 4 2 3
N 7 17 12 6 12 8 8 3 4
N 6 11 8 5 8 6 5 3 3
N 4 10 9 5 8 5 5 3 3
N 7 12 8 5 8 5 6 3 3
N 7 16 11 6 10 7 7 3 4
N 2 10 8 4 8 6 5 3 3
N 7 13 9 6 9 7 7 3 3
N 7 10 9 5 8 6 5 3 3
N 4 10 8 6 8 6 5 3 3
N 6 9 8 6 9 6 6 3 4
N 7 10 9 6 8 6 6 3 3
N 4 12 6 5 8 5 5 3 3
N 7 11 11 6 9 6 6 3 2
N 6 12 9 7 10 7 6 3 2
N 7 14 9 7 11 7 6 4 4
N 7 11 9 7 9 7 6 3 2
N 7 14 11 7 10 6 7 4 2
N 7 12 8 5 8 6 5 3 3
N 2 10 9 5 6 5 5 3 2
N 6 13 12 6 10 7 6 4 3
N 7 10 8 5 8 5 5 3 3
N 7 16 11 7 11 7 7 4 4
N 7 14 11 7 11 7 8 3 4
N 7 12 3 5 8 4 3 1 2
N 7 11 11 7 11 7 7 4 4
N 6 11 9 6 9 6 5 3 2
N 7 10 9 5 8 6 6 3 3
N 7 10 5 5 6 6 5 3 2
N 7 12 9 6 8 6 5 3 3
N 7 16 12 7 10 8 8 4 5
N 7 16 10 7 11 8 7 4 5
N 5 9 8 4 8 5 5 2 2
N 6 10 8 5 6 5 5 2 2
N 5 10 8 5 9 6 5 3 2
N 3 10 9 5 8 6 5 3 3
N 7 10 9 5 9 6 5 3 3
N 7 9 9 5 9 6 5 3 4
N 3 8 5 5 5 4 5 3 3
N 7 10 5 5 5 5 4 3 3
N 8 10 8 5 8 5 6 2 3
N 6 12 9 6 10 6 6 3 3
N 6 12 6 5 3 5 4 2 2
N 7 14 11 6 10 6 6 3 3
N 7 11 11 6 11 7 7 4 3
N 7 12 10 7 11 7 7 3 3
N 5 10 8 4 6 4 6 2 2
N 7 12 12 7 12 7 8 4 4
N 8 14 9 8 9 7 6 4 3
N 7 12 7 5 8 6 5 3 3
N 7 14 9 7 11 0 6 5 4
N 7 10 8 5 6 6 5 3 2
N 7 16 11 8 12 7 6 4 4
N 3 6 6 6 6 5 5 3 3
N 6 14 8 7 11 7 7 3 5
N 8 17 12 7 12 8 8 4 3
N 7 10 8 6 8 5 5 3 3
N 7 16 11 6 11 7 7 4 4
N 7 10 8 5 8 5 4 3 3
N 7 10 8 5 6 6 5 3 2
N 7 10 8 6 8 4 5 3 3
N 7 10 10 7 11 7 7 4 5
N 7 16 11 7 10 7 8 4 5
N 4 8 6 5 8 4 5 2 2
N 7 12 10 5 10 7 6 3 3
N 6 14 9 6 9 6 6 3 3
N 7 12 8 6 8 6 5 3 3
N 7 10 9 4 8 5 6 3 2
N 8 10 9 5 8 6 6 3 3
N 6 12 9 6 8 6 6 4 4
N 6 11 9 6 10 6 6 3 4
N 7 16 11 7 11 8 6 3 5
N 7 18 11 6 11 7 7 3 4
N 8 14 12 7 11 7 7 4 4
N 8 16 11 7 11 7 7 4 5
N 7 10 10 6 10 6 6 3 4
N 6 12 9 6 9 6 6 2 2
N 4 10 8 6 8 5 5 2 3
N 7 14 11 7 10 7 8 3 4
N 8 16 11 8 12 7 6 4 3
N 7 16 11 7 12 8 7 4 4
N 7 12 5 6 5 5 5 2 3
N 3 8 5 4 5 6 4 2 3
N 7 10 8 5 8 5 5 3 3
N 3 8 6 5 8 5 5 3 3
N 8 12 11 8 11 7 8 4 4
N 8 12 11 7 12 7 8 4 4
N 8 17 13 8 13 8 8 4 4
N 9 17 12 8 12 8 7 4 4
N 4 8 8 4 8 5 4 2 3
N 3 8 6 5 8 5 4 2 3
N 5 10 6 4 8 5 5 2 3
N 5 10 9 6 8 5 5 2 3
N 5 10 5 5 8 5 5 3 3
N 8 12 12 7 12 8 8 4 4
N 8 16 11 7 12 7 7 4 4
N 8 13 13 9 11 7 7 4 3
N 5 10 9 5 8 5 4 2 3
N 4 10 8 5 8 5 4 2 3
N 5 10 8 5 8 5 5 3 3
N 7 12 9 6 10 3 5 3 4
N 5 10 5 4 5 3 4 1 3
N 5 8 8 4 8 5 4 2 3
N 9 17 13 8 12 8 7 4 5
N 7 12 9 6 11 5 6 3 3
N 7 10 5 4 6 4 4 1 2
N 5 9 8 5 7 5 5 2 2
N 8 16 13 9 11 7 8 4 5
N 9 13 10 7 11 6 6 3 5
N 4 8 9 4 8 5 4 3 3
N 7 10 8 5 6 5 5 3 3
N 9 15 13 8 12 3 7 3 4
N 4 8 8 4 8 5 5 3 3
N 6 10 8 5 8 5 5 3 3
N 8 8 11 4 10 7 6 3 4
N 7 7 8 5 8 5 5 2 3
N 7 10 8 5 8 5 5 3 3
N 9 13 12 7 12 8 7 4 5
N 4 8 5 5 8 5 4 3 3
N 9 16 12 8 13 8 8 4 5
N 7 10 8 6 8 5 5 3 3
N 4 10 8 4 8 5 5 3 3
N 8 19 14 8 13 7 7 4 5
N 0 0 3 3 0 0 0 1 0
N 6 10 8 5 8 5 10 3 3
N 6 10 8 5 8 5 5 2 3
N 6 10 8 5 8 5 5 2 3
N 6 10 8 5 8 5 5 2 3
N 7 14 9 7 10 5 7 4 3
N 7 10 8 6 9 5 6 3 3
N 7 4 3 3 3 4 2 1 1
N 7 16 10 7 10 7 7 4 0
N 6 10 9 6 8 6 5 3 3
N 8 17 13 8 12 8 8 4 4
N 6 12 9 5 8 7 6 3 3
N 8 17 14 8 13 8 8 4 4
N 7 16 10 7 10 7 7 3 3
N 7 16 12 7 11 7 7 4 2
N 7 16 11 7 11 7 7 4 4
N 7 16 11 7 11 8 7 4 0
N 2 10 9 5 6 4 2 1 2
N 7 13 10 7 11 7 7 3 3
N 6 10 8 5 8 4 4 2 2
N 8 16 11 7 11 7 7 4 5
N 7 16 11 7 12 8 8 4 5
N 7 12 9 6 9 5 5 3 3
N 6 12 9 7 10 0 6 3 1
N 6 14 10 7 9 6 6 3 2
N 7 11 11 5 8 5 6 3 3
N 6 12 8 5 8 5 5 2 2
N 6 10 10 7 10 6 6 4 2
N 7 15 12 7 11 7 7 4 5
N 6 10 10 5 8 5 4 2 2
N 7 10 8 5 8 2 4 3 3
N 7 16 11 7 11 7 8 4 3
N 7 13 10 7 10 7 7 4 4
N 7 4 2 4 3 2 3 2 2
N 7 14 11 7 11 7 7 3 4
N 3 0 0 2 3 0 2 0 2
N 7 8 3 4 5 5 4 2 3
N 2 0 0 2 2 3 3 1 2
N 2 10 4 4 8 4 4 2 3
N 7 10 3 4 8 5 5 2 2
N 7 10 8 5 8 6 5 3 3
N
N
N
N 6 12 9 6 9 6 5 3 3
N
N
N 5 10 8 5 8 5 5 2 3
N
N
N
N 6 14 9 7 9 7 6 3 3
N
N 5 10 8 5 9 6 6 3 3
N
N 7 10 9 6 8 5 5 3 3
N
N 6 12 9 6 9 5 5 2 3
N 7 14 9 6 9 5 5 3 3
N 5 10 8 6 8 5 4 3 3
N
N 6 12 9 6 8 5 5 2 3
N 7 14 9 6 9 6 6 2 3
N
N
N
N 7 14 11 7 9 5 6 3 3
N 6 7 8 8 9 6 7 5 5
N 5 10 8 5 9 6 7 3 3
N 5 10 8 5 8 6 5 2 2
N 7 8 8 7 8 7 6 5 5
N 4 8 8 6 8 5 4 2 2
N 6 12 9 6 8 4 4 3 3
N 5 12 9 6 8 5 5 2 2
N 6 12 9 6 8 5 5 2 3
N 7 12 9 6 8 5 5 2 2
N 7 8 8 6 7 7 7 5 5
N 8 7 8 7 8 7 8 5 5
N 8 8 8 7 7 6 6 5 5
N 6 10 11 7 11 6 6 3 3
N 6 12 9 6 9 6 4 2 2
N 7 12 12 7 11 7 6 3 3
N 7 12 8 6 9 5 5 3 3
N 6 8 6 4 8 4 5 1 2
N 7 14 12 7 12 7 6 3 2
N 7 12 12 7 10 8 7 3 3
N 5 8 8 5 6 5 5 3 2
N 6 11 11 7 10 7 6 4 4
N
N 5 5 5 5 7 0 6 3 4
N 6 11 8 5 8 6 6 3 3
N
N 7 14 12 7 11 7 7 4 4
N 5 8 4 5 7 5 5 2 2
N
N
N
N
N
N
N
N 5 9 8 5 7 5 5 3 3
N
N 2 0 1 2 3 4 3 2 3
N 6 1 6 5 6 5 5 3 3
N 5 5 3 4 5 0 3 2 0
N 0 0 0 0 0 0 0 0 0
N 4 12 11 6 9 6 6 3 4
N 0 0 0 0 0 0 0 0 0
N 5 7 2 5 7 4 5 3 3
N
N 0 0 0 0 0 0 0 0 0
N 4 11 11 6 10 6 6 3 3
N 5 3 7 5 8 0 5 3 4
N 6 10 1 5 8 5 5 3 2
N
N 5 11 10 6 9 6 6 3 4
N
N
N 0 0 0 0 0 0 0 0 0
N
N
N
N 7 14 9 7 11 7 7 4 3
N 4 8 9 6 9 6 6 3 3
N 7 12 8 7 9 7 6 3 3
N
N 6 12 9 6 8 7 7 3 3
N 7 14 9 7 9 6 5 3 3
N
N 8 8 12 7 7 5 4 2 1
N
N 8 10 10 10 4 9 8 4 3
N 8 9 9 9 10 10 10 4 3
N 8 13 8 10 13 8 10 4 4
N 9 10 10 8 6 7 5 3 3
N 8 8 8 8 8 6 7 3 3
N
N
N
N
N
N
N 8 9 11 10 13 8 10 5 5
N 10 12 12 7 10 5 4 3 3
N
N
N 8 8 9 9 9 8 9 3 3
N
N 9 8 9 8 9 8 7 3 3
N 7 11 9 6 9 6 7 4 4
N 10 10 8 8 8 5 5 3 3
N 8 10 8 8 10 7 8 3 3
N 7 12 12 6 11 7 7 4 4
N 8 10 12 9 8 6 8 3 2
N 5 10 9 5 8 6 5 3 4
N 8 10 9 6 9 8 6 2 3
N 5 3 2 5 8 6 5 3 3
N 9 8 10 8 10 8 9 3 3
N 7 12 10 7 10 7 6 4 4
N 7 13 11 6 10 7 6 3 3
N 8 9 9 9 9 8 8 4 3
N 6 12 11 6 9 6 6 4 4
N 0 0 0 0 0 0 0 0 0
N 8 10 8 9 9 7 9 3 3
N 0 0 0 0 0 0 0 0 0
N 8 10 10 8 9 8 8 4 4
N 7 10 10 8 8 9 9 4 3
N 0 0 0 0 0 0 0 0 0
N
N 4 8 8 5 8 0 5 1 3
N 5 1 8 5 8 5 5 3 4
N 4 10 8 5 8 5 5 0 3
N
N
N 7 13 11 7 11 7 7 3 4
N 7 13 11 7 10 7 7 4 4
N
N 6 7 8 5 8 5 6 3 4
N
N 4 10 8 5 8 6 6 3 3
N
N 0 8 8 5 7 5 5 1 2
N 6 9 7 5 7 5 4 3 3
N 5 7 8 5 7 5 4 3 3
N 6 9 10 5 9 6 6 3 3
N 5 8 8 5 8 5 5 3 4
N
N
N 5 0 0 6 10 6 6 4 3
N 0 0 0 4 7 0 4 0 0
N
N
N
N 6 9 0 4 7 5 5 3 2
N 6 5 5 5 7 6 5 3 0
N
N
N
N
N 4 5 5 5 8 5 5 0 3
N 6 10 8 5 8 6 6 3 3
N
N
N 0 0 0 0 0 0 0 0 0
N 7 8 7 6 8 7 7 4 5
N 9 10 9 8 9 8 9 4 4
N
N
N 8 9 8 8 8 8 9 4 3
N 9 10 8 8 10 10 7 4 3
N 10 11 10 10 10 8 8 4 4
N
N 8 9 10 8 10 8 9 4 4
N
N
N
N
N 8 9 8 8 7 7 8 4 4
N 9 10 9 10 10 10 10 4 5
N 9 9 10 10 10 10 10 4 4
N
N
N 9 10 10 9 9 9 9 4 3
N 9 9 10 9 10 9 9 3 3
N 9 9 9 8 9 8 8 4 4
N
N
N
N 9 9 9 8 9 8 10 3 4
N 8 8 9 8 8 8 8 3 4
N
N
N
N 9 9 9 8 8 8 8 4 4
N 8 9 9 8 7 7 7 3 4
N
N 7 10 10 10 10 9 10 4 4
N 7 10 9 8 8 7 8 3 1
N 9 10 12 8 12 10 10 4 4
N 7 14 11 7 11 6 6 2 3
N 7 14 11 6 9 6 6 3 3
N 7 14 11 6 9 7 7 3 3
N
N 7 14 11 6 9 7 6 3 3
N 6 12 9 7 9 7 6 3 3
N
N 7 14 11 6 9 7 7 3 3
N
N 6 14 9 7 9 7 5 2 2
N
N 7 12 8 6 8 6 6 2 3
N
N 7 12 8 6 9 6 6 3 3
N
N 7 12 9 5 9 5 7 3 3
N
N 7 12 9 6 8 5 6 3 3
N
N
N
N 6 10 9 6 9 6 5 3 3
N 6 12 9 9 8 6 6 3 3
N
N
N 7 14 9 6 9 6 6 3 3
N
N 6 12 11 6 9 6 6 3 3
N
N
N
N 6 12 8 6 8 7 7 3 3
N
N
N 6 12 6 5 8 5 6 2 2
N
N
N
N 7 12 9 5 9 4 5 2 3
N 5 10 9 6 6 4 5 3 3
N 7 12 9 6 9 6 6 2 2
N 6 12 9 7 8 6 6 2 3
N 5 10 8 5 8 6 6 3 3
N
N 7 12 9 6 9 6 5 3 3
N 7 12 9 6 8 5 5 2 3
N 6 12 8 6 9 5 5 3 3
N
N 6 9 8 6 9 5 5 3 3
N 0 0 0 0 0 0 0 0 0
N 8 8 8 7 8 5 6 3 3
N 8 7 6 7 7 6 7 5 5
N 0 0 0 0 0 0 0 0 0
N 8 7 7 8 7 7 7 5 5
N 6 9 8 5 8 5 5 3 2
N 0 0 0 0 0 0 0 0 0
N 7 8 7 8 8 7 6 5 4
N 8 8 7 6 8 6 7 5 5
N 4 8 7 5 7 5 4 3 3
N 6 8 8 5 7 5 5 3 3
N 0 0 0 0 0 0 0 0 0
N 5 6 5 5 7 5 5 0 3
N 7 9 8 6 7 6 7 4 5
N 0 0 0 0 0 0 0 0 0
N 5 8 8 5 8 5 5 3 4
N 8 8 7 6 8 7 6 5 5
N 8 6 8 7 8 7 6 5 5
N 7 9 8 8 8 7 7 5 4
N 5 6 8 5 8 5 6 3 4
N 7 8 6 7 7 6 5 4 4
N 0 0 0 0 0 0 0 0 0
N 5 6 5 5 6 5 5 3 2
N 6 9 8 7 8 5 5 5 3
N 4 5 2 5 9 5 5 3 2
N 4 6 5 5 8 0 5 3 4
N 8 7 8 9 9 7 7 5 5
N 0 0 0 0 0 0 0 0 0
N 7 8 8 7 8 6 6 5 5
N 5 8 9 5 8 6 5 3 2
N 6 7 8 5 6 3 5 3 3
N 8 8 8 7 8 7 5 5 5
N 7 9 8 7 8 7 7 5 5
N 6 7 7 5 7 0 5 0 3
N
N 0 0 7 6 9 6 6 3 3
N
N
N
N 0 0 0 2 0 3 0 0 2
N 7 4 3 3 3 3 0 0 1
N
N 7 8 6 5 5 5 4 2 2
N
N 8 12 9 7 8 6 6 2 3
N 7 10 8 5 8 5 4 2 2
N
N 6 12 9 6 8 6 6 3 3
N 5 10 9 5 5 5 4 2 3
N
N 6 8 8 4 8 5 4 3 3
N 4 8 8 4 8 5 4 3 3
N 4 6 6 4 6 5 5 2 2
N
N 2 0 3 2 0 2 2 1 1
N 5 8 9 6 9 6 6 3 3
N
N 5 10 8 5 8 6 6 3 3
N
N 5 10 8 4 8 5 4 3 3
N 3 8 8 5 8 5 5 3 3
N
N
N
N 6 12 9 6 9 7 6 3 2
N 5 10 8 6 8 5 5 3 3
N 5 10 8 5 8 5 5 2 2
N
N 5 10 8 4 6 5 5 2 3
N 4 10 8 4 8 5 4 2 3
N
N 4 10 8 5 8 5 5 2 2
N 7 10 8 4 8 5 5 2 2
N 6 6 8 6 9 6 6 3 2
N
N 6 10 8 4 8 5 4 2 2
N 6 12 9 6 8 6 6 3 3
N 7 10 8 5 8 5 5 3 3
N
N 4 6 5 4 8 5 4 2 3
N
N
N
N
N
N 6 10 9 9 6 7 7 3 3
N 8 8 9 9 9 7 7 3 3
N 7 9 7 7 8 8 8 3 3
N 8 13 10 8 10 7 8 3 3
N 6 9 8 9 9 9 7 3 3
N 7 12 10 6 12 8 7 3 1
N 7 15 12 7 12 7 7 3 3
N 6 14 12 6 10 6 6 3 3
N 5 8 6 5 6 5 4 2 3
N 6 14 9 6 9 6 6 3 3
N
N
N 7 12 10 5 10 5 7 2 5
N 6 14 10 6 10 7 7 3 3
N 7 12 10 7 12 7 6 4 4
N 7 6 7 7 7 6 5 3 5
N 7 12 12 6 13 7 7 3 4
N
N 7 14 13 7 5 7 6 3 2
N 6 4 5 6 6 6 5 3 5
N
N
N
N
N
N
N 7 13 12 7 5 6 5 4 3
N 6 7 9 5 5 6 5 3 3
N
N 8 14 12 8 5 8 7 4 5
N
N
N 9 16 13 8 10 8 9 5 5
N
N 8 5 6 7 7 8 6 3 5
N
N 6 5 4 7 6 7 6 3 5
N 4 10 0 6 8 7 5 3 3
N
N 4 6 5 7 6 5 4 1 2
N 7 14 12 7 11 7 5 3 4
N
N
N 7 14 11 7 11 7 7 4 3
N
N
N
N
N 7 12 9 7 11 7 6 3 2
N
N 5 8 5 6 8 6 0 0 3
N 6 12 9 7 8 6 6 3 4
N 4 10 9 6 9 6 6 3 3
N
N 5 4 5 5 8 7 7 3 3
N
N 4 10 11 8 10 8 7 4 3
N 4 11 12 7 11 7 7 3 3
N 5 6 7 5 8 5 6 3 2
N 6 14 13 7 13 8 8 4 4
N 7 13 11 7 11 8 7 3 3
N 5 12 12 8 12 8 8 4 3
N 4 6 8 4 6 5 5 3 3
N 4 10 11 6 11 7 6 3 3
N 7 14 11 7 9 7 6 3 3
N
N
N 6 11 10 8 12 8 8 3 3
N
N 7 16 12 7 12 7 7 3 3
N 8 15 12 7 10 8 8 4 3
N
N 5 9 9 8 9 7 7 3 2
N 8 18 12 8 10 8 8 4 4
N
N 2 4 8 6 7 5 3 3 2
N
N 8 16 12 7 11 7 7 3 3
N
N
N 6 12 8 6 7 6 6 3 2
N 5 10 8 5 8 5 5 3 3
N 5 7 9 6 7 5 5 3 3
N 6 10 9 5 8 6 6 3 3
N 7 15 10 7 10 7 7 3 2
N 4 6 6 6 9 6 6 3 2
N 7 11 10 8 10 8 8 3 4
N 6 8 10 7 9 7 7 3 3
N
N 5 8 9 7 9 6 7 3 3
N 4 8 6 6 7 5 6 3 2
N 5 14 10 6 8 6 6 3 2
N 6 12 9 6 10 6 7 3 4
N 7 8 9 8 8 8 8 3 3
N
N 7 8 10 8 9 7 7 3 3
N
N 6 11 10 7 11 7 7 3 3
N 5 11 8 7 9 7 7 3 3
N 6 12 9 6 8 7 7 3 2
N 6 10 8 6 8 6 4 2 3
N 7 14 10 6 10 7 7 3 3
N 7 10 8 5 8 5 5 3 3
N 4 10 8 4 8 4 5 2 3
N 5 12 8 5 10 6 6 3 2
N
N 7 12 9 5 8 5 5 3 3
N
N
N
N 5 10 8 4 8 5 4 2 3
N
N
N
N
N
N
N 7 10 6 6 9 6 2 2 3
N 8 10 8 5 8 5 5 3 3
N 5 11 11 6 12 7 7 3 3
N 6 8 8 6 7 0 6 2 4
N
N 7 8 8 6 8 7 6 2 3
N 7 10 10 6 10 7 7 3 3
N
N
N
N 9 16 14 8 10 8 7 4 5
N
N 8 13 12 7 13 8 7 3 4
N
N
N 6 11 9 7 6 7 5 3 5
N
N
N 7 14 13 7 3 5 4 3 5
N 6 9 9 7 11 8 7 3 3
N 8 13 7 7 5 7 6 3 5
N 5 9 5 5 5 6 5 2 3
N 8 13 10 8 5 7 9 5 5
N 8 8 8 7 9 6 7 3 4
N
N
N
N 6 12 9 7 9 7 6 3 3
N 7 12 7 7 6 8 7 3 2
N
N 8 10 8 7 8 6 7 3 3
N 7 9 9 7 9 7 6 3 4
N 8 11 9 8 9 8 7 3 4
N
N
N
N 7 10 8 6 7 6 8 3 3
N
N 7 10 9 6 9 4 6 3 3
N 6 6 3 7 6 4 5 3 1
N
N 7 10 9 6 8 6 5 3 3
N 4 8 8 6 10 6 6 3 3
N 6 8 11 6 10 7 6 3 3
N 6 6 9 6 10 8 8 3 3
N 7 10 9 5 9 6 6 3 3
N 7 12 9 6 9 5 5 3 3
N
N 6 10 11 6 8 5 5 3 3
N 4 10 8 5 8 5 4 3 3
N 6 10 8 5 8 5 5 2 2
N 6 10 7 7 10 6 6 3 3
N 6 10 8 5 6 2 5 2 2
N 7 10 4 4 6 2 4 2 2
N 7 10 3 5 8 4 4 2 3
N 5 8 7 5 10 6 6 2 2
N 7 10 9 5 8 5 4 2 3
N 5 10 9 6 10 6 5 3 3
N 6 11 10 6 11 7 6 3 3
N 7 10 8 6 8 5 2 2 3
N
N 6 10 10 6 10 6 6 3 2
N 7 10 8 5 8 5 2 1 1
N 7 11 10 7 10 7 7 3 3
N 5 10 9 6 9 6 6 3 2
N 6 10 8 4 8 5 2 1 2
N
N 7 10 8 5 8 5 5 2 3
N 5 9 9 6 9 7 6 3 3
N 7 12 11 6 9 5 4 1 3
N 5 10 8 5 5 5 2 1 2
N 2 10 8 5 8 4 2 2 2
N 2 8 8 4 6 5 4 2 2
N
N 0 0 0 2 3 0 0 0 0
N
N 6 9 9 7 9 7 6 3 3
N 7 8 3 6 6 5 2 1 3
N 7 12 8 6 9 6 6 3 3
N 5 9 10 6 8 7 6 3 3
N 7 10 10 6 10 6 6 3 3
N 7 12 9 6 9 7 6 3 2
N
N 6 12 8 7 9 6 7 3 2
N 6 12 9 6 9 6 9 3 3
N 6 8 9 6 6 6 5 3 3
N 7 12 11 6 9 6 6 3 3
N 5 0 0 3 0 3 0 0 0
N 3 10 8 5 6 5 4 2 3
N
N 8 12 10 6 8 5 5 3 3
N 7 10 9 6 8 5 6 3 3
N
N 5 10 8 5 8 5 4 2 2
N 5 10 8 6 10 7 7 3 3
N 6 9 9 7 9 7 7 3 3
N 7 8 5 5 6 5 4 2 2
N
N
N
N 7 8 7 7 7 7 7 4 4
N 7 8 7 6 8 6 7 4 4
N 7 8 9 5 8 7 6 3 3
N 7 8 8 7 8 7 6 3 3
N 6 8 8 6 8 7 6 4 4
N
N
N 6 11 10 5 8 4 3 2 3
N 6 10 8 5 8 5 5 3 3
N 6 10 9 6 8 5 5 3 3
N
N 4 10 9 6 9 5 5 3 3
N 7 11 9 6 8 6 6 3 2
N 4 9 8 4 7 3 3 2 2
N
N 5 9 7 3 6 3 4 2 1
N 6 11 10 5 8 6 5 3 3
N 7 12 9 5 8 5 6 3 3
N
N
N
N 5 10 8 5 8 5 6 3 3
N
N 6 12 9 6 8 5 6 3 3
N 6 14 9 6 8 6 6 3 3
N
N
N 6 12 9 7 8 7 6 3 3
N
N 6 10 9 5 9 5 5 3 3
N
N 5 8 8 5 8 4 5 2 3
N 4 8 8 4 8 5 5 2 3
N
N
N
N 6 9 8 5 7 4 0 0 1
N 5 8 9 4 8 5 5 3 3
N 4 10 8 5 8 4 5 2 2
N 4 8 6 4 6 4 4 3 3
N 4 10 8 5 8 4 5 3 3
N 7 10 9 5 7 5 6 3 3
N
N
N
N 6 9 7 4 5 4 3 2 2
N 5 10 8 5 8 5 5 3 3
N
N 4 10 11 6 8 5 5 2 3
N 6 14 12 6 11 6 6 3 3
N 6 14 11 7 11 6 5 3 3
N 7 16 11 7 12 5 7 3 3
N 7 13 12 7 11 6 6 3 3
N 3 10 3 4 5 5 6 2 3
N 7 14 11 6 8 6 7 3 4
N
N 2 10 9 6 8 5 5 3 3
N 2 10 6 5 8 5 3 1 3
N 6 15 11 7 10 6 6 3 3
N 7 14 11 8 12 6 6 3 2
N 6 14 11 6 11 6 6 3 3
N
N 7 14 11 7 11 6 6 3 3
N 6 12 9 5 9 6 7 3 3
N
N
N 6 12 8 5 8 6 6 3 3
N 6 14 11 6 8 7 6 3 3
N 7 12 11 7 9 7 6 3 3
N 5 8 5 4 5 5 5 2 3
N 5 14 9 5 8 6 5 3 3
N 6 13 10 6 11 5 6 3 3
N
N 5 10 8 6 8 5 6 2 3
N 4 5 6 5 5 5 5 3 2
N
N 6 13 12 5 11 6 6 3 3
N 6 15 12 7 12 6 5 3 2
N 7 12 9 5 8 6 7 3 3
N 7 14 11 8 11 7 6 3 3
N
N
N 5 12 11 6 11 6 6 3 3
N 6 12 9 6 8 5 6 3 3
N 6 15 12 6 10 6 6 3 2
N 6 10 10 5 12 6 6 3 3
N 6 14 11 6 11 6 6 3 3
N 6 12 11 6 11 5 7 3 3
N
N 7 12 9 6 8 7 7 1 3
N 5 11 10 6 11 5 6 3 3
N
N
N 7 12 9 6 8 5 6 3 3
N 6 14 11 5 12 5 6 3 3
N 6 14 11 5 11 6 5 3 3
N 5 12 9 5 8 6 6 3 3
N 7 10 9 4 8 5 6 3 3
N 5 15 13 7 12 6 5 3 3
N 7 12 9 5 9 7 5 3 3
N
N 6 14 12 7 11 6 5 3 3
N
N
N 6 13 12 6 13 5 6 3 3
N 7 13 12 7 12 7 7 3 3
N 6 14 12 7 11 6 6 3 4
N 9 18 13 9 14 9 8 5 4
N 7 16 14 8 13 9 7 4 4
N 8 16 13 7 11 8 8 4 4
N 7 17 8 8 13 8 9 5 5
N 4 10 5 4 8 5 5 3 3
N 9 11 13 8 12 8 7 4 2
N 7 12 8 5 8 5 5 3 3
N 9 16 15 9 12 9 9 4 5
N 7 9 10 6 8 6 7 3 3
N 3 6 3 4 5 3 2 2 2
N 9 13 10 8 10 7 7 3 3
N 6 10 8 5 8 6 5 2 3
N 7 12 9 7 9 7 7 4 3
N 9 16 12 8 12 8 7 4 4
N 5 16 9 6 9 6 7 3 0
N 7 10 8 7 9 6 6 4 3
N 6 14 11 7 11 6 7 3 3
N 3 4 5 2 3 3 5 2 3
N 7 10 14 6 3 6 7 3 4
N 8 15 12 7 11 8 8 4 4
N 7 15 12 7 13 7 6 3 4
N 5 12 10 6 14 7 6 3 3
N 5 12 13 7 10 5 5 3 3
N 7 13 12 7 12 6 6 3 3
N 7 0 6 6 5 5 6 3 3
N 6 14 11 7 10 7 7 3 3
N 6 12 10 6 10 7 5 3 3
N 6 13 12 7 11 5 5 3 2
N 8 13 11 7 11 6 6 3 3
N 5 9 6 6 8 7 4 3 2
N 6 13 12 6 12 6 5 3 3
N 6 10 11 7 8 6 6 3 1
N 7 13 12 7 11 7 7 3 3
N 7 14 12 7 12 7 6 3 2
N 8 13 12 7 10 9 7 4 3
N 6 13 10 5 10 6 5 3 2
N 6 10 11 6 11 4 6 3 2
N 8 16 13 8 13 7 6 4 3
N 7 13 10 7 11 6 6 3 3
N 6 9 10 6 8 5 5 3 2
N 6 10 8 6 8 5 5 3 3
N 6 8 12 6 11 5 6 3 2
N 7 13 11 6 10 6 7 3 3
N 8 15 10 6 11 7 6 3 3
N 7 7 9 8 9 8 7 3 2
N 6 7 9 7 7 7 6 2 3
N 7 13 11 7 10 7 6 3 4
N 7 9 6 7 7 6 8 4 2
N 7 15 12 7 12 7 7 3 3
N 6 8 12 8 13 5 6 3 2
N 6 5 13 7 12 6 7 3 3
N 6 13 10 5 10 7 5 3 3
N 8 13 12 7 11 6 7 3 0
N 6 12 11 6 10 5 7 3 1
N 6 13 12 7 11 5 5 3 3
N 7 13 11 6 12 6 6 3 3
N 8 13 11 7 10 6 6 3 3
N 8 12 11 7 11 8 7 3 3
N 6 12 11 6 11 7 6 3 3
N 6 13 10 7 13 7 6 3 3
N 7 13 11 8 8 6 5 3 3
N 6 13 10 7 8 7 6 3 3
N 6 11 12 7 12 5 8 3 3
N 5 12 9 6 8 5 6 3 3
N 5 14 12 7 12 6 7 3 3
N 6 13 11 6 11 7 6 3 3
N 7 12 12 6 11 6 6 3 3
N 5 12 11 7 8 6 5 3 3
N 5 5 8 7 8 6 5 3 3
N 5 12 8 7 9 6 6 3 4
N 8 13 11 7 12 7 6 3 3
N 6 12 11 6 11 6 7 3 4
N 6 11 10 7 10 6 7 4 4
N 6 9 10 7 9 6 7 3 4
N 6 8 10 7 11 5 6 3 2
N 6 11 10 6 10 5 6 3 3
N 5 8 6 5 8 5 5 3 3
N 4 10 8 4 8 5 5 3 3
N 6 10 8 5 8 5 5 3 3
N 6 10 8 5 8 5 5 2 3
N 7 11 10 8
N 6 5 10 5 9 5 6 3 3
N 3 6 5 4 8 5 3 3 3
N 5 10 8 6 8 5 6 2 3
N 8 13 12 7 13 8 8 3 3
N 8 8 12 6 11 8 7 4 4
N 4 10 8 5 8 5 5 3 3
N 4 8 6 5 8 5 5 2 3
N 8 16 12 6 10 6 6 4 4
N 6 13 10 6 6 6 6 4 4
N 5 10 8 4 8 5 5 2 3
N 8 15 13 8 8 5 8 5 4
N 8 13 12 6 12 7 6 4 4
N 9 15 12 8 7 8 6 4 4
N 7 10 5 5 8 5 5 3 3
N 4 10 5 4 8 5 4 3 3
N 4 10 8 5 8 5 4 3 3
N 8 15 11 5 13 8 7 4 4
N 5 8 5 4 6 4 4 2 3
N 9 17 13 9 11 7 8 4 4
N 6 10 6 4 8 5 5 3 3
N 6 7 13 6 9 7 7 4 4
N 4 10 5 4 6 5 4 3 3
N 4 10 8 5 8 5 5 3 3
N 6 10 8 4 8 4 4 3 3
N 4 10 8 5 8 5 5 3 3
N 4 10 5 4 5 5 5 3 3
N 4 10 8 4 8 5 4 3 3
N 9 17 12 8 11 8 9 4 4
N 8 9 10 7 12 8 6 4 4
N 4 8 5 5 8 5 5 2 3
N
N
N 5 10 8 6 8 5 6 2 3
N
N 5 10 9 6 8 5 6 3 3
N 6 12 9 6 8 6 6 3 3
N
N 7 14 10 7 12 7 6 3 3
N 7 16 12 7 11 7 7 3 3
N 6 12 9 5 8 5 6 3 3
N 6 11 11 6 6 6 5 3 3
N 7 12 8 5 8 5 5 3 3
N 7 11 10 6 6 7 6 3 3
N 6 15 12 6 9 7 6 3 3
N 6 14 12 7 11 5 6 3 3
N 3 10 9 5 9 5 6 3 3
N 5 11 10 6 11 6 5 3 3
N 6 15 10 6 10 6 5 3 3
N 7 14 10 6 10 6 6 3 3
N 6 13 10 7 11 7 6 3 3
N 6 14 12 6 12 6 6 3 3
N 6 14 13 6 12 6 6 3 3
N 5 12 9 6 11 7 7 3 4
N 6 16 13 6 11 6 7 3 3
N 10 9 6 6 8 5 5 3 3
N 5 12 11 6 8 6 7 3 3
N 6 15 7 6 11 7 6 3 3
N 6 14 12 7 12 6 6 3 3
N 4 10 11 7 11 7 7 4 4
N 6 13 10 6 11 6 6 3 3
N
N 6 14 6 6 10 6 5 3 3
N 7 14 10 7 10 6 6 3 3
N 6 11 11 6 10 6 5 3 2
N 7 14 9 5 8 5 6 4 4
N
N
N 6 11 10 7 9 7 5 3 3
N 7 12 9 6 6 5 6 3 3
N 6 12 5 5 8 5 6 3 4
N
N
N 6 12 9 7 8 5 6 3 5
N 6 14 10 6 10 6 6 3 3
N 6 12 9 5 11 7 8 3 3
N
N 6 15 9 7 10 6 6 3 2
N
N
N 7 14 9 6 8 6 7 3 4
N 6 11 10 6 10 6 6 2 3
N 6 12 10 5 10 6 5 3 2
N 6 12 9 6 8 5 7 3 4
N 7 13 11 6 11 6 6 2 3
N 6 11 11 6 9 6 6 3 3
N 2 10 9 6 8 5 5 2 3
N 3 10 8 5 6 5 5 3 3
N
N
N
N
N 8 13 12 7 11 6 7 4 4
N 7 12 10 8 8 7 5 4 4
N 8 12 12 5 8 7 7 3 4
N 3 6 6 5 6 3 4 3 3
N 8 12 11 6 8 7 6 3 3
N 7 10 11 6 9 6 6 4 4
N 5 10 9 5 11 6 6 3 3
N 4 10 7 5 8 7 5 4 3
N 6 10 11 6 8 6 6 3 4
N 7 12 10 7 10 7 5 3 4
N 7 13 11 7 12 8 7 3 3
N 5 10 12 8 10 5 5 3 3
N 7 13 10 6 8 6 5 3 4
N 5 10 10 7 10 7 6 3 3
N 7 12 6 7 8 7 5 3 3
N 6 12 11 6 9 6 5 3 4
N 6 9 10 6 7 7 7 3 3
N 7 12 11 7 9 6 5 3 2
N 6 13 11 6 9 6 6 3 3
N 6 11 10 6 7 7 7 3 3
N 6 11 11 5 8 5 6 3 3
N 6 10 10 7 11 7 7 3 3
N 5 15 9 6 11 5 7 4 3
N 6 12 10 7 8 6 7 3 3
N 6 15 11 7 12 7 7 3 4
N 7 13 11 6 9 7 6 3 4
N 6 12 9 5 8 5 5 2 3
N 6 14 11 7 12 5 6 3 3
N 0 8 8 8 5 5 3 2 2
N 5 12 12 7 12 6 6 3 2
N 6 12 11 6 8 5 6 3 3
Q1 Remarks

Objectives ,scope of the study and coverage are clear

Objectives,scope of the Study and coverage are clear

Clarity of objectives scope and coverage are clear


Adequate Clarity of objectives scope and coverage
Clear formation of objectives, scope of the study and coverage
Clarity of objectives scope and coverage are adequate
Clarity of objectives scope of the study and coverage are limited
Objectives and scope are apparent, with mostly complete coverage

Clarity of objectives scope and coverage are clear

Objectives and scope of the study are mostly covered


Clarity of objectives scope and coverage are adequate
Clear objectives and scope of the study with comprehensive coverage.

No evidence
Clarity of objectives scope and coverage are clear

Clear objectives ,scope of the study and coverage

Clear objectives and scope of the study


Adequate clarity of objectives scope of the study and coverage

objectives and scope of the study are missing

Objectives and scope are vague, leading to incomplete coverage


Adequate objectives and scope of the study
Objectives and scope are apparent, with mostly complete coverage
No clarity of objectives scope and coverage
Limited clarity in objectives and scope, resulting in significant gaps in coverage.
objectives and scope of the study are mostly covered the research area
Objectives and scope of the study are covered mostly

Objectives and scope are apparent, with mostly complete coverage


Objectives and scope are vague, leading to incomplete coverage

Objectives and scope of the study are framed clearly to covers the area
Clarity of objectives scope and coverage are very minimum

Adequate clarity in objectives and scope, but coverage is somewhat limited.

Objectives and scope are vague, leading to incomplete coverage

objectives framed and scope of the study covered at sufficient


Clear objectives ,scope of the study and coverage
Objectives and scope are apparent, with mostly complete coverage

Clarity of objectives scope and coverage are adequate


Clear objectives and scope of the study with comprehensive coverage
Sufficient objectives and clear scope of the study
Objectives and scope are vague

Clear objectives and scope of the study


The objectives and scope are good

good objectives
set more objectives for this study
The objectives are clear and the scope with good coverage
Clear objective and scope with proper coverage
The objectives are clear but require more clarity for scope
The objectives are clear and the scope with good coverage

set clear objectives for this study


The objectives are clear and the scope with good coverage

set clear objectives for this study


The objectives are clear and the scope with good coverage

SET MORE OBJECTIVES


The objectives and scope are vague ,lack in coverage
set more objectives
good objectives are stting
Objectives and scope are appropriate with proper coverage
Exceptional clarity in defining objectives, scope, and thorough coverage of the project

Adequate clarity in objectives and scope ,there is limited coverage


set more objectives to study
The objectives are generally clear but could give more context and explanation

The objectives are clear but require more clarity for scope
good objectives are framed

comprehensive
frame more objectives
set adequate objectives for study
Limited clarity in objectives and scope which results in lack of coverage
Limited clarity in objectives and scope there is some incomplete coverage
The objectives are clear and the scope with good coverage
The research objectives are clearly stated

Clear objectives and scope with proper coverage


Clear objectives and scope with appropriate coverage
Adequate objectives and scope with appropriate coverage
Basic objectives and scope with incomplete coverage
Adequate objectives and scope with appropriate coverage

Adequate objectives and scope with appropriate coverage

The research objectives are clear but need more specific objective
Adequate objectives and scope with appropriate coverage

The research objectives are clearly stated


The research objectives are clear but need more specific objective
Objectives and scope that are clearly defined, with a comprehensive coverage
Adequate objectives and scope with limited coverage
The three objectives are covered the research topic
Basic objectives and scope with limited coverage

Objectives framed and scope of the study are sufficient


Objectives and scope of the study covers are adequate

Adequate objectives and scope with appropriate coverage


The objectives are framed for covering the area of the study
Adequate objectives and scope with appropriate coverage
Adequate objectives and scope with proper coverage
The objectives are adequate and also covered the research area
Clear objectives and scope with appropriate coverage
objectives are covered the research problem
Adequate objectives and scope with appropriate coverage
Clear objectives and scope with appropriate coverage
Adequate objectives and scope with appropriate coverage
Adequate objectives and scope with proper coverage
Basic objectives and scope with lack of coverage
The objectives are clear and the scope with good coverage
Scope of the objectives included more information
Statement of the problem not clearly defined
study covers the objectives and scope of the study
Scope of the study work not clearly defined

Scope of the objectives not defined


Objective should be more elaborated scope of the study need to included more information
Clear objectives and scope with comprehensive coverage
Scope of the objectives more clarity needed
Objective should be more elaborated scope of the study included more information
Clear objectives and scope, with comprehensive coverage.
The objectives of the study is not clear
Objectives and scope are apparent, with mostly complete coverage
Objectives and scope are apparent, with mostly complete coverage
The objective are clear and require to give scope
Required clear objectives
Need more clarity for objectives
The objective of the study is not given
Adequate clarity in objectives and scope, but coverage is somewhat limited.
The research objectives are clearly stated
Clear objectives and scope, with comprehensive coverage
Exceptional clarity in defining objectives, scope, and thorough coverage of the project.
set more objectives for study
The objectives are clear and scope of the study are comprehensive
Exceptional clarity in defining objectives, scope, and thorough coverage of the project.

There is minimum clarity of objectives


set more objectives for your study

The objectives are clear but require more clarity for scope
set more objectives for study

The objectives of study are good but require complete coverage


Clarity of objectives scope and coverage are clear

Clear objectives and scope of the study covers


Clarity of objectives scope and coverage are clear
Objectives and scope are vague, leading to incomplete coverage

Adequate clarity in objectives and scope of the study coverage


Objectives and scope are vague, leading to incomplete coverage
Clear of objectives scope and coverage
Clear objectives and scope, with comprehensive coverage

Clarity of objectives scope and coverage are adequate

Clear objectives and scope of the study


Minimal clarity, objectives and scope unclear

Clear objectives and scope of the study


understandable objectives, scope of the study are coverage

Objectives scope and coverage are adequate


Adequate clarity in objectives scope, and coverage
Limited clarity in objectives and scope, resulting in significant gaps in coverage.
No evidence
Limited clarity in objectives and scope, resulting in significant gaps in coverage
Minimal clarity, objectives and scope unclear, leading to insufficient coverage
Clear objectiveness scope of the study and coverage
Minimal clarity, objectives and scope unclear, leading to insufficient coverage
Clear objectives scope and coverage
Clear objectives and scope, with comprehensive coverage
Well cleared scope of the objectives defined
Clear objectives and scope with comprehensive coverage
All the objectives and scope of the study are framed to cover the study
Statement of the problem not defined clearly
Objective should be more elaborated scope of the study need to included more information
Scope of the objectives not clearly defined
Objective should be more elaborated and scope of the objectives not defined
The objectives and scope of the study are short
Drawn objectives are mostly covered the research area
Scope of the objectives not clearly defined
Statement of the problem clearly defined good
Objective should be more elaborated scope of the objectives more information need to included
Scope of the study included more information
Well cleared scope of the objectives defined
Scope of the objectives not clearly derived

Objectives and scope are apparent, with mostly complete coverage


Adequate clarity in objectives and scope, but coverage is somewhat limited
Objectives and scope are vague, leading to incomplete coverage
Objectives and scope of the study are covered the research area
Objectives and scope of the study are covered sufficient
Adequate clarity in objectives and scope, but coverage is somewhat limited.
Objectives and scope are apparent, with mostly complete coverage
Objectives and scope are apparent, with mostly complete coverage
Objectives and scope are apparent, with mostly complete coverage
objectives and scope of the study are clear
study objectives are sufficient to cover the study area
Objectives and scope are apparent, with mostly complete coverage

Objectives and scope are apparent, with mostly complete coverage


Objectives and scope clear
Adequate clarity in objectives and scope, but coverage is somewhat limited.
Objectives and scope of the study covered clear
To evaluate the knowledge and degree of purpose of different ITES among farmers and agricultural extensionists.
The aim of this project is to streamline Human Resource Management by implementing a flexible system that efficiently manages employee details, project

interfaces can be used offline and use the auditory channel as an alternative to visual or textual information.

security, utility security, endpoint security, cloud security, facts security, identification and get rights .Cyber security alluding to a hone for secure computer

The objectives of this project on "Cybersecurity Risk Mitigation" is designed to address the multifaceted challenges organizations face in safeguarding their

The Optical Character Recognition effectiveness of image pre-processing techniques depends on the OCR is a technology that recognizes printed or writte

The primary objective of the study COVID-19’s Impact on ITSM: Exploring the Pandemic’s Role in Transforming IT Services is to research and understan

on work and family in IT companies


Objectives of the project is clearly stated but coverage is somewhat limited and scope of the study is missing.

Other subject file

education sector

inaccuracies.
objectives
brands by analysing data from social media.
There are 3 project objectives

Exceptional clarity in defining objectives, scope, and thorough coverage of the project. There are 4 to 5 project objectives

There are 4 to 5 project objectives

There are 4 to 5 project objectives

There are 4 to 5 project objectives

objectives

Objectives and scope are apparent, with mostly complete coverage.


.There are 3 project objectives

There are 4 to 5 project objectives


There are 4 to 5 project objectives

There are 4 to 5 project objectives

There are 4 to 5 project objectives

There are 4 to 5 project objectives

There are 4 to 5 project objectives

"Global Economic Prospects: A Fragile Recovery." World Bank Group,


The problem statement elucidates the difficulties encountered by the brass sector in projecting the demand for brass products that are customized.
The main objective of this study is to understand the project of operation management in RSPL LTD need to give clearly.
In International Journal of Information Management,
To analyze the unique challenges associated with e-commerce fulfillment operations, including dynamic order processing, diverse product ategories, and la
Objectives of the study need to give more clearly.
enhanced security protocol

there is no objectives
among SMEs operating in the ecommerce sector.

To concentrate on the Impact of Inventory network Management on Indian Retail Indu


In this project, our overarching goal is to revolutionize software quality assurance
The project titled “A study on the impact of Robotic Process Automation
telecom's companies.
The results and study point to a number of important ideas and recommendations
management studies in the construction industry." Journal of Quality in Maintenance Engineering, 19(4), 404-429
This objective entails a detailed investigation of the Indian EV industry to ascertain its dynamics and existing situation.

consumers who are interested to cooperate to collect the data a questionnaire was prepared.
reliability of the research
A comprehensive technology strategy encompasses continuous monitoring

applications and impacts of cloud computing


To recognize key drivers and potential sub factors associated with operational risk of the bank. To estimate the changes in probability and the impact l
To study market portfolio of Monte Carlo Fashions and understand product.

Objectives of the study need to give more clearly.


Objectives of the study need to give more clearly.
The primary motivation behind this study is to look at the situation with Organizational Citizenship

procedure

necessities,
in Hyderabad, Andhra Pradesh.

Interface
the goal of this investigation is to gain a better understanding of this new hybrid work phenomenon
implications of how and when employees work remotely
objective of this project is to integrate IoT technologies

Objectives of the study need to give more clearly.


The research objectives included the assessment of the current operational practices at Tesla and the environmental impact created as a result, the ide

The system will facilitate online ticket booking, seat selection, payment processing, and real-time updates
It has underscored for planning the patients' consideration as indicated by their necessities by way offering quality administrations in a protected

become critical for organizations


To study the nature and importance of investment decision.

Objectives of the study need to give more clearly.


The objective of this research is to explore Corporate Social Responsibility (CSR) practices globally, in India, and specifically in MEL.
Objectives of the study need to give more clearly.

coverage

To identify and analyze the security risks associated with IoT networks
communities where traditional banking infrastructure may be lacking or difficult to access.

To understand the fundamentals of cloud computing.

documenting
technological and economic developments

covers

focused on five distinct objectives

businesses
The primary objective of this study is to explore the role of customer feedback in shaping operational strategies within organization.

objective went to clear in level of knowledge about specific types of cyber threats
scope went to clear in basics of data center operations and cloud computing
Case Studies of Successful Implementations
Objectives of the study need to give more clearly.
To understand the biggest matters of cybercrime in India.
A quality management is defined as the formalized system that documents processes, procedures, and responsibilities for achieving quality policies and obj

we imagine sooner.
The goal of this project is to shed light on the complex landscape of cloud computing adoption and optimization

Introduction to Cloud Computing. In Cloud Computing: Principles and Paradigms


Studying on digital payment is help to identify
Guarantee the opportune and cost effective transportation of merchandise from providers to conclusion customers

Objectives of the study need to give more clearly.


Engineering and Technology,
various facets
on the supply chain, and its role in the achievement of organizational success.

Objectives of the study need to give more clearly.


methods.
Objectives of the study need to give more clearly.

To have an understanding about operations planning and scheduling and its Significance in Supply Chain Industry and its Challenges in current market.
The sources included articles, research, and case studies.

Objectives of the study need to give more clearly.


oversight and oversight of public buildings using ICT-based systems
its presence in numerous countries worldwide.
dynamics of trade conflicts.
To identify potential areas of inefficiency in the E&R department process using process maps.
There are 4 to 5 project objectives
Objectives and scope are apparent, with mostly complete coverage

There are 4 to 5 project objectives


There are 3 project objectives

There are 3 project objectives

There are 3 project objectives


There are project objectives
There is one project objective.
auxiliary micro, small and medium scale ventures.

the rapidly
Objectives and scope are apparent, with mostly complete coverage

Well-constructed bibliography with minor omissions or inaccuracies.

Well-constructed bibliography with minor omissions or inaccuracies.

Clear objectives and scope, with comprehensive coverage.

The objective of the project is On Line Examination is to make evaluation and conduct of examination in massive but simple, cost effective and faster.
are integrating digital technologies and the effects of such integrations.

Artificial intelligence (AI) becomes increasingly integrated into parenting, understanding its effects, challenges, and ethical considerations is crucial.

The study is only focused on AI applications in e-commerce platforms in general and focused only on improving the customer experience. Artificial intellig
data warehouse is to centralize data from disparate sources into single, unified repository.

The role of the National Optical Fiber Network (NOFN) in empowering rural entrepreneurs and driving the digital economy in India's rural areas.

This research endeavors to assess the impact of cloud computing adoption on organizational efficiency and cost savings.
The scope of ethics and business in a research project can be broad and multifaceted, encompassing various aspects of ethical considerations within the bus

Artificial Intelligence (AI) offers a broad range of applications in many areas, with notable impacts on company management, e-commerce, finance, healthc
for mobile devices which means developers need only develop
objective
the right answer the Alarm will be shut off.

The guidelines to the goals of an internet vote casting gadget to focus on their importance
field of digital payments in Indi
retirees, and self-employed people. N
insurance companies.

THE objective should in points the problem faced how to overcome

infrastructure, servers, and data centers

THE objective are should be in problem with the points and to get solution of what we get are should in objective
Cloud service management involves overseeing the provision of cloud services and optimizing

angles. In particular, the goals

AI, which include privacy concerns, algorithmic bias, and the need for openness
and related stakeholders
computing environments

gathering is alluded as a Knowledge Source

software projects are created, maintained and upheld has changed broadly
related to occupational
objectives

objectives

Objectives and scope are apparent, with mostly complete coverage .There are 3 project objectives
The objective may cover more depth problem available data

objectives

coverage

There are 5 project objectives and they are well connected with scope and coverage of the project. There is a clarity.
There are 6 project objectives. They are connected with scope and coverage of the project clearly.
There are 4 project objectives. They are well connected with scope and coverage of the project study. There is a clarity in objectives, scope and coverage.

There are 5 project objectives. The clarity of the objectives with scope and coverage is not given in the report.
There are 4 project objective with clarity. but scope and coverage are not specifically mentioned in the report.
There are 5 project objectives. They are well correlated with scope and coverage of the project. There is a clarity in the objectives and goals of the project.

There are more than 10 project objectives. They are well defined and interconnected. The scope and coverage are comprehensive with clarity.
There are 3 project objectives. The scope and coverage are very limited
There are 5 project objectives. These objectives are relevant with scope and coverage of the project.
and transparent management of E-tickets.
explain briefly
There are five objectives in the project. These five objectives are well connected with scope and coverage of major area of the project.
good
good
good
There are 6 objectives in the project. Scope and coverage are less connected.
good
good, clear objectives scope and coverage, more objectives given
only three objectives are taken for the project. The objectives are connected with scope and coverage of the project to the limited extent.
There are 2 objectives only. Scope and coverage are some what relevant to the objectives of the project.

There are 4 objectives of the project. Objectives are connected with scope and coverage. Objectives are correlated with title.
There are 9 objectives in the project. Scope & Coverage are moderately related and connected.
There are 8 objectives in the project. Objectives are well connected with scope and coverage.
There are 5 objectives in the project work. No Scope and coverage aspects are given in the project.
The project is done with 3 objectives. No proper scope and coverage are given.
Connectivity between objectives, scope and coverage is moderate. Project is done with only 2 objectives. Needs more clarity.

Adequate clarity in objectives and scope, but coverage is somewhat limited.

Objectives and scope are clear, with mostly absolute coverage.


Objectives and scope are clear, with mostly absolute coverage.

Objectives and scope are clear, with mostly absolute coverage.


Objectives and scope are clear, with mostly absolute coverage.

clear statement of projects goals and defines the boundaries and limitations of project.
Objectives and scope are clear, with mostly absolute coverage.
Objectives and scope are clear, with mostly absolute coverage.
objectives scope and coverage clear,there are 4 project objectives
Objectives and scope are clear, with mostly absolute coverage for this project.
Adequate clarity in objectives and scope, but coverage is somewhat limited.
Objectives and scope are clear, with mostly absolute coverage for this project.
Clear objectives scope and coverage,there are 4 project objectives
widespread adoption within the CRM market.
Clear objectives scope and coverage,need more objectives
Clarity of objectives scope and coverage,more objectives given
Clarity of objectives scope and coverage good,Examine Theoretical Foundations of Sentiment Analysis in Finance,nvestigate the Correlation Between Soci
Clarity of objectives scope and coverage not clear.
The objective of this project is to explore the significant developments in Machine Learning (ML) and Artificial Intelligence (AI) and their applications in t
How to determine how much the Internet of Things is worth for your company.
in India.
Clarity of the objectives and scope were average with minimum coverage of this project.
Objectives and scope are clear, with mostly absolute coverage for this project.
To identify the most useful features that influence the selling price of residential properties, and to examine the importance of each relative feature in the pr
To study the prevailing trends and practices of AI integration in IT systems across industries. To analyze the perceived benefits and advantages of AI integr
residents in Indian urban areas.
An E-billing and Invoicing System report generation system will be created for user and management use. For analyzing the sales volume, sales trend, and
Objectives and scope are clear, with mostly absolute coverage.
Clarity of the objectives and scope were average with minimum coverage of this project.
energy storage, deploying smart grid technologies,
5 Clarity of objectives scope and coverage given,Customer satisfaction Enhancement analyzing customer feedback and usage data to understand preference

Adequate clarity in objectives and scope, but coverage is somewhat limited.

adequate objectives scope and coverage,organizational readiness, external pressures to adopt, perceived benefits of adoption.
Good Clarity of objectives scope and coverage,3 Objectives used

for sustainable ITSM practices.

4 objectives used,The primary objective of this research is to assess the current level of awareness, identify usage patterns, and understand the influencing f
Clarity of objectives scope and coverage better, Obtaining Enterprise-Grade Services,Global Presence and Reliability

Enabling many of the poor to access services more easily and making it possible for government to deliver welfare services more easily.
objectives scope and coverage of theis project adequate,IMPROVEMENT IN RAILWAYS USING CLOUD COMPUTING.

good Clarity of objectives scope and coverage,Identification and Categorization of Digital Transformation Initiatives
To Assess the Ethical Implications and Operational Challenges of AI Integration in Business Processes
objectives scope and coverage good,Identify Key Challenges,Explore Blockchain Technology, Assess Benefits and Implications.
The primary objective of this study is to systematically assess and compare the effectiveness of Virtual Reality (VR)-based training methods with traditiona
good objectives scope and coverage,4 objectives used
Objectives and scope are clear, with mostly absolute coverage for this project.

Objectives and scope are clear, with mostly absolute coverage for this project.

Objectives and scope are clear, with mostly absolute coverage for this project.

No objectives, scope and coverage are presented in the report.


The project is done only with two objectives. Needs to give little more focus on clarity of objectives,scope and coverage.

Less clarity of objectives, scope and coverage. it is done very less number of objectives.
Objectives are connected with scope and coverage of the project

Less clarity of objectives, scope and coverage of the project.

There are 5 project objectives. The clarity of the objectives is good and they are connected with objectives and coverage.

Needs to give more clarity of objectives, scope and coverage of the project study
There are 4 objectives and there are connected with scope and coverage. Less clarity of objectives, scope and coverage.
No objectives of the project are given in the report.

4. To learn about problems of block string and crypto money


4 objectives used,he study aims to give useful insights to organizations and policymakers on how to make remote work better for IT employees.
good Clarity of objectives scope and coverage

good Clarity of objectives scope and coverage.To assess the effectiveness of data-driven marketing strategies in improving customer engagement and reten

the objectives of the production planning and control given good

good Clarity of objectives scope and coverage,Controlling access to sensitive information is often maintained by data privacy regulations and security comp

technologies, and real-world applications.

intervention through automation.

good Clarity of objectives scope and coverage.To study the impact of BI tool based quality decision-making and decision categories.

There are 8 project objectives. They are clearly defined. scope and coverage are well connected with project objectives
Scope and objective of the Remote Resilience" will focus on few areas only with limited boundaries

Scope of the objectives of digital strategies in axis bank covered all the boundaries
financial services

Scope of the study must be improved. Objectives should be more elaborated

Scope of the objectives covers all the boundaries of IOT things


r project's main goal is to replace the existing manual system with a computerized one

in the quick-commerce (Q-commerce) industry in India


and software services.

engagement.
fundamentally different.

Scope of the objectives not covered all the boundaries of digital transformation in health opportunities
Scope of the study work not clearly mentioned

Assent management scope of the objectives not covered all the boundaries
Scope of the objectives not clearly defined

Generalized poins only include no clarity about scope of the objectives


Need to mentain the specific objectives related to the topic
energy-efficient computing, the management of electronic waste, and Virtualization

In-depth knowledge of collecting data is needed outline only represented


Scope of the ERP in medium scale industries not covered all the boundaries

within the B2B market for IT solutions, with a particular focus on SMEs.

Gecko API to provide users with real-time access to comprehensive cryptocurrey outline only represented
Cybersecurity in helthcare not covered all boundaries

Scope of the objectives not clearly defined outline only represented


Well defined statement of problem and scope of the objectives

Statement of the problem not well defined


Scope of the roles and responsibilities of team members in IT project not clearly defined

Scope of the study must be improved

Well defined scope of the objectives of given topic

Statement of problem not clearly presented


Need to include is scope of the study

Statement of the problem well defined, good.

Need to mention the specific objective releted to the topic


Well defined problem statement. scope of the objectives are clearly defined
Well cleared scope of the objectives defined

Scope of the objectives not clearly defined


Scope of the objectives well defined

Scope of the problem included more information

Well defined scope of the objectives

Scope of the objectives more information needed


Well cleared problem statement
Need to mention the specific objective releted to the topic
Objectives should be more elaborated scope of the problem included more information

Well cleared problem statement


Scope of the objectives outline only represented, generalized poins only represented.

Scope of the topic included more information


Objective of the study not defined clearly

Statement of the problem well defined


Problem statement not clearly defined

Statement of the problem not defined

Statement of problem need more information

Statement of problem not clearly defined more information needed about the scope of study

Objective should be more elaborated scope of the study need to included more information
Green cloud computing on IT industry scope of study not defined well.
Statement of the problem not clearly defined
Statement of the problem not defined well more elaborated objectives needed

Objective are not elaborated, need more information about scope of the study work

Scope of the objectives need to included more information

Scope of the objectives need more clarity


Well defined scope of the objectives in study topic

Scope of the study not defined


Problem statement not clearly defined

Statement of the problem not defined well need to improve scope of the objectives

There are 4 project objectives. They are connected with scope and coverage of the project. There is a clarity of objectives.

There are 5 objectives. Objectives are associated with scope and coverage of the project. There is a clarity in objectives .

There are only 2 project objectives. There is no much clarity in objectives and no scope and coverage of the project are mentioned in the report.

There are 6 project objectives. There is a clarity in objectives given. The scope and coverage are well connected with objectives of the project.
Only one project objective is mentioned and there is no clarity in objective and no scope and coverage are given.

There are 6 project objectives. The scope and coverage are connected with the objectives. The clarity of objectives is satisfactory.
There are 3 project objectives. Scope and coverage are connected. The clarity is moderate

There are 4 project objectives in the project. There is a less clarity in the objectives of the project. No scope and coverage are given in the report.
There are 4 project objectives with clarity. The scope of the project is connected with objectives.
There are 7 project objectives with much clarity. The scope and coverage are just connected with objectives of project.
No objectives, scope and coverage are given.

There are 5 project objectives of the study. They are connected with scope and coverage to some extent. The objectives are clear enough.
There are 4 project objectives. They are clearly given. The scope and coverage are related with objectives of the project.

There are 3 project objectives with clarity and scope is connected with given objectives.
There are 5 project objectives. They are clearly stated and scope & coverage are connected with objectives of the project.
Well cleared scope of the objectives defined

Statement of the problem clearly defined


Scope of the objectives well defined.

Scope of the objectives are clearly defined

Some more information included in scope of the objectives.

Well cleared problem statement defined


Operational floor is based on consumer and sales activities. According to this, Objectives were framed and to find the factors influencing consumer behavio
ONLY ONE OBJECIVE IOS GIVEN
Scope of the objectives not clearly defined need to improve
OBJECTIVES , SCOPE AND COVERAGE OF THE TOPIC IS GOOD
Scope of the objectives need to more elaboration
OBJECTIVES AND COVERAGE GOVEN IS RIGHT
MORE OBJECTIVES GIVEN AND SCOPE & COVERAGE OF THE PROJECT IS GOOD
Well cleared statement of the problem defined was good
Objective of study should be more elaborated. Scope of work not defined
Problem statement not clearly defined generalized poins only represented
more objectives given and scope of the study is also good
objectives given and scope of the project is good
Well cleared problem statement defined
objectives framed for this study is good
Scope of the objectives not clearly derived
objecvives given and scope also satisfactory
Scope of the objectives included more information

only 2 objectives given


Statement of the problem not defined well scope of the study no data founded
Scope of the objectives not completely satisfied with the objectives more clarity study work needed
both primary and secondary objectives given is good
objectives given is clear
objectives are clear
Some more information included in scope of the objectives
Clarity of objectives clearly defined

More information needed about the scope of the objectives


Well cleared problem statement
Statement of problem on impact of digital marketing in real estate industry not clearly defined
Statement of problem problem not defined
Scope of the objectives not clearly mentioned
Problem statement not clearly mentioned about cloud computing security levels risk

No clarity of scope of the objective for payroll management system

Scope of the objective are well mentioned and covered all the boundaries of study work

No clarity about Functional pieces of software regularly


Scope of the objectives not clearly mentioned history of coho only presented

Scope of the objectives not covered all the aspects of study work
Intelligence concept

Scope of the objectives of safeguarding patient helth records was good


Scope of the objectives covers all the boundaries of IT and BPO culture aspects
Strategic implementation of AI and ML scope of the objectives not clearly defined

Well defined scope of the objectives


Scope of the objectives not clearly defined, generalized poins only represented
Well defined scope of the objectives of digital era work for tech Mahindra
Generalized poins only represented need to specific objective releted to the topic
Scope of the objectives not defined generalized poins only given
Objectives should be more elaborated and scope of the objectives not clearly defined
Scope of the objectives for given study work well defined
Need to include specific objective related to the topic given
Scope of the objectives well defined

The objectives and scope lack clarity, resulting in incomplete coverage of frameworks for implementing inventory management systems in the auto parts di
There is minimal clarity in the study, as the objectives and scope are unclear, resulting in insufficient coverage of business process reengineering in Barclay

The objectives and scope are clearly defined, providing mostly comprehensive coverage of improving operational efficiency through robotic process autom

The objectives and scope of the study on operational efficiency in small and medium-sized enterprises (SMEs) are clearly articulated, ensuring thorough co

The statement clearly identifies the need for a root cause analysis and a proposed operational model, but it could benefit from specifying key challenges and

The statement highlights clarity in objectives and scope, emphasizing a comprehensive approach to evaluating training effectiveness at RINL-VSP.
The statement highlights clarity in setting objectives and defining scope, essential for a thorough examination of operation management within India's textil

This statement highlights clarity in setting objectives and defining scope, crucial for conducting a comprehensive study on risk management within the oil a
**Comment:** Clear and well-defined objectives are essential for guiding research efforts effectively. Addressing these areas would bolster the project's fo
The statement highlights a well-defined focus on exploring critical aspects of ERP system development, ensuring thorough coverage essential for understan

The objectives were overly broad and lacked specificity related to the topic, resulting in a lack of clarity.
The objectives and scope are apparent, with mostly complete coverage about Supply Chain Surplus concepts

The objectives and scope lack clarity, leading to significant gaps in coverage of key concept areas of the project

The business idea features clear objectives and scope, ensuring comprehensive coverage of all relevant aspects.
The objectives and scope are clear, with comprehensive coverage related to the Foundations of Operations
The objectives and scope are clear, with comprehensive coverage related to analysis of tourism sector
The objectives and scope of the study/project need clearer definition and specificity to ensure focused and effective outcomes. Clarifying these aspects will

Clear objectives and scope, with comprehensive coverage, are essential for the successful implementation of Total Quality Management in an organization.
The objectives and scope are clear, with comprehensive coverage related to the Foundations of Operations
The objectives and scope of the study on the impact of creative techniques on organizational profits are vague, leading to incomplete coverage and a lack of

The objectives and scope are clear, with comprehensive coverage on the topic at hand.

The objectives and scope are apparent, with mostly complete coverage on green initiatives recommendations for electronic gaming slot machines.

somewhat limited.
objective

objectives
limited
vague,
Minimal clarity, objectives and scope unclear

coverage.

coverage. There are 4 to 5 project objective

Adequate clarity in objectives and scope, but coverage is somewhat limited.

There are 4 to 5 project objective the project. There are 4 to 5 project objective

There are 4 to 5 project objective


There are 4 to 5 project objective
coverage. There are 4 to 5 project objective

coverage is somewhat limited.

there are 6 objectives given


coverage.
coverage is somewhat limited

complete coverage
coverage is somewhat limited
mostly complete coverage

Neat and clear objectives are given


coverage is somewhat limited.
objectives
limited.
one objective is given
there are three objectives given
There are 3 project objectives
limited.
There are 3 project objectives
somewhat limited
satisfied objectives are given
Not detailed objectives are given

There are 4 to 5 project objective


comprehensive coverage

there are 4 to nine objectives are given


there are 4 objectives given

there are 4 objectives given


The project's main goal is to assess the impact of project management on the health and fitness sector. Objectives, scope and coverage are comprehensive
few objectives and scope are apparent, without more explanation about this project.but need few points about clarity of coverage

transformed the way developers build, deploy, and maintain software solutions. objectives are clear. need few points about scope and coverage
the project aims to explore the existing organizational culture within the IT and BPO industries.require details about objectives
the project focused for o investigated the efficacy of AI technologies in optimizing incident management processes within ITSM. There is extensive covera

project main goal is comparative analysis of the data privacy and cybersecurity practices employed by Meta and Google. Scope and coverage of the study w

few objectives are mentioned. need clarification about scope and coverage of this project

the project goal is to ascertain how Zomato's founders created such a tremendous success and how the company survived in the Indian market.
These objectives are comprehensive and pertinent to the field of consumer behavior in E-Commerce
Clear objectives and scope with comprehensive coverage are essential for understanding logistics and supply chain management techniques thoroughly.
Minimal clarity in the study, with unclear objectives and scope, leads to insufficient coverage .

Clear objectives and scope provide a well-defined framework that ensures all relevant aspects of the topic are thoroughly covered and addressed. This comp

The objectives and scope of the project are entirely unclear or missing, which is essential for providing direction and defining the boundaries of the study or
The objectives and scope are apparent, with mostly complete coverage regarding innovative strategies for 3PL
The project has clear objectives and scope, providing comprehensive coverage of the topic.

Objectives and scope lack clarity, leading to gaps in coverage for reducing turnaround time and addressing shipment cancellation due to process defects.

The objectives and scope are adequately clear, but the coverage is somewhat limited.

Clear objectives and scope are outlined, with comprehensive coverage of determinants of product market decision-making, specifically focusing on the Indi

Establishing clear objectives and defining scope, with thorough and comprehensive coverage.

The objectives and scope are clearly defined, with a mostly comprehensive coverage of strategies for effective new product commercialization in mid-size p
coverage is somewhat limited.
clear objectives scope is given
adequate objectives is given

adequate objectives and scope in given

basic objectives are used

adequate objectives used

there are seven objectives are used


there are four objectives are used

there are eight objectives are given


coverage is somewhat limited.

there are four objectives given


there are four objectives given Recommendations, usefulness implementation scheme
there are five objectives used
The objectives have been clearly defined in relation to the topic, and the project's scope is also well delineated.
The objectives could have been more clearly defined, and the scope of the project was not adequately attempted. Clearer articulation of objectives and a mo
The project exhibits limited clarity in defining its objectives and scope, leading to significant gaps in coverage. There is only one stated project objective, w
The study's objectives require clearer definition, and the scope needs to be more precisely outlined.

clear objectives has been drawn


objectives and scope are vague

comprehensive objectives and scope are covered

unclear objectives is drawn

Very clear and comprehensive objectives are drawn

Clear objectives with the scope are covered


Comprehensive objectives are covered
Objectives and scopes are not clearly defined
need more objectives its only two objectives

Comprehensive objectives scope are covered

clear objectives scope are covered


there are 4 to 5 objectives drawn
clear and comprehensive objectives are covered
Clear and comprehensive objectives are drawn

comprehensive objectives are drawn

clear and comprehensive objectives are covered


Objectives and scope are entirely missing.
thorough coverage of the project.

Exceptional clarity in defining objectives, scope, and thorough coverage of the project

coverage.

Objectives and scope are apparent, with mostly complete coverage


Objectives of the study need to give more clearly.

Clear objectives with comprehensive coverage the innovative approach


The objectives are very clear and complete coverage of objectives and scope
Sufficient Clarity of objectives scope and enough coverage
Better clarity of objectives with mostly complete coverage
clear objectives of the scope and comprehensive coverage

Limited clarity of objectives and insufficient coverage


Limited clarity of objectives and incomplete coverage

objectives are clearly defined


Clear objectives and enough coverage is made
objectives are clearly defined
Objectives ,scope are clearly defined
Adequate Clarity of objectives scope with minimum coverage
Clear specification of objectives and scope and comprehensive coverage
Clarity of objectives is moderate and incomplete coverage
Minimum clarity of objectives and limited coverage
Adequate clarity of objectives scope and minimal coverage
Well clarity of objectives scope and insufficient coverage
Objectives and scope are apparent and enough coverage
Clear objectives and scope wih comprehensive coverage
objectives and scope are vague and insufficient coverage
Clarity of objectives and scope are accepatable and complete coverage
objectives and scope are clear and comprehensive coverage
Adequate clarity of objectives and scope and enough coverage
teamwork, and efficiency in digital workspaces.
The objective of the research project is to investigate the impact of Cloud Computing and its associated technologies on the E-learning Sector. It aims to ai
impact of cloud computing on creating a frictionless customer experience in the retail banking sector
The objective of the study is to enhances the positive impact of AI on business and society, ensuring that AI technologies are developed and deployed in a m
This study aims to outline clear and achievable objectives for a cloud computing adoption and strategy initiative, providing a roadmap for organizations to m

The scope of the study on the Impact of artificial intelligence on candidate and organizations point of view were given here considering the factors influenc

The objective scope and coverage of the study on IT Potential of Small and Medium Enterprises (SME) challenges, opportunities, building IT infrastructure
The objective scope and coverage of the study on facility monitoring system of TATA technologies is stated well
The objective scope and coverage of the study was stated well with 4 key noted points
The objective of conducting this study is to Gain clear understanding of blockchain technology and cryptocurrency, take of Indian Government on Blockch

The objective scope of this research was to underscore the benefits of implementing employee welfare initiatives at Hindustan Latex Limited, which were s
Objectives are somewhat clear, scope may need more precision, and coverage is moderate.
The study is focused to create a framework that South African higher education institutions can use to further develop their ITSM progression levels stating

The scope of this project on the "Adoption of Digital Payments System" encompasses a comprehensive analysis of the factors, trends, and implications asso
The objectives given in the study addresses the multifaceted aspects of Open Banking and API integration, aiming to provide actionable insights and recom
The objective of the study is to make complex quantitative decision in flash of seconds, risk analysis and measures before every trade
Assess the Current Usage of AR and VR in Education, Evaluate the Impact on Learning Outcomes, Provide Recommendations for Effective Integration we
The objective study was on the impact of information technology on supply chain performance stated good
The objective is to explore IT professionals' perceptions of the impact of GenAI on their daily work tasks, to identify specific IT tasks perceived as most su
Objectives and scope are apparent, with mostly complete coverage
Objectives and scope are apparent, with mostly complete coverage
Objectives and scope are vague, leading to incomplete coverage
The study focuses on the customer relationship management (CRM) software that is utilised by SMEs in India, as well as the ways in which these businesse
The objective of this study was to undertake an in-depth investigation into the ecommerce grocery industry within the Indian market. The study focuses on
Objectives and scope are apparent, with mostly complete coverage
Objectives and scope are apparent, with mostly complete coverage
The objective of this study is to find out how AI and its tools can help Project manager in IT Project management.
The scope and coverage of the study was chosen well on the impact of AI in job roles to explore attitude, perceptions, automation, skills, initiatives need to
The objective of the study is to get through the difficulties and create to accomplish businesses.
Objectives and scope are vague, leading to incomplete coverage
Adequate clarity in objectives and scope, but coverage is somewhat limited.
Objectives and scope are vague, leading to incomplete coverage
The objective was to build a solution that should able to predict the probability of credit default based on credit card owner’s characteristics and payment hi
The objective of the study is to find the role does radio play in the fields of advertising and marketing, how effective is radio in persuading a customer to bu
The objective scope of the study is to evaluate the current state of ITSM implementation and its alignment with iEnergizer's digital transformation goals and
The objective scope and coverage of the study on the IoT Excellance in various field is stated well
The scope of the study is to find out the different ways through which CSR activities are carried in the Indian companies and to find out the amount of spen
Basic bibliography, with several omissions or inaccuracies
The study aims at six objectives stating the Implementation of ITIL-based IT Service Management Framework to Improve Security and Risk Management .
The scope of the study is to understand the performance appraisal system, examine employee attitudes and behaviours, explore the 360-degree performance
The study aims to contribute valuable insights into the complex dynamics of integrating cryptocurrencies into established digital payment systems, specifica
The primary objective of the study is to exploit IT in such a way that it brings about a substantial enhancement in pivotal aspects of a company's performan
The scope is to study the origins, history & evolution of AI, understand the impact AI on different professions & jobs both positively & negatively, study &

The scope of the study is to develop a strategic migration plan for transitioning to Azure, assess the impact of the migration on the company’s operational e

traditional cryptographic frameworks and broadening the horizons of computational capabilities

objectives and scope are clearly defined

Objectives are clearly defined

Objectives are not clearly defined

objectives are clearly defined

objectives are clearly defined


objectives are clearly defined to your project

objectives are comprehensive

objectives and scope are clearly defined


objectives are clearly defined
very clearly defined with the objectives

clear and effective objectives are covered

clear objectives are to be covered


clear objectives and scope also comprehensive

objectives are comprehensive


Need improvements
Clear objectives and scope are comprehensive

objectives are not comprehensive


objectives and scopes are entirely missing
clear objectives and scope are covered
objectives are clearly explained

objectives and scopes are clearly covered


The objectives and scope of the project are vague, resulting in incomplete coverage of how Six Sigma methodologies can improve team efficiencies. More p

The project on risk-return analysis of value investments in the Indian stock market, focusing on the Nifty, has clear objectives and a well-defined scope with
The project on "Navigating Uncertainty: The Evolution and Need of Supply Chain Risk Management" showcases clear objectives and a well-defined scope
The project lacks clear objectives and scope, resulting in incomplete coverage of total quality management implementation. Clarity in defining objectives an

The project demonstrates adequate clarity in its objectives and scope but offers limited coverage of the topic. Expanding the analysis could provide a more t
The project lacks clarity in defining objectives and scope, resulting in incomplete coverage of the impact of Lean Six Sigma on Mahindra & Mahindra Ltd.
The study demonstrates clear objectives and scope, effectively covering various aspects of manufacturing process management at Ashok Sahakari Sakhar K
The project outlines clear objectives and scope, yet it could benefit from expanding its coverage to provide a more comprehensive exploration of the topic.

The project adequately defines its objectives and scope, yet it could benefit from expanding its coverage to encompass a more comprehensive analysis of in

The project outlines clear objectives and scope, focusing on optimizing supply chain networks in the manufacturing industry. However, expanding coverage

The purpose and extent of the study but could be improved by specifying any gaps or limitations in the coverage

The objectives and scope of the study on the buying behavior of coffee consumers are clearly outlined, with extensive coverage anticipated. A focused appr

The study adequately clarifies the objectives and scope of Google's remote work policies and virtual team building, but it may benefit from expanding its c
The objectives and scope regarding the COVID-19 pandemic's impact on the pharmaceutical industry are adequately clear, but there is potential to expand c

The study investigating whether Lean Six Sigma promotes innovation lacks clarity in objectives and scope, potentially leading to incomplete coverage of its
Clarify objectives and scope to ensure comprehensive coverage of challenges faced in managing outbound logistics of Elite Foods, enhancing the study's de

Enhance the coverage of the research analysis on the lack of distribution channels in rural areas within the FMCG sector to ensure a more comprehensive ex

Clearly define the objectives and scope to ensure comprehensive coverage of the impact of Supply Chain Logistics Innovation (SLI) on operational perform
The study on operations management at Vijaya Dairy demonstrates clear objectives and scope, ensuring comprehensive coverage of the dairy's operational

The project on implementing Lean Six Sigma for yield improvement in product manufacturing demonstrates clear objectives and scope, ensuring comprehe
Objectives, scope and coverage are comprehensive

Objectives covered all the aspects of the Battery Management Systems and also technology adoption like software validation.

Primary and secondary objectives are specified clearly


Objectives are based on problem title and covers widely. Scope would be reduction of the COD, efficiency improvement and cost reduction that reduces the

Objectives and scope are focused on Quality Function Deployment. It includes software and hardware which brings exact quality.
Logistics and supply chain management is a booming sector now-a-days, In this regard, Operation management needs to be improved. In such a way that th

Quality of service enhances the product. In such a way that the objectives and scope have been framed in the study
There is one project objective

The study on the evolution of internet banking in the Indian context with special reference to UPI payments has clear objectives and scope, providing comp

The project lacks clarity with unclear objectives and scope, resulting in insufficient coverage of operation and managing of 6'S at Western Refrigeration Pri
Objectives and scope are entirely unclear or missing.

The project has clear objectives and scope, providing comprehensive coverage on the relevance of Six Sigma in Indian manufacturing industries through de

The project provides adequate clarity in its objectives and scope regarding the risk perceptions and portfolio management of equity investors. However, the
learer definition of objectives and scope is crucial for providing comprehensive insights into the total cost of quality, ensuring thorough examination and an
The focus on COVID-19's impact on the real estate sector and the role of REITs is well-defined, providing thorough exploration and analysis crucial for un

The project clearly defines its objectives and scope, providing mostly comprehensive coverage of the subject matter.
**Comment:** Clearer definition of objectives and scope is essential for providing a comprehensive analysis of cargo handling operations, ensuring thorou

The project demonstrates clear objectives and scope, providing comprehensive coverage of the subject matter.
Objectives and scope are clear, with mostly absolute coverage

Objectives and scope are clear, with mostly absolute coverage

Objectives and scope are clear, with mostly absolute coverage for this project.

Objectives and scope are clear, with mostly absolute coverage.

the objectives stated are about fitness assessment of athletes


the stated objectives are good
Objectives and scope are clear, with mostly absolute coverage
the objectives are stated but need clear points

the objectives are stated clearly

more clarity is required in stating objectives


the stated objectives need to be clear
the objectives are not clear

the objectives are stated clearly

Objectives and scope are clear, with mostly absolute coverage


Objectives and scope are clear, with mostly complete coverage
The objectives of the project are defined and relevant to the study of Enterprise Resource Planning (ERP) systems at Ashok Leyland Limited.
The objectives of the project are defined, focusing on developing a system for character recognition using Artificial Neural Networks (ANN).
Objectives and scope are clear, with mostly complete coverage
the objectives are stated
Clarity of the objectives and scope were average with minimum coverage of this project
These objectives are comprehensive and pertinent to the field of IoT and cybersecurity
Objectives and scope are clear, with mostly complete coverage
Objectives and scope are clear, with mostly complete coverage
the objectives are stated
the objectives are stated clearly
Objectives and scope are clear, with mostly complete coverage
Objectives and scope are clear, with mostly absolute coverage
Clarity of the objectives and scope were average with minimum coverage of this project
Objectives and scope are clear, with mostly absolute coverage
Objectives and scope are clear, with mostly absolute coverage

the objectives are stated clearly


the objectives should be defined clearly
the objectives are stated clearly for the ERP system
the objectives are stated minimally need deeper understanding
Objectives and scope are clear, with mostly complete coverage
the objectives are stated clearly
The study emphasizes the importance of proactive risk management in safeguarding critical business functions and data,
the objectives are stated clearly
the objectives are stated but need more clarity
Average Clarity of the objectives, scope is unclear of the project and insufficient coverage

the objectives are stated clearly

objectives are given but need to be precise in specifying objectives


Clarity of the objectives and scope were average with minimum coverage of this project

the objectives are stated clearly


the objectives are stated clearly
objectives should be given precise and specific
Objectives and scope are clear, with mostly absolute coverage for this project
need more precise in specifying objectives
the objectives stated need to be clear
To identify and analyze the key technological advancements and Investigate Innovative Business Models was given as objectives.

the objectives are stated clearly as per the concept of digital marketing in AI

Objectives and scope are clear, with mostly complete coverage.

Objectives and scope are clear, with mostly complete coverage.


Objectives and scope are clear, with mostly absolute coverage.

Objectives and scope are clear, with mostly absolute coverage

Objectives and scope are clear, with mostly absolute coverage for this project.

Objectives and scope are clear, with mostly absolute coverage.


Objectives and scope are clear, with mostly absolute coverage for this project.
Objectives and scope are clear, with mostly absolute coverage.
Objectives and scope are clear, with mostly absolute coverage for this project.

Objectives and scope are clear, with mostly absolute coverage for this project.

Clarity of the objectives and scope were average with minimum coverage of this project.
Objectives and scope are clear, with mostly complete coverage
Objectives and scope are clear, with mostly complete coverage
Objectives and scope are clear, with mostly complete coverage

the objectives are stated clearly


Objectives and scope are clear, with mostly absolute coverage for this project
the objectives are stated clearly

Objectives and scope are clear, with mostly absolute coverage for this project
the objectives need to be stated specifically
the objectives are stated but need to be specific and separate
the objectives are stated clearly
Clarity of the objectives and scope were average with minimum coverage of this project
the objectives are stated clearly

Objectives and scope are clear, with mostly complete coverage


the objectives are stated but need clarity

the objectives are stated minimally


Objectives and scope are clear, with mostly absolute coverage for this project

the objectives are stated clearly


Objectives and scope are clear, with mostly absolute coverage for this project

the objectives are stated clearly

There are five objectives in the project. Scope of the study is not mentioned in the project.
The scope, objectives are clear, need more points about project coverage
the project mainly focused for use and difficulties of block sequence and crypto money.require a detailed description of scope
Objectives, scope and coverage are comprehensive
There are research objectives in this project and scope of the study also clearly written.
There are five objectives in the project. But scope of the study is not given.
Objectives and scope are apparent, with mostly complete coverage
Goals are very clear. more details regarding scope and coverage are required.
There are 5 objectives and the same has been covered with scope.
There are three objectives given in the project. No scope of the study and coverage of the study is less.
the project focused for transformative potential of smart grid technology in revolutionizing power management practices.Objectives and scope are clear, wi
only few objectives are given. needed further explanation of the scope and coverage
Less clarity in study objectives and scope of the study.

the main scope of the project for digital payment.good reliability in specifying the project's objectives, scope and extent of coverage.

research aims to analyze the ways in which Amazon Fresh uses ITSM frameworks and techniques to support its operational objectives, improve customer h
few objectives are given. need more clarity about scope and coverage of project
The project primarily focused on the utilization and problems of block sequences and crypto money.need a clear statement of scope.
few objectives are written. need more clarity about scope and clarity
research focused to fill that gap by identifying and analyzing the factors that shape the information security behavior of the Indian workforce.

the project focused for create a billing software using SAP-ABAR. Scope and coverage are clear. need few clarification about objectives.

There are 2 project objectives.


There are 4 to 5 project objectives

There are 4 to 5 project objectives


good reliability in specifying the project's objectives, scope and extent of coverage.
There are 4 to 5 project objectives

There are 4 to 5 project objectives


There are 4 to 5 project objectives
There are 3 project objectives
objectives and scopes are focused as digital transformation in the business.In VUCA world, it is more difficult to do predict the winners.require a brief expl
There are 4 to 5 project objectives
There are 4 to 5 project objectives
There are 4 to 5 project objectives

There are 4 to 5 project objectives


There are 4 to 5 project objectives
There are 4 to 5 project objectives
There are 4 to 5 project objectives
There are 4 to 5 project objectives
Migration aims to replicate existing functionalities in the cloud, whereas modernization
The process of setting up and configuring the NetSuite software to meet the specific needs and requirements of a business.
Professionals in this discipline are essential to the prevention, detection, response, and recovery from cyber threats.
Complete coverage of scope with atleast 5 objectives
Enough clarity of objectives and complete coverage and scope is incorporated
Well defined objectives and better coverage and scope of the project is developed
The study seeks to identify and categorize the various types of cyber threats but with lack of coverage
objectives are clear but limited coverage and scope
contexts
honestly recognize purchaser action
customer up to an apex limit and by providing the utility of every penny of his money.
Retail industry.
The primary objective of this research is to study the current state of affairs with regard to the use of blockchain technology in intellectual property manage
companies
to the present, Temporal Scope, Geographic Range needs to specify various range in the project scope
Objectives and scope are apparent, with mostly complete coverage.
Adequate clarity in objectives and scope, but coverage is somewhat limited.
There are 4 to 5 project objectives
There are 4 to 5 project objectives
There are 4 to 5 project objectives
There are 4 to 5 project objectives
Exceptional clarity in defining objectives, scope, and thorough coverage of the project.
few objectives and goals are given. but need few points about clarity of coverage
There are 4 to 5 project objectives
There are 4 to 5 project objectives
There are 4 to 5 project objectives
There are 4 to 5 project objectives
There are 2 project objectives.
There are 4 to 5 project objectives
Adequate clarity in objectives and scope, but coverage is somewhat limited.
There are 4 to 5 project objectives
the content is not given
There are 4 to 5 project objectives
Objectives and scope are apparent, with mostly complete coverage.
There are 4 to 5 project objectives
There is one project objective.
There are 4 to 5 project objectives

Need more coverage in objectives. only two objectives given


Need to state objectives specifically
the objectives are stated clearly
the objectives are stated clearly
the objectives are stated as the project requirements
the stated objectives concentrates on website accessibility
to address this significant public health care system scope of the objectives are nicely understand
Scope of the research work blockchain technology not clearly mentioned
Scope of the objectives not clearly mentioned
Banking sector operational process not fully covered
Scope of the objectives not covered all the areas of digital banking platform
Scope of the objectives not mentioned clearly
it has emerged as one of the most prominent destinations for outsourcing worldwide
The scope of the National Depository System (NDS) project encompasses various aspects designed to revolutionize the securities market by introducing a c
There are 4 to 5 project objectives
There are just three set objectives. Require additional goals in Impact of Cloud-Based HR Analytics on Human Capital Management review
the project focused for AI implementation in healthcare in India. many objectives are given. but need more elaboration about objectives and scope.
There are 4 to 5 project objectives
very clear objectives of the study, with mostly complete the intricate relationship between AI and society
the project mainly focused for analyze the CRM practices of Dr. Ethix Products and Services. The goals and extent are clear, and the majority of the materi
There are 4 to 5 project objectives
There is insufficient coverage because the study's objectives are unclear and its scope is absent
Objectives have been famed good and scope of the study also adequately written. But there is lack in the coverage of the study.
main scope of research focused on the impact of digital payments during the Covid-19. with mostly want complete coverage of this project
Good. The scopes and objectives are focused for autonomous car and its significant obstacles.
Objectives and scope of the study is clear but there is lack in coverage
the project focused for whether employees’ perceptions towards work life balance has any impacts on their job satisfaction. Objectives, scope and coverage
main scope of research focused on the impact of digital payments during the Covid-19. with mostly want complete coverage of this project
Adequate clarity in the objectives and scope but coverage of the study is limited.
A good deal of coverage, together with well-defined factors and objective.
Clear objectives and scope of the study with limited coverage have been given in the project.
There are only 3 objectives given in the project . The scope and coverage of the study are vague.
There are three objectives and scope with comprehensive coverage
The project has adequate objectives, scope with mostly complete coverage
The project has adequate research objectives, scope and wide coverage.
Objectives framed by the student for the project is good and there is a clarity in scope with coverage
There are four objectives in the project. Weak in scope of the study and limited coverage.
Five objectives framed for this project with scope and complete coverage
The goal is to provide a comprehensive understanding of how cryptocurrency impacts various policies in India. require a detailed description of scope
There is a clarity in defining objectives, scope and thorough coverage of the project.
There is one project objective..
this project is focused to examine and analyse various employee performance evaluation system for their business. objectives and scope are clear. Neverthe
There are 4 to 5 project objectives
Good. The scope and objectives are focused for e-banking and its impact.
There are 3 project objectives
There are 2 project objectives.
There are 4 to 5 project objectives
There are 4 to 5 project objectives
There are 4 to 5 project objectives
There are 3 project objectives
There are 4 to 5 project objectives
There are 4 to 5 project objectives
the project mainly focused on evaluating the current network security measures at Jaipuriar School. objectives and scopes are clearly explained. but need fe
There are 4 to 5 project objectives
There are 4 to 5 project objectives
There are 4 to 5 project objectives
There are 4 to 5 project objectives
few Objectives and scope are apparent, without more explanation about this project.but need few points about clarity of coverage
the project focused for edge computing in digital age. clearly established objectives and factors. require a brief explanation of the coverage
There are 4 to 5 project objectives
There are 4 to 5 project objectives
the project focused secure data encryption and decryption using cryptographic and stegnography. few goals are given. but need few points about clarity of

There are 2 project objectives.


the clarity of objectives scope and coverage of erp production is good ideas of project
the impact of serverless computing on application developmnent is good
Clarity of objectives scope and coverage of this study are clearly defined.

The goals and the scope of this project is presented nicely.

The primary and secondary objectives scope of this study are very clear.
Clarity of objectives scope and coverage of this study are clearly defined.
The goals and the scope of this project is presented nicely.

Need more clarity of objective sope and coverage of this project.

Clarity of objectives scope and coverage of this study are clearly defined
Clarity of objectives scope and coverage of this study are clearly defined
the concept of blockchain and the primary objective is to analyze adoption patterns, user experiences, and perceptions surrounding in India.

Need more clarity of objective sope and coverage of this project.


Clarity of objectives scope and coverage of this study are clearly defined.
The objectives and scope are ambiguous, resulting in inadequate coverage.
The objectives and scope are clear, but coverage is somewhat limited.
Objectives and scope are ambiguous, resulting in inadequate coverage.
The project has demonstrated exceptional clarity in defining objectives, scope, and comprehensive coverage.
There is limited clarity in objectives and scope, resulting in significant gaps in coverage.
The objectives and scope are clearly defined, but the coverage is somewhat limited.
Objectives and scope are ambiguous, resulting in inadequate coverage.
There is adequate clarity in the objectives and scope, but coverage is somewhat limited.
The project has demonstrated exceptional clarity in defining objectives, scope, and comprehensive coverage.
The primary and secondary objectives of this study are very clear.
There is insufficient coverage since the objectives and scope are unclear.
Clarity of objectives scope and coverage of this study are clearly defined.
There is adequate clarity in the objectives and scope, but coverage is somewhat limited.
Clarified objectives and scope, with comprehensive coverage.
The goals and scope are unclear, resulting in inadequate coverage.
Objectives and scope are vague, leading to incomplete coverage
The objectives and scope are apparent, with a mostly complete coverage.
Clarity in defining goals, scope, and thorough project management.
The project has demonstrated exceptional clarity in defining objectives, scope, and comprehensive coverage.
The primary and secondary objectives of this study are very clear.
The objectives and scope are apparent, with mostly complete coverage.
Add some more clearence of objective and scope of this study.
The objectives and scope are unclear, leading to an incomplete coverage.
The objectives and scope are apparent, with a mostly complete coverage.
The objectives and scope are completely absent.
Clarity of objectives scope and coverage of this study are clearly defined.
Clearly defined goals and parameters, together with extensive coverage.
Clarity in defining goals, scope, and thorough project management.
Clarity in defining the project's objectives, scope, and coverage.
Clarity of objectives scope and coverage of this study are clearly defined.
Objectives and scope are ambiguous, resulting in inadequate coverage.
Clarity of objectives scope and coverage of this study are clearly defined.
Give more Clarity of objectives scope and coverage of this study.
Clarity in objectives and scope, with full coverage.
There is adequate clarity in the objectives and scope, but coverage is somewhat limited.
Clarity of objectives scope and coverage of this study are clearly defined
Clarity of objectives scope and coverage of this study are clearly defined.
Objectives and scope are apparent, with most of the coverage being complete.
Clarity of objectives scope and coverage of this study are clearly defined.
Excellent clarity in defining objectives, scope, and thorough coverage of the project.
The objectives and scope are unclear, leading to an incomplete coverage.
Objectives and scope are entirely unclear or missing.
Objectives and scope of the project is clearly stated with limited coverage.
The goals and extent are clear, and the majority of the material is covered.
Five objectives of the project is clearly stated but coverage is somewhat limited and scope of the study is missing.
Clearly defined goals and parameters, along with extensive coverage.
Objectives and scope of the project is clearly stated with limited coverage.There are 3 objectives given.

The goals and extent are clear, and the majority of the material is covered.
Objectives and scope of the project is clearly stated with limited coverage.There are 3 objectives given.
Objectives and scope are vague, leading to incomplete coverage There are two project objectives.

Clearly defined goals and parameters, together with extensive coverage.

Objectives and scope are vague, leading to incomplete coverage There are two project objectives.

The scope and objectives are clear, and the subject is largely covered.
Objectives and scope are vague, leading to incomplete coverage There are two project objectives.

Objectives and scope are unclear, resulting in incomplete coverage.


Adequate clarity in objectives and scope, but coverage is somewhat limited. There are more than three project objectives.
Objectives and scope are vague, leading to incomplete coverage There are two project objectives.

The goals and scope are self-explanatory, mostly covering the entire research

Adequate clarity in objectives and scope, but coverage is somewhat limited. There are three project objectives.

With clear goals and a wide range of coverage,

There are no objectives or scope.

Comprehensive coverage and clear objectives.


Objectives and scope are apparent, with mostly complete coverage. There are more than project objectives.

Adequate clarity in objectives and scope, but coverage is somewhat limited. There are three project objectives.
The objectives and scope are vague, which leads to incomplete coverage.
The goals and scope are unclear, resulting in inadequate coverage.
It's hard to figure out the goals and scope.
With clear goals and a wide range of coverage of research
Clear objectives and scope, with comprehensive coverage. There are five objectives of the project.

The objectives and scope are sufficiently clear, but coverage is somewhat limited.
The scope and goals are clear, and most of it is covered.

Adequate clarity in objectives and scope, but coverage is somewhat limited. There are three project objectives.
Objectives and scope are vague, leading to incomplete coverage There are two project objectives.
Objectives and scope are apparent, with mostly complete coverage. There are five project objectives.

Clear objectives and scope, with comprehensive coverage. There are five project objectives.
Goals and scope are clear, with generally complete inclusion.

The goals and scope are unclear, resulting in inadequate coverage.


The objectives and scope are sufficiently clear, but coverage is somewhat limited.
The goals and scope are clear, and most of the area is covered.

Objectives and scope are apparent, with mostly complete coverage. There are six project objectives.
Clarity in defining goals, scope with proper coverage of research

Clear objectives and scope, with comprehensive coverage. There are four project objectives.
Clear objectives and scope, with comprehensive coverage. There are four project objectives.
The goals and scope are clear, but the coverage is not complete.

The goals and scope are clear, with mostly complete coverage

Objectives and scope are entirely unclear or missing.

There are clear goals and coverage.


There are clear goals and coverage.
Objectives and scope are apparent, with mostly complete coverage. There are three project objectives.
A precise set of objectives and a comprehensive scope.
Clear objectives and scope, but coverage is limited.

The objectives and scope are apparent, with a mostly complete coverage.

Clear objectives and scope, with comprehensive coverage. There are five project objectives.
With clear objectives and scope, with comprehensive coverage.
Adequate clarity in objectives and scope, but coverage is somewhat limited. There are three project objectives.

The objectives and scope are unclear, resulting in significant gaps in coverage.

Clear objectives and scope, with comprehensive coverage


Excellent clarity in defining objectives, scope, and thorough coverage of the project.

The objectives and scope are clearly defined, but the coverage is somewhat limited.
Objectives and scope are apparent, with mostly complete coverage
The objectives and scope are entirely lacking.

Adequate clarity in objectives and scope, but coverage is somewhat limited

Objectives and scope of the project is clearly stated with limited coverage.
There are four objectives of the project is clearly stated but coverage is somewhat limited and scope of the study is missing.
Objectives and scope of the project is clearly stated with limited coverage.There are nine objectives in this study.
Clearly defined goals and parameters, together with extensive coverage.

Objectives of the project is clearly stated but coverage is somewhat limited and scope of the study is missing.
Objectives and scope are sufficiently clear, albeit coverage is a little bit constrained.
Objectives and scope are entirely unclear or missing.
Limited clarity in objectives and coverage.scope are entirely missing.

Objectives of the project is clearly stated but coverage is somewhat limited and scope of the study is missing.
Objectives and scope are entirely missing.

Objectives and scope of the project is clearly stated with limited coverage.
There are 7 objectives of the project is clearly stated but coverage is somewhat limited and scope of the study is missing.

Goals and boundaries are clear, showing significant coverage.

The objectives and scope are clearly defined, but the coverage is somewhat limited.
Objectives framed were clear with comprehensive coverage.
Objectives drawn are clear and concise. It also framed accordingly to cover the topic selected.
The goals and the scope of this project is presented nicely.
Objectives drawn are clear and concise. It helps for better coverage of the study.
Outstanding clarity in defining objectives, scope, and thorough coverage of the project.
The primary objective of this research is to thoroughly examine how FinTech organizations can effectively identify and implement process strategies that m
The goals and scope are clear, with the majority of the territory covered.
The goals and the scope of this project is presented nicely.
There are significant gaps in objectives and scope.
The goals and the objective scope of this project is presented nicely.
Lack of clarity regarding goals and scope results in substantial coverage omissions.
Clarity of objectives scope and coverage of this study are clearly defined.

The primary objective is to analyze adoption patterns, user experiences, and perceptions surrounding digital payment methods and online banking in India
The main key objective and scope of this project is explained well.
Coverage of the objectives and scope are vague, no proper understanding of the topic.
The clarity of objectives scope and coverage of this project is good .
Objectives specified are apparent. Mostly covered the required scenario.
Objectives framed are vague which may lead to incomplete coverage.
The primary and secondary objectives of this study are very clear.
Objectives framed are very clear with comprehensive coverage.
Objectives are clear and it has a comprehensive coverage of the study
Objectives framed were not clear. There is no clear understanding of the topic and no complete coverage of the study.
Objectives framed are Comprehensive. It helps to cover the purpose of the study.

The primary objective of this study is to provide a comprehensive examination of ransomware attacks, with a focus on understanding current trends, develo

The goals and the scope of this project is presented nicely.


Add moreclarity objective scope and coverage are provide.

The primary and secondary objectives of this study are very clear.
The primary and secondary objectives of this study are very clear.
The clarity of objectives scope and coverage project are nice ,but add some more objectives.

Adequate clarity in objectives and scope, but coverage is somewhat limited.


Clear goals and scope, but coverage is limited.
Objectives and scope are vague, leading to incomplete coverage
Very clear about what the project is about and how it will be done.
Minimal clarity, objectives and scope unclear, leading to insufficient coverage
Objectives and scope are entirely unclear or missing.
There is adequate clarity in the objectives and scope, however, the coverage is somewhat limited.
Objectives and scope are vague, leading to incomplete coverage.
Objectives and scope are ambiguous, resulting in inadequate coverage.
Objectives and coverage are clear.

The objective of this project is to provide an overview of all concepts directly related to SAP ERP implementation projects and scope of this project is clear
Clearly defined goals and parameters, along with extensive coverage.
Objectives and scope are apparent, with mostly complete coverage
The objective scope and coverage of the ecommerce industry includes various trends that are shaping the way businesses operate online, such as mobile co
This project objective involves examining the significant operational adjustments financial institutions have made to comply with the GDPR
The primary objectives scope and coverage of this project are very well.
Clarity of objectives scope and coverage of this project are well
The objectives and scope are completely absent.
Excellent clarity in the definition of objectives, scope, and thorough coverage of the project.
Objectives and scope are apparent, with mostly complete coverage
Clarity of objectives scope and coverage of this study is clear.
Clear objectives and scope, with comprehensive coverage
Clear objectives and scope with full coverage.
Objectives and scope are apparent, with mostly complete coverage
This project aims to explore the impact of digital currency on the financial landscape of India. Specifically, the project will analyse the adoption trends, regu
Adequate clarity in objectives and scope, but coverage is somewhat limited.
Clarity of objectives scope and coverage of this study are clearly defined.
Adequate clarity in objectives and scope, but coverage is somewhat limited.
Clarity of objectives scope and coverage of this study are clearly defined.
Clarity of objectives scope and coverage of this study are not well defined.
Clarity of objectives scope and coverage of this study are clearly defined.
Excellent clarity in the definition of objectives, scope, and thorough coverage of the project.
Objectives and scope are apparent, with mostly complete coverage
The goals and scope are clear, and most of the information is covered.
Objectives and scope are vague, leading to incomplete coverage
Clear objectives and scope, with comprehensive coverage
Objectives and scope are apparent, with mostly complete coverage
Objectives and scope are vague, leading to incomplete coverage
Clarity of objectives scope and coverage of this study are clearly defined.
There is insufficient coverage because the objectives and scope are unclear.
Objectives and scope are ambiguous, resulting in inadequate coverage.
Limited clarity in objectives and scope, resulting in significant gaps in coverage
Adequate clarity in objectives and scope, but coverage is somewhat limited.
With clear objectives and scope, with comprehensive coverage.
The objectives and scope are clear, but coverage is somewhat limited.
Clarity in defining objectives, scope and thorough coverage of the project.
The goals and scope are clear, but the coverage is not complete.
Clarity of objectives scope and coverage of this study are clearly defined
Clarify objectives and scope to ensure comprehensive coverage of the challenges faced by life insurers in appointing and retaining individual agents, facilita
The primary objective of this study is to comprehensively assess the sustainable initiatives implemented by Maersk, a global leader in international logistics

various industries.
Objectives of the study need to give more clearly.
Identify the primary challenges and complexities faced by hospitals in managing their supply chains.
By effectively supervising the onboarding process and evaluating the skills of recently recruited staff, operation management ensures that the comp
Clear objectives and scope provide mostly comprehensive coverage in exploring the impact of fintech innovations on traditional banking, ensuring a focuse
Clear objectives and scope provide mostly comprehensive coverage in a comparative study on portfolio management, ensuring focused and thorough analys
Clarify objectives and scope to ensure comprehensive coverage in studying the workflow of the Indian banking sector, facilitating a thorough analysis of op

Objectives of the study need to give more clearly.


Clear objectives and scope provide mostly comprehensive coverage in the performance analysis of mutual funds in India, ensuring focused and thorough ex

The main objective of ensuring quality in products and services is to achieve maximum customer satisfaction. Quality also ensures that.
Clear objectives and scope ensure comprehensive coverage in the project report on consumer buying behavior towards financial products of HDFC Bank, fa
To enhance operational efficiency and reduce defects through Six Sigma methodologies in a manufacturing/service organization.

The research objectives delineate the overarching goals of the study, aligning with the broader aim of unraveling the intricacies of lean manufacturing i

The main objective of the project was to implement the Kanban system at Anand Teknow Aids Engineering India Limited to achieve smooth flow of inform

To look at areas of strength for the displaying ways of thinking and affiliations made by the web-based marketing specialists to cultivate their client base

objective need to clearly mention the project cloud infrastructure transition provides valuable insights into its strategic advantages
around again till eternity

clearly mention the object and scope of the project in cloud computing techniques
Objective and scope of the project are not given clear in block chain techniques

Objectives and scope are vague, leading to incomplete coverage There are two project objectives.

clear objectives are given

Objectives and scope are apparent, with mostly complete coverage. There are more than four project objectives.

adequate objectives are given

Limited clarity in objectives and scope, resulting in significant gaps in coverage. There is one project objective.
Objectives and scope are apparent, with mostly complete coverage. There are three project objectives.
Objectives and scope are vague, leading to incomplete coverage There are two project objectives.

Objectives and scope are vague, leading to incomplete coverage There are two project objectives.

project.
Adequate clarity in objectives and scope, but coverage is somewhat limited. There are three project objectives.

Objectives and scope are apparent, with mostly complete coverage. There are more than three project objectives.
Objectives and scope are apparent, with mostly complete coverage. There are three project objectives.

Adequate clarity in objectives and scope, but coverage is somewhat limited. There are three project objectives

Adequate clarity in objectives and scope, but coverage is somewhat limited. There are three project objectives.

Objectives and scope are apparent, with mostly complete coverage. There are more than five project objectives.

Adequate clarity in objectives and scope, but coverage is somewhat limited. There are three project objectives.

The primary objective of this study is to comprehensively explore the transformative potential of cloud technology in healthcare, with a specific focus on th
This study is focus on scope of Artificial Intelligence (AI) in the context of banking and financial institutions, needs to mention various scope and coverage
There are 4 to 5 project objectives
There are 3 project objectives
Examine the Role of Digital Transformation is the main objective of the study, needs to expand the coverage of the project study
There are 4 to 5 project objectives
Adequate clarity in objectives and scope, but coverage is somewhat limited. There are five project objectives.
examine the factors driving the increasing adoption of sustainability practices in enterprises worldwide
Objectives and scope are vague, leading to incomplete coverage There are two project objectives
There are 4 to 5 project objectives
Navigating the Metaverse in various field is the main objective of the project, needs to mention more objective and coverage of the study
applications in Web Wise Evaluation, needs to mention some coverage area to design web applications with selenium
Adequate clarity in objectives and scope, but coverage is somewhat limited. There are three project objectives.
There are 4 to 5 project objectives
Adequate clarity in objectives and scope, but coverage is somewhat limited. There are three project objectives.
There are 4 to 5 project objectives
There are 3 project objectives

There are 4 to 5 project objectives

investigate the elements of toxic leadership, analyse the relationship of aspects of Toxic leadership with Leader-part Exchange counterproductive work beha
Objectives and scope are vague, leading to incomplete coverage There are two project objectives.
The primary objective of the project "Navigating the Digital Payment Revolution: Innovations and Impacts" is to thoroughly explore the evolving landscape
Adequate clarity in objectives and scope, but coverage is somewhat limited. There are three project objectives.
Adequate clarity in objectives and scope, but coverage is somewhat limited. There are three project objectives

Objectives and scope are vague, leading to incomplete coverage There are two project objectives.
f the study aim to guide the research process and provide a clear framework for investigating the impact of pricing strategies on customer satisfaction amon
Objectives and scope are apparent, with mostly complete coverage. There are three project objectives
Objectives and scope are vague, leading to incomplete coverage There are two project objectives.
The objectives of this study on the role of artificial intelligence (AI) in predicting consumer behaviour are designed to explore the multifaceted impact of A

Adequate clarity in objectives and scope, but coverage is somewhat limited. There are three project objectives

To analyse the results of ecommerce on banking sector


Adequate clarity in objectives and scope, but coverage is somewhat limited. There are four project objectives.
Needs to present more clear the objective of the project, needs to present scope and coverage of project
Limited clarity in objectives and scope, resulting in significant gaps in coverage. There is one project objective.
Adequate clarity in objectives and scope, but coverage is somewhat limited. There are three project objectives
real-time data from IoT devices with Genea’s Salesforce CRM system
Objectives and scope are vague, leading to incomplete coverage There are two project objectives.
Objectives and scope are vague, leading to incomplete coverage There are two project objectives.
objective of this study is to promote the democratization of information in order to enhance governance and service delivery at the Panchayats

Objectives and scope are apparent, with mostly complete coverage. There are three project objectives
The primary objective of this study to examine the possible ways of improving service quality and efficiency that will lead to bring more customer satisfact
Objectives are mentioned needs to specify the coverage of the study with various factors
Adequate clarity in objectives and scope, but coverage is somewhat limited. There are three project objectives
Objectives and scope are vague, leading to incomplete coverage There are two project objectives.
Android technology is the general topic, needs to clarity on the objective and scope of the project
Analysing Sales Promotion Strategies, Evaluating Advertising Campaigns, Identifying Best Practices and Recommendations
Review on blockchain technology is key objective of the study needs to specify scope and coverage

Objectives and scope are apparent, with mostly complete coverage. There are three project objectives

Objectives and scope are vague, leading to incomplete coverage There are two project objectives.

Objectives and scope are vague, leading to incomplete coverage There are two project objectives.
Objectives and scope are vague, leading to incomplete coverage There are two project objectives

Objectives and scope are apparent, with mostly complete coverage. There are three project objectives.

Objectives and scope are vague, leading to incomplete coverage There are two project objectives.

There are 3 project objectives

Objectives and scope are vague, leading to incomplete coverage There are two project objectives

Objectives and scope are apparent, with mostly complete coverage. There are three project objectives
explore the integration of AI in fintech systems like gpay, phonepe, and amazonpay is the objective of the project
applications in various industries

Study on the impact of AI on E-commerce business in IT Management, needs to concentrate on the coverage of AI in business
migrating an automobile company's new car, used cars sales data, claims, and vehicle operating systems data to the Azure Data Warehouse (ADW)

There are 4 to 5 project objectives


There are 4 to 5 project objectives
Exploring Information Technology Usage among Postgraduate Professional Course Students in the Rayalaseema Region of Andhra Pradesh
The project has two main goals: first, to assess the effectiveness of VR and AR in training, and second, to identify factors that influence the successful adop
to comprehensively investigate the challenges, opportunities, and imperatives surrounding cybersecurity within the financial sector, with the aim of elucidat
The primary objective of this study is to comprehensively investigate the security challenges associated with the Internet of Things (IoT) and to develop eff
Objective scope is understand user adoption patterns and preferences in digital payment usage with factors influencing their choice of the digital payment a
Objectives and scope are apparent, with mostly complete coverage
To scrutinize the influence of digital metamorphosis on customer interaction within the retail banking domain, needs to specify more points on its coverage
There are 4 to 5 project objectives
There are 4 to 5 project objectives
There are 4 to 5 project objectives
There are 4 to 5 project objectives
There are 4 to 5 project objectives
Needs to mention the various language to develop industrial applications and give some suggestion to develop the project with python language, needs to m
Objective of the project is study of blockchain technology needs to mention various scope and coverage of the objectives of the study
Objectives and scope are vague, leading to incomplete coverage There are two project objectives.
There are 2 project objectives.
There are 4 to 5 project objectives
There are 4 to 5 project objectives
Objectives and scope are apparent, with mostly complete coverage. There are three project objectives.
There are 4 to 5 project objectives
intuitive interactions could streamline everyday tasks is the primary objective.
Objectives and scope are vague, leading to incomplete coverage There are two project objectives.

Objectives and scope are vague, leading to incomplete coverage There are two project objectives.
project on the "Impact of Climate Change on Financial Institutions" demonstrates clear objectives and scope, with a comprehensive coverage of the essentia

Adequate clarity in objectives and scope, but coverage is somewhat limited. There are four project objectives.
The objectives and scope of "Exploring Microfinance Self-Help Groups (SHGs) and Bank Connections are clearly defined with comprehensive coverage, p
The objectives and scope of the study on Non-Performing Assets with special reference to Axis Bank are vague, resulting in incomplete coverage and limiti

Clear objectives and scope with comprehensive coverage are essential for assessing microfinance lending by Gramin Bank. These elements ensure focused
Objectives and scope are apparent, with mostly complete coverage. There are three project objectives.
Clear objectives and comprehensive scope are crucial for analyzing the merger's impact on HDFC Limited and HDFC Bank, ensuring thorough coverage an

clear objectives, a comprehensive scope, and coverage of the project production and inventory of leather products
The objectives and scope are clearly delineated with comprehensive coverage, promising a thorough examination of the financial performance of Kerala Sta
The project on "The Impact of Digital Banking on Traditional Banks" provides adequate clarity in objectives and scope, although the coverage could be exp
Objectives of the study need to give more clearly.

Vague objectives and scope hinder comprehensive analysis, emphasizing the need for clear goals to understand inflation and interest rates' impact on person
Clarify objectives further to expand coverage and ensure all relevant aspects of the impact of inflation and interest rates on personal finances are addressed
The objective carried out a QMS in hospitals is addressed difficulties work and help administration. Extend the little coverage about healthcare sector and p
Streamline front desk management, optimizing housekeeping schedules, and improving guest service protocols.
To ensure clear objectives and scope with comprehensive coverage, define specific goals such as understanding key milestones in the evolution of the India
E-procurement tools to reduce procurement cycle time and improve procurement efficiency.
urban environments in India and identify opportunities for optimization.

industries to identify the best practices and challenges in TQM implementation.


Ensure clear objectives and scope for a thorough analysis of mergers and acquisitions in the Indian banking sector to capture all relevant impacts.
Objectives of the study need to give more clearly.
Clear objectives and scope are crucial for a thorough comparative analysis of consumer perceptions of e-banking services in public and private sector banks

Clear objectives and scope provide comprehensive coverage, ensuring a thorough and focused analysis of consumer perceptions of e-banking services in pu
While the objectives and scope are adequately clear, expanding the coverage will provide a more comprehensive analysis of Small Finance Banks in India,

Adequate clarity in objectives and scope, but coverage is somewhat limited. There are three project objectives
Objectives and scope are apparent, with mostly complete coverage. There are three project objectives

Objectives and scope are apparent, with mostly complete coverage. There are three project objectives.
Objectives and scope are apparent, with mostly complete coverage. There are three project objectives.
Objectives and scope are apparent, with mostly complete coverage. There are more than three project objectives.

adequate objectives applied


adequate Objectives are given

Objectives and scope are vague, leading to incomplete coverage There are two project objectives.
Objectives and scope are apparent, with mostly complete coverage. There are more than three project objectives.

Objectives and scope are vague, leading to incomplete coverage There are two project objectives.
Objectives and scope are vague, leading to incomplete coverage There are two project objectives.
Clear objectives and scope, with comprehensive coverage. There are four to five project objectives.
Clear objectives and scope, with comprehensive coverage. There are more than five objectives of the project.
Limited clarity in objectives and scope, resulting in significant gaps in coverage. There is one project objective.
there are five objectives are given
Adequate clarity in objectives and scope, but coverage is somewhat limited. There are three project objectives
there are 6 objectives given

objectives are given

objectives are given


Objectives and scope are vague, leading to incomplete coverage There are two project objectives.
Objectives and scope are vague, leading to incomplete coverage There are two project objectives.
CLEAR
OK
MAY BE REFINED
NEED CONCENTRATION
CLEAR
NOT SO CLEAR
CLEAR
CLEAR
VERY CLEAR
CLEAR
Objectives and scope are vague, leading to incomplete coverage

CLEAR
CLEAR
The objectives, scope, and thorough coverage of the project have been thoroughly defined. There are 3 objectives with many subpoints.
outstanding precision in articulating the project's goals, parameters, and coverage. The project has four goals, not presented separately but integrated into th
Although there is sufficient clarity in objectives and scope, there are some limitations in coverage. There are three objectives for the project.
Adequate clarity in objectives and scope, but coverage is somewhat limited.
Objectives and scope are vague, leading to incomplete coverage
Clear objectives and scope, with comprehensive coverage.
Adequate clarity in objectives and scope, but coverage is some what limited.

Clear objectives and scope, with comprehensive coverage


clarity in objectives and scope, but coverage is somewhat limited.
Limited clarity in objectives and scope, resulting in significant gaps in coverage.
Achieving exceptional clarity in defining objectives, scope, and thorough coverage of the project is key. There are five project objectives
Very clear definition of the project's goals, parameters, and extent. The project has numerous goals.
Brilliant transparency in establishing goals, determining the project's scope, and providing comprehensive detail regarding the project. There are typically m
Adequate clarity in objectives and scope, but coverage is somewhat limited.
Very clear objectives and scope, with precise coverage. There are 7 project objectives
clarity in objectives and scope, but coverage is somewhat limited.
Objectives and scope are apparent, with mostly complete coverage
There are four or five project goals.
The lack of clarity in the objectives and scope results in insufficient coverage. There are two goals for the project.

There are 5 project objectives.


Clear objectives and scope, with comprehensive coverage.
A well-defined goal has been outlined, encompassing the actual state of affairs in major urban areas.
Objectives of the study need to give more clearly to this project.
coverage.
coverage
coverage.
To explore the role and impact of IoT technologies in the development and functioning of smart cities
coverage

coverage
Objectives of the study need to give more clearly.
coverage
coverage.
Objectives of the study need to give more clearly.
coverage.
To Analyze and study the cases of Data breaching.
coverage.
Objectives of the study need to give more clearly.
Identify success factors and best practices for leveraging AI and ML in business contexts.
Adequate clarity in objectives and scope, but coverage is somewhat limited.
Objectives of the study need to give more clearly.
The main objective of this research was to understand the reason behind continuous downfall in profitability within the F&B outlets of the hot
Objectives of the study need to give more clearly.
The use of technology, adherence to data protection laws, and ongoing skill development are crucial to maintaining the integrity and effectiveness of au
Adequate clarity in objectives and scope, but coverage is somewhat limited.
Objectives and scope are vague, leading to incomplete coverage
The project aims to understand the conceptual framework of cybersecurity, analyze data using advanced tools and techniques, and propose recommendation
Objectives and scope are apparent, with mostly complete coverage
Objectives and scope are apparent, with mostly complete coverage
Clear objectives and scope, with comprehensive coverage.
Clear objectives and scope, with comprehensive coverage.
Adequate clarity in objectives and scope, but coverage is somewhat limited.
Clear objectives and scope, with comprehensive coverage.
Adequate clarity in objectives and scope, but coverage is somewhat limited.
Objectives of the study need to give more clearly.
Objectives of the study need to give more clearly.
confidentiality (e.g.by using encryption).
The basic objective of this study is to analyze and define the critical significance of IT Service Management (ITSM) in supporting digital transformation wi
coverage.
coverage.
limited.
To study the popularity of Sony mobile phones among different customers
The main objective of this project was to illustrate the many ways in which AI can be strategically integrated into business and enhance efficiency, innovati
Examine the big data technologies' historical growth and significant turning points.
The scope of the project on the implementation of the ITIL (Information Technology Infrastructure Library) framework encompasses a comprehensive exam
coverage.
coverage.
complete coverage.
coverage.
Objectives of the study need to give more clearly.
Objectives of the study need to give more clearly.
coverage.
To understand challenges or hindrance that was faced while working in sheets.
coverage.
coverage.
business
This research project embarks on a journey to explore the intricate relationship between these systems and their impact on supply chain resilience and perfo
coverage.
coverage.
some what limited.
coverage.
To find out how investors and consumers feel about the use of fintech
in coverage.
Objectives of the study need to give more clearly.
coverage.
coverage.
Undertake a thorough examination to determine how blockchain, AI, and ML technologies can improve the organization's operational effectivenes
coverage
coverage.
It provides an in-depth literature review, examining the theoretical foundations of talent management and its application in virtual team settings.
The main goal is to investigate how supply chain operating efficiency might be increased using IT solution
To study the workings and structure of Mutual Funds in India and the aspects of costs and returns investors should know about along with the taxation laws
To identify the likelihood of working style of employee. To study the Team building ability among employees
To provide actionable insights that support strategic and operational decision-making within Shree Anndata Enterprises.
coverage.
IT ventures remotely and given techniques and best hones for overcoming them.
coverage.
coverage.
coverage.
Objectives of the study need to give more clearly.
coverage.
To know if the customers are prospected through online marketing and the impact of social media marketing on their buying behavior.
coverage.
to incomplete coverage.
The scope of this project includes an overall outline of projects. It includes factors such as critical deliveries, project timelines, resources, activities, bounda
coverage.
coverage.
Objectives of the study need to give more clearly.
Objectives of the study need to give more clearly.
Measure the extent to which IT solutions have enhanced the resilience and adaptability of organizations and communities in managing the crisis.
IoT enabled has also the potential to improve collaboration between humans and IT products, research might focus on developing better user experience and
The study will explore the future trends and innovations in IT Healthcare by identifying the emerging technologies such as Artificial Intelligence, Machine
coverage.
coverage.
To identify the needs and preferences of Health Care Professionals (HCPs) for digital engagement platforms provided by pharmaceutical companies.
coverage.
Objectives of the study need to give more clearly.
application in K-12 mathematics, setting the stage for broader academic applications.
coverage.
To understand the fundamental principles of blockchain technology and its relevance to the financial sector.
Objectives of the study need to give more clearly.
coverage.
coverage.
coverage.
Evaluate the overall user experience of Amazon and eBay
new teaching-learning solutions towards transforming the education system in India.
limited.
coverage
limited.
in coverage.
coverage.
The objective that is primary of research is contrast the NPAs of PSBs and PVBs in Asia with certain mention of SBI and HDFC lender.
Minimal clarity, objectives and scope unclear, leading to insufficient coverage
Clear objectives and scope, with comprehensive coverage.
the project
To develop a framework for integrating cloud and network services.
coverage
Recommendations to objectives of the study need to give clearly about the project.
It can empower employees to function efficiently from anywhere, access their data and programs seamlessly, and cooperate with professionals member
To find out the basic factors of man-made intelligence driven HRM practices of the Indian IT area.
limited.
To provide an online portal that users may access to report issues and obtain answers to often asked problems.
To investigate the current state of IT and ITSM implementation in financial markets.
coverage.
Information Technology Service Management (ITSM)
coverage
Identify factors influencing the preference for social commer
in coverage.
Tt explains the goals and rationale behind the research. Clarifies the goals of the study as well as the reasoning behind its conduct.
Examine the key factors contributing to the success of their e-commerce platforms.
coverage.
To study the impact of artificial intelligence on risk management in financial industry.
coverage.
coverage.
coverage.
This objective will analyze the weather code development delay impacts the final product quality
To use data from the Reserve Bank of India (RBI) and the National Payments Corporation of India (NPCI) to support your study and to invest
coverage.
Objectives of the study need to give more clearly.
Objectives of the study need to give more clearly.
coverage.
coverage.
the project.
coverage.
Objectives of the study need to give more clearly.
systems within the banking sector.
Objectives of the study need to give more clearly.
Research delves into the security challenges associated with mobile devices in the context of BYOD, highlighting the importance of addressing thes
The objective of this study is to perform a thorough assessment and examination of the specific objectives and goals that will form the basis for the
Objectives of the study need to give more clearly.
coverage.
coverage
Objectives of the study to given clearly.
employed by organizations across different sectors.
businesses to support virtual team collaboration.
coverage.
Limited clarity in objectives and scope, resulting in significant gaps in coverage.
Clear objectives and scope, with comprehensive coverage
Limited clarity in objectives and scope, resulting in significant gaps in coverage
Explore best practices and emerging trends in IT service management within the financial sector.
To identify the primary challenges faced by Small and Medium Enterprises (SMEs) during the implementation of ERP system.
To gain a thorough understanding of the principles, methodologies, and algorithms underlying predictive analytics, encompassing both traditional statistical
Objectives of the study are given more clearly.
Objectives and scope are vague, leading to incomplete coverage
Limited clarity in objectives resulting in significant gaps in coverage
Adequate clarity in objectives and scope, but coverage is somewhat limited
Adequate clarity in objectives and scope, but coverage is somewhat limited.
Adequate clarity in objectives and scope, but coverage is somewhat limited
Objectives of the study need to give clearly.
Organizational information systems are classified into four types: transaction processing, decision support, management information, and systems to suppor
WELL WRITTEN
clarity in objectives and scope, but coverage is somewhat limited.
Objectives and scope are vague, leading to incomplete coverage
clarity in objectives and scope, but coverage is some what limited.
GOOD
Adequate clarity in objectives and scope, but coverage is b somewhat limited.
Adequate clarity in objectives and scope, but coverage is somewhat limited.
CLEAR
Clear objectives and scope, with comprehensive coverage. There are 5 project objectives
Clear objectives and scope, with comprehensive coverage.
Limited clarity in objectives and scope, resulting in significant gaps in coverage. even though there are 5
Five clear objectives and scopes with comprehensive coverage hve been presented
Goals that are VERY VIVID AND TRANSPARENT, including scope and coverage
Objectives and scope are vague, leading to incomplete coverage
Clear objectives and scope, with comprehensive coverage.
CLEAR
Objectives and scope are vague, leading to incomplete coverage
Objectives and scope are apparent, with mostly complete coverage
ok
Clear objectives and scope, with comprehensive coverage.
Clear objectives and scope, with comprehensive coverage.
CLEAR
Objectives and scope are vague, leading to incomplete coverage
CLEAR
Clear objectives and scope, with comprehensive coverage.
Objectives and scope are vague, leading to incomplete coverage
clear
Objectives and scope are entirely unclear or missing
Objectives and scope are apparent, with mostly complete coverage
Objectives and scope are apparent, with mostly complete coverage
Objectives and scope are apparent, with mostly complete coverage
Objectives and scope are apparent, with mostly complete coverage
to access data where applicable.
coverage
coverage.
industries, driving innovation, productivity, and competition.
coverage
banking and how it affects consumer happiness and loyality.
coverage
The primary objective of this study is to investigate the application of ITSM best practices in the management of cyber cafes
The primary focus is to explore the motivations behind consumer purchases and understand how shoppers form perceptions and behaviors towards
The primary objective is to explore and analyze how AI technologies are reshaping various aspects of business operations across different industries.
Objectives of the study need to give more clearly.
The challenges of home energy management are worth solving. The significance of residential energy consumption is difficult to overstate, and the tools are
coverage
The study discusses the digitalization of Micro, Small, and Medium Enterprises (MSMEs) in India, emphasizing the impact of digital transformation on var
coverage
Recommendations to objectives of the study need to give clearly about the project.
to safety issues and labour shortages, compounded by a slow adoption of digital technologies.
coverage.
Objectives of the study need to give more clearly.
To provide genuine information about interesting facts of products which we have provided.
coverage.
coverage
Recommendations to objectives of the study need to give clearly about the project.
Objectives of the study need to give more clearly.
coverage
coverage.
Determine the level of knowledge and awareness regarding cyber security and cyber secrecy among individuals in adjacent regions.
The study's objective is to figure out the effect of TM on ES, EM and EC in the IT area of NCR.
coverage.
and to discover how these factors interact with one another.
in coverage.
coverage.
coverage.
coverage.
coverage.
coverage.

Objectives and scope are apparent, with mostly complete coverage

Basic bibliography, with several omissions or inaccuracies.

Objectives and scope are apparent, with mostly complete coverage


Adequate clarity in objectives and scope, but coverage is somewhat limited.

Clear objectives and scope, with comprehensive coverage

Clear objectives and scope, with comprehensive coverage


Adequate clarity in objectives and scope, but coverage is somewhat limited

Objectives and scope are apparent, with mostly complete coverage


Clear objectives and scope, with comprehensive coverage

Clear objectives and scope, with comprehensive coverage.


The science seeks ever-improved means of measuring the chemical composition of natural and artificial materials by using techniques to identify the substa
Adequate clarity in objectives and scope, but coverage is somewhat limited
Adequate clarity in objectives and scope, but coverage is somewhat limited.
The objectives are well-articulated, aiming to investigate the impact of cloud computing on cost, flexibility, security, and control in outsourcing. The scope
Objectives and scope are vague, leading to incomplete coverage
Objectives and scope are apparent, with mostly complete coverage
Adequate clarity in objectives and scope, but coverage is somewhat limited
Objectives and scope are apparent, with mostly complete coverage
Clear objectives and scope, with comprehensive coverage
The study's objectives are well-defined, aiming to explore factors influencing online shopping behavior, consumer preferences, and purchasing patterns. Th
The objectives are clearly defined, aiming to explore how AI influences efficiency, innovation, and competitive advantage in product development and R&D
The scope includes a detailed examination of various challenges such as cultural change, legacy system integration, skill gaps, and change management.
The objective of the study is to identify the threats in digital banking and to provide security
Objectives and scope are apparent, with mostly complete coverage
disappointment, estimating the presentation of CRM and laying out a rule for a CRM program for associations in the IT business situated in Karnataka
Clear objectives and scope, with comprehensive coverage
Objectives and scope are apparent, with mostly complete coverage
The study is aimed to bring the reporting of Service Quality Management under one roof.
The objective of the study is to know about use of block chain and crypto money, to know about problems of block string and crypto money.
Adequate clarity in objectives and scope, but coverage is somewhat limited.
Objectives and scope of the project is clearly stated with limited coverage.

There are large gaps in coverage due to unclear objectives and scope.There are 3 project objectives.
Objectives and scope of the project is clearly stated with limited coverage.There are nine objectives given by the student.

Adequate clarity in objectives and scope, but coverage is somewhat limited.

There is one project objective and scope of the study is missing


Objectives and scope of the project is clearly stated with limited coverage.There are five objectives and six scopes given.
The student has adequate clarity in objectives and scope, but coverage is somewhat limited.
Other subject file
There are 3 project objectives with limited clarity and scope of the study is missing.
Other subject file
Adequate clarity in objectives and scope, but coverage is somewhat limited.
Other subject file
There are six objectives in this study with limited coverage. Scope of the study is missing
Adequate clarity in objectives and scope, but coverage is somewhat limited.
Objectives and scope of the project is clearly stated with limited coverage.There are five objectives and four scope for this study.

There are five project objectives for this study. Scope of the study is missing.

Student uploaded assignment questions with answers.

Objectives and scope are vague, leading to incomplete coverage There are 2 project objectives.
Clear objectives and scope, with comprehensive coverage.

Objectives and scope are apparent, with mostly complete coverage


Clear objectives and scope, with comprehensive coverage.

Customer Experience Management (CEM) is a strategic approach that focuses on understanding, managing, and optimizing the interactions between custom

Clarity of objectives scope and coverage of this project is “clоuds” dо nоt rеfеr tо а spеcific tеchnоlоgy,
The main objective of this study is to determine the necessity for a teacher review website from the perspectives of its primary users—students and parents.

Flexible Work Timings: Examining the impact of flexible work timings on employee retention.
methodologies, and technologies.

technology within the banking sector, with a specific focus on the employees and customers of State Bank of India
human existence, including organizational functions.

s objective aims to delve into the specific security issues that banks encounter when deploying cloud computing solutions.

objectives scope and coverage of this project understand the pros and cons of AI in digital marketing.

AI to increase the breadth and depth of test coverage, ensuring all potential scenarios and edge cases are tested comprehensively.

Clear objectives and scope with comprehensive coverage.


offering stability, efficiency, and seamless operations crucial to economic health.
Adequate clarity in objectives and scope, but coverage is somewhat limited.
and to observe the transition from conventional methods to modern digital solutions.
There are 7 objectives in this study.But scope is missing.
about crucial improvements to enhance the banking sector in India and facilitate further development in the hands of the bank.
There are 16 project objectives
Clear objectives and scope, with comprehensive coverage.
Unique Biotech Limited in the probiotics market by leveraging data-driven techniques.
Objectives and scope are apparent, with mostly complete coverage. There are 2 project objectives
Other subject file
an organization.
Other subject file
decision-making.
technology.
Other subject file

There are two project objectives and the scope is missing.

There are 3 project objectives.scope is missing.

There are 6 project objectives.


Clarity of objectives scope with mostly complete coverage and there are 6 project objectives and scopes given

Objectives and scope of the project is clearly stated with limited coverage.

There are 6 project objectives and scope of the study is missing resulting in significant gaps in coverage.

Objectives and scope are entirely missing.


Student gave sufficient clarity in objectives and scope, but however the coverage is a little narrow.
There are large gaps in coverage due to unclear objectives and scope.There are 5 project objectives.
Student gave sufficient clarity in objectives and scope, but however the coverage is a little narrow.

There are large gaps in coverage due to unclear objectives and scope.There are 5 project objectives.
Objectives and scope are entirely unclear

Student gave sufficient clarity in objectives and scope, but however the coverage is a little narrow.There are 10 project objectives and 11 scopes in this pro

and two scopes in this study.

Other subject file


The objective of this study is to examine the evolution and growth drivers of the gig economy, with a specific focus on India.
machines, arrange and capacity to buyers, over the web and on a pay-as-you-go basis.

choices.
to computing resources over the Internet.
uttermost spans of the nineteenth hundred years.

MLNN.

entities to people
get rid of mistakes, but it was later extended to cover a range of business operations.

in the fashion industry.


improving customer support.
awareness in society about deep fakes.

assistants like Siri, AI is becoming a big part of our daily lives.


over the internet.

objectives scope and coverage to determine the changes or terms and condition, we need to adopt if we are using blockchain and cryptocurrency.

of the project Clarity of objectives scope and coverage Examine and evaluate the data security procedures that Mumbai-based Fintech companies currently
by processing massive amounts of data and looking for patterns to model in their own decision-making.
as conscious attrition.
Clear objectives and scope, with comprehensive coverage.
Clear objectives and scope, with comprehensive coverage.
Clear objectives and scope, with comprehensive coverage.

Clear objectives and scope, with comprehensive coverage.


Objectives and scope are apparent, with mostly complete coverage

Clear objectives and scope, with comprehensive coverage.

Objectives and scope are apparent, with mostly complete coverage

Clear objectives and scope, with comprehensive coverage.

Clear objectives and scope, with comprehensive coverage.

Clear objectives and scope, with comprehensive coverage

Clear objectives and scope, with comprehensive coverage.

Objectives and scope are apparent, with mostly complete coverage


Objectives and scope are apparent, with mostly complete coverage

Clear objectives and scope, with comprehensive coverage.

Objectives and scope are apparent, with mostly complete coverage

Objectives and scope are apparent, with mostly complete coverage

Clear objectives and scope with comprehensive coverage


Adequate clarity in objectives and scope, but coverage is somewhat limited
Clear objectives and scope, with comprehensive coverage.
Objectives and scope are apparent, with mostly complete coverage
Adequate clarity in objectives and scope, but coverage is somewhat limited.

Clear objectives and scope, with comprehensive coverage.


Clear objectives and scope, with comprehensive coverage.
Objectives and scope are apparent, with mostly complete coverage

Objectives and scope of the project is clearly stated with limited coverage.
Other subject file.
To suggest ways to meet the compliance gap.
The main objectives that will be achieved through the investigation of the importance of information technology (IT) in the banking industry.
Other subject file
The main objectives of InfoSec are typically related to ensuring confidentiality, integrity, and availability of company information.

Other subject file


The main objective of a COBOL to Java migration involves modernizing legacy COBOL application to leverage the benefits of Java technologies.
The objective of this research is to study the effect of Social Media Marketing on Young Consumer Buying Behavior.Social media has, over the last few ye

Objectives and scope of the project is clearly stated with limited coverage. There are ten objectives given.
Copy case(Course book)
The student gave adequate clarity in objectives and scope, but coverage is somewhat limited. There are six project objectives, and 10 scopes are given.
To understand the problem of the employee in the working condition. To know the employee's opinion about the workplace, pay, and benefits.
Other subject file
Objectives and scope of the project is clearly stated but coverage is somewhat limited.There are 4 objectives given.
The digital payment framework eliminates the requirement of physical infrastructure, paperwork, and manual handling.
The primary objective of our study is to assess and improve information system management within medium-sized enterprises
This project aims to integrate blockchain technology across various financial sectors to improve efficiency, security, transparency, and accessibility
Adequate clarity in objectives and scope, but coverage is somewhat limited.
The primary objective of this project is to explore and understand the transformative impact of emerging technologies on customer and technical support se
Other subject file

the objective to give a detailed analysis of this with available data, case studies and other information included in this project which has been completed afte
Limited clarity in objectives and scope of the study is missing .There are six project objectives.
There are three project objectives and scope of the study is missing.
It can automate and enhance CRM processes, leading to smarter and more efficient customer interactions.
Other subject file
acknowledged that the nature of today's business has undergone a radical transformation through IT and is presently experiencing these changes.
Adequate clarity in objectives and scope, but coverage is somewhat limited.
Objectives and scope of the project is clearly stated with limited coverage.

The objectives of the study are to understand consumer satisfaction levels with online purchases and the reasons for purchasing online.

Objectives and scope are entirely missing.

Objectives and scope are entirely missing.


Clear objectives and scope, with comprehensive coverage.

Clear objectives and scope, with comprehensive coverage.

The objectives are clear and scope are well presented


Clear objectives and scope, with comprehensive coverage.

The research objectives are clearly stated


Adequate clarity in objectives and scope, but coverage is somewhat limited.
Objectives and scope are apparent, with mostly complete coverage

Objectives and scope are vague, leading to incomplete coverage

Minimal clarity, objectives and scope unclear, leading to insufficient coverage


The objectives and scope of the study are clear

The objective o f the study is good but coverage is somewhat limited

Adequate clarity in objectives and scope, but coverage is somewhat limited.


Limited clarity in objectives and scope, resulting in significant gaps in coverage.

The objectives are clear but require more clarity for scope
Basic bibliography, with several omissions or inaccuracies.
Adequate clarity in objectives and scope, but coverage is somewhat limited

Adequate clarity in objectives and scope, but coverage is somewhat limited.


vague, leading to incomplete coverage

Objectives and scope are vague, leading to incomplete coverage


Clear objectives and scope, with comprehensive coverage.
The objective are clear and scope of the study are effective

Objectives and scope are apparent, with mostly complete coverage


The research objectives are well defined
Clear objectives and scope, with comprehensive coverage.

Objectives and scope are vague, leading to incomplete coverage

Clarity of objectives scope and coverage of this study are clearly defined.
Clarity of objectives scope and coverage are to provide the erp system implementation
The goals and the scope of this project is presented nicely.
The goals and the scope of this project is presented nicely.
Need more clarity of objective sope and coverage of this project
Provided clear objectives regarding the project taken.
research was to gain insights and understanding from professionals in the field of digital marketing through their perspectives and experiences.
This study aimed to investigate the future of HR analytics in the Indian IT industry as well as the difficulties they encounter in implementing it.
Need to provide a clarity of objectives and scopes for research that has taken
Provided good coverage of objectives

The objective scope of this study is well defined and add some more clarity .
Clarity of objectives scope and coverage of this study are clearly defined.
The goals and the scope of this project is presented nicely.

The objective and scope of this paper is highlight the keyways in which BI tools can revolutionize IT decision-making.
objectives and scope are not clearly drawn

Limited clarity of objectives are drawn


Comprehensive and very clear objectives are drawn

very clear and comprehensive objectives and scope are covered

very clear and comprehensive objectives are drawn

Limited comprehensive with the objectives and scope


Clear objectives and scope, with comprehensive coverage.
Objective and scope is give in detailed way

adequate clarity of objective good

SET CLEAR OBJECTIVES


set more objectives
set more clear objectives
good and clear objectives are given
Clear and comprehensive conclusion are drawn
set more objectives for this study
Incomplete objectives and scopes are covered
Objectives and scope are vague and incomplete objectives are covered
Clear objectives and scope are comprehensive

good objective is fixed in your study

Provided main motives of the project taken.


The aim of this research is to perform a thorough analysis of the information with the goal of identifying noteworthy patterns, variances, and trends.

give more objectives for this study


Have a good thought of objectives and clarity

Minimal clarity, objectives and scope unclear, leading to insufficient coverage

contribute to its operational efficiency and rapid growth.


Objectives and scopes are provided
Provided objectives and scopes
add more objective
Provided objectives and scopes
The objective of this study is to investigate the complex dynamics surrounding the adoption and optimization of cloud computing in the context of small a
need clear objectives
good and clear objectives
good objectives are used

set clear objectives


need more clear objectives
Provided clarity of objectives
operational efficiency and aligning IT services with business goals.
CLEAR OBJECTIVE FOR YOUR STUDY

clear objective and add one or more objective

adequate objectives
Adequate clarity in objectives needed
Provided objectives and scopes
The project objectives of big data in healthcare are designed to harness the power of data analytics to improve various aspects of healthcare delivery, patien
Provided good objectives and scopes
Clear objectives and scope, with comprehensive coverage.
Objectives and scope are vague, leading to incomplete coverage
Objectives are provided

Clear objectives and scope, with comprehensive coverage.

Adequate clarity in objectives and scope, but coverage is somewhat limited.

Clear objectives and scope, with comprehensive coverage.


Exceptional clarity in defining objectives, scope, and thorough coverage of the project.
clear objectives
need to give more ideas of Clarity of objectives scope and coverageof hospital management system

Clarity of objectives scope and coverage of this study are clearly defined.
The goals and the scope of this project is presented nicely.

Clarity of objectives scope and coverage of this study are clearly defined.
This study includes proposing good recommendations for enhancing overall are required more points

The goals and the scope of this project is presented nicely

add more ideas of Clarity of objectives scope and coverage

The goals and the scope of this project is presented nicely.


Need more clarity of objective scope and coverage of this project.
objectives scope and coverage of this study are clearly defined

is to analyze adoption patterns, user experiences, and perceptions surrounding in India.

Clear objectives and scope, with comprehensive coverage.


Objectives and scope are apparent, with mostly complete coverage

Clear objectives and scope, with comprehensive coverage.


set clear objectives
good objectives setting
good objectives are given
Clear objectives and scope, with comprehensive coverage.
Clear objectives and scope, with comprehensive coverage.

Objectives and scope are apparent, with mostly complete coverage


Objectives and scope are vague, leading to incomplete coverage
Objectives and scope are apparent, with mostly complete coverage
set more objectives
Objectives and scope are apparent, with mostly complete coverage
Clear objectives and scope, with comprehensive coverage.
Clear objectives and scope, with comprehensive coverage.
set more objectives
Clear objectives and scope, with comprehensive coverage.
set clear objectives fro study
good objectives for this study
Clear objectives and scope, with comprehensive coverage.

strong and clear objectives


Clear objectives and scope, with comprehensive coverage.
Exceptional clarity in defining objectives, scope, and thorough coverage of the project.
set objective more clear
Objectives and scope are apparent, with mostly complete coverage

There are 4 to
set more objectives
Clear objectives and scope, with comprehensive coverage.
Adequate clarity in objectives and scope, but coverage is somewhat limited
Minimal clarity, objectives and scope unclear, leading to insufficient coverage
Minimal clarity, objectives and scope unclear, leading to insufficient coverage

Objectives and scope are entirely missing


coverage.
Clear objectives and scope, with comprehensive coverage.
Clear objectives and scope, with comprehensive coverage.
add more objectives
good objectives framed
The objectives are relevant to the study and it covers overall study

The scope of research is well define and objectives are clear


The research objectives are clear and the scope of the study are well definied
The objectives are clear but require more clarity for scope
The research objectives are clearly stated
Adequate clarity in objectives and scope, but coverage is somewhat limited.
Minimal clarity, objectives and scope unclear, leading to insufficient coverage

Exceptional clarity in defining objectives, scope, and thorough coverage of the project.
Clear objectives and scope, with comprehensive coverage

Adequate clarity in objectives and scope, but coverage is somewhat limited.


set more objectives
adequate objectives are fixed
Clear objectives and scope, with comprehensive coverage.

Objectives and scope are apparent, with mostly complete coverage


Clear objectives and scope, with comprehensive coverage.
Clear objectives and scope, with comprehensive coverage.
Clear objectives and scope, with comprehensive coverage.
Objectives and scope are apparent, with mostly complete coverage

Objectives and scope are apparent, with mostly complete coverage


Objectives and scope are apparent, with mostly complete coverage
Objectives and scope are apparent, with mostly complete coverage

Objectives and scope are vague, leading to incomplete coverage


There are 4 to 5 project objectives
There are 3 project objectives.

Objectives and scope are vague, leading to incomplete coverage.


There are 3 project objectives.
Clear objectives and scope, with comprehensive coverage.

Adequate clarity in objectives and scope, but coverage is somewhat limited.

Objectives and scope are apparent, with mostly complete coverage


Objectives and scope are apparent, with mostly complete coverage

Objectives and scope are apparent, with mostly complete coverage

Objectives and scope are apparent, with mostly complete coverage. There are four project objectives

Adequate clarity in objectives and scope, but coverage is somewhat limited. There are three project objectives
Objectives and scope are vague, leading to incomplete coverage There are two project objectives.

Objectives and scope are apparent, with mostly complete coverage.


Adequate clarity in objectives and scope, but coverage is somewhat limited. There are three project objectives
Objectives and scope are vague, leading to incomplete coverage There are two project objectives.
Objectives and scope are vague, leading to incomplete coverage There are two project objectives.
Objectives and scope are vague, leading to incomplete coverage There are two project objectives.
There are 4 to 5 project objectives

Adequate clarity in objectives and scope, but coverage is somewhat limited.


Adequate clarity in objectives and scope, but coverage is somewhat limited. There are three project objectives

Objectives and scope are vague, leading to incomplete coverage

Establish robust communication channels and feedback mechanisms to engage donors continuously.
The adoption of a strategic plan, the presence of strong leadership, and the preservation of steady development are all necessary components for the success
obligations
Limited clarity in objectives and scope, resulting in significant gaps in coverage.
Clear objectives and scope, with comprehensive coverage.

There is one project objective..


Minimal clarity, objectives and scope unclear, leading to insufficient coverage
The scope of the project is about the exploration of cloud computing in ITC, a top enterprise that deals with complex business environments, and the benefi
To evaluate the current regulatory frameworks and industry standards aimed at addressing these ethical challenges.
this goal by providing a comprehensive analysis of the ethical challenges and proposing practical solutions to navigate them effectively

The aim here is to aid organizations in selecting the most suitable technology aligning with their specific business needs
Objectives and scope are apparent, with mostly complete coverage

Objectives and scope are apparent, with mostly complete coverage


Objectives and scope are apparent, with mostly complete coverage
There are 4 to 5 project objectives
Adequate clarity in objectives and scope, but coverage is somewhat limited.
Adequate clarity in objectives and scope, but coverage is somewhat limited.
strategically pursuing breakthrough digital technologies that may distinguish their company, transactions, and systems

Adequate clarity in objectives and scope, but coverage is somewhat limited.


Digitization leverages technologies and digital tools to enhance or redefine business processes and models

Develop a detailed plan for migrating existing systems and applications to the cloud, including timelines, resource allocation, risk management strategies, a
processes, improve efficiency, and enable informed decision-making, ultimately driving success in the dynamic real estate market. please check the correctn
Clear objectives and scope, with comprehensive coverage.
Clear objectives and scope, with comprehensive coverage.

Examination of case studies to understand real-world applications and outcomes.


Objectives and scope are apparent, with mostly complete coverage
Understand the impact of social commerce on consumer purchasing Behaviour.
Sustainability Reports and Public statements of the Indian and MNCs operating in the IT and ITES sector in India.
The capacity to convey empathy, perseverance, and practical correspondence becomes as fundamental as coding capability
to give an open organization, implied for analysts to share their new revelations and exploration assets
Clear objectives and scope, with comprehensive coverage.
constraint of the study

Clear objectives and scope, with comprehensive coverage.


Comparative study of ability management rehearses for ladies headway across different ventures

clarity in objectives and scope, but coverage is somewhat limited.


Clear objectives and scope, with comprehensive coverage.
One of the primary objectives is to identify and categorize the various types of cyber threats
Clear objectives and scope, with comprehensive coverage.

development

electronic waste and promoting eco-friendly procurement and disposal processes

CLEAR
clear
GOOD
clear
Objectives and scope are vague, leading to incomplete coverage
CLEAR
Clear objectives and scope, with comprehensive coverage.
CLEAR
ok

clear
Objectives and scope are apparent, with mostly complete coverage
Clear objectives and scope, with comprehensive coverage. There are 4 to 5 project objectives
clear

Clear objectives and scope, with comprehensive coverage. There are 4 to 5 project objectives
Objectives and scope are apparent, with mostly complete coverage . There are 3 project objectives
not clearly presented
Clear objectives and scope, with comprehensive coverage. There are 4 to 5 project objectives
There are 6 project objectives
Clear objectives and scope, with comprehensive coverage. There are 4 to 5 project objectives
Adequate clarity in objectives and scope, but coverage is somewhat limited. There are 3 project objectives
The goal of this research is to investigate how generative AI may be applied to boost consumer engagement and customize marketing efforts.
of employees at Infosys Hyderabad towards AI-driven automation in the workplace.
Clear objectives and scope, with comprehensive coverage. There are 4 to 5 project objectives
Objectives and scope are apparent, with mostly complete coverage . There are 3 project objectives
Objectives and scope are apparent, with mostly complete coverage . There are 3 project objectives
Digitize manual processes to help employees perform their tasks more effectively and provide a seamless shopping experience across physical and digital c
Exceptional clarity in defining objectives, scope, and thorough coverage of the project. There are 4 to 5 project objectives
Adequate clarity in objectives and scope, but coverage is somewhat limited. There are 3 project objectives
Evaluate the impact of database migration on the reliability of SaaS MES applications at Siemens.
inclusive policies.
Clear objectives and scope, with comprehensive coverage. There are 4 to 5 project objectives
Clear objectives and scope, with comprehensive coverage. There are 4 to 5 project objectives
Exceptional clarity in defining objectives, scope, and thorough coverage of the project. There are 4 to 5 project objectives
Provide training and awareness programs for employees and managers on the benefits of diversity and inclusion
The purpose of the study is to examine the many ways in which workers see HR procedures and how such practices affect workers' job satisfaction
Exceptional clarity in defining objectives, scope, and thorough coverage of the project. There are 4 to 5 project objectives
There are 4 to 5 project objectives
The project also focuses on key challenges that are being faced in the adoption and intervention of AI and would also expand on the ethics, privacy and secu
The detection of user personality is helpful in many ways and has wide area of applications. Detection user’s personality from the textual information from
This analysis will encompass various aspects such as the expansion of the investor base, changes in investor preferences, advancements in technolog
There are 4 to 5 project objectives
There are 4 to 5 project objectives
Credit card fraud detection is the process of identifying purchase attempts that are fraudulent and rejecting them rather than processing the order.
To direct a comparative study of Information Systems Audit in the academic domain concerning different domains
Clear objectives and scope, with comprehensive coverage.
To provide training facilities in export marketing and management, domestic marketing, quality control, and standardization, management of enterprises, la
Clear objectives and scope, with comprehensive coverage. There are 4 to 5 project objectives
To Investigate the Evolution of Trading Practices:Explore the historical transition from traditional trading methods to modern electronic routing facilitated
To investigate the specific IT tools and strategies that enhance customer experience in the banking sector

Four Primary Objectives and four secondary Objectives are included-


Objectives and scope are apparent, with mostly complete coverage
the literature evaluation, which guarantees that the study is based on accepted practices and expertise.

Exceptional clarity in defining objectives, scope, and thorough coverage of the project.
Exceptional clarity in defining objectives, scope, and thorough coverage of the project
Promoting the adoption of the helpline system requires targeted outreach and marketing efforts to raise awareness and attract users.
Contribution to the host company Data is easier to get than before. In order to enhance the effectiveness of business procedures, all organisations gather per
Clear objectives and scope, with comprehensive coverage.
Objectives and scope are apparent, with mostly complete coverage .
To provide that a fault should be discovered while testing the scenario so that no issues arise when it goes live at the production level.
Adequate clarity in objectives and scope, but coverage is somewhat limited.
channels including social networking, ride-hailing services, and e-commerce apps
This study aims to design an ERP system for comprehensive automation of processes within the company.
key aspects to ensure a holistic improvement in project management efficiency, team collaboration, and customer relationship management
Adequate clarity in objectives and scope, but coverage is somewhat limited.
Design and develop AI algorithms for natural language processing (NLP) and machine learning to enable chat bots to understand user queries and provide r
Adequate clarity in objectives and scope, but coverage is somewhat limited.
Exceptional clarity in defining objectives, scope, and thorough coverage of the project
Objectives and scope are apparent, with mostly complete coverage .
Objectives and scope are apparent, with mostly complete coverage
Objectives and scope are apparent, with mostly complete coverage
To determine the extent and degree of the training programmers fulfilling the set objectives
Objectives and scope are apparent, with mostly complete coverage .
clarity in objectives and scope, but coverage is somewhat limited.
Objectives and scope are vague, leading to incomplete coverage
Objectives and scope are apparent, with mostly complete coverage
Objectives and scope are apparent, with mostly complete coverage
OK
Limited clarity in objectives and scope, resulting in significant gaps in coverage. There is project objective
Limited clarity in objectives and scope, resulting in significant gaps in coverage.
clarity in objectives and scope, but coverage is somewhat limited
VERY CLEAR OBJECTIVE AND SCOPE AND IT COVERS ALL NEEDED INFORMATION. MORE THAN 5 HAVE BEEN PRESENTED
objectives, scope and coverage of the project is very clear and more than 6 objects including subpoints have been presented
Objectives and scope are vague, leading to incomplete coverage

vivid and clear objective, scope and coverage of the project is presented and more than 5 aim have been given
NOT PERFECTLY CLEAR OBJECTIVE AND SCOPE OF THE PROJECT PRESENTED
Adequate clarity in objectives and scope, but coverage is somewhat limited
VERY CLEAR OBJECTIVE SCOPE AND COVERAGE OF THE PROJECT
VERY CLEAR OBJECTIVE, SCOPE AND COVERAGE
Exceptional clarity in defining objectives, scope, and thorough coverage of the project

Objectives and scope are vague, leading to incomplete coverage


Objectives and scope are vague, leading to incomplete coverage
very clear objectives, scope, and coverage defined.
Adequate clarity in objectives and scope, but coverage is somewhat limited.
very Clarity of objectives scope and coverage and 4 objectives presented along with sub objectives
Objectives and scope are apparent, with mostly complete coverage
FINE
Objectives and scope are vague, leading to incomplete coverage
Objectives and scope are vague, leading to incomplete coverage

Objectives and scope are vague, leading to incomplete coverage


Objectives and scope are vague, leading to incomplete coverage
Objectives and scope are vague, leading to incomplete coverage
FINE LEAR
CLEAR
Objectives and scope are vague, leading to incomplete coverage

Adequate clarity in objectives and scope, but coverage is somewhat limited.

Adequate clarity in objectives and scope, but coverage is somewhat limited.


Objectives and scope are apparent, with mostly complete coverage

To analyze the current state of the mutual fund industry in India, including market size, asset under management (AUM), and investor participation.
To examine the nature and sources of credit risk in different types of financial institutions.
Objectives and scope are apparent, with mostly complete coverage
MORE objective with relevant problem facing to be written is required
Clear objectives and scope, with comprehensive coverage.
fee more objective of problems faced by RBI in this work and how to overcome the problem
The goal of this study is to clarify the complex relationships between consumer decision making, brand loyalty, and total sales success and digital marketing
Understand the purpose of modern-day card payment tool or app available in the market Strategies followed by cred for digging its root deep in the market.
Limited clarity in objectives and scope, resulting in significant gaps in coverage.

THE project objective should in the first chapter and it has to face the problems time frame and with available resources
the objective should deal with the problems and available source to find solution
the objective to cover with the problems faced by the individual to mutual fund investments
The fundamental segment introduces the subject on which assessment is finished and the investigation objections set to accomplish.
Advancement system should be incredibly clear and express. It should be given suitably to all the workers. It will stop unsettling and ridiculous sensation o
Adequate clarity in objectives and scope, but coverage is somewhat limited.
This is especially true when it comes to selecting suppliers, negotiating agreements, and maintaining outsourced solutions.
Basic methodology, but with notable gaps or weaknesses.
There are 3
the problems and specific results aims to achieve within a time frame and with available resources of object are some more need
This objective seeks to assess the efficacy of existing cyber security measures implemented by online banking institutions in India.
Objectives and scope are vague, leading to incomplete coverage.
the objective are need some more relevant

The objective measurements are more solving points with finding required
The objective also cover the problem and source of information available to finding
The objective are cover to the project with some more problems points
Clear objectives and scope, with comprehensive coverage.

The objective portion may cover some more problems facing employees in mutual fund
Clear objectives and scope, with comprehensive coverage.
Objectives and scope are apparent, with mostly complete coverage
Objectives and scope are apparent, with mostly complete coverage
The objective too solving problems of home loans
Objectives and scope are apparent, with mostly complete coverage

The objective may consider justifiable problem

Clear objectives and scope, with comprehensive coverage.


The objective of project covers important but some more information in available answer
Scope points required more to the project
Objectives and scope are apparent, with mostly complete coverage
THE project objective should in the first chapter and it has to face the problems time frame and with available resources

Minimal clarity, objectives and scope unclear, leading to insufficient coverage


Limited clarity in objectives and scope, resulting in significant gaps in coverage.

Exceptional clarity in defining objectives, scope, and thorough coverage of the project.
Clear objectives and scope, with comprehensive coverage.
Exceptional clarity in defining objectives, scope, and thorough coverage of the project.
Limited clarity in objectives and scope, resulting in significant gaps
Exceptional clarity in defining objectives, scope, and thorough coverage of the project.
Clear objectives and scope, with comprehensive coverage.
The research centers around cloud computing to be best way of IT outsourcing. Established information shelter mechanisms such encoding have
Objectives and scope are vague, leading to incomplete coverage
Objectives and scope are apparent, with mostly complete coverage .
Clear objectives and scope, with comprehensive coverage.
Clear objectives and scope, with comprehensive coverage
It involves a rigorous analysis of various aspects of the campaign, such as its reach, engagement, conversion rates, and overall impact on the brand's image
Clear objectives and scope, with comprehensive coverage
The evolution of AI social media tools means marketers can quickly sift through tons of data, spot trends before they blow up, and make informed decision
To investigate the efficacy of E-HRM practices using a multi-dimensional perspective that places an emphasis on hiring, rewards and recognition, learning
Objectives and scope are apparent, with mostly complete coverage .
This might include deliverables and assets, or more intangible objectives like increasing productivity or motivation
Clear objectives and scope, with comprehensive coverage.
Objectives and scope are apparent, with mostly complete coverage .
The objective of e commerce includes improving customer service, building more customer base and development of business relationship
To find out about use of block sequence and crypto money, criterion necessitates that a block-related problem that is computational is tough to solve
The objective of analyzing the adoption and usage trends of BHIM UPI is to gain insights into how this digital payment system is being embraced and utiliz
Cloud computing is a paradigm of distributed computing to provide the customers on demand, utility based computing services
request management.
Automated workflows ensure that changes follow established protocols and are consistently applied across the organization
Clear objectives and scope, with comprehensive coverage.
Objectives are apparent with mostly complete coverage. There are 3 project objectives
This objective involves a thorough examination of how Google has adopted ITIL processes and integrated them into its IT operations.
Objectives and scope are entirely unclear
To understand the structure and functioning of the organization
Objectives and scope are apparent, with mostly complete coverage
Q2 Remarks

Basic methodology

Methodology matched with objectives

Methodology for data collection is good


Sufficient study methodology for data collection
Adequate research methodology
Research methodology for data collection is basic
Basic methodology are framed to data collection
Adequate methodology for data collection

Research methodology for data collection is weak

No evidence
Adequate research methodology for data collection
Study methodology for data collection is basic

No evidence
No evidence

Adequate research methodology for data collection

Sound methodology with proper consideration of various data collection methods.


Basic research methodology fur data collection

No methodology given

Basic methodology, but with notable gaps or weaknesses.


Research methodology for data collection are framed to achieve the objectives
Basic methodology, but with notable gaps or weaknesses.
No methodology are framed
Basic methodology, but with notable gaps or weaknesses.
Methodology for data collection is sufficient
Methodology for data collection are weak

Basic methodology, but with notable gaps or weaknesses.


Basic methodology, but with notable gaps or weaknesses.

Study methodology for data collection is good


Study methodology for data collection is basic

Adequate methodology with some limitations in approach. The methodology fits the objective intended.

Basic methodology, but with notable gaps or weaknesses.

limited methodology for data collection


Objectives are fit with methodology
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Adequate methodology are used for data collection
Basic Study methodology for data collection
Research methodology for data collection is basic
Basic research methodology are used for data collection
Study methodology for data collection is simple

Study methodology for data collection is fine


The study methodology for data collection are adequate

various methodology for data collection


using more methodology for data collection
There is an adequate methodology with proper data collection
The adequate methodology and also fit for the objectives
The data collection methodology could be detailed about data management
The qualitative analysis is effective but require some theme identification
using various methods for data collection
using various metjodology for data collection
There is an adequate methodology with proper data collection

use detailed methodology for data collection


Adequate methodology with proper data collection

methodology with some limitations in approach.


Adequate methodology and also fits with objectives
Adequate methodology with some limitations in approach
use more apropriate methodology for data collection
Adequate methodology with some limitations in research approach
Adequate methodology with some limitations in approach. The methodology fits the objective intended.

The adequate methodology with some limitations .


use adequate methodology for data collection
The data collection methodology is good but could improve sampling strategy

The study methodology for data collection are adequate


use more methodology for data collection

use more methodology for data collection


use adequate methodology for data collection
use methodology for data collection
Inappropriate methodology and there is no reliable to the data collection
Methodology is almost absent in the study
The study methodology for data collection are adequate but require to improve objective measures
Appropriate methodology with some limitation in approach

The methodology are generally good with appropriate data collection


Adequate methodology with proper data collection
The study methodology for data collection are adequate but require to improve objective measures
Lack of methodology which affecting reliability of data
The study methodology for data collection are adequate but require to improve objective measures

The study methodology for data collection are adequate but require to improve objective measures

The study methodology for data collection are adequate


The study methodology for data collection are adequate but require to improve objective measures

Adequate methodology with proper data collection


The methodology are generally good with appropriate data collection
proper methodology are framed for data collection methods with considering research objectives
The study methodology for data collection are adequate but require to improve objective measures
Research methodology are satisfy the purpose of three objectives
The study methodology for data collection are adequate but require to improve objective measures

methodology for dat collection is sufficient


Data collection made with limited methodology

Appropriate methodology are used for data collection


The research methodology are good that are framed to analysis the data correctly
The study methodology are good but could detail about data management
The study methodology for data collection are adequate
Research methodology are framed shortly for collection of data
The methodology are generally good with appropriate data collection
Research methodology are covered all aspects
The study methodology for data collection are adequate but require to improve objective measures
The study methodology are clear with proper data collection
The study methodology for data collection are adequate but require to improve objective measures
The study methodology for data collection are adequate but require to improve objective measures
Study methodology are good but could detail about data management
The methodology are generally good with appropriate data collection
Study methodology for data collection was good and sample size also good
Weak methodology used for data collection suggest to collect data using various data resources
Research methodology clearly described the methods of data collection
Survey froms, weblinks only used for data collection suggest to collect data from various data resources

Data collection done from V-knoect only adequate methodology used


Weak methodology used for data collection
Basic methodology with notable gaps or weakness for data collection
Adequate methodology with some limitations used for data collection
Various data resources are used to collect the for study methodology was good
Basic methodology, but with notable gaps or weaknesses.
The methodology is weak require reliability of data collection
Basic methodology, but with notable gaps or weaknesses.
Methodology is weak, affecting the reliability of data.
The data collection methodology are good but could detail about data management
Study methodology for data collection is not given
Study methodology affecting the reliability of data
The methodology is almost non existence
Basic methodology, but with notable gaps or weaknesses.
The research project data collection methods are appropriate for the study
Basic methodology, but with notable gaps or weaknesses.
methodology with proper consideration of various data collection methods.
using adequate methodology for data collection
The study methodology are clearly fit for the objectives
adequate methodology uesd in this project

Inappropriate methodology for data collection


Methodology is almost nonexistent or entirely flawed.

Adequate methodology with some limitations in approach


The data collection methodology are good but could detail about data management
use various methodology for data collection

Limited methodology it impacting the data collection


Basic methodology for data collection

Adequate methodology for data collection


Research methodology for data collection are good
Basic methodology, but with notable gaps or weaknesses.

Primary methodology are framed for data collection


Adequate methodology with some limitations in approach. The methodology fits the objective intended.
The methodology fits with the objectives for data collection
Adequate methodology with some limitations in approach.

Study methodology for data collection are good

Basic methodology for data collection


Basic methodology

Basic Study methodology for data collection


Methodology is low

Methodology is weak
Primary study methodology
Fundamental research methodology,
No evidence
Methodology is almost non existent or entirely flawed
Methodology is almost non existent
Adequate study methodology for data collection
Methodology is no evidence meaning only wrote
Adequate methodology with some limitations
Adequate methodology with some limitations in approach
Study methodology for data collection was good significant methodology used for data collection
Both primary and secondary data resources are used to collect data for study methodology
Research methodology are liked with objectives
Weak methodology used for data collection suggest to use more data resources for research work
Data resources are not properly used for study methodology
Appropriate methodology used for data collection
Data collection done uk e-commerce resources
Study methodology framed for data collection are adequate but few are not clear
Methodology are framed as good for achieve the objectives of the study
Weak methodology for data collection
Adequate methodology with some limitations in approach for data collection
Primary and secondary data resources used for data collection with some limitations used
Various data resources used to collect was good
Semi structure questionnaires and quantitative, quantitative methodology used for data collection
Data collected from various data resources in and around 3 cities Delhi, Indore, Mumbai with sample size 300

Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Basic methodology, but with notable gaps or weaknesses.
Methodology are framed to achieve the objectives
designed methodology for dat collection are clear
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
In Research Methodology used only secondary data
Methodology are not adequate for dat collection
Basic methodology, but with notable gaps or weaknesses.

Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Study methodology for dat collection is minimum
Basic methodology, but with notable gaps or weaknesses.
Methodology for collection of data is limited
Questionnaire Methodology is the methodology used for gathering information
Questionnaire Methodology is the methodology used for gathering information

The quantitative ,qualitative and descriptive study were the methodologies used for gathering data.

sampling Methodology is the methodology used for gathering information


The descriptive, inferential analysis were used for analyzing the data and the statistical tools were used.
The explorative and descriptive study were the methodologies used for gathering data.

Questionnaire Methodology is the methodology used for gathering information

The methodology employed for this project on cybersecurity risk assessment and mitigation involves a combination of qualitative and quantitative research

The quantitative techniques were used in the analysis and interpretation of the collected data.

Primary data was collected by means of structured questionnaire and the explorative Questionnaire and descriptive study were the methodologies used for g
Other subject file

This research adopts a quantitative approach, utilizing secondary data

data.
quality of data.
Methodology is weak, affecting the reliability of data.
Methodology is weak, affecting the reliability of data.

Basic methodology, but with notable gaps or weaknesses.

Basic methodology, but with notable gaps or weaknesses.

Methodology is weak, affecting the reliability of data.

Basic methodology, but with notable gaps or weaknesses.

Basic methodology, but with notable gaps or weaknesses.

intended
Basic methodology, but with notable gaps or weaknesses

Basic methodology, but with notable gaps or weaknesses.


Methodology is weak, affecting the reliability of data.

Methodology is weak, affecting the reliability of data.

Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.

Adequate methodology with some limitations in approach. The methodology fits the objective intended.

Basic methodology, but with notable gaps or weaknesses.

The methodology employed in the research project


Study methodology procedure are partially explained
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
The inquire about will start with a comprehensive writing survey
Study methodology procedure are partially explained
Study methodology procedure are partially explained
qualitative and quantitative approaches.

there is no methodology
the systematic approach and techniques used to conduct research.

The integration of the subjective and quantitative methodologies have been applied in this examination, as well as inductive and logical reason

obtaining
-at-home parents, collegiate students, and academic staff
The research methodology outlines the systematic approach employed
:The methodology section outlines the research methods and approaches
Recent technology uses and methodology to be address clearly.

the customers through personal interaction/ interview method which was adopted.
performance by reducing search and comparison costs.
Any sampling technique where some members of the population are not selected

This study employs a mixed-methods research design, incorporating


sector banks complying Basel accord in the Indian banking system. Data collected from few methodology. but observation, secondary data analysis and cas
on gender differences

The primary data are collected through observations and interactions with the patient’s and employees. The secondary data are collected from hospital
gather data.
Research design a specifically descriptive and causal similar have been utilized for the reason.

One of the most famous and powerful techniques for cloud improvement

Information and Communication Technology


Data collected from few methodology. but observation, secondary data analysis and case studies are needed

The research methodology for the project titled "A Study of Enhancing User Engagement
and versatile data collection method that enable an interviewer
e methodology for this project includes the following phases
research methodology that takes a methodical approach to comprehending,

Data collected from few methodology. but observation, secondary data analysis and case studies are needed
Automakers proceeded in this approach for a number of reasons. First and foremost, a number of strict environmental laws forced local and international

Methodology of Bus Ticketing and Payment System


changing worldwide situation by surveying their administration rehearses in light of three center

management approaches.

The methodology section elucidates the research design, data collection methods

The organization should follow this activity so that research methodology of OEE can be similar for every time it is stu
Data on CSR expenditure in various areas and regions by different companies is collected and analyzed.
Data collected from few methodology. but observation, secondary data analysis and case studies are needed

fits the object

for growth and innovation


Findex Indicators,

This research employs a quantitative strategy utilizing primary data collection. P

generalizing
its impact on banking business.

intended to be disclose

A research project's methodical structure is known as research methodology.

evaluation strategy is methodical create for carrying out research.


Evaluating the effectiveness of suggestion boxes, face-to-face interactions, and telephone surveys

collected data from only in questionnaires specify in internet and books or direct way
data collected global from percent data and also collect from various health care center
understanding of sustainable IT practices and their implications for businesses
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
that is unauthorized of the networks .
Evaluate the ongoing quality administration practices and difficulties looked by association.

will apply algorithms to the dataset to find trends and relevant information
The sample consisted of small business owners, IT professionals, and cloud service providers with experience and expertise relevant

India, not only to service their offshore business through local delivery centers,
The survey will collect data of which factor influencing the adoption
Data collected from few methodology. but observation, secondary data analysis and case studies are needed

Data collected from few methodology. but observation, secondary data analysis and case studies are needed
examination
qualitative and quantitative analyses.
The study employed an exploratory, qualitative technique due to the research topic and the researcher's expertise and interest in the field of bu

Data collected from few methodology. but observation, secondary data analysis and case studies are needed
Study methodology procedure are partially explained

Study methodology procedure are partially explained


comfort of building occupants by taking into account suggestions

Data collection methods are partially described


healthcare, privacy, and ethics.
client platforms.
. Trade disputes can impact the technology sector
The study also aims to assess the benefits and challenges of implementing Six Sigma in the E&R and measure the impact of the implem
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Adequate methodology with some limitations in approach. The methodology fits the objective intended

No methodology

Basic methodology, but with notable gaps or weaknesses.


Basic methodology, but with notable gaps or weaknesse

Basic methodology, but with notable gaps or weaknesses

Methodology is inappropriate, not well-aligned, or lacks reliability and validity


Methodology is weak, affecting the reliability of data.
Research methodology of the proposed research work is as under
Basic methodology, but with notable gaps or weaknesses
different research processes

The methodology for the evaluation and implementation of the core banking solution

No methodology
approach
No methodology

Basic methodology, but with notable gaps or weaknesses.

An Analytical Study of Artificial Intelligence in the Workplace

studies related to the impact of Artificial Intelligence

Basic methodology, but with notable gaps or weaknesses.

Methodology of the system is clear and proper working of the system from the requirements achieved and its contains the working model for the developme
research approaches to cover the breadth and depth of digital transformation in various aspects.

primary and secondary methodology is used for gathering information.

Questionnaire Methodology is the methodology used for gathering information.


The methodology for developing a data warehouse involves a systematic approach to designing, building, and implementing the data warehouse solution.

Descriptive research method is used in the primary data collection.

Qualitative methodology was used for this research study.

AI can read PDFs, emails, and scans. Saving time with OCR and machine learning for data collection and classification.
Use case diagrams model the functionality of a system using actors
intended.
We have followed iterative model for implementing the project

analyses
methodological approach,
and social media analytics.
explore
intended. more data collection like primary and secondary points to elaborate

more methodology of data collection on primary and secondary data points to fill

The methodology used for data collection and analysis of the project impact on organization

intended to write
the approach

impact, qualitative research methods

upon biggest and additional information to eventually reach the mentioned objectives
Although the labels and steps differ slightly, the early methodologies that were rooted
This project employs a mixed-methods research design, combining both qualitative and quantitative approaches.

empirically testing the conceptual framework


In recent years, there has been a significant upheaval in the field of software engineering.
data

data.

data.
May use more questions to get a good result

The decimal Research way with biggest information are applied contained in this research

data.

Descriptive approach is adopted. Primary data are used for the project and collected through questionnaire method of data collection. Simple random sampl
Required data are collected form the portal and MIS. This part needs more improvement
Both primary and secondary data are used. Primary data are collected via structured questionnaire by conducting surveys. Secondary data from reports and

Qualitative and quantitative methods are employed. Secondary data sources are used to examine the objectives of the project study.
Both primary and secondary data are used for data analysis and stratified random and convenience sampling methods are adopted. Questionnaire method is
Qualitative research approach and interviews, observations and sensors are applied for collection of data.

For collecting primary data from employees, customers, suppliers and other stakeholders, surveys, questionnaires, check sheets, interviews, focus groups, o
Descriptive research design has been employed. both primary and secondary sources have been used for the project. Interviews are conducted with industry
Deductive research approach is adopted. Questionnaire method of data collection was employed. The secondary data are also used in the pproject.
➢ Design Blockchain based Solutions and Evaluate performance
need more details
For data collection, surveys, interviews observations and documents analysis are used for collecting required data. For collection of organisation related dat
your data collections are good
data collections are good
good in data collections
For the project, both primary and secondary data were used. Data are collected from journals, research reports, magazines, periodicals and diaries. For prim
good
good, methodology for data collection adequate
Both primary and secondary data are used for the project. Questionnaire with interval and nominal scales are employed for collection of data from custome
Probability sampling technique has been used. Pilot study was conducted. Mailed questionnaire was employed for data collection.

Interviews method of data collection has been applied


Interviews are conducted with key stakeholders. Case study approach is done. Financial analysis is also done.
Case study approach is employed. Surveys and interviews are used to collect the data.
Primary data and Secondary are used. Methods of data collection are not given properly.
Secondary data based project. Required secondary data are collected from various secondary sources.
DMAIC Approach is followed. Excel is used for data analysis.

Methodology has been used in data collection methods for this project.

The sound methodology with appropriate consideration of various data collection methods. The methodology fits the objective intended.
Basic Methodology has been used in data collection methods for this project.

Basic Methodology has been used in data collection methods for this project.-
Basic Methodology has been used in data collection methods for this project.

well defined methodology with 6 Hypothesis used.


The sound methodology with appropriate consideration of various data collection methods. The methodology fits the objective intended.
The Adequate methodology with appropriate consideration of various data collection methods. The methodology fits the objective intended.
Adequate methodology for data collection,Market Penetration and Adoption,impact on Payment Systems,Regulatory and Compliance Challenges.4 hypothe
Very Basic Methodology has been used for data collection.
Basic Methodology has been used in data collection methods for this project.
Very Basic Methodology has been used for data collection.
and resources, and clarify their presuppositions and consequences, relating their potentialities to the frontier areas of knowledge.
emphasis on security and compliance, incorporating advanced encryption, authentication, and access control mechanisms to protect sensitive data
methodology for data collection adequate, Value-Added Resellers,Original Equipment Manufacturers, Managed Service Providers
Primary Data Collection and secondary Data Collection,Methodology for Conducting Surveys with Audio Recordings
relevant to the research question
methodology for data collection not good,need more hypothesis
technology offer significant opportunity to improve and personalise the user experience, streamline operations, and encourage innovation in the leisure mar
good methodology for data collection,Assessing the Viability and Opportunities of Internet of Things (IoT) Integration forIconma Professional Services and
Comparing income and investment through derivative market . Comparing Age and purpose of investing in derivative market, Comparing risk taking strate
Methodology has been used in data collection methods for this project.
The Adequate methodology with appropriate consideration of various data collection methods. The methodology fits the objective intended.
supervised and reinforced. For this project, we will use supervised learning.
attitudes towards AI integration in IT systems
good methodology for data collection,4 hypothesis used,The data collection process involved both primary and secondary sources
clear methodology for data collection,A questionnaire is made up of a list of inquiries made to respondents. It is by far the most often used instrument to co
Methodology has been used in data collection methods for this project.
Very Basic Methodology has been used for data collection.
clear methodology for data collection,The massive amounts of data collected by AI systems raise concerns about privacy and security.
performance indicators, Visualization and Reporting, charts , graphs and pie, overview of the software/tools.

Not properly mentioned for methodology .

The integrity of the data exchange between application systems of trading partners must be guaranteed by agreements concerning data coding and formattin
good methodology for data collection,4 hypothesis used

qualitative research design will be used due to the exploratory character of the study issue and the requirement to comprehend organizational practices and

good methodology for data collection,To identify the percentage of the population that is already knowledgeable about various digital payment options
The research uses a variety of data sources to understand the complex nature of Azure adoption among SMEs.

methodology for data collection good,How Aadhaar have save the millions of monetary funds through elimination of ghosts and duplicates
methodology for data collection sufficient

the effectiveness of digital transformation initiatives in methodology for data collection adequate,enhancing customer engagement and satisfaction within th
Quantitative Data Collection entered
potential to transform TCS's supply chain management
 External Collecting Data: Internet, Journals and Literature.
methodology for data collection is adequate,the methodology employed in this project is characterized by its rigor, comprehensiveness, and adherence to eth
The Adequate methodology with appropriate consideration of various data collection methods. The methodology fits the objective intended.

Basic Methodology has been used in data collection methods for this project.

Basic Methodology has been used in data collection methods for this project.

Nothing is given about study methodology for data collecction


Descriptive research approach is adopted.

Secondary sources of data are collected from books, journals and documents.
Primary data are used for the project and collected through interviews, surveys and questionnaire methods

Primary data are used. For collection of primary data, surveys, questionnaire and interviews are applied.

Exploratory research design is adopted and Questionnaire method of data collection was used.

Questionnaire method of data collection was employed. Sampling design is employed.


Case study approach is adopted. Data collection methodology is not specifically given.
No study methodology for data collection is given

methodology for data collection is apparent.


research techniques to gather comprehensive data
good methodology for data collection,private cloud offers a high amount of protection and privacy to the users.

mixed-methods research approach, combining qualitative and quantitative techniques to comprehensively investigate the role of data analytics in e- comme

good methodology for data collection,The primary responsibility of a production manager is to look into the plant of the organisation.

good methodology for data collection,Several common authentication protocols are utilized within IAM.

patterns, and trends related to IT service automation.

good methodology for data collection, domain models, and integration patterns to adapt to changing business needs and technological advancements.

Primary data is gathered through a questionnaire survey approach, while secondary data is sourced from a variety of articles and annual reports from IT com

Required primary data for the project have been collected for fulfilling the objectives of the project by using relevant data collection tools.
Primary and secondary data resources not clearly mentioned for data collection

Both primary and secondary data resources are used for data collection
Quesionars and survey are used for data collection other resources not used

In depth knowledge of collecting data is needed. only outline represented

In depth knowledge of collecting data is needed.outline only represented.


quiz/examination.

concerning the research problems being investigated.


customer experience, and the challenges faced in implementation.
marketing of tickets by TT are some problems which more or less we all witness in our life.

gather, analyze, and evaluate data for the project.


services

Secondary data resources only used for data collection


Study methodology for Data collection not good what type of resources used to collect the data not presented well

Study methodology for data collection is good


Yupple technology data are used.

Data collection for study methodology was good


Study methodology for data collection was good
Primary and secondary data resources are used to collect the data for study work
Methodology is acceptable, but there are some concerns about reliability or validity.

Primary and secondary data collection resources are not used


Data collection for study work was good

Quantitative and qualitative methodology used for data collection good

Primary and secondary data resources are used to collect the data
Data collection was good primary and secondary data resources are used for study work

The methodology is acceptable, but there are some concerns about reliability or validity.
Poor data collection of study work primary and secondary data resources not used
Quesionars interview and other resources used to collect the data was good

No methodology

Weak methodology used for data collection


Both primary and secondary data resources are used for data collection

Poor data collection, primary and secondary data resources are not used to collect the data for study methodology

Both primary and secondary data resources are used to collect the data for study work

Quesionars only used others data resources are not used to date collection
Weak methodology used for data collection

surveys, conducting experiments, or making first-hand observations

Study methodology for data collection was good using stock market records
Quantitative and qualitative methodology used for data collection was good sampling size also good
Use various data resources to collect the data for study methodology
No methodology

Weak methodology used for data collection need to improve use data resources from various it service
Data collection was good use quesionars interview and other resources

Internet, Book and other resources are used to collect the data

Historical grid records, real time sensor, smart meter, cybersecurity used for data collection was good

Structured quesionars method for data collection


Few data resources are missed in collection of data
Weak methodology used for data collection
Weak methodology used for data collection

Primary and secondary data resources are used to collect the data questionnaires interview and other resources
Quesionars, interview and other resources are used to collect the data

Data collection was good using all the resources


Quesionars, interview, perception used for data collection secondary data resources used with some limitations

Primary and secondary data resources used quesionars for data collection
Weak methodology for data collection

Weak methodology for data collection

Questionnaires, report documentation review, report selection methodology used for data collection

Weak methodology used for data collection, need to include the data collection resources and sample size

Primary and secondary data resources used and questionnaires with 300 sample size taken for study methodology
In depth knowledge needed for data collection
Weak methodology used for data collection
Weak methodology used for data collection need to improve use various primary and secondary data resources for data collection
Interview, reports, semi structure survey methodology used for data collection but sample size not mentioned

Structured questionnaires with same size of 100 customer used for data collection other resources are not used.

Weak methodology used for data collection

Weak methodology used for data collection


Use structured survey and semi structure interviews for data collection

Weak methodology used for data collection


Weak methodology used for data collection

Primary and secondary data resources are for data collection with some limitations

The project is based on the data available from company website. secondary sources of data are used.

Secondary data are used. They are collected from industry reports, academic papers and financial statements. It is a case study approach.

Exploratory research desigh is used. it is stated that Secondary data used but no sources of secondary are mentioned in the report.

Descriptive and analytical nature of research design are adopted. Both primary and secondary data are used. Interview method is adopted for collection of p
No study methodology for data collection is given

The project is based on secondary data like sales, inventory, supply chain, customers data, operational data and financial data.
Both primary and secondary data are used. Primary data are collected via interviews, surveys and focus groups. Secondary data are collected from technical

Secondary data are used for the project study.


Primary data based project. Required primary data are collected from 91 participants via questionnaire method.
Both primary data and secondary data. Primary data are collected by conducting online surveys, interviews and observations. Research reports on climate c
No study methodology for data collection is given

Both primary and secondary data are used for the project. Primary data are collected through questionnaire method.
Primary and secondary data are used for the project. Primary data are collected from 50 employees selected conveniently. Secondary data relating to trends

Case study approach. Primary data collected from sample personnel by random sampling. Data collected by using questionnaire and interviews. Secondary
Descriptive research design is adopted. Primary data are collected through questionnaire and secondary data are also collected through secondary sources l
Weak methodology used for data collection
No methodology
Quantitative and quantitative methodology used for data collection
Structured questionnaires, books , industry reports and websites resources used to collect data of study work was good

Data can be collected using various data resources from Tesla

Questionnaires used for data collection, suggest to refer other data resources also

Data can be collected from various data resources in government high school of odisha and other resources was good
Observation and Questionnaire methods was used in the study to collect the data.
RESEARCH MEHODOLOGY IS NOT GIVEN BUT BREAK UP OF 25 RESPONDENS GIVEN
Stack exchange,sebi guide lines, industry analysis reports in hero moto crop, bajai etc used to collect the data
RESERCH METHODOLOGY GIVEN IS CORRECT FOR DATA COLLECTION
Questionnaires , journal, Books and magazines used for data collection
RESEARCH MEYHODOLOGY FOR DATA COLLECTION IS GIVEN
ADEQUATE METHODOLOGY GIVEN
Data can be collected from various sources academic database, company insight, industry report etc was good
Various data resources used for data collection was good
Weak methodology used for data collection need to improve
the research methodology given is satisfied for data collection
methodology given for the study and data collection is good
Primary and secondary data resources are used to collect data for study work
both primary and secondary data is collected using proper methodology
Weak methodology used for data collection
the methodology used for data collection is satisfactory
Data collection done through country bank of Asia staff members it's not related to the tilte SBI
the methodology used for collection of data is right
questionnaire used for data collection is right
Data can be collected using many resources in Jaipur city
Secondary data resources only used it's not enough for research work use lot of methodology for data collection
methodology is not given
methodology for data collection is given correctly
both quantitative and qualitative research methods given
Weak methodology used for data collection
Primary and secondary data resources are used for data collection

Data can be collected from primary and secondary data resources weak methodology used and sample size not mentioned
Weak methodology used for data collection
Data can be collected from vascon enginnering company resources , suggest to collect the data from other resources also for research work
Weak methodology used for data collection
Study methodology for data collection in mind scribe not yet to be study level use more resources to collect the data for study work
Quesionars only used for data collection it's not enough for study work use all the possible data collection

Data collection not mentioned

Primary and secondary resources are used to collect the data but not clearly mentioned

Primary and secondary data resources are used to collect the data
No methodology
Data can be collected coho website, real-estate website and social media only primary data resources are not used

Data collection not properly done primary and secondary data resources are not used.
primary, secondary data resources are not used to collect the data

Data collection for study methodology not good need to use many data resources
Secondary data resources are used several data resources not used study methodology
Study methodology for data collection was good. Sampling size are taken into account

Weak methodology used for data collection


Both primary and secondary data resources are used to collect the data but few inappropriate data resources used.
Study methodology for data collection was good
Weak methodology is used for data collection
Study methodology for data collection of mobile device security is good
Weak methodology used for data collection
Study methodology for data collection was good
Weak methodology used for data collection
Study methodology for data collection was good

The methodology is adequate for its purpose, but it exhibits some limitations in its approach.
The limited or inappropriate methodology used has negatively impacted the quality and reliability of the data collected for the study.

The methodology is basic, but it exhibits notable gaps or weaknesses that need to be addressed for a more rigorous and comprehensive approach.

The study suffers from a limited or inappropriate methodology, which significantly affects the quality and reliability of the data collected, potentially compr

The methodology aligns well with the intended objective, but it would benefit from addressing its limitations to enhance overall effectiveness and robustnes

The methodology employed shows a basic approach, but there are notable gaps and weaknesses that could impact the thoroughness and reliability of the fin
While the methodology aligns with the project's objectives, addressing the identified limitations could further enhance its robustness and effectiveness in an

The project's effectiveness is hindered by a deficient methodology, impacting its ability to provide reliable insights into risk management practices within th
The project's methodology is a critical component that significantly influences the quality and reliability of its findings. Addressing any limitations or appro
Strengthening the methodology by addressing identified gaps and weaknesses is crucial for enhancing the project's rigor and ensuring the validity of its insi

Basic methodology, but with notable gaps or weaknesses regarding sampling types,size and tools used for analysis
The analysis conducted was proficient, demonstrating the appropriate use of tools and techniques.

The methodology used in the study is foundational, yet it reveals notable gaps or weaknesses that may impact the comprehensiveness or robustness of the re

The methodology employed is robust, incorporating careful consideration of various data collection methods. It aligns effectively with the intended objectiv
The methodology needs more clarity in terms of research design, sampling type and the method adopted to do data collection
The limited or inappropriate methodology negatively affects the quality of the data. Enhancing the methodological approach is essential for obtaining accur
The methodology is adequate but has some limitations in approach. While generally fitting the intended objectives, these limitations may impact the depth o

The limited or inappropriate methodology can significantly impact the quality of data in research. A clearer and more appropriate research framework is nee
The study on "Operations and Supply Chain Management Practices at Maruti Suzuki" employs a basic methodology but exhibits notable gaps or weaknesse
The weak methodology significantly impacts the reliability of data in the study, highlighting the need for improvement to ensure robustness and accuracy in

The limited or inappropriate methodology used impacts the quality of data in the study, highlighting the need for a more robust approach to ensure reliable

The methodology for green initiatives recommendations for electronic gaming slot machines is adequate, but it has limitations in approach that could be add

approach

approach.
approach
methodology,
Basic methodology, but with notable gaps

of various data collection methods

of various data collection methods

methodology fits the objective intended


Basic methodology, but with notable gaps or weaknesses

fits the objective intended

approach
approach.
intended
of various data collection methods.

approach.

the reliability of data


intended
approach. The methodology fits the objective intended

methods.
intended
methods.

More involved data collected is done


intended.
intend

or weaknesses.
methods.
intended
intended
intended.
intended.
data collection is done in good
normal methods for study methodology for data collection

approach.
approach.

limitations in approach
limitations in approach

approach.
Gym activity-method used for data collection. require more details about this
qualitative and quantitative methodologies used for data collection. and also data retrieved from kaggle dataset.

several case study approaches mentioned for data collection. but not provide methodology for data collection
mixed-methods research approach, integrating qualitative and quantitative research methodologies for data collection.
qualitative and quantitative research methodologies for data collection.

Primary and secondary data are the types of data that have been gathered here. greater clarification on the methodology for gathering data is needed.

gathering data from firsthand sources traverse the streets of every city. require more details about data collection
The methodology for studying logistics and supply chain management techniques at Big Bazaar is basic, but it exhibits notable gaps or weaknesses. Strengt
The weak methodology impacts the reliability of data in the study, highlighting the need for a more robust approach to ensure accurate and trustworthy find

The methodology is basic, but it exhibits notable gaps or weaknesses that could potentially limit the study's reliability and thoroughness.

The methodology for analyzing efficiency in production and inventory at Leather Crafts India is basic, with notable gaps or weaknesses.
The methodology is adequate for the intended objective, although it has some limitations in approach. Despite these limitations, it generally aligns well with
The limited or inappropriate methodology used has a significant impact on the quality of data, affecting the reliability and accuracy of findings

The methodology used is inadequate, impacting the quality of data for addressing issues like reducing turnaround time and managing shipment cancellation

The process improvement using DMAIC in a tire manufacturing company follows a basic methodology, but it has notable gaps or weaknesses.

The methodology is generally adequate, although it does have some limitations in its approach. Nevertheless, it aligns well with the intended objectives.

A robust methodology that thoroughly considers various data collection methods, ensuring alignment with the intended objectives.

The methodology is adequate for the intended objective, albeit with some limitations in approach.
Basic methodology, but with notable gaps
adequate methodology used for data collection
adequate methodology is adopted for data collection

proper methodology used for data collection

basic methodology used for data collection

adequate methodology used for data collection

basic methodology used for data collection


adequate methodology used for data collection

adequate methodology used for data collection


adequate methodology used for data collection

adequate methodology used for data collection


methodology is adopted for analysis the data
intended
The methodology was well-attempted, but certain areas such as the research design and sampling frame could have been improved.
The methodology lacked proper structure, including essential metrics such as research design, type, sampling design, sampling frame, and tools used for da
The methodology employed is adequate, albeit with some limitations in its approach. It aligns well with the intended objective, particularly concerning the a
The study's fundamental methodology is solid, but it contains significant gaps regarding usage of tools to measure objectives

Adequate methodology with some limitations


Basic methodology used for data collection

Sound methodology with proper data collection

very weak methodology used for collection of data

Sound methodology used for data collection

sound methodology with proper consideration of various data


Adequate methodology with some limitations
Inappropriate methodology has been used
Basic methodology used for collection of data

Adequate methodology used for data collection

The methodology fits the objective intended


The methodology fits the objective for data collection
Adequate methodology with some limitation
Adequate methodology used for data collection

Adequate methodology is used for collection of data

Adequate methodology used for data collection


Basic methodology, but with notable gaps
collection methods. The methodology fits the objective intended

Rigorous and well-defined methodology with a comprehensive approach to data collection

Adequate methodology with some imitations in approach.

Basic methodology, but with notable gaps


Study methodology procedure are partially explained

Basic study methodologies are used for data collection


Comprehensive study methodologies are used for data collection
Adequate Study methodology. 5 methods are used for data collection
Basic study methodologies are used for data collection
The study methodology fits the specified objectives

Basic study methodology for data collection


Methodology used for data collection is weak

Methodology is suitable for related objectives


Adequate study methodology is used for data collection
methodology is not clearly defined
Methodology for data collection is clearly defined with suitable for objectives
Limited methodology for data collection with less quality of data
Adequate methodology with proper considerations of data collection methods
Basic study methodology for data collection with less quality of data
Study methodology for data collection is unapparent with less quality of data
Basic study methodology used for data collection
Appropriate study methodology used for data collection
Basic study methodology is used for data collection with some inaccuracies
Adequate methodology fits the objectives specified but with some limitations
Basic study methodology with many inaccuracies used for data collection
Adequate Study methodology for data collection
Basic methodology with some limitations
Sound methodology that fits the specified objectives are used
In the study, a descriptive and qualitative research is used to analyse the research objectives. The collection and analysis of the non -numerical data based o
computing adoption and its implications for e-learning, utilizing a mixed-methods approach enables a holistic exploration, allowing for the examination of b
In the study a mixed-methods approach was adopted, combining qualitative and quantitative research methods for the collection of data
This project adopts a qualitative research approach, relying heavily on a comprehensive literature review.
The study incorporates with a robust research methodology to gather relevant data, analyze key factors, and derive significant insights

Descriptive and Qualitative methodology was used for this research study

The project focuses on financial structure analysis, the research is exploratory in nature.
The potential survey was used in the study for the data collection categorizing the customers
Competency Model was used in the study for the data collection
The study will use a mixed-methods approach, integrating quantitative data analysis with qualitative analysis of case studies and literature

The research methodology adopted a mixed-methods approach, combining quantitative surveys with qualitative interviews and focus group discussions to t

Review research is the methodology utilized in providing normalized overviews to amass information in an exact way used for illustrative, exploratory eval

The project will employ a mixed-method approach, including qualitative and quantitative data collection.
Interview, Questionnaire were used in the collection of primary data for the study
Algorithmic trading makes use of complex quantitative and mathematical formulas, combined with probabilistic models and human oversight, to make deci
The study employs a mixed-methods approach, combining quantitative and qualitative data collection and analysis techniques to provide a comprehensive
Qualitative research is a type of research that aims to gather and analyse non-numerical (descriptive) data in order to gain an understanding of individuals' s
Qualitative Data in which a purposive sampling approach and Quantitative Data in which a convenience sampling approach will be used by distributing an
Methodology is sound and generally appropriate with acceptable reliability and validity

Methodology is weak, affecting the reliability of data.


inappropriate methodology, impacting the quality of data
Methodology is weak, affecting the reliability of data.
Questionnaire ,Mode of Distribution were the methodology used for for primary data collection and secondary data from other sources such as articles, mag
The research approach encompasses both qualitative and quantitative methods to ensure a thorough analysis of the data
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Adequate methodology with some limitations in approach.
The methodology of Preferred Reporting Items for Systematic Reviews and MetaAnalyses (PRISMAs) will be employed in the data collection
Literature Review, Survey Design and Distribution, Interviews and Focus Groups, Case Studies, Data Analysis were considered methodologies for the data
supervisors involving IT were considered.
Basic methodology, but with notable gaps
Methodology is weak, affecting the reliability of data.
Methodology is weak, affecting the reliability of data
The project on Credit Card Default Prediction using Python. The dataset contains information on default payments, demographic factors, credit data, histo
respondents on WhatsApp and Instagram and other social media networks
The surveys, interviews, focus groups, and document analysis were used in the collection of data for the study
The study used with interviews and surveys for the data collection.
The type of research used in the study is Descriptive Research. The data is purely secondary in nature and the knowledge has been obtained only through da
Adequate methodology with some limitations in approach
The research methodology involves a qualitative approach aimed at exploring the practical implications of implementing ITIL-based IT service managemen
Sampling Method is used to understand the performance appraisal system, the random sampling method was utilized
The study uses a combination of research types to gain a comprehensive understanding of complex issues in the work.
A combination of quantitative and qualitative methods was employed to gather comprehensive insights and perspectives. Survey questionnaires were utilize
The study used with Pure Basic Research which is also known as “Blue Sky Research along with Strategic Basic Research.

Methodology is somewhat adequate, but improvements are possible in terms of reliability and validity.
qualitative and quantitative research methodologies

This study employs a descriptive research design utilizing a survey method to collect quantitative data from a sample of respondents

the methodology fit with the framed objectives

Methodology and scope of the study is comprehensive relevant with the objectives

only basic methodology for used and scanned copy is there in the report

basic methodology has been used to collection of data for example. primary data

Adequate methodology has been used for data collection


adequate methodology has been used

proper methodology has been used for data collection

Adequate methodology has been used


Sound methodology has been used for your project
Proper methodology has been used

Adequate methodology for the data collection

Basic methodology has been used


sound methodology has to be considered

methodology is weak and affecting the data


Limited methodology has been used
Basic methodology has been used for collection of data

Basic methodology has been used for data collection


Adequate methodology has been used for data collection
Basic methodology used for data collection

Adequate methodology has been used

No methodology
The project's weak methodology undermines the reliability of its data, necessitating improvements to ensure more robust and dependable research outcomes

The project's weak methodology undermines the reliability of its data, suggesting a need for stronger methodological frameworks to ensure more accurate a
The project employs a basic methodology but has notable gaps or weaknesses that could be addressed. Strengthening the methodology with clearer research
The methodology's weaknesses compromise the reliability of the data collected, undermining the project's credibility and robustness in drawing accurate co

The methodology used is limited or inappropriate, significantly impacting the quality and reliability of the data.
The methodology employed in the study requires significant improvement to ensure the reliability and validity of the data collected and analyzed.
Since the methodology fits the intended objectives adequately, it provides a structured approach to address the research goals effectively.
The methodology employed in assessing operational transformations towards smart manufacturing is adequate, but it could benefit from addressing some li

The methodology used in the project appears limited or inappropriate, which could potentially undermine the reliability and quality of the data collected and

The methodology employed in the study lacks robustness, potentially compromising the reliability and credibility of the data collected and analyzed. Streng

The current methodology is severely lacking or fundamentally flawed, necessitating a comprehensive redesign to ensure the study's validity and reliability.

The study on the buying behavior of coffee consumers utilizes a basic methodology, yet it contains notable gaps and weaknesses that could hinder the depth

The study employs a basic methodology, yet it exhibits notable gaps and weaknesses that could limit the depth and reliability of its findings on Google's rem

The study employs a basic methodology with notable gaps or weaknesses, which may limit the robustness and comprehensiveness of its findings on whethe
While the methodology is sound, ensure proper consideration of various data collection methods to comprehensively capture and analyze challenges faced i

trengthen the methodology by addressing notable gaps and weaknesses to ensure a more robust and reliable research analysis on the lack of distribution cha

Strengthen the methodology to enhance the reliability of data in studying the impact of Supply Chain Logistics Innovation (SLI) on operational performanc
The methodology employed is adequate for the intended objectives, but it exhibits some limitations in approach that could be addressed to enhance robustne

The methodology used for implementing Lean Six Sigma for yield improvement in product manufacturing is basic, but it contains notable gaps that should
There is not study methodology for data collection

Data collection method is used in terms of technology such as voltage monitoring, current measurement etc., This is like technology intervention.

Data collection methods are mentioned in the study like survey and questionnaire
Data collected from the procedure of the ETP manual, procedure, reports and official web sites. There is not mentioned about any methodology for data col

Data collection methods are based on software, hardware and technology.


Questionnaire method has been adopted to collect the data from the respondents

Minimum sources of methodology for data collection. There is no evidence for methodology
Strengthening the methodology by addressing these gaps and weaknesses is crucial for enhancing the project's overall rigor and ensuring the validity of its c

The study of after-sales services at Empire Motors Private Limited employs a basic methodology, but it exhibits notable gaps or weaknesses that could imp

The methodology employed is weak, which undermines the reliability and validity of the data collected for the study.

The methodology for studying e-supply chain management and its impact on different sectors is either nonexistent or deeply flawed, compromising the stud
The project's methodology is weak, which undermines the reliability and credibility of the data collected for analysis.
The project employs a basic methodology, but notable gaps or weaknesses may compromise the robustness and reliability of its findings.

The project employs an adequate methodology tailored to its objectives, although there are some limitations in its approach that could be addressed for mor
The project employs an adequate methodology that aligns with its objectives, though certain limitations in approach could be addressed to enhance its robus
The project's methodology is weak, which undermines the reliability and validity of the data collected for analysis, suggesting a need for improvement to en

The project employs an adequate methodology tailored to customer satisfaction through a TQM approach, though there are some limitations in its approach
The project employs a sound methodology that includes proper consideration of various data collection methods, effectively aligning with its intended objec

The project's weak methodology undermines the reliability of its data, necessitating improvements to ensure more robust and dependable research outcomes
The Adequate methodology with appropriate consideration of various data collection methods. The methodology fits the objective intended.

Basic Methodology has been used in data collection methods for this project.

Basic Methodology has been used in data collection methods for this project.

The Adequate methodology with appropriate consideration of various data collection methods. The methodology fits the objective intended.

various methodologies have been used for data collection like getting google form responses as physical fitness parameters
various methodologies have been used for data collection like interviews, getting google form responses, literature reviews and case studies
The Adequate methodology with appropriate consideration of various data collection methods. The methodology fits the objective intended
various methodologies have been used for data collection like interviews

the data collection involved various tools and from various sources

the methodology used for data collection is questionnaire suggest to use more tools
various methodologies are used but need to use new techniques
various methodologies have been used for data collection like interviews, getting google form responses

various methodologies have been used for data collection like getting data from employees

Basic Methodology has been used in data collection methods for this project
The methodology overview is comprehensive, combining both primary and secondary data sources to ensure a well-rounded analysis
The methodology section is well-structured, describing the various steps involved in the character recognition process
The sound methodology with appropriate consideration of various data collection methods. The methodology fits the objective intended
various methodologies have been used for data collection like structured questionnaire
Basic Methodology has been used in data collection methods for this project
The study outlines specific data collection techniques and justifies the selection of methods.
The sound methodology with appropriate consideration of various data collection methods. The methodology fits the objective intended
The Adequate methodology with appropriate consideration of various data collection methods. The methodology fits the objective intended
various methodologies like questionnaire are used but need to use new techniques
various methodologies are used but need to use new techniques
The sound methodology with appropriate consideration of various data collection methods. The methodology fits the objective intended
The sound methodology with appropriate consideration of various data collection methods. The methodology fits the objective intended
Very Basic Methodology has been used for data collection
Methodology has been used in data collection methods for this project
The sound methodology with appropriate consideration of various data collection methods. The methodology fits the objective intended

various methodologies have been used for data collection


the data collection process should be redefined
various methodologies are used but need to use new techniques
various methodologies have been used for data collection
The Adequate methodology with appropriate consideration of various data collection methods. The methodology fits the objective intended
various methodologies have been used for data collection effectively
The study adopts a comprehensive approach to identify and analyze various IT risks, develop a framework for mitigating these risks, and create a robust bu

need to be improved in methodologies in data collection


Not properly mentioned for methodology of the project.-

various methodologies have been used for data collection and they have been discussed

various methodologies have been used for data collection like questionnaire, sampling etc..
Very Basic Methodology has been used for data collection

various methodologies have been used for data collection like surveys
various methodologies have been used for data collection like semi structured interviews, online surveys and content analysis
need to use specific tools to gather data
Basic Methodology has been used in data collection methods for this project.
the data collection have to be done with methodologies
various methodologies are used but need to use new techniques
Mixed-Methods Approach and Exploratory and Descriptive methods were used

various methods have been implemented like surveys , interviews and case studies for data collection

The sound methodology with appropriate consideration of various data collection methods. The methodology fits the objective intended.

The sound methodology with appropriate consideration of various data collection methods. The methodology fits the objective intended-
Basic Methodology has been used in data collection methods for this project.

Basic Methodology has been used in data collection methods for this case study.

The Adequate methodology with appropriate consideration of various data collection methods. The methodology fits the objective intended.

Basic Methodology has been used in data collection methods for this project.
The Adequate methodology with appropriate consideration of various data collection methods. The methodology fits the objective intended.
The Adequate methodology with appropriate consideration of various data collection methods. The methodology fits the objective intended.
Basic Methodology has been used in data collection methods for this project.

Basic Methodology has been used in data collection methods for this project.

Basic Methodology has been used in data collection methods for this project.
The Adequate methodology with appropriate consideration of various data collection methods. The methodology fits the objective intended
The sound methodology with appropriate consideration of various data collection methods. The methodology fits the objective intended
Basic Methodology has been used in data collection methods for this project

various methodologies have been used for data collection like interviews, getting google form responses
Basic Methodology has been used in data collection methods for this project
the data has been collected with various sources

The Adequate methodology with appropriate consideration of various data collection methods. The methodology fits the objective intended
the data has been collected but need to be specific about data collection tools
various methodologies have been used for data collection like interviews from IT employees
various methodologies have been used for data collection like interviews, getting google form responses
Very Basic Methodology has been used for data collection
various methodologies are used but need to use new techniques

The sound methodology with appropriate consideration of various data collection methods. The methodology fits the objective intended
used standard data collection methods

the data collection method used was questionnaire need more methods
Very Basic Methodology has been used for data collection

various methodologies have been used for data collection like surveys, interviews
Basic Methodology has been used in data collection methods for this project

various methodologies have been used for data collection like surveys

Limited methodology, impacting the quality of data.


books, websites, applications,and documents were used for collecting data, can also be used recent techniques for collecting data
data collected by qualitative and descriptive methodology. need more explanation about this
Information gathered by IoT and agricultural cultivation techniques, as well as structured data created for consumer use, are stored in this database
Simple methodology but with notable weakness.
Basic methodology with some notable weakness
To capture the full spectrum of IT's influence , utilized multi-layered data collection approach
collected data from existing system and also included only questionnaires methods. More clarification is needed concerning the approach for data collection
Weak in methodology, it may affect the data reliability
Strong methodology with proper consideration given for collection of both primary and secondary data.
gather data from a sample respondents, aiming to investigate the intricate dynamics of smart grid technology and power management.
preferences by using Data Collection Module methodology. few explanations are given
Strong methodology and secondary data has been taken for study.

quantitative and qualitative approaches.

qualitative and quantitative research methodologies for data collection. can mention observation, mobile survey..etc
not enough study methodology for data collection
data collected by qualitative and descriptive methodology. need more explanation about this
data collected from questionnaire method. require more information about data collection
sampling techniques enabled a wide-reaching data collection process, facilitating the inclusion of individuals from diverse segments of the Indian IT industr

There is not study methodology for data collection

Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.

Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
Quantitative and Qualitative Strategies were used for data collection. this project can be mention some other strategies like mobile survey and observation b
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.

Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
The methodology fits the objective intended.
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
descriptive methodology specified for collecting the data. to apply an empirical approach can be carried out using qualitative or quantitative observation me
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
The methodology fits the objective intended.
The methodology fits the objective intended.

The methodology fits the objective intended.


The methodology fits the objective intended.
The methodology fits the objective intended.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
The methodology fits the objective intended.
The process involves optimizing data accessibility, security, and reliability to ensure that data-driven results are actionable and accurate.
The ERP implementation process includes installing your software, transferring all your data, both financial and transactional data, mapping your processes
In cybersecurity, a risk assessment methodology is a process or framework for identifying, evaluating, and remedying potential threats, risks, and vulnerabi
Used the basic study methodology that uses a quantitative approach for the data collection
Suitable methodology is used for data collection with some lack in the quality of data
The study methodlogy is adequate but with some minimal accuracy od data
Data collection for this study employs structured questionnaires and a descriptive survey method is used
Data Collection is done by Surveys and Questionnaires,Industry Reports and Market Research
A varied and broad collection of digital pathology photos that represent a wide range of pathological disorders will serve as the main data source for this inv
The manner of growing a cooperative and collaborative relationship between the consumer and vendor is known as consumer relationship administration qu
sampling, and analytical techniques
The focus is on store level operational decision-making assuming strategic decisions would be centralized and taken by the head office of an organized reta
blockchain protocols and international standards used.
annual reports of the company
The study mainly uses secondary data sources, industry publications, case studies, and publicly accessible information
Basic methodology, but with notable gaps or weaknesses.
Basic methodology, but with notable gaps or weaknesses.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
The methodology fits the objective intended.
The methodology fits the objective intended.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
The methodology fits the objective intended.
The data is collected using descriptive research methodology but recent methodology techniques can be adopted to explain this detail
The methodology fits the objective intended.
Basic methodology, but with notable gaps or weaknesses.
The methodology fits the objective intended.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
Basic methodology, but with notable gaps or weaknesses.
The methodology fits the objective intended.
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
The techniques used for data collection need to be explained in detail
The methodology fits the objective intended.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
The methodology fits the objective intended.
Limited or inappropriate methodology, impacting the quality of data.
The methodology fits the objective intended.

The methodology for data collection is limited and used various sampling techniques
Only standard method is used for data collection
various methodologies are used but need to use new techniques
various methodologies have been used for data collection and used various gap analysis
various methodologies have been used for data collection like interviews,questionnaire
various methodologies have been used for data collection like interviews, testability tools
Data collection methodology was good
Basic methodology for data collection interview,quesionars (qualitative and quantitative)
Existing literature reports and online resources only used for data collection it's not enough
Basic techniques used for data collection primary and secondary data collection methods
Not mentioned data collection methods it's primary or secondary data resources
Basic methodology used to collect the data

his methodology encompasses various research approaches, techniques, and tools to ensure the accuracy, reliability, and validity of the findings
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
only questionnaires approach were given for data collection such as surveys and interviews.it require more information about this. can use various recent m
Data is gathered by survey methodology, direct observation, interviews, and review. further details regarding the sampling process are needed
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
mixed-methods research approach, integrating qualitative and quantitative research methodologies for data collection. can mention data collection control
data collected and analysed by comprehensive approach, incorporated both primary and secondary sources of information. Good methodology, although the
The methodology fits the objective intended.
Inappropriate study methodology for data collection impacting the quality of data.
Sufficient methodology has been given in the project but with some limitations in the approach.
Methodology is basic, yet it has some obvious shortcomings. here collected data as primary and secondary source
in-depth interviews, survey, observation and questionnaires method used to gathered data. require further information on data gathering
No proper methodology relating to the problem has been presented
only questionnaire method was utilized to gather the data collection. can be use other recent methodology for collecting data
data collected from surveys and questionnaires methodology, require more information about collected primary and secondary data.
Methodology is almost non existence which results in flaws.
multifaceted approach was adopted to collect data,ensuring the exploration of various dimensions of the research
Adequate methodology has been written with proper justification for selection of sample.
Methodology is weak and it may affect the reliability of data.
Limited methodology which impact the quality of data
Adequate methodology with some limitations. Sample procedures were not utilized. Instead, a Census poll of 2113 individuals was conducted as a substitut
Methodology is weak and ambiguity
Sound methodology with proper consideration of various data collection methods.
Strong methodology with proper consideration of both primary and secondary data collected for the study.
Sufficient methodology but with some notable limitations
data collected from survey online using a web platform and also secondary data from magazines, newspapers, journals. can be use recent techniques for col
Sound methodology with consideration of various data
Methodology is almost non existent or entirely flawed.
have data collected by 360-degree critique or multi-rater feedback technique. this technique have May lack positivity and Anonymity issues. researcher can
The methodology fits the objective intended.
some methodology are mentioned for data collection. but need more explanations about these methodologies and also need other methods can be used to co
Basic methodology, but with notable gaps or weaknesses.
Methodology is almost non existent or entirely flawed.
The methodology fits the objective intended.
The methodology fits the objective intended.
The methodology fits the objective intended.
Basic methodology, but with notable gaps or weaknesses.
The methodology fits the objective intended.
The methodology fits the objective intended.
researcher mentioned multifaceted research methodology used for data collection. require more information about quantitative and qualitative methods
The methodology fits the objective intended.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
The methodology fits the objective intended.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended
researcher, data collected from the Open Government Data (OGD) Platform India dataset.but require further information regarding the methods employed i
by using sampling Technique for data collected, it have been mentioned primary and secondary data. require other methodology can be use for data collecti
The methodology fits the objective intended.
The methodology fits the objective intended.
- researcher mentioned, UML represents classes and objects, linkage between shapes and other forms demonstrate data flows and relationships. questionna

Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
give some content methodology refers to the techniques used to structure a study and gather and analyze information
the methodology for data collection of project is good response of project
this study the gathering of diverse datasets from reputable sources, to ensure the availability of comprehensive and high-quality data for subsequent analysis

The most comprehensively used study procedures incorporate; quantitative research, subjective research and furthermore a mixed methodology approach

Data collected from academic papers, industry reports, case studies, and relevant books on the role of IT in achieving business agility can provide valuable
The research instrument in this study is a „Structured Questionnaire‟ structure questionnaire is those questionnaires in which there are definite concrete and
In this study the gathering of diverse datasets from reputable sources, to ensure the availability of comprehensive and high-quality data for subsequent analy

Add more Study methodology for data collection of this research.

Data collected from valuable insights into various aspects of the topic
The data was source from Internet and few research papers that were accessible is clear concept
In this study of blockchain and the gathering of diverse datasets from reputable sources, to ensure the availability of comprehensive and high-quality data fo

study the gathering of diverse datasets from reputable sources, to ensure the availability of need more content of project
Data collected from valuable insights into various aspects of the topic
Inappropriate methodology, affecting the quality of the data.
The methodology is basic, but there are notable weaknesses.
Basic methodology, but with notable gaps, but with notable gaps.
A suitable methodology with some limitations in its approach. The methodology aligns with the intended objective.
There is limited clarity in objectives and scope, resulting in significant gaps in coverage.
There are some limitations in the methodology. The approach accomplishes the intended goal.
The methodology is basic, but there are notable gaps.
A sufficient methodology with some limitations in approach.
A clearly defined methodology with a comprehensive approach to data collection.
The data of this study are gathered from different businesses, periodical, publications, publications, old newspapers, theses, dissertation, education researc
Methodology is basic, yet it has some obvious flaws.
Data collected from valuable insights into various aspects of the topic.
The basic methodology is lacking significant deficiencies.
A sound methodology that takes into account the various data collection methods with due consideration.
There are notable weaknesses to the basic methodology.
The methodology is inadequate, thereby affecting the reliability of the data.
A sound methodology that takes into account the various data collection methods with due consideration.
A comprehensive approach to data collection is provided by a well-defined methodology.
A rigorous, well-defined methodology with a comprehensive approach to data collection.
Data collected from academic papers, industry reports, case studies, and relevant books on the role of IT in achieving business agility can provide valuable
Proper consideration of various data collection methods is required for sound methodology.
Data collected from valuable insights into various aspects of the topic.
A sufficient methodology with some limitations in approach. The methodology aligns with the intended objective.
A suitable methodology with some limitations in its approach. The methodology aligns with the intended objective.
The methodology is inadequate, thereby affecting the reliability of the data.
Data collected from valuable insights into various aspects of the topic.
A solid approach that takes into account various methods for gathering data.
A meticulous and defined procedure with a thorough approach to data collection.
A rigorous and well-defined methodology, coupled with a comprehensive approach to data collection.

Methodology is weak, which affects the reliability of data.


Data collected from academic papers, industry reports, case studies, and relevant books on the role of IT in achieving business agility can provide valuable
need more explanation of study methodology for data collection of this project.
Methodology needs improvement, required more information.
A sufficient methodology with some limitations in approach.
Data collected from valuable insights into various aspects of the topic
Need more Study methodology for data collection .
A sufficient methodology with some limitations in approach.
The most comprehensively used study procedures incorporate; quantitative research, subjective research and furthermore a mixed methodology approach.
A sound methodology with proper consideration for various data collection methods. The methodology meets the intended objective.
The methodology is weak, affecting the reliability of the data.
No study methodology for data collection presented.
Identified basic methodology but with notable gaps in this study.
Weak methodology compromises data reliability.

Good methodology, but approach has certain limitations.

Good methodology, but approach has certain limitations.


Limited or inappropriate methodology, impacting the quality of data.

Good approach that takes into account the several ways that data might be collected.

Limited or inappropriate methodology, impacting the quality of data.

Simple approach, but with some obvious flaws


Methodology is weak, affecting the reliability of data.

The methodology is weak, which affects the reliability of the data.


Basic methodology, but with notable gaps or weaknesses.
Basic methodology, but with notable gaps or weaknesses.

Appropriate methodology with certain limitations of the approach.

Limited or inappropriate methodology, impacting the quality of data.

Appropriate methodology with some approach limitations.

Data reliability is affected by weak methodology.

The objective was met by the methodology.


Basic methodology, but with notable gaps or weaknesses.

Methodology is weak, affecting the reliability of data.


The basic approach has some flaws or shortcomings.
Appropriate approach with some drawbacks.
Analysis is nearly absent
Satisfactory technique for certain impediments in approach.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.

There is almost no methodology.


Basic method, but it has significant flaws or holes.

Methodology is weak, affecting the reliability of data.


Basic methodology, but with notable gaps or weaknesses.
Methodology is weak, affecting the reliability of data.

Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Basic method, but it has significant flaws or holes.

The basic approach has some flaws or shortcomings.


There is almost no methodology.
There are notable gaps or weaknesses in the basic methodology.

Basic methodology, but with notable gaps or weaknesses.


A solid approach that takes into account various methods for gathering data.

Basic methodology, but with notable gaps or weaknesses.


Limited or inappropriate methodology, impacting the quality of data.
Basic methodology, but with a lot of weaknesses.

Good methodology with some limitations in approach.

No methodology presented

Even though sufficient methodology was adopted it has some limitations


Adequate methodology with limitations in approach.
Methodology is weak, affecting the reliability of data.
A sound methodology with proper consideration for various data collection methods.
Good methodology with some limitations.

A sound methodology should be followed with proper consideration of various data collection methods.

Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Good methodology that takes into account the different ways that data can be collected.
Basic methodology, but with notable gaps or weaknesses.

The methodology is virtually nonexistent.

Adequate methodology with some limitations in approach


A comprehensive approach to data collection is combined with a rigorous and well-defined methodology.

Basic methodology, but with significant gaps or weaknesses.


Adequate methodology with some limitations in approach
No methodology is provided.

Adequate methodology with some limitations in approach

Insufficient study methodology for data collection compromises the accuracy of the data.

Adequate study methodology for data collection with some limitations in approach.
Methodological is basic, yet it has some obvious flaws.

Basic study methodology for data collection but with notable gaps.
Good methodology, however approach has certain limitations. The approach is appropriate for achieving the goal.
Inappropriate study methodology for data collection.

Identified basic methodology but with notable gaps in this study.


Basic Study methodology for data collection but with notable gaps.

Study methodology for data collection is almost non existent.

Weak methodology compromises data reliability.

A sufficient methodology with some limitations in approach.


Methodology framed with proper consideration of requirements to the objectives intended.
Basic methodology has been framed that to it has some noticeable gaps.
The data would properly and systematically presented utilizing tables, diagrams, outlines, etc. It would then be deciphered to make determination about the
Methodology framed fits the objective intended. There is no need for such detailed explanation in methodology session.
A comprehensive approach to data collection is combined with a rigorous and well-defined methodology.
Data collected from valuable insights into various aspects of the topic.
A suitable methodology with some limitations in its approach. The methodology aligns with the intended objective.
Data collected from academic papers, industry reports, case studies, and relevant books on the role of IT in achieving business agility can provide valuable
The utilization of methodology is almost non-existent.
In this study the gathering of diverse datasets from reputable sources, to ensure the availability of comprehensive and high-quality data for subsequent analy
Quality of data is affected by inappropriate methodology.
Data collected from academic papers, industry reports, case studies, and relevant books on the role of IT in achieving business agility can provide valuable
The fundamental methodology is lacking significant deficiencies.
A mixed-methods approach is employed, combining a literature review with primary data collection through a Google survey targeting 150 respondents acr
Add more details about Study methodology for data collection .
The methodology explained is inappropriate to what it has been used.
There is no data collection details are added in this study.
Though there are some limitations the methodology selected fits the objective.
Methodology selected fits the objective framed, even though it has some limitations.
strategies.
No methodology is mentioned in the research work.
Methodology framed and collected was proper with the consideration of the study requirements.
Only some basic information stated in the methodology. It also lacks some required information like tools required , sample size and sampling techniques u
Adequate methodology has been framed with some basic limitations.

Data collection for this study was conducted using a combination of surveys, interviews, and secondary data analysis.

The primary data was collected through surveys and interviews conducted within various government departments, domestic territories, academic institutio
Add more data collection methods of this study.

Need more Study methodology for data collection of this study.


The most comprehensively used study procedures incorporate; quantitative research, subjective research and furthermore a mixed methodology approach.
provide some data collection data used for quantitative analysis, while thematic coding and the Constant Comparative Method were utilized for qualitative a

Basic methodology, but with notable gaps or weaknesses


Good methodology with some limitations.
Methodology is weak, affecting the reliability of data.
A well-defined method with a comprehensive approach to data collection.
inappropriate methodology, impacting the quality of data.
No methodology presented
A suitable methodology with some limitations in its approach.
Adequate methodology with limitations in approach.
The methodology is inadequate, which affects the reliability of the data.
Good methodology with some limitations.

In this project, both qualitative and quantitative components to the study and Interviews were carried out to evaluate and examine the validity of theoretica
A sufficient methodology with some limitations in approach.
Adequate methodology with some limitations in approach
In this project the study methodology for data collection are based on market research, website developement, digital marketing, CRM, logistics and payme
This study employs a mixed-methods approach, combining qualitative and quantitative research methods.
The data collection of this project is collected bt various aspects.
Data collected from academic papers, industry reports, case studies, and relevant books on the role of IT in achieving business agility can provide valuable
The methodology is basic, but it has notable weaknesses.
A suitable methodology with some limitations in its approach.
Basic methodology, but with notable gaps or weaknesses
Data collected from various aspects of the topic.
Sound methodology with proper consideration of various data collection methods
A good method that considers different data collection methods.
Basic methodology, but with notable gaps
In this project the methodology involves an extensive review of existing literature, reports, and data sources related to digital currency, blockchain technol
Adequate methodology with some limitations in approach.
The data of this study are gathered from different research published by RBI and national businesses, periodical, publications, publications, mags, old new
Basic methodology, but with notable gaps
Data collected fromvaluable insights into various aspects of the topic.
Data collected from valuable insights into various aspects of the topic.
Data collected from academic papers, industry reports, case studies, and relevant books on the role of IT in achieving business agility can provide valuable
Rigid and well-defined methodology with a comprehensive approach to data collection.
Basic methodology, but with notable gaps
A sufficient methodology with some limitations in approach. The methodology achieves the intended objective.
inappropriate methodology
Sound methodology with proper consideration of various data collection methods
Basic methodology, but with notable gaps
Methodology is weak, affecting the reliability of data.
This research is dependent largely on workers and customer happiness of county lender of India by using the introduction of data technologies equipment’s
Weak methodology compromises data reliability.
The methodology is basic, but there are notable gaps or weaknesses.
Adequate methodology with some limitations in approach
Basic methodology, but with notable gaps
A suitable methodology with some limitations in its approach. The methodology meets the intended objective.
There are some limitations in the methodology. The objective was met by the methodology.
A meticulous and defined procedure with a thorough approach to data collection.
A sound methodology that takes into account the various data collection methods with due consideration.
In this study the gathering of diverse datasets from reputable sources, such as Yahoo Finance, Alpha Vantage, and Quandl, to ensure the availability of com
Revise the methodology to align with the complexities of the challenges faced by life insurers in appointing and retaining individual agents, ensuring robust
The study aims to examine the challenges and barriers encountered by Maersk in its pursuit of sustainability goals.

Study methodology procedure are partially explained


Data collected from few methodology. but observation, secondary data analysis and case studies are needed
Data collection methods are partially described
Study methodology procedure are partially explained
The methodology is adequate for achieving the intended objectives, although addressing its limitations would improve the depth and reliability of the analy
While the methodology is adequate for the intended objectives, addressing its limitations could enhance the depth and reliability of the comparative study o
Revise the methodology to align with the complexities of studying the workflow of the Indian banking sector, ensuring robust data quality and reliability fo

Data collected from few methodology. but observation, secondary data analysis and case studies are needed
While the methodology is adequate for the intended objectives, addressing its limitations could enhance the depth and reliability of the performance analysi

Total quality management is a management approach centered on quality, based on the participation of an organization’s people and aiming at long term su
Enhance the methodology to bolster data reliability in analyzing consumer buying behavior towards HDFC Bank's financial products, ensuring robust resea
The study began by defining Six Sigma as a data-driven, customer-focused methodology that seeks to minimize defects, reduce variations, and optimiz

faceted dimensions of lean implementation and its impact.

Data collected from few methodology. but observation, secondary data analysis and case studies are needed

Data collected from few methodology. but observation, secondary data analysis and case studies are needed

data collected from IT persons and employees need to ask all type of peoples like villager
Collecting data from various places in questionnaires and books and websites are good

data collection from books and internet need to collect direct manor
data collected from students through questionnaires not mention the secondary data

Methodology is weak, affecting the reliability of data.

adequate methodology used for data collection

Basic methodology, but with notable gaps or weaknesses.

adequate methodology used for data collection

Limited or inappropriate methodology, impacting the quality of data.


Basic methodology, but with notable gaps or weaknesses.
Limited or inappropriate methodology, impacting the quality of data.

Basic methodology, but with notable gaps or weaknesses.

Basic methodology, but with notable gaps or weaknesses.


Adequate methodology with some limitations in approach. The methodology fits the objective intended.

Basic methodology, but with notable gaps or weaknesses.


Basic methodology, but with notable gaps or weaknesses.

Methodology is weak, affecting the reliability of data.

Methodology is weak, affecting the reliability of data.

Basic methodology, but with notable gaps or weaknesses.

Methodology is weak, affecting the reliability of data.

collection of data through structured questionnaires, the amassed dataset undergoes rigorous statistical analysis to unveil underlying patterns, trends, and rel
this project data collection done in qualitative research approach because of the new and uncertain aspects associated with A
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
Basic methodology, but with notable gaps or weaknesses.
The current study utilizes a quantitative methodology. survey conduct on google form needs to use more tools to collect the data with various environment
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
Methodology is weak, affecting the reliability of data.
Quantitative and qualitative methods followed in the data collection but needs to present the key variable data in the result analysis
Methodology is weak, affecting the reliability of data.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
Needs to mention various tools to collect the data about metaverse, only case study taken for this project
Quantitative, qualitative and case study analysis mention needs to mention the key variable and metrics for collecting data and [resent the data with various
Basic methodology, but with notable gaps or weaknesses.
The methodology fits the objective intended.
Methodology is weak, affecting the reliability of data.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
Web data collection methods are discussed needs to specify some bench mark dataset for obtain the result of the objective
The methodology fits the objective intended.

investigates the methods followed for the determination of the sample, collection of data and the apparatuses and procedures that have been applied for data
Methodology is weak, affecting the reliability of data.
A Purposive random sampling method is used to ensure representation across different age groups, income levels, and educational background,
Basic methodology, but with notable gaps or weaknesses.
Basic methodology, but with notable gaps or weaknesses

Methodology is weak, affecting the reliability of data.


convenience sampling method was employed to select respondents for the survey
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Basic methodology, but with notable gaps or weaknesses.
The methodology is structured to provide a comprehensive analysis through the collection of both quantitative and qualitative data, employing various rese

Basic methodology, but with notable gaps or weaknesses.

Primary facts is obtained through the review method (questionnaire interview and observation) against the participants
Methodology is almost non existent or entirely flawed.
Data collection method and tools needs to clearly mention, key factors of study methodology needs to be scrutinize
Methodology is weak, affecting the reliability of data.
Methodology is weak, affecting the reliability of data.
Data collection methodology given but Needs to present tools to collect the data in various places
Methodology is weak, affecting the reliability of data.
Basic methodology, but with notable gaps or weaknesses.
study only focus on particular company, in study report you may be use various company and give some more suggestions

Adequate methodology with some limitations in approach. The methodology fits the objective intended.
OTACE Process of data collection methods are discussed needs to specify various study methods to collect the data
sources of data collection mentioned needs to specify data format of the data used for data analysis
Methodology is weak, affecting the reliability of data.
Methodology is weak, affecting the reliability of data.
Android technology usages and functionality are discussed needs to write data collection methodology and give tools. this project like a review of android t
Primary and secondary data sources given needs to present various key matrices
Needs to collect the data and present how to asses the studied data

Basic methodology, but with notable gaps or weaknesses

Basic methodology, but with notable gaps or weaknesses.

Basic methodology, but with notable gaps or weaknesses


Methodology is weak, affecting the reliability of data.

Adequate methodology with some limitations in approach. The methodology fits the objective intended.

Basic methodology, but with notable gaps or weaknesses.

Adequate methodology with some limitations in approach.

Methodology is weak, affecting the reliability of data.

Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Qualitative research study methodology followed needs to focus on some new data collection and analysis methodology of the project
eight project management methodologies and at final, Compare Waterfall and Agile methodologies used in Software development

combining qualitative and quantitative techniques but needs to mention how to collect data and methods with tools
Needs to mention the data collection methods for why migrating automobile data to the cloud storage

The methodology fits the objective intended.


Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.

This project's methodology will be research-based, with a focus on data collection, analysis, and interpretation to meet project objectives
and best practices
Data collection conducted using a combination of surveys, interviews, and document analysis
The mixed method approach was followed to collect the data for this study which is a combination of qualitative and quantitative data. Needs to increase th
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Quantitative research methods are utilized to quantify the impact of digital transformation on customer experience and assess the statistical significance of k
The methodology fits the objective intended.
The methodology fits the objective intended.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
Needs to perform and mention various metrics and measurements taken for the study
happened to be analysed. needs to mention qualitative or quantitative data collection for the study
Basic methodology, but with notable gaps or weaknesses
Limited or inappropriate methodology, impacting the quality of data.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
A total of 100 participants were involved in the user studies, and the system performance tests were conducted with 50 different gestures across various env
Basic methodology, but with notable gaps or weaknesses.

Limited or inappropriate methodology, impacting the quality of data.


The methodology is weak, which adversely affects the reliability of the data. Strengthening this section is crucial to enhance the credibility and validity of y

Methodology is weak, affecting the reliability of data.


The methodology's weakness may compromise the data reliability in exploring microfinance Self-Help Groups (SHGs) and bank connections
The methodology demonstrates weaknesses that could impact the reliability of data, highlighting the need for enhancements to ensure more robust research

Enhancing the methodology is crucial to ensure the reliability and thoroughness of data analysis in the assessment of microfinance lending.
Limited or inappropriate methodology, impacting the quality of data.
The analysis of the merger between HDFC Limited and HDFC Bank appears to be based on a basic methodology, but there are noticeable gaps and weakne

only questionnaire methodology have been used for data collection. need more details about data collection like primary and secondary data
The limited or inappropriate methodology used undermines the quality and reliability of the data in the financial performance analysis, highlighting the nee
The project demonstrates a sound methodology with proper consideration of various data collection methods, ensuring comprehensive and reliable analysis
Study methodology procedure are partially explained. Data collected from few methodology. but observation, secondary data analysis and case studies are n

A weak methodology undermines the reliability of data, necessitating a robust approach for accurate and dependable financial analysis.
Revise the methodology to ensure it is appropriate for the analysis of inflation and interest rates' impact on personal finances, aiming for robustness and acc
researcher gathered data from google forms. in google form, design customization is very limited. you can use an alternate method for collecting data.
Data collection methods are partially described
Revise the methodology to ensure it is appropriate and robust, improving data quality and the reliability of your study on the evolution of the Indian bankin
To collected data is analyzed and interpreted in detail, utilizing tables and figures to support the findings.
Data collected from few methodology. but observation, secondary data analysis and case studies are needed

The systematic review will help identify the critical success factors and challenges in TQM implementation, which can be used to develop a generalized fra
Refine the methodology to address limitations and enhance its alignment with the intended objectives for a more robust analysis of mergers and acquisition
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
Enhance the methodology to address notable gaps or weaknesses, ensuring robustness in comparing consumer perceptions of e-banking services between pu

The methodology is adequate and aligns with the objectives, though addressing its limitations could enhance the depth and reliability of the analysis.
Enhance methodology to bolster data reliability in analyzing Small Finance Banks in India, ensuring robust research outcomes.

Basic methodology, but with notable gaps or weaknesses.


Methodology is weak, affecting the reliability of data.

Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Basic methodology, but with notable gaps or weaknesses.
Basic methodology, but with notable gaps or weaknesses.

adequate methodology used for data collection

Methodology is weak, affecting the reliability of data.


Basic methodology, but with notable gaps or weaknesses

Methodology is weak, affecting the reliability of data.


Basic methodology, but with notable gaps or weaknesses.
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Methodology is weak, affecting the reliability of data.
Methodology is weak, affecting the reliability of data.

Basic methodology, but with notable gaps or weaknesses.


adequate methodology used for data collection

adequate methodology need to use

methodology used for data collection


Methodology is weak, affecting the reliability of data.
Basic methodology, but with notable gaps or weaknesses.
FINE
YET TO IMPROVE
OK
NOT COMPLETELY OBTAINED
MIGHT BE PRESENTED MORE
NOT COMPLETELY PRESENTED
OK
WELL PRESENTED
NEAT AND GOOD
GOOD

Basic methodology, but with notable gaps


FINE STUDY
FINE
The methodology is comprehensive and rigorous, and it complies with the intended objective.
thorough and well-defined methodology that takes a broad approach to gathering data. The methodology fits the intended objective.
A basic method, but with significant shortcomings or gaps.

Basic methodology, but with notable gaps


Basic methodology, but with notable gaps
Basic methodology, but with notable gaps
Basic methodology, but with notable gaps
Basic methodology, but with notable gaps
Basic methodology, but with notable gaps
Basic methodology, but with notable gaps or weaknesses
Rigorous and well-defined methodology with a comprehensive approach to data collection. The methodology fits the intended objective.
thorough approach to data collection combined with a methodical and well-defined approach. The approach fulfills the intended goal.
This procedure aligns perfectly with the goal set.
Basic methodology, but with notable gaps
many techniques for gathering data. The approach achieves the desired result.
Methodology is weak, affecting the reliability of data
Basic methodology, but with notable gaps or weaknesses.
Sufficient methodology with certain limits in methodology. The approach is suitable for achieving the desired goal.
Simple methodology, but with several obvious flaws or gaps.
Basic methodology, but with notable gaps
The methodology aligns with the targeted objectives.
Basic methodology, but with notable gaps or weaknesses.
methodology is well defined and fits the objective
Study methodology procedure are partially explained
notable gaps.
notable gaps
notable gaps.
Data collection methods are partially described
notable gaps
Data collected from few methodology. but observation, secondary data analysis and case studies are used for this project
notable gaps
Study methodology procedure are partially explained
data.
notable gaps
Data collection procedure are partially explained
notable gaps
Study methodology procedure are partially explained
data.
in outsourcing.
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
Basic methodology, but with notable gaps
Data collection procedure are partially explained
Data collection procedure are partially explained
Study methodology procedure are partially explained
in gaining valuable insights into the opportunities and challenges posed by emerging technology.
Methodology is weak, affecting the reliability of data.
Basic methodology, but with notable gaps
Methodology involves both primary and secondary data collection, employing qualitative and quantitative analysis techniques to derive insights.
Basic methodology, but with notable gaps
Basic methodology, but with notable gaps
Methodology is weak, affecting the reliability of data.
Basic methodology, but with notable gaps
Methodology is weak, affecting the reliability of data.
Basic methodology, but with notable gaps or weaknesses.
Basic methodology, but with notable gaps
Based on the theoretical framework drawn from the componential theory of creativity, the study led the literature review to distinguish the influencer
Data collection procedure are partially explained
Recent technology uses and methodology to be address clearly.
Study methodology procedure are partially explained
data.
approach.
approach.
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
Study methodology procedure are partially explained
Data collection methods are partially described

notable gaps.
approach.
or weaknesses.
data.
Recent technology uses and methodology to be address clearly.
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
intended.
Evaluating the feedback from employees and management and their experience before and after the implementation of system.
approach.
data.
The finance sector, known for its substantial transaction volume, regulatory obligations, and need for precision, is especially well-positioned to gain advant
Understand prevalent technologies, methodologies, and levels of integration employed in the existing landscape.
intended.
notable gaps.
intended.
intended.
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
data.
Study methodology procedure are partially explained
intended.
intended.
Monitor pilot outcomes and gather data to refine the implementation strategy.
existent.
intended.
Maintaining high levels of engagement in virtual teams is challenging due to the potential for isolation and lack of social interaction.
Evaluating IT's contribution to real-time supply chain visibility is another important goat.
impact on investor decision-making.
A web-based questionnaire survey as a quantitative research method was used. Data were collected from employees in Slovakia and Kuwait.
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
data.
The discoveries of this think about will be supportive for organizations transitioning to a farther work environment and IT venture supervisors loo
notable gaps.
notable gaps.
intended.
Study methodology procedure are partially explained
notable gaps.
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
notable gaps.
notable gaps.
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
notable gaps.
intended.
Data collection methods are partially described
Study methodology procedure are partially explained
Study the impact of IT-driven initiatives such as telemedicine, contact tracing apps, and online education platforms.
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
The study will evaluate the impact of IT on Healthcare quality and Patient care by investigating how accurate IT systems are, measuring their effectiveness
intended.
notable gaps.
Conducting surveys and interviews with HCPs to understand their requirements and preferences for a digital engagement platform.
notable gaps.
Data collection methods are partially described
Recent technology uses and methodology to be address clearly.
intended.
The study is limited to exploring existing implementations and their impacts, as well as future trends and potential developments in blockchain technology
The study is restricted to both Hyderabad and Ranga Reddy Dist and that to among 100 respondents only.
notable gaps
notable gaps
approach.
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
notable gaps
notable gaps
notable gaps
notable gaps
notable gaps
Need to improve research work focus on clear idea about scope of the objectives and data collection methods
data
Basic methodology ,but with notable gaps
notable gaps
Study methodology procedure are partially explained
intended
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
Study methodology procedure are partially explained
Data collected from few methodology. but observation, secondary data analysis and case studies are needed to this project
notable gaps
This study has shed light on the significance of customer support portals and the necessity of having strong portals like these in order to main
To identify the key benefits and challenges associated with the integration of IT and ITSM in financial market operations.
approach.
Data collection methods are partially described
notable gaps
Analysis of the collected data unearthed a plethora of intriguing findings, shedding light on the intricate interplay of factors that underpin consumer preferen
quality of data
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
Study methodology procedure are explained
notable gaps.
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
notable gaps
notable gaps
notable gaps.
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
Data collection methods are partially described
data.
Recent technology uses and methodology to be address clearly.
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
approach.
objective intended.
notable gaps.
approach.
Study methodology procedure are partially explained
highlighting the limitations of traditional methods and the need for more advanced solutions.
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
Phishing, malware, and man-in-the-middle attacks are particularly prevalent, exploiting vulnerabilities in mobile operating systems and applications. A
The study's findings and recommended IT solutions could have a substantial impact on fostering competition among organizations in the Indian
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
intended.
Basic Methodology, but with notable gaps
experiences.
optimum utilization of future technologies is multifaceted.
with various collaboration tools.
approach. Then methodology fits the objective intended.
Methodology is weak, affecting the reliability of data.
Basic methodology, but with notable gaps or weaknesses
Methodology is weak, affecting the reliability of data
Data collection methods are partially described
Study methodology procedure are partially explained
Gather relevant datasets from multiple sources, including internal databases, third-party providers, and public repositories, ensuring data integrity and consi
Managing privileged access across diverse IT environments comprising cloud, on-premises, and hybrid infrastructures can be complex and resource-intensi
Methodology is weak, affecting the reliability of data.
Methodology is weak, affecting the reliability of data.
Basic methodology, but with notable gaps or weaknesses.
Basic methodology, but with notable gaps
Basic methodology, but with notable gaps
Data collected from few methodology. but observation, secondary data analysis and case studies are given in this project
likelihood of extreme weather occurrences.
FEW MORE MAY BE ADDED
Basic methodology ,but with notable gaps
Basic methodology, but with notable gaps

NEED MORE
Basic methodology, but with notable gaps or weaknesses.
Methodology is weak, affecting the reliability of data.
OK
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Basic methodology, but with notable gaps or weaknesses.
Limited or inappropriate methodology, impacting the quality of data
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
METHODOLOGY PRESENTED WERE OK TO THE DATA THAT THEY COLLECTED
Methodology is weak, affecting the reliability of data
Basic methodology, but with notable gaps
MAY BE IMPROVED
Methodology is weak, affecting the reliability of data
Basic methodology, but with notable gaps or weaknesses.
not complete
Basic methodology, but with notable gaps
Basic methodology, but with notable gaps or weaknesses.
FINE
Methodology is weak, affecting the reliability of data.
FINE
Basic methodology, but with notable gaps
Basic methodology, but with notable gaps or weaknesses.
good
No methodology presented
Basic methodology, but with notable gaps or weaknesses.
Basic methodology, but with notable gaps or weaknesses.
Basic methodology, but with notable gaps or weaknesses.
Basic methodology, but with notable gaps or weaknesses.
prior to making key choices
notable gaps
existent
Resource constraints pose another challenge for IT service desks. Many organizations struggle to allocate sufficient staff and resources to their service desk
notable gaps
Data collected from few methodology. but observation, secondary data analysis and case studies are used in this project
intended.
owners, managers, and customer
This study aims to identify factors that influence customers to buy from Amazon.com, concentrating on four key aspects: convenience, time efficiency,
organizational activity
Study methodology procedure are partially explained
Study methodology procedure are partially explained
notable gaps
Data collection methods are partially described
notable gaps.
needed
Study methodology procedure are partially explained
intended
Study methodology procedure are partially explained
To display the collection of some relative images to the genuine us
approach.
intended.
Project execution summary is need to give more information of implementation of project
Data collection methods are partially described
notable gaps
notable gaps
Study methodology procedure are partially explained
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
existent
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
presented.
data.
methodology presented
notable gaps.
notable gaps
notable gaps

Adequate methodology with some limitations in approach

Basic methodology, but with notable gaps or weaknesses

Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
Basic methodology, but with notable gaps or weaknesses

Basic methodology, but with notable gaps or weaknesses

Adequate methodology with some limitations in approach


Sound methodology with proper consideration of various data collection methods
Basic methodology, but with notable gaps or weaknesses

Adequate methodology with some limitations in approach. The methodology fits the objective intended
Sound methodology with proper consideration of various data collection methods.

Sound methodology with proper consideration of various data collection methods.


To conduct a comprehensive competition analysis of the construction chemicals industry in India, you need a well-defined study methodology for data colle
Basic methodology, but with notable gaps or weaknesses
Basic methodology, but with notable gaps or weaknesses
The methodology section outlines the research approach clearly, detailing data collection methods such as surveys, interviews, or case studies. It ensures a m
Methodology is weak, affecting the reliability of data.
Adequate methodology with some limitations in approach
Adequate methodology with some limitations in approach
Adequate methodology with some limitations in approach
Adequate methodology with some limitations in approach
The methodology section outlines a mixed-methods approach, combining quantitative surveys and qualitative interviews to gather data on consumer behavi
The methodology section outlines a well-structured approach, combining qualitative and quantitative research methods. Surveys, interviews, and case studie
he study can gather a comprehensive range of qualitative and quantitative data, providing a rich understanding of the challenges and best practices in implem
The data has been collected from the traditional literature review methods
Adequate methodology with some limitations in approach
The contextual investigation is the methodology used for gathering data from the sources using interviews
Adequate methodology with some limitations in approach
Methodology is weak, affecting the reliability of data.
Tableau Software was used as a tool for data collection and allows to connect to data using multiple pre-built connectors
The research is followed to be exploratory, qualitative, and descriptive. The method is actually based on a foundation that is theoretical.
Insufficient methodology compromises the accuracy of the data.

Inappropriate study methodology for data collection, impacting the quality of data.
Adequate methodology for data collection with some limitations in approach.

Insufficient study methodology for data collection compromises the accuracy of the data.

No study methodology for data collection presented by the student.


Study methodology for data collection is almost non existent
Inappropriate methodology adopted that impacts the quality of data.
Other subject file
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Other subject file
Insufficient methodology for data collection compromises the accuracy of the data.
Other subject file
Simple study methodology for data collection but with some obvious gaps.
Study methodology for data collection is almost not presented in this study.
Identified basic methodology but with notable gaps in this study.

Adequate methodology for data collection with some limitations in approach.

Student uploaded assignment questions with answers.

Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
Methodology is weak, affecting the reliability of data.
Adequate methodology with some limitations in approach.

Adequate methodology with some limitations in approach.


Sound methodology with proper consideration of various data collection methods.

specialized computing systems designed for specific tasks or functions.

Sеrvicе Оriеntеd Аrchitеcturеs аnd in pаrticulаr in (businеss оriеntеd) Virtuаl Оrgаnizаtiоns.


methodology of project is The scope of this study encompasses various dimensions to provide a comprehensive analysis of the need for a teacher review we
research design is recommended.
explore the relationships between work-life balance initiatives and employee retention.
comprehensive understanding and meaningful insights.

technology and the banking sector, particularly focusing on State Bank of India.
extracting value from large and complex datasets

banking industry

different age groups as well. And with the help of that I have come to one conclusion

The project will use existing AI tools and platforms rather than developing new AI technologies from scratch.
methods for data collection and a strategy for statistical analysis are all identified in a study's design.
Adequate methodology with some limitations in approach.
shifting economic practices and technological capabilities.
Basic methodology, but with notable gaps or weaknesses.
anticipated to be the most significant changing factors in the future of payments in India.
Study methodology for data collection is almost non existent
The evaluation focused on the financial business in India, relying on both primary and additional information to achieve the defined objectives.
Adequate methodology with some limitations in approach
Adequate Study methodology for data collection with some limitations in approach
: Utilizing advanced CRM tools like HubSpot, the system enhances customer segmentation by categorizing leads based on various criteria such as demogra
Adequate Study methodology for data collection with some limitations in approach
Other subject file
objectives scope and coverage of this project key objective for developing a BIA is to identify and confirm the financial impact a business interruption even
Other subject file
implications of utilizing AI in corporate decision-making processes.
methodology of this project is human being in this universe should lead happy and comfortable life and realize the so-called concept of heaven on earth.
Other subject file

Study methodology for data collection is weak affecting the reliability of data.
No Study methodology for data collection presented.
Basic Study methodology for data collection but with notable gaps.

Adequate methodology with some limitations in approach.


Adequate methodology with some limitations in approach. The methodology fits the objective intended.

Insufficient methodology compromises the accuracy of the data.

Basic methodology both primary and secondary data were used but with notable gaps.

Study methodology for data collection is weak affecting the reliability of data.
Simple methodology for data collection with notable gaps
Student gave incorrect methodology which lowers the data quality.

No study technique is provided for gathering data


There is no Study methodology for data collection discussed.

Student has limited Study methodology for data collection.

Limited Study methodology for data collection impacting the quality of data.
Identified basic Study methodology for data collection but with notable gaps in this study.

Other subject file


The methodology section describes the research design, data collection methods, and data analysis methodologies used in this study to explore the effect of
control, security, and protection compared to open cloud situations

designed to combine significance on the research factor with economic climate in procedure”.
has been the subject of extensive research.
the field information comparable to support and investmanagemet in the example UCBs

and decision theory

methodology for data collection of this project exactly is computing that is cloud.
correspond with requests from clients.
descriptive.

decisions to determine an individual's style score.


interacted with chatbots for customer support purposes.

beings.
into two stages namely Exploratory and Descriptive.

methodology for data collection the purpose of connecting and exchanging data with other devices and systems over the internet.
methodology for data collection of the project It was collected through google forms in a questionnaire format where 6 questions where asked as per the res

Study methodology for data collection of the project Examine the much technological advancement made in Mumbai's Fintech industry and evaluate how th
Research methodology is a way of explaining how a researcher intends to carry out their research. It's a logical, systematic plan to resolve a research proble

Sound methodology with proper consideration of various data collection methods.


Sound methodology with proper consideration of various data collection methods.
Sound methodology with proper consideration of various data collection methods.

Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
Adequate methodology with some limitations in approach.

Sound methodology with proper consideration of various data collection methods.

Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.

Adequate methodology with some limitations in approach. The methodology fits the objective intended.

Adequate methodology with some limitations in approach. The methodology fits the objective intended.

Adequate methodology with some limitations in approach

Adequate methodology with some limitations in approach

Basic methodology, but with notable gaps or weaknesses


Adequate methodology with some limitations in approach.

Sound methodology with proper consideration of various data collection methods.

Adequate methodology with some limitations in approach

Adequate methodology with some limitations in approach.

Adequate methodology with some limitations in approach. The methodology fits the objective intended

The methodology fits the objective intended.


Basic methodology, but with notable gaps
Adequate methodology with some limitations in approach.
Adequate methodology with some limitations in approach
Basic methodology, but with notable gaps

Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Adequate methodology with some limitations in approach
Adequate methodology with some limitations in approach

Basic Study methodology for data collection but with notable gaps or weaknesses.
Other subject file.
The amendments specifies that to qualify for recognition as part of applying the acquisition method,
The research design used in this study was descriptive surve and presenting of digital information technologies
Other subject file
Challenges related to implementing information security are not only technical; they also involve changes in processes and the behaviour

Other subject file


Which consists of various sections like working storage Section, procedure division, and linkage Section
collected from surveys, interviews, focus groups, and usage analytics to provide a clear overview of the characteristics and behaviors of Payusnap users.
Insufficient study methodology for data collection compromises the accuracy of the data.
Insufficient Study methodology for data collection compromises the accuracy of the data.
Copy case(Course book)
Limited study methodology for data collection impacting the quality of data.
Many studies confirmed that higher job satisfaction can only lead to higher performance. Hence, managers, human resource departments, or employers mus
Other subject file

There are various modes of digital payments, including UPI, NEFT, AEPS, mobile wallets, and PoS terminals.
This project employs a mixed methods research design, integrating both qualitative and quantitative approaches to provide a comprehensive analysis of info
The research involved a structured and systematic approach to gather, analyze, and interpret data related to the implementation and impact of blockchain tec
Inappropriate methodology, impacting the quality of data.
This section details the approaches, methods, and techniques employed to effectively achieve the research objectives. Adopting a mixed-methods approach,
Other subject file
Limited study methodology for data collection impacting the quality of data.
Service-based operation is a company offering an intangible and non-including sales and satisfactions type of product.
Inappropriate Study methodology for data collection, impacting the quality of data.
Limited study methodology for data collection impacting the quality of data.
Study methodology for data collection provides AI CRM software helps you connect with customers in a whole new way.
Other subject file
The methodology behind HRM recognises the value employees bring to an organisation, also known as human capital. Investing in employees and strategic
Insufficient methodology for data collection compromises the accuracy of the data.
Insufficient methodology compromises the accuracy of the data.
per the need of the study.
This study used primary data collected from randomly picked 100 digital payments users by using well-structured and pre tested questionnaire method.
Insufficient study methodology for data collection compromises the accuracy of the data.

No methodology presented.

No methodology presented.
Methodology is almost non existent

Methodology is weak, affecting the reliability of data.

The data collection methodology is generally good


Basic methodology, but with notable gaps

The data collection methodology are good but could detail about data management
Basic methodology, but with notable gaps
Methodology is weak, affecting the reliability of data.
Methodology is weak, affecting the reliability of data.
Limited or inappropriate methodology, impacting the quality of data.

No methodology presented.
The survey distribution process could be improved by using additional channels to reach a wider audience

The data collection process could need more attention to issues of bias, ethics.

Basic methodology, but with notable gaps or weaknesses.


Methodology is weak, affecting the reliability of data.

The data collection are well presented by the use of convenience sampling
Basic methodology, but with notable gaps
Basic methodology, but with notable gaps

Basic methodology, but with notable gaps


Basic methodology, but with notable gaps or weaknesses.

Basic methodology, but with notable gaps or weaknesses.

The methodology of the data collection are limited need clarity

Basic methodology, but with notable gaps or weaknesses


The study methodology for data collection are adequate but require to improve objective measures
Basic methodology, but with notable gaps or weaknesses.

Limited or inappropriate methodology, impacting the quality of data.

The most comprehensively used study procedures incorporate; quantitative research, subjective research and furthermore a mixed methodology approach
the study methodology for data collection erp system are need more exp;anation of project
The most comprehensively used study procedures incorporate; quantitative research, subjective research and furthermore a mixed methodology approach
Data collected from valuable insights into various aspects of the topic.
In this study the gathering of diverse datasets from reputable sources, to ensure the availability of comprehensive and high-quality data for subsequent analy
has conducted to establish a foundation for the project.
a qualitative study was conducted through interviewing 10 experts in the field. The study used thematic content analysis as the method of analysis to interp
The study presented here is qualitative in nature, and its findings are based on an analysis of previously published studies in academic journals, magazines,
No clear data collection methods were specified
Questionaries' were collected from 120 workers

In this project, the most comprehensively used study procedures incorporate; quantitative research, subjective research and furthermore a mixed methodolog

Data collected from academic papers, industry reports, case studies, and relevant books on the role of IT in achieving business agility can provide valuable
Methodology is inappropriate, not well-aligned, or lacks reliability and validity.
In this project, the primary data is collected through questionnaire check system and the secondary data is collected from colourful papers and the periodic r
Basic methodology for collection data

Limited inappropriate of methodology used for data collection


Sound methodology used for collection of data

Sound methodology used for collection of data

Adequate methodology used for collection of data

Methodology is almost is basic


Adequate methodology with some limitations in approach.The methodology fits the objective intended
Basic methodology used

USE ADDITIONAL METHODOLOGY IN YOUR STUDIES


using methodology is good and also used more tools
more methodology used
good and ued more appropriate tools and techniques to be used for your study
Sound methodology with proper consideration of data
used adequate tools for this study
Limited methodology are used for data collection
Basic methodology for data collection
Sound methodology with proper consideration of data

need appropriate tools to be used for this study

potential flood events with high accuracy.


Questionnaires are asked for 100 customers

appropriate analysis used in this study


Primary data is collected by questionnaire and surveys. Secondary data is sourced from academic journals, industry reports, market research databases, and

use appropriate methodology in your study

Conduct structured questionnaires among Blinkit employees and Conduct semi-structured interviews with Blinkit's IT and operations management teams
The data collected through surveys, interviews, and case studies
Data collected through questionnaires
use appropriate methodology in this study
Questionnaire, publications, the world-wide-web, the business site are mentioned as data collecting methods
Data collection methods include questionnaires and surveys, interviews, and secondary data sources.
impacting the quality of data
appropriate tools used in this project
using appropriate tools for analysis

using appropriate tools for data collection


use suitable and appropriate methods are used in project
Primary data is collected through structured questionnaires, interviews, observations and Secondary data is collected through Website, Information brochur
Survey and questionnaires are used for data collection
Basic methodology, but with notable gaps or weaknesses.

use suitable tools for data collection

using methodology for data collection is more suitable


use sufficient methodology for data collection
sustainability disclosures, and interviews with representatives.
Case studies are taken for data
Primary data can be extracted from questionnaires, surveys, interviews, and opinions, whereas secondary data can be collected through data sheets, books, j
Basic methodology, but with notable gaps
Basic methodology, but with notable gaps
Case studies and questionnaires are used for data collection

Adequate methodology with some limitations in approach. The methodology fits the objective intended.

Basic methodology, but with notable gaps

Basic methodology, but with notable gaps


Basic methodology, but with notable gaps
adequate tools used for this study
give the brief explanation of Study methodology for data collection

Add more details about study methodology for data collection.


Data collection for this study was conducted using a combination of surveys, interviews, and secondary data analysis.

machine learning model is collected from valuable insights into various aspects of the topic
Study methodology for data collection,provide some more key concept of project

Data collection for this study was conducted using a combination of surveys, interviews, and secondary data analysis.

Study methodology for data collection is in clear form of business

need more information of Data collected from valuable insights into various aspects
A mixed-methods approach is employed, combining a literature review with primary data collection
study procedures incorporate; quantitative research, subjective research and furthermore a mixed methodology approach

The most comprehensively used study procedures incorporate; quantitative research, subjective research and furthermore a mixed methodology approach

Basic methodology, but with notable gaps


Limited or inappropriate methodology, impacting the quality of data.

Basic methodology, but with notable gaps


used appropriated methodology for data collection
adequate methodology was used
using adequate methodology used for data collection
Basic methodology, but with notable gaps
Adequate methodology with some limitations in approach.

Basic methodology, but with notable gaps


Basic methodology, but with notable gaps
Basic methodology, but with notable gaps
Objectives and scope are apparent, with mostly complete coverage
Basic methodology, but with notable gaps
Basic methodology, but with notable gaps
Basic methodology, but with notable gaps
use proper methodology for data collection
Basic methodology, but with notable gaps
more methodology is used for data collection
various methododlogy used for data collection
Basic methodology, but with notable gaps

various methodology used for data collection


Basic methodology, but with notable gaps
well-defined methodology with a comprehensive approach to data collection
use adequate methodology for data collection
Basic methodology, but with notable gaps

Basic methodology, but with notable gaps


adequate methodology is used in data collection
Adequate methodology with some limitations in approach
Basic methodology, but with notable gaps
Basic methodology, but with notable gaps
Methodology is weak, affecting the reliability of data.

No methodology presented.
Basic methodology, but with notable gaps
Methodology is weak, affecting the reliability of data.
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
use various tools used to data collection
adequate methodology used iin project
The data analysis plan is appropriate for the research question.

The data collection methodology is good but need explanation on the data analysis
The sample size is appropriate for the research question and sampling method are well defined
The data collection are clear but require more information
The research project data collection methods are appropriate for the study
No methodology presented.
Basic methodology, but with notable gaps

Adequate methodology with some limitations in approach.


Basic methodology, but with notable gaps

Basic methodology, but with notable gaps


suitable tools are used for data collection
using adequate methodology was used to analyse the data collection
Methodology is weak, affecting the reliability of data.

Basic methodology, but with notable gaps or weaknesses.


Basic methodology, but with notable gaps or weaknesses.
Basic methodology, but with notable gaps or weaknesses
Sound methodology with proper consideration of various data collection method
Basic methodology, but with notable gaps or weaknesses.

Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Basic methodology, but with notable gaps or weaknesses.
Basic methodology, but with notable gaps or weaknesses.

Basic methodology, but with notable gaps or weaknesses.


Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Methodology is weak, affecting the reliability of data.

Methodology is weak, affecting the reliability of data.


Basic methodology, but with notable gaps or weaknesses.
Adequate methodology with some limitations in approach. The methodology fits the objective intended.

Basic methodology, but with notable gaps or weaknesses.

Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.

Adequate methodology with some limitations in approach. The methodology fits the objective intended.

Basic methodology, but with notable gaps or weaknesses.

Adequate clarity in objectives and scope, but coverage is somewhat limited. There are three project objectives
Methodology is weak, affecting the reliability of data.

Methodology is weak, affecting the reliability of data.


Methodology is weak, affecting the reliability of data.
Basic methodology, but with notable gaps or weaknesses.
Methodology is weak, affecting the reliability of data.
Basic methodology, but with notable gaps or weaknesses
Basic methodology, but with notable gaps or weaknesses.

Basic methodology, but with notable gaps or weaknesses.


Basic methodology, but with notable gaps or weaknesses.

Basic methodology, but with notable gaps or weaknesses.


Identify meaningful donor segments that can guide personalized engagement strategies, improve donor retention, and optimize fundraising efforts.
The goals of each of these objectives are expected to be achieved. In light of the fact that cloud computing provides scalability, flexibility, and cost-effectiv
It covers the exploratory methods employed, the selection criteria for participants and case studies, the data collection techniques, and the data analysis me
This chapter outlines the research approach hired to investigate venture control methodologies, especially Agile and Waterfall, and a framework for choosin
Basic methodology, but with notable gaps or weaknesses.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.

Basic methodology, but with notable gaps or weaknesses.


Basic methodology, but with notable gaps or weaknesses.
operational variables interact with each other in deciding the use and acceptance level for these new technologies in organizations
Data will be gathered through literature reviews, case studies, expert interviews, and surveys of consumers and marketing professionals.
Research methodology refers to the systematic, structured approach that researchers use to conduct scientific research, gather data, analyze information, and

The methodology for this project involves conducting an in-depth study on digital vulnerability assessments for businesses, with the intention of understand
Adequate methodology with some limitations in approach. The methodology fits the objective intended.

Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Methodology is weak, affecting the reliability of data.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
In order to address the research problems, the theoretical structure is completed with an analytical model based on the selected core subjects.

Basic methodology, but with notable gaps or weaknesses.


Those approaches promote iterative, step wise development, which helps organizations adjust on the fly to evolving technical requirements and business ne

addresses security, compliance, and regulatory requirements.


This project, we aim to develop a comprehensive solution empowering real estate companies to leverage their data effectively, driving operational efficienc
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.

methodologies, applications, and strengths.


Adequate methodology with some limitations in approach. The methodology fits the objective intended.
The methodical, theoretical examination of the approaches used in a field of study is known as methodology. It consists of the theoretical examination of th
rundown could convey up to six expressions and each expression must be more than single word and could ultimately depend on five words in length

simplicity, it has given them the chance of developing at a fast speed


Adequate methodology with some limitations in approach. The methodology fits the objective intended.
The developing IT associations face ability shortage, but they have extreme human resources. In solicitation to keep up with worldwide contest and conceiv

Adequate methodology with some limitations in approach. The methodology fits the objective intended.

The purpose of this study is to provide strategic recommendations based on the findings of the research in order to assist businesses and marketers in India i
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Basic methodology, but with notable gaps or weaknesses.
The research methodology outlines the systematic approach used to conduct research on cyber technology.
Adequate methodology with some limitations in approach. The methodology fits the objective intended.

structure and can be used in different research methods.

Develop and implement a comprehensive strategy for integrating green computing principles into existing IT operations.
The researcher must have a clear understanding of what needs to be done and how to take required initiatives to achieve the research goals and objectives.
NICE STUDY PRESENTED
imderstood
SOME POINTS
sudir thet
Basic methodology, but with notable gaps or weaknesses
FINE
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
WELL PRESENTED
no completely given
Limited or inappropriate methodology, impacting the quality of data.
somewhat presented
Basic methodology, but with notable gaps
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
well presemted
Rigorous and well-defined methodology with a comprehensive approach to data collection. The methodology fits the objective intended
Basic methodology, but with notable gaps or weaknesses.
Adequate
not clearly presented
Basic methodology, but with notable gaps or weaknesses
methods and it correlates the objective intended.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
Adequate methodology with some limitations in approach. The methodology fits the objective intended
Analyzing published academic studies and business journals on GAI applications in marketing to identify industry trends and best practices.
Quantitative analysis of the questionnaire responses is conducted using statistical techniques to identify patterns, trends, and correlations within the data
No methodology presented.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Supply chain operators integrate processes and data through specialist intermediaries the data collection methods, sources of primary and secondary data, sa
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
Methodology is weak, affecting the reliability of data.
This research is assessing the cost-effectiveness of database migration for SaaS MES applications and identify potential cost-saving opportunities
widely acknowledged, its relationship with employee engagement within the IT sector remains an under explored area.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
Analyzing data systematically or theorizing about the principles and procedures of a certain field of study—that is research methodology
duplicate specifics of earlier studies or the project as a whole to examine the validity of instruments, processes, or experiments.
Rigorous and well-defined methodology with a comprehensive approach to data collection. The methodology fits the objective intended
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
educators to maximize the benefits of artificial intelligence adoption and intervention.
classification is one of the problems considered by personality psychology, a branch of psychology. The focus of this field is the study of personality and in
The methodology of this project involves a multi-pronged approach to analyze the growth prospects of mutual funds in India.
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
The methodology fits the objective intended.
A Decision Tree model will be developed to learn from a training set of historical fraudulent and legitimate transactions
Data means recorded information, the data is of two sorts qualitative data and quantitative data.Primary data collection is the data, which is very new
approach.
Determination and analysis of the several deficiencies that women encounter when establishing and operating a mechanical wander
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended
o analyze the impact of information technology on the share market by examining historical data, trading patterns, and technological advancements.
Data analytics for personalized recommendations and insights
different phases of SDLC and their effectiveness in efficiency, accuracy, and quality enhancement in software development processes.
Adequate methodology with some limitations in approach.
Adequate methodology with some limitations in approach
deployment in real-world scenarios, providing a clear understanding of their capabilities and limitations
adopted to achieve the project's objectives, ensuring the credibility and reliability of the findings.
Adequate methodology with some limitations in approach
Adequate methodology with some limitations in approach
systematic framework and technique known as research methodology, which aids in the collection, analysis, and interpretation of data
This research methodology outlines the systematic approach for developing, implementing, and evaluating AI-driven tools and techniques for efficient softw
Adequate methodology with some limitations in approach
Sound methodology with proper consideration of various data collection methods
data and findings of several publications that were selected for review in order to highlight pertinent information about Only a few statements are employed
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
revolutionary potential for improving customer experiences in the embedded banking industry.

The project also involved adopting the Scrum methodology for project management. Scrum, an agile framework, was chosen to enhance team collaboration
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
he purpose of this project is to explore the development, deployment, and evaluation of AI-based chatbots for IT service management.
Adequate methodology with some limitations in approach
Sound methodology with proper consideration of various data collection methods.
Adequate methodology with some limitations in approach
Adequate methodology with some limitations in approach.
Basic methodology, but with notable gaps or weaknesses
To focus on training and development as an implementation of strategic planning in the organization.
Basic methodology, but with notable gaps or weaknesses.
Methodology is weak, affecting the reliability of data.
Basic methodology, but with notable gaps
Basic methodology, but with notable gaps or weaknesses
Basic methodology, but with notable gaps
FINE
Limited or inappropriate methodology, impacting the quality of data
Limited orinappropriate methodology, impacting the quality of data.
Basic methodology, but with notable gaps
Methodology has been presented but not completely reveal the study
well defined methodology have been presented to analyse data
Basic methodology, but with notable gaps or weaknesses
Methodology is weak, affecting the reliability of data
well defined methodolgy have been given for analysing data
WELL DEFINED METHODOLOGY BUT MAPPING METHODOLOGY IS LEFT UNEXPLAINED
Basic methodology, but with notable gaps
GOOD METHODOLOGY HAVE BEEN PRESENED TO ANALYZE THE DATA
WELL DEFINED METHODOLOGY THAT USED FOR ANALYSIS
Rigorous and well -defined methodology with a comprehensive approach to data collection. The methodology fits the objective intended.
Basic methodology, but with notable gaps or weaknesses.
Basic methodology, but with notable gaps or weaknesses.
Basic methodology, but with notable gaps or weaknesses.
All the methodology presented are inadequate to analyze the data
Methodology is weak, affecting the reliability of data.
The methodology is adequate, although there are certain limitations in approach. The methodology aligns with the targeted objectives.
Basic methodology, but with notable gaps or weaknesses.
OK
Basic methodology, but with notable gaps or weaknesses.
Basic methodology, but with notable gaps or weaknesses.
Basic methodology, but with notable gaps
Basic methodology, but with notable gaps
Basic methodology, but with notable gaps or weaknesses.
Basic methodology, but with notable gaps or weaknesses.
WELL STUDIED
FINE
Methodology is weak, affecting the reliability of data.

Basic methodology, but with notable gaps or weaknesses.

Basic methodology, but with notable gaps or weaknesses.


Adequate methodology with some limitations in approach. The methodology fits the objective intended.

Evaluation of the key drivers of growth, such as regulatory reforms, investor education, technological advancements, and demographics
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
only secondary data is available some point of primary data of explanation to be write
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
the data may with questionnaire of using exchange option and to get primary data in the bank involved in exchange activities

These processes are carried out with a certain motive in mind .that could be about awareness or gaining knowledge or clearing out some misunderstanding o
Basic methodology, but with notable gaps or weaknesses.
to classify the source of primary and secondary part of data collection to be exhibit in the project
the source of data collection with what are the ways in primary and secondary to be very clear
the data collection should deal with the source of data collection like primary and secondary points
the data collection also sate that the secondary source of data available to collect
This research was meant to study what is happening with work tension among representatives who are working in information technology-based organizatio
published was analysed to determine knowledge gaps. To determine present procedures and inconsistencies in company procedures, a qualitative evaluation
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
The research aims at studying the role of Artificial intelligence in Digital payment systems. The study is conducted to study the effectiveness of AI technolo
Adequate analysis, though some areas may lack depth or precision
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
the data collection method are to various source to gets a correct data
The methodological approach employed to investigate cyber security issues and solutions affecting online banking
Basic methodology, but with notable gaps or weaknesses.
the more expansion of source of data and we used to get a good data points to note

The ways of data collection points like primary and secondary are ok
Primary data collection points required with used secondary data
Data of source with what are the methods we use have to mention
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.

The data collection method to be written with what are the source available more
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Te source of data exploration and used parts are needed some more
Adequate methodology with some limitations in approach. The methodology fits the objective intended.

The data collection may consider the scope of the study and some point of primary data

Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
The source of data collection with more details of primary data collection
Data collection are with more primary points
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
the primary data collection with what are the ways in primary and secondary to be very more clear
Adequate methodology to use with some limitations are in the approach.
Basic methodology, but with notable gaps or weaknesses.
Basic methodology, but with notable gaps or weaknesses.

Sound methodology with proper consideration of various data collection methods


Adequate methodology with some limitations in approach
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Limited or inappropriate methodology, impacting the quality of data
Adequate methodology with some limitations in approach
Basic methodology, but with notable gaps or weaknesses
The process used to gather info and information for the purpose of making company choices. A investigations methodology is set that is systematic for
Basic methodology, but with notable gaps or weaknesses
Basic methodology, but with notable gaps or weaknesses
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Sound methodology with proper consideration of various data collection methods.
The effectiveness of an advertising campaign is often gauged through both quantitative and qualitative measures.
Sound methodology with proper consideration of various data collection methods
AI-driven social media analytics revolutionize marketing by offering real-time insights, predictive analytics, and personalized consumer engagement.
Maintaining worker records and adhering to authorities-created rules regarding employee rights and welfare are hallmarks of the personnel control segment
Adequate methodology with some limitations in approach
SAP Materials management covers all tasks within the supply chain, including consumption-based planning, planning, vendor evaluation and -invoice ve
Adequate methodology with some limitations in approach
Sound methodology with proper consideration of various data collection methods.
E-commerce is the process of buying and selling over the Internet, or conducting any transaction involving the transfer of ownership or rights to use goods
CHAPTER-2 LITERATURE REVIEW 2.1 Literature Review During all of our research that is preliminary found an article that offered an introduction to
he study seeks to understand user requirements, preferences, and pain points through user surveys, interviews, and usability testing, and identify opportuniti
The virtual resources can be extended as needed.If the user needs more resource then it is provided on demand basis.
Intelligence (AI) on IT Service Management (ITSM)
This history of electric vehicles highlights the cyclical nature of their development, from early experimentation and widespread adoption to decline and resu
Sound methodology with proper consideration of various data collection methods. The methodology fits the objective intended.
Adequate methodology with some limitations in approach. The methodology fits the objective intended.
This study adopts a mixed-methods research design, combining both qualitative and quantitative approaches to provide a comprehensive analysis of the imp
Methodology is weak, affecting the reliability of data.

Adequate methodology with some limitations in approach. The methodology fits the objective intended.
Q3 Remarks

No evidence of data analysis

Tools used for analysis the data are good

Proficient tools for data analysis


Basic tools used to analysis the data
Appropriate statistical tools for data analysis
No evidence for tools used
No evidence
Very basic tool is used to analysis the data

Percentage analysis only used to analysis the data

Basic tool percentage only used


No evidence

No evidence
No evidence

Basic tool percentage is used to analysis data

Basic tool percentage is used to analysis the data


No evidence

no evidence for data analysis

Adequate analysis, though some areas may lack depth or precision


no evidence for data tool and analysis
Adequate analysis, though some areas may lack depth or precision
Their no tools used to analysis the data
Analysis is rudimentary, with significant flaws impacting overall quality.
Percentage method only used to analysis the data
No tools used

Basic analysis with noticeable gaps or errors in the use of tools


Basic analysis with noticeable gaps or errors in the use of tools.

Advanced statistical tools are used to analysis the data


no evidence

Adequate analysis, though some areas may lack depth or precision

Basic analysis with noticeable gaps or errors in the use of tools.

no evidence
Analysis of data are advanced
Adequate analysis, though some areas may lack depth or precision
Tools used for analysis of data are adequate
No evidence of data analysis
Percentage is used to analysis the date
Tools used for analysis the data are adequate
No evidence of data analysis

Basic analysis of data


Analysis of data are appropriate and also fit to the objectives

different tools are used to analse the data


adequate tools used for data analysis based on objectives
The qualitative analysis is well-suited to exploring the research question
The appropriate analysis of data with the help of tools and techniques
Tools and techniques are good but need to improve for greater reliability
Basic analysis need to give reliable tools and techniques
Adequate analysis, though some areas may lack depth or precision

The data analysis plan is adequate and use of tools and techniques are good

use various tools for anslyse the data


The data analysis plan is adequate and use of tools and techniques are good

The data analysis plan is adequate and use of tools and techniques are good
Adequate analysis, though some areas may lack depth or precision
various tools are used to analyse the data
The qualitative data analysis are appropriate for this approach but have to use tools and techniques
Adequate analysis, though some areas may lack depth or precision

Basic analysis of data with some errors in the use of tools


use strong tools and techniques for analyse the data
Basic analysis are used and lack of tools and techniques

Basic analysis and limited use of tools and techniques


use more technical tools for analyse the data

various tools used to analyse the data


use sufficient tools for analyse the data
inadequate tools for analyse the data
The basic data analysis and inappropriate tools and techniques
Analysis of study is absent
Tools and techniques are good but need to improve for greater reliability
The use of tools and techniques are effective but could need additional statistical analysis

The use of tools and techniques are effective but could need additional statistical analysis
Basic analysis data and lack of tools and techniques
Basic analysis of data with inappropriate tools and techniques
Adequate analysis of data with lack of analytical tools
Tools and techniques are good but need to improve for greater reliability

The use of tools and techniques are effective but could need additional statistical analysis

The techniques and tools are adequate with proper data analysis
Tools and techniques are good but need to improve for greater reliability

The use of tools and techniques are effective


The SWOT analysis could be strengthen by including more specific and require actionable recommendation
Ratio trend inventory control and percentages tools are used to analysis the data
Tools and techniques are good but need to improve for greater reliability
One percentage method is used to analysis the data
Tools and techniques are good but need to improve for greater reliability

tools used for analysis the data is not


No tool used

The data analysis are good with appropriate tools and techniques
Percentage tool is used to analysis the date
Adequate data analysis with proper use of tools
Appropriate data analysis with the help of adequate tools
Percentage tool is only used to analysis the data based on that interpret the data
Adequate data analysis with appropriate tools and techniques
More number of advanced statistical tools are used for analysis the data
Tools and techniques are good but need to improve for greater reliability
Adequate analysis with appropriate use of techniques
Tools and techniques are good but need to improve for greater reliability
The use of tools and techniques are effective but could need additional statistical analysis
The data analysis plan is adequate and use of tools and techniques are good
The use of tools and techniques are effective but could need additional statistical analysis
Ms Excel, spreadsheet, spss and various statistical tools used
Use atleast any 2 specific tools for analysis of data
to analysis the data for using percentage analysis only
Basic techniques used for analysis of data

Percentage and statistics tools are used for analysis of data it's a basic tools advance tools not used
Bi- varient, hypothesis testing technique used for analysis of data
Sophisticated analysis using advanced tools and techniques demonstrating a deep understanding. SWOT analysis techniques used.
Adequate analysis through some areas may lack of depth or precision.
More significant approach used for analysis of data
Basic analysis with noticeable gaps or errors in the use of tools
There is no proper tools and techniques are used
Basic analysis with noticeable gaps or errors in the use of tools.
Basic analysis with noticeable gaps or errors in the use of tools
Tools and techniques are good but need to improve for greater reliability
There is no analysis of data tools and techniques
Incorrect analysis of data there is no proper use of tools and techniques
Analysis of data is fully absent in the study
Basic analysis with noticeable gaps or errors in the use of tools
The data analysis plan is adequate and use of tools and techniques are good
Basic analysis with noticeable gaps or errors in the use of tools.
Adequate analysis, though some areas may lack depth
Adequate analysis, though some areas may lack depth
Tools and techniques are good but need to improve for greater reliability
various tools are used to analykse the data

The SWOT analysis could be strengthen by including more specific and require actionable recommendation
various tools and techniques for analyse the data

using various tools for analyse the data


There is basic analysis of data and could need additional statistical analysis
Proficient analysis with appropriate use of tools and techniques.

Analysis of data is nearly absent


Very basic analysis of data, tools and techniques

No evidence of data analysis


Basic analysis tool used
Basic analysis with noticeable gaps or errors in the use of tools.

Very basic analysis of some theoretical aspects


Basic analysis with noticeable gaps or errors in the use of tools.
Percentage tool only used
Basic tool used to analysis of data

Two statistical tool are used to analysis of data

Percentage tool only used to analysis the data


No evidence of data analysis

No evidence
Sufficient analysis to analysis the data

No evidence
No evidence
No evidence
No evidence
no evidence
No evidence
Data analysis tool are adequate
no evidence
Basic analysis techniques
Basic analysis tool for data analysis
Spss,excel , quantitative analysis used for analysis of data
Proficient analysis with appropriate use of tools and techniques
Tools used for data analysis are very good
No special technique used for analysis of data
Basic Statistics tools used for analysis of data suggest use any special technique for data analysis
No specific tools used for analysis of data rating technique used our research work
No special technique used for analysis of data
Basic tool is used to analysis the data
Tools used for data analysis is good
No special technique used for analysis of data
Basic techniques used for analysis of data suggest to use atleast 2 or more technique
Atleast use any 2 specific tools used for analysis of data
Significant approach used with some limitations
Basic techniques quantitative analysis used for data analysis suggests to use atleast 2 techniques
Basic approach used for analysis of data suggest to use atleast any 2 to 3 tools

Adequate analysis, though some areas may lack depth or precision


Adequate analysis, though some areas may lack depth or precision
Adequate analysis, though some areas may lack depth or precision
Percentage tool only used to analysis the data
Techniques used for data collection are adequate
Adequate analysis, though some areas may lack depth or precision
Adequate analysis, though some areas may lack depth or precision
Basic analysis with noticeable gaps or errors in the use of tools.
Basic analysis with noticeable gaps or errors in the use of tools
Data analysis in form of theory but not using any tools
Their is no techniques used to analysis the data
Adequate analysis, though some areas may lack depth or precision

Adequate analysis, though some areas may lack depth or precision


no tools used
Basic analysis with noticeable gaps or errors in the use of tools.
No Tools used
The descriptive, inferential analysis were used for analyzing the data and the statistical tools were used.
The descriptive, inferential analysis were used for analyzing the data and the statistical tools such as analysis by percentage, pie charts, sampling technique

The descriptive, inferential analysis were used for analyzing the data and the statistical tools such as analysis by detailed insight sampling technique were u

The earlier used convenience sampling was used and expected to use the recent innovative techniques.
The descriptive, inferential analysis were used for analyzing the data and the statistical tools such as analysis by percentage, pie charts, sampling technique
The data collected from various areas of the concern and used pie, bar charts, histograms, run chart and various techniques for interpreting the data.

The descriptive, inferential analysis were used for analyzing the data and the statistical tools such as analysis by percentage, pie charts, sampling technique

The study used with a brief description of research methodology adopted in selection of the area, sampling of retailers, method of data collection and the to

The descriptive, inferential analysis were used for analyzing the data and the statistical tools such as analysis by percentage, pie charts, sampling technique

Quantitative Data Analysis and Qualitative Data Analysis The SPSS / R software would be useful to analyze the survey data collected from the participants

The data are analysed using percentage analysis, Chi Square and t- test were used to analysis.
Simple methodology used for analysing data with some gaps.The student needs to use ideally two or more analytical tools properly used.

Other subject file

engagement

correctly
correctly
Basic analysis with noticeable gaps or errors in the use of tools. At least 1 analytical tool used correctly
Basic analysis with noticeable gaps or errors in the use of tools. At least 1 analytical tool used correctly

Basic analysis with noticeable gaps or errors in the use of tools. At least 1 analytical tool used correctly

Basic analysis with noticeable gaps or errors in the use of tools. At least 1 analytical tool used correctly

Basic analysis with noticeable gaps or errors in the use of tools. At least 1 analytical tool used correctly

Basic analysis with noticeable gaps or errors in the use of tools. At least 1 analytical tool used correctly

At least 2 analytical tools used correctly.

used correctly.
Basic analysis with noticeable gaps or errors in the use of tools. At least 1 analytical tool used correctly

Basic analysis with noticeable gaps or errors in the use of tools. At least 1 analytical tool used correctly
asic analysis with noticeable gaps or errors in the use of tools. At least 1 analytical tool used correctly

At least 2 analytical tools used correctly.

At least 2 analytical tools used correctly

Basic analysis with noticeable gaps or errors in the use of tools. At least 1 analytical tool used correctly

Basic analysis with noticeable gaps or errors in the use of tools. At least 1 analytical tool used correctly

and more.
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
No noteworthy innovation technique used for problem scheme in this project
throughput, and resource utilization
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
Current techniques need to implement and analysis the project.
It represents the familiarity and visibility of a brand among its target audience.

each other and a given package


analysis.

Data collection methods are partially described

statistical methods
Graphs and tables basic techniques used for analysis of data
data obtained from interviews and open-ended survey responses will be analyzed
including news articles, official reports, and industry publications.
No noteworthy innovation technique used for problem scheme in this project

In this study both primary and secondary data are used for data analysis. For data analysis statistical tools like mode, frequencies, chi-square test, etc.
industry
The study's data is being collected in this way.

Survey data will be analyzed using descriptive and inferential statistical techniques
No noteworthy innovation technique used for problem scheme in this project
No noteworthy innovation technique used for problem scheme in this project

knowledge about its principles.


The data gathered for this study is from essential sources.

data collection and analysis process for cloud computing development models:

and analysis was carried on a mission to validate the Research Model through survey.
Current techniques need to implement and analysis the project.

User engagement increases when features and elements are easy to interact
of remote work, here are some interesting insights
existing green IT initiatives.
is essential for maximizing IoT's potential.

Current techniques need to implement and analysis the project.


Possible to make certain generalizations about Tesla’s current status and the potential directions for their development as a leader in the automotive and ene

To summarise the collected data and provide an overview of user behaviour and system
The accentuation has been given for preparing and improvement on the grounds that as the hole saw essentially in the space of practices and administrat

The majority of respondents are IT Service Desk Analyst


One unit information has been taken for this study of capital budgeting
- A structured survey questionnaire is designed to collect quantitative data on cybersecurity

Application of same decision on the similar incident is very common and useful for any industry.
The report highlights the importance of sustainable development, climate change, media, and advocacy groups in CSR activities, and examines the presen

used correct

and determination
impact of the average number of users of digital channels

cloud computing security,

methods of marketing research are in a way the methods of data collection


from secondary sources

used correctly

Data will be collected partially from the respondents

information.
Exploring the use of mobile apps, chatbots, and AI-powered tools for real-time feedback collection.

data analysis in old way like calculation format and using thematic tools specify some new techniques Spss
health care analysis of data to perform thorough testing to ensure that it has migrated correctly
- Quantitative data from surveys will undergo analysis using statistical techniques
Current techniques need to implement and analysis the project.
India.
Data collection methods are partially described

between the output and the selected items.


Transcripts of interviews were coded and categorized based on key topics and concepts relevant to the research objective

the norm. Indeed, a significant


experts get the brief idea
Current techniques need to implement and analysis the project.

No outstanding innovation technique used to slove the problem


be popular and are well attended.
In the contemporary global economy, India stands as the foremost exporter
Current techniques need to implement and analysis the project.

Data collected from few methodology. but observation, secondary data analysis and case studies are needed

The perspective of Gen Z towards the quality of logistic service on home delivery was studied by collecting primary data via questionnaires and secondary

No outstanding innovation technique used to solve the problem


the absence of substantial measures to enhance the energy efficiency

Graphs and tables basic techniques used for analysis of data


on society and 14.7% responders not sure about that.
protect their data.
into the causes,
To implement Six Sigma tools and techniques to address areas of inefficiency and improve the quality of solutions provided.
At least 2 analytical tools used correctly.
Basic analysis with noticeable gaps or errors in the use of tools. At least 1 analytical tool used correctly

No data analysis

Basic analysis with noticeable gaps or errors in the use of tools. At least 1 analytical tool used correctly
Analysis is rudimentary, with significant flaws impacting overall quality. At least 1 analytical tool used correctly

Analysis is rudimentary, with significant flaws impacting overall quality. At least 1 analytical tool used correctly

Analysis is rudimentary, with significant flaws impacting overall quality. At least 1 analytical tool used correctly
the study.
Basic analysis with noticeable gaps or errors in the use of tools. At least 1 analytical tool used correctly
Data collection should be followed by data translation.

inconsistencies or errors

No data analysis
No data analysis
efforts,
No data analysis

analysis, though some areas may lack depth or precis

Data collection will be carried out using the following methods

The findings from the data collection and analysis provide a comprehensive

analysis, though some areas may lack depth or precis

The integration of functional and Non-functional requirements were used in the analysis and DFD,ER were using interpretation of the collected data.
The data collected from various areas of the concern and used pie, bar charts, run chart and various techniques for interpreting the data.

The integration of quantitative and qualitative techniques were used in the analysis and interpretation of the collected data.

The data collected from various areas of the concern and various techniques like timeline, action and content for interpreting the data.
user profiles, purchase history, product details, ratings, reviews, and behavioral data such as clicks, views, and dwell time. This data is collected from multi

The descriptive, inferential analysis were used for analyzing the data and the statistical tools such as analysis by using time horizons, charts, percentage, sa

The quantitative and qualitative data collections were used in the analysis and interpretation of the collected data.
Analysis of the collected data using appropriate analytical techniques and methods such as content analysis. Content analysis or discourse analysis.

The explorative and descriptive study were the methodologies used for gathering data.
application
correctly
Data collection plays an important role in a projects succession and also it plays an inevitable

service desks
Any research framework must include a section on data collection methods
Utilizing analytical methods to draw conclusions from the information
Data collection is a critical phase of the research, involving the systematic
used correctly

the tools are very important in analysis and finding with the data we collected to be separate by tools of finding

The data analysis plan outlines the procedures and techniques used to analyze collected data.

precision
To analyze and interpret collected data to address research questions.

from focus groups, interviews, and content analysis.

label in 2013
and more efficient
infrastructure or misconfigurations.

analysis

factors
and stem from or are influenced by other design forces or requirements
used correctly

used correct

correctly
F test like test are written but more advanced tools may use

These types and service features cloud that is various

used correctly

Data analysis is done with the help MS excel application. Graphs and Charts are used to present the data analysis results.
Data are presented by using various graphs and charts. needs to use advanced statistical tools
For data analysis, Simple percentage analysis and graphical presentation of the results of the data analysis. All statistical calculations are done through exce

No details relating to data analysis and tools and techniques are specifically mentioned in the report.
Content and thematic analysis are used for data analysis. Charts & Graphs and simple percentage are used. More tools may be applied for data analysis.
Thematic analysis, process mapping, SPC and root cause analysis are used to evaluate the data.

Descriptive statistical analysis, range, hypothesis testing, ANOVA, Regression analysis, time series analysis and RCA are applied to analyse the data and r
Adequate analysis is done. but extensive data analysis with advanced tools may be done.
PERT, CPM, Gnntt Chart, Stage Gate process and EVM are applied for data analysis and interpretation are given.
good in usage of tools,This innovative approach ensures that ticket issuance, distribution, and validation occur seamlessly, fostering trust and reliability amo
need more tools and data
Correlation analysis, regression analysis and descriptive analysis are employed to analyse the data. For data analysis process, NVivo or ALTAS software ar
useage of tools is best
good
good
For data analysis, descriptive and inferential tools are applied. Charts and diagrams are used to present data for better understanding.
need more inportance

For data analysis, Descriptive statistics and inferential statistics are used. Chi-square analysis. correlational analysis and hypothesis testing are done.
For data analysis, SPSS software was applied. Uni-variate, bi-variate and multi-variate techniques are used for data analysis. but the specific tools applied w

Charts, diagrams and five point scaling technique have been applied to data analysis and presentation.
reports, industry publications, news articles, and academic research.
Statistical tools like correlation and regression analysis are employed to do data analysis. Charts & Graphs are used to present the data.
No details relating to data analysis and data analysis techniques are given.
For data analysis, various descriptive tools are used. Multiple regression analysis model has been used to analyse the data.
Charts and diagrams are used. Pareto analysis is applied.

Some of the tools and techniques have been used for this project.

Tools such as Ms-Excel, graphs and Bar charts have been used for this project
Basic tools and techniques has been used for this project.

Basic tools such as Ms-Excel and Bar charts has been used for this project.
Tools such as mean , standard deviation and coefficient of variation and Pie charts has been used for this project.

sophisticated analysis using tools and techniques,details on how data was gathered,analysed and interpreted.
Tools such as Ms-Excel and Pie charts have been used for this project.
Basic tools and techniques has been used for this project.
proficient analysis of data, tools and techniques, The choice of management tools is influenced by a number of factors,including the nature of the project, or
Basic tools such as Ms-Excel and Bar charts have been used for this project.
Basic tools such as Ms-Excel, Pie charts and Bar charts has been used for this project.
Tools such as Ms-Excel, Bar charts and Pie charts have been used for this project
Questionnaire tool is adopted for the Data collection. It refers to a device securing answers to questions by using a form, which the respondent fills by hims
not more Analysis of data, tools and techniques.
Qualitative data will be collected through interviews with experts in the software industry, such as executives, analysts, and consultant
contributing to the overall goals of the project.
Analysis of data, tools and techniques adequate,he study includes participants from various occupational backgrounds, with a significant representation of e
Optimizing plant design and material flow, as well as selecting and installing the appropriate equipment and tools, are both essential steps in achieving grea
This research relies on primary data. Primary data are those gathered from firsthand sources by a researcher employing surveys. It is derived directly from p
Machine Learning for Predictive Maintenance: Implement machine learning algorithms to analyze IoT data streams and predict equipment failures or maint
Analysing the growth of derivative market through secondary data, Analysing the investors views towards derivative data through secondary data
Tools such as Ms-Excel, Pie charts and Bar charts has been used for this project.
Tools such as Ms-Excel and graphs charts have been used for this project.
The quality and quantity of the data collected directly affects the performance and accuracy of the machine learning model. Data can be collected from vari
responses.
from the survey responses were analyzed using statistical techniques such as descriptivestatistics, correlation analysis, and regression analysis to identify pa
systems typically used in communication.
Tools such as Ms-Excel and Pie charts have been used for this project.
Basic tools such as Ms-Excel, Simple percentages analysis and Pie charts has been used for this
not more tools and techniques used.
Some key of data analysis technique used in ITSM decision-making,depend on specific objectives of data analysis for ITSM decision making.

Analysis is basic, with significant flaws impacting overall quality.

adequate Analysis of data, tools and techniques


gathered, analysed and examined, how the technique was picked demonstrated stead

good Analysis of data, tools and techniques,4 tools used

Mixed-Methods Analysis,Comparative Analysis


Analyzing Differences Between Azure and Conventional Systems,Comparative Analysis,Analyzing Business Impact.

various tools and techniques used The use of IT to improve the ability of the government to address the needs of society.
4 tools and techniques used,Enhanced client arranged information advancement for rail lines in arising countries the experience of Tanzania Rail courses A

quantitative methods.
Quantitative Data Analysis,Secondary Data Analysis used
various tools and techniques,Current Supply Chain Analysis, Blockchain Benefits Analysis used
The comprehensive analysis of data, encompassing learning outcomes, user engagement, long-term impact, and cost considerations, reveals a clear advanta
Predictive Analytics Tools,Time Series Forecasting Tools,Survival Analysis Software,Prescriptive Analytics Tools used
Tools such as graphs, Bar charts and Percentages analysis have been used for this project

Tools such as graphs, pie charts, Bar charts and Percentages analysis have been used for this project.

Analysis is basic, with significant flaws impacting overall quality

No details are given above analysis of data, tools and techniques.


No details are presented under the heading data analysis and findings

Data analysis is done with descriptive statistics and results are presented through charts and diagrams.
Descriptive statistics, thematic analysis and content analysis are employed to do data analysis and results are presented using charts and diagrams.

Charts and diagrams are used to present the data. Descriptive analysis is applied

Nothing is given about data analysis tools and techniques.

Data are analysed by using pie charts and diagrams and statistical tools.
No particulars about data analysis tools and techniques are given.
No data analysis - tools and techniques are mentioned in the report

various tools and techniques used


The data collected will be analyzed to identify patterns, correlations, and significant findings.
some tools and techniques good,Cloud computing provides researchers and instructors with access to computer resources and tools that would otherwise be

Conducting surveys among e-commerce businesses to gather quantitative data on data analytics adoption, usage, and perceived impact.

finished product.

seamless integration with existing ITSM tools can be achieved by IAM, automating access provisioning and revocation for delegated tasks.

efficiency, and enhance service delivery.

Functional Analysis,Flow Analysis,Systems Evolution Analysis,Cause & Effect Analysis used.

various tools and techniques used

For data analysis, histogram and scatter diagram are applied. Appropriate tools have been applied for data analysis.
Any specific tools or techniques are not used for analysis of data

Graphs and tables used for analysis of data no specific tools used
Descriptive and comparative techniques used analysis of data no specific tools used

With some limitations used

No specific tools or techniques used for analysis of data


requirements and preferences.

academic evidence
order tracking
f QR-Scanner and GPS method correct one.

need the executive summary describes the topic in detail.


The digital shift was further expedited by the development of mobile computing The digital shift was further expedited by the development of mobile comp

No specific tools used for analysis of data


Graphs and tables and charts some basic techniques used for analysis of data

No specific tools used for analysis of data


No specific tools used for analysis of data

Focus on quantitative analysis of data, mathmatical tools and graphics represention were used
Suggest tools are not properly integrated with the analysis of topic
No specific tools used for analysis of data

No specific tools and techniques are used


Hypothesis testing quantitative techniques are used to analysis of data need to use latest tools

Statistical tools used for analysis of data but no specific tools and techniques used.

No specific tools and techniques used for analysis of data


Specific technique of sime concept used for analysis of data

No specific technique used for analysis of data need to improve


Sampling statistics technique used for analysis of data good

No data analysis

No specific technique used for analysis of data


Basic techniques graphs and tables used for analysis of data

Adequate methods with some limitations used

Graphs and tables used to analysis of data no specific tools used

Graphs and charts basic techniques used for analysis of data


No specific enhanced technique used for analysis of data

Mean , media, standard deviations, range, regression, hypothesis testing used for analysis of data was good

ML and significant approach used for analysis of data


Themetic analysis, content analysis, statistics analysis used for data analysis
Significant technique used for analysis of data was good
No data analysis

Statistical techniques used for analysis of data no specific tools used


Special technique used for analysis of data

Lotame support the specific technique used for analysis of data

No specific tools used for analysis of data basic techniques used

Basic techniques used for analysis of data


SWOT analysis for analysis of data was good
No special technique enhanced for analysis of data
Basic techniques used for analysis of data

Basic techniques used for analysis of data graphs and charts


Graphs and tables basic techniques used for analysis of data

No specific technique used for analysis of data


No specific tools used for analysis of data

Basic approach for analysis of data


No specific tools used for analysis of data

No specific technique used for analysis of data

SWOT analysis techniques used for analysis of data

No any specific tools or techniques used to analysis of data

Return on investment technique used to analysis of data


Significant approach not used for analysis of data
Basic techniques and tools used for analysis of data , graphs and tables used for analysis of data
Any specific tools or techniques not used for analysis of data
Triangulation,cross case technique used for data analysis of study work

Pie chart, bar chart, statistical tools, tabulation

Use any one specific tools for analysis of data

Basic techniques used for analysis of data


No specific tools used for analysis of data

Linear regression and ANOVA technique used for analysis of data


Any special technique or tools used for analysis of data

No special technique used for analysis of data

Dendrogram. Cluster tree and Cluster R and SWOT analysis are used for data analysis.ABC, FSN and SDE tools are used for data analysis.

Descriptive and Comparative analysis are done for data analysis. GAP analysis and Conjoint analysis and TURF analysis are applied.

Charts & Diagrams are used to present the data. Nothing is given about data analysis tools and techniques.

SPSS & Excel softwares are used for data analysis. Comparative and content analysis are employed
No details about data analysis, tools & techniques are given. Just title is given as data analysis.

MS Excel package is used for data analysis and python and R are also used for data analysis. Charts, diagrams and pie charts are used to present the data in
Thematic, content analysis, descriptive and inferential statistics are employed to do data analysis. Excel, SPSS and R are used to perform data analysis.

Penetration test, Marshall stability test are applied to do data analysis.


Data analysis is done by using SPSS statistical package. Descriptive and inferential statistics are used for data analysis.
Simple percentage analysis is applied for data analysis. The results are presented via charts and graphs.
Nothing is given about analysis of data, tools and techniques.

Data are analysed by using simple percentage analysis. The results are presented via tables and charts.
For data analysis, Simple percentage analysis is used and the results of the analysis are presented through tables, charts and graphs.

Only simple percentage analysis is applied for data analysis and the results are presented in tables, charts, graphs.
Only percentage analysis is adopted for data analysis. The results of the analysis are presented through tables and charts.
Need to specific any one tool for analysis of data
No Analysis of data
Regression model, correlation analysis, descriptive analysis techniques used for analysis of data
No specific tools used for analysis of data
No Analysis of data
Statistical tools used for analysis of data

Statistical analysis, T-test technique used for analysis of data

Statistics tools for analysis of data


Percentage analysis is used to analyze the data and association between two variables are found in the study
TOOLS USED NO GIVEN BU ANALYSIS MADE AND RESULS INTERPRETED
Statistical analysis concept used for analysis of data
TOOLS USED FOR DAA COLLECTION IS RIGH AND APPROPRIATE
Percentage techniques used for analysis of data
PERCENTAGE ANALYSIS IS USED
ADEQUATE ANNALYSIS GIVEN
Statistical and ML techniques used for analysis of data
Basic techniques used for analysis of data any specific tools not used.
Statistical analysis tools used for data analysis
modern techniques used for analysis of data
the tools used for analysing the data is clear
Few methods are used to analysis the data with some limitations
correlation and regression used for analysis of data is relevant
No specific tools or techniques used for analysis of data
using proper tools data is analysed
Mean , standard deviations, T-test technique used for analysis of data
appropriate tools are used for analysis of data
data analysis with tools and techniques are right
Statistics tools used for analysis of data
No specific tools or techniques used to analysis of data
data is analysed but which tools used is not given
data is analysed with proper tools
data is analysed with appropriate tools and techniques
No specific tools or techniques used for analysis of data
Basic approach only used no specific tools used for analysis of data

Basic techniques used for analysis of data no special technique used


Any special technique not used for analysis of data
No any specific tools or techniques used to analysis of data
No specific tools or techniques used for analysis of data
Basic techniques only used for analysis of data ,no specific tools used
Regression and ANOVA technique used to analysis of data

No specific tools used to analysis of data

No specific tools or techniques used to Analysis of data

No specific tools and techniques are used to analysis of data


No data analysis
No specific tools or techniques are used to analysis of data, basic techniques graphs used for analysis of data

AWS CloudWatch, AWS cloud trail used to Analysis of data


Statistical analysis basic techniques used for analysis of data no specific tools used.

Basic tools only used no specific tools or techniques used to analysis of data
No specific tools or techniques used to analysis of data
Basic techniques graphs and tables used for analysis of data

Basic tools and techniques graphs and tables used for analysis of data
Weak methodology used for analysis of data
Adequate method with some limitations used
No specific tools and techniques used for analysis of data
Simplex percentage and graph technique used for analysis of data
No specific tools and techniques are used for analysis of data
Some specific tools and techniques are used to analysis of data
No specific tools and techniques used for analysis of data
Basic techniques graphs and tables used for analysis of data

The analysis is proficient, demonstrating the appropriate use of tools and techniques to achieve thorough insights.
The analysis provided is basic and exhibits noticeable gaps that detract from a comprehensive understanding of the subject matter.

The analysis is adequate, although certain areas may lack depth or precision, suggesting opportunities for further refinement and detail to enhance understan

The analysis of operational efficiency in small and medium-sized enterprises (SMEs) is basic, revealing noticeable gaps that detract from a comprehensive

The analysis provides a basic overview but contains noticeable gaps or errors in the application of tools, indicating a need for more thorough and accurate u

The analysis presented offers a foundational understanding, but notable gaps and errors in tool application suggest opportunities for refining methodology to

The analysis presented is fundamental, but significant gaps or errors in tool application detract from its overall reliability and depth.
The project offers a solid foundation of analysis, with opportunities for deeper exploration to enrich its insights into financial feasibility in development dril
Addressing the identified flaws in the analysis is critical to improving the project's credibility and ensuring its insights into ERP system crafting are accurate

The analysis is adequate, but certain areas may lack sufficient depth regarding Industry 4.0 approaches
The analysis was proficient, demonstrating the effective use of tools and techniques related to supply chain management

The analysis conducted is sufficient, although there are certain areas where more in-depth exploration would have been beneficial.

The analysis conducted is foundational, but there are noticeable gaps or errors in the application of tools only percentage analysis is used
ROC analysis is used need some clarity in interpretation more usage of tools gives more validity
needs more clarity in analysis statistical tools could be employed for better results
The analysis of workforce management's impact on operational productivity is rudimentary, revealing gaps and errors in tool application. Improving analyti

A very basic or incorrect analysis can undermine the credibility of a project, especially when it remains overly theoretical without detailed practical explana
The analysis of Maruti Suzuki's operations and supply chain management practices is basic, with notable gaps in tool utilization, suggesting room for impro
The analysis is adequate, though some areas may lack depth or precision. Two analytical tools have been correctly employed, demonstrating a foundational

The analysis of IKEA's operations management exhibits a basic approach with noticeable gaps. Strengthening the analysis by addressing these gaps would p

The analysis of green initiatives recommendations for electronic gaming slot machines is adequate, though certain areas may lack depth. Further exploration

depth
gaps

depth
depth
tools.
basic analysis with noticeable gaps

depth

and techniques

and techniques.

depth
Adequate analysis, though some areas may lack depth

used correctly.

and techniques
depth
and techniques
and techniques.

depth

Very basic Analysis of data


use of tools
data analyzed with various types of chats

data analyzed with various types of charts


use of tools and techniques.
Very basic

perfect tools are used. Analysis is done based on the data


very basic
use of tools and technique
very basic
data analyzed with ratio ,ABC Analysis and XYZ Analysis
use of tools
and techniques
understanding.
and techniques
Basic analysis with noticeable gaps
tools and techniques used are good
good analysis of data, tools and techniques

various tools and techniques are used


gaps

various tools like charts, inventory control ratio etc are used
data were analyzed with various tools and techniques

Very basic tools and techniques are used


analysis of case studies and examples from the actual world is also included in the scope to show the concrete advantages of implementing strong project m
using excel and SPSS have been analysis of data. can employ current trend techniques use to analysis of data like spss, zoho sheet, calc and cryptpad sheet.

several case study approaches used for analyzed data. required future information about data analysis
a work that is healthy for the IT and BPO sector
sampling techniques are mentioned. analyzing the data can be done using programs like anova and hypothesis

data has been analyzed and interpreted in various forms

analysed the legislative questions being very likely to impact the aid of cryptocurrencies

food delivery app, Zomato used for food ordering application, attracting numerous customers with its innovative strategies
data analysed by Percentage analysis to comparison between two or more series of data. can be use some other techniques for data analysis
The analysis of logistics and supply chain management techniques at Big Bazaar is basic, with noticeable gaps or errors in the use of analytical tools. Enhan
The analysis is adequate, though certain areas may lack depth or precision. Further refinement and detail in these areas would enhance the thoroughness and

The analysis is adequate, but certain areas may lack depth or precision, suggesting room for further refinement and detailed exploration to enhance the thoro

Basic analysis of production and inventory efficiency at Leather Crafts India, with notable gaps in tool application.
The analysis is adequate overall, though there are areas that may lack depth. Further exploration and detail in these areas would enhance the thoroughness a
There are noticeable gaps or errors in the application of analytical tools. Improving the use of these tools would enhance the accuracy and comprehensivene

Basic analysis with noticeable gaps in addressing issues like reducing turnaround time and managing shipment cancellations due to process defects.

The process improvement using DMAIC in a tire manufacturing company involves basic analysis, but there are noticeable gaps or errors in the use of tools.

The analysis is fundamental, but there are noticeable gaps or errors in the use of tools, which could impact the accuracy and depth of the findings.

Logistics and distribution management at Amazon: A basic analysis indicates noticeable gaps in the application of tools, with a greater emphasis on the usa

A basic analysis reveals noticeable gaps, suggesting areas where further investigation or refinement is necessary to enhance comprehensiveness and accurac
depth
it was analyzed with ratio analysis, types of charts ,percentage analysis
data were analyzed with various charts and interpretation drawn

data were analyzed with various tool like charts, percentage analysis

dept

data were analyzed with Chi-square test

Analysis of data, tools and techniques are weak


basic analysis used

some of the tools are used for analysis the data


dept

Analysis is nearly absent


various tools are used
lack in usage of Analysis of data, tools and techniques
Tools were applied appropriately; however, the usage of tools could have been improved to yield more valid results.
The analysis was rudimentary, with noticeable gaps or errors in the application of tools. There was at least one analytical tool used correctly, but improvem
The SERVQUAL model has been applied extensively to gain a deeper understanding of gaps within the selected medical device service provider industry.
Sound methodology with appropriate usage of tools

Adequate analysis used to analysis of data


Adequate tools and techniques used for analysis of data

Efficient tools and techniques used for data analysis

Case study used for collection of data

Efficient analysis used for data techniques

Efficient analysis of data tools and techniques are used


Adequate analysis with same areas
Very basic methodology used for collection of data
Adequate analysis used for the data

Efficient tools and techniques are used for analysis for data

At least 3 analytical tools used correctly


Proficient analysis used for tools and techniques
case study is used for the analysis of data
Case study is used for analysis of data

case study are used for analysis of data

Efficient analysis used with proper techniques


techniques.
depth or precision .2 analytical tools used correctly.

Adequate analysis, though some areas may lack depth

Adequate analysis, though some areas may lack depth

overall quality.
Data collected from few methodology. but observation, secondary data analysis and case studies are needed

Proper analysis of data and the tools and techniques are somewhat uesd
Adequate analysis of data through the analytical tools correctly
Analysis of data is minimally done with less number of tools and techniques
Adequate analysis of data with enough tools and techniques
Depth analysis of data with analytical tools used correctly

Adequate analysis of data with minimum number of tools and techniques


Very basic analysis of data with no tools and techniques

simple percentage method is used, six sigma tool used


Basic Analysis of data with less number of tools and techniques tools and techniques
some data is scanned copy and its not an originality
Basic analysis are to be used in data
Very basic analysis of data with undetermined tools
Better analysis of data and maximum number of tools and techniques
Insufficient analysis of data with some tools
Moderate Analysis of data with minor usage of tools and techniques
Appropriate analysis of data with less number of tools
Basic analysis of data with minimal tools
Adequate analysis of data with some analytical tools
Adequate analysis of data with some analytical tools and techniques
Inappropriate analysis of data without proper use of tools
Clear analysis of data with many tools and techniques
Adequate Analysis of data with some analytical tools
Basic analysis of data with less tools
employees, which made collecting and analyzing the data much easier and quicker.
stakeholders within educational institutions and e-learning platforms
Conducting surveys and interviews with key stakeholders in the banking industry, including IT professionals, customer service representatives, and custome
Content analysis, Case study analysis, Comparative analysis were involved in the project for the analysis of of data collected
Exploratory Research, Descriptive Research, Comparative Research, Case Study Analysis were considered for the analysis of data collected. Literature Rev

Structured questionnaires and surveys has been used to collect data from TCS customers. The secondary sources such as academic literature, industry repor

Questionnaire is used for gathering data for the study.


The descriptive analysis were used for analyzing the data and the statistical tool of sampling technique were used
Surveys and Questionnaires, Interviews, Focus Groups were the tools used in the analysis of data for the study
surveys and interviews were used for primary data collection, utilizing quantitative data to assess market trends, adoption rates, and the overall impact on th

The data collection for the study was conducted through structured surveys, interviews, and focus group discussions

Survey Questionnaire is involved in the gathering of information and performed over with analysis and interpretations well

studies, and secondary data analysis from industry reports, academic papers, and market research.
To analyze and interpret the information, we will employ elementary statistical tools, including measures like the mean (average) and proportions of the tot
Kite Connect suite empowers developers to create tailored and dynamic trading applications for users.
Survey Questionnaire, Interviews and Focus Groups were used in the data collection and analysis of the collected data
The researcher adopts an exploratory and qualitative approach, which enables the researcher to gather analysis and interpret the set of data, which were used
The analysis of interview data and survey responses will be used to evaluate whether IT professionals express significant concern about GenAI's potential to
Adequate analysis, though some areas may lack depth
Analysis is rudimentary, with significant flaws impacting overall quality
Basic analysis with noticeable gaps or errors in the use of tools
The research employed a random convenience sampling technique comprised 102 respondents from the targeted population
representative sample and a purposive sampling method was used to select interview participants.
Adequate analysis, though some areas may lack depth or precision
Adequate analysis, though some areas may lack depth
Chatbots, Zivebox, Rescoper, Clickup, Polydone, Clarizen were the tools involved in the analysis of collected data
The sampling method is used in the collection of data, analysis over the data for the study
The pie outlines, visual diagrams, PLS displaying relationship, and ANOVA have been used for getting the vital results over the collected data
Analysis is rudimentary, with significant flaws impacting overall quality
Analysis is rudimentary, with significant flaws impacting overall quality
Analysis is rudimentary, with significant flaws impacting overall quality.
The study involves various entities of the data set like column, row by applying Pandas, NumPy, Statistical methods, and Data visualization packages in the
The data collected were analyzed with sampling technique, data analysis tools and interpretations were given
From the Data Analysis, ensures a comprehensive and well-rounded understanding of the factors contributing to the success or failure of ITSM in digital tra
The study of hypothetical research is used in the analysis of IoT applications and its excellence.
The tools used for data interpretation are Bar Graph and appropriate statistical tools will be used. The comparative study is done among the selected blue ch
Adequate analysis, though some areas may lack depth
Data collected through literature review of academic journals, books, and official ITIL documentation. Comparison of findings with existing research litera
Primary data was gathered through questionnaires, direct contact, and personal interactions and the secondary data was sourced from the internet. Tables, gr
Primary data is typically gathered through methods such as surveys, interviews, experiments, observations, or direct interactions. To analyze and interpret t
In the analysis of data random samples were used
The study relied on qualitative tools for data collections and analysis, It is used with extended version of web survey.

Literature Review, Interviews, Focus Groups, Surveys were used in the primary data collection

Data is collected through an online survey platform, ensuring a diverse and geographically dispersed sample. The survey includes multiple-choice questions

Basic analysis are to be used with data.

Advanced tools and techniques are used

chi-square test is used for your report

techniques and analysis are used to efficiently to your project

adequate analysis for used in data


proficient analysis with suitable for your objectives

analytical tools are used for very correctly and proper in manner

analysis of data tools and techniques are effectively used in your study
very useful techniques for analysis the data
Analysis of data used with sufficient

analysis of data tools and techniques are used with effectively

adequate analysis has been used


proficient analysis of data and techniques has been used for the objectives

analysis is absent and entirely different


Basic analysis used with the data
Adequate analysis has been used

Basic analysis with notable gaps


proficient analysis with appropriate tools
Adequate analysis and techniques has been used
Proficient analysis, tools and techniques are used

Adequate analysis used with the data

No data analysis
No data analysis
The analysis in the project on improving team efficiencies with Six Sigma methodologies is rudimentary, marked by significant flaws that detract from its o

The project exhibits basic analysis with noticeable gaps or errors in the use of tools, indicating opportunities for improving analytical techniques and ensuri
The project provides a rudimentary analysis with evident shortcomings in tool application, compromising its analytical rigor.
The analysis is adequate overall, though certain areas may benefit from deeper exploration to enhance the project's thoroughness and completeness. Strengt

The analysis is basic, with noticeable gaps or errors in the application of tools, reducing the overall effectiveness and credibility of the findings.
The analysis conducted shows basic insights but lacks depth and completeness, indicating noticeable gaps in the findings.
The analysis covers the essentials adequately, yet certain areas could benefit from more thorough exploration to enhance depth and insight.
The analysis conducted with appropriate tools and techniques demonstrates a proficient approach, ensuring comprehensive and insightful outcomes in the s

The analysis conducted in the project is basic and exhibits noticeable gaps, which may impact the depth and comprehensiveness of the findings and conclus

The analysis presented is rudimentary and contains notable flaws that undermine the overall quality of the study. Addressing these shortcomings through m

The analysis is either very basic , which significantly undermines the project's credibility and necessitates a thorough revision to ensure accurate and meanin

he analysis of the buying behavior of coffee consumers is rudimentary, with noticeable gaps that may limit the study's depth and completeness. Addressing

he analysis of Google's remote work policies and virtual team building shows a basic approach with noticeable gaps, suggesting opportunities for more thor
The analysis of the pandemic's impact on the pharmaceutical industry is basic and contains noticeable gaps, indicating a need for more comprehensive resea

The analysis is adequate, although certain areas may lack depth, potentially limiting the study's comprehensive understanding of how Lean Six Sigma prom
Strengthen the depth of analysis in areas where it is currently adequate to provide a more comprehensive understanding of the challenges faced in managing

Enhance the analysis to address noticeable gaps and provide a more comprehensive examination of the lack of distribution channels in rural areas within the

he study demonstrates proficient analysis with appropriate use of tools and techniques, ensuring a comprehensive examination of the impact of Supply Chai
The analysis is basic and reveals noticeable gaps that should be addressed to provide a more comprehensive understanding of the subject matter.

The analysis of implementing Lean Six Sigma for yield improvement in product manufacturing is adequate, though it may lack depth in certain areas, sugge
Proficient analysis with use of tools and techniques such as historical analysis and SWOT analysis

Analysis is based on Battery Management System in Electric Vehicle.

Percentage analysis were used in the study


Detailed analysis carried out for each and individual objectives and drawn flow diagram to reach efficiency and cost control

Tools are used very clearly mentioned and analyzed the collected data
Percentage analysis and Chi-square tests were used to analyze the collected data

Percentage and Kruskal Walley Test have been conducted in the study.
The analysis presented is basic, yet it contains noticeable gaps or errors in the application of analytical tools, which could impact the accuracy and depth of

The analysis presented is basic, with noticeable gaps that detract from its comprehensiveness and reliability in examining e-supply chain management's imp
The analysis conducted is rudimentary and contains significant flaws that detract from the overall quality and reliability of the project's outcomes.
The project demonstrates proficient analysis with appropriate utilization of tools and techniques, ensuring reliable and insightful findings.

The project demonstrates proficient analysis through the appropriate application of tools and techniques, ensuring thorough and reliable research findings.
The project's analysis is adequate, though there are areas where depth and precision could be improved to strengthen the overall findings and conclusions.
The project's analysis is either very basic, entirely inappropriate, which significantly undermines the credibility and reliability of the findings due to a lack o

The project's analysis is basic, with noticeable gaps or errors in the application of tools, which may compromise the accuracy and reliability of the findings.
The project on Pentagon Logistics' cargo handling shows basic analysis with notable tool-related gaps, impacting depth and accuracy.

The project offers adequate analysis overall, though certain areas may lack the depth needed for a more comprehensive understanding.
Tools such as Ms-Excel, Pie charts and Bar charts has been used for this project.

Basic tools such as Ms-Excel, Pie charts and Bar charts has been used for this project.

Analysis is basic, with significant flaws impacting overall quality.

Tools such as ABC analysis, Economic Order Quantity, VED Analysis,Re-Order Level, Safety stock, and Inventory Turnover Ratio have been used for th

the data has been analyzed and interpreted in various forms


the collected data has been analyzed and interpreted in various forms
Basic tools and techniques has been used for this project
data has been analyzed and interpreted in various forms

only analysis is discussed.no tools used for data analysis

the data has been analyzed and interpreted in table form


data has been analyzed.only standard tools used
various analysis tools are used for data analysis

analysis of data collected gives meaningful insights of the findings with various tools.

Basic tools and techniques has been used for this project.
Basic tools such as Ms-Excel, Pie charts and Bar charts have been used for this project
various ERP system evaluation techniques and ROI assessments were employed
the specific software tools or platforms (e.g., TensorFlow, PyTorch) used for implementing the ANN are not clearly stated and could be included for more c
Analysis is basic, with significant flaws impacting overall quality
analysis of data collected gives meaningful insights of the findings with various tools. suggested to use new tools
Analysis of data, tools and techniques are entirely inappropriate
The analysis tools used in the study are appropriate for the objectives and uses various taxonomies and frameworks provides a robust analytical foundation.
Basic tools and techniques has been used for this project
Tools such as Ms-Excel, graphs, pie charts and Bar charts have been used for this project
data has been analyzed and interpreted in various forms
data has been analyzed and interpreted in various forms
Basic tools such as Ms-Excel, Pie charts and Bar charts have been used for this project
Basic tools and techniques has been used for this project
Analysis of data, tools and techniques are entirely inappropriate
Basic tools and techniques has been used for this project.
Basic tools such as Ms-Excel and Pie charts has been used for this project

data has been analyzed and interpreted in various forms


the data has been collected but analysis is not done with any techniques
data has been analyzed and interpreted in various forms
analysis of data collected gives meaningful insights of the findings with various tools. suggested to use new itools
Basic tools and techniques has been used for this project
analysis of data collected gives meaningful insights of the findings with various tools.
the tools used are to facilitate Various controls for mitigating IT risks, including preventive, detective, and corrective controls​
qualitative and quantitative analysis are used but need detailed description
analysis of data collected is done with various tools. suggested to use new tools
Analysis of data, tools and techniques are entirely inappropriate

analysis of data collected gives meaningful insights of the findings with various tools. suggested to use new tools

data has been analyzed and interpreted in various forms like bar and pie charts
Analysis is basic, with significant flaws impacting overall quality

the data analysis is done with various tools and results are interpreted in various forms like charts
data has been analyzed using various statistical techniques and interpreted in various forms
data analysis has to be done with various tools and techniques
Analysis is basic, with significant flaws impacting overall quality
the collected data has been analyzed and not interpreted using tools
data has been analyzed and interpreted in various forms
Statistical methods such as regression analysis and Thematic analysis were implemented

various tools have been used and data has been interpreted using charts and graphs

Basic tools such as Ms-Excel and Bar charts have been used for this project

Tools such as Ms-Excel, graphs and pie charts have been used for this project.
Tools such as Ms-Excel, graphs and Bar charts have been used for this project

Quantitative techniques, Six Sigma practitioners been used for this case study.

Tools such as Ms-Excel , Bar charts and Pie charts have been used for this project.

Basic tools such as Ms-Excel, Pie charts and Bar charts has been used for this project.
Tools such as Ms-Excel, Chi-Square test, pie charts and Bar charts have been used for this project.
Basic tools and techniques has been used for this project.
Basic tools and techniques has been used for this project.

Some of the tools and techniques have been used for this project.

Basic tools such as Ms-Excel, Pie charts and Bar charts has been used for this project.
Tools such as Ms-Excel, graphs, pie charts and Bar charts have been used for this project
Basic tools and techniques has been used for this project.
Basic tools and techniques has been used for this project

analysis of data collected gives meaningful insights of the findings with various tools. suggested to use new tools
Tools such as graphs, pie charts, Bar charts and Percentages analysis have been used for this project
the collected data has been went through analysis using various qualitative and quantitative approaches

Basic tools and techniques has been used for this project
data has been analyzed and interpreted in bar charts
the collected data has been analyzed and interpreted in various forms
data has been analyzed and interpreted in various forms
Analysis is basic, with significant flaws impacting overall quality
data has been analyzed and interpreted in various forms

Basic tools and techniques has been used for this project
need to analyze data using various research tools

the collected data has been analyzed and interpreted in various forms
Tools such as Ms-Excel, graphs, pie charts and Bar charts have been used for this project

the collected data has been analyzed and interpreted in various forms
Tools such as Ms-Excel, graphs, pie charts and Bar charts have been used for this project

data has been analyzed and interpreted in various forms

Analysis part of tools for analysis are not in the project.


Social science research used for process of finding new information or confirming existing information
study analyzed cryptocurrency platforms and revealed many troubles and difficulties that jeopardize the system that is financial
decision-making process for agricultural automation is aided by this extensive collection of fertilizer knowledge and techniques of crop cultivation.
For data analysis some basic test has been employed
Tools and techniques for analysis is not given clearly in the project.
the expected symphony of Insights are obtained by combining real-time data analysis with traditional research methods. in-depth and comparative analysis
Exploratory and Descriptive techniques used for analyzing the collected data. require additional information about this. can be mention recent techniques fo
Analysis by using some statistical tools are missing in the project
Though analysis are basic it has been seems good
quantitative data obtained from the survey responses underwent analysis employing descriptive statistics techniques
Adaptive Algorithm uses machine learning to analyzed data and adapted content in real-time. require elaborate details about data analysis
For analyzing the data some ratios and CARAMEL model have been used

data analysed by sampling techniques,and also a variety of comparative data analyses and interpretations have been given

satisfaction and operational improvement.


survey is expanded into a more in-depth feasibility assessment based on the findings of the preliminary research. require more details about data analysis
study analyzed cryptocurrency platforms and revealed many troubles and difficulties that jeopardize the system that is financial
- Simple Random Sampling techniques used for data analysis.can be use other techniques easily analyze the data
quantitative cross-sectional data analysis approach enabled to derive quantitative insights into the prevalence of information security system.

only sampling methodology was used in analysis of data. an ABAR and Agile methodology can be mentioned for data analyzing. need more clarity about th

At least 2 analytical tools used correctly.


At least 2 analytical tools used correctly.

At least 3 analytical tools used correctly.


two types of statistics tools are used. Thematic analysis techniques were used for data analyzed. give other analysis tools for developing an enterprise
At least 3 analytical tools used correctly.

At least 3 analytical tools used correctly


Complex analytical tools used. At least 3 tools.
At least 2 analytical tools used correctly.
data examined through a variety of methods. need further clarification on this. however, data analysis is still possible with the most latest mobile application
Complex analytical tools used. At least 3 tools.
Complex analytical tools used. At least 3 tools.
Complex analytical tools used. At least 3 tools.

Complex analytical tools used. At least 3 tools.


Complex analytical tools used. At least 3 tools.
Complex analytical tools used. At least 3 tools.
At least 3 analytical tools used correctly.
Complex analytical tools used. At least 3 tools.
migrating data from legacy systems to technologically advanced and scalable platforms like cloud-based systems.
The methodology of an ERP implementation can be simple or complex, based on factors like size of the organization.
The report illuminates current trends, upcoming vulnerabilities, and enhanced defense systems by examining technical cybersecurity issues
Basic analysis of data and 2 tools and techniques are used
Minimal analysis of data with less number of tools
Appropriate tools and techniques are used
Basic analysis of data with minimum number of tools and techniques
Insufficient analysis of data with inappropriate tools and techniques
privacy of patient data and patient consent, and these problems need rigorous adherence to ethical norms. Due to the many different digital pathology system
researcher to conduct the study in an economical method and relevant to the problem.
processes to make educated decisions regarding its business transactions
Most formal analyses of knowledge driven economies have focused on the supply side: research and development and productivity.
Blockchain technology provides a secure and immutable method for recording transactions across a distributed network.
Ratio Analysis, Trend Analysis, Comparative Income Statement are performed needs to mention analysis tools
percentage. needs to use some advanced analysis tools to make data concurrency
Basic analysis with noticeable gaps or errors in the use of tools. At least 1 analytical tool used correctly
At least 1 analytical tool used correctly
At least 3 analytical tools used correctly.
Complex analytical tools used. At least 3 tools.
Complex analytical tools used. At least 3 tools.
At least 2 analytical tools used correctly.
Complex analytical tools used. At least 3 tools.
in-depth analysis on the need of ERP for a manufacturing organizations. Here SAP ERP tools are used, can be mention recent tool like Sage X3, Plex syste
Complex analytical tools used. At least 3 tools.
Adequate analysis, though some areas may lack depth
Complex analytical tools used. At least 3 tools.
At least 3 analytical tools used correctly.
Basic analysis with noticeable gaps or errors in the use of tools. At least 1 analytical tool used correctly
Complex analytical tools used. At least 3 tools.
At least 3 analytical tools used correctly.
Complex analytical tools used. At least 3 tools.
the researcher have used market analysis techniques for the analysis of data. So many techniques are there, some of the recent techniques can be utilized and
Complex analytical tools used. At least 3 tools.
Adequate analysis, though some areas may lack depth
Complex analytical tools used. At least 3 tools.
Very basic or incorrect analysis, undermining the project's credibility.
Complex analytical tools used. At least 3 tools.

various analysis tools have been used for data analysis


basic tools have been used.needs improvement
data has been analyzed and interpreted in various forms
analysis of data collected gives findings with various tools. suggested to use new tools
data has been analyzed and interpreted in various forms
various tools have been used to analyse the data
Advanced tools and techniques are used for analysis of data
Basic techniques graphs and charts table used for data analysis
Percentage,pie chart and table basic tools for used to analysis tha data
Simple statistics tools graph is used for analysis of data
Basic statistics tools are used analysis of data no new technique can be founded
No new technology used for analysis of data
The main reason for the rapid growth of the BPO industry in India is the cost-effective workforce.

At least 2 analytical tools used correctly.


quantitative and qualitative data were analyzed using statistical software and NVivo software. only few explanations are given, can be use recent other clou
various tools and techniques are given to incorporating the results of data analysis. but need few explanation it.
At least 3 analytical tools used correctly.
data analysed by Qualitative,quantitative and experimental techniques for interplay of AI with data privacy
this study employed CRM software, interrelationship and ANOVA used to evaluate the data. can be including MNOVA analysis for two or more variable s
Complex analytical tools used. At least 3 tools.
Student used only basic analysis with some gaps. He needs to use ideally two or more analytical tools properly.
Some elementary techniques has been used for analysis. Better if the student may use at least one advanced technique along with one basic tool .
using sampling techniques.can be use other techniques easily analyze the data, because have few limitation of this techniques
data will be analyzed using qualitative and quantitative techniques.but require additional information regarding data analysis
The student has used only percentage analysis. Required to use some of advanced tools for analysing the data which in turn to learn some innovative ideas.
sampling technique have been analysed primary and secondary data. can be use other techniques easily analyze the data
using excel and SPSS have been analysis of data. can employ current trend techniques use to analysis of data like zoho sheet, calc and cryptpad sheet.
Analysis is nearly absent which flaws in the result part.
For the data that were analyzed, descriptive and inferential statistical tools are indicated. but require additional information regarding data analysis
Adequate analysis, though some areas are lack. At least two analytical may be used correctly
Basic tools has been employed for data analysis.
Analysis is rudimentary. some of the number test has been employed
Excel sheets, graphs, and pie charts are used as tools.
Basic analysis with some notable gaps
Some quality statistical techniques have been employed
Simple percentage analysis has been used with some charts. No advanced research techniques used for analysis.
Basic analysis such as percentage analysis and charts have been used
For the data that were analyzed, descriptive tools are indicated. but require additional information regarding data analysis
Sufficient analysis with some noticeable lack
Basic analysis with noticeable gaps or errors in the use of tools. At least 1 analytical tool used correctly
various tools and techniques are given to incorporating the results of data analysis. but need few explanation it.
Complex analytical tools used. At least 3 tools.
Quantitative,Qualitative and Sampling Strategy methods were used to identify the obstacles and challenges in the electronic banking, to require further clari
Basic analysis with noticeable gaps or errors in the use of tools. At least 1 analytical tool used correctly
Very basic or incorrect analysis, undermining the project's credibility.
Complex analytical tools used. At least 3 tools.
Complex analytical tools used. At least 3 tools.
Complex analytical tools used. At least 3 tools.
Basic analysis with noticeable gaps or errors in the use of tools. At least 1 analytical tool used correctly
Complex analytical tools used. At least 3 tools.
Complex analytical tools used. At least 3 tools.
statistical and technical analysis techniques focused for analyzed data. And also this framework aims to enhance network security measures. Can employ so
Complex analytical tools used. At least 3 tools.
At least 3 analytical tools used correctly.
Complex analytical tools used. At least 3 tools.
At least 3 analytical tools used correctly.
latitude and longitude variables are used to analysis the dataset and network rating. require a thorough explanation for this. Can be use some other technique
thematic analysis, comparative analysis techniques used to compare findings from different data sources. need further explanation about this
Complex analytical tools used. At least 3 tools.
Complex analytical tools used. At least 3 tools.
mentioned, analyzing key sensitivity approach proved impervious to a malleability attack because of the built-in hash algorithm and FFT. have been used cr

Complex analytical tools used. At least 3 tools.


The data would properly and systematically presented utilizing tables, diagrams, outlines, but add some tools and techniques of project.
add more data tools and techniques of project devlopmnent is nice data
The data would properly and systematically presented utilizing tables, diagrams, outlines, etc. It would then be deciphered to make determination about the

The study will use a mixed-methods approach, combining quantitative data analysis with qualitative insights.

In this study the collected data to analyze trends, identify patterns, and draw conclusions.
In this study the analysis used for the study is percentage method.
The data of this project are analyzed by pie chart and tabulation format.

Add more Analysis of data, tools and techniques

In this study the collected data to analyze trends, identify patterns


the tools and techniques of the project is need some more content of blockchain
the analysis of the data ,tools and techniques of blockchain management are required some more key information of project

Analysis of data, tools and techniques need to give more ideas of this project
The data of this project are analyzed the tools and techniques of information technology is clear
Analysis is rudimentary and has significant flaws that impact overall quality.
Analysis is adequate, although some areas may lack depth or precision.
A fundamental analysis with discernible deficiencies.
There are noticeable gaps in the use of tools in basic analysis
Analysis is rudimentary and has significant flaws that impact overall quality.
Analytical skills with appropriate use of tools and techniques.
A fundamental analysis with discernible deficiencies.
Proficient analysis using appropriate tools and techniques.
Competent analysis using the right instruments and methods.
In this study the collected data to analyze trends, identify patterns, and draw conclusions.
Simple analysis with obvious flaws or mistakes in the tools' application.

There are noticeable errors in the use of tools in basic analysis


An advanced analysis using advanced tools and techniques demonstrates a deep understanding.
There is adequate analysis, though some areas may lack depth.
The process of analysis is fundamentally flawed, with significant shortcomings that have a significant impact on the overall quality.
Competent analysis utilizing appropriate tools and techniques.
A deep understanding is demonstrated by sophisticated analysis using advanced tools.
An advanced analysis using advanced tools and techniques demonstrates a deep understanding. The utilization of intricate analytical tools.
In this study the collected data to analyze trends, identify patterns, and draw conclusions.
Competent analysis utilizing appropriate tools and techniques.
The data of this project are analyzed by pie chart and tabulation format.
Basic analysis with obvious errors in the use of tools.
Accurate evaluation employing the right tools and techniques.
The analysis is rudimentary, with significant flaws impacting overall quality.
The study will use a mixed-methods approach, combining quantitative data analysis with qualitative insights.
Analytical skills with appropriate use of tools and techniques.
Advanced analysis employing cutting-edge tools and techniques, demonstrating a thorough comprehension. Analytical techniques are involved.
Advanced analysis employing cutting-edge tools and techniques, demonstrating a thorough comprehension. Analytical techniques are involved.
In this study the collected data to analyze trends, identify patterns, and draw conclusions.
There are noticeable gaps or errors in the use of tools in basic analysis.
In this study the collected data to analyze trends, identify patterns, and draw conclusions.
Analysis of data, tools and techniques are need more content of this projet
Sufficient analysis, though some areas may lack depth
An adequate analysis, although certain areas may lack depth.
In this study the collected data to analyze trends, identify patterns, and draw conclusions.
Add more Analysis of data, tools and techniques .
A proficient analysis with the appropriate use of tools and techniques.
The data would properly and systematically presented utilizing tables, diagrams, outlines, etc. It would then be deciphered to make determination about the
Advanced analysis employing cutting-edge tools and techniques, demonstrating a thorough comprehension. Complex analytical tools are used to analyze co
Basic analysis with visible gaps in the use of tools.
Very basic analysis used undermining the project's credibility. Need to use two or more analytical tools
Basic analysis used with some gaps.Student needs to use ideally two or more analytical tools properly used.
The analysis is basic and has serious errors that lower the overall quality.
No evidence of data analysis.
Sufficient analysis, although certain sections might be shallow or imprecise.
Sufficient analysis, even though there might not be enough depth in some places.

Competent analysis using the right instruments and methods.


Analysis of data, tools and technique is entirely inappropriate.
Analysis is rudimentary, with significant flaws impacting overall quality. At least 1 analytical tool used correctly

Competent analysis using the right instruments and methods.

Very basic or incorrect analysis, undermining the project's credibility.

Good analysis, albeit certain details might be a little shallow


Analysis is rudimentary, with significant flaws impacting overall quality. There are one analytical tool used correctly.

Basic analysis with significant gaps


Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly
Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly.

Sufficient analysis, although some areas may lack depth

Analysis is rudimentary, with significant flaws impacting overall quality. There is one analytical tool used correctly

Adequate research, despite the fact that some areas may lack depth

There are noticeable gaps in the basic analysis.

Accurate evaluation employing the right tools and techniques.


Adequate analysis, though some areas may lack depth or precision. There are two analytical tools used correctly.

Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly.
Analytical skills with appropriate use of tools and techniques.
Good analysis, though some areas may lack precision or depth.
The analysis is rudimentary, with significant flaws impacting overall quality.
Capable investigation with proper utilization of instruments and strategies.
Adequate analysis, though some areas may lack depth or precision. There are two analytical tools used correctly.

Analysis are scarce or completely inappropriate.


Analysis is almost nonexistent or completely inappropriate.

Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly.
Adequate analysis, though some areas may lack depth or precision. There are two analytical tools used correctly.
Analysis is rudimentary, with significant flaws impacting overall quality. There is one analytical tool used correctly.

Adequate analysis, though some areas may lack depth or precision. There are two analytical tools used correctly.
There is virtually no analysis.

Good analysis, though some areas may lack precision or depth.


There is virtually no analysis.
Good analysis, though some areas may lack precision or depth.

Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly.
Accurate evaluation employing the right tools and techniques.

Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly.
Analysis is rudimentary, with significant flaws impacting overall quality. There is one analytical tool used correctly.
Basic analysis that shows errors in the use of tools.

Good analysis, but some areas may not be deep or precise.

No evidence of data analysis.

Accurate evaluation employing the right tools and techniques.


The analysis is rudimentary, with significant flaws impacting overall quality.
Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly.
An advanced analysis using advanced tools and techniques demonstrates a deep understanding.
Competent analysis utilizing appropriate tools and techniques.

Analytical skills with appropriate use of tools and techniques.

Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly
Advanced analysis using advanced tools and techniques, demonstrating a deep understanding.
Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly

The analysis is largely absent or entirely inappropriate.

Basic analysis with noticeable gaps


Advanced analysis employing cutting-edge tools and techniques, demonstrating a thorough comprehension.

The process of analysis is fundamentally flawed, with significant shortcomings that have a significant impact on the overall quality.
Analysis is rudimentary, with significant flaws impacting overall quality
There exists no evidence of data analysis.

Basic analysis with noticeable gaps or errors in the use of tools

Sufficient analysis, even though there might not be enough depth in some places.
Competent analysis using the right instruments and methods.

Ratio analysis only used.Student needs to use ideally two or more analytical tools properly used.
Competent analysis using the right tools and methods.
Analysis is nearly absent.
Very basic analysis used.The student must use at least two analytical tool appropriately
Basic analysis used with some gaps.Student needs to use ideally two or more analytical tools properly used.
Adequate analysis, though some areas may lack depth.The student can use at least 2 more analytical tools used correctly.
Simple methodology used for analysing data with some gaps.The student needs to use ideally two or more analytical tools properly used.
Analysis is nearly absent

Sufficient analysis, even though there might not be enough depth in some places.Student needs to use atleast two analytical tools appropriately.
Simple analysis with mistakes in the tools use. The student can use at least two or more analytical tool appropriately

The analysis is basic and has serious errors that lower the overall quality.

Analysis is adequate, though some areas may be lacking depth.


only basic analysis were done with noticeable gaps. there are many flaws in interpretation.
Only a basic Analytical tools had been used.
The most comprehensively used study procedures incorporate; quantitative research, subjective research and furthermore a mixed methodology approach
Only basic tools is used in the analysis of the study.
An advanced analysis using advanced tools and techniques demonstrates a deep understanding.
The study will use a mixed-methods approach, combining quantitative data analysis with qualitative insights.
Accurate evaluation employing the right tools and techniques.

Analyses are lacking.


In this study the collected data to analyze trends, identify patterns, and draw conclusions.
The process of analysis is fundamentally flawed, with significant shortcomings that have a significant impact on the overall quality.
The study will use a mixed-methods approach, combining quantitative data analysis with qualitative insights
There are noticeable errors in the use of tools in basic analysis.
The study will use a mixed-methods approach, combining quantitative data analysis with qualitative insights.
Add more analysis of data, tools and techniques of this project.
Only ratio analysis has been used, since the paper is both primary and secondary based. No analysis done based on collected questionnaire.
There is no data analysis , tools and techniques of this study are provided.
Only simple percentage analysis is used here. Tables and charts to used to represent the analysis.
Only one tool is used for the research purpose.
employed to interpret the collected data.
There is no evidence of data analysis in the study.
Usage of tools required are appropriate.
No analysis part is explained in the study.
Adequate analysis has been used in the study, though it lacks some depth and precision.

Quantitative data from the surveys were analysed using statistical techniques, including descriptive statistics and inferential analysis, to identify patterns and

The data would properly and systematically presented utilizing tables, diagrams, outlines, etc. It would then be deciphered to make determination about the
Add more analysis ,tools and techniques of this study.

The data would properly and systematically presented utilizing tables, diagrams, outlines, etc. It would then be deciphered to make determination about the
More content need for study will use a mixed-methods approach, combining quantitative data analysis with qualitative insights

Basic analysis with noticeable gaps or errors in the use of tools


Analysis is adequate, though some areas may lack depth or precision.
Analysis is rudimentary, with significant flaws impacting overall quality
A sophisticated analysis employing sophisticated tools and techniques, demonstrating a profound comprehension. The utilization of intricate analytical tool
Basic analysis with noticeable gaps
Analysis is nearly absent
Analytical analysis is adequate, though some areas may lack depth or precision.
There are noticeable gaps or errors in the use of tools in basic analysis
There are significant flaws in the analysis that affect the overall quality.
Analysis is adequate, though some areas may lack depth or precision.

Competent analysis utilizing appropriate tools and techniques.


Adequate analysis, though some areas may lack depth
The data of this project are analyzed by pie chart and tabulation format.
The analysis of data protection legislation globally reflects the increasing importance of data in the modern economy.
The data of this project are analyzed by pie chart and tabulation format.
In this study the collected data to analyze trends, identify patterns, and draw conclusions regarding the relationship between IT and organizational agility.
A fundamental analysis exhibiting discernible errors in the utilization of tools.
Sufficient analysis, albeit certain sections might be shallow
Adequate analysis, though some areas may lack depth or precision
The data of this project are analyzed by pie chart and tabulation format.
Adequate analysis, though some areas may lack depth or precision
Competent analysis using the right instruments and methods.
Basic analysis with noticeable gaps or errors in the use of tools.
In this project the data analysis involves a combination of quantitative and qualitative techniques to extract insights and discern patterns from the collected d
Basic analysis with noticeable gaps or errors in the use of tools
The data of this project are analyzed by yes or no question type and tabulation format.
Basic analysis with noticeable gaps or errors in the use of tools.

The study will use a mixed-methods approach, combining quantitative data analysis with qualitative insights
The project report on TCS's AI adaptation initiative in project management encompasses a thorough analysis derived from various sources.
An advanced analysis using advanced tools and techniques demonstrates a deep understanding. The utilization of intricate analytical tools.
Basic analysis with noticeable gaps or errors in the use of tools.
Competent analysis using the right instruments and methods.
Basic analysis with noticeable gaps
Proficient analysis with appropriate use of tools and techniques
Analysis is rudimentary, with significant flaws impacting overall quality
Analysis is rudimentary, with significant flaws impacting overall quality
In this study the collected data to analyse trends, identify patterns, and draw conclusions regarding the relationship between IT and Banking.
Simple analysis with obvious flaws or mistakes in the tools' application.
Basic analysis with visible gaps or errors in the use of tools.
Analysis is nearly absent
Adequate analysis, though some areas may lack depth
A proficient analysis with the appropriate use of tools and techniques.
A thorough examination, though some areas may lack intricacy.
Advanced analysis employing cutting-edge tools and techniques, demonstrating a thorough comprehension.
An adequate analysis, although certain areas may lack depth.
The study will use a mixed-methods approach, combining quantitative data analysis with qualitative insights.
Strengthen the analysis by conducting a more thorough examination of the challenges faced by life insurers in appointing and retaining individual agents, en
The primary focus of this study is to examine sustainable initiatives undertaken by Maersk, a leading player in the international logistics industry.

No outstanding innovation technique used to solve the problem


No noteworthy innovation technique used for problem scheme in this project
No noteworthy innovation technique used for problem scheme in this project
Current techniques need to implement and analysis the project.
Strengthen the analysis by addressing noticeable gaps to ensure a more thorough and comprehensive exploration of the impact of fintech innovations on tra
Strengthen the analysis by addressing noticeable gaps to ensure a more comprehensive and detailed comparative study on portfolio management.
Enhance the analysis by addressing noticeable gaps to provide a more thorough and comprehensive examination of the workflow in the Indian banking sect

No noteworthy innovation technique used for problem scheme in this project


While the analysis is adequate, enhancing depth in certain areas will provide a more comprehensive understanding of the performance of mutual funds in In

Current techniques need to implement and analysis the project.


Address noticeable gaps to provide a more comprehensive analysis of consumer buying behavior towards HDFC Bank's financial products, ensuring thorou
To create a dedicated team of Six Sigma experts and foster leadership buy-in for sustainable improvement.

Empirical evidence from case studies and empirical analysis demonstrates that lean manufacturing implementation leads to improvements in produc

Analysis of existing system and implement the Kanban system to avoid drawbacks of the existing system

Current techniques need to implement and analysis the project.

data are analysis by some new tools and techniques like SPSS tools
data should analysis some new tools and techniques to level and usage of HRIS

analysis of data not mentioned clearly using only cloud computing technology
analysis of data really old tools like charts and spreadsheets mention new like SPSS

Analysis is rudimentary, with significant flaws impacting overall quality. There is one analytical tool used correctly

various tools and techniques are used for data analysis the data

Adequate analysis, though some areas may lack depth or precision. There are two analytical tools used correctly.

various tools and techniques are used for analysis the data

Analysis is rudimentary, with significant flaws impacting overall quality. There is one analytical tool used correctly
Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly
Analysis is rudimentary, with significant flaws impacting overall quality. There is one analytical tool used correctly.

Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly.

Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly.
Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly

Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly.
Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly.

Analysis is rudimentary, with significant flaws impacting overall quality. There is one analytical tool used correctly.

Analysis is rudimentary, with significant flaws impacting overall quality. There is one analytical tool used correctly.

Adequate analysis, though some areas may lack depth or precision. There are two analytical tools used correctly.

Analysis is rudimentary, with significant flaws impacting overall quality. There is one analytical tool used correctly.

Data analysis done needs to specify some data analysis tools and techniques
Needs to mention some analysis data methods and tools and techniques for mention result of the project
At least 3 analytical tools used correctly.
At least 2 analytical tools used correctly.
Data analysed with the Google form analytics charts needs to use various innovative tools and techniques to analyse the data and give results
At least 3 analytical tools used correctly.
Basic analysis with noticeable gaps or errors in the use of tools. There are one analytical tool used correctly
Needs to mention the analysis of data result and techniques with solid metrics
Analysis is rudimentary, with significant flaws impacting overall quality. There are one analytical tool used correctly
At least 3 analytical tools used correctly.
Needs to analyse the data with various tools and techniques
Needs to mention analysis of data methods and tools with some key factors
Basic analysis with noticeable gaps or errors in the use of tools. There are one analytical tool used correctly.
Complex analytical tools used. At least 3 tools.
Analysis is rudimentary, with significant flaws impacting overall quality. There are one analytical tool used correctly
At least 3 analytical tools used correctly.
At least 3 analytical tools used correctly.
Descriptive and predive analysis performed needs to specify metrics followed for analyse the data
Complex analytical tools used. At least 3 tools.

Factor analysis is a typical term utilized for various express computational strategies. needs to mention various tools and techniques for analysis the data. ne
Basic analysis with noticeable gaps or errors in the use of tools. At least 1 analytical tool used correctly.
Quantitative analysis involves the systematic empirical investigation of observable phenomena via statistical, mathematical, or computational techniques
Basic analysis with noticeable gaps or errors in the use of tools. There are one analytical tool used correctly.
Basic analysis with noticeable gaps or errors in the use of tools. There are one analytical tool used correctly.

Analysis is rudimentary, with significant flaws impacting overall quality. There are one analytical tool used correctly
Google form inbuild analysis charts are given needs to use more advanced tools to present the data and techniques
Basic analysis with noticeable gaps or errors in the use of tools. There was analytical tool used correctly.
Basic analysis with noticeable gaps or errors in the use of tools. There are analytical tool used correctly.
Data analysed with tools needs to mention some key variables and factors get result of the study

Basic analysis with noticeable gaps or errors in the use of tools. There are one analytical tool used correctly

Primary facts is obtained through the review method (questionnaire interview and observation) against the participants. needs to present some of the tools n
Analysis is nearly absent or entirely inappropriate.
Data analysis tools, techniques not present in the study report, only lenovo software documentation was analysed
Analysis is rudimentary, with significant flaws impacting overall quality. There are one analytical tool used correctly
Basic analysis with noticeable gaps or errors in the use of tools. There are one analytical tool used correctly
quantitative and qualitative analyse charts are discussed
Analysis is rudimentary, with significant flaws impacting overall quality. There are one analytical tool used correctly
Basic analysis with noticeable gaps or errors in the use of tools. There are one analytical tool used correctly
Questionnaire data collection analysis reports are discussed needs to present various tools to analyse the data and give some techniques

Adequate analysis, though some areas may lack depth or precision. There are two analytical tools used correctly.
Needs to specify various analysis tools and techniques to analyse the data, needs to present analysis report in the report
Economic variables are analysed needs to specify tools and techniques to analyse the data
Analysis is rudimentary, with significant flaws impacting overall quality. There is one analytical tool used correctly.
Analysis is rudimentary, with significant flaws impacting overall quality. There is one analytical tool used correctly
Data collection methods not specified, needs to specify tools and techniques to analyse the data
Needs to mention analysis data report and mention various tools and techniques for the study
Needs to present data analysis tools and techniques to present data

Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly

Adequate analysis, though some areas may lack depth or precision. There are two analytical tools used correctly.
Analysis is rudimentary, with significant flaws impacting overall quality. There is one analytical tool used correctly.

Adequate analysis, though some areas may lack depth or precision. There are two analytical tools used correctly

Basic analysis with noticeable gaps or errors in the use of tools. There are one analytical tool used correctly

At least 2 analytical tools used correctly.

Basic analysis with noticeable gaps or errors in the use of tools. There are one analytical tool used correctly

Adequate analysis, though some areas may lack depth or precision. There are two analytical tools used correctly
Needs to mention various data analysis tools and technique to obtain the result of the case study, this project tells a global AI benefits and techniques
Quantitative Analysis was made in the project needs to mention the analysis tools and techniques to get the result

Needs to mention analysis tools and give explanation on the techniques


Migrating data to the cloud is the main objective, needs to study on why cloud storage need for data migration and what are all the key aspects for data mig

Complex analytical tools used. At least 3 tools.


At least 3 analytical tools used correctly.
The data expected for the study is gathered from postgraduate students using questionnaire instrument by visiting all the school libraries personally under th
Needs to mention the data tools and may be focus on qualitative analysis methods and algorithms also
needs to mention the metrics to analyse the data
Quantitative data from the surveys analysed using statistical software to identify trends, patterns, and correlations
Needs to mention various analysis tools to solve the problem and give results
Adequate analysis, though some areas may lack depth
Needs to specify some key variables focus on the statistical analysis and give some tools and techniques to perform analysis
Complex analytical tools used. At least 3 tools.
Complex analytical tools used. At least 3 tools.
Complex analytical tools used. At least 3 tools.
At least 3 analytical tools used correctly.
At least 3 analytical tools used correctly.
Data collection with key variables not given in the section needs to mention some tools and techniques to perform analysis
data analysis tools and techniques needs to mention
Adequate analysis, though some areas may lack depth or precision. There are two analytical tools used correctly.
Very basic or incorrect analysis, undermining the project's credibility.
Complex analytical tools used. At least 3 tools.
At least 3 analytical tools used correctly.
Adequate analysis, though some areas may lack depth or precision. There are two analytical tools used correctly.
At least 3 analytical tools used correctly.
needs to mention the data analysis tools and methods with key variables
Basic analysis with noticeable gaps or errors in the use of tools. There are one analytical tool used correctly

Analysis is rudimentary, with significant flaws impacting overall quality. There is one analytical tool used correctly
The analysis is adequate; however, some areas may lack depth. Enhancing these sections will provide a more comprehensive understanding of the impact o

Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly.
The analysis is basic with noticeable gaps, suggesting a need for further depth and completeness in understanding the connections between Self-Help Group
The analysis is adequate overall, although certain areas could benefit from deeper exploration to provide a more comprehensive understanding.

The analysis provided is generally adequate, but it would benefit from delving deeper into certain areas to achieve a more thorough and insightful assessme
Analysis is rudimentary, with significant flaws impacting overall quality. At least 1 analytical tool used correctly
The project's analysis is foundational but lacks depth in several critical areas, which could be addressed by conducting more thorough research and filling in

researcher mentioned sampling techniques have used for analyzed the data. needed more explanation about this. other techniques can be used for inventory
The analysis demonstrates proficiency with appropriate utilization of tools and techniques, ensuring thorough and insightful findings.
The analysis presented is basic, revealing noticeable gaps that should be addressed to provide a more thorough understanding of the impact of digital bankin
Current techniques need to implement and analysis the project.

The analysis is basic and contains noticeable gaps, requiring a more thorough examination to ensure completeness and accuracy.
Enhance the analysis by addressing gaps and errors in tool usage, ensuring a more thorough and accurate examination of the impact of inflation and interest
systematic approach and techniques used by researchers to analyzing primary and secondary data. can employ current trend techniques used to analysis of
No noteworthy innovation technique used for problem scheme in this project
Improve the analysis by addressing significant flaws and employing more sophisticated techniques to enhance the overall quality of the study on the evoluti
The project aims to contribute to a deeper understanding of the procurement process, particularly the role of technology, and its impact on various stakehold
Current techniques need to implement and analysis the project.

No noteworthy innovation technique used for problem scheme in this project


Ensure the analysis maintains proficiency by consistently applying appropriate tools and techniques to effectively examine mergers and acquisitions in the I
India is the world's largest producer and consumer of milk and dairy products, accounting for 20% of global milk production.
Improve the analysis by rectifying noticeable gaps and errors in tool usage, ensuring a more comprehensive evaluation of consumer perceptions of e-bankin

The analysis is basic and contains noticeable gaps, requiring a more detailed and thorough examination to ensure completeness and accuracy.
Enhance the analysis by addressing noticeable gaps to ensure a more thorough and comprehensive examination of Small Finance Banks in India.

Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly
Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly.

Adequate analysis, though some areas may lack depth or precision. There are two analytical tools used correctly.
Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly
Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly

some of the Analysis used


depth

Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly.
Adequate analysis, though some areas may lack depth or precision. There are two analytical tools used correctly.

Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly
Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly
Adequate analysis, though some areas may lack depth or precision There are two analytical tools used correctly.
Adequate analysis, though some areas may lack depth or precision. There are two analytical tools used correctly
Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly.
give some of the tools for analysis the data
Adequate analysis, though some areas may lack depth or precision. There are two analytical tools used correctly.
various analysis and techniques used for data collection

use various tool and techniques for analysis the data

various tools are charts, percentage analysis used


Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly.
Basic analysis with noticeable gaps or errors in the use of tools. There is one analytical tool used correctly
YET TO BE TUNED
NEED MORE ATTENTION
FINE
OK BUT NOT COMPLETELY ANALYSED
SOME WHAT ANALYSED
EVERY THING IS COPIED FROM INTERNET
ANALIZED
WELL ANALYSED
ANALYSED WELL
WELL ANALYSED
Analysis is nearly absent or entirely inappropriate.
Basic analysis with noticeable gaps or errors in the use of tools.
WELL ANALYSED
WELL ANALYZED
Deep understanding is demonstrated through sophisticated analysis using advanced tools and techniques. 3 tools were employed.
Sophisticated analysis using advanced tools and techniques, demonstrating a deep understanding. Many sophisticated analytical tools are utilized.
An analysis that is basic and has some visible gaps or errors in the use of tools. The analytical tool is correctly used.
Analysis is rudimentary, with significant flaws impacting overall quality.
Very basic or incorrect analysis, undermining the project's credibility
Basic analysis with noticeable gaps or errors in the use of tools
Basic analysis with noticeable gaps or errors in the use of tools
Basic analysis with noticeable gaps or errors in the use of tools
Basic analysis with noticeable gaps or errors in the use of tools.
Basic analysis with noticeable gaps or errors in the use of tools
Very basic or incorrect analysis, undermining the project's credibility.
Advanced analytical tools and techniques are used to demonstrate a deep understanding of sophisticated analysis.
competent analysis using the right instruments and methods.significant analytical instruments used appropriately.
deep comprehension demonstrated through sophisticated analysis utilizing cutting-edge tools and techniques. Robust analytical instruments are employed. t
Basic analysis with noticeable gaps or errors in the use of tools.
and techniques. more than three analytical tools are used properly.

Basic analysis with noticeable gaps or errors in the use of tools.


competent analysis using the right instruments and methods. at least three properly applied analytical tools.
Using at least two analytical tools appropriately
Basic analysis with noticeable gaps or errors in the use of tools.
Powerful analytical tools are utilized.

Adequate analysis, though some areas may lack depth or precision. many tools have been used, all of which are concrete
No noteworthy innovation technique used for problem scheme
depth.
gaps
gaps.
To examine the importance of data security and privacy in IoT applications within smart cities and propose protective measures.
gaps
Current techniques need to implement and analysis the project.
tools.
Data collection methods are partially described
techniques
data analysis.
Current techniques need to implement and analysis the project.
tools.
Current techniques need to implement and analysis the project.
tools.
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
Current techniques need to implement and analysis the project.
Basic analysis with noticeable gaps
Current techniques need to implement and analysis the project.
Current techniques need to implement and analysis the project.
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
Current techniques need to implement and analysis the project.
Basic analysis with noticeable gaps
Adequate analysis, though some areas may lack depth
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
gaps
Proficient analysis with appropriate use of tools and techniques.
Adequate analysis, though some areas may lack depth
Adequate analysis, though some areas may lack depth
Analysis is rudimentary, with significant flaws impacting overall quality.
Basic analysis with noticeable gaps
Basic analysis with noticeable gaps
Current techniques need to implement and analysis the project.
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
encryption.
automation.
credibility.
depth.
precision.
Current techniques need to implement and analysis the project.
No noteworthy innovation techniques are used for problem statement
Current techniques need to implement and analysis the project.
The project will assess the readiness of organizations for ITIL implementation by evaluating their existing IT service management practices, infrastructure,
depth.
depth.
depth.
inappropriate.
Current techniques need to implement and analysis the project.
No noteworthy innovation technique used for problem scheme in this project
precision
Current techniques need to implement and analysis the project.
depth.
gaps.
Current techniques need to implement and analysis the project.
Current techniques need to implement and analysis the project.
gaps.
overall quality.
depth.
depth .
Current techniques need to implement and analysis the project.
Very basic
Current techniques need to implement and analysis the project.
techniques.
techniques.
Develop a framework for continuous evaluation and adoption of emerging technologies to maintain a competitive edge.
tools.
depth.
Attracting top talent for virtual teams necessitates a broader reach and the use of digital recruitment tools.
Recommendations to objectives of the study need to give clearly about the project.
On the basis of the study, it can be safely concluded that most of the selected mutual fund schemes during the study period are performing well and are goin
maintain competitiveness in the future.
Ensuring that marketing strategies and product offerings are inclusive of all genders is essential.
overall quality.
considers utilized a subjective investigate strategy where information is collected from the member and examined utilizing topical examine.
gaps.
depth.
depth.
Current techniques need to implement and analysis the project.
gaps.
A few people use them for business purposes, to network and discover new bargains.
depth.
gaps.
Current techniques need to implement and analysis the project.
depth.
overall quality.
No noteworthy innovation technique used for problem scheme in this project
Current techniques need to implement and analysis the project.
Identify and analyze the specific roles played by IT infrastructure, digital communication platforms, and data analytic tools need to use in this project.
No noteworthy innovation technique used for problem scheme in this project
Strong measures to protect patient privacy and data security are crucial, especially considering the sensitive nature of healthcare data.
gaps.
precision.
Building and deploying the platform, followed by testing and feedback collection.
gaps.
Understand customer perceptions of digital accessibility and sustainability aspects of digital solutions.
Enable precise and adaptive educational recommendations that are aligned with individual student profiles, helping to guide their learning journey accordin
nearly absent
Current techniques need to implement and analysis the project.
No noteworthy innovation technique used for problem scheme in this project
depth
Very basic
depth
Analyse the impact of navigation and layout on user engagement and satisfaction on Amazon and eBay
To study the relationship between gender and the perception that AI Intervention will disrupt the Education System of India
gaps
gaps
gaps
depth
depth
Current techniques need to implement and analysis the project.
the project's credibility
undermining the project's credibility
gaps
Data collection methods are partially described
tools.
Current techniques need to implement and analysis in this project work.
No noteworthy innovation technique used for problem scheme in this project
Current techniques need to implement and analysis this project.
gaps
Current techniques need to implement and analysis the project.
Advanced IT systems enable accurate record-keeping, real-time monitoring of transactions, and compliance with regulatory requirements, thereby reduci
gaps
Current techniques need to implement and analysis the project.
gaps.
No noteworthy innovation technique used for problem scheme in this project
overall quality.
No noteworthy innovation technique used for problem scheme in this project
Current techniques need to implement and analysis the project.
tools.
To analyze the performance of AI tools and its impact on the risk management framework
tools.
tools.
gaps.
No noteworthy innovation technique used for problem scheme in this project
Fundamental restructuring of the payment landscape, with far-reaching consequences for the future of commerce and financial inclusion.
overall quality.
Graphs and tables basic techniques used for analysis of data
No noteworthy innovation technique used for problem scheme in this project
gaps .
depth.
depth.
precision.
No noteworthy innovation technique used for problem scheme in this project
This involves assessing the capabilities of artificial intelligence technologies in detecting and mitigating fraudulent activities in financial transac
Providing targeted training and education programs to increase awareness of cyber threats and effective coping strategies.
Risk is exacerbated if devices are not equipped with adequate security measures such as strong passwords, biometric authentication, or remote wiping capab
Current techniques need to implement and analysis the project.
Current techniques need to implement and analysis the project.
precision.
Basic analysis with noticeable gaps or errors in the use of tools.
autonomous delivery system
information from unauthorized access, loss, or theft.
to understand industry-specific needs and preferences for collaboration tools.
Very basic or incorrect analysis, undermining the project's credibility
Very basic or incorrect analysis, undermining the project's credibility.
Basic analysis with noticeable gaps or errors in the use of tools

By addressing current challenges, aligning with industry best practices, and optimizing service delivery, JP Morgan is positioned to not only enhance intern
Conduct thorough market research to identify ERP systems that best meet their specific business need
Techniques may include encoding categorical variables, scaling numerical features, creating interaction terms, and deriving time-based features.
Cyber security seeks to safeguard digital assets, including sensitive data, intellectual property, and critical infrastructure, from unauthorized access, theft, or
Basic analysis with noticeable gaps or errors in the use of tools.
Analysis is rudimentary, with significant flaws impacting overall quality.
Analysis is rudimentary, with significant flaws impacting overall quality.
Adequate analysis, though some areas may lack depth
Very basic or incorrect analysis, undermining the project's credibility.
Current techniques need to implement and analysis the project.
be wondering what actionable steps you can take.
WELL EXPLAINED
Adequate analysis, though some areas may lack depth
Basic analysis with noticeable gaps or errors in the use of tools
Basic analysis with noticeable gaps or errors in the use of tools
ANALYSED WELL BUT NEED LITTLE IMPROVEMENT

Basic analysis with noticeable gaps or errors in the use of tools


WELL ANALYSED
Sophisticated analysis using advanced tools and techniques, demonstrating a deep understanding. Complex analytical tools used. more than 3 tools.

Basic analysis with noticeable gaps or errors in the use of tools. At least 1 analytical tool used correctly
Sophisticated analysis using advanced tools and techniques, demonstrating a deep understanding. Complex analytical tools used.
LITTLE NEED CONCENTRATION NEEDED IN SELECTING TOOLS AND TECHNIQUES FOR ANALYSATION
Adequate analysis, though some areas may lack depth or precision
Basic analysis with noticeable gaps or errors in the use of tools
WELL ANALYSED
Basic analysis with noticeable gaps or errors in the use of tools
Basic analysis with noticeable gaps or errors in the use of tools
not completely analyzed
Basic analysis with noticeable gaps or errors in the use of tools.
Basic analysis with noticeable gaps or errors in the use of tools
NEED TO BE CONCENTRATED
Very basic or incorrect analysis, undermining the project's credibility
OK
Basic analysis with noticeable gaps or errors in the use of tools
Basic analysis with noticeable gaps or errors in the use of tools.
well analyzed

Basic analysis with noticeable gaps or errors in the use of tools.


Basic analysis with noticeable gaps or errors in the use of tools
Basic analysis with noticeable gaps or errors in the use of tools
Basic analysis with noticeable gaps or errors in the use of tools.
computed, affects the results of the analysis.
gaps
nearly absent
With the increasing reliance on technology for day-to-day operations, the role of IT service desks has never been more critical.
depth
Current techniques need to implement and analysis the project.
precision
Current techniques need to implement and analysis the project.
Current techniques need to implement and analysis the project.
use through transparent governance frameworks and compliance with regulations
Creating a dedicated innovation lab or think tank could foster a more structured approach to experimentation and innovation.
Current techniques need to implement and analysis the project.
gaps
No noteworthy innovation technique used for problem statement of the projext
tools
Analyzing the incorporation of IoT in various sectors, along with the challenges in adopting IoT and its advantages.
Current techniques need to implement and analysis the project.
depth
No noteworthy innovation technique used for problem scheme in this project
No noteworthy innovation technique used for problem scheme in this project
techniques.
gaps
No noteworthy innovation technique used for problem scheme
Current techniques need to implement and analysis the project.
depth
tools.
Current techniques need to implement and analysis the project.
Current techniques need to implement and analysis the project.
nearly absent
Current techniques need to implement and analysis the project.
data analysis.
nearly absent
data analysis.
nearly absent
nearly absent
gaps

Adequate analysis, though some areas may lack depth or precision

Basic analysis with noticeable gaps or errors in the use of tools.

Adequate analysis, though some areas may lack depth or precision


Basic analysis with noticeable gaps or errors in the use of tools.

Adequate analysis, though some areas may lack depth or precision

Adequate analysis, though some areas may lack depth or precision


Adequate analysis, though some areas may lack depth or precision
Basic analysis with noticeable gaps or errors in the use of tools.

Adequate analysis, though some areas may lack depth or precision


Adequate analysis, though some areas may lack depth or precision

Proficient analysis with appropriate use of tools and techniques.


Analyzing data for competition analysis in the construction chemicals industry in India involves using various tools and techniques to extract meaningful in
Basic analysis with noticeable gaps or errors in the use of tools
Basic analysis with noticeable gaps or errors in the use of tools.
The analysis effectively links these findings to outsourcing strategies, showing how cloud computing enables organizations to optimize their IT resources. I
Basic analysis with noticeable gaps or errors in the use of tools
Adequate analysis, though some areas may lack depth or precision
Adequate analysis, though some areas may lack depth or precision
Adequate analysis, though some areas may lack depth or precision
Adequate analysis, though some areas may lack depth or precision
The data analysis is thorough, employing appropriate statistical tools to identify patterns and correlations. The findings are well-presented, with clear charts
Analyzing data, tools, and techniques in assessing AI's impact on corporate product development and R&D involves evaluating how AI is used, what data i
Analyzing data, tools, and techniques for implementing ITIL 4 in modern organizations involves evaluating the methods used to gather, process, and derive
The usage of proactive and holistic approach to cybersecurity within the framework of ITSM was used to analyze the data
Adequate analysis, though some areas may lack depth
The Ramification and Dissecting were used for the analysis of the collected data.
Basic analysis with noticeable gap
Analysis is rudimentary, with significant flaws impacting overall quality.
The study involves Stake holders’ meetings, Subjective interviews, Business critical analysis, Pain points lists and problem statements as the analytical tool
The most of the data and information in this research is secondary data obtained from periodicals, papers, magazines, and reports
Simple methodology used for analysing data with some gaps.He needs to use ideally two or more analytical tools properly used.

Very basic analysis undermining the project's credibility.


Simple methodology used for analysing data with some gaps. The student needs to use ideally two or more analytical tools properly.

Student used Percentage Analysis and chisquare analysis which demonstrates a deep understanding and use two more analytical tools.
The student didnot use any analtical tools for analyising the data.

Simple methodology used for analysing data with some gaps.The student needs to use two or more analytical tools properly.

No evidence of data analysis


Very basic analysis used. At least 2 analytical tools used correctly
The student didnot present any analytical tools
Other subject file
Sufficient analysis, even though there might not be enough depth in some places.Student needs to use two more analytical tools appropriately.
Other subject file
The student didnot use any analytical tools.
Other subject file
Sufficient analysis, even though there might not be enough depth in some places.Student needs to use two more analytical tools appropriately.
simple analysis with mistakes in the tools' use. Use two more analytical tool appropriately.
Student didnot present any analysis of data, tools and techniques.

Sufficient analysis, even though there might not be enough depth in some places.

Student uploaded assignment questions with answers.

Basic analysis with noticeable gaps or errors in the use of tools.

Adequate analysis, though some areas may lack depth or precision


Adequate analysis, though some areas may lack depth or precision

dаtа is flеxibly distributеd аcrоss multiplе rеsоurcеs.


techniques of the project is study is to determine the necessity for a teacher review website from the perspectives of its primary users.
including robotic process automation (RPA), artificial intelligence (AI), and machine learning (ML), is expected to accelerate in the coming years.
importance of fostering a supportive and inclusive workplace environment.
tools and techniques scope of a data warehouse encompasses its intended functionalities, capabilities, and the range of data it is designed to handle.

banking and IT sectors


utilising these core principles.

officers in various banks to gather quantitative data on the extent of cloud computing adoption, perceived security threats, and compliance issues.

Analysis of data of this project find them online for future references for the further more study that needs to be done with the help of the study I conducted
Descriptive and inference statistics analysis used with some gaps.Student needs to use one more analytical tools used.
techniques of the projects Users can create automated tests without extensive coding knowledge.
techniques of the project is data collection in Crest Life sciences Private Limited due to limited time in hand.
Proficient analysis with appropriate use of tools like factor analysis, Chisquare and ANOVA techniques.
investigating the potential of implementing digital currencies.
Adequate analysis, though some areas may lack depth at least 2 analytical tools used correctly.
systems that are shaping the future of digital transactions in the country.
Analysis of data, tools and techniques is nearly absent
tools.
Frequencies and percentage analysis only used. At least 2 analytical tools used correctly.
Descriptive and inferential analysis analysis used. Need to use one more analytical tool.
Comprehensive market research and targeted outreach enhance Unique Biotech’s brand positioning.
Adequate analysis though some areas may lack depth and use 2 more analytical tools.
Other subject file
f occurrence is required to understand the frequency at which such failures occur. This is based upon previous experiences and also looking at the current im
Other subject file
In this case, primary data were acquired using survey methodologies.
Technology in Indian Automobile Industry”.
Other subject file

Basic analysis with noticeable gaps in the use of tools. At least 1 analytical tool used correctly
simple analysis used with noticeable gaps in the use of tools. Student needs to use two or more analytical tool used correctly.
Basic analysis with noticeable gaps or errors in the use of tools. At least 1 analytical tool used correctly.

Proficient analysis with appropriate use of tools and techniques.


Proficient analysis with appropriate use of tools and techniques.

Simple methodology used for analysing data with some gaps.The student needs to use ideally two or more analytical tools properly used.

Basic analysis with noticeable gaps in the use of tools. At least 1 analytical tool used correctly.

Basic analysis with noticeable gaps in the use of tools. At least 2 analytical tool used correctly
Simple analysis with mistakes in the tools application. Student should use at least two analytical tools appropriately.
The analysis is basic and has some errors that lower the overall quality.student can use at least two analytical tool appropriately.
Sufficient analysis, even though there might not be enough depth in some places
Simple methodology used for analysing data with some gaps.He needs to use ideally two or more analytical tools properly used.

Analysis of data, tools and techniques is nearly absent


Statistical data analysis is nearly absent

Analysis of data, tools and techniques is nearly absent


Very basic analysis used by the student. Need to use at least 2 analytical tool correctly.

Very basic analysis used by the student. Need to use at least 2 analytical tool correctly.
Simple methodology used for analysing data with some gaps.He needs to use ideally two or more analytical tools properly used.

Other subject file


Small and medium enterprises commonly referred to as SMEs, constitute a vital component of a robust economy.
adoption of Cloud Computing

need much more tools about project it helps quality of the project
presentation of data, providing deeper insights into banking operations and aiding in more effective decision-making.
and the SLR.

tools and techniques predictive analysis.

elevated number of efforts without impacting system performance. A


issue-distincting evidence, is a feature of an intelligently guided research project.
up in discussions on online businesses and online shopping

learning algorithms created by the University of Waikato.


customer support.
results.

researchers to conduct a study, gather data, analyze findings, and draw conclusions.
new technologies from IoT to drones to boost efficiencies

the data in a study.


Data Analysis & Interpretation All the data collected is described in this part of the research project

techniques of the project is Original information gathered directly from sources by researchers for a particular study goal is referred to as primary data.
data analysis is a process to convert data to a story and interpret it to derive insights.
Analysis of data, tools and techniques of the project is the information regarding the verifiable gadgets embraced for the study has been consolidated.
Proficient analysis with appropriate use of tools and techniques
Proficient analysis with appropriate use of tools and techniques.
Proficient analysis with appropriate use of tools and techniques.

Proficient analysis with appropriate use of tools and techniques.


Adequate analysis, though some areas may lack depth or precision

Proficient analysis with appropriate use of tools and techniques.

Adequate analysis, though some areas may lack depth or precision

Basic analysis with noticeable gaps or errors in the use of tools.

Basic analysis with noticeable gaps or errors in the use of tools.

Adequate analysis, though some areas may lack depth or precision

Adequate analysis, though some areas may lack depth or precision

Adequate analysis, though some areas may lack depth or precision


Adequate analysis, though some areas may lack depth or precision

Adequate analysis, though some areas may lack depth or precision

Proficient analysis with appropriate use of tools and techniques.

Basic analysis with noticeable gaps or errors in the use of tools

Analysis is rudimentary, with significant flaws impacting overall quality.

Adequate analysis, though some areas may lack depth or precision


Adequate analysis, though some areas may lack depth or precision
Adequate analysis, though some areas may lack depth or precision
Adequate analysis, though some areas may lack depth or precision
Basic analysis with noticeable gaps or errors in the use of tools.

Adequate analysis, though some areas may lack depth or precision


Adequate analysis, though some areas may lack depth or precision
Basic analysis with noticeable gaps or errors in the use of tools

Basic analysis with noticeable gaps or errors in the use of tools.


Other subject file.
These special purpose financial statements have been prepared in accordance with Indian Accounting Standards
Internet banking, mobile banking applications, and digital payment solutions have empowered customers with round-the-clock access to their accounts, ena
Other subject file
Target identification and analysis techniques include network discovery, network port and service identification, vulnerability scanning, wireless scanning,
Simple methodology used for analysing data with some gaps.He needs to use ideally two or more analytical tools properly used.
Other subject file
This paper is an industrial report on a project for migrating an airport management system from a Bull mainframe using COBOL
The evolution of digital marketing has been driven by the rapid growth of internet usage and the proliferation of digital devices, transforming how business

Simple methodology used for analysing data with some gaps.The student needs to use ideally two or more analytical tools properly used.
Copy case(Course book)
Very basic analysis used by the student. Need to use at least 2 analytical tool correctly.
This analysis shows that majority of the employees in Infosys are satisfied
Other subject file
simple analysis used with noticeable gaps in the use of tools.Student needs to use at least two more analytical tool used correctly.
This seamless one-time payment mechanism enables users to redeem the voucher without a card, digital payments app or internet banking access
Data analytics relies on a variety of software tools including spreadsheets, data visualization, reporting tools, data mining programs, and open-source langua
The application of blockchain for transaction processing, coupled with data analytics for operational insights, significantly optimizes efficiency

These methods are crucial for drawing conclusions from data and assessing the significance of findings.
Other subject file
Very basic analysis used by the student. Need to use at least 2 analytical tool correctly.
Data collection and analysis tools are defined as a series of charts, maps, and diagrams designed to collect, interpret, and present data for a wide range of ap
Analysis is nearly absent.
Very basic analysis used by the student. Need to use at least 2 or more analytical tool correctly.
Salesforce offers several tools to help you analyze your data and act on it. Reports and dashboards are built into Salesforce.
Other subject file
This document provides an analysis of human resource planning and its effect on organizational effectiveness at the Information Services
Basic analysis used with some gaps.Student needs to use ideally two or more analytical tools properly used.
simple analysis with mistakes in the tools' use. Use at least two or more analytical tool appropriately.
on customer satisfaction by observing variations in AI implementation and measuring resulting changes in customer satisfaction levels.
Customer behavior analytics involves gathering customer data to examine user behaviors and extract valuable insights.
Simple analysis with mistakes in the tools' use. Use at least two more analytical tool appropriately.

simple analysis with mistakes in the tools' use. Use at least two analytical tool appropriately.

No evidence of data analysis.


Analysis is nearly absent

Analysis is rudimentary, with significant flaws impacting overall quality

The use of secondary data is strength of this study


Basic analysis with noticeable gaps

The research project data collection methods are appropriate for the study
Adequate analysis, though some areas may lack depth
Basic analysis with noticeable gaps or errors in the use of tools
Basic analysis with noticeable gaps or errors in the use of tools
Analysis is rudimentary, with significant flaws impacting overall quality.

Analysis is nearly absent


The SWOT analysis could be strengthen by including more specific and require actionable recommendation

The data analysis plan is adequate and use of tools and techniques are good

Basic analysis with noticeable gaps or errors in the use of tools


Basic analysis with noticeable gaps or errors in the use of tools

The use of tools and techniques are effective but could need additional statistical analysis
Basic analysis with noticeable gaps or errors in the use of tools.
Basic analysis with noticeable gaps or errors in the use of tools

Basic analysis with noticeable gaps or errors in the use of tools


Basic analysis with noticeable gaps or errors in the use of tools

Basic analysis with noticeable gaps or errors in the use of tools.


Basic analysis with noticeable gaps or errors in the use of tools
The use of Percentage Analysis and ANOVA test tools is an appropriate choice for analyzing the data

Basic analysis with noticeable gaps or errors in the use of tools


The use of MS Excel for data analysis is appropriate and effective but require to improve data management
Basic analysis with noticeable gaps or errors in the use of tools

Very basic or incorrect analysis, undermining the project's credibility

The data of this project are analyzed by pie chart and tabulation format.
The data of this project are analyzed by pie chart and tabulation format.
The study will use a mixed-methods approach, combining quantitative data analysis with qualitative insights.
In this study the collected data to analyze trends, identify patterns, and draw conclusions
The data would properly and systematically presented utilizing tables, diagrams, outlines, etc. It would then be deciphered to make determination about the
A comprehensive analysis of past and current research, case studies, and industry reports.
opted for Google Meets and telephone interviews to facilitate participation and ensure comfort for the participants.
Interpretation were done on basis of tables and charts
Data analysis provided has no source evidence
tables are used for data analysis

The study will use a mixed-methods approach, combining quantitative data analysis with qualitative insights.
In this project the data are analyzed by the legislative issues which are prone to have an effect on the aid of cryptocurrencies.
The study will use a mixed-methods approach, combining quantitative data analysis with qualitative insights

The data would properly and systematically presented utilizing tables, diagrams, outlines, etc. It would then be deciphered to make determination about the
Case study is used for the data

Very basic and incorrect analysis of tools and techniques are used
Advanced tools and techniques are used for analysis of data

Efficient data tools and techniques are used for analysis of data

Adequate analysis of data tools and techniques are used

Very basic or incorrect analysis are used to data


Adequate analysis, though some areas may lack depth or precision At least 2 analytical tools used correctly
good and adequate analysis tools are used

very basic analysis only given use more analysis needed

GOOD ANALYSIS
analysis was good and more techniques to be used
anaysis is not sufficient
using advancedtools and techniques,demonstrating a deep understanding.
Proficient analysis with appropriate use of tools
use some additional tools for this data analysis
Basic analysis with noticeable techniques are used
Proficient analysis with appropriate use of tools and techniques are used
Efficient analysis of data ,tools and techniques are used

detailed analysis of data is needed and also used more techniques to be used

was analyzed using advanced data analytics techniques.


Interpretation are done through tables and charts

excellent tools are used in this research study

detailed analysis needed by using various tools

SPSS technique is used for data analysis


Descriptive Analysis, Thematic Analysis, Comparative Analysis, Inferential Analysis and Case Study Analysis are presented
Data interpreted are done through charts
suitable tools to be used for study
Specific tool is not clearly mentioned
Utilized statistical software to examine the survey data, such as SPSS or R.
in the use of tools
use various tools for the study
using analysis technique was suitable for this project

areas may lack depth


various tools are used for analyze the data
Data analyzed from 32 responders
Case studies are taken for analysis
INSUFFIENT TOOLS USE MORE TOOLS TO ANLYSE THE DATA

using various innovative tools for analysing the data

sufficient tools and technique are used for analysis of data


tools are inadequate using more tools are used for data analysis
comparative analysis.
Clinical Decision Support Systems is used as technique
In quantitative analysis, surveys are conducted to analyze the data.
Basic analysis with noticeable gaps
Basic analysis with noticeable gaps
qualitative and quantitative techniques are used

Adequate analysis, though some areas may lack depth

Basic analysis with noticeable gaps or errors in the use of tools.

Analysis is rudimentary, with significant flaws impacting overall quality.


Basic analysis with noticeable gaps
most appropriate tools are used
The data of this project are analyzed by pie chart and tabulation format.

Add more details about how analyse the of this project.


The data will also be gathered through interviews and through the studies delivered to staff members and people of State financial of India

the concept of system machine learning is good for analysis of data tools and concept
The study will use a mixed-methods approach, combining quantitative data analysis with qualitative insights.

this study the collected data to analyze trends, identify patterns, and draw conclusions

a mixed-methods approach, combining quantitative data analysis with qualitative insights.

this study the collected data to analyze trends, identify patterns, and draw conclusions
In this study the collected data to analyze trends, identify patterns, and draw conclusions.
we will use a mixed-methods approach, combining quantitative data analysis with qualitative insights.

this study the collected data to analyze trends, identify patterns, and draw conclusions

Adequate analysis, though some areas may lack depth


Analysis is nearly absent

Adequate analysis, though some areas may lack depth


inadequate tools are used and apply various tools for analyse the data
Some attempt at innovation,but withlimited impacton problem solving
Adequate analysis,though someareas may lack depth
Adequate analysis, though some areas may lack depth
Adequate analysis, though some areas may lack depth

Proficient analysis with appropriate use of tools and techniques.


Basic analysis with noticeable gaps
Basic analysis with noticeable gaps
various tools are used for data analysis
Basic analysis with noticeable gaps
Analysis is nearly absent
Analysis is nearly absent
use various tools are used to data collection
Adequate analysis, though some areas may lack depth
more tools and techniques are used for based on objective
using analysis techniques is good and adopt various tools for future
Basic analysis with noticeable gaps

use sufficient tools are used for analysis of data


Basic analysis with noticeable gaps or errors in the use of tools.
Adequate analysis, though some areas may lack depth
Basic analysis with noticeable gaps or errors in the use of tools.
Basic analysis with noticeable gaps

Basic analysis with noticeable gaps


Adequate analysis, though some areas may lack depth
Proficient analysis with appropriate use of tools and techniques.
Basic analysis with noticeable gaps
Basic analysis with noticeable gaps
Basic analysis with noticeable gaps

No evidence of data analysis


Adequate analysis, though some areas may lack depth
Analysis is nearly absent
Adequate analysis, though some areas may lack depth
various tools are used for analysis of data
strong tools are used for analysis of data
The study has good of summarizing the descriptive statistics but could develop deeper into the inferential statistics.

The data analysis from the semi-structured interviews is good but may require more clarity
The tools and techniques used are adequate a
The exploratory research methods are appropriate for the research question
The data analysis plan is adequate and use of tools and techniques are good
No evidence of data analysis
Basic analysis with noticeable gaps

Proficient analysis with appropriate use of tools and techniques


Adequate analysis, though some areas may lack depth

Basic analysis with noticeable gaps


various techniques and tools are used for analyse the data
use more techniques for analyse the data
incorrect analysis, undermining the project's credibility

Analysis is rudimentary, with significant flaws impacting overall quality. At least 1 analytical tool used correctly
Basic analysis with noticeable gaps or errors in the use of tools.
Proficient analysis with appropriate use of tools and techniques
Proficient analysis with appropriate use of tools and techniques
Basic analysis with noticeable gaps or errors in the use of tools.

At least 2 analytical tools used correctly.


Basic analysis with noticeable gaps or errors in the use of tools.
Adequate analysis, though some areas may lack depth or precision

Adequate analysis, though some areas may lack depth or precision


At least 3 analytical tools used correctly.
Basic analysis with noticeable gaps or errors in the use of tools.

At least 1 analytical tool used correctly


Adequate analysis, though some areas may lack depth or precision.
Adequate analysis, though some areas may lack depth or precision

Basic analysis with noticeable gaps or errors in the use of tools

Adequate analysis, though some areas may lack depth or precision


Adequate analysis, though some areas may lack depth or precision

Adequate analysis, though some areas may lack depth or precision

Adequate analysis, though some areas may lack depth or precision. There are two analytical tools used correctly.

Basic analysis with noticeable gaps or errors in the use of tools. There are one analytical tool used correctly.
Basic analysis with noticeable gaps or errors in the use of tools. There are analytical tool used correctly.

Basic analysis with noticeable gaps or errors in the use of tools.


Adequate analysis, though some areas may lack depth or precision. There are analytical tools used correctly.
Basic analysis with noticeable gaps or errors in the use of tools. There are one analytical tool used correctly
Analysis is rudimentary, with significant flaws impacting overall quality. There are one analytical tool used correctly
Basic analysis with noticeable gaps or errors in the use of tools. There are one analytical tool used correctly
At least 2 analytical tools used correctly.

At least 1 analytical tool used correctly


Basic analysis with noticeable gaps or errors in the use of tools. There are one analytical tool used correctly

Proficient analysis with appropriate use of tools and techniques.

The integration of cloud services with legacy structures may result in a variety of technological issues; thus, it is necessary to find a solution to this problem

The primary approach of statistics collection for this look is the systematic evaluation of literature related to mission manipulation methodologies, with a fo
Analysis is nearly absent or entirely inappropriate.
Proficient analysis with appropriate use of tools and techniques.

At least 2 analytical tools used correctly.


Analysis is rudimentary, with significant flaws impacting overall quality.
Recognizing these connections not only simplifies experimental approaches but also equips us with predictive power in complex corporate environments
The proactive management of ethical challenges not only mitigates risks but also creates significant opportunities for companies to build trust, innovate, and
gauge customer sentiment

This data can be gathered independently or with the assistance of third-party organizations. The purpose of this approach is to gain deeper insights
Adequate analysis, though some areas may lack depth or precision

Basic analysis with noticeable gaps or errors in the use of tools.


At least 3 analytical tools used correctly.
Proficient analysis with appropriate use of tools and techniques.
Very basic or incorrect analysis, undermining the project's credibility.
Adequate analysis, though some areas may lack depth or precision
mainly looked at simple processes during testing and initial implementation.

Basic analysis with noticeable gaps or errors in the use of tools.


comparative analysis is a type of statistical method whereby two or more datasets are compared to determine their consistency with one another

qualitative and quantitative research methodologies


improve productivity within the organization.
Adequate analysis, though some areas may lack depth or precision
Proficient analysis with appropriate use of tools and techniques.

To better prepare for this transition, we gathered insights from key stakeholders through surveys and interviews. This report summarizes the findings and pr
Adequate analysis, though some areas may lack depth or precision
Each approach has unique benefits and drawbacks, and the selection process is influenced by a number of variables, including the study questions, the targe
This could be on the grounds that most MNCs have India as only one of the objective nations and their consideration into disclosing everything about the C
The fundamental data is accumulated with the help of a coordinated poll. The develop for the study is recognized from empirical investigations
issue. It very well might be perceived as a study of concentrating how examination is done logically
Adequate analysis, though some areas may lack depth or precision
This part covers and incorporates the layout of ability management, profile of test IT organizations and the reasonable framework of the study

Adequate analysis, though some areas may lack depth or precision


Important control and encoding service are more complex at the cloud. The services, practices, and methods available to log and monitor cloud solutions ty
The survey was designed to elicit responses from a cross-section of participants for the goal of data collection.
Adequate analysis, though some areas may lack depth or precision
Adequate analysis, though some areas may lack depth or precision
collection methods, data analysis techniques, and the ethical considerations taken into account throughout the study.
Adequate analysis, though some areas may lack depth or precision

The method also serves as a decision-making process that allows evaluation of the facts to be determined

The fund manager of an investment company takes the responsibility of investing the resources collected from the investors
meet the requirements of diverse enterprises
The mixed method of research design combines the strengths and features of both the quantitative research design method and the qualitative research desig
ANALYSED WELL
analysed well
analysed
not amalude
Very basic or incorrect analysis, undermining the project's credibility
ANALYSED
Basic analysis with noticeable gaps or errors in the use of tools.
well analysed
analysed
Analysis is nearly absent or entirely inappropriate.
analysed but npt properly
Adequate analysis, though some areas may lack depth
Adequate analysis, though some areas may lack depth or precision At least 2 analytical tools used correctly
analysed
Adequate analysis, though some areas may lack depth or precision At least 2 analytical tools used correctly.
Basic analysis with noticeable gaps or errors in the use of tools. At least 1 analytical tool used correctly
Proficient analysis with appropriate use of tools and techniques. At least 3 analytical tools used correctly.
not completely analysed
Proficient
Easy usable tool for analysis and new techniques, demonstrating a deep understanding have been presented.
Sophisticated analysis using advanced tools and techniques, demonstrating a deep understanding. Complex analytical tools used. At least 3 tools.
Proficient analysis with appropriate use of tools and techniques. At least 3 analytical tools used correctly.
This idea is used to pictures via diffusion models, which start with an image and progressively change its pixel composition until the images

Analysis is rudimentary, with significant flaws impacting overall quality. At least 1 analytical tool used correctly
Proficient analysis with appropriate use of tools and techniques. At least 3 analytical tools used correctly
Adequate analysis, though some areas may lack depth or precision At least 2 analytical tools used correctly.
Analyzing how traditional retailers can differentiate themselves from online giants through unique value propositions, exceptional customer service, and lev
Proficient analysis with appropriate use of tools and techniques. At least 3 analytical tools used correctly
Analysis is rudimentary, with significant flaws impacting overall quality. At least 1 analytical tool used correctly
It provides direct employment to millions of skilled individuals, including software engineers, developers, analysts, and IT consultants.
Data is collected through questionnaire by using Google forms as a tool
Sophisticated analysis using advanced tools and techniques, demonstrating a deep understanding. Complex analytical tools used. At least 3 tools.
Sophisticated analysis using advanced tools and techniques, demonstrating a deep understanding. Complex analytical tools used. At least 3 tools.
Sophisticated analysis using advanced tools and techniques, demonstrating a deep understanding. Complex analytical tools used. At least 3 tools.
The speed and efficiency of IoT-enabled devices and physical assets will improve as a result of their widespread use in commercial setting.
The methodology is the overarching research approach that specifies how the study is to be conducted and, among other things, what methods are to be emp
Sophisticated analysis using advanced tools and techniques, demonstrating a deep understanding. Complex analytical tools used. At least 3 tools.
At least 2 analytical tools used correctly.
The project will also take a glance at how this new technology will enable India to achieve socio-economic growth, which is what the Indian government is
Task that bridges the gap between system level requirements engineering and software design. Requirements engineering activities result in the specificatio
Data collection is a crucial aspect of our methodology, as it provides the necessary information to support our analysis of the mutual fund industry in
At least 3 analytical tools used correctly.
At least 2 analytical tools used correctly.
Various predictive modeling algorithms are available for credit card fraud detection, including logistic regression, decision trees, random forests, support ve
The current study narrows down with the scope of online admission in the academic domain. The Overview research methodology adopted
techniques.
A successful female business visionary is eager to share her accomplishments with the general public.
Sophisticated analysis using advanced tools and techniques, demonstrating a deep understanding. Complex analytical tools used. At least 3 tools.
his ensures the reliability and accuracy of the financial information analysed, as the BSE is one of the premier stock exchanges in Asia and a trusted reposit
IT enables banks to collect and analyze vast amounts of customer data, allowing them to gain insights into customer preferences, behavior patterns, and nee
Artificial Intelligence can run a series of automated tests, including unit tests, integration tests, and regression tests with its tool set.
Sophisticated analysis using advanced tools and techniques, demonstrating a deep understanding
Proficient analysis with appropriate use of tools and techniques
The objective is to provide a detailed financial framework that can assist managers and stakeholders in making informed decisions about the allocation of re
statistics, correlation analysis, and regression analysis, while qualitative data are analyzed thematically to identify recurring patterns, themes, and narratives
Proficient analysis with appropriate use of tools and techniques
Proficient analysis with appropriate use of tools and techniques
influence on the findings' generalization since it establishes how participants or data points are selected for the study
opportunities for the generation of AI.
Proficient analysis with appropriate use of tools and techniques.
Adequate analysis, though some areas may lack depth or precision
companies think using agents is the best strategy for reaching customers in remote areas.
Adequate analysis, though some areas may lack depth or precision
Many customers accepts that due to Embedded Finance, their experience increased while purchasing from E-Commerce or while participating in financial s
Research involves a systematic examination of an issue or problem to derive accurate conclusions
The implementation process began with a thorough assessment of the current workflows to identify inefficiencies and areas for improvement
Proficient analysis with appropriate use of tools and techniques
Data collection is carried out from various sources, including ITSM systems, user interactions with chat bots, feedback from users and IT personnel, and ind
Basic analysis with noticeable gaps or errors in the use of tools.
Proficient analysis with appropriate use of tools and techniques.
Proficient analysis with appropriate use of tools and techniques
Adequate analysis, though some areas may lack depth or precision
Proficient analysis with appropriate use of tools and techniques
Market research specifies the information required to address these issues; designs the method of collecting information; manages and implements the d
Adequate analysis, though some areas may lack depth
Analysis is rudimentary, with significant flaws impacting overall quality
Basic analysis with noticeable gaps or errors in the use of tools
Basic analysis with noticeable gaps or errors in the use of tools
Basic analysis with noticeable gaps or errors in the use of tools.
OK ANALYSED
ANALYZED, BUT NOT COMPLETELY PRESENTED
Very basic or incorrect analysis, undermining the project's credibility.
Basic analysis with noticeable gaps or errors in the use of tools.
tools used have been properly presemted to analyze the data and which technique reflects the results are not mentioned
data have been analyzed with some innnovative tools and techniques
Basic analysis with noticeable gaps or errors in the use of tools.

TOOLS GIVEN ARE GOOD AND COMPLEX THAT WELL ANALYSED THE DATA
AVERAGE STATISTICAL TOOLS PRESENTED FOR ANALYSING DATA
Basic analysis with noticeable gaps or errors in the use of tools.
DATA ARE WELL ANALYZED AND MORDERN TOOLS AND TECHNIQUES HAVE BEEN PRESENTED
WELL COMPLEX TOOLS HAVE BEEN UTILIZED FOR ANALYSIS
Adequate analysis, though some areas may lack depth or precision. MINOR analytical tools used correctly
Very basic or incorrect analysis, undermining the project's credibility.
Basic analysis with noticeable gaps or errors in the use of tools.
Some of the main tools that analyse the presented data are missing
Very basic or incorrect analysis, undermining the project's credibility
Sophisticated analysis using advanced tools and techniques, demonstrating a deep understanding

FINE

noticeable gaps or errors in the use of tools


Basic analysis with noticeable gaps or errors in the use of tools
Basic analysis with noticeable gaps or errors in the use of tools

Basic analysis with noticeable gaps or errors in the use of tools.


FINE
ANALYSED
Very basic or incorrect analysis, undermining the project's credibility

Basic analysis with noticeable gaps or errors in the use of tools.

analysis, though some areas may lack depth or precision


Adequate analysis, though some areas may lack depth or precision

Data collected from few methodology. but observation, secondary data analysis and case studies are needed
managing credit risk.
Adequate analysis, though some areas may lack depth or precision
.
Basic analysis with noticeable gaps or errors in the use of tools.
the tools of spss and t test of tools have to use for analysis the project
Primary data sources include surveys, interviews, and observations, which provide firsthand accounts of the effects of digital marketing practices on revenu
It allows us to brainstorm the available ways and methods of conducting a research and it offers us to choose a scientifically best way which promises us wi
Adequate analysis, though some areas may lack depth or precision
depth of accuracy or precision
depth or precision
the data collected have to analysis with tools like spss and t test and more testing points required to mention in the project
the data tools analysis part should be more based on the collected source of data to make arrange to getting result
Research is an insightful endeavor of designing, rehashing, affirming, dissecting various parts of an issue or circumstance.
The use of questionnaires allowed for the collection of quantitative data from a sizable number of firms that specialize in information technology outsourcin
Adequate analysis, though some areas may lack depth or precision
The data collection instrument used was structured questionnaire and questions are in closed ended questions.
Adequate understanding, though some conceptual areas may be less developed.
Proficient analysis with appropriate use of tools and techniques.
the tools used to analysis of data to clarify with more depth evolution get a final result in our primary data
The data collection process involves both primary and secondary methods. Primary data is gathered through a structured survey questionnaire distributed to
Proficient analysis with appropriate use of tools and techniques.
the tools of analysis are to be for our primary data are separate for a response level

The analysis tool like f test


The. Tool of usage are some more optimum to our selection criteria
The collection of sample seperate with the questions points to mention
Adequate analysis, though some areas may lack depth or precision

The tools like percentage t test anova to be required more


Adequate analysis, though some areas may lack depth or precision
Very basic or incorrect analysis, undermining the project's credibility.
Adequate analysis, though some areas may lack depth or precision
The collection data are seperate with points of using tool more spss also
Adequate analysis, though some areas may lack depth or precision

The tools used are ok if more advanced tools may reduce the time consider

Adequate analysis, though some areas may lack depth or precision


Tools used are needed to be more like anova t test
Tools of data analysis are too smart required
Adequate analysis, though some areas may lack depth or precision
depth or precision
The analysis with appropriate use of tools and techniques. Some more points required
Adequate analysis, though some areas may lack depth or precision
Basic analysis with noticeable gaps or errors in the use of tools.

Sophisticated analysis using advanced tools and techniques, demonstrating a deep understanding
Adequate analysis, though some areas may lack depth or precision
Sophisticated analysis using advanced tools and techniques, demonstrating a deep understanding
Analysis is rudimentary, with significant flaws impacting overall quality
Proficient analysis with appropriate use of tools and techniques.
Proficient analysis with appropriate use of tools and techniques
Research design could be the structure that is conceptual which research was executed; it constitutes the plan when it comes to range, description an
Basic analysis with noticeable gaps or errors in the use of tools.
Proficient analysis with appropriate use of tools and techniques.
Proficient analysis with appropriate use of tools and techniques
Proficient analysis with appropriate use of tools and techniques
he study of the comparative data uses descriptive and inferential indicators to measure the effectiveness of online media advertising.
Proficient analysis with appropriate use of tools and techniques
AI uses complex algorithms and machine learning (ML) to go through vast amounts of social media data
e concept of execution evaluation took place throughout this degree and the corporations started out finding out future wages and improvements in view of
Proficient analysis with appropriate use of tools and techniques
In order to improve the delivery performance, decreased the lead times within the enterprise and improved efficiency and effectiveness, manufactures need
Proficient analysis with appropriate use of tools and techniques
Proficient analysis with appropriate use of tools and techniques
The scope of marketing involves both science and an art that needs a dynamic approach to solve real-world problems and crises in society.
The fundamental concept behind cryptocurrency may be the exchange of money from one celebration to a different by counting best on cryptography, i
The study aims to explore these opportunities, such as expanding merchant acceptance, introducing value-added services, and leveraging BHIM UPI for inn
uniform view of the available data
comprehensive understanding of the subject.

Proficient analysis with appropriate use of tools and techniques


Adequate analysis, though some areas may lack depth or precision. At least 2 analytical tools used correctly.
The data collection process involves multiple methods to ensure comprehensive and reliable data
Basic analysis with noticeable gaps or errors in the use of tools.
Compensation is also provided in related to any accidents within the company during production or manufacturing process, it all depends on the degree or l
Proficient analysis with appropriate use of tools and techniques.
Q4 Remarks

Basic understanding about the concept

Strong understanding about the concept

Sufficient understanding of the content


Understanding the content is adequate
Sufficient understanding of the subject content
Basic understanding of the concept
Minimum understanding of the subject
Sufficient understanding of the research area

Limited understanding of the concept

Adequate understanding, though some conceptual areas may be less developed


Basic understanding of the subject
Adequate understanding, though some conceptual areas may be less developed

Limited understanding, leading to conceptual flaws.


Maximum understanding about the subjects through secondary data

Sufficient understanding of the subject

Strong understanding the research subject


Sufficient understanding of the subject

Theoretical concept understanding is limited

Basic understanding, with noticeable gaps in conceptualization


the concept understanding is very low
Strong understanding of the subject with clear conceptualization.
secondary data are presented in the form of concept understanding
Weak understanding, resulting in significant conceptual errors.
Concepts understanding is sufficient
Basic understanding about the study problem

Adequate understanding, though some conceptual areas may be less developed.


Basic understanding, with noticeable gaps in conceptualization.

Concepts understanding about the subject are better


Understanding the concept of the study are short

Basic understanding, with noticeable gaps in conceptualization

Basic understanding, with noticeable gaps in conceptualization

adequate understanding about the concept


Understanding of the subject are adequate
Adequate understanding, though some conceptual areas may be less developed.
Adequate understanding for the concept
Understanding the subject concept are basic
Understanding the concept is adequate
Understanding of the subject are minimum
Understanding of the subject is fine

Adequate understanding of the concept


Adequate understanding of the subject with clear concept

understanding and concept is adequate


Basic understanding, with noticeable gaps in conceptualization
The understanding of the subject need improvement in particular areas
The understanding of the study is strong which are clear conceptualization
The understanding of the subject need to improvement in particular areas
Basic understanding of the subject need to improve the conceptualization key areas
understanding and concept is claer
understanding and concept is clear
The understanding of the subject need improvement in particular areas

understanding and concept is clear


The understanding of the subject need improvement in particular areas

UNDERSTANDING AND CONCEPT IS SATISFIED


Fair understanding of the subject but could improve alternative limitations
Adequate understanding, though some conceptual areas may be less developed.
understanding and concept is need to strongly developed
Basic understanding with lack of concepts are applied
Strong understanding of the subject with clear conceptualization

Adequate understanding of the subject


understanding and concept is needed
Adequate understanding with some inappropriate concepts

Adequate understanding and some proper concepts are applied


understanding and concept is clear with objectives

understanding and concept is good


understanding and concept is weak based on objectives
Basic understanding, with noticeable gaps in conceptualization
Fair understanding of the subject but could improve alternative limitations
Weak understanding and lack of conceptual approach
The understanding of the subject need improvement in particular areas
Fair understanding of the subject but could improve alternative limitations

Basic understanding of the subject need to improve the conceptualization key areas
Understanding of the subject are good but may require further improvement
Basic understanding of the subject need to improve the conceptualization key areas
Understanding of the subject are good but may require further improvement
Basic understanding of the subject need to improve the conceptualization key areas

Basic understanding of the subject need to improve the conceptualization key areas

Basic understanding of the subject need to improve the conceptualization key areas
The understanding of the subject need improvement in particular areas

Adequate understanding of the subject and proper conceptualization key areas


The understanding of the subject need improvement in particular areas
The subjects of the study areas are strongly understand
Understanding of the subject are good but may require further improvement
Few ares are concentrated but few ares are not subjective
Fair understanding of the subject but could improve alternative limitations

Concepts understanding are limited


Concept are covered adequately

Understanding of the subject are good but may require further improvement
the research is basic understand in about the concept
Understanding of the subject are good but may require further improvement
The understanding of the study is strong which are clear conceptualization
The study have only limited concept analysis
The understanding of the study is strong which are clear conceptualization
the concept of Supply chain optimization are described as adequate
Fair understanding of the subject but could improve alternative limitations
The understanding of the study is strong which are clear conceptualization
The understanding of the study is strong which are clear conceptualization
Fair understanding of the subject but could improve alternative limitations
Understanding of the subject are good but may require further improvement
Basic understanding of the subject need to improve the conceptualization key areas
Storing subject knowledge about study topic
Strong in-depth knowledge needed in subject and specific topic releted to study work
Concept of the study covers sufficiently
Generalized poins only represented, main key ares of subject not covered

Generalized points only represented, strong subject knowledge needed


Outline only represented main key ares of subject not covered
Adequate understanding through some conceptual areas not strongly coverd all the points
In-depth strong subject knowledge needed.outline only represented
Generalized points only represented, main key ares of subject not covered
Limited understanding, leading to conceptual flaws.
Lack of understanding the subject
Basic understanding, with noticeable gaps in conceptualization
Basic understanding, with noticeable gaps in conceptualization.
Understanding of the subject are good but may require further improvement
Not clear
Basic understanding of the subject need to improve the conceptualization key areas
Limited understanding of the subject
Basic understanding, with noticeable gaps in conceptualization
Adequate understanding of the subject
Basic understanding, with noticeable gaps in conceptualization.
understanding and concept is adequate based on objectives
Adequate understanding, though some conceptual areas may beless developed.
The understanding of the study is strong which are clear conceptualization
Strong understanding of the subject with clearconceptualization

Lack of understanding it results in conceptual error


Weak understanding, resulting in significant conceptual errors

understanding and concept is clear


Basic understanding of the subject need to improve the conceptualization key areas
understanding and concept is clear based on objectives

Limited understanding there is conceptual errors


Understanding the content is normal

Basic understanding
Sufficient understanding of the concept
Basic understanding, with noticeable gaps in conceptualization.

minimum conceptualization of the Key areas


Basic understanding, with noticeable gaps in conceptualization.
Adequate understanding concept
Basic understanding of the concept

Understanding the concept are adequate

Adequate understanding
adequate understanding of subjects

Sufficient understanding of the subject


Conceptualization of the Key areas are enough

Basic understanding about the concept


Understanding the subject is fine
Adequate understanding of the subject
Very limited understanding of concepts
Very limited understanding or entirely lacking.
Very limited understanding
conceptualization of the Key areas are sufficient
Weak understanding
Basic understanding of the subjects
Basic understanding, with noticeable gaps in conceptualization
Strong subject knowledge about the subject
Adequate understanding through some conceptual areas may be less developed
concept of the area are covered
Generalized poins only represented main key ares of subject not covered
In-depth subject knowledge needed outline only represented
Strong subject knowledge needed for research work releted to the given topic
Generalized points only represented main key ares of the subject not covered
About the Subject area covers minimum area only
study covers all the area
Generalized poins only represented indepth knowledge needed about this topic
Generalized poins only represented main key ares of subject not covered well
Strong in-depth knowledge needed for subject, outline only represented not covered all the boundaries of given topic
Main key ares of mutual fund growth some key points are not included
Strong in-depth knowledge in digital transformation
All the key areas of subject covered but some gap in the releted to the topic

Strong understanding of the subject with clear conceptualization


Adequate understanding, though some conceptual areas may be less developed.
Adequate understanding, though some conceptual areas may be less developed.
Basic research area only described
few concepts are wrote to understand the research
Adequate understanding, though some conceptual areas may be less developed.
Strong understanding of the subject with clear conceptualization
Strong understanding of the subject with clear conceptualization.
Basic understanding, with noticeable gaps in conceptualization.
Study covers the adequate understandings about the study area
few theoretical concepts are drive from the study
Limited understanding, leading to conceptual flaws.

Basic understanding, with noticeable gaps in conceptualization.


Understating the concept are sufficient
Basic understanding, with noticeable gaps in conceptualization.
Concepts are applied for understanding through theory form
was not stated properly.
The subject understanding and the conceptualization of key areas of the human resource management was not properly stated.

The subject understanding and the conceptualization of key areas of AI in workplace was good.

The subject understanding and the conceptualization of key areas of Internet of Thing (IoT) Cyber Security was good.
The subject understanding and the conceptualization of key areas of a study on effectiveness of software service delivery was good
The subject was clearly identified and key areas of the problems were focused and stated well.

The subject understanding and the conceptualization of key areas of the was good

The subject understanding on the practical workings of the analysis and threat identification of cyber security is found to be good

The subject understanding and the conceptualization of key areas of the logistics management was good.

The subject understanding and the conceptualization of the key areas of the demographics description were well stated.

The subject understanding and the conceptualization of the key areas of the study of Work-Life Balance well stated.
Other subject file

content on YouTube,

applied.
applied.
Adequate understanding, though some conceptual areas may be less developed. At least 5 concepts are applied.
Adequate understanding, though some conceptual areas may be less developed. At least 5 concepts are applied.

Strong understanding of the subject with clear conceptualizat on. At least 8 concepts are applied.

Adequate understanding, though some conceptual areas may be less developed. At least 5 concepts are applied.

rong understanding of the subject with clear conceptualizati on. At least 8 concepts are applied

Adequate understanding, though some conceptual areas may be less developed. At least 5 concepts are applied.

Strong understanding of the subject with clear conceptualizati on. At least 8 concepts are applied.

applied.
Adequate understanding, though some conceptual areas may be less developed. At least 5 concepts are applied.

Adequate understanding, though some conceptual areas may be less developed. At least 5 concepts are applied.
Strong understanding of the subject with clear conceptualizati on. At least 8 concepts are applied.

Strong understanding of the subject with clear conceptualizati on. At least 8 concepts are applied.

Strong understanding of the subject with clear conceptualizati on. At least 8 concepts are applied.

Strong understanding of the subject with clear conceptualizati on. At least 8 concepts are applied.

Strong understanding of the subject with clear conceptualizati on. At least 8 concepts are applied.

opportunity for enhancing the efficiency


The problem statement highlights the potential impact of imprecise demand forecasting on the competitiveness and profitability of brass manufacturers and
Identify the operational and administrative processes in your own organization.
the effectiveness of the enhanced security protocol
To investigate the strategies employed by successful e-commerce enterprises in supply chain and vendor management for improved efficiency.
Project execution summary is need to give more information of implementation of project
customers.

a way that only the best deal for a chosen product


encounter cyber threats or security breaches rarely

stock-outs.

customer relations, expedite processes, and maximize resource usage.


Credible results need a sample that faithfully represents the characteristics of the population without bias
The impact areas table provides a clear view of where5G is expected
insights into the effectiveness of different risk management
Continued evaluation and adaptation of policies will be essential to ensure their effectiveness in driving sustainable mobility solutions and achieving

Project execution summary is need to give more information of implementation of project


pricing strategies,
The focus has shifted from the data itself to the value

Device and location flexibility enable users to access services through a browser
A review of operational risk explicitly shows that subject coverage is restricted to quantification of operational risk data and modelling techniques.

Provide flexibility and allowing hospital to include specific areas of interest such as ideas for new services that hospital may be considering or
Examine the unique project challenges associated in the government-led oil and gas initiatives.
been gathered during the review

Google Cloud Stage

of the variables was calculated


to testing a hypothesis of everyday partnership between factors.

specific user engagement metrics such as click-through rates, time spent on the platform
the chance to work remotely take advantage of this option:
and power management policies resulted
Key measures include range, variance, and standard deviation

To improve Breakdown and spare cost of plant by reducing electrical and mechanical breakdown and streamline production process.
The research utilized a mixed-methods approach, drawing upon quantitative and qualitative data.

Access to responsive customer service channels, such as live chat and email, is critical
To assess the opening between existing standards and overall standards in Indian

Capacity and Availability Management are integral components of IT infrastructure governance


projected performance. A feedback device, it is useful in several ways

The company should identify the bottleneck of the process before starting any project.
The aim is to identify improved methods for implementing CSR activities at MEL and in India to achieve sustainable benefits for the underprivileges.
The perception of people towards electric vehicles is still unsatisfactory as a major section of our society is still unaware of various Alternative

applied

resources,
demonstrating its popularity

Dependent variable (the outcome variable you are trying to predict or explain

financial institution to conduct a range


Efficient application of technology multiplies the growth and development of banks.

less developed.

revealed.

expenses
to drive improvements in various operational domain.

key areas on good way to role of service providers in promoting secure usage of public Wi-Fi networks
key areas are mention to planning and management aspects of a migration and not the technical aspects
The implementation of energy-efficient hardware and software not only resulted in reduced energy
implementations of methodologies towards the accomplishment of sustainable supply chain.
recommendations for tightening up government’s electronic defenses
Driving quality mindsets empower and motivate every employee to focus on the quality of work. Every employee should understand the value and contribu

account, if you give them permission.


flexible infrastructure to support the growing demands of cloud-based applications and services.

software companies
the variables
Maximize the proficient utilization of assets, counting labor, materials, and hardware, to decrease costs and make strides in productivity

Current techniques need to implement and analysis the project.


perspectives can further enrich the analysis
on society and the environment through its corporate social responsibility
No outstanding innovation technique used to solve the problem

No noteworthy innovation technique used for problem scheme in this project


To evaluate the steps and techniques in place before the utilization of slim Six Sigma.
delivery is a critical strategy for success, even more significant than price and quality.

The adoption of contemporary and efficient planning methodologies has led to a surge in the need for a greater degree of expertise and p
to reduce project costs and increase the payback period

Equipment Effectiveness (OEE), downtime reduction, and product quality improvement


, AI also offers opportunities for improving efficiency, productivity, decision making, and quality of life
infrastructure security, and identity management.
policymakers
To determine the feasibility and effectiveness of implementing Six Sigma in Tech operations.
Strong understanding of the subject with clear conceptualizati on. At least 8 concepts are applied.
Strong understanding of the subject with clear conceptualizati on. At least 8 concepts are applied.

Limited understanding, leading to conceptual flaws.


Adequate understanding, though some conceptual areas may be less developed. At least 5 concepts are applied.

Limited understanding, leading to conceptual flaws.

Strong understanding of the subject with clear conceptualizati on. At least 8 concepts are applied.
environment and animals.
basic understanding, with noticeable gaps in conceptualization
The researcher has examined the accumulated data i

system’s impact on operational efficiency and customer satisfaction

out how they spend their money, what they like, and what they need.
Strong understanding of the subject with clear conceptualizati on.

meeting procedures,

Combining both qualitative and quantitative analyses provided a holistic

Adequate understanding, though some conceptual areas may be less developed.

The subject was clearly identified and key areas of the problems were focused and stated well.
The subject understanding and the conceptualization of the key areas of the digital transformation strategies for small to medium enterprises (SMEs) are des

The subject understanding and the conceptualization were well stated.

The subject understanding and the conceptualization of the AI were partially stated.
The subject understanding and the conceptualization of the key areas of the data warehousing were well stated.

The subject was clearly identified and key areas of the problems were focused and stated well.

Adoption on Organizational Efficiency and Cost Savings were well stated.


The subject understanding on the ethics and business is found to be good.

The subject understanding and the conceptualization of the key areas of were well stated.
application dependencies, which mock objects cannot easily satisfy

Have one-on-one discourses with the staff individuals included within the operation

request fulfillment. Key AI technologies


. We are dedicated to upholding the highest ethical standards in this project
media analytics
. This study employs a combination of probability and non-probability
applied

the cosmetic conceptual are with average to be detailed with present market condition

in physical infrastructure, including servers, networking equipment, and data centers

areas may be less developed.


reduction

boost productivity, and provide them a competitive edge

There isn't any connection this might be company that is certainly considerable
the other
Key indicators are metrics used to assess the level of cybersecurity risk and the effectiveness of mitigation strategies

designations

suitability in examining the study data


operations that must be performed to achieve an information objective
applied.

applied.

applied.
Project cover all stady area but some portions not cover

All the machines in collection can keep in touch with one another

applied.

The level of understanding of subject concepts and key areas is good. More concepts and key areas are well mentioned in the report.
There is a moderate level of understanding of the subject concepts and key areas of the problem under study.
The level of understanding of the subject concepts and key areas is good through a good number of reference materials.

The level of understanding of subject concepts and key areas is satisfactory.


The level of understanding of subject concepts and key areas is moderate.
The level of understanding the subject concepts and key areas is moderate.

Books, Journal articles, conference proceedings and research papers are extensively reviewed and gained clarity in the subject under study and key areas of
Sufficient concepts are used in the project. key areas are very less in number.
Sufficient number of concepts are developed and key areas are defined to the some extent.
technology plays a crucial role in ensuring high-performance and automated processes
explain detail
Key areas are well conceptualized and concepts are well defined.
good
good
need more data
Key areas and concepts defined and identified are satisfactory. Moderate level of understanding is shown.
good

Based on the reference materials and literature review, concepts are well understood and defined. Key areas are clearly mentioned.
Less focus is given for understanding and defining concepts and identifying Key Areas.

This aspect is lack in the projects. Concepts and key areas are given. But level of understanding is low.
Concepts and key areas are defined and understood based on the reference materials.
Needs to focus on the subject concept and identification of key areas. Level of understanding of concepts and key areas is moderate.
Less level of understanding of the concepts and key areas of the project.
The understanding of concepts and key areas is average.
Understanding of the concepts and key areas are satisfactory.

Basic understanding, but some conceptual areas need to be developed.

Basic understanding, but some conceptual areas need to be developed.


Basic understanding, but some conceptual areas need to be developed.

Basic understanding, but some conceptual areas need to be developed.


Sufficient understanding, but some conceptual areas need to be developed.

strong understanding of subject with clear conceptualization with 5 concepts used.


The subject of the project and conceptualization of the Key areas were Basic understanding.
The subject of the project and conceptualization of the Key areas were Basic understanding.
adequate Understanding of the subject and conceptualization of the Key areas,5 concepts used
Basic understandings, with noticeable gaps in conceptualization, some of the concepts are applied
The subject of the project and conceptualization of the Key areas were Basic understanding.
The subject of the project and conceptualization of the Key areas are Very limited understanding.
management strategies. It helps the retailing company to improve its internal organization.
clear Understanding of the subject and conceptualization of the Key areas
Understanding of the subject and conceptualization of the Key areas clear
detailed responses.
good Understanding of the subject and conceptualization of the Key areas.
Understanding of the subject and conceptualization of the Key areas not clear.
Understanding of the subject and conceptualization of the Key areas adequate.
clear Understanding of the subject and conceptualization of the Key areas
not clear Understanding of the subject and conceptualization of the Key areas
Basic understanding, but some conceptual areas need to be developed.
Basic understanding, but some conceptual areas need to be developed.
clear Understanding of the subject and conceptualization of the Key areas, the main objective of a real estate price prediction model is to provide accurate.
clear Understanding of the subject and conceptualization of the Key areas.
residents.
good Understanding of the subject and conceptualization of the Key areas.
Basic understanding, but some conceptual areas need to be developed.
The subject of the project and conceptualization of the Key areas are Very limited understanding.
not clear Understanding of the subject and conceptualization of the Key areas
Collect data from various sources such as incident reports,change management logs and service desk tickets, etc. Check the data collected is comprehensive

The subject of the project and conceptualization of the Key areas are Very limited understanding.

Understanding of the subject and conceptualization of the Key areas not clear.As the use of information technology increased,decentralization as well as cen
Understanding of the subject and conceptualization of the Key areas adequate, best practices for management in patient HIS inside the look at vicinity

good Understanding of the subject and conceptualization of the Key areas.

is a crucial learning outcome


rise to the idea of cloud computing, which provides a more adaptable, scalable, and affordable substitute.

Implementations of e- governance in Government departments with Aaadhaar numbers for transparency and integrity.
The cloud setup assists with digitizing the old records that are not machine-justifiable and structure future reports.

Understanding of the subject and conceptualization of the Key areas adequqe,Establish regular communication channels and update frequencies .
costs for businesses
Exploration of how blockchain can secure supply chain data, prevent fraud, and ensure data integrity.
technology
data transformation techniques may be applied to make the data more amenable to analysis, such as logarithmic transformations to meet statistical assumpti
Basic understanding, but some conceptual areas need to be developed.

Sufficient understanding, but some conceptual areas need to be developed.

Basic understandings, with noticeable gaps in conceptualization, some of the concepts are applied.

Adequate reference materials are reviewed to have a better understanding about social media marketing.
Concepts and key areas are defined and understanding level is moderate.

Understanding level of the subject concepts and key areas is satisfactory.


The level of understanding of the subject concepts and key areas is good. Sufficient reference materials are used.

The understanding level of subject concepts and key areas is very low.

The level of understanding of subject concepts and key areas are satisfactory.

The level of understanding of subject concepts and key areas moderate and satisfactory.
The level of understanding of subject concepts and key areas is moderate and satisfactory
Various aspects of port management in operations management are conceptually discussed.

better Understanding of the subject and conceptualization of the Key areas


good Understanding of the subject and conceptualization of the Key areas
good Understanding of the subject and conceptualization of the Key areas.Cloud computing allows companies and groups to build and control their virtual p

the importance of investing in advanced analytics capabilities, fostering a data- driven culture, and addressing challenges related to data privacy and securit

Improved and longer lasting competitive advantage, Increased employee engagement and initiative.

the identification of any suspicious activity related to delegated access is allowed by IAM reporting, facilitating faster investigation and remediation efforts

good Understanding of the subject and conceptualization of the Key areas.

good Understanding of the subject and conceptualization of the Key areas.

identification of data steward/ owners for managing the data Data/Information quality is addressed as part of the project.

For better understanding of the concepts and key areas of project, adequate number of early studies have been reviewed and they are presented in the projec
Main key ares of the study work for subject not covered only outline represented

were using digital interactions.


Conceptualization of the key areas of subject not clearly mentioned main key ares are missing.

Main key ares of the subject not founded need to cover all the boundaries of study work

Main key ares of the given study work not mentioned


biometric authentication, or single sign-on.

education institution.
to remain competitive in the evolving market landscape.
income and viable, effective and safe tasks.

marketing communications generated by artificial intelligence


IT.

Subject related main key ares not covered in this research work
Good understanding of the conceptualization key areas

Employee asset management not focus on this research work


Generalized poins only representedain key areas of SEO not founded

Generalized data only described specific key areas for the work is inappropriate
Generalized data only described main key ares for the work is inappropriate
Many strategies are compared but that are not main key ares of the given topic

Main key ares of the subject not covered


Record employee details, evaluate performance, recruit & reimburse

Main key ares of the subject not covered outline only represented.

Main key ares of crypto currency real time factors not clearly explained
Main key ares of cyber security in helth care system not founded

Mani key ares of E brain in India not clearly mentioned, generalized poins only include
Main key ares of urban life empowering with help of iot tools the contents are covered

Android app also support for desktop and laptop but our research work only represent mobile device
Outline only represented main areas are not founded to releted study work

Main key ares of agent on demand outsourcing in digital transformation not Covered

Good understanding of the conceptual key areas

Main key ares of media marketing contents not included


AI adoption main key ares in small apperal industry contents not founded

All the boundaries of coverd, main key ares of subject knowledge was good

Few key ares are not included, stock market strategy is unpredictable
Good knowledge in digital payment development and future prediction in the form of emergency technique block chain and crypto currency
Strong in-depth knowledge in study topic few key factor are missing

Generalized poins only represented, main key ares of subject not covered
All the main key ares of banking sector CRM taken into study work was good

Main key ares of customer relationship management and retention not represented

All the aspects of given topic contents used

Few key areas are not related to the given topic


Good knowledge in study area it covered all the boundaries
Blockchain and crypto currency outline only represented main key ares of subject not covered
Outline only represented main key ares of Orient cement migration cloud computing are missing.

Barriers of robotics automatic not taken into research work


Main key ares of customer supports content are missing

Good knowledge of study area all the contents taken into research work

Health care system in india key factor are clearly taken into study work
Main key ares of fire fighting robo contents not founded

Generalized poins only represented main key ares are not founded

Good subject knowledge in study topic

Generalized poins only represented main key ares of subject knowledge not founded

Generalized poins only representedain key of the topic not covered


Green cloud computing on IT industry main key factor are not founded

Outline only represented main key areas of ERP implementation in manufacturing sector not covered
Main key ares of how information technology connected in cyber security issues not included

Main key areas of subject working capital not included outline only represented ,

Main key ares of digital marketing in AI contents not founded

Main key ares of the study work not covered well


Cloud computing in banking industry adoption main key ares are not founded

Cloud computing security and it's risk management main key ares are not founded
Generalized poins only represented main key ares of the objectives not founded

Generalized points only represented main key ares of subject not founded

v
The level of understanding of the subject concepts and key areas is moderate and satisfactory.

The level of understanding of the subject concepts and key areas of the project is satisfactory.

The level of understanding of the subject concepts and key areas is below average level

The level of understanding of the subject concepts and key areas is very good.
Lack of proper understadning of the subject concepts and key areas.

The level of understanding of the subject concepts and key areas is moderate.
The level of understanding of the subject concepts and key areas is moderate and satisfactory.

The level of understanding of the subject concepts and key areas is moderate.
Adequate reference is done for having better understanding of the subject concepts and key areas of the project study.
Sufficient reference materials are used for having satisfactory level of understanding of the subject concepts and key areas of the project.
It is just like a conceptual research paper on fuel drain system

The moderate level of the understanding of subject concepts and key areas.
Required details and information are collected for better understanding of the subject concepts and key areas of the project.

The level of understanding of subject concepts and key areas is moderate.


The level of understanding of the subject concepts and key areas is moderate.
Main keys of e-learning contents not covered, in-depth knowledge needed for the topic

It service management in AI talent acquisition in mindtree coverd all the key area of study work
Few main key ares of AI intelligence not include in the study work

In depth knowledge needed about study topic

Main key ares of tourism and travel packages not covered more subjects contents added for research work

Clear understanding of subject knowledge was good


Yes, its clearly understood that the subject and conceptualization of the aras
SATISFIED WIH THE KEY AREAS
Some main key ares of stock management and market analysis are not included
KEY AREAS UNDERSTANDING IS RIGHT
Few main key ares of buyer attitude not included
KEY AREAS AND CONCEPTS DISCUSSED WELL
STRONG UNDERSTANDING OF THE PROJECT IS THERE
Good knowledge in study topic
In depth knowledge of study topic was good
Main key ares of IT industry response during covid time not covered
key areas given is understandable
key areas understanding is good
subject knowledge for study work generalized poins only represented.main key ares not founded
key areas are understandable
Generalized poins only represented main key ares of medical services information are missing
understanding of the subject is satisfactory
Outline only represented study topic main key ares are not founded
understanding of the concepts clear
understanding of the subject and key areas are good
Main key ares of subject not clearly understand
In depth knowledge of the study work not good
concepts are clear to understand
key areas discussed correctly
key areas discussed well
In-depth knowledge needed for research work related to the study topic, generalized poins only represented
The original development process quickly to avoid losses and failure

In-depth knowledge needed about the concept of study work


Main key ares of the subject contents not founded outline only represented
Outline only represented mail key ares of real estate industry contents not founded
Generalized poins only represented main key ares of subject not included
Few factors of mind scribe key ares are not covered
Not covered all the boundaries of cloud computing security risks

Not covered all the boundaries of the conceptualization key areas

Compared many ares that are covered all the aspects of research work

Few functional pieces of software areas not covered


Coho buliding brand -cover all the boundaries of the study work

Need to improve the conceptualization of the key areas of cloud areas especially amazon
all the aspects of conceptualization of the key ares of objectives not covered

Not covered all the boundaries of safeguarding patient helth records subject conceptualization of the key areas
Good understanding the conceptualization of the key areas
Many strategies are compared but that are not main key ares of the given topic

All the boundaries of digital payment during covid time covered for research work
Many strategies are compared but that are not main key ares of given topic
Main key ares of digital era in tech Mahindra are defined well
In-depth knowledge needed for research topic
Many strategies are compared but that are not main key ares of given topic
Generalized poins only represented main key ares of subject not include
Good understanding of the subject of application of IOT in agriculture
Many strategies are compared but that are not covered main key ares of the topic given
Main key ares of given topic persented well

There is a strong understanding of the subject, characterized by clear and well-developed conceptualization.
There is an adequate understanding of the topic, although certain conceptual areas may require further development to enhance depth and clarity.

There is an adequate understanding of the subject, although some conceptual areas may require further development to achieve a more thorough comprehen

The understanding of operational efficiency in small and medium-sized enterprises (SMEs) is foundational, yet it lacks depth in conceptualizing critical asp

The understanding is adequate overall, though some conceptual areas would benefit from further development to ensure a more comprehensive grasp of the

The understanding displayed is satisfactory overall, but certain conceptual areas could benefit from further development to enhance depth and clarity in the
The statement reflects a robust grasp of the complexities surrounding operation management within India's textile industry, showcasing clarity in conceptua

The project demonstrates a strong grasp of the subject matter, characterized by clear and insightful conceptualization.
The project demonstrates a sufficient understanding overall, although there are opportunities to further develop certain conceptual areas for a more compreh
Enhancing the conceptual framework and addressing these gaps is essential for a more robust and thorough exploration of ERP system development, ensuri

There is an adequate understanding, although some conceptual areas may be less developed about TQM in inconnect with Automotive industry
There is an adequate understanding demonstrated, although some conceptual areas may not be fully developed.

There is a satisfactory level of understanding demonstrated, although certain conceptual areas may not be fully developed.

The individual exhibits a strong understanding of the subject matter, evidenced by their ability to clearly conceptualize and articulate key concepts and idea
There is a basic understanding of the topic, but there are noticeable gaps in conceptualization. This suggests that while the fundamental concepts are graspe
There is an adequate understanding of tourism, though some conceptual areas may be less developed. Strengthening these areas will lead to a more compreh
There is a sufficient grasp of how workforce management impacts operational productivity, but some conceptual areas need further development for a more

A strong understanding of the subject with clear conceptualization is crucial for the successful implementation of Total Quality Management (TQM) in an o
There is a basic understanding of the topic, but there are noticeable gaps in conceptualization. Further development in these conceptual areas would enhanc
There is a sufficient understanding of the impact of creation techniques on profits at Dabur, but some conceptual areas may need further development for a

There is an adequate understanding of IKEA's operations management, though certain conceptual areas may be less developed. Further exploration and refi

There is a strong understanding of the subject with clear conceptualization, particularly in green initiatives recommendations for electronic gaming slot mac

areas may be less developed


conceptualization

less developed.
less developed.
conceptualization. A

with clear conceptualization.

with clear conceptualization.

conceptualization.

applied.

applied.
area
areas may be less developed
areas may be less developed

less developed

conceptual flaws.
areas may be less developed
areas may be less developed

with clear conceptualization.


with clear conceptualization.
noticeable gaps in conceptualization.

very clear
gaps in conceptualization.
with clear conceptualization.
gaps in conceptualization.
gaps in conceptualization.
gaps in conceptualization.
conceptualization.
conceptualization.

on.
understanding is good
good understanding of the key areas

conceptualization.

gaps in conceptualization.
the subject understanding is good and covered major discussed concepts
subject and conceptualization of the Key areas mainly focused on factors influencing HUL’s stock price. Give some other module

Understanding of the subject of ML-driven approaches, developers can detect defects earlier, prioritize testing efforts effectively, and ensure the overall qu
conceptualization of the Key areas for Working hours and rotational changes bring a role that is significant the organizational community for the IT and BP
conceptualization of the Key areas of AI in revolutionizing traditional incident management practices and driving organizational innovation in the digital er

the subject understanding is good and covered major discussed concepts

conceptualization of the Key areas in usage and problem of block chain and cryptocurrency

conceptualization of the Key areas for Zomato can improved its brand image, customer satisfaction, and operational efficiency, thereby strengthening its po
The conceptualization of key areas, such as ordering food in online, factors influence to order in Swiggy and services of Swiggy
Adequate understanding of logistics and supply chain management techniques at Big Bazaar, with room for development in certain conceptual areas.
There is an adequate understanding of the subject, although certain conceptual areas may be less developed. Further exploration and clarification in these ar

There is an adequate understanding of the subject, although certain conceptual areas may be less developed. Further exploration and clarification in these ar

Adequate understanding of production and inventory efficiency at Leather Crafts India , with room for development in certain conceptual areas.
Adequate understanding of 3PL logistics optimization, with room for development in certain conceptual areas.
There is a basic understanding of the subject, although there are noticeable gaps in conceptualization. Further development and clarification in these areas w

Basic understanding, with noticeable gaps in conceptualization.

There is an adequate understanding, though some conceptual areas may be less developed. Further refinement and elaboration in these areas could enhance

There is an adequate understanding, although certain conceptual areas may be less developed and could benefit from further exploration or clarification.

Proficient grasp of Amazon's logistics and distribution management, demonstrating clear conceptualization of operational intricacies.

There is an adequate understanding, although certain conceptual areas may require further development.
areas may be less developed.
with clear conceptualization.

conceptualization.

gaps in conceptualization

At least

gaps in conceptualization
gaps in conceptualization.

areas may be less developed.


areas may be less developed

conceptualization
less developed
gaps
There is an adequate understanding, though some conceptual areas may be less developed related to monetary detailing practices in IT companies
Limited understanding resulted in conceptual flaws throughout the project.
There is a sufficient understanding, although certain conceptual areas related to service failure and strategies to overcome them may require further develop
Greater conceptual clarity is needed regarding the strategies employed to enhance productivity in remote areas.

Adequate understanding with some conceptual key areas are developed


Basic understanding of the conceptualization of the key areas

Strong understanding of the subject with conceptualization of the key areas

Basic understanding used for the conceptualization of the key areas

Strong understanding of the subject with key areas

strong understanding with clear subject conceptualization of the key areas


Strong understanding with clear objectives
Basic understanding with the subject and conceptualization of the key areas
Strong understanding with clear conceptualization

Strong understanding of the subject with clear conceptualization

strong understanding of the subject and conceptualization of the key areas


very strong understanding of the subject with clear conceptualization
Adequate understanding with conceptual areas
Basic understanding with noticeable gaps

Adequate understanding with some noticeable gaps

Very clear understanding of the subject


conceptual areas may be less developed
Strong understanding of the subject with clear conceptualization.

Basic understanding, with noticeable gaps in conceptualization.

Limited understanding leading to conceptual flaws


Current techniques need to implement and analysis the project.

Clear Understanding of the subject and insightful conceptualization of the Key areas
Clear understanding of the subject and enough conceptualization of the key areas is made
Enough understanding of the subject and clear conceptualization of the Key areas
Adequate understanding of the subject with lacking of conceptualization of the key areas
Better understanding of the subject and conceptualization of the key areas

Well understanding of the subject and least conceptualization of the Key areas
Adequate understanding of the subject and conceptualization of the Key areas

concepts are clearly defined


Enough understanding of the subject and moderate conceptualization of the Key areas
basic understanding concepts are used
subject is clearly understood
Basic understanding of the subject and lacking in conceptualization of the Key areas
Clear understanding of the subject and conceptualization of the Key areas are better
Limited understanding of the subject and less conceptualization of the Key areas
Moderate understanding of the subject and very minimum level of conceptualization of the Key areas
Moderate understanding of the subject and less conceptualization of the key areas
Enough understanding of the subject but minimal conceptualization of the key areas
Adequate understanding of the subject and less concepts applied
Enogh understanding of the subject and less conceptualization of the Key areas
Basic understanding of the subject and minimal conceptualization of the Key areas
Strong understanding of the subject and clear conceptualization of the Key areas
Strong understanding of the subject and clear conceptualization of the Key areas
Strong understanding of the subject and clear conceptualization of the Key areas
The subject understanding on the comparative analysis on digital workspace strategies was good
The subject understanding and the conceptualization of the key areas of the Cloud Computing on the E-Learning Sector were well stated
The subject understanding on Cloud Computing for a Frictionless Customer Experience in Retail Banking sector is found to be good
The subject understanding and the conceptualization of the idea of giving a business guide to responsible AI is found to be good
The subject understanding on the topic chosen for the study was found to be good

The subject was clearly identified and key areas of the problems were focused and stated well.

The subject understanding and the conceptualization of the key areas of the study were not well stated
The subject understanding and the conceptualization of the key areas of the study were well coined
The study is to ensure a comprehensive understanding of how the study was conducted, providing a clear path for replication and validation.
The subject understanding and the conceptualization of the key areas of the study were well stated

The chosen subject was identified and the key areas of the problems were focused and stated well.

The subject understanding and the conceptualization of key areas in assessing the viability of data innovation administrations in advanced education was go

The subject was identified and the key areas of the problems were focused and stated well.
The subject understanding and the conceptualization of key areas of the study was good
The subject understanding and the conceptualization of the key areas of the study were well stated
The subject understanding and the conceptualization of the areas of the study were well stated
The subject was clearly identified and key areas of the problems were focused and stated well.
The subject identification was clear and the key areas of the problems were stated well.
Basic understanding, with noticeable gaps in conceptualization
Basic understanding, with noticeable gaps in conceptualization.
Basic understanding, with noticeable gaps in conceptualization
The research involved in determining the challenges faced by practitioners and the extent to which these developments have been incorporated into Indian S
Sampling Bias, Data Accuracy and Generalizability were considered the limitations of the study and conceptualization of the Key areas were stated well
Adequate understanding, though some conceptual areas may be less developed
Limited understanding, leading to conceptual flaws.
The subject understanding and the conceptualization of the impact of Artificial intelligence is found to be good
The subject understanding and conceptualization over the impact of AI is found to be good
The subject understanding and the conceptualization of the effect of information technology on human asset management is found to be good
Basic understanding, with noticeable gaps in conceptualization
Limited understanding, leading to conceptual flaws.
Limited understanding, leading to conceptual flaws.
The study over the understanding of the subject and conceptualization of the Key areas were good
The subject understanding and the conceptualization of the impact of advertising in radio and its usage is stated to be good
The study aims to provide valuable insights and recommendations for the success of IT Service Management (ITSM) in digital transformation initiatives fo
The subject understanding and the conceptualization of the key areas of the IoT usages were well stated
The subject understanding and the conceptualization of key areas on corporate social responsibility was good
Adequate analysis, though some areas may lack depth
The subject understanding on ITIL-based IT Service Management Framework to Improve Security and Risk Management is found to be good
The subject understanding and the conceptualization of key areas of the study was good
The subject understanding and the conceptualization of the future of cryptocurrencies in digital payments is found to be good
The subject understanding on the Outsourcing of Information Systems in International Financial Institutions is found to be good
The subject understanding and the conceptualization of key areas of the future of AI was focused good

The subject understanding and the conceptualization of the key areas of Migrating from On-Prem to Cloud were good

The subject was clearly identified and key areas of the problems were focused and stated well.

basic understanding with the conceptualization of the key areas

understanding of the subject is clearly defined

basic understanding with suitable conceptualization

strong understanding of the subject

basic understanding with the objectives


strong understanding with clear conceptualization

Very strong understanding and clear with the objectives

very strong understanding of the subject with clear conceptualization


strong understanding of the subject with clear objectives
Strong understanding of the subject and conceptualization

strong understanding of the subject with the conceptualization of key areas

Adequate understanding for development of conceptualization


strong understanding with clear objectives

Adequate understanding of the subject


Basic understanding with the clear objectives
Adequate understanding with some conceptual framework

Adequate understanding with the conceptual area


strong understanding of the subject clear
Limited understanding with conceptualization of the key areas
strong understanding with the subject

Basic understanding with the conceptualization

No understanding was there


The project demonstrates a basic understanding, yet it lacks depth in conceptualization, indicating opportunities for further exploration and clarification of k

The project demonstrates a basic understanding but shows noticeable gaps in conceptualization, highlighting the need for further exploration and clarity in k
The project demonstrates adequate understanding, yet certain conceptual areas may require further development for a more comprehensive exploration of th
The project demonstrates a sufficient grasp of the subject matter, but certain conceptual areas could benefit from further development to enhance clarity and

The project demonstrates an adequate understanding of the subject, although some conceptual areas could be further developed to enhance depth and clarity
The project demonstrates a basic understanding of the subject matter; however, there are noticeable gaps in the conceptualization, requiring further develop
The project demonstrates a foundational grasp of the subject matter, but it lacks coherence in connecting key concepts, resulting in noticeable gaps in under
The project exhibits a strong grasp of the subject matter, coupled with clear and well-developed conceptualization, reflecting a robust foundation in underst

The project demonstrates adequate understanding of the subject matter, although certain conceptual areas could benefit from further development to enhanc

The project demonstrates a strong understanding of supply chain networks in manufacturing, coupled with a clear conceptualization of optimization strategi

The project demonstrates a weak understanding, leading to significant conceptual errors. This critical study on the procurement of machines for steel bridge

The project demonstrates a satisfactory level of understanding, though certain conceptual aspects could benefit from additional refinement and depth to enh

he study demonstrates an adequate understanding of Google's remote work policies and virtual team building, yet some conceptual areas may require furthe
: The analysis demonstrates a basic understanding of the topic, but there are significant gaps in the conceptual framework, suggesting a need for deeper exp

The study demonstrates a strong understanding of the subject with clear conceptualization, providing a solid foundation for exploring how Lean Six Sigma
Enhance the development of conceptual areas where understanding is currently adequate to achieve a more thorough analysis of the challenges in managing

Strengthen the conceptualization to address noticeable gaps and achieve a more thorough understanding of the lack of distribution channels in rural areas w

The study exhibits a strong understanding of the subject matter, characterized by clear conceptualization, which forms a solid foundation for investigating th
The study demonstrates a strong understanding of the subject matter, characterized by clear conceptualization, which supports a thorough exploration of the

The project demonstrates a strong understanding of Lean Six Sigma for yield improvement in product manufacturing, characterized by clear conceptualizati
Strong understanding of the subject with clear conceptualization.

Yes, the candidate clearly understood of the subject and conceptualization of the key areas of Battery Management System.

Business perspective, technological factors and traditional banks are key areas
Key areas were used to reduce the COD, increasing efficiency and reduction of waste

Key areas belong to quality function deployment are mentioned as well


Key areas are identified in the study such as operational efficiency..

Quality of service is the key area that has carried out in the study
The project displays sufficient understanding of the impact of electric vehicles on green supply chains, but enhancing conceptual depth would strengthen its

The project demonstrates a strong understanding of after-sales services at Empire Motors Private Limited, characterized by clear conceptualization and insig

The project demonstrates an adequate understanding overall, but certain conceptual areas may benefit from further development to enhance depth and clarit
The project demonstrates a basic understanding of the subject matter, but there are noticeable gaps in conceptualization that detract from its depth and clarit
The project exhibits a strong understanding of the subject matter, characterized by clear conceptualization and insightful perspectives.

The project showcases a strong understanding of the subject matter, characterized by clear conceptualization and insightful exploration of risk perceptions a
The project demonstrates a strong understanding of the subject matter, characterized by clear conceptualization and insightful exploration of the topic.
The project demonstrates a basic understanding of the subject matter, but there are noticeable gaps in conceptualization that detract from its depth and clarit

The project demonstrates an adequate understanding overall, though certain conceptual areas may benefit from further development to enhance clarity and d
The project demonstrates adequate understanding, although certain conceptual areas may require further development to enhance clarity and depth.

The project demonstrates adequate understanding, but some conceptual areas could benefit from further development to enhance overall clarity and depth.
Sufficient understanding, but some conceptual areas need to be developed.

Basic understanding, but some conceptual areas need to be developed.

Basic understanding, but some conceptual areas need to be developed.

Sufficient understanding, but some conceptual areas need to be developed.

the subject understanding is good and covered major discussed concepts


the subject understanding is good and covered major discussed concepts
Basic understandings, with noticeable gaps in conceptualization, some of the concepts are applied
the subject understanding is good and covered major discussed concepts

the subject understanding is good

the subject understanding is fair and covered few areas


the project understanding is fair and covered few key areas
the project understanding is good and covered few key areas

the project understanding is good and covered major key areas

The subject of the project and conceptualization of the Key areas were Basic understanding.
Basic understandings, with noticeable gaps in conceptualization, some of the concepts are applied
the project understanding is good and covered major key areas
The author shows a solid understanding of the subject, particularly in the domain of character recognition and neural networks.
Sufficient understanding, but some conceptual areas need to be developed
the project understanding is good and covered major key areas
The subject of the project and conceptualization of the Key areas are Very limited understanding
The conceptualization of key areas, such as privacy concerns, technological advancements, and regulatory challenges, is given
The subject of the project and conceptualization of the Key areas were Basic understanding
The subject of the project and conceptualization of the Key areas were Basic understanding
the subject understanding is good and covered major discussed concepts
the project understanding is good and covered major key areas
Basic understanding, but some conceptual areas need to be developed
Basic understandings, with noticeable gaps in conceptualization, some of the concepts are applied
Basic understanding, but some conceptual areas need to be developed
Basic understanding, but some conceptual areas need to be developed
The subject of the project and conceptualization of the Key areas were Basic understanding

the subject understanding is good and covered major discussed concepts


the subject understanding is not good
the subject understanding is good and covered major discussed concepts
the subject understanding is fair and covered few discussed concepts
Basic understandings, with noticeable gaps in conceptualization, some of the concepts are applied
the project understanding is good and covered major key areas
The study provides a detailed understanding of the significance of IT risk management and business continuity planning.
the project understanding needs improvement
the project understanding is fair and need improvement
The subject of the project and conceptualization of the Key areas are Very limited understanding

the project understanding is good and covered major key areas

the subject understanding is good and covered major discussed concepts


The subject of the project and conceptualization of the Key areas are Very limited understanding

the project understanding is good and covered major key areas


the subject understanding is good and covered major discussed concepts
the subject understanding need improvement
The subject of the project and conceptualization of the Key areas were Basic understanding
the subject understanding is fair and covered few discussed concepts
the subject understanding is good and covered major discussed concepts
Concepts were clearly explained

the subject understanding is good

The subject of the project and conceptualization of the Key areas were Basic understanding.

Sufficient understanding, but some conceptual areas need to be developed.


Sufficient understanding, but some conceptual areas need to be developed.

Basic understanding, but some conceptual areas need to be developed.

Sufficient understanding, but some conceptual areas need to be developed.

The subject of the project and conceptualization of the Key areas were Basic understanding.
The subject of the project and conceptualization of the Key areas were Basic understanding.
Basic understandings, with noticeable gaps in conceptualization, some of the concepts are applied.
Basic understanding, but some conceptual areas need to be developed

The subject of the project and conceptualization of the Key areas were Basic understanding.

The subject of the project and conceptualization of the Key areas were Basic understanding.
Basic understandings, with noticeable gaps in conceptualization, some of the concepts are applied.
Sufficient understanding, but some conceptual areas need to be developed
Sufficient understanding, but some conceptual areas need to be developed

the project understanding is good and covered major key areas


The subject of the project and conceptualization of the Key areas were Basic understanding
the subject understanding is good and covered major discussed concepts

The subject of the project and conceptualization of the Key areas were Basic understanding
the subject understanding is fair and conceptualization needs improvement
the subject understanding is good and covered major discussed concepts
the subject understanding is good and covered major key areas
The subject of the project and conceptualization of the Key areas are Very limited understanding
the subject understanding is fair and covered few discussed concepts

Basic understanding, but some conceptual areas need to be developed


the subject understanding is fair

the subject understanding is good and covered major discussed concepts


The subject of the project and conceptualization of the Key areas were Basic understanding.

the subject understanding is good and covered major discussed concepts


Sufficient understanding, but some conceptual areas need to be developed

the subject understanding is good and covered major discussed concepts

Less understanding, leads to conceptual flaws.


some possess a clear intellectual comprehension of the subject.
conceptualization of the Key areas in usage and problem of block chain and cryptocurrency.
Understanding of the subject for agriculture institutions to implement an IoT strategy that was planned and adapted to meet their specific needs.
Good understanding of the subject with clear conceptualization
Less understanding which results in conceptual flaws.
IT and Systems Management on Organizational Productivity
conceptualization of the Key areas to determine whether developing the product is financially and technically feasible
Adequate understanding though some conceptual areas are less developed
Adequate understanding of the subject with good conceptualization.
complexities.
conceptualization of the Key areas are customization, adaptive learning real time feeback, data analystics. need clarity about this
Strong understanding with good conceptualization

Understanding of the subject and conceptualization of the Key areas is research project highlight several key aspects and implications of digital payment

the subject understanding is good and covered major discussed concepts


the subject understanding is fair and covered few discussed concepts
conceptualization of the Key areas in usage and problem of block chain and cryptocurrency.
the subject understanding is good and covered major discussed concepts
sufficient understanding of the subject and conceptualizated of analyzing information security systems

subject and conceptualization of the Key areas mainly focused on billing software. give some other module

Basic understanding, with noticeable gaps in conceptualization. At least 4 concepts are applied.
Adequate understanding, though some conceptual areas may be less developed. At least 5 concepts are applied.

Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
The small and medium-sized firm (SME) sector benefited from the efficiency, innovation, and growth that cloud computing brought about.require few infor
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.

At least 8 concepts are applied.


At least 8 concepts are applied.
Adequate understanding, though some conceptual areas may be less developed. At least 5 concepts are applied.
the subject and conceptualization of the Key areas to do succeed and implement Industry 4.0 in the Inventory Systems
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
At least 8 concepts are applied.
At least 8 concepts are applied.

At least 8 concepts are applied.


At least 8 concepts are applied.
At least 8 concepts are applied.
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
At least 8 concepts are applied.
the process of progressively transforming applications and infrastructure to extend into higher-value cloud native services
Key ERP project management tools include Gantt charts, Agile, Kanban, Risk registers, Communication plans, Change control, Issue tracking, and Perform
Challenges faced by cyber security on the latest technologies are focused on and latest about the cyber security techniques, ethics and the trends changing
Enough understanding of the subject and less concepts of the key areas are applied
Adequate understanding of the subjects and concepts are incompletely applied
Sufficient understanding of the subject and the concepts of the Key areas are described minimally
Insufficient understanding of the subject and conceptualization of the Key areas
limited understanding of the subject and lacking of conceptualization
defined scenario to be addressed nor a pre defined set of procedures on this project
Project manager has to be aware of the exterior and inside surroundings of the organization
The well designed operational plan used by the organization, it is able to efficiently carry out its activities.
improve their experience and increment their turnover.
India and practical functionality breakthroughs for blockchain in the IP industry
Comparative study with financial statements is the subject needs to mention some more recent Trends and technology for analysis the data
The case study of Flipkart's digital marketing is the conceptualization key area needs to scrutinize the key area of in digital marketing with innovative techn
Basic understanding, with noticeable gaps in conceptualization. At least 4 concepts are applied.
Basic understanding, with noticeable gaps in conceptualization. At least 4 concepts are applied.
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
At least 8 concepts are applied.
At least 8 concepts are applied.
Adequate understanding, though some conceptual areas may be less developed. At least 5 concepts are applied.
Exceptional understanding of the subject, showcasing insightful conceptualization of key areas.
the subject and conceptualization of the key areas in ERP implemented for enterprise advancement using SAP
At least 8 concepts are applied.
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
At least 8 concepts are applied.
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
Basic understanding, with noticeable gaps in conceptualization. At least 4 concepts are applied.
At least 8 concepts are applied.
Adequate understanding, though some conceptual areas may be less developed.
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
conceptualization of the key areas covered only few points of library management system. More points need to be added
At least 8 concepts are applied.
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
At least 8 concepts are applied.
Limited understanding, leading to conceptual flaws.
At least 8 concepts are applied.

the subject understanding is good and covered major key areas


the subject understanding is average
the subject understanding is good and covered major discussed concepts
the project understanding is good and covered major key areas
the project understanding is good and covered major key areas
the project understanding is fair and covered few key areas
Strong understanding of the subject key areas
Conceptualization of the key areas not meet to the given research work objectives
Provided solution not leads the objectives of the given study work
Many strategies are compared but that are not main key area of the given research topic
Main key ares of subject not given clearly
Main key areas of the given topic not covered all the boundaries
Understanding of the subject and conceptualization of the Key areas
It discusses key aspects such as what is a depository participant, the two depositories in India (NSDL and CDSL).
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
conceptualization of the key areas impact of cloud based HR analytics was given. need some other details about current HR analytics practices
conceptualization of the Key areas for an AI-powered medical devices and software that can process enormous amounts of data have opened up a variety of
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
thorough understanding of the subject and conceptualization of the key areas on privacy challenges posed by AI and the potential solutions
conceptualization of the Key areas to examine CRM practices at Dr. Ethix Products and Services. this project research involved collecting and analyzing cu
At least 8 concepts are applied.
The student has limited understanding with conceptual errors
Adequate understanding with some noticeable lack in the conceptualization.
conceptualization of the Key areas for online payment transaction during Covid 19 . further information on client comments is required
conceptualization of the Key areas for Investigate and evaluate the most significant obstacles that stand in the way of the widespread adoption and impleme
Understanding of the subject and conceptualization is very limited which leads conceptual errors.
highlighted conceptualization of the importance of worklife balace in IT sector, and also person's ability to manage the circumstances at their job.
conceptualization of the Key areas for online payment transaction during Covid 19 . further information on client comments is required
The student has weak understanding, resulting in conceptual errors.
the subject and conceptualization of the key areas in cloud based CRM helped in insurance company. require few information about this
Sufficient understanding though some conceptual areas may be less developed
Basic understanding with noticeable gaps in conceptualization.
The project is somewhat related to scientific aspect and the test applied also scientific related
Adequate understanding though some conceptual areas are less developed
Limited understanding and its leads to conceptual flaws
Sound understanding of the subject with clear conceptualisation
Sound understanding of the project with clear conceptualization.
Sufficient understanding though some conceptual area are missing
conceptualization of the Key areas in usage and problem of block chain and cryptocurrency.
Strong understanding of the subject with clear conceptualisation
Limited understanding, leading to conceptual flaws.
understanding of the subject for an analysis of software in Evaluating Performance. require some information regarding how the major areas are conceptua
At least 8 concepts are applied.
conceptualization of the Key areas of e-banking offers a methodical and structured approach to comprehend and examine the several facets. need more clar
Adequate understanding, though some conceptual areas may be less developed. At least 5 concepts are applied.
Basic understanding, with noticeable gaps in conceptualization. At least 4 concepts are applied.
At least 8 concepts are applied.
Exceptional understanding of the subject, showcasing insightful conceptualization of key areas.
At least 8 concepts are applied.
Basic understanding, with noticeable gaps in conceptualization. At least 4 concepts are applied.
At least 8 concepts are applied.
At least 8 concepts are applied.
the subject and conceptualization of the key areas to measure the network security in school, need more clarification about effectiveness of comparative stu
At least 8 concepts are applied.
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
At least 8 concepts are applied.
At least 8 concepts are applied.
conceptualization of the Key areas covered few objectives. demand a detailed justification for this.
architectures and functionality. it require more information about this
At least 8 concepts are applied.
At least 8 concepts are applied.
subject and conceptualization of the Key areas mainly focused on encryption and decryption. give some other module.

Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
need to give special conceptualization of the Key areas of erp implementaion sucess of project
give some more information of subject and conceptualization of the Key areas of project devlopment
The project will provide SMEs considering AWS cloud computing with useful advice, understandings, and recommendations.

The project will provide SMEs considering AWS cloud computing with useful advice, understandings, and recommendations
The literature review provides a foundation for understanding key concepts, methodologies, and trends pertinent to enhancing supply chain performance thr
The findings of this study will inform industry stakeholders about the current state of AI adoption, its effectiveness in various applications, and the potentia

The practical application of concepts in a real-world setting motivates learners and fosters a deeper understanding of this study

Back ground of this study helps to understanding of the subject and concept of the key areas
some special data are need for understanding of the subject and conceptualization of the Key areas
The practical application of concepts in a real-world setting motivates learners and fosters a deeper understanding of this study

give more functions of a real-world setting motivates learners and fosters a deeper understanding of this study
The conceptual background and literature review of this project helps the understanding the subject of this research.
Basic understanding with visible gaps in conceptualization.
There is a basic understanding, with noticeable gaps in conceptualization.
Some conceptual areas may be less developed, but adequate understanding is achieved.
Accurate comprehension, though some conceptual concepts may be lacking.
Basic knowledge, but apparent misunderstandings.
Appropriate understanding, though some conceptual areas may be less developed.
Basic comprehension, with evident deficiencies in conceptualization.
Accurate comprehension, though some conceptual concepts may be lacking.
Strong conceptual understanding of the subject.
The literature review provides a foundation for understanding key concepts, methodologies, and trends pertinent to enhancing supply chain performance thr
Inadequate comprehension, resulting in conceptual errors.
The literature review provides a foundation for understanding key concepts, methodologies, and trends pertinent to enhancing supply chain performance thr
Accurate comprehension, though some conceptual concepts may be lacking.
A comprehensive comprehension of the subject matter coupled with lucid conceptualization.
An adequate comprehension, albeit some conceptual areas may be less developed.
A limited comprehension leads to conceptual deficiencies.
An adequate comprehension, albeit some conceptual areas may be less developed.
A strong understanding of the subject and a clear conceptualization.
An exceptional comprehension of the subject matter, exhibiting insightful conceptualization of crucial domains.
Back ground of this study helps to understanding of the subject and concept of the key areas.
Appropriate understanding, though some conceptual areas may be less developed.
The conceptual background and literature review of this project helps the understanding the subject of this research
There is a basic understanding, with noticeable gaps in conceptualization.
A strong understanding of the subject is combined with a clear conceptualization.
There are noticeable gaps in conceptualization.
The project will provide SMEs considering AWS cloud computing with useful advice, understandings, and recommendations.
Clear conceptualization and a deep comprehension of the topic.
An exceptional understanding of the subject is exhibited by an insightful conceptualization of key areas.
Excellent understanding of the subject, with insightful conceptualization of key areas.
The findings of this study will inform industry stakeholders about the current state of AI adoption, its effectiveness in various applications, and the potentia
Basic knowledge, but apparent misunderstandings.
Back ground of this study helps to understanding of the subject and concept of the key areas.
provide more content of understanding of the subject and conceptualization of the Key areas
Basic understanding of research work, though some conceptual areas may be less developed.
An adequate comprehension, albeit some conceptual areas may be less developed.
understanding ot this project are need some more content and the key areas of project
Add more points of understanding of the subject and conceptualization of the Key areas of this study.
Understanding is adequate, though some conceptual areas may be less developed.
The conceptual background and literature review of this project helps the understanding the subject of this research.
Excellent comprehension of the topic, displaying insightful conceptualization of key aspects.
An adequate comprehension, albeit some conceptual areas may be less developed.
The student has weak understanding, resulting in significant conceptual errors.
Sufficient comprehension and conceptual gaps in some areas.
Sufficient comprehension, despite possible conceptual gaps in some areas.

Strong conceptual understanding of the subject.

Sufficient comprehension, despite possible conceptual gaps in some areas.


Student has limited understanding with conceptual errors.
Limited understanding, leading to conceptual flaws.

Sufficient comprehension, albeit with certain conceptual gaps.

Limited understanding, leading to conceptual flaws.

Sufficient comprehension, notwithstanding possible conceptual gaps in some areas.


Limited understanding, leading to conceptual flaws.

Basic understanding with significant conceptual gaps.


Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.

Clear understanding, although some conceptual areas may be less developed.

Limited understanding, leading to conceptual flaws.

Appropriate comprehension, though some conceptual areas may need more work.

Adequate understanding is achieved, though some conceptual areas may be less developed.

Clear conceptualization and a deep comprehension of the topic.


Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.

Limited understanding, leading to conceptual flaws.


A strong understanding of the subject is combined with a clear conceptualization.
Some conceptual areas may be less developed, but adequate understanding is achieved.
There are conceptual flaws due to limited understanding.
Appropriate comprehension, though some conceptual areas may need more work.
Adequate understanding, though some conceptual areas may be less developed. There are five concepts are applied.

Appropriate comprehension, though some conceptual areas may need more work.
Appropriate comprehension, though some conceptual areas may need more work.

Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
Limited understanding, leading to conceptual flaws.

Adequate understanding, though some conceptual areas may be less developed. There are five concepts are applied.
Basic comprehension with noticeable conceptual gaps.

Adequate understanding is achieved, though some conceptual areas may be less developed.
Inadequate comprehension, which results in conceptual flaws.
Adequate understanding is achieved, though some conceptual areas may be less developed.

Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
Excellent understanding of the subject, showcasing insightful conceptualizations on key areas.

Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
Limited understanding, leading to conceptual flaws.
Good understanding, though some areas may need more work.

Good understanding, though some concepts may be less developed.

No evidence of understanding or conceptualization.

A strong understanding of the subject is combined with a clear conceptualization.


Some conceptual areas may be less developed, but adequate understanding is achieved.
Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
An exceptional understanding of the subject, showcasing an insightful conceptualization of key areas.
Appropriate understanding, though some conceptual areas may be less developed.

A strong understanding of the subject is combined with a clear conceptualization.

Adequate understanding, though some conceptual areas may be less developed. There are five concepts are applied.
Very good knowledge of the subject and good ideas about important parts.
Limited understanding, leading to conceptual flaws.

Weak understanding leads to significant conceptual errors.

Adequate understanding, though some conceptual areas may be less developed.


Excellent comprehension of the topic, displaying insightful conceptualization of key aspects.

Basic comprehension, with evident deficiencies in conceptualization.


Limited understanding, leading to conceptual flaws.
There are no evidence of understanding or conceptualization.

Basic understanding, with noticeable gaps in conceptualization

Sufficient comprehension and conceptual gaps in some areas.

Sufficient comprehension and conceptual gaps in some areas.


Sufficient comprehension, notwithstanding possible conceptual gaps in some areas.

Student has limited understanding with conceptual errors.


Sufficient comprehension, notwithstanding possible conceptual gaps in some areas.
Sufficient comprehension and conceptual gaps in some areas.

Sufficient comprehension and conceptual gaps in some areas.

Weak understanding, resulting in significant conceptual errors.

Sufficient comprehension, although with certain conceptual gaps.


Student has basic understanding with conceptual errors.

Sufficient comprehension, despite possible conceptual gaps in some areas.

Basic comprehension, with evident deficiencies in conceptualization.


Basic understanding on the concepts. There are gaps on concepts applied.
Adequate understanding of the concepts though it has some noticeable flaws.
The conceptual background and literature review of this project helps the understanding the subject of this research
There is better understanding of the conceptualization of the the subject.
An exceptional comprehension of the subject matter, exhibiting insightful conceptualization of crucial domains.
The findings of this study will inform industry stakeholders about the current state of AI adoption, its effectiveness in various applications, and the potentia
A strong understanding of the subject is combined with a clear conceptualization.
The literature review provides a foundation for understanding key concepts, methodologies, and trends pertinent to enhancing supply chain performance thr
There is a very limited understanding.
The literature review provides a foundation for understanding key concepts, methodologies, and trends pertinent to enhancing supply chain performance thr
Basic understanding with visible gaps in conceptualization.
This industry overview provides a comprehensive understanding of the potential and challenges of biometric authentication in digital payments, offering va
Adequate understanding, though some conceptual areas may be less developed.
The project will provide SMEs considering AWS cloud computing with useful advice, understandings, and recommendations
need some more understanding of the subject and conceptualization of the Key areas of the project.
Understanding of the subject is weak, it also has many basic flaws.
Give more understanding of the subject and conceptualization of the Key areas of this study.
Reasonable understanding in the conceptual areas.
Only basic understanding of the concepts.
The literature review provides a foundation for understanding key concepts, methodologies, and trends pertinent to enhancing supply chain performance thr
There is only basic understanding of the concepts.
Subject understanding is very clear with conceptualization.
Lack of proper understanding of concepts.
Better understanding of the subjects based on Conceptualization.

The practical application of concepts in a real-world setting motivates learners and fosters a deeper understanding of this study

Back ground of this study helps to understanding of the subject and concept of the key areas.
Back ground of this study helps to understanding of the subject and concept of the key areas.

The practical application of concepts in a real-world setting motivates learners and fosters a deeper understanding of this study
Back ground of this study helps to understanding of the subject and concept of the key areas.
Understanding of the subject and conceptualization of the Key areas are required more key points

Limited understanding, leading to conceptual flaws.


Good understanding, though some concepts may be less developed.
Limited understanding, leading to conceptual flaws
An exceptional comprehension of the subject matter, exhibiting insightful conceptualization of crucial domains.
No evidence of understanding
Very limited understanding
Basic comprehension, with evident deficiencies in conceptualization.
Some conceptual areas may be less developed, but adequate understanding is achieved.
Lack of comprehension results in conceptual flaws.
Good understanding, though some areas may need more work.

Understanding the SAP ERP installation process requires an understanding that every SAP ERP deployment is essentially a project. As a result, project man
An adequate comprehension, albeit some conceptual areas may be less developed.
Adequate understanding, though some conceptual areas may be less developed
One of the key advantages of this project model is its ability to reach a large audience of potential customers globally.
The literature review provides a foundation for understanding key concepts, methodologies, and trends pertinent to enhancing supply chain performance thr
The practical application of concepts in a real-world setting motivates learners and fosters a deeper understanding of this study
The conceptual background and literature review of this project helps the understanding the subject of this research.
There is a basic understanding, with noticeable gaps in conceptualization.
Sufficient comprehension, despite possible conceptual gaps in some areas.
Adequate understanding, though some conceptual areas may be less developed
Back ground of this study helps to understanding of the subject and concept of the key areas.
Adequate understanding, though some conceptual areas may be less developed
Sufficient comprehension, despite possible conceptual gaps in some areas.
Basic understanding, with noticeable gaps in conceptualization
This project investigates how digital currency is transforming the Indian financial sector. The analysis will reveal the increasing popularity of digital payme
Basic understanding, with noticeable gaps in conceptualization
The practical application of concepts in a real-world setting motivates learners and fosters a deeper understanding of this study
Adequate understanding, though some conceptual areas may be less developed
The literature review provides a foundation for understanding key concepts, methodologies, and trends pertinent to enhancing supply chain performance thr
The practical application of concepts in a real-world setting motivates learners and fosters a deeper understanding of this study
Executive summary provides a foundation for understanding key concepts, methodologies, and trends pertinent to enhancing supply chain performance thro
Excellent understanding of the subject, with insightful conceptualization of key areas.
Adequate understanding, though some conceptual areas may be less developed
Sufficient comprehension, despite possible conceptual gaps in some areas.
Basic understanding, with noticeable gaps in conceptualization.
Adequate understanding, though some conceptual areas may be less developed
Limited understanding, leading to conceptual flaws.
Limited understanding, leading to conceptual flaws.
The literature review provides a foundation for understanding key concepts, methodologies, and trends pertinent to enhancing supply chain performance thr
A basic understanding, but there are obvious gaps in understanding.
Basic understanding with visible gaps in conceptualization.

Adequate understanding, though some conceptual areas may be less developed


Excellent understanding of the subject, showcasing insightful conceptualization of key areas.
A strong understanding of the subject is combined with a clear conceptualization.
A comprehensive comprehension of the subject matter coupled with lucid conceptualization.
There is a basic understanding, with noticeable gaps in conceptualization.
Back ground of this study helps to understanding of the subject and concept of the key areas.
While there is an adequate understanding, further development of conceptual areas is necessary to enhance the depth and completeness of the analysis on ch
It involves identifying obstacles such as technological limitations, regulatory constraints, financial considerations, and organizational barriers that may hind

Current techniques need to implement and analysis the project.


Recent technology need to use and methodology to be address clearly.
Provide actionable insights and recommendations for hospital administrators, supply chain professionals, and policymakers to improve supply chain effectiv
Organizations often face resistance when attempting to execute major changes, largely because thorough planning was not done beforehand.
While demonstrating a basic understanding, filling the gaps in conceptualization will enrich the analysis of the impact of fintech innovations on traditional b
While demonstrating adequate understanding, further development of conceptual areas would enrich the comparative study on portfolio management, ensur
While demonstrating a basic understanding, filling gaps in conceptualization will enhance the analysis of the workflow in the Indian banking sector, provid

Dell adopted the Toyota Production System (TPS) and its core principles of continuous improvement, respect for people, and eliminating waste.
While demonstrating adequate understanding, further development of conceptual areas would enrich the analysis of mutual fund performance in India, ensu

Garvin, a Harvard professor, researched on quality issues and derived eight dimensions.
While demonstrating adequate understanding, further development of conceptual areas would enrich the analysis of consumer buying behavior towards HD
To achieve and sustain a Six Sigma level of performance, minimizing defects and optimizing processes.

A robust methodology underpins the research endeavor, ensuring rigor, validity, and reliability in the pursuit of insights

Project execution summary is need to give more information of implementation of project

To propose serious areas of strength for a genuine technique reasonable for new firms to address the difficulties of this new modernized market.

Main Keys in this project to improve the aware about Flipkart’s move to cloud infrastructure
to mention the clear keys in future to know whether HRIS is improving with changing time

key to the project subject is to be much of a connection between cloud computing and education
keys are to use developing a blockchain-based system for managing academic credentials

Limited understanding, leading to conceptual flaws.

conceptual areas may be less developed

Adequate understanding, though some conceptual areas may be less developed. There are five concepts are applied.

gaps in conceptualization.

Limited understanding, leading to conceptual flaws.


Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
Limited understanding, leading to conceptual flaws.

Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.

Adequate understanding, though some conceptual areas may be less developed. There are five concepts are applied.
Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.

Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
Adequate understanding, though some conceptual areas may be less developed. There are five concepts are applied.

Limited understanding, leading to conceptual flaws.

Limited understanding, leading to conceptual flaws.

Adequate understanding, though some conceptual areas may be less developed. There are five concepts are applied.

Limited understanding, leading to conceptual flaws.

transformation of data into cloud technology is the key area needs to perform some literature review on cloud technology
AI is the key concept area needs to conduct literature review on the AI with financial sectors
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
Adequate understanding, though some conceptual areas may be less developed. At least 5 concepts are applied.
long-term environmental and economic impacts of Tesla's digital transformation needs to mention with various attributes
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
Limited understanding, leading to conceptual flaws.
integrating sustainability into business operations is the key area needs to conduct various literature review based on the subject with various methods
Limited understanding, leading to conceptual flaws.
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
Metaverse is the key area needs to review the subject with various applications studies
Synopsis only given needs to present literature review on the selenium web application key areas
Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
At least 8 concepts are applied.
Limited understanding, leading to conceptual flaws.
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
Needs to perform some literature review on the key area of AI models
At least 8 concepts are applied.

Needs to preform some literature review on the factors of toxic leaderships and analysis of data
Limited understanding, leading to conceptual flaws.
frequency of digital payment usage are mentioned. needs to review the digital payments of various applications to understand the key areas
Limited understanding, leading to conceptual flaws.
Limited understanding, leading to conceptual flaws.

Limited understanding, leading to conceptual flaws.


Investigation is the key subject in the study needs to perform literature reviews on various investigation techniques and concepts
Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
Impact of AI in the field needs to perform some literature review to understand the subject

Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.

Primary facts is obtained through the review method needs to present more points
No evidence of understanding or conceptualization.
Overview of lenovo software discussed, needs to present problem statement and explain the key areas to solve the problem study, literature review not give
Limited understanding, leading to conceptual flaws.
Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
Key concept area are discussed needs to specify various metrics to analyse the data
Limited understanding, leading to conceptual flaws.
Limited understanding, leading to conceptual flaws.
Rural area digital transformation problem needs to be reviewed in the literature review part

Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
Improving customer satisfaction is the key concept of the study report needs to review various expectation come from the customer side and find the best m
Digital transaction is the key concept area needs to review the concepts with various references
Limited understanding, leading to conceptual flaws.
Limited understanding, leading to conceptual flaws.
Android technology are clearly discussed needs to specify key areas for solving the problem
Needs to review of the key concepts of the problem scheme
Needs to specify conceptualization of the subject and key areas

Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.

Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.

Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
Limited understanding, leading to conceptual flaws.

Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.

Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.

Basic understanding, with noticeable gaps in conceptualization. At least 4 concepts are applied.

Limited understanding, leading to conceptual flaws.

Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
Integration of payment system is the key subject area needs to specify some algorithm or flow diagram to solve this problem
compares Agile and Waterfall project management methods and highlights various perspectives

Needs to study AI technology which used in the project and give clear idea about the finding of the project
Needs to mention the literature review on cloud migration and requirements

At least 8 concepts are applied.


Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
Needs to mention some new concept in the relevant study of the problem.
Concept of the VR in various subjects discussed needs to focus on the analysis
systematically gathering and analysing numerical data on cybersecurity solutions within the financial sector at Tata Consultancy Services (TCS)
Key area of IOT security protocol needs some literature survey
Digital payment is the key area of the study needs to study the e-payment subject and perform literature review
Adequate understanding, though some conceptual areas may be less developed. At least 5 concepts are applied.
Digital banking service is the key area needs to perform various literature reviews on the key subject
At least 8 concepts are applied.
At least 8 concepts
At least 8 concepts are applied.
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
usefulness of the python for developing applications needs to mention with clear aspects
Block chain is the key area needs to perform more literature review on this study
Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
Limited understanding, leading to conceptual flaws.
At least 8 concepts are applied.
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
Gesture recognition is the key area needs to understand the subject with various literature reviews
Limited understanding, leading to conceptual flaws.

Limited understanding, leading to conceptual flaws.


The project demonstrates an adequate understanding, though some conceptual areas may be less developed. Strengthening these areas will improve the over

Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
The understanding demonstrated is adequate, yet there is room for improvement in developing certain conceptual areas to strengthen the analysis comprehe
The understanding demonstrated is adequate, although there are some conceptual areas that could be further developed to enhance depth and clarity.

The understanding demonstrated shows a basic grasp of the subject, but there are noticeable gaps that should be addressed for a more comprehensive under
Limited understanding, leading to conceptual flaws.
The analysis of the HDFC Limited and HDFC Bank merger shows a basic understanding with notable gaps in conceptualization, requiring deeper research

thorough understanding of the subject and conceptualization of inventory management a better means of leather products. need more details about this
There is a strong understanding of the subject with clear conceptualization, facilitating comprehensive insights and informed conclusions.
There is an adequate understanding overall, although certain conceptual areas could benefit from further development to deepen the analysis of the impact o
No noteworthy innovation technique used for problem scheme in this project

There is an adequate understanding, though some conceptual areas may need further development for a more comprehensive grasp.
While there is an adequate understanding, consider further developing conceptual areas to deepen comprehension of the impact of inflation and interest rate
theorization of the primary focus of key areas for QMS in MAX healthcare is on customer expectations and requirements. need further clarification on impo
Implement advanced booking and reservation systems, ensuring seamless integration with online travel agencies.
Enhance the understanding by addressing noticeable gaps in conceptualization to provide a more complete and nuanced study of the evolution of the Indian
To identify the key drivers of procurement technology adoption, including the factors that influence organizations to adopt procurement technology.
No outstanding innovation technique used to solve the problem

No outstanding innovation technique used to solve the problem


Demonstrate a strong understanding of the subject through clear and precise conceptualization of mergers and acquisitions in the Indian banking sector.
No outstanding innovation technique used to solve the problem
While there is adequate understanding, further development of conceptual areas is needed to enhance the depth and completeness of the analysis on consum

While there is adequate understanding, further development of some conceptual areas is needed to enhance the depth and comprehensiveness of the analysi
While demonstrating adequate understanding, further development of conceptual areas is necessary to deepen the analysis of Small Finance Banks in India

Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
Basic understanding, with noticeable gaps in conceptualization. There are fourconcepts are applied.

Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
Limited understanding, leading to conceptual flaws.
Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.

gaps in conceptualization.
areas may be less developed.

Limited understanding, leading to conceptual flaws.


Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.

Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
Limited understanding, leading to conceptual flaws
adequate Understanding of the subject and conceptualization of the Key areas
Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
conceptual areas may be less developed.

noticeable gaps in conceptualization

gaps in conceptualization
Limited understanding, leading to conceptual flaws.
Limited understanding, leading to conceptual flaws.
YES
OK
OK
OK
UNDERSTANDABLE
NOT FULLY STUDENT IDEA
UNDERSTANDABLE
WELL UNDERTANDABLE
WELL UNDERSTANDABLE
UNDERSTANDALE
Very limited understanding or entirely lacking.
Basic understanding, with noticeable gaps in conceptualization.
UNDERSTANDABLE
understandable
The thoughtful conceptualization of important areas, including the application of more than six concepts, demonstrates an extraordinary mastery of the subj
A comprehensive understanding of the subject that showcases insightful conceptualization of key areas. More than 6 concepts were applied.
The application of four concepts has a basic understanding, but there are noticeable gaps in conceptualization.
Basic understanding, with noticeable gaps in conceptualization.
Limited understanding, leading to conceptual flaws.
Basic understanding,with noticeable gaps in conceptualization
Basic understanding, with noticeable gaps in conceptualization
Basic understanding, with noticeable gaps in conceptualization.
Adequate understanding, though some conceptual areas may be less developed.
Basic understanding, with noticeable gaps in conceptualization.
Limited understanding, leading to conceptual flaws.
A strong comprehension of the subject with a clear understanding and application of more than`` 6 concepts.
competent analysis using the right tools and methods. numerous analytical tools applied appropriately
remarkable comprehension of the subject, exhibiting perceptive conceptualization of important areas. All seven of the above ideas are used.
Limited understanding, leading to conceptual flaws.
The subject is deeply understood and is demonstrated through insightful conceptualization of key areas. A minimum of 8 concepts are utilized.
Weak understanding, resulting in significant conceptual error
Basic understanding, with noticeable gaps in conceptualization.
solid comprehension of the topic with precise conceptualization. At least eight ideas
More information about how the topic is mapped out is needed.
Limited understanding, leading to conceptual flaws
A minimum of eight concepts are applied.

Demonstrates a thorough comprehension of the subject and clear conceptualization. More than eight concepts are applied.
Project execution summary is need to give more information of implementation of project
conceptualization.
conceptualization.
conceptualization.
To identify and address the technical, financial, and regulatory challenges of integrating IoT in smart cities
flaws.
The study should aim to analyze the competitive landscape and the impact of fintech players and mobile payment solutions on traditional financial institut
conceptualization.
Customers are willing to pay for digital banking
less developed.
less developed.
Project execution summary is need to give more information of implementation of project
less developed.

conceptualization
It will give a complete overview of the outsourcing situation and establish the background for the rest of the study.
Clearly define the business objectives and use cases for AI and ML adoption.
Limited understanding, leading to conceptual flaws.
IT outsourcing is actually upgrading the heap as sellers take control of increasingly strategic applications
though food & beverage outlets are used as tools to attract more customers.
Recent technology uses and methodology to be address clearly.
Adoption of automating the processes, data analytics and AI driven tools and they assist in planning, execution and reporting of IT Audits
Basic understanding, with noticeable gaps in conceptualization.
Basic understanding, with noticeable gaps in con
The project emphasizes the importance of regulatory compliance and data protection within the BFSI sector, and discusses the implementation of network a
Basic understanding, with noticeable gaps in conceptualization.
Basic understanding, with noticeable gaps in conceptualization.
Limited understanding, leading to conceptual flaws.
Adequate understanding, though some conceptual areas may be less developed.
Basic understanding, with noticeable gaps in conceptualization.
Basic understanding, with noticeable gaps in conceptualization.
Basic understanding, with noticeable gaps in conceptualization
This study strengthened the past literature and gave an open door to future researchers to expand the scope in the Human asset management.
Strong cooperation amongst stakeholders is required to make sure that all efforts to speed up the roll out of 5G are coordinated and that inter de
their decision.
By developing structured processes and practices, ITSM assures that IT services are aligned with business goals, offered successfully, and continually upda
flaws.
with clear conceptualization.
gaps in conceptualization.
Analyzing the differences between the two groups based on the key factors that affect consumer behaviors.
Recent technology uses and methodology to be address clearly.
Recognize the four categories of big data analytics: prescriptive, predictive, diagnostic, and descriptive

less developed.
less developed.
less developed.
flaws.
Project execution summary is need to give more information of implementation of project
To assess the degree of distinction or association inverse the solicitation for tendency of the explanations behind pressure
less developed.
Strategies used to transition from excel to data management system which includes understanding of detail working of inhouse data management, employm
applied.
conceptualization.
No noteworthy innovation technique used for problem scheme in this project
By delving into the current integration landscape, assessing technological advancements, and evaluating the tangible and intangible benefits of integration,
conceptualization.
conceptualization.
gaps in conceptualization.
gaps in conceptualization.
The purpose of this study is to review the body of research on the development of the fintech sector in India and the contentment of its use.
flaws.
Evaluate the impact of enhanced cyber security on organizational resilience.
less developed.
gaps in conceptualization.
Execute pilot projects in selected business units to test the feasibility and effectiveness of AI, ML, and blockchain solutions.
errors.
less developed.
ML algorithms can analyze employee performance data to identify trends and provide personalized development recommendations.
The ultimate goal is to investigate new developments in technology and future trends that have the potential to significantly transform supply cha
to enhance returns on domestic savings and improve the allocation of investments across various sectors.
employees several ways to keep businesses running.
Investing in research and development to stay ahead of these trends will be crucial. Collaborations with fashion influences and leveraging social media cam
gaps in conceptualization.
The study's discoveries have suggestions for organizations looking for to execute farther work and IT extend directors looking for to lead and oversee farth
gaps.
conceptualization.
conceptualization.
Small businesses, in particular, may struggle with these barriers due to limited resources and expertise.
flaws.
The research design is exploratory till identification of sites popularity.
conceptualization.
less developed.
Project execution summary is need to give more information of implementation of project
less developed.
conceptualization.
Project execution summary is need to give more information of implementation of project
Project execution summary is need to give more information of implementation of project
Explore the scalability and sustainability of IT-driven solutions in addressing evolving challenges and demands during the pandemic.
To gain a comprehensive understanding of customer behaviour and preferences, Triveni Media should expand the use of IoT devices across more touchpoin
To facilitate smooth data interchange and integration across various systems and care contexts, healthcare companies should give priority to investing
less developed.
conceptualization.
Analyzing the platform’s performance, usability, and impact on HCP engagement
conceptualization.
Examine whether customers favour restaurants utilizing digital tools to personalize their dining encounters through the utilization of their dining data.
Enhance the academic performance and motivation of K-12 students in mathematics by providing educational challenges that are optimally matched to thei
gaps in conceptualization.
adoption of blockchain technology
with different people at work place.
conceptualization.
conceptualization.
less developed.
Assess the effectiveness of content presentation and readability on Amazon and eBay
in Education in India
flaws.
conceptualization
conceptualization.
conceptualization
conceptualization
No noteworthy innovation technique used for problem scheme in this project
gaps in conceptualization.
gaps in conceptualization.
conceptualization.
To optimize network performance and resource utilization.
conceptualization.
No noteworthy innovation technique used for problem scheme in this project
Cloud-based possibilities can provide scalability, allowing companies to changing workloads and meet remote teams successfully.
The indispensable benefits of man-made reasoning were found the speed quality and evacuation of repetitive exercises, while the best snag was seen the ov

Monitoring problems and automatically directing them to the appropriate person to ensure their resolution.
To analyze case studies of financial institutions that have successfully harnessed IT and ITSM for market transformation.
conceptualization.
Building Trust Through Transparency and User Control
conceptualization.
Examine differences in consumer preference between social commerce and conventional shopping
conceptual flaws
Current techniques need to implement and analysis the project.
Analyse customer feedback, reviews, and ratings to assess satisfaction levels.
areas may be less developed
No noteworthy innovation technique used for problem scheme in this project
gaps in conceptualization.
on.
areas may be less developed.
To analyze the Impact of the development slippage on the Regression testing. This objective will identify and analyze the impact of the delay on the
To Highlight the obstacles that consumers and providers of digital payment systems encountered during the Covid-19 outbreak.
conceptualization.
No outstanding innovation technique used to slove the problem
No outstanding innovation technique used to slove the problem
less developed.
gaps in conceptualization.
gaps in conceptualization.
less developed.
Recent technology uses and methodology to be address clearly.
The project examines various AI-driven fraud detection techniques, including anomaly detection, pattern recognition, and predictive analytics.
Defense personnel experience high levels of perceived stress intensity in response to online fraud incidents, compounding their occupational stress.
awareness of best security practices, inadvertently exposing their devices.
The main goal of this study was to enhance efficiency by examining the agency's ability to tailor its services.
Consumers expect guidance in solving any issues that may arise with a product. This expectation has become a norm in the age of consumer.
less developed.
Adequate understanding, though some conceptual areas may be less developed
The customer's web browser will exchange information with the server hosting the e-commerce website during the order placement process.
factors such as industry type, geographic location, and organizational size.
available for virtual team collaboration, their applications, and their impact on business operations
Adequate understanding, though some conceptual areas may be less developed.
Limited understanding, leading to conceptual flaws
Basic understanding, with noticeable gaps in conceptualization.
Basic understanding, with noticeable gaps in conceptualization.
Compile all findings, analyses, and recommendations into a comprehensive report. Clearly articulate the rationale behind each recommendation, suppo
ERP systems offer complete visibility into all crucial processes across an organization, crucial for senior management.
ANOVA is a statistical technique used to compare means across multiple groups and determine if there are statistically significant differences between them
Project execution summary are given more information of implementation of project
Limited understanding, leading to conceptual flaws.
Basic understanding, with noticeable gaps in conceptualization.
Limited understanding, leading to conceptual flaws.
Adequate understanding, though some conceptual areas may be less developed.
Basic understanding, with noticeable gaps in conceptualization
Project execution summary is need to give more information of implementation of project
Virtualization and cloud computing technologies are also required for green IT implementation.
GOOD
Basic understanding, with noticeable gaps in conceptualization.
Basic understanding, with noticeable gaps in conceptualization.

FEW RECENT POINTS MAY BE INCLUDED


Limited understanding, leading to conceptual flaws.
Limited understanding, leading to conceptual flaws.
NICE UNDERSTANDING
Adequate understanding, though some conceptual areas may be less developed.
conceptual flaw
Basic understanding, with noticeable gaps in conceptualizati on.
Strong understanding of the subject with clear conceptualization
CANDIDATE HAVE WRITTEN IN SUCH A WAY THAT CONCEPTS ARE IN UNDERSTANDABLE FORM
Limited understanding, leading to conceptual flaws.
Basic understanding, with noticeable gaps in conceptualization.
OK
Limited understanding, leading to conceptual flaws.
Basic understanding, with noticeable gaps in conceptualization
ok
Basic understanding, with noticeable gaps in conceptualization.
Basic understanding, with noticeable gaps in conceptualization
NOT CLEARLY PRESENTED
Basic understanding, with noticeable gaps in conceptualization
well understood
Adequate understanding, though some conceptual areas may be less developed.
Limited understanding, leading to conceptual flaws.
understandable
Weak understanding, resulting in significant conceptual errors.
Basic understanding, with noticeable gaps in conceptualization.
Basic understanding, with noticeable gaps in conceptualization.
Basic understanding, with noticeable gaps in conceptualization.
Basic understanding, with noticeable gaps in conceptualization
Focus on the star products so that you can forecast their prospects in order to manage the correct inventory and promotion strategies.
less developed.
errors.
These centralized units play a pivotal role in providing technical support, troubleshooting, and assistance to endusers, ensuring the smooth functioning of IT
less developed.
By enhancing their comprehension and resolution of clients' cybersecurity apprehensions, online banks have the potential to mitigate hazards and con
conceptualization
service delivery.
Identifying the factors that encourage users to return to or recommend Amazon.com.
The analysis considers a diverse range of industries to capture the broad spectrum of AI applications and their implications across different sectors, such as
-term impact on brand equity and customer loyalty.
The home energy management system must have the means of delivering its recommendations to the user.
flaws.
of India's economic landscape
conceptualization
Objectify the applications of IoT on real-world and case studies on smart cities to explain the practical inference of IoT.
like manufacturing.
less developed.
Focus on Cost Management Set budgets for cloud expenditure and use forecasting tools to predict future costs
To help user find the precise information with the help of website analysis
conceptualization
conceptualization.
The IT revolution has been instrumental in achieving the current milestones in banking
People are going to be very content with the newest Green Cloud service, causing unprecedented enterprise adoption of Green affect service.
conceptualization.
conceptualization.
Examine the efficacy of actions undertaken by the Indian government to address cyber security challenges.
The study discovers that ability management expects a fundamental part in worker motivation
flaws.
As a result, any business that accepts digital payments may add UPI apps as a payment option and incentivize customers to utilize them with deals, discoun
understanding
flaws.
understanding
flaws.
flaws.
conceptualization.

Adequate understanding, though some conceptual areas may be less developed

Basic understanding, with noticeable gaps in conceptualization

Strong understanding of the subject with clear conceptualization.


Basic understanding, with noticeable gaps in conceptualization.

Adequate understanding, though some conceptual areas may be less developed

Adequate understanding, though some conceptual areas may be less developed


Adequate understanding, though some conceptual areas may be less developed
Adequate understanding, though some conceptual areas may be less developed

Adequate understanding, though some conceptual areas may be less developed


Adequate understanding, though some conceptual areas may be less developed

Strong understanding of the subject with clear conceptualization


To effectively conduct a competition analysis of the construction chemicals industry in India, it is essential to have a comprehensive understanding of the in
Basic understanding, with noticeable gaps in conceptualization.
Basic understanding, with noticeable gaps in conceptualization
It provides organizations with a flexible and cost-effective alternative to traditional IT infrastructure and operations. Cloud computing has three primary ser
Adequate understanding, though some conceptual areas may be less developed
Adequate understanding, though some conceptual areas may be less developed
Adequate understanding, though some conceptual areas may be less developed
Adequate understanding, though some conceptual areas may be less developed
Adequate understanding, though some conceptual areas may be less developed
The subject of this study involves exploring the various factors that influence consumers' online shopping and purchasing behaviors. With the rise of e-com
Assess how AI technologies contribute to fostering innovation in product development and R&D processes.
Implementing ITIL 4 in modern organizations involves a strategic approach to managing IT services, processes, and operations.
The subject understanding and conceptualization of the key areas were well identified in the study
Adequate understanding, though some conceptual areas may be less developed
The subject understanding and the conceptualization of the key areas of the CRM issues were well stated
Adequate understanding, though some conceptual areas may be less developed
Limited understanding, leading to conceptual flaws
The subject was clearly identified and key areas of the problems were focused and stated well.
The objective scope and coverage of the study on the block chain and cryptocurrency is stated well

Basic understanding with certain conceptual gaps in this study.

The student has adequate understanding of the subject with clear conceptualization.

Very limited understanding of the subject and conceptualization of the Key areas
Student has limited understanding with conceptual errors.
The student has limited understanding, leading to conceptual flaws
Other subject file
Sufficient comprehension, although with certain conceptual gaps.
Other subject file
Other subject file
Adequate understanding though some conceptual gaps in some areas.
Student has limited understanding with conceptual errors.
Limited understanding with conceptual errors.

Student gave adequate understanding though some conceptual areas may be less developed.

Student uploaded assignment questions with answers.

Strong understanding of the subject with clear conceptualization on.


Adequate understanding, though some conceptual areas may be less developed.
Strong understanding of the subject with clear conceptualizati on.

Adequate understanding, though some conceptual areas may be less developed.


Strong understanding of the subject with clear conceptualizati on.

key area of the project is products, locations, or wearables gather real-time data on customer behavior and product usage

pricing, chаrging аnd billing. It is thеrеfоrе а prе-cоnditiоn fоr thе еlаsticity оf clоuds.
receive constructive criticism and praise that help them refine their teaching methods.
capable of performing tasks independently without human intervention.
significant relationship between family support initiatives and employee retention.
mining operations, facilitating business intelligence (BI) initiatives and decision support.

key areas of this project This research is based on extensive and comprehensive data to achieve the identified objectives.
referred to as nodes, connected by a network.

the Key areas of this project is data from surveys are analyzed using statistical methods.

given them a good insight about the topic and the study I conducted.
Sufficient comprehension, although with certain conceptual gaps.
key areas : Fictionize uses NLP to interpret user stories, requirements, and test scenarios written in plain English.
Key areas TV advertising is more dependable than internet advertising, according to the report.
Adequate understanding, though some conceptual areas may be less developed.
payment methods.
Basic understanding, with noticeable gaps in conceptualization.
ability to function without an internet connection.
Basic understanding, with noticeable gaps in conceptualization.
to conduct their financial transactions with confidence and peace of mind.
Strong understanding of the subject with clear conceptualization of the Key areas.
Adequate understanding though some conceptual areas may be less developed
Data-Driven Approach at Vita Food Exhibition,"
Adequate understanding, though some conceptual areas may be less developed.
Other subject file
business and to minimize business damage by preventing & limiting the impact of security incidents.
Other subject file
accurate and tailored information that was closely linked to the research aims.
seems to be right time for automobile companies to choose green factor only in automobile.
Other subject file

Basic understanding with noticeable gaps in conceptualization


Student has limited understanding with conceptual errors.
Basic understanding, with noticeable gaps in conceptualization.

Strong understanding of the subject with clear conceptualization.


Strong understanding of the subject with clear conceptualization.

Basic understanding of the subject and conceptualization of the key areas.

Basic understanding with noticeable gaps in conceptualization


Student has limited understanding of the subject and conceptualization of the key areas.
Student has limited understanding of the subject and conceptualization of the key areas.
Student has limited understanding of the subject and conceptualization of the key areas.

Student has sufficient understanding of the subject and conceptualization of the Key areas
Student has limited Limited understanding with conceptual errors.

Student has limited understanding with conceptual errors.


Student has basic understanding with conceptual errors.

Other subject file


The flexibility enables them to scale their operations based on market demand or seasonality without incurring extra fixed costs associated with a permanen
in the cloud

Key areas The research centers around Green affect computing to be most effective way of IT outsourcing.
concerned about security and sustainability.
own asset position isn't exceptionally uplifting

Key areas of the project perfect place for implementing the data mining and machine learning algorithms.

cloud-based solutions
Key areas of the project gathering, transferring, displaying, developing information, reconsidering business procedures,accounting, receiving, etc.
infancy; because of this, there is a scarcity of skills necessary to construct and employ it.

Key areas of the project is computational styling; the second is visual garment representation; and the third is trend monitoring.
effectiveness is a strong predictor of user perception of chatbot effectiveness.
misinformation and manipulating the original content.

Key areas this Primary research through a survey involves collecting first-hand data directly from the individuals.
Key areas of the project e IoT technology and its role in logistics and supply chain industry.

Key areas of the project is d the hospital ICU patients data and analyze the requirements as per different wards of ICU.
immutability ensures the integrity and traceability of transactions.

size for statistical significance.


Artificial Intelligence, the technology that enables machines to mimic human the Key areas of the project is intelligence, is now an integral part of the bank
the Key areas of the project is gives the particular estimations of all scales used in the study.
Strong understanding of the subject with clear conceptualizati on.
Adequate understanding, though some conceptual areas may be less developed.
Adequate understanding, though some conceptual areas may be less developed.

Adequate understanding, though some conceptual areas may be less developed.


Strong understanding of the subject with clear conceptualizati on.

Adequate understanding, though some conceptual areas may be less developed.

Strong understanding of the subject with clear conceptualization.

Adequate understanding, though some conceptual areas may be less developed.

Adequate understanding, though some conceptual areas may be less developed.

Adequate understanding, though some conceptual areas may be less developed

Adequate understanding, though some conceptual areas may be less developed

Adequate understanding, though some conceptual areas may be less developed. At least 5
Adequate understanding, though some conceptual areas may be less developed.

Adequate understanding, though some conceptual areas may be less developed

Adequate understanding, though some conceptual areas may be less developed.

Adequate understanding, though some conceptual areas may be less developed

Basic understanding, with noticeable gaps in conceptualization

Basic understanding, with noticeable gaps in conceptualization


Adequate understanding, though some conceptual areas may be less developed
Adequate understanding, though some conceptual areas may be less developed
Strong understanding of the subject with clear conceptualization
Basic understanding, with noticeable gaps in conceptualization

Adequate understanding, though some conceptual areas may be less developed


Adequate understanding, though some conceptual areas may be less developed
Adequate understanding, though some conceptual areas may be less developed

Student has limited Understanding of the subject and conceptualization of the Key areas.
Other subject file.
The document provides an overview of the infrastructure engineering industry in India and applications of hydraulic components.
Knowledge of the customer demographics and TR profiles and how they influence his acceptance of internet banking can enable banks to understand their c
Other subject file
This paper describes key theories and researches about some factors influencing employees' information security behavior.
Student has limited understanding of the subject and conceptualization of the key areas.
Other subject file
Explore the journey of COBOL to Java migration in our blog. Discover the challenges and solutions
Social media marketing provides an unprecedented opportunity to communicate with consumers, connect with a worldwide audience and build a loyal audi

Student has limited understanding with conceptual errors.


Copy case(Course book)
Student has limited understanding of the subject and conceptualization of the key areas.
It continuously works towards motivating employees, by providing an environment where they feel comfortable and secure.
Other subject file
Student has limited understanding of the subject and conceptualization of the key areas.
The e-RUPI voucher can be used without a card, without downloading a digital payments app, and even without having a bank account.
Key steps in implementation include planning, acquiring facilities, testing the system, training personnel, and maintenance.
This concept paper seeks to understand the influence of blockchain on the financial industry, shedding light on its key features and benefits Key areas

Learning emerging technologies is important because they can enhance the learning experience and have the potential to positively impact teaching and lear
Other subject file
Student has basic understanding with conceptual errors.
A company focusing only on creating and selling physical or digital products to customers is known as a product-based company.

AI can enable agents and managers to increase productivity, drive contact center efficiency, and deliver a more personalized experience
Other subject file
It reduces the administrative expenses greatly. It enables data management, which helps in taking vital choices. It bolsters HR strategies and hones the orga
Student has basic understanding of the subject and with conceptual errors.

Ecosystem for banking technology comprises governments, regulators, academic institutions, major technology companies, emerging financial technology c
E-commerce has revolutionized the way people shop. Thanks to the internet and digital devices, consumers can now shop online anytime and anywhere the
Student has limited understanding with conceptual errors.

Sufficient comprehension and conceptual gaps in some areas.

Very limited understanding


Weak understanding, resulting in significant conceptual errors.

Basic understanding, with noticeable gaps in conceptualization

Understanding of the subject are good but may require further improvement
Basic understanding, with noticeable gaps in conceptualization

Understanding of the subject are good but may require further improvement
Basic understanding, with noticeable gaps in conceptualization.
Limited understanding, leading to conceptual flaws.
Limited understanding, leading to conceptual flaws.
Limited understanding, leading to conceptual flaws.

Very limited understanding


The understanding of the subject need improvement in particular areas

The understanding of the subject need improvement in particular areas

Limited understanding, leading to conceptual flaws.


Basic understanding, with noticeable gaps in conceptualization

Fair understanding of the subject but could improve alternative limitations


understanding, though some conceptual areas may be less developed.
Basic understanding, with noticeable gaps in conceptualization

Limited understanding, leading to conceptual flaws.


Limited understanding, leading to conceptual flaws.

Basic understanding, with noticeable gaps in conceptualization

Understanding of the subject are good but may require further improvement

Limited understanding, leading to conceptual flaws.


Fair understanding of the subject but could improve alternative limitations
Basic understanding, with noticeable gaps in conceptualization.

Limited understanding, leading to conceptual flaws.

Back ground of this study helps to understanding of the subject and concept of the key areas. are need more key points
provide some more concept of Understanding of the subject and conceptualization of the Key areas
The project will provide SMEs considering AWS cloud computing with useful advice, understandings, and recommendations are need more ideas
The conceptual background and literature review of this project helps the understanding the subject of this research.
Back ground of this study helps to understanding of the subject and concept of the key areas.
Researcher had a good understand regarding the required concepts and important key areas.
Provided concepts and key areas of AI in digital marketing
Key areas and concepts are analyzed
Keys areas discussed need clear focus
Key areas in cloud computing are discussed

Add some more key findings and implications drawn from the study.
The comparison of Blockchain vs Cryptocurrency offering to be a utility or resource in a number of situations,and even digitizing the possession of an item
The literature review provides a foundation for understanding key concepts, methodologies, and trends pertinent to enhancing supply chain performance thr

This study presents a review of business intelligence tool literature to understand the significance & benefits of the BI tool and to understand the relationshi
Adequate understanding of the subject and conceptualization of key areas

Basic understanding of the subject and concepts are applied


Strong understanding of the subject with conceptualization of the key areas

strong understanding of the subject with concept

Strong understanding of the subject with clear conceptualization of key areas

Limited understanding of the subject and conceptualization of the key areas


Strong understanding of the subject with clear conceptualization.At least 8 concepts are applied
adequate analysis and need conceptualisation content

Limited understanding, leading to conceptual flaws.

UNDERSTANDING LEVEL IS GOOD AND CLEAR CONCEPTUALISATION


understanding is good and clear conceputalisation
understanding level is moderate
with clear conceptualization
Strong understanding of the subject with clear objectives
good and strong conceptualisation is given in this project
Limited understanding of the subject with conceptualization of the key areas
Adequate understanding of the subject with conceptualization of the key areas
Strong understanding of the subject with clear conceptualization of the key areas

write clear concept based on your objectives

Provided the key areas of concept.


Important key areas are covered

understanding and conceptulasastion is excellent


Key areas are covered

inadequate conceptualization

Case study analysis of Blinkit and Comparative analysis with other quick commerce entities to contextualize ITSM practices are discussed
Data interpretation is not provided in the study
Key areas are discussed
Basic understanding, with noticeable gaps in conceptualization. At least 4 concepts are applied
Key areas are discussed
Data interpretation are done through tables and charts
conceptualization
understanding and conceptualization is appropriate
understanding and conceptualization is good

conceptualization
understanding and conceptualization is not adequate
Project period is given as 2012 and it is outdate data by present
management, assuming successful implementation by businesses.
conceptual areas are sufficient

clear understanding and concepts are adequate

understanding and concept are clear with objective


areas may be less developed.
provided key areas for analyze
Key areas in Healthcare are discussed
Concepts are provided with important aspects
Basic understanding, with noticeable gaps in conceptualization.
Limited understanding, leading to conceptual flaws.
Key areas are discussed

Basic understanding, with noticeable gaps in conceptualization

Limited understanding, leading to conceptual flaws.

Adequate understanding, though some conceptual areas may be less developed.


Basic understanding, with noticeable gaps in conceptualization.
understanding and concept is clear based on objective
the understanding key concepts, methodologies, and trends pertinent to enhancing supply chain performance through data insights.

Back ground of this study helps to understanding of the subject and concept of the key areas.
The literature review provides a foundation for understanding key concepts, methodologies, and trends pertinent to enhancing supply chain performance thr

The practical application of concepts in a real-world setting motivates learners and fosters a deeper understanding of this study of project
The project will provide more data for conceptualization of the Key areas

The conceptual background and literature review of this project helps the understanding the subject of this research.

add some data understanding of the subject and conceptualization of the Key areas

understanding of the subject and conceptualization of the Key areas are required of project is need some more data
back ground of this study helps to understanding of the subject and concept of the key areas.
this study helps to understanding of the subject and concept of the key areas

add some special features of Understanding of the subject and conceptualization of the Key areas

Adequate understanding, though some conceptual areas may be less developed.


Basic understanding, with noticeable gaps in conceptualization

Adequate understanding, though some conceptual areas may be less developed.


weak understanding and concepts
Adequate understanding,though some conceptual areas are clear
Adequate understanding, though some conceptualareas may be less develope.
Basic understanding, with noticeable gaps in conceptualization
Adequate understanding, though some conceptual areas may be less developed.

Adequate understanding, though some conceptual areas may be less developed.


Basic understanding, with noticeable gaps in conceptualization.
Basic understanding, with noticeable gaps in conceptualization
understanding and concept is good
Basic understanding, with noticeable gaps in conceptualization.
Limited understanding, leading to conceptual flaws.
Basic understanding, with noticeable gaps in conceptualization
understanding and concept is not clear
Basic understanding, with noticeable gaps in conceptualization.
understanding and concept is clear
understanding and concept is clear
Basic understanding, with noticeable gaps in conceptualization

understanding and concept is clear


Basic understanding, with noticeable gaps in conceptualization.
understanding of the subject with clear conceptualization.
Basic understanding, with noticeable gaps in conceptualization
Limited understanding, leading to conceptual flaws.

Basic understanding, with noticeable gaps in conceptualization


Strong understanding of the subject with clear conceptualization
Adequate understanding, though some conceptual areas may be less developed.
Basic understanding, with noticeable gaps in conceptualization.
Basic understanding, with noticeable gaps in conceptualization.
Limited understanding, leading to conceptual flaws.

Very limited understanding


Adequate understanding, though some conceptual areas may be less developed.
Basic understanding, with noticeable gaps in conceptualization.
Adequate understanding, though some conceptual areas may be less developed
Adequate understanding, though some conceptual areas may be less developed
understanding and concept is good
Understanding the research implications but need to explore the practical limitations

The understanding of the subject is good but may need to improve by considering alternative approaches
Understanding of the subject are good but need to further explore the practical application
Understanding of the subject are good but may require further improvement
Fair understanding of the subject but could improve alternative limitations
Weak understanding, resulting in significant conceptual errors.
Basic understanding, with noticeable gaps in conceptualization.

Adequate understanding, though some conceptual areas may be less developed.


Adequate understanding, though some conceptual areas may be less developed.

Basic understanding, with noticeable gaps in conceptualization.


understanding and concept is suitable based on objective
understanding and concept is adequate based on objective
Basic understanding, with noticeable gaps in conceptualization.

Adequate understanding, though some conceptual areas may be less developed.


Adequate understanding, though some conceptual areas may be less developed.
Strong understanding of the subject with clear conceptualizati on
dequate understanding, though some conceptual areas may be less developed.
Basic understanding, with noticeable gaps in conceptualization

Basic understanding, with noticeable gaps in conceptualization. At least 4 concepts are applied.
Basic understanding, with noticeable gaps in conceptualization.
understanding, though some conceptual areas may be less developed.

Adequate understanding, though some conceptual areas may be less developed.


Adequate understanding, though some conceptual areas may be less developed. At least 5 concepts are applied.
Limited understanding, leading to conceptual flaws.

Weak understanding, resulting in significant conceptual errors.


Basic understanding, with noticeable gaps in conceptualization. At least 4 concepts are applied.
Basic understanding, with noticeable gaps in conceptualization

Basic understanding, with noticeable gaps in conceptualization.

Adequate understanding, though some conceptual areas may be less developed.


Adequate understanding, though some conceptual areas may be less developed.

Strong understanding of the subject with clear conceptualization

Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.

Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
Limited understanding, leading to conceptual flaws.

Limited understanding, leading to conceptual flaws.


Limited understanding, leading to conceptual flaws.
Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
Limited understanding, leading to conceptual flaws.
Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.
Basic understanding, with noticeable gaps in conceptualization. At least 4 concepts are applied.

Limited understanding, leading to conceptual flaws.


Basic understanding, with noticeable gaps in conceptualization. There are four concepts are applied.

Adequate understanding, though some conceptual areas may be less developed.


The project will be implemented using the Agile methodology, which promotes iterative development, collaboration, and flexibility.
The data will be employed to offer guidance for the design of a conceptual model that will be utilized throughout the process of version development

The information collected via a secondary property is analysed using thematic evaluation, a qualitative research technique for identifying, analyzing, and re
Limited understanding, leading to conceptual flaws.
Adequate understanding, though some conceptual areas may be less developed.

Adequate understanding, though some conceptual areas may be less developed.


Basic understanding, with noticeable gaps in conceptualization.
This process ensures the validity of our results, which hinges on acquiring accurate info illegitimate manner
Identifying and mitigating the spread of deepfakes and misinformation in digital marketing will be crucial to maintain trust and integrity.
enjoyable, and improved their overall learning experience, indicating positive learner satisfaction.

The qualitative approach serves as a critical tool for managing cyber risks within organizations, often utilized by entities with less mature risk management
Basic understanding, with noticeable gaps in conceptualization.

Basic understanding, with noticeable gaps in conceptualization


Adequate understanding, though some conceptual areas may be less developed.
Strong understanding of the subject with clear conceptualization.
Limited understanding, leading to conceptual flaws.
Basic understanding, with noticeable gaps in conceptualization
Clarifying the reasoning behind configuration choices, rather than just listing parameters, to ensure that those who were not part of the project period can re

Adequate understanding, though some conceptual areas may be less developed.


Further studies should focus on identifying specific digital tools which can aspects of digitization, this study also assessed concerns of the surveyed particip

Organize focus group discussions with teams involved in cloud implementation projects within different organizations
Assess how these tools enable streamlined processes, agile resource allocation, and dynamic decision-making, ensuring firms can efficiently scale operatio
Basic understanding, with noticeable gaps in conceptualization.
Exceptional understanding of the subject, showcasing insightful conceptualization of key areas.

Specific challenges mentioned included managing legacy systems, high maintenance costs, and limited remote access capabilities.
Adequate understanding, though some conceptual areas may be less developed.
Research designs can be categorized in a variety of ways, however occasionally the division is made artificially and other times distinct designs are mixed.
objective clients gatherings, examine the endeavors made by the enterprises to understand the necessities
To recognize, analyze and find an answer for the research inquiries of this study, there ought to be a wellspring of data.
administration assaults viewpoint for a superior understanding to its possibilities
Adequate understanding, though some conceptual areas may be less developed. At least 5 concepts are applied.
Organizations that ace ability management will be particularly anticipated a drawn out improvement in workforce execution into the indefinite future

Adequate understanding, though some conceptual areas may be less developed.


Virtualization is a approach in which a completely practical operating system image is captured in another operating-system to work with the sources of the
administrators of an organisation need to have a comprehensive grasp of all of the activities that are carried out by that business
Basic understanding, with noticeable gaps in conceptualization.
Limited understanding, leading to conceptual flaws.
Limited access to certain proprietary or confidential data, affecting the comprehensiveness of secondary data analysis
Basic understanding, with noticeable gaps in conceptualization. At least 4 concepts are applied.

During the evaluation phase, the user's information needs are determined, the business model is determined, a design plan is prepared according to the need

The funds are based on the market performance so fund manager always invests in more than one asset class to spread the risks, it is called as diversificatio
We will suggest and implement energy-saving hardware and software, keeping a close eye on the ensuing drops in energy usage and reporting on them on a
This approach also offers a path to a deeper understanding of the research topic in focus and allows acknowledging the complexity of different ways of wor
EASY TO UNDERSTAND
undertadable
UNDERSTANDABLE
well

UNDERSTANDABLE
Basic understanding, with noticeable gaps in conceptualization.
understandab;le
need to improve
Limited understanding, leading to conceptual flaws.
ok
Basic understanding, with noticeable gaps in conceptualization.
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
understandable
Adequate understanding, though some conceptual areas may be less developed. At least 5 concepts are applied
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied
no clearly presented
Adequate understanding, though some conceptual areas may be less developed. At least 5 concepts are applied
clear and nice understanding of the subject with conceptualization. eight concepts presented
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
Adequate understanding, though some conceptual areas may be less developed. At least 5 concepts are applied.
products on their customers
implications for job roles and responsibilities.
Adequate understanding, though some conceptual areas may be less developed. At least 5 concepts are applied.
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
Adequate understanding, though some conceptual areas may be less developed. At least 5 concepts are applied
Retailers must be willing to invest in modernizing their IT infrastructure, training their workforce, and developing new business models that leverage the po
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
Adequate understanding, though some conceptual areas may be less developed. At least 5 concepts are applied.

Reliability analysis allows you to study the properties of measurements scales and items that compose the scales.
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
automation of fundamental monetary procedures.
The hypothetical questions that follow are designed to be assessed using the chi-square test and nova algorithm
Exceptional understanding of the subject, showcasing insightful conceptualization of key areas. At least 8 concepts are applied.
Strong understanding of the subject with clear conceptualization. At least 8 concepts are applied.
The research begins by examining the fundamental concepts of AI and then differentiates between various types of AI based on their skills and purposes
A sub query must be made for each pair of user to determine if they are not or are friend or comments it was not possible to submit a query for each pair of
Systematically analyzing the content of industry reports, regulatory documents, and media articles to identify key themes, trends, and issues related to t
Adequate understanding, though some conceptual areas may be less developed. At least 5 concepts are applied.
Adequate understanding, though some conceptual areas may be less developed. At least 5 concepts are applied.
Credit card frauds are detected through various methods, including transaction monitoring, fraud analytics, machine learning algorithms, real-time alerts for
The researcher has made the arrangement in the framework that each step ought to get reflected noticeably by the verticals referenced stack holders
Strong understanding of the subject with clear conceptualization.
The development of women entrepreneurs is a fundamental component of improving human resources
Exceptional understanding of the subject, showcasing insightful conceptualizati on of key areas.
t is a automated Trading Technique used by traders mostly institutional to ensure that orders are executed at best available prices across multiple markets or
he purpose of this study is to investigate the specific IT tools and strategies that enhance customer experience in the banking sector.
Strategic integration of this AI technology is being proposed across the SDLC. These technologies include intelligent code editors to AI-powered project m
Strong understanding of the subject with clear conceptualization.
Adequate understanding, though some conceptual areas may be less developed
The scope also extends to the examination of emerging technologies and their potential to revolutionize current practices in data analytics.
Comparative analysis techniques are used to identify commonalities, differences, and best practices across different healthcare settings.
Strong understanding of the subject with clear conceptualization
Strong understanding of the subject with clear conceptualization
runs easily and effectively, researchers need to carefully organised and manage their time, money, staff, and equipment
Compared to inspections, technical reviews are bit informal and there is little or no focus on defect identification on the basis of referenced documents
Exceptional understanding of the subject, showcasing insightful conceptualizati on of key areas.
Strong understanding of the subject with clear conceptualization.
participants believed that the proposed rise in the foreign direct investment (FDI) cap in the insurance industry would have a far greater impact on the qualit
Adequate understanding, though some conceptual areas may be less developed
help customers to choose and make their experience convenient.
manufacturing, and purchasing, marketing, and customer service.
strategies
Strong understanding of the subject with clear conceptualization
Data is collected from multiple sources, including IT service management systems, user interactions with the chatbot, and feedback from users and IT perso
Strong understanding of the subject with clear conceptualization.
Strong understanding of the subject with clear conceptualization.
Adequate understanding, though some conceptual areas may be less developed
Strong understanding of the subject with clear conceptualization
Strong understanding of the subject with clear conceptualization
he findings of the study revealthat HCL hasa wide range of training & development programs which helps the employees to develop their
Adequate understanding, though some conceptual areas may be less developed
Basic understanding, with noticeable gaps in conceptualization.
Limited understanding, leading to conceptual flaws.
Basic understanding, with noticeable gaps in conceptualization
Basic understanding, with noticeable gaps in conceptualization
UNDERSTANDABLE
UNDERSTANDABLE BUT MAJOR POINTS UNEXPLAINED

Adequate understanding, though some conceptual areas may be less developed.


concepts are well understandable and key areas are well emphasised
CONCEPTS PRESENTED ARE SOMEHOW UNDERSTANDABLE
Basic understanding, with noticeable gaps in conceptualization
Basic understanding, with noticeable gaps in conceptualization
comprehended but not entirely read and examined by the candidate
UNDERSTANDABLE BUT ALL THE CONCEPTS ARE NOT LINKED WITH THE SUBJECT OF INTREST
Limited understanding, leading to conceptual flaws.
areas may be WELLdeveloped.
understandable but no graph is presented to say everything
Adequate understanding, though some conceptual areas may be nicely developed.
Basic understanding, with noticeable gaps in conceptualization.
Limited understanding, leading to conceptual flaws.
Basic understanding, with noticeable gaps in conceptualization
the candidate partially analyzed the data and all the concepts are not completely understandable
Limited understanding, leading to conceptual flaws.
candidate presented the subject and concept in well inderstandable manner
Limited understanding, leading to conceptual flaws.
UNDERSTANDABLE
Limited understanding, leading to conceptual flaws.
Basic understanding, with noticeable gaps in conceptualization
Limited understanding, leading to conceptual flaws.
Basic understanding, with noticeable gaps in conceptualization
Limited understanding, leading to conceptual flaws.
Limited understanding, leading to conceptual flaws.
USEL
UNDERSTANDABLE
Basic understanding, with noticeable gaps in conceptualization.

Adequate understanding, though some conceptual areas may be less developed.

Adequate understanding, though some conceptual areas may be less developed.


Adequate understanding, though some conceptual areas may be less developed.

To propose strategies and recommendations for mutual fund companies, regulators, and policymakers to enhance the growth prospects of the industry.
To derive insights and lessons from past successes and failures in credit risk management.
Basic understanding, with noticeable gaps in conceptualization.
areas may be less developed with the points of capital and current operational points
Basic understanding, with noticeable gaps in conceptualization. At least 4 concepts are applied.
areas may be less developed
Using online platforms to reach and engage a wider audience has become essential for companies navigating the digital landscape
The intention of this report was to highlight a new business industry which has come into market to ease of monetary investments and bill payments .
Basic understanding, with noticeable gaps in conceptualization.
the project of coverage is more conceptualization of the overall outcomes and project
the project points are Adequate understanding, though some conceptual areas may be few more relevant developed
the exchange control of subject matters are need more explanation of exchange value changes and charges
applie
countries, in India no such study has been led up until this point
The improvement of the quantitative outcomes was brought about by the qualitative data that was collected over time
Adequate understanding, though some conceptual areas may be less developed.
Tasks such as transaction reconciliation, customer support, and regulatory compliance can now be performed more efficiently, allowing businesses to alloca
Adequate understanding, though some conceptual areas may be less developed.
Adequate understanding, though some conceptual areas may be less developed.
applied
Quantitative data collected through the survey are analyzed using statistical techniques, such as descriptive statistics, inferential statistics, and regression an
Strong understanding of the subject with clear conceptualization.
the project cover a good part of subject but a efficient result may require more conceptual

The project are cover major part but some more concentration point required
The overall usability and cover the topic
The project were covered some portions of sub mater
Basic understanding, with noticeable gaps in conceptualization.

The key area are understand well but more concerned concentration need
Adequate understanding, though some conceptual areas may be less developed.
Limited understanding, leading to conceptual flaws.
Strong understanding of the subject with clear conceptualization.
The sub area covered are good but more depth required
Basic understanding, with noticeable gaps in conceptualization.

The concept of are used some more

Adequate understanding, though some conceptual areas may be less developed


The subject understand is required more in chapter three
Project may to give more coverage
Adequate understanding, though some conceptual areas may be less developed.
the project points are Adequate understanding needed, though some conceptual areas may be few more relevant develop
Some more Strong understanding of the subject with clear concept
Adequate understanding, though some conceptual areas may be less developed.
Basic understanding, with noticeable gaps in conceptualization.

Strong understanding of the subject with clear conceptualization.


Exceptional understanding of the subject, showcasing insightful conceptualization of key areas.
Basic understanding, with noticeable gaps in conceptualization
Basic understanding, with noticeable gaps in conceptualization.
Adequate understanding, though some conceptual areas may be less developed.
Adequate understanding, though some conceptual areas may be less developed
A Research Design could be the platform or policy for a scholarly study used as being a instructions in collecting and evaluating the info compile
Basic understanding, with noticeable gaps in conceptualization
Adequate understanding, though some conceptual areas may be less developed
Strong understanding of the subject with clear conceptualization
Strong understanding of the subject with clear conceptualization
The information you get should come from different sources, including unique visitors, page views, search engine traffic, inbound links, and bounce rates
Adequate understanding, though some conceptual areas may be less developed.
A key benefit of using AI for social media analytics is getting exceptionally accurate insights.
The information is protected by E-HRM; subsequently, guarantees respectability and dependability of the measurements
Adequate understanding, though some conceptual areas may be less developed
Taking information from every function it is a tool that assist employee and manager’s plan, monitor and control the entire business.
Strong understanding of the subject with clear conceptualization.
Adequate understanding, though some conceptual areas may be less developed
The electronics shop business plan delineates a strategic roadmap for launching and managing a retail outlet focused on electronic devices
The blockchain is really a distributed ledger that is managed by way of a distributed system of personal computers, and many cryptocurrencies
This includes operational risks associated with system failures or disruptions, technological risks related to cyber threats or data breaches, legal risks stemm
highlighted.
their experiences in detail
The technologies on the understanding of the subject and conceptualization of the Key areas are well
Adequate understanding, though some conceptual areas may be less developed.
Basic understanding, with noticeable gaps in conceptualization.

Basic understanding, with noticeable gaps in conceptualization.


Their marketing team is playing a vital role in the goal achievements they are very enthusiastic and energetic towards their work
Adequate understanding, though some conceptual areas may be less developed.
Q5 Remarks

Lack of innovation

Some attention innovative

Creative innovative techniques are used


Some innovative techniques are supported to solve the problem
Innovative techniques used to approach the problem is fine
Very basic innovation
Lack of innovation techniques to solve the problem
Very minimum innovation technique used to solve the problem

Very basic techniques with no innovation.

Basic technique with minor attempts at innovation


Lack of innovation to solve the problem

Very basic or inappropriate techniques with no innovation

Basic techniques with minor attempts at innovation

Basic innovation technique


Limited innovation

No innovation techniques used only theoretical concepts are wrote

Basic techniques with minor attempts at innovation.


basic techniques is used for solving the problem
Some attempt at innovation, but with limited impact on problem-solving.
Techniques are inappropriate
Very basic or inappropriate techniques with no innovation.
Basic techniques used to solve the problem
with minimum approach of the research problem

Basic techniques with minor attempts at innovation.


Basic techniques with minor attempts at innovation.

Innovative technique used to approach the problem is good


basic innovative techniques is used to solve the peoblem

Basic techniques with minor attempts at innovation.

Basic techniques with minor attempts at innovation.

Innovative technique is not used to approach the problem related aspects taken from secondary source
Creative techniques for approach the problem
Basic techniques with minor attempts at innovation.
few techniques are used to solve the problem
Innovative techniques minimum
Innovative techniques used to approach the research problem minimum
Innovative techniques to approach the problem is some level
Basic techniques with minor attempts at innovation to approach the problem

Basic techniques to approach the problem scheme


Creative techniques are used to enhance problem solving

most innovative tools are used to problem solving


adopt more innovative tools for problem solving
The techniques are innovative which were useful to solve problem scheme
Creative techniques which enhance the problem solving
The study's innovative techniques are somewhat predictable but could need more originality
Basic techniques are used to problem solving approach
various innovative tools are used to problem solving
use more innovative tools for analyse the problem solving
The techniques are innovative which were useful to solve problem scheme

use more innovative tools are used to problem solving


The innovative techniques are good but could improve more

use more innovative techniques for problem solving


The innovative techniques are good but could improve more
use innovative techniques for problem solving
inovative techniques used for problem solving
Innovative techniques are not given
Some attempt at innovation, but with limited impact on problemsolving

Inappropriate techniques are used for solving the problem


adopt various innovative tools to problrm solving
Lack of innovation techniques it leads to conventional problem solving approach

The innovative techniques are good but could improve more


use more innovative tools to solve

use innovative techniques for problem solving


use innovative techniques for problem solving
The understanding of the subject need improvement in particular areas
There is an absence of innovative techniques
Understanding of the subject are good but may require further improvement
The techniques are innovative which were useful to solve problem scheme

The study's innovative techniques are somewhat predictable but could need more originality
The innovative techniques are good but could improve more
The study's innovative techniques are somewhat predictable but could need more originality
Limited innovative techniques are used to solving the problem
Basic innovation techniques used

The study's innovative techniques are somewhat predictable but could need more originality

Basic understanding of the subject need to improve the conceptualization key areas
The study's innovative techniques are somewhat predictable but could need more originality

The understanding of the study is strong which are clear conceptualization


The study's innovative techniques are somewhat predictable but could need more originality
The research problems are solved with creative approaches
Basic techniques with less innovation techniques
Approaches are made to problem solving are good
The innovative techniques are good but could improve more

No innovative techniques used basic approach are used


Problems solved with help of information but no innovative technique

The understanding of the study is strong which are clear conceptualization


Basic technique is used
Creative techniques which enhance the problem solving
Creative techniques which enhance the problem solving
The study have used innovative techniques to achieve the objectives
Creative techniques which enhance the problem solving
several methodology and frameworks are developed to analysis the problem
Adequate innovation techniques are used
Creative techniques which enhance the problem solving
The innovative techniques are good but could improve more
The study's innovative techniques are somewhat predictable but could need more originality
The innovative techniques are good but could improve more
Creative techniques which enhance the problem solving
No noteworthy innovation technique used for problem solving
No noteworthy innovation technique used to slove the problem
Solving the research problem with covering less innovative techniques
No notable innovative technology used for problem solving

No noteworthy innovation technique used for problem solving


No notable innovative technology used for problem solving
No notable innovative technology used for problem solving
No remarkable innovation technique used for problem solving
No remarkable innovation technique used for problem solving
Lack of innovation, leading to a conventional problem solving approach.
The innovative techniques used in techniques are limited
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
Lack of innovation techniques and need more advanced training
Need to give innovative techniques
Lack of innovation technique require some improvement
The techniques are inappropriate

The innovative techniques are good but could improve more


Basic techniques with minor attempts at innovation.
use various tools and techique for problem solving
various innovative tools are used to problem solving
The innovative techniques are good but could improve more
adopt innovative techniques for problem solving

The techniques are innovative which were useful to solve problem scheme

using more innovative tools for prblem solving


The innovative techniques are good but could improve more
use various tools for problem solving

The innovation techniques are almost non existent


No innovation technique to approach the problem

Innovative techniques to approach the problem is primary


Innovative techniques to solve the problem are adequate
Basic techniques with minor attempts at innovation.

Innovative techniques to approach to problem is basic


Basic techniques with minor attempts at innovation.
Innovative techniques used to approach the problem creative
Basic techniques with minor attempts at innovation

Basic innovative techniques to solve approach

Basic techniques with minor attempts at innovation.


Basic techniques used to approach the research problem minor attempts of innovation

minimum innovative technique is used to solve the problem


Basic techniques with low attempts at innovation

Basic technique to be used to approach the secondary information


Basic techniques used to solve the problem but no innovation
Basic techniques are derived from solve the research problem but very low innovation
inappropriate techniques with no innovation
Techniques are almost nonexistent or entirely inappropriate.
Innovative technique is entirely inappropriate
minimum techniques are used to approach the problem but low innovation
Innovative techniques is entirely inappropriate.

Lack of innovation
Remarkable innovation technique used for problem solving
No noteworthy innovation technique used to slove the problem
Solve the research problem to use creative techniques
No notable innovative technology used for problem solving
Problem solving skills no notable innovative techniques used
No noteworthy innovation technique used for problem solving
No remarkable innovation technique used to slove the problem
To approach the research problem is average
more number of techniques are used to this study
No significant approach used for problem solving
No noteworthy innovation technique used for problem solving
No remarkable innovation technique used for problem solving
No notable innovative technology used for problem solving
No noteworthy innovation technique used for problem solving
No remarkable innovation technique used for problem solving

Some attempt at innovation, but with limited impact on problem-solving.


Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
some techniques are used to approach the problem
To made research approach is some aspect
Basic techniques with minor attempts at innovation.
Creative techniques or approaches that enhance problem-solving.
Creative techniques or approaches that enhance problem-solving.
Basic techniques with minor attempts at innovation.
Basic technique is used to present the study problem
Their is no innovation but the concepts are taken from secondary data
Lack of innovation, leading to a conventional problem-solving approach.

Basic techniques with minor attempts at innovation.


Innovation is not there only concept is approach
Basic techniques with minor attempts at innovation.
No innovative techniques used by approach to handle the research problem based on theoretical aspects
The innovative techniques were used well in obtaining the feasible solution to the chosen problem
The innovative techniques were used well in obtaining the feasible solution to the chosen problem.

Artificial intelligence complements the intelligence of an individual, which can lead to advances, especially in terms of quality, accuracy and precision. In a

The innovative techniques were used well in obtaining the feasible solution to the chosen problem
The innovative techniques were used well in obtaining the feasible solution to the chosen problem
The innovative techniques were used well in IVR obtaining the feasible solution to the chosen problem

The innovative techniques were used well in obtaining the feasible solution to the chosen problem

Inaccuracies may arise due to non-cooperative and rude respondent behavior obtained from the method of analysis used. Need to improve innovative techn

The innovative techniques were used well in obtaining the feasible solution to the chosen problem.

Quantitative survey of IT professionals from different industries to collect data on the scale of changes that the organizations.IT service underwent . In-dept

The innovative techniques were used well in obtaining the feasible solution to the chosen problem
Student made little innovative effort, but not much of an influence on problem.

Other subject file

innovation.

innovation.
approach.
Lack of innovation, leading to a conventional problem- solving approach.
At least 2 recommendati ons or techniques are futuristic or tech based or shows deep reflection and integration

Basic techniques with minor attempts at innovation.

Basic techniques with minor attempts at innovation.

Basic techniques with minor attempts at innovation.

Lack of innovation, leading to a conventional problem- solving approach.

Lack of innovation, leading to a conventional problem- solving approach.

integration.
Basic techniques with minor attempts at innovation.

Basic techniques with minor attempts at innovation.


Basic techniques with minor attempts at innovation.

At least 3 recommendati ons or techniques are futuristic or tech based or shows deep reflection and integration.

At least 2 recommendati ons or techniques are futuristic or tech based or shows deep reflection and integration.

At least 4 recommendati ons or techniques are futuristic or tech based or shows deep reflection and integration.

At least 3 recommendati ons or techniques are futuristic or tech based or shows deep reflection and integration.

Identifying and addressing the root causes of recurring issues


The business was able to significantly improve customer service and inventory management by utilizing cutting-edge statistical and machine-learning techn
Describe the boundaries of an operations system, and recognize its interfaces with other functional areas within the organization and with its external enviro
testing results
To examine the role of operational efficiency initiatives, including process optimization and employee training, in enhancing overall performance in the e-c
No outstanding innovation technique used to slove the problem
and sustainable energy solutions

have otherwise struggled to break


The majority of respondents fall within the age range

No noteworthy innovation technique used for problem scheme in this project


frequently
reinforced by greater interaction, shorter
service-related inquiries.
the study offers a comprehensive understanding of the opportunities
Despite significant advancements in cybersecurity technologies and practices,
Current techniques need to implement and analysis the project.

No outstanding innovation technique used to slove the problem


emerges
claims, invoicing, and clinical analytics.

The dynamic nature of workload fluctuations presents a challenge for enterprises t


To assess the demographic profile influence on operational risk perception
must be created based on the intrinsic variation in body size of customers.

To allows patient experience management team to recognize any attitudinal changes throughout their entire stay at the hospital.
Determine the extent to which the best commitment of administration affects LC appropriation.
to them. In the given table, all the questions scored

on the situation

Consequences of empirical research introduced


To establish how stakeholder involvement effects implementation of ERP modal among dairy businesses in KWALITY BRIEF.

digital product.
Accepting the Alternative hypothesis. It is concluded
current IT practices and sustainability perceptions
The study revealed a pressing need for integrating

Implementing a robust monitoring and analysis system for steam generation can provide insights into operational inefficiencies and areas for improvement.
Tesla's environmental impact and bolster its standing as one of the top businesses using sustainable business practices the industry level.

potential
The review finishes that the current medical care administrations ought to be checked and assessed appropriately every once in a while, to imp

metrics are crucial for assessing the efficiency and effectiveness of ITSM operations
the project

wastages the organization can analyse the actual matter and take the necessary step to improve the overall process.
A new CSR model for MEL is recommended to create a larger societal impact by addressing India's top priority needs and achieving differentiation.
No noteworthy innovation technique used for problem scheme in this project

innovation

In this study, two sampling methods, Convenience Sampling and Snowball Sampling,
construct the infrastructure necessary for the transition to a cashless society.

provide

business
issues without human intervention

integration

emotion in an individual.

It really is increased if multiple redundant internet are widely-used, which makes


remain central to their success, driving continuous improvement and innovation.

innovative techniques are clear in the direct experiences of users with security issues such as hacking or data theft
problems are in health care to practices from other activities and may be risky due to possible oversights
This line graph illustrates the positive trend in energy consumption reduction
centres, and other facilities, as well as their locations and sizes.
and financial claims
Analyzing the objectives of implementing Quality Management Implementation reveals several key insights into its significance and potential impact on or

evaluate the effectiveness


scalable and cost-effective computing resources, such as virtual machines, storage, and networking, delivered over the internet.

of disclosure.
perception of Digital Payment Trends and Technologies:
Utilize stock administration frameworks to screen stock levels and computerize replenishment.

Project execution summary is need to give more information of implementation of project


need problems in this project
The research primarily examines the IT sector's evolution,
The present study collected its data from a diverse array of sources, including prior case studies, personal experiences, observations, interviews, and oth

No noteworthy innovation technique used for problem scheme in this project


No noteworthy innovation technique used for problem scheme in this project
The information regarding the logistic service quality of various firms is based on the available secondary data.

the objectives outlined in the business plan.


These projects use renewable energy sources, under utilized technology,

continuous improvement within the organization.


intellectual property, liability
government and commercial customers.
The prospects for resolving trade wars depend on various factors,
To evaluate the impact of Six Sigma on the quality of currency bins provided.
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation

Basic techniques with minor attempts at innovation.


Basic techniques with minor attempts at innovation

Basic techniques with minor attempts at innovation.

Basic techniques with minor attempts at innovation.


energy and pollute the environment.
Basic techniques with minor attempts at innovation.

Use project management software

spot scams, and personalize services


Basic techniques with minor attempts at innovation

encompassing

the banking sector, provided insightful and comprehensive data through a combination

Creative techniques or approaches that enhance problem- solving.

The earlier used convenience sampling was used and expected to use the recent innovative techniques
The innovative techniques were used well in obtaining the feasible solution to the chosen problem.

The innovative techniques were used well in obtaining the feasible solution to the chosen problem.

The earlier used convenience sampling question and answer was used and expected to use the recent innovative techniques.
The innovative techniques and types of data warehouse were used well in obtaining the feasible solution to the chosen problem.

The innovative techniques were used well in obtaining the feasible solution to the chosen problem.

The quantitative techniques were used in the analysis and interpretation of the collected data.

The study was expected to use the recent innovative techniques


Displays the result made
innovation
trying out every department of a choice point

privacy considerations, and continuous optimization


is positively correlated with users' perceptions of the systems
from many social media networks.
the consistency and dependability of the research findings
integration should be points out the tools

innovation.

quickly to changing market dynamics

valuable insights into the performance, efficiency, and security of their cloud services

and ethical considerations present substantial challenges.

has create reduced pressure on the workers in relation to satisfying customers


and productivity by helping
operations without compromising security

the most widely recognized.

commitment,
specialized knowledge
approach.

approach

approach.
May use a more simple the solution of data

properties

innovation.

The innovative techniques and approach are satisfactory.


Use of Innovative techniques and approach is no up to the satisfaction. It needs to give more focus.
Innovative techniques and approach are not up to the mark and needs to be improved

Less focus on application of innovative techniques and approach.


More focus may be extended for application of innovative techniques and approach.
The application of innovative techniques and approach is not up to the mark. needs to apply innovative approach.

TQM is having many innovative tools. The emerging innovative techniques are applied. Recommendations are different and new research approach.
Innovations in terms of research approach, techniques used and conclusions are satisfactory.
Traditional techniques are applied. Innovativeness is less focused.
Innovative techniques/approach that significantly need more to solve problem scheme.
good
Analysing industry 4.o is an innovative one. Tools aliped for data analysis are unique and different.
problem solve approach are good
need more details
good
Needs to adopt innovation in concepts, tools employed and less linkage between objectives and coverage.
good
futuristic or tech based or shows deep reflection and integration.
Needs focus on more innovative methods and tools. The project is lack in application of innovative techniques and approach.
Innovative techniques and uniqueness are missed.

Traditional tools and methodology are followed. No innovation in research methods & methodology.
Lack of application of innovation in research approach including research methods & methodology.
Innovative techniques adoption level is moderate and satisfactory.
No proper innovative approach adopted and methods & methodology followed.
For data analysis, Multiple regression model has been used. it is a commendable one.
Lean production and six sigma are innovative techniques used to study problem of the project.

Basic techniques with minor attempts at innovation have been given.

Some techniques with minor attempts at innovation have been given.


Basic techniques with minor attempts at innovation have been given.

Lack of Innovative techniques and approach to problem scheme.


Some attempt at innovation, but with limited impact on problem solving.

to enhance problem solving innovative techniques and approaches that shows deep reflection and integration
Some attempt at innovation, but with limited impact on problem solving.
Basic techniques with minor attempts at innovation have been given.-

Some techniques with minor attempts at innovation have been given.


Basic techniques with minor attempts at innovation have been given.
Lack of Innovative techniques and approach to problem scheme.
adequate Innovative techniques/approach to problem scheme,business processes and communications with suppliers and customers.
not more Innovative techniques/approach to problem scheme
Innovative techniques/approach to problem scheme adequate.
Innovative techniques/approach to problem scheme given clear
Innovative techniques/approach to problem scheme good,various techniques given.
nnovative techniques/approach to project problem scheme is adequate.
good Innovative techniques/approach to problem scheme.Most people tend to believe that AI and ML can impact the Social Media, Healthcare,and E-comm
potential impact of IoT integration on various aspects of Iconma Professional Servicesand Solutions Private Limited's operations in India.
not more Innovative techniques/approach to problem scheme
Basic techniques with minor attempts at innovation have been given.
Some techniques with minor attempts at innovation have been given.
not more Innovative techniques/approach to problem scheme
not more Innovative techniques/approach to problem scheme
more Innovative techniques/approach to problem scheme
not clear Innovative techniques/approach to problem scheme.
Basic techniques with minor attempts at innovation have been given.
Some techniques with minor attempts at innovation have been given.
The surge in AI technologies encompasses various factors such as handling big data, utilizing vast computational power, advancements in information techn
good Innovative techniques/approach to problem scheme

There is no Innovative technique to given.

not more Innovative techniques/approach to problem scheme.With the use of IT, specialization increased even though that these companies moved towards
good Innovative techniques/approach to problem scheme

average Innovative techniques/approach to problem scheme

The research highlights how cloud computing may transform the daily operations of small and medium-sized enterprises (SMEs) and their stakeholders by

adequate Innovative techniques/approach to problem scheme


Innovative techniques/approach to problem scheme adequate

adequate Innovative techniques/approach to problem scheme.


AI's ability to streamline operations, enhance efficiency, and automate tasks that traditionally require substantial human effort and time.
not clear Innovative techniques/approach to problem scheme
clear Innovative techniques/approach to problem scheme
trends, and relationships.
Some attempt at innovation, but with limited impact on problem solving.

Basic techniques with minor attempts at innovation have been given.

Some techniques with minor attempts at innovation have been given.

Nothing is given in the project report


No unique innovative techniques and approach applied.

This aspect is not up to the mark in the project.


Thematic and content analysis are used to study problem. They are something different and unique

Below average in applying innovative techniques and approach to problem.

The innovative techniques and approach are used is in below average level.

The level of applications of innovative techniques and approach is in below average level. Needs improvement
Six sigma in operation process is taken for the study is something new, But no other innovative techniques or approach are adopted.
No details about innovative techniques and approach are presented in the project report

commerce and estate that is real.


By developing flexible policies, leveraging appropriate technology, offering robust support systems, providing training and development opportunities
Enabling ongoing deployment, Making the most of the cloud, Improving security and resilience.

A combination of probability and non-probability sampling techniques will be employed.

good Innovative techniques/approach to problem scheme

IAM systems can be configured to automate the delegation process within ITSM workflows. This not only improves efficiency but also reduces the risk of

managing IT services.

Use domain events or messaging patterns to decouple synchronous dependencies and enable asynchronous communication between bounded contexts.

IT organizations.

Based on the early studies, gap has been identified and some innovative techniques and approaches have been used to solve the project problem.
No remarkable innovation technique used for problem solving

Block chain technology used for problem scheme


AI techniques used for problem scheme

No noteworthy technique used for problem scheme

No remarkable innovation technique used to slove the problem scheme


font sizes.

problem scheme of the project is are some key findings related to the hybrid work mode.
Innovative techniques of this project Research should explore AI models that can predict micro-trends in consumer behavior.
Innovative techniques of this project is using cloud computing.

customers.
Innovative techniques of this project AI but more tools can use project quality will be improved.

No noteworthy innovation technique used to problem scheme


No remarkable innovation technique used for solving problems to the given study work

No noteworthy innovation technique used for problem scheme


No notable innovative technology used for problem solving

Special technique enhanced for problem solving skills


No outstanding innovation technique can be founded.
No notable innovative technologies can be founded

No noteworthy innovation technique used for solving problems


No remarkable innovation technique can be founded

No noteworthy innovation technique can be founded.

No noteworthy innovation technique used for problem solving


No remarkable innovation technique used to slove the problem

No notable innovative techniques used for problem solving


IOT technique used for problem solving it's nice approach

Android app used for problem solving


No noteworthy innovation technique used for problem solving

No remarkable innovation technique used to slove the problem

No noteworthy innovation technique used for problem solving

No notable innovative technology used for problem solving


No notable innovative technology used for problem solving

No remarkable innovation technique used for problem solving

ML technique used for problem solving


Block chain and crypto currency innovation approach used for problem solving
AI notable innovative technology used for problem solving

ITSM approach used to slove the problem


AI and chatbot innovation technique used to slove the problem

No outstanding innovation technique used for problem solving

No noteworthy innovation technique used to slove the problem

No outstanding innovation technique used to slove the problem


No noteworthy innovation technique used for problem solving
No special technique can be enhanced for problem solving
No noteworthy innovation technique used to slove the problem

Robotics with AI innovation technique used for problem solving


No outstanding innovation technique used to slove the problem

IOT technique used for problem solving


No noteworthy innovation technique used to slove the problem

AI innovation technique used for problem solving in helthcare system


Automation technique used for problem solving

No remarkable innovation technique used for problem solving

No remarkable innovation technique used for problem solving

No noteworthy innovation technique used for problem solving

No notable innovative technology used for problem solving


No remarkable innovation technique used for problem solving
No remarkable innovation technique used for problem solving
No notable innovative technology used for problem solving
No noteworthy innovation technique used for problem solving in cyber security issues.

No remarkable innovation technique used to slove the problem

AI and significant innovative technologies used for problem solving

No remarkable innovation technique used to slove the problem


No noteworthy innovation technique used for problem solving

No remarkable innovation technique used to slove the problem


No noteworthy innovation technique used for problem solving

No notable innovative technology used for analysis of problem

Cluster R, ABC, SDE and FSN tools are unique and differnently used in analysis of data of the project.

Conjoint Analysis, GAP analysis and TURF analysis are different and unique.

No innovative techiniques and approach are adopted.

Application of packages like SPSS and Excel is innovative and differnet one.
Nothing is given about innovative techniques and approach adopted.

For data analysis, MS Excel, Python and R programming are applied. It is unique and innovative one.
Application of various statistical tools and techniques by using Excel, SPSS and R is commendable and innovative one.

In terms of innovation, Needs to give more focus.


Use of statistical package SPSS is innovative technique.
Undertaking a project to study the impact of climate change on agricultural productivity is unique at MBA level. It is a commendable project.
Nothing is mentioned about innovative techniques and approach

There is lack of innovative techniques and approach to the problem.


In terms of innovation, the projects lacks and only simple tools are used for data analysis and case study approach is adopted.

Lack of innovative techniques and tools application. only simple percentage analysis is done for data analysis.
lack of innovative techniques and approach and needs to give more focus on this aspect.
No remarkable innovation technique used for problem solving

AI innovation technique used for problem solving in talent acquisition


AI innovation technique used for problem solving

Ml innovation technique used for problem solving

No noteworthy innovation technique used to slove the problem

More innovation and significant approach used for problem solving


Very limited innovative practices were adopted in the study
NO INNOVATIVE TECHNIQUES GIVEN
No notable innovative technology used for problem solving
TECHNIQUES AND APPROACH O PROBLEM SCHEME IS SATISFACTORY
No outsourcing innovation technique used to slove the problem
NO INNOVATIVE SCHEMES USED
MINOR ATTEMPTS IN INNOVATION
More significant approach for problem solving
Iot innovation technique used for problem solving
No noteworthy innovation technique used for problem solving
innovative techniques are used in this study and approach to problem is also good
Approach to the problem scheme using the techniques is good
No remarkable innovation technique used for problem solving
approach to the problem is appreciable
No noteworthy innovation technique used for problem solving
no innovativeness in techniques
No notable innovative technology used for problem solving
innovative techniques are ued
approaches o problem is right
No remarkable innovation technique used to slove the problem
No noteworthy technique used for problem scheme
techniques o approach the problems are satisfactory
approaches to the problems is right
innovative techniques are satisfactory
No notable innovative technology used for analysis of data
Agile project management to take as many risks into account is possible

No noteworthy innovation technique used for problem solving


No noteworthy innovation technique used for problem solving
No outstanding innovation technique used for problem solving
No remarkable innovation technique founded to slove the problem
No remarkable techniques used for solving problems of the given objective
No noteworthy technique used to slove the given problem

No outstanding technique used for problem solving

No noteworthy technique used for solving problems of the given objective

No noteworthy technique used to slove the given objective of the problem


No remarkable techniques are used to slove the given objective

No noteworthy technique used to slove the problem scheme


no remarkable technique used for solve the given problem objectives.

No noteworthy technique used to slove the given objective of the problem


No outstanding technique used to slove the problem scheme
No remarkable innovation technique used for problem scheme

Good innovation technique used to slove the problem


No noteworthy innovation technique used for problem solving
No remarkable innovation technique used for problem solving
No special technique can be enhanced for problem solving
No noteworthy innovation technique used for problem solving
Need more innovative and significant approach for problem solving
More innovative approach used for solving problems in applications of IOT in agriculture
Special technique can be enhanced for problem solving
No noteworthy innovation technique used for problem solving

There has been an attempt at innovation, yet its impact on problem-solving remains limited in scope and effectiveness.
Basic techniques are employed with minor attempts at innovation, indicating a need for more creative and pioneering approaches to enhance effectiveness.

The techniques employed are basic, with minor attempts at innovation, indicating potential for more creative and innovative approaches to enhance effectiv

The techniques employed are fundamental, with limited attempts at innovation, suggesting potential for exploring more creative and advanced approaches t

Basic techniques are employed with minor attempts at innovation, showing some effort to go beyond the fundamentals.

While there is an effort to innovate, the project's impact on addressing training effectiveness at RINL-VSP could be strengthened with more substantial and
The project shows initiative in exploring innovative approaches, yet its practical impact on solving problems within the context of the textile industry's oper

The statement indicates a foundational approach with some innovation attempts, suggesting potential for further exploration and enhancement of risk manag
While foundational, integrating more innovative approaches could enhance the project's ability to provide insightful and actionable financial assessments, p
Incorporating more innovative approaches could significantly enhance the project's impact and effectiveness, leading to more advanced and valuable findin

The approach primarily relies on basic techniques with only minor attempts at innovation about TQM and Industry 4.0 approaches

The study predominantly employs conventional or basic techniques, with only occasional and limited efforts made towards innovative approaches.

There have been some attempts to introduce innovative approaches, but their effectiveness in solving problems has been limited or not fully realized.
The work demonstrates proficiency in basic techniques, with minor attempts at innovation. While foundational methods are effectively applied, there is lim
Basic techniques are employed with minor attempts at innovation within the context of tourism. While fundamental methods are utilized effectively, further
The lack of innovation in workforce management often leads to a conventional approach to solving productivity challenges.

Implementing Total Quality Management (TQM) in an organization with very basic or inappropriate techniques, lacking innovation, can hinder effective de
The operations and supply chain management practices at Maruti Suzuki exhibit a lack of innovation, resulting in a conventional problem-solving approach
There are some attempts at innovation, but they have limited impact on problem-solving regarding the impact of creation techniques on Dabur's profits. Imp

Basic techniques are employed with minor attempts at innovation in IKEA's operations management. While foundational methods are used effectively, expl

While there has been some attempt at innovation, its impact on problem-solving in the context of green initiatives for electronic gaming slot machines rema

solving.
innovation.

innovation.
techniques
innovation.
on problem- solving.

Some attempt at innovation

Creative techniques

Creative techniques

problem- solving. At least 3 recommendations


innovative

At least 3 recommendations

Some attempt at innovation


limited impact on problem- solving.
on problem- solving.
solving.

limited impact on problem- solving

limited impact on problem- solving.


limited impact on problem- solving.

problem-solving.
on problem- solving.
attempts at innovation.

New innovative techniques are used


innovation.
Some attempt at innovation
innovation
on problem- solving.
solving.
limited impact on problem- solving
Creative techniques with innovation
on problem- solving.
limited impact on problem-solving
innovative techniques areused
new innovative techniques are used to problem sloving

solving.
on problem- solving.

on problem- solving.
adequate Innovative techniques used

innovation.
Project management tools and techniques enabled better resource planning and utilization, minimizing waste and maximizing the use of available assets.
regression analysis techniques were used for solving many problems and also can be compared to other techniques and take solution level

In AI tools, by analyzing patterns and historical data, expedite the identification and rectification of potential problems.
this study to highlight the standards influencing these characteristics, therefore offering a foundation for tips to boost the functional problems and decreased
AI techniques has emerged as a promising solution to revolutionize incident management practices within ITSM frameworks.

Google’s proactive approach to data privacy and cybersecurity has helped the company maintain a positive reputation.

Blockchain technology to eliminated the need for middlemen in various activities

innovative marketing strategies that captured consumer attention and drive engagement.
The major factor implemented by the respondents to order in Swiggy is promotion, convenience, easy accessibility and timely delivery.
There have been some attempts at innovation, but these efforts have had limited impact on problem-solving within the context of logistics and supply chain
Basic techniques are employed with minor attempts at innovation. While fundamental methods are effectively used, exploring more innovative approaches

Basic techniques are used with minor attempts at innovation. While fundamental methods are employed effectively, incorporating more innovative approac

The approach to problem-solving lacks innovation, relying instead on conventional methods.


Basic techniques are utilized with minor attempts at innovation in the context of 3PL logistics optimization
The approach lacks innovation, resulting in a conventional problem-solving method for addressing issues related to 3PL logistics optimization.

There is a lack of innovation, resulting in a conventional problem-solving approach.

Basic techniques are used, with minor attempts at innovation. More substantial efforts towards creativity could further improve the results.

Basic techniques are employed with minor attempts at innovation. More substantial innovations could potentially yield greater improvements or efficiencies

There's been some attempt at innovation, but its impact on problem-solving remains limited.

There has been some initiative towards innovation, yet its application has shown limited effectiveness in addressing core problems. Further refinement and
on problem- solving
creatives techniques are used
adequate Innovative techniques are used

adequate Innovative techniques used

some of the Innovative techniques used

give some of the adequate Innovative techniques

innovation
some of the few Innovative techniques used

innovation
Basic techniques with minor attempts at innovation

lack in use of Innovative techniques


some of the Innovative techniques are used
some of the Innovative techniques
Basic techniques were utilized in the project, with only minor attempts made to introduce innovative approaches or methods.
The project primarily utilized elementary or unsuitable techniques, lacking any attempt to introduce innovative methods or approaches that could enhance it
The project utilized basic techniques with limited attempts at introducing innovative approaches related to SERVQUAl model
There have been efforts towards innovation, but their impact on problem-solving has been limited.

Basic techniques with minor attempts has been used


Basic techniques with notable attempts has used to solve the problem

creative techniques used to approach the problem

Lack of technique used to solve the problem

Creative techniques used to approach to solve the problem

Creative techniques and approach to solve the problem


Creative techniques with enhance their solve the problem
minor innovation very basic technique used to solve the problem
only limited techniques used to approach to problem scheme

Creative techniques and innovative approach to solve the scheme

Creative techniques and analysis to enhance the problem


Creative techniques used to approach the problem
lack of innovation technique is used to solve the problem
Lack of innovation technique is used to solve the problem

Basic techniques are used to solve the problem

Creative techniques are used to understanding the problem


innovation.
Creative techniques or approaches that enhance problem-solving.

Basic techniques with minor attempts at innovation

limited impact on problem-solving.

Basic techniques with minor attempts at innovation


Recent technology uses and methodology to be address clearly.

Moderately attempted the innovative approach to the problem scheme


Innovative approach to problem scheme are attempted with more impact on the problem solving
Minimal attempts are made over Innovative techniques to problem scheme
MInimum attempt of innovative approah to the solution of the problem
Some attempt of innovative techniques to the problem scheme

Minimum attempts of Innovative techniques/approach to problem scheme


Lack of innovative approach to the problem scheme

basic techniques are used to solve the problem


Lack of innovation in the solution of the problem
basic techniques are to be used
creative techniques to be used
Inappropriate techniques with no innovation
Some attempt of innovation are made to the solution of the problem
Less attempt of Innovative techniques/approach to problem scheme
very less attempt of innovative approach to problem scheme
Minimal attempt of innovative techniques/approach to problem scheme
Some attempt of Innovative approach to problem scheme
Minor attempt of innovative approach to problem scheme
Basic techniques with minor attempts of innovation
Lack of innovative approach to problem scheme
Used innovative techniques/approach to problem scheme better
Some attempt of innovative techniques/approach to problem scheme
Lack of innovative approach to problem scheme
Sampling strategies were used in the study to approach the problem scheme and expected to use innovative techniques
Descriptive Statistics, Thematic Analysis were the technologies used in the study
The non-probability sampling technique involved in the study deliberately choosing specific documents, reports, case studies, and other secondary data sou
The need of using innovative techniques to be expected to be a part in the analysis and interpretation of the collected data
and reliability of the research findings by selecting participants from the target population

The sampling was used and expected to use the recent innovative techniques

The innovative techniques were not used well in the chosen problem to analyze and interpret
The sampling was used and expected to use the innovative techniques to approach the problem
the research subjects based on specific characteristics or qualities.
With the advent of new fundraising techniques like Security Token Offerings (STOs) and Initial Coin Offerings (ICOs), now raise money by issuing digital

Stratified random sampling techniques were utilized to ensure the inclusion of diverse perspectives and experiences, thus enhancing the reliability and gene

The study used with a exploratory evaluation technique and expected to be used recent innovative tools and techniques

Statistical tools and software will be used for quantitative data analysis, while thematic analysis will be applied to qualitative data to identify key patterns an
Sampling statistics techniques were used well in obtaining the feasible solution to the problem
This study is an attempt to gather the basic and advanced techniques to stock price prediction that are invented
Descriptive Statistics and Inferential Statistics were the techniques adopted in the study for Quantitative Data Analysis
surveys, interviews, experiments, specially designed for understanding and solving the research problem were used
Sampling techniques used in the study and expected to have a innovative techniques to be used
Basic techniques with minor attempts at innovation
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation
The sampling techniques were used well in obtaining solution to the CRM
The quantitative and qualitative techniques were used in the analysis and interpretation of the collected data
Basic techniques with minor attempts at innovation
Basic techniques with minor attempts at innovation.
The integration of quantitative and qualitative techniques were used in the analysis and interpretation over the data
Quantitative and Qualitative techniques were employed in the analysis of data were used for this research study
Quantitative techniques were used in the study for the Analysis and Interpretation of data.
Lack of innovation, leading to a conventional problem- solving approach.
Basic techniques with minor attempts at innovation.
Creative techniques or approaches that enhance problem- solving.
Outlier detection, Normalization and Over-sampling were the performance improvement techniques used in the study
Scaling Technique, Dichotomy Scale with a sample size of of 37 respondents out of which 32 responded were taken for the study
The study has a combination of data collection techniques employed providing valuable insights from various stakeholders and sources, ensuring a well-rou
The convenience sampling was used and expected to use the recent innovative techniques
The innovative techniques were need to be used in obtaining the feasible solution to the chosen problem
Some attempt at innovation, but with limited impact on problem- solving.
Data analysis will involve organizing and categorizing the collected data, identifying patterns and themes, and drawing conclusions based on the research o
Ranking method, Forced distribution method, Critical Incident Technique, . Checklists and Weighted Checklists, . Field Review Method, Management by O
The research has devised a sampling strategy that incorporates the specified approaches to the problem scheme.
The study uses the survey using questionnaires, random samples from the sampling frame which are need to be changed to recent techniques
The data in the study tracks & analyses the performance of AI against human performance in various different tests like Reading, Image recognition, Speec

involved in or affected by the migration process

The recent techniques were need to be used in the analysis and interpretation of the collected data

very basic and innovative techniques used to solve their problem

Advanced techniques and to resolve their problems

lack of innovative techniques used to solving their problem

creative techniques are to be used

lack of innovative techniques are to be used


innovative techniques has been used to solve the problem of your study

innovative techniques are used to solve their problem

limited innovative techniques are to solve their problem


creative techniques has been used to solve their problem
creative techniques are with to solve their problem

futuristic techniques are used to solve their problem

creative techniques approach that enhance the problem


creatives techniques and to enhance the problem

Basic techniques are used to solve the problem


Very basic techniques has been used to solve the problem
basic techniques used to solve the problem

Basic techniques with minor attempts has used


creative technique approach that enhance the problem solving
Basic techniques with minor attempts
Basic technique has been used

creative techniques approaches to enhance the problem


The project on improving team efficiencies through Six Sigma methodologies utilizes basic techniques with minor attempts at innovation, indicating room f

The project shows some attempt at innovation, but its impact on problem-solving is limited, suggesting potential for further development to achieve more si
The project makes some attempt at innovation, but its impact on problem-solving is limited, suggesting potential for further development in practical applic
The project shows some innovative approaches, although their practical impact on solving the problem appears limited.

The project employs basic techniques with minor attempts at innovation, indicating room for more advanced or creative approaches to improve its impact a
The project lacks innovation, relying on conventional methods for problem-solving without introducing novel approaches or insights.
The project utilizes fundamental techniques with limited attempts to introduce innovative approaches.
The project incorporates innovative techniques that effectively enhance problem-solving methodologies, demonstrating creativity in addressing complex iss

The project relies on conventional problem-solving methods without introducing innovative approaches to enhance its outcomes or insights.

The project relies on basic techniques with limited innovation, which may restrict its ability to propose novel solutions or insights in the field.

The project employs basic techniques with limited attempts at innovation, indicating potential for further exploration and development of more advanced m

The study utilizes basic techniques with limited attempts at innovation, indicating potential for further exploration and development of more advanced meth
The study exhibits a lack of innovation, resulting in a conventional problem-solving approach that may limit the exploration of novel solutions and insights.

The study exhibits a lack of innovation, resulting in a conventional problem-solving approach that may limit the exploration of novel solutions and insights
xpand beyond basic techniques and make more substantial efforts toward innovation in addressing the challenges of managing outbound logistics for Elite F

Introduce innovative approaches to problem-solving to overcome the conventional methods used in addressing the lack of distribution channels in rural area

The study makes some attempt at innovation, but its impact on problem-solving within the context .Further exploration of novel approaches may be benefic
The study makes some attempt at innovation, but its impact on problem-solving is limited, suggesting potential for further exploration of more impactful so

The project makes some attempt at innovation in implementing Lean Six Sigma for yield improvement in product manufacturing, but its impact on problem
Historical analysis for past findings and Risk assessment for SWOT analysis were used in the study

Technology intervention is the innovative technique to solve the certain issues in Electric Vehicle

Limited innovative approach to the problem scheme


Innovative techniques were used to reduce the COD and

Technology intervention is an innovative technique


All the operational efficiency has been identified, this is the innovative technique and chi-square and percentage analysis has been used to analyze the data.

Service quality tools may be used. so that minimum utilization of innovative techniques to problem scheme
The project shows potential with innovative approaches, but further development and application of these innovations are needed to significantly impact pro

The project displays commendable efforts in exploring innovative approaches to address after-sales service challenges at Empire Motors Private Limited. H

The project exhibits a lack of innovation, resulting in a conventional approach to problem-solving that may limit its ability to offer novel insights or solutio
The project lacks innovation, resulting in a conventional approach to problem-solving that may limit its ability to propose novel solutions or insights in the
The project lacks innovation, resulting in a conventional approach to problem-solving that may limit its ability to propose novel solutions or insights.
The project incorporates creative techniques or approaches that effectively enhance problem-solving, contributing to innovative solutions and insights.

The project incorporates creative techniques or approaches that effectively enhance problem-solving, contributing to innovative insights and strategies in th
The project shows some attempts at innovation, but these efforts have limited impact on enhancing problem-solving approaches or generating novel solutio
The project utilizes basic techniques with limited attempts at innovation, which may restrict its potential to provide novel insights or solutions in the subject

The project utilizes basic techniques with limited attempts at innovation, which may limit its ability to propose novel solutions or insights effectively.
The project employs basic techniques with limited attempts at innovation, which may restrict its potential to offer novel solutions or insights effectively.

The project utilizes basic techniques with minor attempts at innovation, which may limit its potential to introduce more effective or novel solutions.
Some techniques with minor attempts at innovation have been given.

Some techniques with minor attempts at innovation have been given.

Lack of Innovative techniques and approach to problem scheme.

Some attempt at innovation, but with limited impact on problem solving.

various approaches have been used to apply the problem scheme but suggested to give innovative techniques
various approaches have been used to apply the problem scheme but suggested to give innovative techniques
Some techniques with minor attempts at innovation have been given
various approaches have been used to apply the problem scheme but suggested to give innovative techniques

no innovative techniques used

few approaches have been used to apply the problem scheme but suggested to give innovative techniques
various approaches have been used to apply the problem scheme but suggested to give innovative techniques
various approaches have been used to apply the problem scheme but suggested to give innovative techniques

various approaches have been used to apply the problem scheme but suggested to give innovative techniques

Some techniques with minor attempts at innovation have been given.


Basic techniques with minor attempts at innovation have been given
various techniques have been used new techniques are suggested
The report could further benefit from discussing any novel algorithms or unique modifications to existing algorithms implemented in the project.
Lack of Innovative techniques and approach to problem scheme
various approaches have been used to apply the problem scheme but suggested to give innovative techniques
There is no Innovative technique to given
These approaches are forward-thinking and relevant to current cybersecurity challenges
Some attempt at innovation, but with limited impact on problem solving
Some attempt at innovation, but with limited impact on problem solving
various approaches have been used to apply the problem scheme but suggested to give innovative techniques
various approaches have been used to apply the problem scheme but suggested to give innovative techniques
Some attempt at innovation, but with limited impact on problem solving
Some techniques with minor attempts at innovation have been give
Some techniques with minor attempts at innovation have been given
Basic techniques with minor attempts at innovation have been given
Some techniques with minor attempts at innovation have been given

various approaches have been used to apply the problem scheme but suggested to give innovative techniques on IT project management
No innovative techniques used
analysis of data collected gives meaningful insights of the findings with various tools. suggested to use new tools
need to use innovative techniques
Some techniques with minor attempts at innovation have been given
various approaches have been used to apply the problem scheme
the study emphasis on integrating ITRM and BCP for a holistic approach to organizational resilience
need to develop innovative techniques.only existing techniques are discussed
need innovative techniques for problem scheme
There is no Innovative technique to given

various approaches have been used to apply the problem scheme but suggested to give innovative techniques

the data has been analyzed using various tools and techniques
Some techniques with minor attempts at innovation have been given

various case studies have been analyzed and discussed with innovative approaches
various techniques are defined in problem scheme
the innovative techniques are needed to implement the problem
Basic techniques with minor attempts at innovation have been given
need to use innovative techniques standard techniques were discussed
various approaches have been used to apply the problem scheme but suggested to give innovative techniques
Block chain/distributed ledgers technology were used

need more innovative techniques to be implemented

Basic techniques with minor attempts at innovation have been given.

Lack of Innovative techniques and approach to problem scheme


Some techniques with minor attempts at innovation have been given.

Fundamental techniques with slight attempts at innovation. Needs to improve problem solving techniques.

Some attempt at innovation, but with limited impact on problem solving.

Basic techniques with minor attempts at innovation have been given.


Basic techniques with minor attempts at innovation have been given.
Some techniques with minor attempts at innovation have been given.
Some techniques with minor attempts at innovation have been given.

Some techniques with minor attempts at innovation have been given.

Some techniques with minor attempts at innovation have been given.


Some attempt at innovation, but with limited impact on problem solving.-
Some attempt at innovation, but with limited impact on problem solving.
Basic techniques with minor attempts at innovation have been given

various approaches have been used to apply the problem scheme but suggested to give innovative techniques
Basic techniques with minor attempts at innovation have been given.
standard techniques have been discussed but suggested to have innovative techniques

Some attempt at innovation, but with limited impact on problem solving


various approaches have been used to apply the problem scheme but suggested to give innovative techniques
various approaches have been used to apply the problem scheme but suggested to give innovative techniques
standard techniques have been discussed need innovative techniques
Lack of Innovative techniques and approach to problem scheme
various approaches have been used to apply the problem scheme but suggested to give innovative techniques

Some attempt at innovation, but with limited impact on problem solving


need to use innovative techniques

various approaches have been used to apply the problem scheme but suggested to give innovative techniques
Basic techniques with minor attempts at innovation have been given

the problem scheme needs innovative approach


Some attempt at innovation, but with limited impact on problem solving

various approaches have been used to apply the problem scheme but suggested to give innovative techniques

Techniques are almost non existent.


various cloud models are used for solving many problems. require more additional information about this
generate fake money that is virtual take virtual finances by simply manipulating membership balances and also limitless of currency in a variety of virtual
different approaches may be utilized to increase growth while maintaining a sustainable environment.
Basic technique with minor attempt made at innovation
Lack of innovation leading to conventional problem solving approach
product-based approach, Transformed operating mode and modern engineering tools have been used for solving the problem of IT and Systems Manageme
A phased approach gives the staff time to adjust to the new system.Thus approach is sensible when the consequences of failure are disastrous, but will requ
Lack of innovation
Basic techniques with less attempts at innovation
analyzed Tata Power's experiences, successes, and challenges in implementing smart grid initiatives, this study aims to extract valuable lessons and best pra
experience. Demand more explanation
Creative techniques has been used for analysing the data

educational initiatives, and efforts to bridge the digital divide to drive broader adoption of digital payments

ITSM as a strategic tool to attain operational excellence and enhance customer satisfaction amidst the fiercely competitive environment of e-commerce
analysis.
generate fake money that is virtual take virtual finances by simply manipulating membership balances and also limitless of currency in a variety of virtual c
cloud protection problems, Business utilized different affect service as IaaS, PaaS, SaaS and the models like general public, exclusive, crossbreed.
to provide organizations with strategic insighted that have practical implications for decision-making processes

this project mainly done in SAP. The all modules are integrated together, so by using SAP-ABAR. can employ recent techniques use to solve the billing iss

Basic techniques with minor attempts at innovation.


At least 2 recommendations

At least 2 recommendations
Small and medium-sized enterprises have adopted a proactive strategy to save unnecessary expenses and align their cloud investments with their financial c
At least 4 recommendations

At least 4 recommendations or techniques are futuristic or tech based or shows deep reflection and integration.
At least 4 recommendations
Basic techniques with minor attempts at innovation.
implementation approach is in the way to manage the complex and often the contradictory objectives that in a bound in the digital age. need more clarity ab
At least 4 recommendations
At least 4 recommendations or techniques are futuristic or tech based or shows deep reflection and integration.
At least 4 recommendations

At least 4 recommendations or techniques are futuristic or tech based or shows deep reflection and integration.
At least 4 recommendations
At least 4 recommendations
At least 3 recommendations
At least 4 recommendations
The capacity of an organization to carry out its cloud migration plan can be significantly impacted by several hazards related to shifting to the cloud.
The six-part ERP implementation phase lifecycle includes discovery and planning, design, development, testing, deployment and support.
Cyber security technique that simulates a cyberattack on a system. This may also be known as a pen test or ethical hacking.
Minimal attempts of applying innovative techiniques
The problem solving approach is made with less innovative techniques
Lack of innovative approah to the problem scheme
Minimal attempt of innovative approach to the problem scheme
Inappropriate techniques with no innovation
The machine learning model displayed acceptable generalization across a variety of digital pathology datasets and platforms
Leading companies have to think about pursuing some new techniques in their ongoing effort in the direction of enhancing patron experience
The importance of data analysts cannot be overstated, as they extract valuable information from marketing data in order to provide actionable ideas
Data is one of the huge components for any retail unit. Here it is when innovation helps any kind of industry or association to gather, save, support and utili
After exploring the status of use of blockchain technology in IP management in India, the study further describes which blockchain technologies are prefera
Needs to specify some innovative algorithm or technology for analysis the data and problem scheme
This is case study needs to solve the digital marketing problem using innovative techniques
Basic techniques with minor attempts at innovation.
Lack of innovation, leading to a conventional problem-solving approach.
At least 3 recommendations
At least 4 recommendations
At least 4 recommendations or techniques are futuristic or tech based or shows deep reflection and integration.
At least 3 recommendations
At least 4 recommendations or techniques are futuristic or tech based or shows deep reflection and integration.
With limited techniques available for ERP implementation, issues can be resolved through SAP. can be use some other techniques
At least 4 recommendations
At least 3 recommendations
At least 4 recommendations
At least 3 recommendations
Basic techniques with minor attempts at innovation.
At least 3 recommendations
Basic techniques with minor attempts at innovation.
At least 4 recommendations
the techniques which provide solution to the problem should mentioned with clarity
At least 4 recommendations
At least 3 recommendations
At least 4 recommendations or techniques are futuristic
Very basic or inappropriate techniques with no innovation.
At least 4 recommendations

basic few innovation techniques have been used


standard approaches only used
need to improve innovative techniques only standard techniques used
various approaches have been used to apply the problem scheme but suggested to give innovative techniques
various approaches have been used to apply the problem scheme but suggested to give innovative techniques
need new innovative techniques to be implemented
Notable innovative technology used for problem scheme was good
No notable techniques used for problem solution
No outstanding technique can be founded
No remarkable innovation technique can be founded
No remarkable innovation technique used to analysis of data
No notable techniques used to slove the problem scheme
By embracing emerging trends and technologies such as digital transformation, RPA, data analytics, and cloud computing,
Using innovative and flexible technology systems, NSDL works to support the investors and brokers in the capital market of the country.
At least 3 recommendations
Descriptive statistics, T-tests and regression analysis techniques were mentioned. elaborate answer are not provided. and also can be compare best cloud HR
collaborative approach to implemented that involves all stakeholders and takes into account the unique needs and challenges of the healthcare industry. nee
At least 3 recommendations
AI while mitigating its negative impacts, a multifaceted approach is necessary for robust data governance and privacy protection
advanced CRM techniques represented a comprehensive business strategy that integrates various customer-facing departments with other organizational un
At least 4 recommendations
The student made minor attempts for innovative techniques to problem scheme
The student has made an attempt for innovation but with limited impact on problem solving.
Descriptive research used for understand the concept behind the topic and to find the problems faced on the research. In this research, the digitization of Ind
methodical approach that is utilized in the process of carrying out an investigation or study in the autonomous vehicle. good approach , need further clarific
The student has only minor Innovative ideas relating to identified problem
Descriptive research has been used for solved for issues in worklife balance. require more information about this

The student is weak in finding the innovative techniques


CRM implementation was fraught with challenges and complexities, requiring careful planning, strategic foresight, and meticulous execution
Minor attempts has been made at innovation
Has used basic techniques with minor attempts at innovation
Some attempt at innovation but related with the social science research oriented
Lack of innovation in techniques as used some basic tools only
Made a minor attempts at innovation
Creative technique that enrich the problem solving
Some simple attempt made for an innovation
Some simple attempt has been made at innovation
Blockchain technology to eliminated the need for middlemen in various activities
Some attempt at innovation but with limited impact on the problem solving.
Very basic or inappropriate techniques with no innovation.
KAP techniques and self-report framework review approaches used to solve the problem and get accurate result. require more clarity about this
At least 4 recommendations
analytical techniques were applied in the research. but need elaborate explanation about how to solve problem
At least 2 recommendations or techniques are futuristic or tech based or shows deep reflection and integration.
Very basic or inappropriate techniques with no innovation.
Innovative techniques and approaches that significantly contribute to problem-solving.
At least 4 recommendations
At least 4 recommendations or techniques are futuristic or tech based or shows deep reflection and integration.
Basic techniques with minor attempts at innovation.
At least 4 recommendations or techniques are futuristic or tech based or shows deep reflection and integration
At least 4 recommendations
researcher, mentioned to detect threats by using NGFWs and IPS. need explanation about this. And also use some other techniques to prevent cyber threats
At least 4 recommendations
At least 3 recommendations
At least 4 recommendations
At least 4 recommendations
researcher mentioned, Power BI data -visualization techniques have been used in telecom network performance across Indian.However, need further clarific
Understanding edge computing is becoming more and more important in the digital age because of its revolutionary effects on many facets of business, soc
At least 4 recommendations
At least 4 recommendations
- strategy was using image files in conjunction with RSA algorithm. Issues related to the security of digital data transmission via networks are investigated i

At least 4 recommendations
This project is essential to strike a balance between innovation and ethical considerations of project development
add more innovative approach of project application devlopmnent
In this study consistently demonstrates a creative and innovative approach to problem solving.

This project is essential to strike a balance between innovation and ethical considerations in order to harness the full potential of AI for the benefit of societ

This study has a proven ability to turn innovative ideas in to successful projects that deliver tangible results.
This study has a proven ability to turn innovative ideas in to successful projects that deliver tangible results.

In this study consistently demonstrates a creative and innovative approach to problem solving.

give some more innovative techniques for problem scheme are to be provided more content of the project
the techniques and approach of problemn sceme are required more information
the blockchain consistently demonstrates a creative and innovative approach to problem solving

the ability to turn innovative ideas in to successful projects that deliver tangible results.
In this study consistently demonstrates a creative and innovative approach to problem solving
Basic techniques are used with minor attempts at innovation.
Innovative techniques and approaches that significantly contribute to the resolution of problems.
There was some attempt at innovation, but with limited impact on problem-solving.
Creative approaches or techniques that enhance problem- solving.
Minor attempts at innovation are basic techniques.
Innovative techniques and approaches that significantly contribute to the resolution of problems.
Creative techniques or approaches that enhance problem-solving capabilities.
Attempts at novelty, but with limited impact on resolving issues.
Techniques or approaches that enhance problem-solving.
This study has a proven ability to turn innovative ideas in to successful projects that deliver tangible results.
Simple methods with sporadic attempts at creativity.
In this study consistently demonstrates a creative and innovative approach to problem solving
Attempts at novelty, but with limited impact on resolving issues.
Some attempt to innovate, but with limited impact on problem-solving.
There have been some attempts at innovation, however, their impact on problem-solving has been limited.
Lack of innovation leads to a conventional problem-solving approach due to a lack of innovation.
Creative techniques or approaches that enhance problem-solving capabilities.
New ways of doing things that help solve problems.
Creative techniques or approaches that enhance problem-solving capabilities.
This project is essential to strike a balance between innovation and ethical considerations in order to harness the full potential of IT for the benefit of society
Some attempt to innovate, but with limited impact on problem-solving.
This project is essential to strike a balance between innovation and ethical considerations in order to harness the full potential of AI for the benefit of societ
Fundamental techniques, with minor attempts at innovation.
Techniques or approaches that enhance problem-solving.
Fundamental techniques, with minor attempts at innovation.

Innovative methods or approaches that aid in resolving issues.


Innovative techniques and approaches that significantly contribute to problem-solving are used.
Innovative techniques and approaches that significantly improve problem-solving.
This project is essential to strike a balance between innovation and ethical considerations in order to harness the full potential of AI for the benefit of societ
There was some attempt at innovation, but with limited impact on problem-solving.
This study has a proven ability to turn innovative ideas in to successful projects that deliver tangible results.
more ideas to be needede for Innovative techniques/approach to problem scheme
Some attempts made at innovative techniques
Basic techniques with minor attempts at innovation.
This study has a proven ability to turn innovative ideas in to successful projects that deliver tangible results
Give some more innovative things based on this study.
There have been some attempts at innovation, however, their impact on problem-solving has been limited.
This study has a proven ability to turn innovative ideas in to successful projects that deliver tangible results.
Techniques and approaches that significantly contribute to problem-solving.
Some attempt to innovate, but with limited impact on problem-solving.
Very basic techniques with no innovation.
Some attempt made for innovation but with limited impact on problem-solving.
Lack of creativity results in the use of a traditional approach to problem-solving.
Lack of creativity/lack of innovative techniques which results in problem-solving.
Simple methods with sporadic attempts at creativity.
Student made little innovative effort, but not much of an influence on problem.

Simple methods with sporadic attempts at creativity.


Student made little innovative effort, but not much of an influence on problem.
Lack of innovation, leading to a conventional problem- solving approach.

A few attempts at innovation, but not much of an influence in solving problems.

Lack of innovation, leading to a conventional problem- solving approach.

Simple methods with sporadic attempts at creativity.


Lack of innovation, leading to a conventional problem- solving approach.

Core technologies with small innovative companies.


Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.

Creative approaches that improve problem solving.

Lack of innovation, leading to a conventional problem- solving approach.

There are attempts at innovation, but they have little effect on solving problems.

Minor attempts at innovation are basic techniques.

Creative approaches or techniques that enhance problem- solving.


Basic techniques with minor attempts at innovation

Lack of innovation, leading to a conventional problem- solving approach.


Attempts at novelty, but with limited impact on resolving issues.
Basic techniques with minor attempts at innovation with basic techniques.
Basic or inappropriate techniques with no innovation.
Fundamental methods with sporadic innovations.
Some attempt at innovation, but with limited impact on problem- solving. There are two recommendations or techniques are futuristic or tech based or show

Innovative methods or approaches that help people solve problems better.


Techniques that are either inappropriate or very basic without any new ideas.

Basic techniques with minor attempts at innovation.


Basic techniques with minor attempts at innovation.
Lack of innovation, leading to a conventional problem- solving approach.

Some attempt at innovation, but with limited impact on problem- solving. There are two recommendations or techniques are futuristic or tech based or show
There are attempts at innovation, but they have little effect on solving problems.

Innovative methods or approaches that aid in resolving issues.


There are almost no methods.
Innovative methods or approaches that aid in resolving issues.

Basic techniques with minor attempts at innovation.


Innovative ways of solving problems.

Basic techniques with minor attempts at innovation.


Basic techniques with minor attempts at innovation.
Innovative ways of solving problems.

Some attempts at innovation, but they don't help solve problems.

No evidence of any innovative techniques.

Techniques and approaches that significantly contribute to problem-solving.


Innovative methods or approaches that aid in resolving issues.
Lack of innovation, leading to a conventional problem- solving approach.
New ways of doing things that help solve problems.
Techniques or approaches that enhance problem-solving.

Innovative methods or approaches that aid in resolving issues.

Some attempt at innovation, but with limited impact on problem- solving. There are two recommendations or techniques are futuristic or tech based or show
Innovative techniques and approaches that significantly contribute to the resolution of problems.
Basic techniques with minor attempts at innovation.

Techniques are lacking or entirely inappropriate.

Basic techniques with minor attempts at innovation.


Techniques and approaches that significantly contribute to problem-solving.

Basic techniques are used with minor attempts at innovation.


Basic techniques with minor attempts at innovation
Techniques are virtually inexistent.

Some attempt at innovation, but with limited impact on problem- solving.

Student made little innovative effort, but not much of an influence on problem.
Some attempt made for innovation but with limited impact on problem-solving.
Student made little innovative effort, but not much of an influence on problem.

A little innovative effort, but not much of an influence on problem.


A few attempts at innovation, but not much of an influence on solving problems.

Student made little innovative effort, but not much of an influence on problem.

A little innovative effort, but not much of an influence on problem.


Student made little innovative effort, but not much of an influence on problem.
Some attempt made for innovation but with limited impact on problem-solving.
Student made little innovative effort, but not much of an influence on problem.
A little innovative effort made by the student, but not much of an influence on problem.
Very basic techniques with no innovation.

Some attempt made for innovation but with limited impact on problem-solving.
A little innovative effort made by the student, but not much of an influence on problem.

A few attempts at innovation, but not much of an influence on solving problems.

Basic techniques with minor efforts at innovation.


Lack of innovation techniques used in the study report.
Usage of chart and interpretation in analysis part was good.
The problem appearsof this project is to be escalating over time due to its widespread nature.
Some attempt has been made in the study but has limited impact.
Innovative techniques and approaches that significantly contribute to the resolution of problems.
In this study consistently demonstrates a creative and innovative approach to problem solving.
Techniques or approaches that enhance problem-solving.

Techniques are virtually absent.


This project is essential to strike a balance between innovation and ethical considerations in order to harness the full potential of AI for the benefit of societ
Fundamental techniques, with minor attempts at innovation.
The research presents a number of different biometric technologies, such as voice recognition, facial recognition, and fingerprint recognition, and emphasis
Basic techniques with some minor attempts at innovation.
This project is essential to strike a balance between innovation and ethical considerations in order to harness the full potential of digital banking for the bene
This study has a proven ability to turn innovative ideas in to successful projects that deliver tangible results
Only basic approach is used in the report.
There is no Innovative techniques/approach to problem scheme are listed.
Attempt on innovation has been made while suggesting some recommendations to the company.
There are only basic techniques involved in the research work.

the techniques applied are mostly nonexistent


Some basic techniques are used in the study.
ABC review has been stated in the study.
Some attempt has been made but with limited impact.

This project is essential to strike a balance between innovation and ethical considerations in order to harness the full potential of IT for the benefit of society

This study has a proven ability to turn innovative ideas in to successful projects that deliver tangible results.
In this study consistently demonstrates a creative and innovative approach to problem solving.

Cloud computing promotes innovation by providing access to a wide range of advanced


This study has a proven ability to turn innovative ideas in to successful projects that deliver tangible results.
Give some ideas of innovative techniques foe cloud compting of this project

Basic techniques with minor attempts at innovation.


Creative ways to solve problems.
Basic techniques with minor attempts at innovation.
Innovative techniques and approaches that significantly contribute to problem-solving are used.
No evidence of any innovative techniques.
No evidence of any innovative techniques
Problem-solving is enhanced by creative techniques or approaches.
Problem-solving is enhanced by creative techniques or approaches.
There are attempts at innovation, but with limited impact on problem- solving.
Some attempt to innovate, but with limited impact on problem-solving.

Creative techniques or approaches that enhance problem-solving capabilities.


Some attempt at innovation, but with limited impact on problem- solving.
In this project, the consumers have the flexibility to choose what products or services they want to offer, how much they want to charge for them, and unde
This project has consistently demonstrates a creative and innovative approach to problem solving.
of Things (IoT) platforms.
In this study consistently demonstrates a creative and innovative approach to problem solving.
Innovative ways of solving problems.
Innovative strategies that improve problem-solving.
Some attempt at innovation, but with limited impact on problem- solving.

Some attempt at innovation, but with limited impact on problem- solving


Novel methods and strategies that greatly aid in the solution of problems.
Basic techniques with minor attempts at innovation
This project is essential to strike a balance between innovation and ethical considerations in order to harness the full potential of digital currency for the be
Basic techniques with minor attempts at innovation.
This project is essential to strike a balance between innovation and ethical considerations in order to harness the full potential of banking industry for the be
Basic techniques with minor attempts at innovation
This project is essential to strike a balance between innovation and ethical considerations in order to harness the full potential of AI for the benefit of societ
This study has a proven ability to turn innovative ideas in to successful projects that deliver tangible results.
This study has a proven ability to turn innovative ideas in to successful projects that deliver tangible results.
Innovative techniques and approaches that significantly improve problem-solving.
Basic techniques with minor attempts at innovation
Novel methods and strategies that greatly aid in the solution of problems.
Basic techniques with minor attempts at innovation.
Some attempt at innovation, but with limited impact on problem- solving.
Lack of innovation, leading to a conventional problem- solving approach.
Limited understanding, leading to conceptual flaws.
In this study consistently demonstrates a creative and innovative approach to problem solving.
Basic methods with a little innovation.
Fundamental techniques, with minor attempts at innovation.
inappropriate techniques with no innovation.
Some attempt at innovation, but with limited impact on problem- solving.
Creative approaches or techniques that enhance problem- solving.
Basic techniques are used with minor attempts at innovation.
Innovative techniques and approaches that significantly improve problem-solving.
There is some attempt at innovation, but it has limited impact on problem-solving.
This study has a proven ability to turn innovative ideas in to successful projects that deliver tangible results.
The lack of innovation results in a conventional approach to problem-solving, indicating the need for more creative strategies to address challenges in appoi
Based on the findings of the study, the objective is to provide actionable recommendations for Maersk and other stakeholders in the logistics industry to enh

efficiency.
Graphs and tables basic techniques used for analysis of data
Analyze the potential risks associated with counterfeit drugs and medication errors in hospital supply chains and identify mitigation strategies.
This improved understanding could result in significant benefits for everyone involved
Introduce more innovative techniques to complement basic methods, enriching the analysis of fintech innovations' impact on traditional banking with deepe
Introduce more innovative techniques alongside basic methods to elevate the comparative study on portfolio management, enhancing the depth and relevanc
Introducing innovative problem-solving approaches is essential to address the complexities of studying the workflow in the Indian banking sector, enhancin

No outstanding innovation technique used to solve the problem


While there are some attempts at innovation, their impact on problem-solving in mutual fund performance analysis in India remains limited, suggesting a ne

The product is offered at a competitive price in the market and meets customer expectations.
Introduce innovative techniques alongside basic methods to enrich the analysis of consumer buying behavior towards financial products, enhancing depth a
To establish a culture of innovation and collaboration within the organization.

Organizations that embrace lean principles can achieve sustainable competitive advantage and business success.

To achieve significant competitive advantage by reducing overall cost of excess inventory and getting on-time deliveries of each and every p

the field of publicizing.

problem scheme in this project to deliver all the pleases in the village areas

problem to solve the protection for virtual computer and cloud security issues
students and the companies who hired them

Lack of innovation, leading to a conventional problem- solving approach.

techniques with minor attempts at innovation

Basic techniques with minor attempts at innovation.

some of the Innovative techniques are used

Lack of innovation, leading to a conventional problem- solving approach


Basic techniques with minor attempts at innovation.
Lack of innovation, leading to a conventional problem- solving approach.

Basic techniques with minor attempts at innovation.

Basic techniques with minor attempts at innovation


Some attempt at innovation, but with limited impact on problem- solving. There are two recommendations or techniques are futuristic or tech based or show

Basic techniques with minor attempts at innovation.


There are two recommendations or techniques are futuristic or tech based or shows deep reflection and integration.

Lack of innovation, leading to a conventional problem- solving approach.

Lack of innovation, leading to a conventional problem- solving approach.

Basic techniques with minor attempts at innovation.

Lack of innovation, leading to a conventional problem- solving approach.

needs to mention some innovative techniques used in various analysis phases


Needs to mention innovative tools and techniques to analyse the data for finding result
At least 3 recommendations
At least 2 recommendations
Green computing with AI is mention in the study needs to mention the problem scheme solution with various applications
At least 3 recommendations
Lack of innovation, leading to a conventional problem- solving approach
Needs to mention some innovative algorithms or tools to solve the problem scheme of the project
Basic techniques with minor attempts at innovation.
At least 3 recommendations
Metaverse is the technology to solve the data collection problem needs to focus on various advanced technology to solve the problem in the given scenario
Problem scheme solution and key factors need to mention with results
Basic techniques with minor attempts at innovation.
At least 3 recommendations
Lack of innovation, leading to a conventional problem- solving approach.
At least 3 recommendations
At least 3 recommendations
NLP and Machine learning are mentioned needs to specify which tool and technique solve the problem scheme
At least 4 recommendations

Needs to present some innovative analysis tools and techniques to solve the problem scheme
Lack of innovation, leading to a conventional problem- solving approach.
May be use AI technology, machine learning or blockchain techniques to solve the integration problem of the study
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.

Lack of innovation, leading to a conventional problem- solving approach.


May be use various statistical methods to solve the problems in the study and may be use AI or machine learning algorithms to solve the problem scheme
Basic techniques with minor attempts at innovation
Basic techniques with minor attempts at innovation.
Area of study is AI may be use to review the AI tools with innovative techniques to solve the problem scheme

Needs to present some innovative ideas and techniques to solve the problem scheme
No evidence of any innovative techniques
Needs to present innovative techniques to solve the problem in the study report, needs to present data decentralization problem with various tools and find t
Lack of innovation, leading to a conventional problem- solving approach.
Basic techniques with minor attempts at innovation.
Needs to utilize various innovative approaches or algorithm to solve the problem
Lack of innovation, leading to a conventional problem- solving approach.
Basic techniques with minor attempts at innovation
innovative Tools and techniques to solve problem needs some more points and give problem solution scheme

Some attempt at innovation, but with limited impact on problem- solving. There are two recommendations or techniques are futuristic or tech based or show
needs to specify various innovative techniques to solve the customer problem scheme with various resources
Needs to specify various tools and innovative techniques to solve the problem scheme
Lack of innovation, leading to a conventional problem- solving approach.
Lack of innovation, leading to a conventional problem- solving approach.
Needs to specify problem and give the solution for the problem scheme
Needs to present more innovative techniques and problem scheme with solution
Needs to present problem scheme and give innovative techniques

Basic techniques with minor attempts at innovation

Basic techniques with minor attempts at innovation.

Basic techniques with minor attempts at innovation.


Lack of innovation, leading to a conventional problem- solving approach

Some attempt at innovation, but with limited impact on problem- solving. There are two recommendations or techniques are futuristic or tech based or show

Basic techniques with minor attempts at innovation.

Basic techniques with minor attempts at innovation.

Lack of innovation, leading to a conventional problem- solving approach

There are two recommendations or techniques are futuristic or tech based or shows deep reflection and integration.
Needs to study on the innovative techniques like AI enabled analysis tools for the problem scheme
Needs to mention various innovative techniques to solve the problem scheme

Needs to mention the innovative techniques like AI, Machine learning or any other latest tools to solve the problem scheme
Data migration the problem scheme, needs to mention which data mainly migrate to the industry scope

At least 4 recommendations
At least 3 recommendations
Questionnaire data collection methods specified, Needs to mention innovative tools and techniques to solve the problem in the study.
Needs to mention various innovative techniques to solve the problem scheme
Needs to present various innovative technique like AI or machine learning in relevant field
This study mentioned some statistical tools to solve the problem scheme, needs to mention some innovative techniques to solve the mentioned problem
Google form data analysis was made, needs to focus on innovative techniques like AI, Machine learning algorithms to solve the problem scheme
Basic techniques with minor attempts at innovation.
Needs to mention the problem scheme with some innovative techniques to solve the problem
At least 4 recommendations
At least 4 recommendations
At least 3 recommendations
At least 3 recommendations
At least 3 recommendations
Some innovative techniques to analyse the data with the problem scheme needs to mention
key subject of the study is block chain but needs to specify current trend in analysis tools with problem scheme
Basic techniques with minor attempts at innovation.
Very basic or inappropriate techniques with no innovation.
At least 4 recommendations
At least 3 recommendations
Basic techniques with minor attempts at innovation.
At least 3 recommendations
Needs to use various innovative tools to analyse the given data for identify solution of the problems
Basic techniques with minor attempts at innovation.

Lack of innovation, leading to a conventional problem- solving approach.


The project employs basic techniques with minor attempts at innovation. Increasing the use of advanced methodologies and innovative approaches could sig

Basic techniques with minor attempts at innovation.


The project employs basic techniques with limited attempts at innovation, suggesting opportunities for exploring more creative and advanced methodologie
The project employs basic techniques with limited attempts at innovation, indicating potential for exploring more creative and advanced methodologies to e

The project lacks innovation, resulting in a conventional approach to problem-solving that may limit novel insights and solutions.
Basic techniques with minor attempts at innovation.
The analysis lacks innovation, resulting in a conventional approach to problem-solving that may limit novel insights and transformative solutions for the HD

time consuming techniques and costly tools have used for solving production management. need some other clarity about current market problems
The project shows initiative in exploring innovative approaches, but further enhancements are needed to maximize their effectiveness in solving complex pr
There is some attempt at innovation, but its impact on problem-solving is limited, indicating potential for more transformative approaches to address challen
No outstanding innovation technique used to solve the problem

Basic techniques are employed, with only minor attempts at innovation, indicating potential for further creative approaches.
The approach relies on basic techniques with occasional, modest attempts at innovation, suggesting potential for further exploration and creativity in metho
- PESTLE analysis of implementing a QMS to enhance customer satisfaction in Max Healthcare. can also include other techniques
Ensuring compliance with industry standards and regulations is also a key goal.
Utilize more advanced techniques and increase innovative approaches to strengthen the analysis of the evolution of the Indian banking sector and the risks f
To examine the current state of procurement, technology, including the benefits, challenges, and limitations of leveraging technology for procurem
was gathered from academic literature, government reports, and reputable websites.

TQM across all aspects.


Creative techniques and innovative approaches are essential for effective problem-solving in mergers and acquisitions within the Indian banking sector, driv
To decentralize CCI and bring it closer to the farms, more work still needs to be finished. Many small farmers don't know how to store their crops properly
Expand on basic techniques by introducing more innovative approaches to elevate the analysis of consumer perceptions in e-banking services between publ

The lack of innovation results in a conventional problem-solving approach, indicating the need for more creative and novel strategies to enhance the analysi
Employ more advanced techniques and introduce innovative approaches to elevate the analysis of Small Finance Banks in India, enhancing insights and rel

Basic techniques with minor attempts at innovation.


Basic techniques with minor attempts at innovation.

Basic techniques with minor attempts at innovation.


Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.

innovation.
innovation

Basic techniques with minor attempts at innovation.


Basic techniques with minor attempts at innovation.

Lack of innovation, leading to a conventional problem- solving approach.


Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
Some attempt at innovation, but with limited impact on problem- solving. There are two recommendations or techniques are futuristic or tech based or show
Lack of innovation, leading to a conventional problem- solving approach.
innovation
Some attempt at innovation, but with limited impact on problem- solving. There are two recommendations or techniques are futuristic or tech based or show
some of the Innovative techniques are used for the study

innovation

innovation
Lack of innovation, leading to a conventional problem- solving approach.
Basic techniques with minor attempts at innovation
YES
FINE
NOT COMPLETELY
FINE
FINE
IDEA IS INNOVATIVE BUT COPY AND PASTE
OK
FINE
NICE AND NEAT APPROACH
INNOVATIVE
Techniques are almost nonexistent or entirely inappropriate.
Basic techniques with minor attempts at innovation.
YES
good
Innovative techniques and approaches that make a significant difference in problem-solving. Most of the recommendations or techniques are futuristic.
The problem is approached from a fresh perspective.
Techniques that are basic with only minor innovations.
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
Strategies exhibit deep integration and reflection, are tech-based or futuristic.
Methods demonstrate deep reflection and integration and are based on futuristic technology.
The utilization of innovative methods and strategies plays a significant role in addressing problems. A minimum of four suggestions or approaches should b
Basic techniques with minor attempts at innovation
The presented suggestions include cutting-edge approaches or tactics for enhancing problem-solving, with over 4 futuristic, technology-driven, or reflectiv
Very basic or inappropriate techniques with no innovation.
Basic techniques with minor attempts at innovation.
At least three suggestions or methods are technologically oriented, futuristic, or demonstrate in-depth analysis and integration.
Simple methods with sporadic attempts at creativity.
Basic techniques with minor attempts at innovation
demonstrates significant reflection and integration.
Basic techniques with minor attempts at innovation.
Innovative techniques and approaches that significantly contribute to problem solving.
The E-commerce sites are for all types of consumers like those go for quality over money, they will get good brand options there. Those who are money mi
Very basic
innovation.
innovation.
This exploration covers various dimensions including infrastructure, environment, governance, healthcare, transportation, and public safety, based
innovation.
financial systems, and various devices remains a complex.
innovation.

solving.
nonexistent
Current techniques need to implement and analysis the project.
approach.
The data breach in itself is a crucial situation for both the customer and the company. Similar to Equifax, where the institution has suffered a lot with the fin
innovation.
The study looks for the possible risks that outsourcing entails and how they can be successfully reduced through systematic risk management method.
Invest in salable and flexible data infrastructure that can support AI and ML initiatives.
Basic techniques with minor attempts at innovation.
operations that are internal it will experiment IT’s management and control procedure.
reasons of this drop as tremendous growth in the travel industry has been recorded in recent years.
Current techniques need to implement and analysis the project.
To assess implications of emerging technology on data privacy and security considerations within IT audit
Lack of innovation, leading to a conventional problem-solving approach.
Some attempt at innovation, but with limited impact on problem-solving.
prevalent threats such as phishing, malware, ransomware, and insider treats.
Basic techniques with minor attempts at innovation.
Some attempt at innovation, but with limited impact on problem-solving
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
Lack of innovation, leading to a conventional problem-solving approach.
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation
Information technology projects involve different improvement phases involving tech and non-tech professionals' layout thinking, planning, an
Current techniques need to implement and analysis the project.
Processing is necessary to perform a task in the public interest or to carry out some official function. (e.g. You’rea private garbage collection company.)
Systematic approach is crucial for supporting the dynamic and multifaceted nature of digital change.
nonexistent.
solving.
solving.
No noteworthy innovation technique used for problem scheme in this project
Current techniques need to implement and analysis the project.
Examine the advantages of big data for risk management, encompassing compliance monitoring, fraud detection, and predictive maintenance
This improvement was reflected in more efficient incident management, streamlined change management processes, and better alignment between IT servic
solving.
innovation.
attempts at innovation.
approach.
No noteworthy innovation technique used for problem scheme
To assess accepting that there is huge difference in the perspective on pressure controlling techniques between the age get-togethers.
solving.
Identify the actions that were taken to overcome obstacles which are seen in a management system
solving.
approach.
Change management and human factors play a crucial role in ensuring a seamless transition and successful adoption of a system
Identify potential applications of these technologies to facilitate seamless integration between WMS and ERP systems
solving.
approach.
solving.
solving.
India's quickly developing fintech sector.
approach.
Formulate an extensive and meticulously structured implementation plan aimed at fortifying cybersecurity resilience
innovation.
solving.
Create a thorough plan for integrating and testing blockchain, AI, and ML technologies while making sure that it is in line with the long-term aims a
approach.
solving.
Continuous learning and development are vital for maintaining a skilled and motivated workforce.
The goal of the study is to investigate how IT helps supply chains make data-driven decisions
To evaluate the performance of selected Public and Private sector Mutual Funds.
Data collected from few methodology. but observation, secondary data analysis and case studies are needed
High-engagement platforms like Pinterest and Instagram offer substantial opportunities for brand promotion.
approach.
Learn about the problems with keeping computer systems safe when working from home, and how to reduce the chances of hackers stealing informat
innovation.
innovation.
innovation.
No noteworthy innovation technique used for problem scheme in this project
innovation.
Social Media is the current enormous popular expression in the realm of Internet Marketing, and all things considered.
innovation.
innovation.
No noteworthy innovation technique used for problem scheme in this project
innovation.
innovation.
Current techniques need to implement and analysis the project.
No noteworthy innovation technique used for problem scheme in this project
Current techniques need to implement and analysis the project.
Triveni Media should invest in advanced data integration platforms that can consolidate data from multiple IoT devices and other sources into a unified syst
To prevent unwanted access to patient data or security breaches, healthcare institutions should put authentication procedures, access controls, and e
innovation.
approach.
To provide recommendations for continuous improvement and scalability of the platform.
innovation.
Restaurants must ensure that their staff are well-trained in the usage of digital tools so that they can guide the less tech-savvy customers
Ensure the platform’s functionality and reliability as a tool for personalized education, preparing it for wider implementation and scaling.
innovation.
The significance of this study lies in its potential to provide valuable insights for financial institutions considering blockchain adoption.
Current techniques need to implement and analysis the project.
innovation.
approach.
innovation
Current techniques need to implement and analysis the project.
Current techniques need to implement and analysis the project.
innovation.
approach.
solving.
innovation.
solving.
Recent technology uses and methodology to be address clearly.
Inappropriate techniques with no innovation.
innovation.
innovation.
To ensure security and reliability in cloud-network integration.
nonexistent
Current techniques need to implement and analysis the project.
effectiveness of cloud integration in isolated perform situations.
intelligence and its possibilities.
approach.
Monitoring modifications and ensuring adherence to approval procedures.
To propose a framework for leveraging IT and ITSM to achieve sustainable growth and efficiency in financial markets.
innovation
Maintaining Human Oversight and Fostering Workforce Collaboration.
approach
Analyze if there are significant variations in consumer preferences between genders concerning the adoption of social commerce platform
approach.
characterised by a significant population of individuals lacking access to banking services or experiencing limited access.
Identify areas for improvement in enhancing customer engagement.
innovation.
The final contribution proposed is to design, develop and demonstrate a risk management framework using AI tools for the financial applications.
innovation
approach.
innovation.
To analyze the Impact development slippage on overall product quality in Agile Projects.
To analyses laws and regulations have influenced the development of digital payments both during and after the pandemic.
innovation.
Current techniques need to implement and analysis the project.
Current techniques need to implement and analysis the project.
innovation.
innovation.
innovation.
innovation.
Current techniques need to implement and analysis the project.
It discusses the implications of these findings for banking institutions and offers recommendations for the future adoption and implementation of AI t
Perceived Stress Scale is found to be a reliable instrument for measuring stress intensity among defense personnel.
This study will explore the best practices and technologies that can be implemented to achieve this balance, ensuring that organizations can enjoy the benef
established social media marketing company based in India
Recent technology uses and methodology to be address clearly.
solving.
Basic techniques with minor attempts at innovation.
Blockchain technology has emerged as a potential answer to the need for more efficient and secure means to conduct transactions brought about b
and processes.
A global perspective, examining the use of collaboration tools in different regions, with a focus on understanding regional preferences and challenges.
Very basic or inappropriate techniques with no innovation.
Very basic or inappropriate techniques with no innovation.
Basic techniques with minor attempts at innovation
Basic techniques with minor attempts at innovation.
The scope of the project encompasses a comprehensive evaluation and optimization of the IT service management at JP Morgan
By automating business processes and reducing the need for manual entry, ERP systems increase efficiency and reduce the likelihood of errors.
This project aims to provide a comprehensive exploration of predictive analytics, covering various methodologies, algorithms, and applications across diffe
Real-time monitoring of privileged sessions enables organizations to detect and respond to suspicious activities promptly, mitigating the risk of insider threa
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation
Basic techniques with minor attempts at innovation.
Current techniques need to implement and analysis the project.
helps to reduce reliance on fossil fuels and reduces carbon footprint
YES
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
GOOD

Basic techniques with minor attempts at innovation.


YES
Creative techniques or approaches that enhance problem - solving. Three suggestions or methods demonstrate in-depth contemplation and integration and a

Basic techniques with minor attempts at innovation.


Strong understanding of the subject with clear conceptualizati on
techniques are futuristic or tech based or shows deep reflection and integration.
Basic techniques with minor attempts at innovation
- solving approach
YES

Basic techniques with minor attempts at innovation.


yes
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
YES
Basic techniques with minor attempts at innovation.
ok
Basic techniques with minor attempts at innovation.

ok
No evidence of any innovative techniques.
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
It is also necessary to collect data systematically and store all the gathered data on a special SQL base on Google Cloud to work only with unified data.
solving.
nonexistent
IT service desks serve as the frontline support mechanism, providing users with assistance, troubleshooting, and resolution of ITrelated.
innovation.
to adjust to emerging circumstance
innovation.
Project execution summary is need to give more information of implementation of project
Determining the key factors influencing online buying behavior of consumers in India.
such as automation, predictive analytic, and natural language processing, to optimize processes and enhance performance.
Investigating the role of emerging technologies such as artificial intelligence, augmented reality, and blockchain in enhancing social media analy
of action for the user to take in future.
approach.
a conducive digital ecosystem.
innovation.
Description of comprehensive IoT details for policymakers, industrial management, and tech-fanatic to deep delve into the IoT landscape
opportunities, and barriers.
solving.
Current techniques need to implement and analysis the project.
Recent technology uses and methodology to be address clearly.
innovation.
innovation
Current techniques need to implement and analysis the project.
Concerns about data security and confidentiality include slowing industrial adoption of Green Cloud processing.
innovation
innovation.
Analyze existing literature and research findings to contextualize the findings within the broader domain of cyber security awareness.
No noteworthy innovation technique used for problem scheme
nonexistent
Businesses should keep their systems secure, and customers should do the same. More customers will willingly adopt digital payment methods when they a
nonexistent
Very basic
techniques.
innovation.
innovation.
innovation.

Some attempt at innovation, but with limited impact on problem- solving

Basic techniques with minor attempts at innovation

Some attempt at innovation, but with limited impact on problem- solving


Some attempt at innovation, but with limited impact on problem- solving.

Basic techniques with minor attempts at innovation.

Some attempt at innovation, but with limited impact on problem- solving


Some attempt at innovation, but with limited impact on problem- solving.
Basic techniques with minor attempts at innovation.

Basic techniques with minor attempts at innovation


Some attempt at innovation, but with limited impact on problem- solving

Some attempt at innovation, but with limited impact on problem- solving


To conduct an innovative and comprehensive competition analysis of the construction chemicals industry in India, you can adopt a variety of advanced tech
Some attempt at innovation, but with limited impact on problem- solving.
Basic techniques with minor attempts at innovation.
Problem Scheme for structured questionnaires to gather data on organizational outsourcing practices before and after the adoption of cloud computing. Stati
Basic techniques with minor attempts at innovation
Basic techniques with minor attempts at innovation
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation
Basic techniques with minor attempts at innovation.
This helps identify distinct consumer groups with specific needs and preferences.
Utilize AI-powered simulation and modeling tools to create virtual prototypes, test product variations, and simulate R&D scenarios.
These innovative techniques and approaches can complement traditional ITIL 4 implementation strategies, fostering creativity, engagement, and effectivene
The emerging trends and techniques in the cybersecurity were identified in the study to solve the issues and threats in banking
Some attempt at innovation, but with limited impact on problem- solving.
Ramifications and Dissecting were used in the analysis of data approaching to problem scheme
Some attempt at innovation, but with limited impact on problem- solving.
Basic techniques with minor attempts at innovation
The perspective and predictive analysis were used in the study for providing better solutions in the BI
The innovative techniques were used well in obtaining the feasible solution to the chosen problem
Lack of innovation leading to a conventional problem-solving approach.
A few attempts at innovation made by the student, but not much of an influence on problem-solving.

Student tried a little bit to use creative methods to problem scheme.


Student made little innovative effort, but not much of an influence on problem.

Creative techniques that enhance problem-solving.


Student tried a little bit to use creative methods to problem scheme.

Student tried a little bit to use creative methods to problem scheme.

Techniques are almost entirely inappropriate.

Very basic techniques with no innovation


Other subject file
Some attempt made for innovation but with limited impact on problem-solving.
Other subject file
Student tried a little bit to use creative methods to problem scheme.
Other subject file
Few attempts at innovation, but not much of an influence on problems.

Student made little innovative effort, but not much of an influence on problem.

A little innovative effort made by the student but not much of an influence on problem.

Student uploaded assignment questions with answers.

Some attempt at innovation, but with limited impact on problem- solving.


Some attempt at innovation, but with limited impact on problem- solving.

Basic techniques with minor attempts at innovation


Some attempt at innovation, but with limited impact on problem- solving.

Innovative techniques of the project is Data Security and Privacy Concerns.

dаtа is principаlly unknоwn аnd thе sаmе rеsоurcе mаy bе аssignеd tо multiplе usеrs.
knowing that their performance is being monitored and evaluated regularly
technologies enable robots to understand and respond to human language, allowing for more intuitive and conversational interactions.
explore the relationships between work-life balance initiatives and employee retention.
centralized repository of data aimed at supporting decision-making processes within an organization.

method is applied.

lives, although many people are unaware of its presence.


A little innovative effort, but not much of an influence on problem.
optimizes the testing process, identifying the most critical paths and potential points of failure.
Innovative techniques e survey, majority of people always checks the review of product.
Creative techniques or approaches that enhance problem-solving.
Innovative techniques Security is another paramount concern.
Basic techniques with minor attempts at innovation.
features, ensuring it remains user-friendly and capable of handling increasing transaction volumes.
Basic techniques with minor attempts at innovation.
actually genuine.
A few attempts at innovation, but not much of an influence on problem-solving.
Some attempt made at innovation but with limited impact on problem-solving.

Some attempt made at innovation, but with limited impact on problem-solving.


Other subject file
Innovative techniques Specific security policies may be drawn up at each BHEL unit to support the Corporate Information System Security Policy.
Other subject file
Innovative techniques e incident exposes the unethical effects of bias in AI hiring systems.
contributed many technologies to the society which include Aircraft technology.
Other subject file

Basic techniques with minor attempts at innovation.


Student made little innovative effort, but not much of an influence on problem.
Basic techniques with minor attempts at innovation.

Innovative techniques to problem scheme that enhance problem-solving.


Some attempt at innovation made, but with limited impact on problem-solving

Student made little innovative effort, but not much of an influence on problem.

Basic techniques with minor attempts at innovation.

Lack of innovation leading to a conventional problem-solving approach.


Student tried a little bit to use creative methods to problem scheme
Student tried a little bit to use creative methods to problem scheme.

Student made little innovative effort, but not much of an influence on problem.

Student made a few attempts at innovation, but not much of an influence on solving problems.
Student tried a little bit to use creative methods to problem scheme.

Student tried a little bit to use creative methods to problem scheme.


Student tried a little bit to use creative methods to problem scheme.

A little innovative effort made by the student, but not much of an influence on problem.
A little innovative effort made by the student, but not much of an influence on problem.

Other subject file


he gig economy, Micro, Small, and Medium Enterprises can quickly fulfil work requirements with a PAN India presence without the need to invest time an
pack in terms of the highest potential returns

implementing Green processing practices.


overhead, increased collaboration, scalability, flexibility, and cost savings.
more actually and effectively

identifying new revenue building opportunities

information can be defined as the data compiled specifically and initially when it comes to research
Innovative techniques of the project is generally speaking, 37% of individuals who didn't think the Dark Belt was beneficial were ignorant of the amazing o

previous work.
of the survey data, revealing key insights into user perceptions of chatbot effectiveness
methods. Each method has various implementations, and integrations, processes, for detection.

implemented to enhance interactions with customers.


Innovative techniques of the project The Internet of Things (IoT) has the power to create a smarter and more connected world of commerce.

Innovative techniques of the project analyze the demand of the hospital market.
cryptographic signal of the previous block, creating a secure chain.

Innovative techniques is financial sector, credit risk analysis and management hold particular significance for banks and financial institutions that serve reta
higher for PG group with highest qualification.
Creative techniques or approaches that enhance problem- solving.
Some attempt at innovation, but with limited impact on problem- solving.
Some attempt at innovation, but with limited impact on problem- solving.

Some attempt at innovation, but with limited impact on problem- solving.


Some attempt at innovation, but with limited impact on problem- solving.

Some attempt at innovation, but with limited impact on problem- solving.

Some attempt at innovation, but with limited impact on problem- solving

Basic techniques with minor attempts at innovation

Some attempt at innovation, but with limited impact on problem- solving.

Some attempt at innovation, but with limited impact on problem- solving.

Basic techniques with minor attempts at innovation.

Some attempt at innovation, but with limited impact on problem- solving.


Basic techniques with minor attempts at innovation.

Some attempt at innovation, but with limited impact on problem- solving

Some attempt at innovation, but with limited impact on problem- solving

Basic techniques with minor attempts at innovation.

Basic techniques with minor attempts at innovation

Some attempt at innovation, but with limited impact on problem- solving.


Lack of innovation, leading to a conventional problem- solving approach
Some attempt at innovation, but with limited impact on problem- solving.
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.

Some attempt at innovation, but with limited impact on problem- solving


Basic techniques with minor attempts at innovation.
Some attempt at innovation, but with limited impact on problem- solving.

A little innovative effort, but not much of an influence on problem.


Other subject file.
Wipro's policy is to comply fully with all laws and regulations that apply to government contracting and transactions
The paper is structured to understand the innovations taking place in the Indian Banking Sector. It also highlights the benefits and challenges
Other subject file
The CIA triad refers to an information security model made up of the three main components: confidentiality, integrity and availability.
A little innovative effort made by the student, but not much of an influence on problem.
Other subject file
This research is just to give an architectural approach to migrate in the context of COBOL systems to Java through XML.
An active social media presence enhances how people view a brand. Posting positive customer reviews, feedback, and testimonials can boost e-commerce c
Student tried a little bit to use creative methods to problem scheme.
Student tried a little bit to use creative methods to problem scheme.
Copy case(Course book)
Student tried a little bit to use creative methods to problem scheme.
The study was conducted to assess the job satisfaction needs of the employees in major Information Technology companies.
Other subject file
A little innovative effort made by the student, but not much of an influence on problem.
It aims to revolutionise the way transactions are conducted in India, making them faster, more secure and convenient.
Innovation management is simply the process of coming up with and introducing new things and developing the business, one way or the other
Blockchain can be used to increase the security and transparency around the sharing of customer data
A little innovative effort made by the student, but not much of an influence on problem.
The purpose of this paper is to discuss digital transformation and its four trajectories – digital technology, digital strategy, customer experience
Other subject file

It involves comparing a company’s financial performance and key metrics with its industry peers. This allows investors to identify companies that exhibit s
A little innovative effort made by the student but not much of an influence on problem.
A little innovative effort made by the student, but not much of an influence on problem.
It can automate and enhance CRM processes, leading to smarter and more efficient customer interactions. AI also offers personalized customer interactions
Other subject file
One of the primary roles of technology in HRM is automating various HR processes. Tasks like payroll processing, attendance tracking, and benefits admin
A little innovative effort made by the student, but not much of an influence on problem.

AI and generative AI provide Indian banks with the opportunity to create an evolving banking ecosystem while meeting expanded risk management
consumer behavior changes in four main ways: by creating new value propositions, by influencing preferences and expectations, by enabling new forms of
Student tried a little bit to use creative methods to problem scheme.

A little innovative effort, but not much of an influence on problem.

No evidence of any innovative techniques.


Techniques are almost nonexistent

Inappropriate techniques with no innovation

The innovative techniques are good but could improve more


Basic techniques with minor attempts at innovation.

The innovative techniques are good but could improve more


Inappropriate techniques with no innovation
Basic conclusions drawn, with some gaps in support or clarity.
Basic techniques with minor attempts at innovation.
Lack of innovation, leading to a conventional problem solving approach.

No evidence of any innovative techniques.


The qualitative analysis is effective but require some theme identification

Techniques are innovative but require to improve in some areas

Basic techniques with minor attempts at innovation.


Basic techniques with minor attempts at innovation.

The innovative techniques are good


Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.

Lack of innovation, leading to a conventional problem solving approach


Basic techniques with minor attempts at innovation.

Basic techniques with minor attempts at innovation.


Basic techniques with minor attempts at innovation.
The innovative techniques are good but could improve more

Basic techniques with minor attempts at innovation.


The study's innovative techniques are somewhat predictable but could need more originality
Basic techniques with minor attempts at innovation.

Basic techniques with minor attempts at innovation.

In this study consistently demonstrates a creative and innovative approach to problem solving.
Innovative techniques/approach to problem scheme is clear and concept
This study has a proven ability to turn innovative ideas in to successful projects that deliver tangible results are required more informations
This study has a proven ability to turn innovative ideas in to successful projects that deliver tangible results.
in this study consistently demonstrates a creative and innovative approach to problem solving
Many new trending techniques like AI, Blockchain has been used as innovative techniques.
Deep learning, Machine learning and AI-driven marketing are used as innovative techniques
Questionaries' were asked by interview and analyzed
Better innovative techniques to be provided with latest techniques
innovative technique is provided through cloud risk management

This project is essential to strike a balance between innovation and ethical considerations in order to harness the full potential of AI for the benefit of societ
In this study consistently demonstrates a creative and innovative approach to problem solving.
In this study consistently demonstrates a creative and innovative approach to problem solving.

This study has a proven ability to turn innovative ideas in to successful projects that deliver tangible results.
Basic technique with minor approach to solve the problem

Lack of innovation techniques used to approach the problem


Creative techniques are used to enhance the problem

Creative techniques and approach to solve the problem

Creative techniques are used to enhance the problem

Basic techniques are used to approach the problem


Basic techniques with minor attempts at innovation.
some innovative technique was used but limited problem solving

basic and minor innovations are presented instead should use most innovative techniques

USE SOME INNOVATIVE TECHNIQUES FOR YOUR RESEARCH PROBLEM


used some additional techiniques for your problems
need some innovative techniques for your study
good innovative techniques to be used
creative techniques are used to enhance the problem
used some other innovative tools for your study
Lack of innovation technique which lead to problem solving approach
Creative techniques that enhance the problem solving
Limited innovative techniques are used to approach solve the problem

used more adequate technique used in your study

management efficiency.
Problem solving has been approach through questionnaires asked with customer

used good innovative tools in this study


Interpreted data with table and charts

suitable techniques to be used

techniques to acquire a comprehensive knowledge of ITSM adoption at Blinkit.


Quantitative and qualitative analysis is used
Current trends & analysis are used
using innovative techniques based on your objective
decoy ideas innovation, that individuals came to contact Fog computing is mentioned as technique employed
edge computing, hybrid cloud architectures, artificial intelligence-driven optimization methods, and other technologies that will shape the future of cloud co
limited impact on problem solving
clear and innovative techniques are used
using various innovative tools in this study

Basic techniques with minor attempts at innovation.


improve innovative technique for research problem
Interpretation are done through tables and charts
Data interpretation done through charts
INSUFICIENT TOOLS BASED ON YOUR OBJECTIVE

using more innovative techniques for problem solving

more adequate innovative techniques are added in your study


Some attempt at innovation, but with limited impact on problem solving.
Bar chart is used as analytic technique
Platforms and Tools in big data are discussed
Interpretation done through charts and tables
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation
Interpretation are done through tables and charts

BaTo more sic techniques with minor attempts at innovation.

Basic techniques with minor attempts at innovation.

Some attempt at innovation, but with limited impact on problem-solving


Basic techniques with minor attempts at innovation.
use more innovative tools for analysing the data
ability to turn innovative ideas in to successful projects that deliver tangible results.

This study has a proven ability to turn innovative ideas in to successful projects that deliver tangible results.
In this study consistently demonstrates a creative and innovative approach to problem solving.

the problemn solving of project approach to problem scheme is good response


add some more key concept of nnovative techniques/approach to problem scheme

In this study consistently demonstrates a creative and innovative approach to problem solving

study consistently demonstrates a creative and innovative approach to problem solving

In this study consistently demonstrates a creative and innovative approach to problem solving.
add more ideas of back ground of this study helps to understanding of the subject and concept of the key areas.
study has a proven ability to turn innovative ideas in to successful projects that deliver tangible results.

technologies and services

Some attempt at innovation, but with limited impact on problem-solving.


Lack of innovation, leading to a conventional problem-solving approach.

Some attempt at innovation, but with limited impact on problem-solving


apply more innovative techniques for problem solving
use more innovative tools for anal;ysis of data
Creative techniques or approaches that enhance problem solving.
Some attempt at innovation, but with limited impact on problem-solving.
Some attempt at innovation, but with limited impact on problem-solving.

Basic techniques with minor attempts at innovation.


Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
use more innovative techniques for problem solving
Lack of innovation, leading to a conventional problem-solving approach.
Lack of innovation, leading to a conventional problem-solving approach.
Basic techniques with minor attempts at innovation.
use more innovative techniques for problem solving
Basic techniques with minor attempts at innovation.
use appropriate techniques for problem solving
strong innovative technique is used for problem solving
Basic techniques with minor attempts at innovation.

adopt more and innovative tecniques are used for problem soling
Basic techniques with minor attempts at innovation.

Basic techniques with minor attempts at innovation.


Basic techniques with minor attempts at innovation.

Some attempt at innovation, but with limited impact on problem-solving.


use more innovative techniques are used based on your objectives
Some attempt at innovation, but with limited impact on problem-solving.
Very basic
Basic techniques with minor attempts at innovation.
Lack of innovation, leading to a conventional problem-solving approach.

Techniques are almost entirely inappropriate


use various innovative tools for problem solving
Lack of innovation, leading to a conventional problem-solving approach.
Some attempt at innovation, but with limited impact on problem-solving.
more innovative tools are used for based on objectices
various innovative techniques was used based on objectives
The innovative techniques are potential further may need to systematic in its approach

The project shows innovative elements but need to thorough in its analysis
The innovative techniques are good but may require further explanation
The innovative techniques are good but could improve more
The innovative techniques are good but could improve more
No evidence of any innovative techniques.
Lack of innovation, leading to a conventional problem-solving approach

Basic techniques with minor attempts at innovation.


Basic techniques with minor attempts at innovation.

Basic techniques with minor attempts at innovation.


use more innovative tools for problem solving
need to use innovative tools to problem solving
Lack of innovation, leading to a conventional problem-solving approach.

Basic techniques with minor attempts at innovation.


Some attempt at innovation, but with limited impact on problem- solving.
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.

Basic techniques with minor attempts at innovation.


Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.

Some attempt at innovation, but with limited impact on problem-solving.


approaches that enhance problem-solving
Lack of innovation, leading to a conventional problem-solving approach.

Lack of innovation, leading to a conventional problem-solving approach.


Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.

Basic techniques with minor attempts at innovation.

Basic techniques with minor attempts at innovation.


Basic techniques with minor attempts at innovation.

Basic techniques with minor attempts at innovation.

Some attempt at innovation, but with limited impact on problem- solving. There are recommendations or techniques are futuristic or tech based or shows de

Basic techniques with minor attempts at innovation.


Basic techniques with minor attempts at innovation.

Lack of innovation, leading to a conventional problem-solving approach.


Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
Lack of innovation, leading to a conventional problem- solving approach.
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.

Very basic or inappropriate techniques with no innovation.


Basic techniques with minor attempts at innovation.

Basic techniques with minor attempts at innovation.


The dataset is then split into training, validation, and test sets to ensure robust evaluation of segmentation algorithms.
The purpose of these case studies is to provide examples of cloud computing solutions and best practices that have been effectively implemented in the real

management based on the analysis of data and literature review.


Very basic or inappropriate techniques with no innovation.
Basic techniques with minor attempts at innovation.

Basic techniques with minor attempts at innovation.


Basic techniques with minor attempts at innovation.
Data was turned into knowledge by means of manual scrutiny, analysis and interpretation.
Create comprehensive ethical guidelines for AI use in digital marketing, incorporating input from industry experts, ethicists, and consumers.
Continuously assess and refine gratification elements based on usage patterns and learner feedback to optimize engagement.

Some attempt at innovation, but with limited impact on problem-solving.

Basic techniques with minor attempts at innovation.


Basic techniques with minor attempts at innovation.
Some attempt at innovation, but with limited impact on problem-solving.
Very basic or inappropriate techniques with no innovation.
Basic techniques with minor attempts at innovation.
The process begins with gaining an awareness of the intended outcomes, continues with identifying the typical challenges and roadblocks to achieving thos

Basic techniques with minor attempts at innovation.


They have need Innovative techniques approach to problem scheme

Analyzing the strategic implementation of cloud computing solutions involves examining various aspects such as the business objectives, technological req
personalisation across diverse channels like email, social media, mobile messaging, and advertising.
Basic techniques with minor attempts at innovation.
Creative techniques or approaches that enhance problem-solving.

Semi-structured interviews with 10 selected participants from the survey group to gain deeper insights.
Basic techniques with minor attempts at innovation.
Depending on the type of data and the goals of the study, researchers use a variety of analytical methods, such as descriptive statistics, inferential statistics,
work and therefore organizations take on exercises which guarantee help in the sustenance of a solid local area
This segment presents the data analysis, results, and understanding. Dependability and legitimacy are attempted to comprehend the effect of the made meas
Design and evaluate a security assessment system for security examination past the structure level for instance Plan, appraisal and assessment of a fragment
Basic techniques with minor attempts at innovation.
The reasonable framework researches the effect of versatile work plans, family-obliging techniques, and solid hierarchical social orders in improving work-

Basic techniques with minor attempts at innovation.


The main data source can be built-up by getting ready surveys in accordance of reliant variable and variables that are independent.
It is the responsibility of those who create the material to produce content that is current,interesting, and appropriate for use across a variety of digital platfo
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
The digital transformation driven by these technologies has brought about significant improvements in efficiency and connectivity
Some attempt at innovation, but with limited impact on problem-solving.

framework that relies heavily on historical perspective

The various debenture holders of the corporate sector are protected by the mortgage of the assets
Data centers and IT infrastructures can drastically cut their energy usage by putting these strategies into practice, which will save operational expenses and
The data sources which can be referred to when preparing a research study project can be classified into three major types
OK
fine
INNOVATION
fine
Basic techniques with minor attempts at innovation.
OK
Basic techniques with minor attempts at innovation.
few may be presented
no properly presented
Very basic or inappropriate techniques with no innovation.
yes
Basic techniques with minor attempts at innovation.
Some attempt at innovation, but with limited impact on problem solving. At least 2 recommendations or techniques are futuristic or tech based or shows de
fine
Some attempt at innovation, but with limited impact on problem solving. At least 2 recommendations or techniques are futuristic or tech based or shows de
Some attempt at innovation, but with limited impact on problem solving. At least 2 recommendations or techniques are futuristic or tech based or shows de
Creative techniques or approaches that enhance problem solving. At least 3 recommendations or techniques are futuristic or tech based or shows deep refle
no
Techniques are almost nonexistent or entirely inappropriate.
Highlevel techniques or approaches that enhance problem solving.
Innovative techniques and approaches that significantly contribute to problem solving. At least 4 recommendations or techniques are futuristic or tech base
recommendations or techniques are futuristic or tech based or shows deep reflection and integration
: Establishes an innovative culture within the teams responsible for data science and marketing
bias and increasing the generalization of the findings.
Very basic or inappropriate techniques with no innovation
Some attempt at innovation, but with limited impact on problem solving. At least 2 recommendations or techniques are futuristic or tech based or shows de
Some attempt at innovation, but with limited impact on problem solving. At least 2 recommendations or techniques are futuristic or tech based or shows de
industry
Creative techniques or approaches that enhance problem solving. At least 3 recommendations or techniques are futuristic or tech based or shows deep refle
Basic techniques with minor attempts at innovation.
A reliable database system ensures data integrity by maintaining data accuracy, consistency, and reliability.
From the various conducted tests, we found that most of the independent factors helping employee engagement in the organization
Creative techniques or approaches that enhance problem solving. At least 3 recommendations or techniques are futuristic or tech based or shows deep refle
Innovative techniques and approaches that significantly contribute to problem solving. At least 4 recommendations or techniques are futuristic or tech base
Some attempt at innovation, but with limited impact on problem solving. At least 2 recommendations or techniques are futuristic or tech based or shows de
Detailed data analytics, business pattern analysis, and market research provide the basis for many business choices, including investment decisions.
Process and encourages accurate and clear documentation. There were two sections to the questionnaire. The purpose of the first section was to gather gene
Innovative techniques and approaches that significantly contribute to problem solving. At least 4 recommendations or techniques are futuristic or tech base
At least 3 recommendations or techniques are futuristic or tech based or shows deep reflection and integration.
AI applications in healthcare include diagnostic tools, personalized treatment regimens, and advanced data analytics.
Project scheduling is a mechanism to communicate what tasks need to get done and which organizational resources will be allocated to complete those task
Developing a coding scheme based on the research objectives and literature review to categorize and analyze the content of expert interviews a
At least 2 recommendations or techniques are futuristic or tech based or shows deep reflection and integration.
At least 3 recommendations or techniques are futuristic or tech based or shows deep reflection and integration.
Real-time monitoring helps businesses identify and react to scans and display the result
Information systems gain their importance by handling the data from organization contributions to generate information that is valuable for managing t
Some attempt at innovation, but with limited impact on problem solving.
he current research work is based on descriptive research methodology, wherein the study isdone on the secondary data available through different existing
Innovative techniques and approaches that significantly contribute to problemsolving
De materialization has significantly reduced fraud and increased the efficiency of transactions.
T enables businesses to gather real-time feedback from customers through surveys, ratings, and reviews.
summarize responses about different demographic factors, including years of software development experience and organizational roles.
Creative techniques or approaches that enhance problem solving
Some attempt at innovation, but with limited impact on problem solving
Big Data projects involve a diverse array of data types and sources, and the quality and consistency of this data can vary greatly.
Users can easily access information about the services available to them, enabling them to make informed choices based on their specific needs and prefere
Some attempt at innovation, but with limited impact on problem solving.
Creative techniques or approaches that enhance problem solving
and its influence on SME operations by constructing the questionnaire in this manner.
environments and methodologies. Customization algorithms allowed for fine-tuning based on specific project needs.
Basic techniques with minor attempts at innovation
Basic techniques with minor attempts at innovation.
After Client creation as per the customers requirement and suitability of the customer income and premium they can pay the insurance product is selected a
Basic techniques with minor attempts at innovation.
Since most of the customers, does not know how AI will work on their platform, and no transparency among customers
quantities
The collected data was rigorously analyzed to measure the impact of the introduced project management tools and methodologies on team performance and
Basic techniques with minor attempts at innovation
Descriptive statistics are used to summarize quantitative data collected from ITSM systems and chat bot interactions.
Some attempt at innovation, but with limited impact on problem solving.
Innovative techniques and approaches that significantly contribute to problem solving
Creative techniques or approaches that enhance problem solving
Creative techniques or approaches that enhance problem solving.
Some attempt at innovation, but with limited impact on problem solving.
The development is the accountability of the individual, supported and assisted by the organization.
Creative techniques or approaches that enhance problem solving.
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.

At least two recommendations or strategies are futuristic, technology-based, or demonstrate profound contemplation and integration.
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
innovative technique have ben presented to analyze the problem
FEW TECHNIQUE UTILIZED ARE VERY UNIQUE AND SOME ARE REGULAR
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
SOME OLDER TECHNIQUE HAVE BEEN PRESENTED TO SOLVE THE PROBLEM
SOME WHAT NEW TECHNIQUE PRESENTED TO ANALYSE THE PROBLEM
Basic techniques with minor attempts at innovation.
reflection and integration.
TECHNIQUES UTILIZED ARE VERY SUBERB THAT EASILY SOLVE THE PROBLEM SCHEME
Lack of innovation, leading to a conventional problem - solving approach.
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation
Basic techniques with minor attempts at innovation.
innovative technique but may be presented with graph
Lack of innovation, leading to a conventional problem solving approach
few techniques are innovative that solves the problem considered
Basic techniques with minor attempts at innovation
NOT OMPLETELY PRESENTED
Lack of innovation, leading to a conventional problem solving approach.
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation
Basic techniques with minor attempts at innovation
Very basic or inappropriate techniques with no innovation.
Basic techniques with minor attempts at innovation.
YES
YES
Basic techniques with minor attempts at innovation.

Basic techniques with minor attempts at innovation.

Basic techniques with minor attempts at innovation.


Basic techniques with minor attempts at innovation.

To evaluate the future growth potential of the mutual fund industry in India, considering demographic shifts, economic trends, and regulatory changes.
To review existing regulatory guidelines and standards related to credit risk management.
Basic techniques with minor attempts at innovation.
solving. worth of problems in merger points
Basic techniques with minor attempts at innovation.
innovation
Measuring and analyzing data enables organisations to improve client , hone their strategy, and allocate resources more effectively

Some attempt at innovation, but with limited impact on problem-solving.


more attempt at present innovation, some limited impact on problem solving to get more solving the objective oriented
Some the project on problem-solving techniques are updated or tech based or shows deep reflection and integration
exposure risks through regulating the firms financial position the finding about the problem scheme
integration.
In this research work was finished in an exceptionally systematic and logical way, so the genuine outcomes may be accomplished and for that reason each s
Outsourcing information technology may be done using a variety of different methods, as shown by the case studies that were carried out in the banking, he
Creative techniques or approaches that enhance problem-solving.
AI has expanded the reach of financial services, fostering economic empowerment and social development.
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
integratio
The research adheres to ethical guidelines outlined by institutional review boards and professional associations, and measures are taken to minimize potenti
Creative techniques or approaches that enhance problem-solving.
the problem scheme are to get a affordable result

Project used more technical advantage preventing error but some of net adoption needed
The problems solving required some more concentration
Only following percentage analysis more technical portion to be use
Basic techniques with minor attempts at innovation.

Few more technical advantage of retrieving answer is required


Lack of innovation, leading to a conventional problem-solving approach.
Very basic or inappropriate techniques with no innovation.
Basic techniques with minor attempts at innovation.
More usages of advance tools to simplify work are suggesting
Creative techniques or approaches that enhance problem-solving.

The project may use a more advanced tools to a accuracy

Basic techniques with minor attempts at innovation.


The collection data interpretation is few consider accuracy
The technical portion to be more needed
Basic techniques with minor attempts at innovation.
Some the project on problem-solving techniques are updated or tech based or shows deep require and integration
Innovative techniques to problem scheme that enhance problem-solving and increase scope
Basic techniques with minor attempts at innovation.
Lack of innovation, leading to a conventional problem-solving approach.

Creative techniques or approaches that enhance problem solving


Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation.
Lack of innovation, leading to a conventional problem solving approach.
Basic techniques with minor attempts at innovation.
Some attempt at innovation, but with limited impact on problem solving
The meaning purported to lower barriers to entry, as infrastructure is normally offered by a third-party and does not need to be obtained for on
Basic techniques with minor attempts at innovation.
Basic techniques with minor attempts at innovation
Creative techniques or approaches that enhance problem solving.
Innovative techniques and approaches that significantly contribute to problem solving
To measure the effectiveness of their social media ad campaigns, advertisers can employ various metrics and techniques.
Basic techniques with minor attempts at innovation.
AI algorithms can process vast amounts of social media data to gauge public sentiment towards brands, products, or services.
A document proposing implementation methods of innovation activity programs, resulting in creation of new or significantly improved products, technolog
Some attempt at innovation, but with limited impact on problem solving.
This phase will provide youth requirement analysis with answers for why an ERP system is required and for what goals.
Some attempt at innovation, but with limited impact on problemsolving.
Some attempt at innovation, but with limited impact on problem solving
Ensure continuous improvement in customer experience management through process & product innovation, analytics, automation, new age service parame
The blockchain innovation has grown to be the subject of extensive research across companies, also the testing of the number of application cases
This information allows us to identify target demographics for promotional campaigns and user engagement initiatives, as well as areas for improvement an
would aid in modifying the marketing strategies are good .
their experiences in detail

Some attempt at innovation, but with limited impact on problem solving


Basic techniques with minor attempts at innovation.
A structured survey was distributed to a larger sample of Google employees to gather quantitative data on their perceptions of ITIL implementation.
Very basic or inappropriate techniques with no innovation.
Describe the main departments or functions of a business organization.
Basic techniques with minor attempts at innovation.
Q6 Remarks

Conclusion is weak

Clear conculsion is drawn from.data analysis

Clearly conculded
Sufficient conclusion
Conculsion is sufficient
Basic conclusion
Basic conclusion
Conclusion is weak

Basic conclusions drawn, with some gaps in support

Conclusion is adequate
Clear conclusion
Adequate conclusion

Very basic conclusion


Conclusion are adequate through few aspects may be

Conclusion is adequate

Conclusion is enough

Conclusion is not drawn

Basic conclusions drawn, with some gaps in support or clarity.


No evidence
Conclusions are evident, though some aspects may be less thoroughly addressed.
Conclusion are minimum
Basic conclusions drawn, with some gaps in support or clarity.
Conclusions are drawn with basic
Conclusion drawn with basic concepts

Conclusions are evident, though some aspects may be less thoroughly addressed.
Conclusions are evident, though some aspects may be less thoroughly addressed.

Clear conclusion drawn from data analysis


Adequate Conclusion derived from the data analysis

Basic conclusions drawn, with some gaps in support or clarity.

Conclusions are evident, though some aspects may be less thoroughly addressed.

Basic conclusion is drawn from the theoretical presentation


Conclusions drawn are sufficient
Clear and supported conclusions derived from the analysis.
Clear conclusion drawn
Conclusions drawn is very minimum
Conclusion is derived from the analysis in clear
Conclusions covered all aspect of finding
Conclusions drawn is minimum

Clear conclusion drawn from analysis


The conclusions of the study are well presented

Clear and supported conclusions derived from the analysis.


Clear and supported conclusions derived from the analysis.
The conclusions are clearly linked to the objectives and also informative
The conclusions are clearly linked to the objectives and also informative
The conclusion are good but need to be more specific
The conclusion are good but need to be more specific
Basic conclusions drawn, with some gaps in support or clarity
Clear and supported conclusions derived from the analysis.
The conclusions are clearly linked to the objectives and also informative

Basic conclusions drawn, with some gaps in support or clarity


The conclusions are clearly linked to the objectives and also informative

Clear and supported conclusions derived from the analysis.


The conclusions are clearly linked to the objectives and also informative
strong conclusions are needed for based on objectives
Conclusions are evident, though some aspects may be less thoroughly addressed.
Conclusion are nearly absent
Clear and supported conclusions derived from the analysis

Conclusion are appropriate with objectives of the study


Clear and supported conclusions derived from the analysis.
Conclusion are generally good

The conclusion are good but need to be more specific

Clear and supported conclusions derived from the analysis.


Clear and supported conclusions derived from the analysis.
Conclusions are weak, lacking necessary support or coherence.
The conclusion are good but need to be more specific
Basic conclusions are drawn
The conclusions are clearly linked to the objectives and also informative
The conclusions are clearly linked to the objectives and also informative

The conclusions are clearly linked to the objectives and also informative
The conclusion are good but need to be more specific
The conclusion are good but need to be more specific
The conclusion are good but need to be more specific
The conclusions are clearly linked to the objectives and also informative

The conclusions are clearly linked to the objectives and also informative

The conclusions are clearly linked to the objectives and also informative
The conclusions are clearly linked to the objectives and also informative

The conclusion are good but need to be more specific


The conclusions are clearly linked to the objectives and also informative
the study provides clear conclusion from the analysis
The conclusion are good but need to be more specific
The conclusion drawn from this analysis are clear
The conclusion are adequate bur could improve clarity

Conclusion based on secondary data


Conclusion are drawn based upon theoretical aspects

The conclusion are good but need to be more specific


Conclusion of the study are clearly covered
The conclusion are good but need to be more specific
Conclusion of the study is clear with proper analysis
Conclusion are sufficient derived from data analysis and interpretation
Clear and appropriate conclusions of the study
Conclusion is clear regarding the research problem
The conclusions are clearly linked to the objectives and also informative
The conclusion are good but need to be more specific
The conclusions are clearly linked to the objectives and also informative
The conclusion are good but need to be more specific
The conclusions are clearly linked to the objectives and also informative
The conclusions are clearly linked to the objectives and also informative
Well cleared conclusion are derived
Conclusion are partially derived 2008 old pattern insurance and pension concept derived
Adequate conclusion are given for the problem of the study
Conclusion are not dervied

Conclusion was not fullfiled recruitment process not completely satisfied with the provided evidence
Comprehensive and well supported conclusions drawn from the analysis.
Conclusion are evident, through some aspects may be less addressed
Basic conclusion are drawn with some gaps in support or clarity
large size of microfinance studies from various disciplines suggest that microfinance has significant impact on poverty reduction as well as household wellb
Basic conclusions drawn, with some gaps in support
The conclusion is not clear
Conclusions are evident, though some aspects may be less thoroughly addressed.
Basic conclusions drawn, with some gaps in support or clarity.
The conclusion are well defined and impactful
There is no conclusion
The conclusion are good but need to be more specific
Basic conclusions drawn need more clarity
Conclusions are weak, lacking necessary support or coherence.
The conclusions are clearly linked to the objectives and also informative
Basic conclusions drawn, with some gaps in support or clarity
Clear and supported conclusions derived from the analysis.
Clear and supported conclusions derived from the analysis.
The conclusion are clear
Clear and supported conclusions derived from the analysis.

Basic conclusions for the study


Basic conclusions drawn, with some gaps in support or clarity.

Clear and supported conclusions derived from the analysis


The conclusions are good and it relates to objectives
Clear and supported conclusions derived from the analysis.

Lacking of necessary conclusions


Conclusion is basic

Basic Conclusions drawn


Conclusion driven from data analysis
Basic conclusions drawn, with some gaps in support or clarity.

Conclusion have gaps in clarity.


Basic conclusions drawn, with some gaps in support or clarity.
Conclusions drawn are adequate
Conclusion is weak

Clear and supported conclusions derived from the analysis

Basic conclusions drawn, with some gaps in support or clarity


Conclusion is minimum aspect from secondary data

for data analysis


few conclusions are drives from data analysis

Based on theory taken basic conclusion is drawn


Conclusion is fundamental
Conclusions are nearly absent
Weak conclusion based secondary data
Very basic conclusion
Very basic conclusions,
Conclusions are evident, though some aspects may be less
lacking necessary support
Basic conclusions drawn
Conclusions are clear but some aspects may be less
Well cleared conclusion are derived in future banking concept
Conclusion are evident, some aspects may be less thoroughly addressed
Adequate conclusion are drawn from the analysis
Well defined conclusion are not clearly dervied, partially derived need to improve
Conclusion are evident but few lack of gap in the study objectives
Positively impact the banks performance meaning a higher numb will increase the bank earings
Evidence are not clearly mentioned uk e-commerce market
Few areas only covered
Conclusion drawn are some what not clear
Conclusion are not clearly derived need to improve
Conclusion are evident but some factors are not related to the topic
Conclusion are partially derived need to improve evident
Well cleared conclusion are evident in mutual funds evolution during covid time
Well cleared conclusion are derived
Well cleared conclusion are derived

Clear and supported conclusions derived from the analysis.


Conclusions are evident, though some aspects may be less thoroughly addressed.
Conclusions are evident, though some aspects may be less thoroughly addressed.
Conclusion are drawn adequately
Conclusion is clear for few aspects
Basic conclusions drawn, with some gaps in support or clarity.
Clear and supported conclusions derived from the analysis.
Clear and supported conclusions derived from the analysis.
Conclusions are evident, though some aspects may be less thoroughly addressed.
Conclusion are basic driven theory
conclusion is are not clear for few aspects
Basic conclusions drawn, with some gaps in support or clarity.

Basic conclusions drawn, with some gaps in support or clarity.


limited conclusion are drawn
Basic conclusions drawn, with some gaps in support or clarity.
Basic conclusion drawn from this study
and tackle problems related to farming and assist them with taking proper and normal choices brilliantly to boost agricultural creation.
From the conclusion, it is to determined and characterized the role that human resource management system plays .

The conclusion says that that AI has additional potential to promote individual learning and development in the workplace, which should not be overestima

Concluding with analysis from this research study are the effects of cyberattacks on Internet of Things devices including botnets, the Pot virus, Internet of T
the majority of respondents were pleased with the products manufactured by Cert Technologies
conclusions says that governors provide information about the pandemic for all citizens, and IVR systems may play an important role in such scenario. inve

wide run of activities from specialized executions and persistent checking to preparing and collaboration over the organization

organization's cybersecurity strategy, providing valuable insights into the threat landscape, identifying vulnerabilities and weaknesses, informing decision-m

The conclusion says that OPTICAL CHARACTER RECOGNITION will improve the business operations.

transformation and their challenges, as well as implications and recommendations based on that.

To compare male and female employees on different variables in IT industries and To know about the significance of work life balance policy provided by
Other subject file

addressed.

addressed
addressed.
Clear and supported conclusions derived from the analysis.
Clear and supported conclusions derived from the analysis.

less thoroughly addressed.

Clear and supported conclusions derived from the analysis.

Clear and supported conclusions derived from the analysis.

less thoroughly addressed.

Clear and supported conclusions derived from the analysis.

addressed.
less thoroughly addressed.

less thoroughly addressed.


less thoroughly addressed

Clear and supported conclusions derived from the analysis.

Clear and supported conclusions derived from the analysis.

Clear and supported conclusions derived from the analysis.

Clear and supported conclusions derived from the analysis.

The integration of these frameworks


to lower costs, optimize production schedules, and manage inventory more effective.
Conclusions is to give more specific implementation of the project. Due to the dynamic change in the business environment, the scope of operation manage
security
sing Meesho as a paradigm of operational excellence and innovation in the ever-evolving realm of online retail
Conclusions is to give more specific implementation of the project.

lives of both consumers and merchants


In conclusion, the results of the poll emphasize the crucial significance of cybersecurity

Conclusions is to give more specific implementation of the project.


The comprehensive study on optimizing software quality assurance
ways that RPA has affected BFSI and highlights how these modifications
market responds to their products and services.
significant milestone in the evolution of the telecom industry.
adopting a holistic approach, investing in advanced technologies,
Stakeholders navigate this evolving landscape, continued collaboration and adaptation will be instrumental in realizing the full potential of electric transp

Conclusions is to give more specific implementation of the project.


In conclusion, the comparative study illuminates the intense competition
In this post, we'll look at how the healthcare industry may profit from using big data analytics,

but they also come with drawbacks.


The spread of the risk culture in active operational risk management serves the interest of economic operators by promoting financial stability.
Conclusions is to give more specific implementation of the project.

Improve analysis of patient satisfaction surveys by determining why certain score are low and how to improve them.
challenges identified in government-led oil and gas construction project.
does exist among employees

While considering distributed computing, it's fundamental

the findings of the research study are summarized


The findings and advice with this research is likely to be useful by two essential viewers.

engagement.
work arrangements
programs
The integration of Internet of Things (IoT) technologies

The analysis of breakdown and spare costs reveals significant insights into the operational challenges faced by the facility.
The conclusion derived as a result of the study is a synthesis not only of the findings but also of the recommendations.

on the go, make sure the booking procedure is seamless and mobile-friendly
passion and Substantial quality.

In conclusion, effective Capacity and Availability Management are imperative for Larsen & Toubro Limited to optimize
wait to get back his investment
Indian

Conclusions is to give more specific implementation of the project.


Conclusions is to give more specific implementation of the project.
The consumers will prefer electric vehicles only if they are comparable with current vehicles on road, so a change in consumers behaviour is import

addressed

implications
insights and findings

residential properties,

checks
The primary component of any study that sets it apart from others is its findings

futuristic

depends on the colour psychology

expenditure
In conclusion, customer feedback is a powerful tool that significantly influences operational strategies across various aspects of a business.

give correct way of conclusion in practices and knowledge of individuals when using these networks
conclusion are clear in a well-defined roadmap and the ability to overcome challenges are essential.
organizations to align profit with the planet.
Conclusions is to give more specific implementation of the project.
every person to become wise and to adhere to preventive
Organizations that prioritize quality management are better positioned to remain competitive in today's global marketplace. By consistently delivering high-

regarding equilibrium is more stable than a decision regarding an option.


In conclusion, the in-depth study that was carried out as part of this research has shed light on essential insights into the complex dynamics

operations
focusing on UPI,
The company is planning to execute and hone the e-procurement, EDI arranges deliberately in the future.

Conclusions is to give more specific implementation of the project.


The business concede possibility
emergence as a prominent player in the global IT landscape.
The researcher intends to offer suggestions derived from the comprehensive body of research, supplemented with the key results that will be de

Conclusions is to give more specific implementation of the project.


strategies for the business as well as other IT enterprises.
The SEM model shows a positive relationship between logistic service quality and order condition, order discrepancy handling, customer satisfaction

To understand the various risks associated with financial investments and the risk minimizing techniques.
s to reduce power usage in their facilities by using demand-side

By understanding the core principles, adapting them to their specific contexts, and addressing potential challenges, organizations can embark on
Nature highlights the potential
that lies ahead
The conclusion of this research report encapsulates the key findings
holds substantial promise for organizations seeking to achieve operational excellence, enhance product quality, and optimize process
drawn from the analysis.
Basic techniques with minor attempts at innovation

less thoroughly addressed.


support or clarity.

less thoroughly addressed.

support or clarity.
support or clarity.
support or clarity.
This is the sixth and last part of the study, report

ensures a comprehensive

improving speed, and providing value to customers


less thoroughly addressed.

nuanced understanding of the effect

less thoroughly addressed.

The conclusion states that the existing but not stated well
In conclusion, the journey of digital transformation for small to medium enterprises (SMEs) is marked by significant opportunities to enhance operational e

The exploration of artificial intelligence (AI) in parenting practices has yielded significant insights.

The purpose was accomplished through the use of primary and secondary data, as well as the findings for conclusions .
The conclusion says that the data will improve the business operations.

Conclusions aims to investigate the key factors that impact management's support for the National Optical Fiber Network . The NOFN plays a vital role in s

to cost savings. Cloud computing has emerged as a transformative technology, offering organizations a wide range of benefits, including scalability, flexibil
The integration of ethics into business strategy and operations is essential for fostering a culture of integrity, trust, and accountability, and for ensuring long

The conclusion says that the Applications of AI in Business Management, E-commerce not properly stated.
Alarm System like any other Alarm System on Android Device allows the user to set an Alarm.

voting rights.

organizations
sectors
positive, negative, and neutral sentiments
enhance current marketing and promotional strategies
coherence.

conclusion we find is trend is more competitive in present situational points required

In conclusion, the implementation of cloud computing in enterprise environments offers

six sigma technique are covered with the points of coverage are concluded with correct explanation required some more points
In conclusion, cloud service management is a key practice in today's digital environment

different industries

and part
employed, several key conclusions
real-time threat detection

designations of the IT professionals

and organizational
to the evolving landscape of Information Technology
addressed.

addressed.

the analysis.
Conclusion part to be with over all results more

suppliers.

addressed.

Based on the findings and recommendations, conclusions are drawn and presented in the conclusions section of the report.
No conclusions are given in the project report.
Conclusions drawn are findings and recommendations based in accordance with objectives of the project.

Conclusions are drawn on the basis of the project objectives.


Conclusions are based on objectives and recommendations of the project study.
No conclusions are given in the project report.

Conclusions drawn from data analysis are well matched with objectives, scope and findings the project.
Drawn conclusions based on the findings from the data analysis and objectives & conclusions are inter-connected.
Based on data analysis and findings of the project, conclusions are drawn in align with objectives of the project.
improved record-keeping, and heightened accountability, fostering trust among event organizers, ticket sellers, and buyers
conclusion is not proper
Conclusions drawn are well connected with objectives and findings of the project.
excellent
good
good
Conclusions drawn are based on the findings and suggestions offered. More focus may be given on conclusion section.
need to improve
can do better, Basic conclusions drawn
Conclusions are drawn based on the objectives and findings of the project. Conclusions are having limited association with recommendations of the project
Conclusions given are based on the findings and recommendations of the project.

Findings based suggestions and conclusion are given. needs more focus
No conclusion is given
Conclusion part is commendable. Conclusions are drawn based on the analysis of the data, findings and connected with recommendations.
Conclusions drawn are not well associated with objectives and recommendations of the project
Conclusions given are not well connected with objectives and recommendations of the project.
Objectives and recommendations based conclusions are drawn in connection with findings of the project work.

Supporting conclusions have been derived from the analysis of the project.

Fundamental conclusions drawn with some gaps in clarity of the project .


Fundamental conclusions drawn with some gaps in clarity of the project.

The basic conclusions have been given in this project.


Clear and supported conclusions derived from the analysis in this project.

clear and supported conclusions derived from analysis


Supporting conclusions have been derived from the analysis of the project.
The basic conclusions have been given in this project
Financial Inclusion,Efficiency in Cross-Border Transactions,Decentralization and Transparency,Innovation in Financial Products.
Supporting conclusions have been derived from the analysis of the project.
Supporting conclusions have been derived from the analysis of the project.
Fundamental conclusions drawn with some gaps in clarity of the project.
modifying the retail landscape.
AI-driven ITSM tools can enhance efficiency, accuracy, and proactive problem-solving.
rigor of the research process.
Conclusions good,Compatibility with multiple devices ensures that a broader audience can use the app without technical difficulties
In a real study, the data analysis would involve statistical methods and a more in-depth exploration of respondent responses.
The Hindustan Petroleum Corporation must be accessible at all times of the day, seven days a week, in both urban and rural parts of the country
Accurate trend analysis and forecasting improves product planning and inventory management.
Global retailers are acting inertly because they believe that Indian customers are not "prepared" for cutting-edge products.
to the buyer's needs.
Fundamental conclusions drawn with some gaps in clarity of the project.
Fundamental conclusions drawn with some gaps in clarity of the project.
Decision trees involve splitting the data into branches based on a series of if-then statements, with the goal of predicting the target variable at the end of eac
For AI projects, IT professionals often feel either highly (24%) or well (48%) suited to work with data scientists and AI experts, allowing for efficient proje
quality of life for residents.
E-billing is a revolutionary method of doing financial transactions.
Fundamental conclusions drawn with some gaps in clarity of the project.
Fundamental conclusions drawn with some gaps in clarity of the project.
Combining multiple renewable energy sources, such as wind and solar, with complementary characteristics can increase overall system reliability and resili
The Data Analysis for ITSM Decison-Making project representing a significant step towards transformed ITSM processes reactive to proactive, data-driven

The basic conclusions have been given.

greater ability to build relationships between SME’s, their customers, and their suppliers.
: Management of patient information has not upheld effective health care service delivery at selected tertiary hospitals

innovation, connectivity and economic growth

digital payments
SMEs can capitalize on new chances for expansion, creativity, and sustainability by utilizing Azure, establishing themselves as forces behind social and eco

Aadhaar has been designed in a such a way that only minimum information is collected and Aadhaar numbers don’t have any intelligence built into them..
model for cloud associations among Rail lines, giving Focal Rail lines full control through possession and activities of their cloud frameworks.

Encourage a holistic approach to digital transformation that encompasses people, processes, and technology, with a keen focus on addressing regional nuan
cautious optimism regarding the integration of AI into business.
Implementing blockchain technology in SCM offers significant potential benefits for TCS, including enhanced transparency, security, and efficiency.
Continuous monitoring of technological advancements, collaboration with VR experts, and a focus on user training and support are vital components of suc
Positive Correlation between Data Analytics Implementation and Healthcare Outcomes
Supporting conclusions have been derived from the analysis of the project.

Clear and supported conclusions derived from the analysis in this project.

Fundamental conclusions drawn with some gaps in clarity of the project .

No conclusion part is presented in the report


Conclusion part is satisfactory.

No conclusion is given
Conclusions are drawn based on the findings and recommendations of the project study.

No Conclusion part in the project

Conclusions are drawn in accordance with recommendations of the project study.

Conclusions drawn are having less association with objectives and recommendations of the project study.
Conclusions are given but not upto the satisfaction and expectation
Conceptual conclusion is given and no analysis based conclusion is given.

individuals is signing up for blockchain training.


organizations can enhance productivity, job satisfaction, and overall well-being for their remote workforce.
Cloud computing plays a pivotal role in furthering e-governance, supporting the development of smart cities, and contributing to the efficient management o

Data analytics tools currently utilize in e-commerce operations.

An Integral Component of Supply Chain Management and Warehouse Management System shown.

critically facilitated by IAM. ITSM focuses on the efficient delivery of these services.

focus on more strategic initiatives.

Breaking up a monolithic application using domain-driven design (DDD) involves identifying bounded contexts, defining domain models, and establishing

Platform enabling data driven decision-making culture for future organizational strategies.

Conclusions are drawn based on the findings of the data analysis and well connected with the project objectives
Conclusion of Remote Resilience not clearly dervied.

eliminated this requirement.


Conclusion are not completely satisfied the contents used in this study work

Conclusion are not completely satisfied the contents are used in this study work

Conclusion not derived


quiz/survey service to small institutes just by creating users for them.

interpret events, and how these events form causal chain judgments. N
India. By enhancing operational efficiency, improving customer experience
Conclusions of this project is Railroads are viewed as the core of the India as Indian economy also hand-off on it

Conclusions of the project incorporation of artificial intelligence into personalized marketing.


navigating the challenges and opportunities presented by the digital era.

Conclusion are partially derived


Conclusion are derived good

Conclusion of TCS asset Management partially derived


Conclusion are partially derived

Conclusion are partially derived not completely satisfied with the content used in this project
Conclusion are not completely satisfied with content used in this research work
Conclusion are partially derived in environment practices.

Conclusion of fast food management not clearly presented


Conclusion are partially derived need to more elaboration of ERP in medium scale industries

advanced solution

users with useful tools that will help them navigate the complex cryptocurrency , more information needed
Conclusion are not dervied

Conclusion are partially derived,it's not completely satisfied the contents used in this research work
Well defined conclusion are derived

Conclusion are partially derived


Conclusion are not completely covered the given objective

Conclusion are partially derived not completely satisfied with the content

Well cleared conclusion are derived

Conclusion are partially derived


AI adoption in small apperal industry in india conclusion are not clearly dervied

Well cleared conclusion are derived

Well cleared conclusion are derived


Conclusion are evident but few gap in objectives what you taken

Conclusion are not clearly dervied more information needed


Conclusion are derived well

Conclusion are partially derived

Well defined conclusion are derived

Conclusion are clearly dervied


Conclusion are partially derived
Conclusion are partially derived
Cloud computing migration of Orient cement conclusion partially derived

Conclusion are partially derived in robotics automatic business process


Conclusion of web based applications customer support are partially derived

Well cleared conclusion are derived


E-commerce conclusion are not clearly dervied

Well cleared conclusion are derived


Conclusion are partially derived

Conclusion are partially derived

Conclusion no data founded

Well cleared conclusion are derived

Conclusion are partially derived


Conclusion of green cloud computing in IT industry partially derived
Conclusion are partially derived
Conclusion are partially derived ERP implementation more clear explanation needed
Conclusion are clearly derived.

Conclusion are partially derived not attain the level

Digital marketing in AI environment challenges are not clearly derived

Conclusion are partially derived


Cloud computing adoption in banking industry not clearly derived

Cloud computing security and it's risk management conclusion are partially derived
Conclusion are not derived

Conclusion are not clearly dervied

Conclusions part needs improvement. Conclusions are based on findings and sugesstions to some extent only.

Conclusions are given and they are based on the findings and recommendations of the project.

Conclusions drawn are not based on the findings and findings are not presented in the report.

The title conclusion is given. But only findings are presented.


Conclusions are given but unable to find the relationship of conclusions with objectives and recommendations.

Conclusions drawn are based on the findings and recommendations of the project.
Conclusion given in the report is based on the findings, recommendations and objectives of the project.

Conclusion given is based on the findings of the project. Not able to connect with recommendations due to not providing recommendations.
Conclusions drawn are based on the findings and recommendations of the project.
No conclusion part is given in the project report.
No conclusion is given

Conclusions are drawn based on the findings and recommendations of the project study.
Conclusions drawn based on the findings and suggestions given. But needs improvement.

No conclusion is given in the project report.


The given conclusion is based on the findings and findings based recommendations.

Well cleared conclusion are derived


Conclusion are partially derived

Conclusion are partially derived. IT enabled automotive industry in Tesla not clearly mentioned

Conclusion are partially derived tourism and travel packages not clearly derived

Well cleared conclusion are derived


conclusion was based on the problem area
CONCLUSIONS DRAWN IS SOMEWHAT SATISFACTORY
Well cleared conclusion are derived
GOOD
Conclusion are partially derived from buyer attitude on online shopping
CONCLUSION GIVEN IS RELEVANT
CONCLUSION DRAWN IS GOOD
Well cleared conclusion are derived
IOT for home automation not clearly dervied
Conclusion of IT industry response during covid -19 are not completely dervied
the conclusions drawn also good
conclusions drawn is good
Conclusion not derived
proper conclusions given
Conclusion are partially derived
conclusions given is satisfactory
Well cleared conclusion are derived
conclusions drawn is good
relevant conclusions drawn
Well cleared conclusion are derived
Conclusion are not clearly dervied about this research work
Conclusions given is satisfactory
appropriate conclusions drawn
conclusions given correctly
Conclusion are partially derived
Importance of agile project management in its development partially derived

Conclusion are partially derived


Conclusion are not dervied
Conclusion of impact on digital marketing in real estate industry not clearly derived
Conclusion are partially derived
Conclusion are clearly drawn
Two conclusion are drawn both are not clearly mentioned

Conclusion not clearly drawn

Customer relationship management conclusion clearly drawn

Conclusion are not clearly drawn


Conclusion are clearly drawn

Conclusion are not clearly drawn about cloud computing management Amazon
conclusion are not completely satisfied the contents used in this study work.

Conclusion are clearly drawn few boundaries of medical healthcare records security levels missing
Conclusion are clearly drawn
Conclusion are completely satisfied with the contents used in this topic

Conclusion of digital payment during covid time in india not clearly defined
Cryptographic techniques and hardware security module not clearly dervied based on modern security
Conclusion are clearly dervied
Conclusion are partially derived in mother dairy
Well cleared conclusion are derived
Conclusion are partially derived
Well defined conclusion are derived
Digital marketing impact revenue partially derived
Conclusion are completely satisfied the contents used in this topic

The conclusions drawn from the analysis are clear and well-supported by the findings, providing a solid basis for informed decision-making.
The conclusions drawn are apparent, although some aspects could benefit from more thorough and detailed examination.

The conclusions drawn are evident, yet there may be some aspects related to improving operational efficiency with robotic process automation that could be

The conclusions drawn are clear, yet certain aspects may not have been fully explored or detailed, indicating opportunities for deeper analysis and considera

The conclusions are clear and well-supported by the analysis, demonstrating a strong link between the data and the findings.

The statement indicates clear and well-supported conclusions derived from the analysis of training effectiveness at RINL-VSP, reflecting a robust understan
The statement acknowledges clear conclusions drawn from the project, but suggests that certain areas may require more in-depth analysis to strengthen the

While the project's conclusions are clear, ensuring thoroughness across all aspects would strengthen the overall reliability and applicability of the findings i
Ensuring comprehensive coverage of all relevant aspects in the conclusions would strengthen the project's overall reliability and applicability in financial fe
While the project provides evident conclusions, expanding the analysis to cover all relevant aspects comprehensively would strengthen the overall robustne

The conclusions are apparent, though some aspects may be less thoroughly addressed in relate to automotive industry
The conclusions are apparent, though some aspects may not have been thoroughly addressed.

The conclusions drawn from the study are clear, although there may be some aspects that have not been fully explored or addressed in depth.

The conclusions drawn from the analysis are clear and well-supported by the data and findings presented.
The conclusions are evident, although some aspects may be less thoroughly addressed. This indicates that while the main points are clear, certain elements c
The conclusions are apparent, although certain aspects may not have been thoroughly addressed. This indicates that while key findings are clear, there may
The conclusions drawn regarding workforce management's impact on operational productivity are basic, with gaps in support or clarity evident. Strengtheni

The conclusions are apparent, although certain aspects may not have been thoroughly addressed, potentially leaving gaps in the overall understanding or ap
The conclusions are apparent regarding the operations and supply chain management practices at Maruti Suzuki, although certain aspects may not have bee
Clear and well-supported conclusions derived from the analysis are crucial for understanding the impact of creation techniques on Dabur's profitability.

The conclusions drawn regarding IKEA's operations management are apparent, though some aspects may not be thoroughly addressed, potentially leaving g

The conclusions are apparent regarding green initiatives for electronic gaming slot machines, although certain aspects may not have been thoroughly addres

the analysis
addressed

addressed.
addressed
drawn,
Basic conclusions drawn, with some gaps in support

the analysis

derived from the analysis

drawn from the analysis

the analysis.
less thoroughly addressed

drawn from the analysis

Conclusions are nearly absent


the analysis
the analysis.

lacking Conclusions drawn


Conclusions are evident, though some aspects may be less thoroughly addressed.
the analysis.

the analysis.
the analysis
some gaps in support

cleared conclusion is given


support
the analysis
evident
the analysis
Basic conclusions drawn,
the analysis
drawn from the analysis
less thoroughly addressed
the analysis
condlusion given is neat
conclusion is normal

the analysis
less thoroughly addressed.

addressed.
adequate Conclusions drawn

less thoroughly addressed


the conclusions are drawn and discussed solutions for project management in health and fitness industry
conclusion drawn, analyze the factors in detail and perform the regression using SPSS. simple conclusion reached

case study conclusions are written. project conclusion is not given


Supportive conclusions were drawn for specified organizational culture For IT and BPO industry
the conclusions are drawn and discussed for integration of AI into incident management within ITSM. require more clarity about this

The conclusion highlighted significant concerns among users regarding data privacy and security on Meta and Google platforms

conclusion drawn, examined cryptocurrency systems and identified several challenges that pose risks to the financial system

concluded, Zomato aims to further expand its service offerings and reach into new markets, with plans to raise additional funds to support its growth initiati
conclusion found that respondents prefer to use Swiggy for ordering food in online followed by Zomato and Food Panda.
Basic conclusions have been drawn regarding logistics and supply chain management at Big Bazaar, but there are gaps in support or clarity. Strengthening t
conclusions are basic supporting the study needs clarity

Clear and supported conclusions derived from the analysis.

Basic conclusions have been drawn, but there are gaps in support or clarity, which could benefit from additional evidence or explanation.
Basic conclusions have been drawn, but there are gaps in support or clarity, which could benefit from additional evidence or explanation to strengthen their
Basic conclusions have been drawn, but there are gaps in support or clarity, which could be addressed with additional evidence or explanation to strengthen

Basic conclusions have been drawn, but there are gaps in support or clarity that need to be addressed.

Basic conclusions are drawn, though there are some gaps in support or clarity. Strengthening the evidence and providing clearer explanations would enhanc

No evidence of any conclusions drawn.

Clear and supported conclusions derived from the analysis provide robust insights and actionable recommendations for strategic decision-making. They und

The conclusions are apparent, although there are some aspects that could benefit from more thorough analysis and discussion.
need to give Conclusion
adequate Conclusions given
conclusion given

clear Conclusion given

adequate Conclusions drawn

inadequate Conclusions

support
adequate Conclusions drawn

support
Basic conclusions drawn,

basic Conclusions drawn


Conclusions drawn
Conclusions drawn
basic conclusions were drawn needs more clarity
No evidence of any conclusions drawn.
No evidence of conclusions drawn
No evidence of any conclusions drawn.

Basic conclusion drawn


conclusion is not drawn

Comprehensive conclusion with relevant objectives

conclusion is not drawn

Comprehensive conclusion is drawn

Comprehensive and supported conclusion are drawn


Clear and supported conclusion are drawn
no conclusion is drawn
clear and supported conclusion is drawn

Comprehensive and well supported conclusion is derived

clear and supported conclusions derived from the analysis


Basic conclusion is drawn need to improve the more relevant conclusion
conclusion is some aspects may be less drawn
Basic conclusion are drawn with some gaps

conclusion is missing

conclusions is missing
Basic conclusions drawn, with some gaps in clarity
the analysis.

aspects may be less thoroughly addressed

Conclusions are evident, though some aspects may be less thoroughly addressed

Basic conclusions drawn, with some gaps in support


Conclusions is to give more specific implementation of the project.

The conclusions drawn addresssed the objectives and results of the project sufficiently
Clear and supportive conclusions are given
Conclusions drawn are covered the overall objective of the project
The overall project concept is well addressed in the conclusions
Apparent conclusions are given which addressed the concepts of the entire project

Basic conclusions are given


Basic conclusions are given

conclusion defined in well manner


Sufficient conclusions are given
conclusion is not defined in your project
conclusion is missing
Conclusions drawn are weak and less supportive
Well constructed conclusions are given
Conclusions drawn are not clearly address the overall project
Moderate Conclusions given which is somewhat explains the project
Basic conclusions drawn that less addressed the objectives of the project
Conclusions drawn have insufficient data that less adderess the objectives
Basic conclusions drawn with less clarity
Conclusions that sufficiently addresses the project objectives are drawn
Conclusions drawn are weak and no clarity
Apparent conclusions are given well
Clear and supportive conclusions are given
Clear and supportive conclusuions are drawn
perks, like better communication, collaboration, and productivity.
From the conclusion, the results reveal that cloud-based e-learning solutions have significantly impacted personal and professional development
The study reveals that cloud computing significantly enhances the customer experience in the retail banking sector by offering several key benefits
The study highlights the importance of collaboration. International organizations provide guiding ethical principles, while leading technology companies of
From the conclusion, it is noted that cloud technologies have revolutionized the way organizations deploy, manage, and scale IT infrastructure, enabling un

The conclusion says, integrating artificial intelligence (AI) into TCS customer service operations promises to instigate a paradigm shift in support mechanis

This study enables a comprehensive viewpoint, providing the foundation for a tailored implementation of ITIL service management that directly supports th
Operational Impact, Resource Optimization and Agility and Responsiveness were the three factors given away with the findings in the conclusion
strategic objectives
In conclusion, the blockchain technology holds immense promise in revolutionizing trust and value exchange, its transformative potential can only be realiz

The study on the employee welfare schemes provided with various findings that will improve the status of the employees as well as the company stated clea

The evaluation has demonstrated that ITSM progress levels at South African higher education institutions are not consistently low, which is an exceptionall

The insights of the study provide a comprehensive view of the factors influencing digital payment adoption, user preferences, and expectations.
This study on "Open Banking and API Integration: Assessing Impacts on Financial Services and Customer Experience" has provided valuable insights into
From the conclusion, transitioning to automated trading can streamline the trade execution process, eliminating the need for manual intervention. This blog
In conclusion, the potential of augmented reality (AR) and virtual reality (VR) to revolutionize educational experiences is substantial
From the conclusion, the integration of Information Technology (IT) into supply chain management has ushered in a new era of possibilities, transforming h
From the conclusion, focusing on continuous learning, upskilling initiatives, and educational reforms, we can ensure a smooth transition for the current IT w
Conclusions are weak, lacking necessary support
support

After the study on the chosen topic, gave away with 7 key points to be noted with in the challenges faced by practitioners of CRM
In the conclusion stated with the grocery basket business has the potential to bridge the gap between customers and e-grocery sector and catalyse the growth
Conclusions are weak, lacking necessary support
Conclusions are weak, lacking necessary support
The conclusion states that the By utilizing AI for projects, project managers have gained additional assistance, precision, understanding, and strategic plann
The study findings underscore the multifaceted nature of the impact of AI on job roles, encompassing concerns about job displacement, skill demands, ethic
The study accumulated a lot of data on the job of IT in HRM from the subject matter experts, senior trained professionals, and supervisors of the HR divisio
Conclusions are weak, lacking necessary support
the application of data visualization
The conclusion says the best solution for a company when it comes to the efforts for increasing visibility on the market, as well as for raising brand awarene
The conclusion says embedding environmental sustainability considerations into IT governance mechanisms, iEnergizer can ensure that its ITSM initiative
From the conclusion, it is identified that the effects of the Internet of Things on well-established businesses will be inspiring.
From the conclusion, CSR is an emerging field. It is the ethical responsibility for companies to do CSR activities. Effective corporate social responsibilities

The conclusion states on about the effectiveness of an ITIL-based IT service management framework in addressing security and risk management issues.

The study on the integration of cryptocurrencies with the Unified Payments Interface (UPI) in digital payments provides valuable insights into the evolving
managing its IT functions
The conclusion of this report is AI has already impacted millions of individuals if not billions of individuals across the world with majority of that impact b

research objectives stated

The study analyzing the Impact of Quantum Computing on Data Encryption provides crucial insights into the impending revolution in computational techno

very clear and supported conclusion

clear conclusion is defined in your study

conclusion is derived from clearly

clearly and suitable conclusion with the objectives

clear and supportive conclusion are derived from the objectives


very clear and supportive conclusions derived from the analysis

Very clear and suitable conclusion with the objectives

conclusion is very comprehensive supported with the objectives


clear and relevant conclusion with the objectives
Comprehensive conclusion and relevant with the objectives

clear and supportive conclusion are connected with the objectives

conclusion is need more comprehensive


conclusion is very little bit you improve further development

clear and supported conclusion


Very basic and incorrect conclusion
clear and supported conclusion is derived

Basic conclusion has drawn in thesis


Comprehensive conclusions with supported analysis
Clear and supported conclusion is derived
Clear and supported conclusion is drawn

clear and supported conclusion has been drawn

Nil
The project draws basic conclusions, but there are gaps in support or clarity, which could benefit from additional evidence and elaboration to strengthen the

The conclusions drawn from the analysis are clear and well-supported, demonstrating a thorough examination of the data and findings to provide meaningfu
No evidence of any conclusions drawn.
The conclusions drawn are generally clear, yet certain aspects may warrant more thorough exploration or explanation.

The project presents basic conclusions, but there are noticeable gaps in support or clarity, which undermine the overall strength and coherence of the finding
The conclusions presented are clear, but there are areas where further depth or detail could enhance their thoroughness and completeness.
The conclusions drawn are discernible, but there are areas where further depth could enhance the analysis and findings.
The conclusions drawn are generally clear, but certain aspects could benefit from more thorough examination and clarification.

The conclusions drawn are discernible; however, certain aspects could benefit from more detailed exploration or analysis.

The conclusions drawn are fundamental, but they lack comprehensive support and clarity in certain aspects, potentially limiting their robustness and applica

The conclusions of this critical study on the procurement of machines for steel bridge fabrication are very basic significantly impacting the overall project's

The conclusions drawn are basic, with noticeable gaps in support or clarity, suggesting a need for additional evidence or refinement to strengthen their valid

No evidence of any conclusions drawn.


conclusions are apparent, although certain aspects may not be thoroughly explored, suggesting a need for further investigation to enhance the depth and co

The study presents clear and well-supported conclusions derived from its analysis, indicating a thorough understanding of how Lean Six Sigma promotes in

While conclusions are apparent, ensure thorough addressing of all aspects related to the lack of distribution channels in rural areas within the FMCG sector

*Comment: The study presents clear and well-supported conclusions derived from its analysis of supply chain logistics innovation and operational performa
No evidence of any conclusions drawn.

Strengthen the conclusions by providing necessary support and evidence to enhance the validity and reliability of findings in the context of implementing L
Supportive conclusions were drawn for specified objectives

Conclusion focuses on overall industry in Electric Vehicles

Generic conclusions were drawn in the study


Each objective have separate conclusion

Conclusions were drawn related to the objectives


Conclusions were drawn clearly

Conclusion drawn precisely


No evidence of any conclusions drawn.
The conclusions drawn are apparent, although some aspects could benefit from more thorough exploration and analysis.

The project presents clear and well-supported conclusions derived from thorough analysis, providing robust insights into risk perceptions and portfolio man
The conclusions drawn are evident, yet certain aspects could benefit from more thorough exploration and analysis to strengthen their comprehensiveness an
The project presents basic conclusions, though there are gaps in supporting evidence or clarity, which could benefit from further elaboration or validation to

The project presents clear conclusions, though there are certain aspects that could benefit from more thorough exploration and analysis to strengthen their c
The conclusions drawn are basic, with noticeable gaps in support or clarity, suggesting a need for further substantiation and refinement to strengthen their r

The project presents basic conclusions, but there are gaps in support or clarity that need to be addressed to strengthen their validity and comprehensiveness.
Fundamental conclusions drawn with some gaps in clarity of the project.

The basic conclusions have been given in this project.

Supporting conclusions have been derived from the analysis of the project.

Clear and supported conclusions derived from the analysis in this project.

the conclusions are drawn that are stated in objectives


the conclusions are given neatly
Supporting conclusions have been derived from the analysis of the project
the conclusions are given as per the discussions made

the conclusions are given

the conclusions must be clear enough to draw the solution of the problem definition
the conclusions need to be clear and specific
the conclusions are given

the conclusion has been given with the analysis of the primary data has been collected

Conclusions are nearly absent


Clear and supported conclusions derived from the analysis in this project
The conclusions drawn from the study are well-founded and emphasize the significant benefits of ERP integration at Ashok Leyland Limited
The conclusions section summarizes the outcomes of the project , highlighting the success and potential improvements in the character recognition system.
The basic conclusions have been given in this project
the conclusion has been given with the analysis of the primary data has been collected
The basic conclusions have been given in this project
The conclusions drawn are logical and based on the data and analysis presented. They summarize the key findings and reiterate the importance of addressin
Supporting conclusions have been derived from the analysis of the project
Clear and supported conclusions derived from the analysis in this project
the conclusion has been given with the analysis of the primary data collected through facebook media
the conclusions are given by the understanding of needs, preferences, and challenges faced in hospitals
Supporting conclusions have been derived from the analysis of the project
Fundamental conclusions drawn with some gaps in clarity of the project
Fundamental conclusions drawn with some gaps in clarity of the project
he basic conclusions have been given in this project
Fundamental conclusions drawn with some gaps in clarity of the project

the conclusions are drawn and discussed solutions for IT project management
no specific conclusions given
the conclusions met the need of concluding the report
the conclusions are drawn but need improvement
Supporting conclusions have been derived from the analysis of the project
the report concludes the influence of digital payment
The study concludes that a proactive approach to IT risk management and a well-developed BCP are essential for ensuring business continuity
Be specific in providing conclusions
need clarity in conclusions drawn
The basic conclusions have been given in this project

the conclusions need to be more clear

the conclusions are given clearly


Fundamental conclusions drawn with some gaps in clarity of the project

the conclusions are given with challenges to be faced with AI technologies


conclusions define the ethics of digital marketing
the conclusions are given
Fundamental conclusions drawn with some gaps in clarity of the project -
the given conclusions are related with the discussed topic
the conclusions are stated clear
Insurance Technology will have to meet insurance regulations as well as wider data protection and cyber security requirements as they try to scale their bus

more clarity is needed in drawing conclusions

Conclusions are nearly absent

Conclusions are nearly absent.


Conclusions are nearly absent.

Supporting conclusions have been derived from the analysis of the case study.

Supporting conclusions have been derived from the analysis of the project.

Fundamental conclusions drawn with some gaps in clarity of the project.


Clear and supported conclusions derived from the analysis in this project.
Fundamental conclusions drawn with some gaps in clarity of the project.
Supporting conclusions have been derived from the analysis of the project.

Fundamental conclusions drawn with some gaps in clarity of the project.

Clear and supported conclusions derived from the analysis in this project.
Supporting conclusions have been derived from the analysis of the project
Supporting conclusions have been derived from the analysis of the project
Fundamental conclusions drawn with some gaps in clarity of the project

provides a report on existing technologies on cloud adoption for health care SMEs
Fundamental conclusions drawn with some gaps in clarity of the project
the conclusion provides a summary of deepfake origin, prevention methods

Fundamental conclusions drawn with some gaps in clarity of the project


the given conclusions are generic in aspect of online shopping suggested to give specific conclusion points
the report concludes with prevention strategies
the conclusions are stated clearly
The basic conclusions have been given in this project
the conclusion has been given with the analysis of the primary data has been collected

Supporting conclusions have been derived from the analysis of the project
the conclusions are generic need to be specific

the conclusions provide various comparisons of financial services


Fundamental conclusions drawn with some gaps in clarity of the project

the report concludes the approach for health care SMEs


Supporting conclusions have been derived from the analysis of the project

the conclusions are given expected for the study

Clear and relevant conclusion has been given


cloud technology platform is AWS, it has led the cloud computing services market. and also covering about every aspect on its platform, making it an excel
Supportive conclusions were drawn for specified objectives
need some topics explained in more detail, the conclusions remain clear.
Good conclusion has been drawn for this project.
Basic conclusion only drawn by the student
conclusion not written
conclusion drawn, ARS developed by JAVA with SQL. ARS system was tested with the availability data and throughput reports are verified with reports w
No evidence of any conclusion drawn
No evidence for any conclusion drawn in the project
Supportive conclusions were drawn for specified objectives
PLS harness the power of AI to revolutionize education by delivering tailored learning experiences that cater to the unique needs of each student. Need mor
No proper conclusion drawn in the project

financial inclusion. require some other points about customer satisfactions

efficiency and customer satisfaction. require more details about this


certain points might not been covered, but conclusions are acceptable
Supportive conclusions were drawn for specified objectives

Supportive conclusions were drawn for few specified objectives. require more information regarding conclusion

only Retail Store Billing Software using ERP -SAP. And also integrated all modules. require more information about this

Basic conclusions drawn, with some gaps in support or clarity.


Conclusions are evident, though some aspects may be less thoroughly addressed.

Conclusions are evident, though some aspects may be less thoroughly addressed.
Simple conclusions reached, even with some ambiguities or lack of evidence but many suggestions are given.
Clear and supported conclusions derived from the analysis.

No evidence of any conclusions drawn.


Comprehensive and well-supported conclusions drawn from the analysis.
Basic conclusions drawn, with some gaps in support or clarity.
many information are given, but clear justification are needed about digital transformation
Clear and supported conclusions derived from the analysis.
Comprehensive and well-supported conclusions drawn from the analysis.
Comprehensive and well-supported conclusions drawn from the analysis.

Comprehensive and well-supported conclusions drawn from the analysis.


Comprehensive and well-supported conclusions drawn from the analysis.
Comprehensive and well-supported conclusions drawn from the analysis.
Clear and supported conclusions derived from the analysis.
Comprehensive and well-supported conclusions drawn from the analysis.
Completing the migration, the enterprise is laying the foundation for a more modern, agile, and secure IT environment
In conclusion, an Enterprise Resource Planning (ERP) system is an essential tool for medium and large-sized organizations.
This paper concludes that the cyber-crime has significant consequences for national and economic security. It is pervasive, violent, ubiquitous and increasin
Basic conclusions are given with less clarity of points that describes the overall project
Simple conclusions are given which describes the result of the project with less clarity
Appropriate conclusions are given which describes the entire project objectives
The conclusions drawn are very basic and weakly defined
Weak conclusions are given with no neccessary support
This study has made a contribution to research that is being done at the convergence of pathology informatics, interactions between humans and computers,
The operations can be aimed at getting the proper clients and then preserving them with the aid of extending unique remedy beneath CRM environment
The research encompassed a comprehensive assessment of various aspects of the business, including the business model, operational strategy, service offeri
The agreement got from the assessment and cases examined assists us with learning the job of Information innovation in retail area.
reshape the IP ecosystem, particularly in the utilization and commercialization of IP.
Conclusion drawn with few points Needs to specify more specific outcome of the project
the development and prospects for digital marketing underscore the dynamic and transformational character of this industry, needs to precise the conclusion
Conclusions are evident, though some aspects may be less thoroughly addressed.
Conclusions are weak, lacking necessary support or coherence.
Comprehensive and well-supported conclusions drawn from the analysis.
Comprehensive and well-supported conclusions drawn from the analysis.
Comprehensive and well-supported conclusions drawn from the analysis.
Basic conclusions drawn, with some gaps in support or clarity.
Clear and supported conclusions derived from the analysis.
certain points might not been covered, but conclusions are acceptable
Comprehensive and well-supported conclusions drawn from the analysis.
Clear and supported conclusions derived from the analysis.
Comprehensive and well-supported conclusions drawn from the analysis.
Clear and supported conclusions derived from the analysis.
Conclusions are weak, lacking necessary support or coherence.
Clear and supported conclusions (summary)derived from the analysis.
Basic conclusions drawn, with some gaps in support or clarity.
Conclusions are evident, though some aspects may be less thoroughly addressed.
Conclusion is given. But it should be given in a more relevant way
Comprehensive and well-supported conclusions drawn from the analysis.
Conclusions are evident, though some aspects may be less thoroughly addressed.
Conclusions are evident, though some aspects may be less thoroughly addressed.
Very basic or incorrect conclusions, significantly impacting the overall project.
Comprehensive and well-supported conclusions drawn from the analysis.

major conclusions have been addressed


the conclusions are given as per the project scope
the conclusions are given
the conclusion has been given with the analysis of the data
the conclusions are given as per covering the project objectives
need improvement in drawing conclusions
Conclusion are completely cover the given objective random forest method is best for any other one
Conclusion not clearly mentioned
Conclusion was not clearly drawn
Conclusion of core banking solutions not clearly mentioned
Conclusion are not clearly drawn
Conclusion not clearly drawn not yet to be objectives of the research work
BPO as its a footloose industry can be set up anywhere, and it has a tremendous potential for growth and development in the Indian market
A depository system is considered a system where scripts can be transferred as well as settled through the modern way of resulting transfer of possession of
Clear and supported conclusions derived from the analysis.
conclusion drawn, Workday is a comprehensive and modern solution for organizations looking to streamline their HR, finance, planning, and analytics proc
conclusion informed consent for AI use in healthcare, and accountability and transparency in AI decision-making. require more information about AI applic
Clear and supported conclusions derived from the analysis.
concluded, the integration of AI into various sectors has brought about significant benefits, but also substantial privacy challenges.
conclusion drawn integrated with CRM and IT solutions, Dr. Ethix Products and Services can further enhance their service quality and customization capab
Comprehensive and well-supported conclusions drawn from the analysis.
Simple conclusion given by the student that lack clarity in some places
The student has drawn conclusion for his project with some limitation.
conclusion highlighted how digital payments have revolutionised the Indian economy with the help of cutting-edge technology and government support. the
concluded, autonomous vehicles show a great deal of promise in terms of revolutionising transportation and tackling critical societal difficulties. slightly ex
Conclusion given by the student about the problem identified is very simple. It cannot give some clear ideas in the some places.
significantly impact their work-life balance
Examining the effects of COVID-19 on the development of online banking is the main goal of this study
Only simple conclusion has been given by the student, resulting in lack clarity in some places.

Well conclusion drawn from the analysis


Basic conclusions only drawn.
Basic conclusion only drawn
Clear and supportive conclusion has been drawn.
Conclusions are weak
No evidence of conclusion drawn for the project
Simple conclusion has been drawn for the study.
Conclusions are evident though some aspects may be less
conclusion drawn, examined cryptocurrency systems and identified several challenges that pose risks to the financial system
Simple conclusion has been drawn for the study.
Basic conclusions drawn, with some gaps in support or clarity.
Simple conclusions were given about finding chapter. not provide clear conclusion
Conclusions are weak, lacking necessary support or coherence.
conclusion drawn, e-banking on a daily basis and emphasizing the significance of security features. need some other details about approaches and precise v
Basic conclusions drawn, with some gaps in support or clarity.
No evidence of any conclusions drawn.
No evidence of any conclusions drawn.
Comprehensive and well-supported conclusions drawn from the analysis.
Comprehensive and well-supported conclusions drawn from the analysis.
Basic conclusions drawn, with some gaps in support or clarity.
Comprehensive and well-supported conclusions drawn from the analysis.
Comprehensive and well-supported conclusions drawn from the analysis.
conclusion drawn, comparative analysis of network security measures in educational institutions, but this conclusion needs a more explanation and also men
Comprehensive and well-supported conclusions drawn from the analysis.
Clear and supported conclusions derived from the analysis.
Comprehensive and well-supported conclusions drawn from the analysis.
Comprehensive and well-supported conclusions drawn from the analysis.
conclusion drawn, the results demonstrate the dominance of Jio and Airtel and the rise in consumer satisfaction. additional comparative analysis is required
the researcher concludes although particular topics might be considered covered, the findings remain true.
Comprehensive and well-supported conclusions drawn from the analysis.
Clear and supported conclusions derived from the analysis.
- conclusion drawn, goal of this project is to enhance efficiency via the integration of steganography and Cryptography

Clear and supported conclusions derived from the analysis.


conclusion of the project is good response of erp systems
the conclusion of application process is good information of project
The conclusion of this project is very clear.

The conclusion of this project is very focusable.

The conclusion of this project presents a holistic approach to enhancing project management effectiveness in the digital age.
The conclusion of this project is very clear.

The conclusion of this project is very clear.

The conclusion of this project is very focusable


the blockchain of the conclusion concept is good response
The conclusion of this project is very clear

Add more clarity to conclusion of this study


The conclusion of this project is very focusable
The conclusion is weak and lacks the necessary support.
Conclusions are clear, though some aspects may not have been addressed as well.
Some gaps in support were found in the basic conclusions drawn.
Some aspects may be less thoroughly addressed, but conclusions are evident.
There are some gaps in the support for the basic conclusions drawn.
There are some gaps in support for the basic conclusions drawn.
The fundamental conclusions drawn are supported by some gaps.
There were some gaps in support for the basic conclusions drawn.
The analysis yielded clear and supported conclusions.
The conclusion of this project presents a holistic approach to enhancing project management effectiveness in the digital age.
The conclusions lack the essential basis and are weak.
The conclusion of this project is very focusable.
There are some gaps in the support for the basic conclusions drawn.
The analysis yielded precise and substantiated conclusions.
Basic conclusions were drawn with some gaps in support.
Conclusions are lacking the necessary support.
The analysis yielded clear and supported conclusions.
There were clear and supported conclusions derived from the analysis
Conclusions are evident, although certain aspects may be ambiguous. This issue is less thoroughly addressed.
The conclusion of this project is very clear.
Clear and supported conclusions derived from the analysis
Add more clarity to conclusion of this study.
less thoroughly addressed.
It is evident that some aspects may be less thoroughly addressed.
Basic conclusions have been drawn, although there may be some gaps in support or clarity.
The conclusion of this project is very focusable.
Clear and convincing conclusions emerged from the investigation.
The analysis yielded comprehensive and well-supported conclusions.
The analysis yielded comprehensive and well-supported conclusions.
Conclusion of this study has demonstrated that AI technologies provide telecom companies with the tools to enhance operational efficiency, deliver person
There are some gaps in the support for the basic conclusions drawn.
The conclusion of this project presents a holistic approach to enhancing project management effectiveness in the digital age.
not given for this project for conclusion
Very basic conclusion have drawn.
There are some basic conclusions drawn, with some gaps in support.
give more clearness of conclusion
Give clear conclusion of this study.
There are some basic conclusions drawn, with some gaps in support.
The conclusion of this project is very focusable.
Comprehensive and well-supported conclusions were drawn from the analysis.
The fundamental conclusions drawn are supported by some gaps.
Conclusions are weak, lacking necessary support

less carefully considered.

assistance.

less carefully considered.


support or clarity.

less thoroughly addressed.

support or clarity.

covered in less detail. of.


Conclusions are weak, lacking necessary support or coherence.

support or clarity.
support or clarity.
support or clarity.

Clear and supported conclusions of analysis.

Conclusions are weak, lacking necessary support or coherence.

Clear and upheld ends got from the investigation.

Conclusions are apparent, though some aspects may be unclear.

Clear and convincing conclusions emerged from the investigation.


support or clarity.

support or clarity..
Clear and convincing conclusions emerged from the investigation.
It was not thoroughly addressed.
Conclusions are weak and lack the necessary support or coherence.
Despite the fact that some aspects may be less comprehensively addressed.
Clear and supported conclusions derived from the analysis.

Despite the fact that some aspects may be less comprehensively addressed.
There are some inconsistencies in the basic conclusions that have been drawn. backing or lucidity.

support or clarity.
support or clarity.
No evidence of any conclusions drawn.

less thoroughly addressed.


Basic conclusions are drawn, but there are some support or clarity gaps.

It was not thoroughly addressed.


The conclusion lacks the necessary support and coherence.
Clear and convincing conclusions emerged from the investigation.

support or clarity.
Conclusions from the analysis that are clear and supported.

support or clarity.
Conclusions are weak, lacking necessary support or coherence.
Simple conclusions that have a big impact on the overall project.

Clear and supported conclusions drawn from the analysis.

No evidence of any conclusions drawn.

Conclusions drawn from the analysis are comprehensive and well- supported.
Conclusions are apparent, though some aspects may be unclear.
Conclusions are weak, lacking necessary support or coherence.
The analysis came up with clear and well-supported conclusions.
The analysis yielded precise and substantiated conclusions.

There were clear and supported conclusions derived from the analysis

support or clarity.
Comprehensive and well-substantiated conclusions were drawn from the analysis.
support or clarity.

Conclusions are lacking or entirely inappropriate.

Conclusions are weak, lacking necessary support or coherence.


There were comprehensive and well-supported conclusions drawn from the analysis

Basic conclusions are drawn with some gaps in support or clarity.

Conclusions are largely absent.

No evidence of any conclusions drawn.

Conclusions are clear, even though certain points might not have been covered in full.

There are certain points might not have been covered in full in the conclusion.
The analysis produced results that were backed by evidence.

No evidence of any conclusions drawn.


no support or clarity

Student gave basic conclusions with some gaps in clarity.


Very basic conclusions, significantly impacting the overall

Conclusions are clear, even though certain points might not have been covered in full.

assistance or clarification.

There are some basic conclusions drawn, with some gaps in support.
Conclusions drawn in the study is very basic and it lacks necessary support.
Conclusions drawn are evident. It has some aspects which needs to addressed thoroughly.
The conclusion of this project is very clear.
Conclusions drawn from the study are clear and relevant.
Comprehensive and well-substantiated conclusions were drawn from the analysis.
The conclusion of this project presents a holistic approach to enhancing project management effectiveness in the digital age.
Clear and supported conclusions derived from the analysis were drawn from the analysis.
The conclusion of this project is very focusable.
Conclusions that are incorrect are significantly impacting the overall project.
The conclusion of this project presents a holistic approach to enhancing project management effectiveness in the digital age.
There are some ambiguities or gaps in support for the basic conclusions drawn.

There are some gaps in the conclusions.


The conclusion of this project is very clear.
The conclusion of this project is very focusable.
Concept based conclusions are drawn but didn't meet expectations nor suggest any future recommendations.
There is no conclusion of this study are given.
Conclusions drawn are clear and it clearly supported the over all topic.
Conclusions drawn are evident.
The conclusion chapter summarizes the key findings of the study and reflects on the insights gained.
Only very basic conclusions are drawn in the study.
Conclusions drawn are evident but some aspects may be less concerned.
There is precise difference between the conclusions drawn and the objectives stated.
Conclusions drawn are clearly derived from the analysis.

The conclusion of this study is very well.

The conclusion of this project is very clear.


Add more clarity of conclusion of this project.

The conclusion of this project is very clear.


The conclusion of this project is very focusable.
good information of the conclusion of the project

Conclusions are weak, lacking necessary support or coherence.


The conclusion is clear, but some parts may not have been covered thoroughly.

Comprehensive and well-substantiated conclusions were drawn from the analysis.

Conclusions are nearly absent


Creative techniques or approaches can enhance problem-solving.
There are some ambiguities or gaps in support for the basic conclusions drawn.
The conclusion is inadequate, lacking the necessary support.
There are some gaps in support or clarity in the conclusions drawn.

The conclusion of this project are good.


The analysis yielded precise and substantiated conclusions.

The conclusion of this project need more information with related to E-Commerce.
need more clearence conclusion of this project.
develop in the future.
The conclusion of this study is clear.
Basic conclusions are drawn, with some gaps in understanding.
assistance or clarification.

The cloud computing security is necessary for the average person consumers, enterprises and cloud providers and this research posses focused on their educ

The analysis produced conclusions that were supported by evidence.


support
The conclusion of this study are clearble to understand.

The conclusion of this study is well.

The conclusion of this project is very focusable.


The conclusion of this project is very clear.
The conclusion of this project is very focusable.
The analysis yielded precise and substantiated conclusions.
support
less carefully considered.

Conclusions are weak, lacking necessary support


Conclusions are weak, lacking necessary support
The conclusion and future scope of this project is very clear.
The fundamental conclusions drawn are supported by some gaps.
Basic conclusions have been drawn, although there may be some gaps in support or clarity.
Conclusions are weak, lacking necessary support
Clear and supported conclusions derived from the analysis.
Conclusions are evident, albeit certain aspects may require less comprehensive attention.
Basic conclusions were drawn with some gaps in support.
Comprehensive and well-supported conclusions were drawn from the analysis.
support .
The conclusion of the project was the model development phase, where we selected and trained various machine learning algorithms, including linear regre
Enhance conclusions with clearer support to fill gaps and improve the overall coherence of the analysis on challenges in appointing and retaining individual
Conclusions is to give more specific implementation of the project.

range of sectors.
Conclusions is to give more specific implementation of the project.
Objectives of the study need to give more clearly.
Objectives of the study need to give more clearly.
While conclusions are discernible, ensuring comprehensive coverage of all relevant aspects will strengthen the overall depth and validity of findings regard
While conclusions are apparent, ensuring comprehensive coverage of all relevant aspects will strengthen the overall depth and validity of findings in the com
Refine conclusions by providing stronger support and clarity to address gaps in the analysis of the workflow in the Indian banking sector, ensuring a more r

Dell's commitment to lean manufacturing principles has not only enhanced its operational efficiency but has also contributed to its long-term sustainability
The conclusions drawn are clear and well-supported by the analysis conducted on mutual fund performance in India.

In the context of the research project at hand, a fairly high implementation level of the requirements of TQM in the food industry has been found.
While conclusions are apparent, addressing less thoroughly covered aspects would strengthen the overall depth and validity of the analysis on consumer buy
applications, methodologies, challenges, and real-world success

In summary, the research findings presented in this study highlight the significant impact of lean manufacturing principles on operational

Conclusions is to give more specific implementation of the project.

The exposures propose that numerous affiliations ought to zero in their endeavors on drawing in their clients through experiential advancing through b

conclusion is clear if not properly handled may affect depth and extent of analysis done
actions that HRIS has not absorbed

only security to conclude the giving security of its information amid transmission
give correct conclusion part to a distributed blockchain network must be developed across all universities

support or clarity.

support

support or clarity.

Conclusions drawn

support or clarity.
support or clarity.
Conclusions are weak, lacking necessary support or coherence.

support or clarity.

less thoroughly addressed.


support or clarity.

Conclusions are weak, lacking necessary support or coherence.


support or clarity.

Conclusions are weak, lacking necessary support or coherence.

Conclusions are weak, lacking necessary support or coherence.

support or clarity.

Conclusions are weak, lacking necessary support or coherence.

conclusion drawn with the research methodology needs to specify some finding and results
Conclusion drawn but needs to mention the research finding and analysis outcome in the proper manner
Clear and supported conclusions derived from the analysis.
Conclusions are evident, though some aspects may be less thoroughly addressed.
Conclusion needs to mention in the precise manner needs to specify the result of the study
No evidence of any conclusions drawn.
Conclusions are weak, lacking necessary support or coherence.
Conclusion needs to mention with various finding and results
Conclusions are weak, lacking necessary support or coherence.
Clear and supported conclusions derived from the analysis.
summary of findings given needs to focus on the recent trends in the study
outcome only given needs to draw with various factors about the result
support or clarity.
Clear and supported conclusions derived from the analysis.
Conclusions are weak, lacking necessary support or coherence.
Clear and supported conclusions derived from the analysis.
Clear and supported conclusions derived from the analysis.
Conclusion specified needs to mention some key findings for the AI applications
Comprehensive and well-supported conclusions drawn from the analysis.

conclusion drawn needs to present various result of the analysis methods


Conclusions are weak, lacking necessary support or coherence.
conclusion drawn needs to mention various outcome of the study and suggestions to improve the research area.
Conclusions are weak, lacking necessary support or coherence.
support or clarity.

support or clarity.
Conclusion drawn needs to focus on the prediction points
support or clarity.
support or clarity.
Conclusion drawn may be write about measurement and techniques to get result of the study

support or clarity.

Conclusion drawn needs to precise the conclusion part and present it with results
Conclusions are nearly absent or entirely inappropriate.
Lenova's software usages given the study report, needs to present various tools choose to study and finalize with the scope of the study
Conclusions are weak, lacking necessary support or coherence.
support or clarity.
Findings are discussed needs to present conclusion part in the report
Conclusions are weak, lacking necessary support or coherence
support or clarity.
Needs to scrutinize the conclusion points and give study findings

Conclusions are weak, lacking necessary support or coherence.


Conclusion drawn needs to specify what are the results after analyse the customer reaction data and present in this section
conclusion drawn needs to specify the result of the study with various metrics
Conclusions are weak, lacking necessary support or coherence.
Conclusions are weak, lacking necessary support or coherence.
There is no conclusion part in the study report
Needs to present conclusion points
Conclusion needs to be scrutinize and give some more points related to results

No evidence of any conclusions drawn.

support or clarity.
Conclusions are weak, lacking necessary support or coherence.

support or clarity.

support or clarity.

Basic conclusions drawn, with some gaps in support or clarity.

Conclusions are weak, lacking necessary support or coherence.

Clear and supported conclusions derived from the analysis.


Needs to present précised conclusion points about the integration
Finding and suggestions given needs to mention the conclusion part of the project

Conclusion drawn needs to present the conclusion in short and sweet manner
Conclusion drawn but needs to mention various conclusion point innovative idea and what are all the problem finding and suggestions

Comprehensive and well-supported conclusions drawn from the analysis.


Clear and supported conclusions derived from the analysis.
Conclusion drawn need to focus on the more precise problem solution in the case study
Conclusion drawn needs to mention some key solution and finding of the study
Conclusion drawn needs to specify data discrepancy in the specified subject
this research highlights the multifaceted nature of IoT security challenges and provides actionable insights for organizations to strengthen their security fram
Conclusion drawn needs to focus on primary constraint of the study and give some suggestions to improve the qualitive of the subject
Conclusions are evident, though some aspects may be less thoroughly addressed.
Needs to specify more points on the conclusion section based on the data analysis
Comprehensive and well-supported conclusions drawn from the analysis.
Comprehensive and well-supported conclusions drawn from the analysis.
Clear and supported conclusions derived from the analysis.
Clear and supported conclusions derived from the analysis.
Clear and supported conclusions derived from the analysis.
conclusion drawn but needs to specify some clarity points based on the nature of the python attributes
Needs to precise the conclusion with various key aspects of the study
support or clarity.
Very basic or incorrect conclusions, significantly impacting the overall project.
Clear and supported conclusions derived from the analysis.
No evidence of any conclusions drawn.
support or clarity.
Clear and supported conclusions derived from the analysis.
conclusion drawn needs to specify the outcome of the study with some improvements
support or clarity.

Conclusions are weak, lacking necessary support or coherence.


The conclusions drawn are basic and contain some gaps in support or clarity. Strengthening the evidence and providing clearer explanations will improve th

support or clarity.
No evidence of any conclusions drawn.
The conclusions drawn are basic and exhibit gaps in supporting evidence or clarity, suggesting a need for additional data and clearer explanations to strengt

Assessing microfinance lending requires robust methodologies that capture both quantitative metrics (e.g., repayment rates, loan portfolio quality) and qual
Conclusions are weak, lacking necessary support or coherence.
The conclusions drawn are apparent, yet some aspects could benefit from more thorough exploration and analysis in the context of the HDFC Limited and H

conclusion drawn, inventory business process implemented the ABC methodology in leather products. require more clarification about this
The conclusions drawn are fundamental, yet they lack sufficient support or clarity in certain areas, requiring additional evidence and explanation to strength
The conclusions drawn are apparent, although certain aspects may benefit from more thorough exploration and clarification in the context of the impact of d
Conclusions is to give more specific implementation of the project.

Basic conclusions are drawn, but there are gaps in support and clarity that need to be addressed for a more convincing analysis.
The conclusions drawn are basic, but there are gaps in supporting evidence and clarity, which could benefit from more detailed analysis and explanation for
Healthcare to embark on a journey of continuous improvement and excellence in healthcare delivery.
Many articles, journals are need to give clearly in this project
Strengthen conclusions by providing more robust support and ensuring greater clarity to improve the analysis of the evolution of the Indian banking sector a
management, and enhance demand forecasting accurarcy.
development in India.

Conclusions is to give more specific implementation of the project.


While conclusions are evident, ensuring thorough addressing of all aspects will strengthen the overall depth and validity of findings regarding mergers and
The cold-chain industry in India has a big opportunity for growth, but it also uses a lot of energy and refrigerants which can harm the environment.
While conclusions are apparent, ensuring thorough addressing of all pertinent aspects will strengthen the overall depth and validity of findings concerning c

The conclusions are clear and well-supported by the analysis conducted.


No evidence of any conclusions drawn.

No evidence of any conclusions drawn.


support or clarity.

No evidence of any conclusions drawn.


No evidence of any conclusions drawn
support or clarity.

support
Conclusions are nearly absent

No evidence of any conclusions drawn.


less thoroughly addressed.

support or clarity.
support or clarity.
support or clarity.
support or clarity
Conclusions are nearly absent or entirely inappropriate.
basic Conclusions drawn
less thoroughly addressed.
adequate Conclusions drawn

Conclusions given

Conclusions drawn
Conclusions are weak, lacking necessary support or coherence.
support or clarity.
WELL WRITTEN
OK
NEED TO BE PRECIELY WRITTEN
WELL CONCLUDED
OK
COPIED
WELL PRESENTED THE CONCLUSION
WELL CONCLUDED
GOOD
WELL CONCLUDED
Conclusions are nearly absent
Basic conclusions drawn, with some gaps in support or clarity.
WELL CONCLUDED
ok
The analysis has led to comprehensive conclusions
A comprehensive conclusion is well drawn from the useful process of mapping between objective and consequence.
The conclusions are basic, but there may be some gaps in support or clarity
Basic conclusions drawn, with some gaps in support or clarity
Basic conclusions drawn, with some gaps in support or clarity.
Basic conclusions drawn, with some gaps in support or clarity.
Basic conclusions drawn, with some gaps in support
Basic conclusions drawn, with some gaps in support or clarity.
Basic conclusions drawn, with some gaps in support

Conclusions drawn from the analysis were precise and well-supported.


The analysis produced conclusions that were both clear and well-supported.
The analysis yields thorough and well-backed conclusions.

Well-drawn conclusion based on the objective and analysis.


Conclusions are nearly absent or entirely inappropriate.
Basic conclusions drawn, with some gaps in support or clarity
clear and well-supported findings drawn from the investigation.
Simple conclusions made, perhaps with some ambiguities or lack of evidence.
Basic conclusions drawn, with some gaps in support or clarity.
Clear and substantiated findings based on the analysis.
Conclusions are evident, though some aspects may be less thoroughly addressed.
A clear and demonstrated conclusion was drawn according to the analysis.
The shopping is easier, the payment methods are secured, you even get an option to book hotel, travels etc.
support.
support
support.
Conclusions is to give more specific implementation of the project.
support.
their growing importance in daily financial transactions.
support.
No conclusions in this project, Conclusions is to give more specific implementation of the project.
support.
overall project.
Conclusions is to give more specific implementation of the project.
support
Conclusions is to give more specific implementation of the project.
support
rgencies, and use outsourcing as a strategic tool for achieving their business goals.
No conclusion for this project, Conclusions is to give more specific implementation of the project.
Conclusions are weak, lacking necessary support
This innovative style of obtaining IT connected providers makes organizations to revisit their own system and program service technique and enhance their
Conclusions is to give more specific implementation of the project.
Conclusions is to give more specific implementation of the project.
The integration of data analytics, artificial intelligence, electronic work papers, continuous monitoring, and other technological tools has revolutionized the
Basic conclusions drawn, with some gaps in support
Conclusions are evident, though some aspects may be less thoroughly addressed.
Project provides a comprehensive analysis of cybersecurity challenges and solutions in the BFSI sector in India.
Basic conclusions drawn, with some gaps in support
Conclusions are evident, though some aspects may be less thoroughly addressed.
Conclusions are evident, though some aspects may be less thoroughly addressed.
Basic conclusions drawn, with some gaps in support
Conclusions are nearly absent
Basic conclusions drawn, with some gaps in support
Basic conclusions drawn, with some gaps in support
The study highlighted PSYSFT as a mediator between the HPWS and CPB.
progress in the years to come
Conclusions is to give more specific implementation of the project.
ITSM delivers the needed architecture and processes to manage IT services properly, while digital transformation employs these services to support c
overall project.
addressed.
addressed.
The study reveals data success of a brand depends upon the satisfaction of consumers such as quality, performance, price, etc. The customers are satisfied w
transformative realm of artificial intelligence, seeking to highlight its potential in organizational design
Conclusions is to give more specific implementation of the project.
Conclusions is to give more specific implementation of the project.
addressed.
addressed.
support.
nearly absent.
Conclusions is to give more specific implementation of the project.
Conclusions is to give more specific implementation of the project.
addressed.
To identify the challenges faced during the implementation and look out for future improvements to enhance the system’s effectiveness.
addressed.
nearly absent.
This research aims to bridge the gap between the theoretical benefits of RPA and practical implementation, providing a roadmap for organizations to naviga
This partial integration often translates into fragmented data visibility and synchronization, hindering the attainment of real-time insights necess
support.
support.
addressed.
addressed.
The study's conclusions show how the fintech sector affects India's digital economy. According to the report, because fintech companies save them time and
support.
Conduct a thorough examination of contemporary cybersecurity threats within the context of IT service management.
support.
support.
AI has been identified as a powerful tool for enhancing operational efficiency through automation of routine tasks, predictive maintenance, and optim
support.
addressed.
Conclusions is to give more specific implementation of the project.
Conclusions is to give more specific implementation of the project.
Current techniques need to implement and analysis the project.
In addition, this study was conducted during the COVID-19 pandemic when the employees’ experience was shaped by a unique set of circumsta
Conclusions is to give more specific implementation of the project.
support.
Provide information about what might happen in the future and the technologies that will impact working from a distance.
addressed.
support.
support.
This project has explored these emerging trends, the challenges associated with them, and the opportunities they present for businesses aiming to thrive in th
addressed.
Conclusions is to give more specific implementation of the project.
addressed.
addressed.
Conclusions is to give more specific implementation of the project.
addressed.
support.
Conclusions is to give more specific implementation of the project.
Conclusions is to give more specific implementation of the project.
Conclusions is to give more specific implementation of the project.
Conclusions is to give more specific implementation of the project.
Conclusions is to give more specific implementation of the project.
addressed.
support.
Conclusions is to give more specific implementation of the project.
support.
Conclusions is to give more specific implementation of the project.
Conclusions is to give more specific implementation of the project.
support
Conclusions is to give more specific implementation of the project.
Conclusions is to give more specific implementation of the project.
addressed.
addressed.
addressed.
Conclusions is to give more specific implementation of the project.
Technology has always played an important role in education, but its current use is more prevalent than ever thanks to the increased availability of sm
clarity.
support
addressed.
addressed.
addressed.
Conclusions is to give more specific implementation of the project.
Conclusions are weak, lacking necessary support
support
support
Conclusions is to give more specific implementation of the this project work.
addressed.
Conclusions is to give more specific implementation of this project work
opportunities that are significant increased production, cooperation, and cost-effectiveness.
Conclusions is to give more specific implementation of this project.
support
Conclusions is to give more specific implementation of the project.
Continuous in vestment in advanced technologies such as artificial intelligence, blockchain, and cloud computing to stay competitive.
addressed
No conclusion provided in this project, need to giveConclusions is to give more specific implementation of the project.
addressed.
Conclusions is to give more specific implementation of the project.
support.
lators, and other relevant entities.
Businesses employ e-business models to generate value and turn a profit on the internet.
support
Conclusions is to give more specific implementation of the current project work.
addressed.
addressed.
support.
Agile’s constant cycle of design, test, deploy, delivers continuous subsets of high-value features and puts them in the hands of users as fast as poss
Conclusions is to give more specific implementation of the project.
support .
Conclusions is to give more specific implementation of the project work.
Conclusions is to give more specific implementation of the project.
addressed.
support.
addressed.
addressed.
Conclusions is to give more specific implementation of the project.
AI technologies continue to evolve, ongoing research, knowledge sharing, and best practices will be essential in driving further advancements in fraud detec
Overall, the study emphasizes the importance of addressing cyber-related stressors within military settings.
The findings will help businesses to balance the benefits of BYOD with robust security measures, ultimately ensuring a secure and efficient workpla
Conclusions is to give more specific implementation of the project.
Conclusions is to give more specific implementation of the project.
addressed.
Basic conclusions drawn, with some gaps in support
E-commerce businesses must prioritize transparency, excellent customer service, and consistent product quality to foster long-term relationships with custo
The optimum utilization of future technologies in cyber security risk management requires a comprehensive and dynamic.
Conclusions is to give more specific implementation of the project.
Basic conclusions drawn, with some gaps in support
less thoroughly addressed.
Basic conclusions drawn, with some gaps in support or clarity.
Basic conclusions drawn, with some gaps in support or clarity.
Conclusions is to give more specific implementation of this project.
Conclusions is to give more specific implementation of the project.
Project contributes to the advancement of research in the field of predictive analytics, providing valuable insights and recommendations for practitioners an
Conclusions is to given more specific implementation of the project.
Basic conclusions drawn, with some gaps in support or clarity
Basic conclusions drawn, with some gaps in support or clarity
Basic conclusions drawn, with some gaps in support or clarity.
Basic conclusions drawn, with some gaps in support
Basic conclusions drawn, with some gaps in support or clarity.
Conclusions is to give more specific implementation of the project.
To ensure that technological advancements do not come at the price of our planet, but rather contribute to a sustainable and resilient future for everybody, it
CONCLUDED WELL
Basic conclusions drawn, with some gaps in support or clarity.
Basic conclusions drawn, with some gaps in support
Basic conclusions drawn, with some gaps in support
MAY BE IMPROVED
Very basic or incorrect conclusions, significantly impacting the overall project
Basic conclusions drawn, with some gaps in support
CONCLUSION IS OK
some more important findings can be presented
Conclusions are weak, lacking necessary support or coherence.
CONCLUSION NEED TO BE REFINED WHAT HAVE BEEN DONE
WELL WRITTEN CONCLUSION which fill the gps betwwn aim and result
YET TO BE IMPROVED INSUCH A WAY THAT AN OBJECT IS REACHED OR AT THE POINT OF REACHING STATE
Basic conclusions drawn, with some gaps in support or clarity
Basic conclusions drawn, with some gaps in support or clarity.
need to give precise conclusion that is on the result obtained
Basic conclusions drawn, with some gaps in support or clarity.

yet to be revised
Basic conclusions drawn, with some gaps in support or clarity.
Basic conclusions drawn, with some gaps in support or clarity.
WELL
Basic conclusions drawn, with some gaps in support
well presented
Basic conclusions drawn, with some gaps in support
Basic conclusions drawn, with some gaps in support or clarity.
well concluded
No evidence of any conclusions drawn
Basic conclusions drawn, with some gaps in support
Basic conclusions drawn, with some gaps in support or clarity.
conclusions drawn, with some gaps in support or clarity.
Basic conclusions drawn, with some gaps in support or clarity
Conclusions is to give more specific implementation of the project.
support
support
Cultivate a culture of agility, adaptability, and continuous improvement, where feedback is embraced as a catalyst for innovation and change.
addressed.
The research titled "Enhancing E-Banking Cybersecurity Measures and its Influence on Customer Satisfaction and Loyalty" has examined the
the analysis.
and customer satisfaction.
Conclusions is to give more specific implementation of the project.
Invest in AI Training: Businesses should invest in training programs to enhance employees' AI skills and knowled.
Analyzing the customer journey from awareness to purchase to understand the role of social media touchpoints in influencing buying decisions.
Homes are environments designed for the comfort of individual human beings and not the safety of sensors. But the challenges of residential energy consum
support
Digital India programme is a beginning in the right direction. As cost-effectiveness and convenience gain traction with consumers, digital adoption makes s
support
Conclusions is to give more specific implementation of the project.
In conclusion, the future of AI in the construction industry holds immense promise. By overcoming the current challenges and embracing AI technologies,
support
No conclusion for this project work, Conclusions is to give more specific implementation of the project.
Conclusions is to give more specific implementation of the project.
support
support
Conclusions is to give more specific implementation of the project.
Considering the prevalence of IT in today's facts economy, IT managers can significantly affect the struggle against worldwide warming while imp
support
nearly absent
As a result, when utilising the internet to combat this huge menace Cyber Crime, all of us shouldtake some preventative precautions
Conclusions is to give more specific implementation of the project.
nearly absent
The results will show how customers rank FinTech as well as other payment firms in terms of their intention to utilize their services and which
drawn.
support.
overall project.
support
support
addressed.

Clear and supported conclusions derived from the analysis


The competition analysis of the construction chemicals industry in India reveals a dynamic and rapidly evolving market influenced by several key factors su

The conclusion effectively summarizes the key points and reiterates the significant impacts of cloud computing on outsourcing. It highlights the transforma

Conclusions are weak, lacking necessary support

The conclusion succinctly summarizes the key findings and their implications for businesses and marketers. It reinforces the importance of understanding c
The conclusion succinctly summarizes the key findings and their implications for corporate product development and R&D.
In conclusion, implementing ITIL 4 requires a holistic approach that combines technological innovation, organizational readiness, and strategic planning. B
The conclusion was given with suggestions towards preventing the threats in a clear sketch

The conclusion says the ways to improve the CRM from the three contextual investigations taken for the study

Conclusions are weak, lacking necessary support


The study gave an action plan to integrate all BI solutions in one stack and good stated
possibility to notably increase earnings for people and operators.

Conclusions drawn from the analysis were precise and well-supported.

No evidence of any conclusions drawn.


Conclusions are clear, even though certain points might not have been covered in full.

Conclusions drawn from the analysis were precise and well-supported.

Conclusions are weak, lacking necessary support.

No evidence of any conclusions drawn.


Other subject file
Conclusions are clear, even though certain points might not have been covered in full.
Other subject file
Conclusions are weak lacking necessary support.
Other subject file
Conclusions drawn from the analysis were precise and well-supported.
No evidence of any conclusions drawn.
Simple conclusions with lack of clarity in some places.

Conclusions are clear, even though certain points might not have been covered in full.

Student uploaded assignment questions with answers.

Clear and supported conclusions derived from the analysis.

Clear and supported conclusions derived from the analysis.

Clear and supported conclusions derived from the analysis

conclusion of the project is highlights the significant potential of IT-IoT integration for transforming customer experience management.

however 37% respondents replied that they have been working in Soft Age from 2 to less than 4 years
platform to share their experiences and rate products or services.
Robotic automation enables organizations to automate repetitive, manual tasks, reducing the need for human intervention and streamlining ITSM processes
and employee retention in the IT industry
facilitate the creation, management, and utilization of data warehouses.

allowed with/without GPRS back link. There is no need to seize the application kind
ushered in by the evolution of big data analytics.

conclusions of the project is total of 500 surveys were distributed to IT professionals, security experts, and compliance officers across various banks.

r observation is used in this method if the researcher need to come to a conclusion this will given them a good insight about the topic and the study I conduc
There are certain points might not have been covered in full in the conclusion.
continuously exploring and optimizing test scenarios, Test craft ensures comprehensive.
goal.
Clear and supported conclusions derived from the analysis.
to innovate and adapt.
Conclusions are evident, though some aspects may be less thoroughly addressed.
underserved areas with limited internet connectivity
Conclusions are evident though some aspects may be less thoroughly addressed.

Conclusions drawn from the analysis were precise and well-supported.


Clear and supported conclusions derived from the analysis.
launching pre-event marketing campaigns and conducting post-event analysis.
Conclusions are evident though some aspects may be less thoroughly addressed.
Other subject file
methodology describes the techniques and procedures used to identify and analyze information regarding a specific research topic.
Other subject file
conclusion of this project AI systems must go through routine audits and assessments in order to identify and correct biases.
conclusion of the project is Geographical Boundaries has also a role to play in this data collection.
Other subject file

No evidence of any conclusions drawn.


Simple conclusions with lack of clarity in some places.
Basic conclusions drawn with some gaps in clarity.

Clear and supported conclusions derived from the analysis.


Clear and supported conclusions derived from the analysis.

Conclusions are evident, though some aspects may be less thoroughly addressed.

Basic conclusions drawn with some gaps in clarity.


Simple conclusion that lack clarity in some places.

Student didnot give any conclusion

Conclusions are clear, even though certain points might not have been covered in full.

Student gave basic conclusions with some gaps in clarity.

Other subject file


MSMEs can leverage these prospects and further increase their productivity, boost growth, and contribute to the country's economic progress.
financial challenges and foundation lacks.

competitive rather than invest important info on building program in‐house.


and within established guidelines
recent multi decade. These banks have made their reality felt in the space of activity

techniques in an efficient way.

Conclusions of this project Within these advanced technologies age, the cloud processing has been put generally.
of concern.
$11.7 billion year.

Conclusions drawn AI technologies to the fashion styling industry and conducts a evaluation of the current state of the art.
for organizations looking to optimize their chatbot strategies to enhance customer satisfaction.
hybrid detections. M

although AI eliminates the need for some employment


which can be shared in real time between the different links in the supply chain.

conclusion of the project demand of the hospital market


Blockchain networks, comprising multiple interconnected nodes, ensure secure and transparent transaction recording through a decentralized verification an

assurance derived from satisfied outcomes, convenience, and perceived dependability.


Integration, Predictive Analytics, Advanced Content Management, High-Value Document Solutions
significant assets of an association.

Clear and supported conclusions derived from the analysis.

Clear and supported conclusions derived from the analysis.


Clear and supported conclusions derived from the analysis.

Clear and supported conclusions derived from the analysis.

Clear and supported conclusions derived from the analysis

Clear and supported conclusions derived from the analysis.

Conclusions are weak, lacking necessary support or coherence


Conclusions are weak, lacking necessary support or coherence
Other subject file.
Income tax is a type of tax that the central government charges on the income earned during a financial year by individuals and businesses. Taxes are sourc
The overall conclusion that emerges from the analysis is that in banking industry, performance is a positive function of information technology. The finding
Other subject file
it is necessary to take easy precautions like using the most recent hardware and software for your digital needs to safeguard your devices and data from cyb

Other subject file


A primary reason to consider migrating legacy COBOL code to Java is the cost efficiency of maintaining that code going forward.
It has provided businesses with a powerful tool to market and sell their products online.
Simple conclusions with lack of clarity in some places.

Copy case(Course book)


Simple conclusion that lack clarity in some places.
Satisfied employees are preferred because they simply make a work environment and organizational climate better. There are many different practices that a
Other subject file
Simple conclusions with lack of clarity in some places.
the digital payments ecosystem in India has grown significantly in recent years, driven by government initiatives, an increase in internet and smartphone pe
MIS helps managers make effective decisions to support ongoing operations
The study concludes that the vulnerabilities and inefficiencies inherent in traditional financial systems underscore the need for decentralized financial system

In conclusion, technology has transformed our world in many ways. It has revolutionized the way we communicate, work, and live. While it has brought m
Other subject file

There are many companies in the market and some are service-based and some product based,

Student didnot give conclusion for this study.


The amalgamation of AI and Salesforce is redefining the CRM landscape, offering unprecedented opportunities for business
Other subject file
HRIS systems are a key part of any successful HR and recruitment workflow. The functions of HRIS systems include record keeping, data processing and m
Student gave basic conclusions with some gaps in clarity.
Very basic conclusions significantly impacting the overall project.
From improving customer service with chatbots to safeguarding your finances from fraud, AI is reshaping the way banks operat
Consumer decision making varies with the type of buying decision. Comparatively, complex and expensive purchases, like durable procurements, are likely
No evidence of any conclusions drawn.

incorrect conclusions, significantly impacting the overall project.


Incorrect conclusions, significantly impacting the overall project.

Basic conclusions drawn, with some gaps in support

The conclusion are good but need to be more specific


Basic conclusions drawn, with some gaps in support

The conclusion are good but need to be more specific


Basic conclusions drawn, with some gaps in support
Basic conclusions drawn, with some gaps in support or clarity.
Basic conclusions drawn, with some gaps in support or clarity.

Conclusions are nearly absent


The conclusion are good but need to be more specific

The conclusion are good but some lack in analysis

Basic conclusions drawn, with some gaps in support


Basic conclusions drawn, with some gaps in support or clarity.

The conclusions are clearly linked to the objectives and also informative
Basic conclusions drawn, with some gaps in support
Basic conclusions drawn, with some gaps in support or clarity

Basic conclusions drawn, with some gaps in support or clarity


Basic conclusions drawn, with some gaps in support or clarity.

Basic conclusions drawn, with some gaps in support or clarity.


Basic conclusions drawn, with some gaps in support or clarity
The conclusions are well presented and also linked to the objectives and also informative

Basic conclusions drawn, with some gaps in support or clarity


The conclusions are clearly linked to the objectives and also informative
Basic conclusions drawn, with some gaps in support

Basic conclusions drawn, with some gaps in support or clarity

The conclusion of this project is very focusable.


conclusions drawn of the project are requied more key concept
The conclusion of this project is very clear

add some more clarity to conclusion of this study.


networking websites and provide insights into future trends in the industry.
The study's main conclusion is that artificial intelligence technology can significantly improve marketing strategies by processing customer data quickly and
It takes a look at the challenges that firms have when trying to use HR analytics, noting reasons such a lack of qualified HR employees and issues with data
Conclusions were driven from the data work.
Conclude with the issues in cloud computing

Results and findings are added cleverly but at last conclusion part is missing in this project.

The conclusion part delivers strong clearence of this study.


Clear and supported conclusion is drawn

Basic conclusion are drawn


Very clear and supported conclusion are drawn

clear and comprehensive conclusion are drawn

clear and supported conclusion are drawn

Basic conclusion is drawn


Conclusions are evident, though some aspects may be less thoroughly addressed
addressed

give clear and correct conclusions are needed

GOOD AND ALSO CLEAR AND SUPPORTED CONCLUSIONS


conculsion is opted to your objectives
write clear conclusions based on your study
clear conclusions to be based on your objectives
Comprehensive and well supported conclusion are drawn
based on your objectives your conclusions is good
Basic conclusions are drawn with some clarity
Clear and supported conclusion are drawn
Clear and supported conclusion are drawn

proper conclusions to be drawn based on your objectives

Concluded with real-time monitoring and predictive capabilities that are essential for effective flood management.
The study's conclusions have shed light on the advantages, disadvantages, and results of marketing online banking services.

good and strong conclusions is to be given


Conclusion is clear about the project taken

impacting the overall project.

customer experiences.
The findings of this study carry substantial practical implications for individuals involved in social entrepreneurship, policymakers, and other relevant stake
The study discusses future growth and highlights how important e-commerce is to the Indian economy.
write conclusion based this project objectives
Concluded with good ideas
research paper provides valuable insights into the adoption and optimization of cloud computing for small businesses, offering practical guidance and recom
less thoroughly addressed.
strong and good conclusions given in this project
conclusion is appropriate for this object of study

Clear and supported conclusions derived from the analysis


suitable conclusions are drawn from analyze the data
The results of the survey support the assertion that replacing paper-based medical records is particularly useful for medical secretaries and, to a lesser exten
organizational performance and IT service delivery.
Conclusions are evident, though some aspects may be less thorough

conclusion is clear with based on your objective

strong conclusion is given based on the objectives


suitable conclusions are given based on objectives
and contributes valuable insights to the field.
Concludes as by leveraging the comprehensive suite of big data tools and platforms, organizations can unlock new opportunities, optimize operations, and d
concludes that that Go Karting needs to be in a competitive market to improve its business because the aim of the competitive market is to develop custome
Basic conclusions drawn, with some gaps in support
Conclusions are weak, lacking necessary support
Concludes with the adoption of AI-driven features can be boosted by open information regarding data privacy and security safeguards.

Basic conclusions drawn, with some gaps in support

Basic conclusions drawn, with some gaps in support

Conclusions are evident, though some aspects may be less thoroughly addressed.
Basic conclusions drawn, with some gaps in support
suitable conclusions are given
Add more clarity to conclusion of this study.

The conclusion of this project is very focusable.

This study includes proposing good recommendations for enhancing overall of machine learning concept
the conclusion of the project is good and clear

the content of conclusion of project good response of this project

The conclusion chapter summarizes the key findings of the study and reflects on the insights

need togive more ideas of conlusion


Add more clarity to conclusion of this study.
The conclusion of this project presents a holistic approach to enhancing project management effectiveness in the digital age.

this project presents a holistic approach to enhancing project management effectiveness in the digital age.

Conclusions are weak, lacking necessary support


Conclusions are weak, lacking necessary support

Conclusions are evident, though some aspects may be less thoroughly addressed.
Basic conclusions drawn, with some gaps in support or clarity
good and apropriate conclusions are given
strong conclusions are given based on objectives
Conclusions are evident, though some aspects may be less thoroughly addressed.
Basic conclusions drawn, with some gaps in support

Basic conclusions drawn, with some gaps in support


Basic conclusions drawn, with some gaps in support
Basic conclusions drawn, with some gaps in support
strong conclusions are drawn based on objectives
Conclusions are nearly absent
Conclusions are nearly absent
Conclusions are weak, lacking necessary support
write proper conclusions based on your objective
Basic conclusions drawn, with some gaps in support
give proper conclusions based on your objectives
Clear and supported conclusions derived from the analysis
Basic conclusions drawn, with some gaps in support.

strong conclusions is given


Basic conclusions drawn, with some gaps in support
Clear and supported conclusions derived from the analysis.
Basic conclusions drawn, with some gaps in support or clarity
Basic conclusions drawn, with some gaps in support

Basic conclusions drawn, with some gaps in support


Clear and supported conclusions derived from the analysis.
Basic conclusions drawn, with some gaps in support
Basic conclusions drawn, with some gaps in support
Conclusions are weak, lacking necessary support
Basic conclusions drawn, with some gaps in support

No evidence of any conclusions drawn.


Clear and supported conclusions derived from the analysis
Basic conclusions drawn, with some gaps in support
Conclusions are evident, though some aspects may be less thoroughly addressed.
Basic conclusions drawn, with some gaps in support or clarity

The findings are clearly presented and the conclusions are informative

The conclusion are reasonable and useful recommendation


The conclusion are clearly linked to research questions
The conclusion are good but need to be more specific
The conclusion are well presented but may require further analysis
incorrect conclusions, significantly impacting the overall project.
Basic conclusions drawn, with some gaps in support

Basic conclusions drawn, with some gaps in support


Basic conclusions drawn, with some gaps in support

Basic conclusions drawn, with some gaps in support


appropriate conclusions are drawn based on objectives
conclusions are more suitable for objective of this study
Basic conclusions drawn, with some gaps in support

less thoroughly addressed.


less thoroughly addressed.
less thoroughly addressed.
Clear and supported conclusions derived from the analysis.
support or clarity.

Conclusions are weak, lacking necessary support or coherence.


Basic conclusions drawn, with some gaps in support or clarity.
Basic conclusions drawn, with some gaps in support or clarity.

Basic conclusions drawn, with some gaps in support or clarity.


Conclusions are evident, though some aspects may be less thoroughly addressed.
Very basic conclusions, significantly impacting the overall project.

Very basic or incorrect conclusions, significantly impacting the overall project.


Conclusions are evident, though some aspects may be less thoroughly addressed.
Basic conclusions drawn, with some gaps in support or clarity.

conclusions drawn, with some gaps in support or clarity.

Basic conclusions drawn, with some gaps in support or clarity.


Conclusions are evident, though some aspects may be less thoroughly addressed.

Clear and supported conclusions derived from the analysis.

support or clarity.

Conclusions are weak, lacking necessary support or coherence.


support or clarity.

Conclusions are weak, lacking necessary support or coherence.


support or clarity.
Conclusions are weak, lacking necessary support or coherence.
Conclusions are weak, lacking necessary support or coherence.
Conclusions are weak, lacking necessary support or coherence.
Basic conclusions drawn, with some gaps in support or clarity.

Conclusions are weak, lacking necessary support or coherence.


support or clarity.

Basic conclusions drawn, with some gaps in support or clarity.


Implementing segmentation-driven strategies holds immense potential for enhancing donor retention, increasing donation amounts, and fostering long-term
The ability for companies to quickly and simply scale their services to meet their unique needs is another advantage of moving to the cloud
failing to respond to or complete the surveys within the specified time frame.
technique desire alternatives and promoting a culture of non-prevent improvement and learning in mission management practices.
Basic conclusions drawn, with some gaps in support or clarity.
Conclusions are evident, though some aspects may be less thoroughly addressed.

Basic conclusions drawn, with some gaps in support or clarity.


Basic conclusions drawn, with some gaps in support or clarity.
Use the power of cloud computing to make operations more efficient, simplify processes and get the best possible use from resources.
Strengthen data protection laws and regulations to ensure responsible AI usage and safeguard consumer privacy
The purpose of this study was to investigate the effect that gamification has on student engagement and academic accomplishment

comprehensive understanding of security requires both qualitative and quantitative assessments


Conclusions are evident, though some aspects may be less thoroughly addressed.

Conclusions are evident, though some aspects may be less thoroughly addressed.
Clear and supported conclusions derived from the analysis.
Clear and supported conclusions derived from the analysis.
Basic conclusions drawn, with some gaps in support or clarity.
Conclusions are evident, though some aspects may be less thoroughly addressed.
The researchers set out to learn more about the problems and difficulties that come with RPA deployment

Basic conclusions drawn, with some gaps in support or clarity.


This research has ended with the conclusion that digitization is very useful for small and medium industries.

literature review and then compiled four groups of attributes in a proposed testing framework to be considered when looking at IS agility
and practices.
Conclusions are evident, though some aspects may be less thoroughly addressed.
Clear and supported conclusions derived from the analysis.

Providing extensive training and resources ensured that users were well-prepared to utilize the new tools effectively. This significantly improved user adopt
Basic conclusions drawn, with some gaps in support or clarity.
The majority of respondents reported using social media platforms multiple times a day, indicating the widespread usage and popularity of these platforms
Their inclusion in the essential degree of deciding upon the socially capable exercises and their idea in its communication whenever included in the CSR ex
This study embraced a quantitative method for managing answer the objectives framed for the study and perceived the essential issue, directly and indirectl
can handle concurrently and at the same time give an indication about the systems Availability
Clear and supported conclusions derived from the analysis.
Ability management is extensively seen as a cycle to draw in, make and hold high possible entertainers from outside as well as inside the association

Basic conclusions drawn, with some gaps in support or clarity.


indicates revealing of computational information, treatments storing and application together with other renters residing on same physical/logical system at
The predicted income of Insightful social hub' as well as the anticipated timescale to attain profitability point to the fact that the company may have the abil
Conclusions are evident, though some aspects may be less thoroughly addressed.
Basic conclusions drawn, with some gaps in support or clarity.
This study highlights the persistent and evolving nature of cyber security threats, including malware, phishing, advanced persistent threats, and insider threa
Clear and supported conclusions derived from the analysis.

This project demonstrates a strong understanding of the ITSM curriculum by combining theoretical knowledge with practical application to design and dev

intermediary who provides the required knowledge about the financial market and expertise in the financial market
Reducing environmental implications requires promoting green computing and sustainable IT practices. They are necessary to lessen the rapidly expanding
As implementation of Artificial Intelligence in health insurance industry or rather any industry for that matter relies heavily on the data and its various proc
WELL DRAWN
drawn
WELL DRAWN
well draen
Basic conclusions drawn, with some gaps in support or clarity
WELL DRAWN
Basic conclusions drawn, with some gaps in support or clarity.
well concluded
drawn ok
Very basic or incorrect conclusions, significantly impacting the overall project.
drawn well
Conclusions are evident, though some aspects may be less thoroughly addressed.
Clear and supported conclusions derived from the analysis
well drawn
Conclusions are evident, though some aspects may be less thoroughly addressed
Conclusions are evident, though some aspects may be less thoroughly addressed.
Conclusions are evident, though some aspects may be less thoroughly addressed.
nor completely concluded
Conclusions are evident, though some aspects may be less thoroughly addressed.
Clear and nice conclusions drawn from the analysis.
Clear and supported conclusions derived from the analysis.
Clear and supported conclusions derived from the analysis.
Research has indicated a favorable association between key engagement measures, including click-through rates, conversion rates, dwell time, and social m
The analysis of the questionnaire responses revealed a mixed outlook among employees regarding the impact of AI on their jobs.
Basic conclusions drawn, with some gaps in support or clarity
Clear and supported conclusions derived from the analysis.
Clear and supported conclusions derived from the analysis.
offering unprecedented opportunities for growth, efficiency, and customer satisfaction
Conclusions are evident, though some aspects may be less thoroughly addressed.
Clear and supported conclusions derived from the analysis.
Database migration presents or reducing infrastructure maintenance costs, optimizing resource utilization, and achieving scalability to handle growing data
This study revealed that various independent factors positively contribute to employee engagement, and a positive organizational culture plays a significant
Clear and supported conclusions derived from the analysis
Clear and supported conclusions derived from the analysis.
Comprehensive and well supported conclusions drawn from the analysis
gain additional power from the Internet of Things with the proper infrastructure in place and the right relationships, allowing them to revolutionize their org
The conclusion of this study shows the employee’s perception towards organizational HR practices. By the perception, it also signifies the personal characte
Clear and supported conclusions derived from the analysis.
Conclusions are evident, though some aspects may be less thoroughly addressed.
focus on improving its infrastructure, establishing effective laws and regulations, providing focused training and education.
Personality is actually behavior and emotional pattern of the person. Social media is a place where users present themselves to the world, revealing persona
Our analysis of the growth prospects of mutual funds in India has yielded several key findings that highlight the industry's potential and the challenges it fac
Conclusions are evident, though some aspects may be less thoroughly addressed.
Clear and supported conclusions derived from the analysis
We investigated the data, checking for data unbalancing, visualizing the features, and understanding the relationship between different features
Information plays a significant job in the field of big business. Additionally, it has been treated as an asset of the organization and each organization wants t
Clear and supported conclusions derived from the analysis.
Many challenges faced by women in company throughout their startup and early stages of employment included limited flexibility, difficulty getting back t
Clear and supported conclusions derived from the analysis.
Support the development of new algorithms and trading technologies through partnerships with technology firms and academic institutions
This research aims to identify the key technologies and approaches utilized by banks to improve customer interactions, satisfaction, and loyalty

Conclusions are evident, though some aspects may be less thoroughly addressed.
Basic conclusions drawn, with some gaps in support or clarity.
Accenture continues to be a leader in the professional services industry by consistently delivering comprehensive and innovative solutions that address com
establishing trust and credibility among users.
Conclusions are evident, though some aspects may be less thoroughly addressed
Comprehensive and well supported conclusions drawn from the analysis.
Projects are included to improve a student's learning capacity and to stimulate their desire to conduct new work and pursue excellence since they are intende
Develop tools with a modular design that enables efficient integration of newly developed features and functionalities.
Conclusions are evident, though some aspects may be less thoroughly addressed.
Clear and supported conclusions derived from the analysis
and risk management tool for citizens of all countries.
Basic conclusions drawn, with some gaps in support or clarity.
The conclusion are well read the project

The introduction of project management practices led to better communication and collaboration among team members
Conclusions are evident, though some aspects may be less thoroughly addressed.
Machine learning models, such as recurrent neural networks (RNNs) and transformers, are trained on historical data to improve the chat bot's accuracy and
Conclusions are evident, though some aspects may be less thoroughly addressed.
Clear and supported conclusions derived from the analysis
Conclusions are evident, though some aspects may be less thoroughly addressed
Conclusions are evident, though some aspects may be less thoroughly addressed.
Basic
The study concludes that, as olid employee-development program can mean the difference between a successful company and one that struggles.
Basic conclusions drawn, with some gaps in support or clarity.
Basic conclusions drawn, with some gaps in support or clarity.
Basic conclusions drawn, with some gaps in support or clarity

Basic conclusions drawn, with some gaps in support or clarity

There are several holes in support or clarity.


Basic conclusions drawn, with gaps in support or clarity

conclusions are drawn in such a way that how the mapping done from objective and goal
WELL DRAWN CONCLUSION THAT MAPS OBJTCIVES AND OUTCOME
Basic conclusions drawn, with some gaps in support or clarity
Basic conclusions drawn, with some gaps in support
WELL DRAWN CONCLUSION THAT MAPS AIM AND OUTCOMES
WHAT IS THE OUTCOME HAVE NOT BEEN COMPLETELY DRAWN
Basic conclusions drawn, with some gaps in support or clarity
CONCLUSIONS ARE WELL DRAWN THAT AIM AND OUTPUT ARE MAPPED WELL
CONCLUSION IS DRAWN THAT MAPS 75% OF THE OBJECTIVE
Comprehensiv e and well - supported conclusions drawn from the analysis.
Basic conclusions drawn, with some gaps in support
Basic conclusions drawn, with some gaps in support or clarity.
Basic conclusions drawn, with some gaps in support
well-drawn result that perfectly matches the aim
Conclusions are weak, lacking necessary support or coherence.
conclusion is drawn with negotiable flaws
Basic conclusions drawn, with some gaps in support or clarity.
WELL DRAWN
Basic conclusions drawn, with some gaps in support or clarity.
Basic conclusions drawn, with some gaps in support
Conclusions are weak, lacking necessary support or coherence.
Basic conclusions drawn, with some gaps in support or clarity.
Basic conclusions drawn, with some gaps in support or clarity.

YES
WELL ANSWRED
Basic conclusions drawn, with some gaps in support

Basic conclusions drawn, with some gaps in support or clarity

Basic conclusions drawn, with some gaps in support or clarity.


Conclusions are evident, though some aspects may be less thoroughly addressed.

Conclusions is to give more specific implementation of the project.


Conclusions is to give more specific implementation of the project.
Basic conclusions drawn, with some gaps in support or clarity.
addressed of the major solution of problem
Basic conclusions drawn, with some gaps in support or clarity.
the analysis.
In conclusion, determining the extent to which digital marketing channels contribute to the expansion of income is a difficult endeavor that is riddled with p
This is achieved after the few surveys of relevant literature and learning and also by learning the status of the field of research .
Basic conclusions drawn, with some gaps in support or clarity.
Conclusions are few more evident, though relevant aspects may be less thoroughly described
aspects may be technology thoroughly addressed
the conclusion part are to overall statement to disclose the project and specify the exchange rate change may be in the time of research duration may explain
the analysis
Most importantly, the review revealed a basic connection between statement related apprehension and various pieces of delegate thriving and progressive ex
A number of duties are required to optimize information technology outsourcing projects. These jobs include the selection of dealers, the negotiation of sett
Clear and supported conclusions derived from the analysis.
In conclusion, the digital payments ecosystem in India has grown significantly in recent years, driven by government initiatives, an increase in internet and
Basic conclusions drawn, with some gaps in support or clarity.
Conclusions are evident, though some aspects may be less thoroughly addressed.
the analysis
The presentation of findings is structured according to the research objectives, with clear and concise explanations provided to facilitate understanding and
Clear and supported conclusions derived from the analysis.
the conclusion cover the full project with objective of what we get

The conclude also cover a finding what we expect and get


Conclusion also cover the entire project some more part of coverage
The conclusion are not cover the entire project some of points missing
Basic conclusions drawn, with some gaps in support or clarity.

Conclusion cover a good part some more points required


Basic conclusions drawn, with some gaps in support or clarity.
Basic conclusions drawn, with some gaps in support or clarity.
Basic conclusions drawn, with some gaps in support or clarity.
Conclusion part need more coverage of whole project
Clear and supported conclusions derived from the analysis.

Conclusion of project should conver some more parts

Conclusions are evident, though some aspects may be less thoroughly addressed.
Conclusion written are ok some more about sources points needed
Conclusion with more key area and suggestions portion more required
Basic conclusions drawn, with some gaps in support or clarity.
aspects may be technology thoroughly addressed very clear more need
Some what Clear and supported conclusions derived from the analysis.
Basic conclusions drawn, with some gaps in support or clarity.
Basic conclusions drawn, with some gaps in support or clarity.

Conclusions are evident, though some aspects may be less thoroughly addressed
Clear and supported conclusions derived from the analysis.
Clear and supported conclusions derived from the analysis
Very basic or incorrect conclusions, significantly impacting the overall project
Clear and supported conclusions derived from the analysis
Conclusions are evident, though some aspects may be less thoroughly addressed.
Experts and systems integrator may benefit on the emergence of business cloud-computing into the term that is short the market industry are seen as an con
Clear and supported conclusions derived from the analysis
Conclusions are evident, though some aspects may be less thoroughly addressed
Clear and supported conclusions derived from the analysis
Comprehensive and well supported conclusions drawn from the analysis.
The undertaken study is an effort to examine the importance and effectiveness of online digital media advertising for building brand sustainability.
Conclusions are evident, though some aspects may be less thoroughly addressed.
AI can process vast amounts of unstructured data from social media platforms, including text, images, and videos, to extract meaningful insights. This
This should give you enough time to succinctly review your main themes and major concepts while not being too brief.
Basic
The introduction of a new information system such as an ERP system will definitely change the way people work. The platform is new, new and different in
Conclusions are evident, though some aspects may be less thoroughly addressed
Conclusions are evident, though some aspects may be less thoroughly addressed.
Online marketing is a pervasive strategy for increasing sales leading to more revenue for businesses, and more visibility to products
The blockchain is a de centralised and ledger that is distributed facilitates consensus-building across several network
he research findings highlight the positive impact of BHIM UPI on financial inclusion and user satisfaction, while also identifying barriers and challenges th
Virtualization in combination with utility computing model can make a difference in the IT industry and as well as in social perspective.
The data analysis procedures involve both qualitative and quantitative techniques to ensure a comprehensive analysis of the collected data.
The development of charging networks creates new business opportunities and jobs in the construction, maintenance, and operation of charging stations. It
Clear and supported conclusions derived from the analysis
Basic conclusions drawn, with some gaps in support or clarity.
and recommendations from this study provide valuable insights for other organizations looking to adopt and optimize ITIL practices to enhance their IT ser
Basic conclusions drawn, with some gaps in support or clarity.
The capacity of chilling plants of PDP is less than the milk collected from that area.
Basic conclusions drawn, with some gaps in support or clarity.
Q7 Remarks

Recommendations are clear for implementation

Implementation of recommendation are useful is clear

Recommendations are fine


Recommendation implementation scheme are basi6
Recommendation is to implemented fundamentally
Recommendation for. Implementation is basic
Fundamental recommendation but very minimum implementation
Recommendation are clear but implementation is very less

lacking sufficient detail

Recommendations are adequate but few are nor implemented


Recommendations are adequate but implementations are very less developed
Basic recommendations

No evidence
Recommendations are adequate though the implementation plan

Basic recommendation with some gaps in implementation

few recommendations are useful to implement


Basic recommendations with some gaps in implementation

Recommendations based on secondary data

Basic recommendations with some gaps in implementation or usefulness.


Recommendations are implementation in few aspects
Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Recommendation are based on theoretical information is very basic
Basic recommendations with some gaps in implementation or usefulness.
Recommendation offered are minimum implementation
Recommendations are implement only minimum

Sound recommendations with a reasonable implementation plan and potential usefulness.


Recommendations are apparent, though the implementation plan or usefulness may be less developed.

Basic recommendations are offered in the name of future research


Recommendations are minimum useful implementation scheme

Recommendations are apparent, though the implementation plan or usefulness may be less developed.

Recommendations are apparent, though the implementation plan or usefulness may be less developed.

In Recommendations few ideas are implemented


Few recommendations are useful
Sound recommendations with a reasonable implementation plan and potential usefulness.
some recommendations are useful to implement
Recommendations are implemented are less useful
All Recommendation are adequate useful implementation content
All recommendations are useful to implement
Weak recommendation along with conclusion

Recommendation is useful to implement is minimum


Recommendation and implementations are appropriate to the study

recommendations with a reasonable implementation plan


Basic recommendations with some gaps in implementation or usefulness.
Sound recommendations with a reasonable implementation
Sound recommendations which are valuable or future studies
Basic recommendations with gaps in implementation
The recommendations are valuable for future studies
Sound recommendations with a reasonable implementation plan andpotentialusefulness
Recommendations are apparent, though the implementation plan
The recommendations are valuable for future studies

Basic recommendations with some gaps in implementation


The recommendations are valuable for future studies

Basic recommendations with some gaps in implementation


The recommendations are valuable for future studies

Recommendations are apparent, though the implementation plan


Basic recommendations with lack of implementation
Recommendations are apparent, though the implementation plan

Recommendations are good with proper implementations


Recommendations are apparent, though the implementation plan
The recommendations are clear with reasonable implementation

The implementation scheme are clear but could be more detail


Well-founded recommendations with a clear implementation scheme and demonstrated usefulness

Sound recommendations with a reasonable implementation plan


Sound recommendations with a reasonable implementation plan
recommendations with some gaps in implementation or usefulness.
Recommendation are basic and there is lack of implementation
Inappropriate recommendations and lack of sufficient details
The recommendations are valuable for future studies
The recommendations are valuable for future studies

The recommendations are valuable for future studies


Adequate recommendations but require to develop implementation plan
The recommendations are valuable for future studies
The recommendations are valuable for future studies
The recommendations are generally good with reasonable implementation

The recommendations are valuable for future studies

The recommendations are valuable for future studies


The use of implementation scheme are clear but could be more detail

The recommendations are valuable for future studies


The recommendations are valuable for future studies
Sufficient recommendation are offered from this study
The recommendations are clear with proper implementation
Recommendations for improvisation in the logistics service industry
Basic recommendation with lack of implementation

All recommendations are not possible to implement


Entire Recommendations are not possible to implement

Recommendations and techniques are used well but need to improve some areas
The recommendations are useful for the reliance jio
Recommendations and techniques are used well but need to improve some areas
Recommendation and implementations are appropriate to the study
Recommendation are good for the improvement of the study are
Recommendations and techniques are used well but need to improve some areas
Recommendation are good it is solutions for the problem
Recommendation and implementations are adequate to the study
Recommendation and implementations are appropriate to the study
The recommendations are valuable for future studies
Recommendations and techniques are used well but need to improve some areas
Recommendations and techniques are used well but need to improve some areas
Recommendation and implementations are appropriate to the study
Suggestions provided solution that leads to the objectives
Suggestions provided solution way of execution was not correlated with objectives
Recommendations are useful to implement
Suggestions provided solution that way of execution was not correlated

Only few suggestions are provided need more recommendations and way of execution was not correlated with objectives
Sound recommendation with reasonable implementation of the provided solution
Sound recommendation with a reasonable implementation paln and potential usefulness
More suggestions needed , recommendation are apparent way of execution was not correlated
Suggestions provided solution that leads to the objectives was not correlated
Basic recommendations with some gaps in implementation
Recommendations are not sufficient to the study
Basic recommendations with some gaps in implementation
sufficient detail
Recommendations are generally good and well defined
Recommendations are not given
The implementation scheme are clear but could be more detail
Recommendations are almost absent in this study
Basic recommendations with some gaps in implementation
The recommendations are valuable for future studies
Basic recommendations with some gaps in implementation
Basic recommendations with some gaps in implementation
Basic recommendations with some gaps in implementation
The recommendations are valuable for future studies
Recommendations are apparent, though the implementation

Basic recommendations with lack of implementations


Basic recommendations with some gaps in implementation

Recommendations are apparent, though the implementation plan


The implementation scheme are clear but could be more detail
Recommendations are apparent, though the implementation plan

Required specific recommendations of the study


few recommendations are useful to implement

Recommendations to usefulness implementation is minimum


Recommendation is useful in implementation at minimum level
Basic recommendations with some gaps in implementation or usefulness.

Basic recommendation with gap in implementation


Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Basic recommendations with some gaps in implementation
No evidence of any recommendations

Recommendation are apparent,

Very basic or inappropriate recommendations, with little consideration of implementation


Recommendations is basic with included in conclusion

Recommendations are useful to implement are minimum


clear recommendation is useful to implement

No sufficient detail recommendation


very basic recommendation
Recommendation from secondary data is implemented if minimum
no evidence
no evidence
entirely inappropriate
Recommendations are almost absent
No evidence
Weak recommendations,

Suggestions provided solution way of implementing are good


Suggestions provided solution that leads to the objectives of given topic
All recommendation are offered to implement in the area
Suggestions provided solution that not leads to the given objective
More suggestions needed and way of implementing also not correlate to the objectives
More recommendations needed, provided solution that not leads to the objectives
No data founded
Implementation of the recommendations are less
In recommendation only few are implemented
Suggestions provided solution that not leads to the objectives
Suggestions provided solution way of implementation not attain the objective, more suggestions needed with worthy implementation
More recommendations needed way of execution was not correlated
Few suggestions provided solution way of implementing are not correlated
Suggestions provided solution that way of implementation was good
Recommendations provided solution that leads to the objectives was correlated

Sound recommendations with a reasonable implementation plan and potential usefulness.


Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Recommendations are apparent, though the implementation plan or usefulness may be less developed.
To offered recommendations are less useful
Implementation of recommendations are not covered all area
Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Sound recommendations with a reasonable implementation plan and potential usefulness.
Sound recommendations with a reasonable implementation plan and potential usefulness.
Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Implementation is less
all recommendations are not implemented
Basic recommendations with some gaps in implementation or usefulness.

Basic recommendations with some gaps in implementation or usefulness.


Recommendations are useful but few are implemented
Basic recommendations with some gaps in implementation or usefulness.
All recommendations are not possible to implement
The recommendations and useful implementation of the scheme were given focusing the development of the ideal solution to the problem.
The recommendations and useful implementation of the scheme were given focusing the development of the ideal solution to the problem

The recommendations and useful implementation of the scheme were given focusing the development of the ideal solution to the problem

The recommendations and useful implementation of the scheme were given focusing the development of the ideal solution to the problem
The recommendations and useful implementation of the scheme were given focusing the development of the ideal solution to the problem
The recommendations and useful implementation of the scheme were given focusing the development of the ideal solution to the problem

The recommendations and useful implementation of the scheme were given focusing the development of the ideal solution to the problem

The recommendations and useful implementation of the scheme were clearly stated in the study

The linking of the recommendations was made appropriate for the study.

The recommendations and useful implementation of the scheme were given focusing the development of the ideal solution to the problem.
Recommendations are missing.

Other subject file

developed.

developed.
developed.
Recommendati ons are apparent, though the implementatio n plan or usefulness may be less developed.
Sound recommendations with a reasonable implementation plan and potential usefulness.

Recommendations are apparent, though the implementation plan or usefulness may be less developed.

Sound recommendations with a reasonable implementation plan and potential usefulness.

Sound recommendations with a reasonable implementation plan and potential usefulness.

Sound recommendati ons with a reasonable implementatio n plan and potential usefulness.

Sound recommendati ons with a reasonable implementatio n plan and potential usefulness.
Sound recommendati ons with a reasonable implementatio n plan and potential usefulness.

Basic recommendati ons with some gaps in implementatio n or usefulness.


Recommendati ons are apparent, though the implementatio n plan or usefulness may be less developed.

Recommendati ons are apparent, though the implementatio n plan or usefulness may be less developed.

Sound recommendati ons with a reasonable implementatio n plan and potential usefulness.

Basic recommendati ons with some gaps in implementatio n or usefulness.

Recommendati ons are apparent, though the implementatio n plan or usefulness may be less developed.

Based on the findings of the research project


In summary, our research on demand forecasting models for brass industry customized goods has yielded insightful information about the opportunities and
Recent technology uses and methodology to be address clearly.
enhanced security protocol
To evaluate the impact of customer experience initiatives on satisfaction and loyalty within the context of e-commerce fulfillment operations
should both prioritise implementing a service management system
related to marketing performance,

there is no recommendations
Ensure that cybersecurity is adequately funded by allocating a substantial

To Concentrate on the Job of IT in Store network Management of Retail Industry.


including unit, integration
The results and study point to a number of important ideas and recommendations
It has been advised that Tata Teleservices staff become more businesslike and customer-friendly in order to better meet the needs of the company's clientele
This includes upgrading existing infrastructure, deploying small cells and distributed
The recommendations provided in this section are designed to address the key
Project execution summary is need to give more information of implementation of project

Customers should be given training as per to using online banking application


monitoring
The Internet of Things (IoT) is becoming more important for monitoring the health of people

Recent findings indicate that cloud technology effectively meets the demands of modern business.
and its effect on banks credibility.
summer sales.

Goes beyond mystery services and treatment in that it taps into the emotional needs of the patient and patient’s family and increase face validity of the hosp
Develop strategies to get around the obstacles to Lean implementation.
in order

necessities,

for the smooth adoption of Information and Communication Technology


Research had been performed for Hyderabad people who had been targets that are main this study. Consumers had been inquired about their o

highly relevant and useful to users.


implications of how and when employees work remotely
services
Allocate resources for the development and deployment of a robust IoT infrastructure capable

To reduce power and fuel cost by reducing steam generation cost


Tesla is making significant progress toward the sustainability of its operations, but there is still plenty of room for improvement in the way that op

Here are some recommendations for bus ticketing and payment systems:
To assess the opening in existing course of action of Value Improvement and Patient Security practices in THs as per overall norms.

and availability management practices


investment decisions.

The productivity also helps the organization to fulfill the demand of the customer.
The report advocates for the application of shared value concepts and increased employee participation.
From a bird’s eye view, the companies mentioned above could be a great bet to put upon as the electric vehicle segment is yet to achieve its full potential in

developed

recommendations emerge to enhance the security posture of IoT devices.


Based on the findings of the study, the following recommendations

integrity,

factors,
, but they don't always satisfy customers with regard to security, recommendations

addressed

The main concept here is to reach out to maximum consumers just with the representation

have to use a short‐term and a plan that is long‐term deployment


Customer feedback is a valuable asset that can drive significant improvements in operational strategies and overall business performance.

implement to all advanced security technologies by making them more accessible and user-friendly
implementation are in health care center are still hesitant to migrate due to perceived security risks.
present a comprehensive set of recommendations
new and current goods into the supply chain load management
we imagine sooner.
The scope of implementing a quality management system (QMS) can vary depending on the size, industry, and specific needs of an organization.
Prioritize investments in scalable cloud solutions to accommodate fluctuating demands and support business growth.

between predictors
to do continuous changes in the security measure
Actualize economical hones to diminish the natural impression of coordinations and supply chain activities.

Recent technology uses and methodology to be address clearly.


dispose of non consider accumulating exercises,
various factors such as changes in market demand,
Project execution summary is need to give more information of implementation of project

Project execution summary is need to give more information of implementation of project


through the Lean Six Sigma implementation.
The answers given by the respondents towards logistics service quality of home delivery during pandemic may be affected by the personal value judgment.

To know the role of Advancements in Technology to Improve the project planning on which can ease the tracking system and maintain stock data t

Careful planning, leadership commitment, and addressing cultural change are crucial for successful implementation. Examining the challenges and opportun
proactive measures are necessary
this can create compliance challenges.
recommendations encompass a range of policy areas
To measure OBFs by customer satisfaction and staff satisfaction before and after the implementation of Six Sigma.
Sound recommendati ons with a reasonable implementatio n plan and potential usefulness.
Sound recommendati ons with a reasonable implementatio n plan and potential usefulness

Basic recommendati ons with some gaps in implementatio n or usefulness.


Basic recommendati ons with some gaps in implementatio n or usefulness.

Basic recommendati ons with some gaps in implementatio n or usefulness

Sound recommendati ons with a reasonable implementatio n plan and potential usefulness
Basic recommendati ons with some gaps in implementatio n or usefulness.
Sound recommendati ons with a reasonable implementatio n plan and potential usefulness.
These Suggestions are given toward the completion of the report

The evaluation and implementation of the core banking solution (

No proper recomendations
Basic recommendati ons with some gaps in implementatio n or usefulness.
Basic recommendati ons with some gaps in implementatio n or usefulness

Sound recommendati ons with a reasonable implementatio n plan and potential usefulness.

Sound recommendati ons with a reasonable implementatio n plan and potential usefulness.

Sound recommendati ons with a reasonable implementatio n plan and potential usefulness.

It is recommended to stated partially about the implementation


The recommendations and useful implementation of the scheme were not clearly stated in the study

The recommendations and useful implementation of the scheme were not clearly stated in the study.
The recommendations and useful implementation of the scheme were given focusing the development of the ideal solution to the problem

The recommendations and useful implementation of the scheme were clearly stated in the study.

The recommendations and useful implementation of the scheme were given focusing the development of the ideal solution to the problem.
These recommendations aim to build a robust ethical framework within organizations, fostering a culture of integrity, accountability and transparency, whic

The recommendations and useful implementation of the Applications of AI in Business Management.


the right answer the Alarm will be shut off.
usefulnes
authentication, and normal protection

In order to improve and reinforce the current situation of the Indian economy, t
answers
objectives and operational areas, ensuring a comprehensive approach to improvement.
developed.

usefulness.

within the organization

noted
Here are some recommendations for further research into cloud service management:

need for openness

essential tasks
recommendations, and an implementation
cybersecurity posture in cloud computing environments

software projects are created, maintained and upheld has changed broadly

related to occupational
researcher to offer practical recommendations
usefulness

developed.

developed
The project useful to future as a considerable

It in a position to change the application

developed.

Recommendations offered, their usefulness and implementation scheme are moderate and satisfactory.
Recommendations given are satisfactory. The more focus may be given for this part.
The recommendations given are viable and practicable. the implementation scheme given are implementable

No recommendations are given in the report.


Recommendations given are viable and able to implement.
Recommendations given are viable to implement and implementation scheme practiable.

Recommendations are well aligned with objectives and findings of the project. They are having viable implementation plans.
Viable implementation schemes are given with recommendations and recommendations are sound enough.
Recommendations are given but implementation schemes are not properly mentioned
good,Implementation of the system's algorithms on a smartphone demonstrates significantly lower computational and communication overhead compared t
good
Recommendations are well connected with findings of the study. They are easily practicable and viable to implement. The implementation scheme is easily
good
good
good
Recommendations are given. They are less matched with findings of the project.
good

Recommendations are viable and practicable. There is a lack in provision of proper implementation plans
The given recommendations and suggestions are variable. but more focus may be given while giving recommendations

No strong recommendations and suggestions given. Needs to give viable and implementable schemes to follow.
Recommendations and suggestions are viable and able to implement
The recommendations are well connected with the findings of the project. Viable implementation plans are offered in the project.
Lack of proper implementation plans and less association with findings of the project.
Recommendations are not satisfactory and proper implementation plans are needed.
Recommendations offered and implementation plans are good. Implementation plan is given with cost-benefit analysis

Basic recommendations have been given in the project.

Some of the recommendations have been given in the project.


Very basic recommendations have been given in the project.

Very basic recommendations have been given in the project.


Basic recommendations have been given in the project

well defined recommendatios and usefulness implementation scheme.


Very basic recommendations have been given in the project.
Basic recommendations have been given in the project.
traditional finance depends on various factors. Regulatory clarity, technological advancements, market stability, consumer trust, and global adoption are key
Very basic recommendations have been given in the project.
Basic recommendations have been given in the project
Lacking insufficient recommendations to be given.
method can be used for data collection.
lies in user adoption.
Future research can strive to address the limitations of this study, whether by expanding the scope, employing different sampling techniques, triangulating d
systems and devices.
good Recommendations, usefulness implementation scheme.improve transparency in data sources used for sentiment analysis to build trust among users an
Hindustan Petroleum Corporations will experience considerable savings in both costs and the amount of time it takes because to this innovative modern fac
Individuals are roughly evenly split on whether they are willing to pay a premium for AI or ML enabled Lifestyle products and services.
Investors should have knowledge of technical analysis, especially 5 Day moving averages as derivatives trading is for a short period of time Investors shoul
Basic recommendations have been given in the project
Basic recommendations have been given in the project.
Linear regression uses a statistical method in machine learning to model a relationship between a dependent variable and one or more independent variables
To evaluate the primary challenges faced by IT professionals in implementing AI technologies within their organizations.
Successful implementation of innovative IoT solutions has led to significant improvements in urban infrastructure, service delivery, and quality of life in cit
how well software performs when used in the context of an integrated system. All phases of the testing process include performance testing
Very basic recommendations have been given in the project.
Basic recommendations have been given in the project.
Establishing supportive policies and regulations, such as renewable energy incentives and grid interconnection standards, can foster investment in renewabl
data analytics to optimize IT service delivery, improve operation efficiency, enhance customer satisfaction.

Very basic recommendations have been given.

improving the adaptability of the economy to changing market forces and conditions, supplying necessary raw and semi-manufactured materials for large f
Recommendations, usefulness implementation scheme not clear,not connected to objectives

The implementation of sustainable ITSM practices may provide tangible benefits such as reduced costs, reduced risk, and improved corporate social respon

awareness and address any concerns


the crucial role that organizational culture and leadership commitment play in promoting successful Azure implementations.

Implementing Aadhaar in a massive country like India is not an easy task but the Unique Identification Authority of India achieved it effectively with strong
Censor monitoring system should be implemented to check extra luggage Carriage. ➢ Customer services should be taken care of by improvement of restin

Establish best practices for integrating digital technologies into healthcare marketing efforts, focusing on personalized engagement, data-driven decisionma
technology and business strategy
stakeholders understand and adopt the new technology.
frameworks
The successful integration of data analytics in healthcare requires collaboration between stakeholders.
Some of the recommendations have been given in the project.

Some of the recommendations have been given in the project.

Basic recommendations have been given in the project.

No details are given about the mentioned aspects


No recommendations are given in the project

Recommendations given are viable and able to implement.


Under conclusions heading recommendations are presented. They useful and implementable.

No recommendations and implementation scheme

The recommendations are viable and offered with practicable implementation scheme.

Recommendations are given with implementation scheme and less viable to follow.
No recommendations are specifically offered in the project
Some general recommendations are given. No study based suggestions are given in the project.

examination that is additional a selection of different aspects.


implementing recommendations can help organizations create a more supportive and effective remote work environment for IT employees.
Quantum computers are known for their huge working power, but that can be difficult to achieve.

providing practical recommendations for leveraging data analytics effectively

functions of a business

By fostering collaboration between IAM and ITSM teams and implementing well-defined access control policies, a more secure and efficient foundation fo

implementing IT service automation requires a combination of key components that work together to automate and streamline IT processes effectively.

define policies, procedures, and roles for data management. This ensures data quality, security, and accessibility for all authorized users.

categories—operational, tactical, and strategic—and contributes to the development of leadership traits in managers.

Recommendations are given in align with objectives project and they are viable and practicable .
Usefulness implementation scheme of Remote Resilience in environment security not clearly mentioned

in order to provide clients with individualised services and products


Recommendation to implement AI robo financial sector not correlated

Recommendation of the objectives not correlated

Usefulness implementation scheme not founded


significant advancement in the field of education and assessment.

highly recommended of the project to help Effects of Hybrid Work Model on Employees and Staff’s Work Productivity
usefulness implementation scheme of this project AI will implement to management oriented process
highly recommended of this project to implement various organization.

AI help to develop future marketing strategies.


highly recommended to implement of this project various organizations.

Recommendation of your reserch work not correlate to Usefulness implementation scheme


Implementation scheme is related to the recommendation was good

Recommendation are not related to the study work of asset Management concept of TCS
Some more suggestions need to included

Implementation contents are not satisfied with the recommendation


Suggestions for implementation scheme related to the given objective
information enables better decision-making, resource management, and the implementation of eco-friendly practices.

Recommendation are not satisfied with given objective


Suggestions to implementation are good

Suggestions are good that are related to the study work

Suggestions are not clearly explained


Few Suggestions only represented more recommendation need releted to the topic

Recommendation to implement psycho cognitive profiling not clearly defined


Suggestions provided solution that leads to the objectives of given topic

Nil

Suggestions are good for implementation scheme


Suggestions not founded

Linking of given contents attain the objective

Suggestions provided solution that leads to the objectives of given topic

Recommendations are not satisfied with the implementation scheme


Suggestions are not released to the given topic

Suggestions provided solution that leads to the objectives was correlated

Suggestions provided solution that way of execution was some what ok but more recommendations needed
Suggestions provided solution that leads to the given topic
Suggestions provided solution that way of execution was good
No recommendations

Recommendations provided solution that not leads to the objectives of the study
Suggestions provided solution that leads to the objectives of given topic

Suggestions provided solution that leads to the objectives of given topic

Suggestions provided solution that leads to the objectives of the given study

Well defined recommendation with clear implementation


Some more suggestions needed to implementation
Few Suggestions only given some are inappropriate content used
Recommendations are inappropriate

Suggestions are not related to the given study work


Suggestions provided solution that not leads to the objectives of the study

Suggestions provided solution that leads to the objectives of given topic


Recommendations data not founded

Suggestions on health care system was good


No data founded

Recommendations provided solution that leads to the given topic

Suggestions that provided solution way to execution was Good

Suggestions provided that was way of execution was good

Suggestions no data founded with implementation


Suggestions for green cloud computing on IT industry not completely usefull for implementation.
Recommendations provided solution that leads to the objectives
More suggestions needed way of implementations of recommendation not correlated
Some suggestions are inappropriate to implementation of given topic

Suggestions provided solution that not leads to the objectives of given topic

Useful suggestions data not founded

Some more recommendations needed and way of implementation also improve its not leads to the objectives
Recommendations of cloud computing adoption in banking industry not clearly defined

Recommendations not satisfied with the content of this given objective


Recommendations usefulness implementation no data founded

Recommendations provided solution that leads to the objectives was not correlated

Recommendations are given and their usefulness is limited and implementation scheme needs improvemnt

Recommendations given are having usefulness and implementation scheme needs improvement.

Recommendations are in general no study based recommednations are given. Hence it is diffcult to find the usefulness of recommendations.

No recommendations are offered in the project report


No usefulness and implementation scheme of recommendations are given in the report.

Recommendations given with their usefulness and implementation scheme are acceptable.
The recommendations are based on the findings of the project. They are given with their usefulness and implementation scheme. This is satisfactory.

No recommendations are offered in the report.


Recommendations are offered with their usefulness and implementation scheme.
Recommendations given are viable and they are given with their usefulness and implementation scheme.
No recommendations, usefulness and implementation scheme are presented in the report.

The recommendations offered with their usefulness and implementation scheme needs improvement
Recommendations and their usefulness & implementation scheme are moderately given.

Recommendations are given based on the findings. The usefulness and implementation scheme are not up to the expectation
The usefulness and implementation scheme of recommendations given are satisfactory .
More suggestions with clear implementation needed

Suggestions of very useful to find talent acquisition with help of AI


Suggestions provided solution that are very useful for implementation scheme

Suggestions provided solution was ok some more suggestions added for good

Limited suggestions provided more suggestions needes way of implementation also need to improve

Suggestions provided solution that way of execution was good that leads to the objectives
Findings and recommendations are useful to the Big bazaar
FINDINGS GIVEN BASED ON RESULS ARE GOOD
Some more suggestions to be added to be better implementation
FINDINGS AND RECOMMENDAIONS GIVEN ARE GOOD
Few suggestions only provided more recommendation needed
MORE YTHAN FIVE RECOMMENDFATIONS GIVEN IS SATISFACTORY
RECOMMENDATIONS GIVEN IS HIGHLY GOOD
Suggestions provided solution that way of execution was good
Well defined suggestions with clear implementation
Suggestions provided solution that leads to the objectives of given topic
more than five recommendations given
many recommendations given and i is useful
Suggestions way of implementing not attain the given objective
implementation is highly possible
Suggestions provided solution that way to execute are not related to the given objective
insufficient recommendations given
Suggestions provided solution that way of implementation was good
appropriate recommendations given and its usefulness is righv
based on findings proper recommendations given
Some more suggestions needed. Way of implementation was good to the topic
Adequate usefulness recommendation scheme
based on findings recommendations given
recommendations given is right
suggestions on the basis of findings are right
Suggestions provided way of execution are not correlate to the given objective
Recommendations are not clearly defined

Suggestions way to implement the objectives of given topic not matched


Suggestions provided solution that leads to the objectives of given topic
Recommendations, usefulness implementation no data founded
Suggestions are not enough need to improve
Implementation of mind scribe not clearly mentioned
Recommendation of the study work not yet to the level need to improve implementation scheme

Implementation of the research work not clearly mentioned need to elaborate the concept

Implementation scheme of CRM system was good

Usefulness of Recommendation not founded


Nil
Compared many ways that are meet to the given objective of study work

No usefulness implementation presented in the study work


implement more amenities to draw in more visitors.

Usefulness implementation scheme not founded


Compared many strategies that are help to the IT and BPO sector culture process improvement need to focus geographical environment also
Suggestions are good for usefulness implementation of scheme.

Suggestions are good for implementation scheme that are related to the given topic
Recommendations with implementation are not more amenities
Suggestions based on digital era was good
Recommendations are not completely related to the given topic
Linking of recommendation way to implementing objectives are clearly defined
Suggestions not leads to the objectives of the given topic
Well defined recommendation with clear implementation
Suggestions are not enough to implementation scheme
Suggestions are good to implementation scheme

While the recommendations are evident, there may be room for further development in terms of the implementation plan and demonstrating their practical u
The recommendations provided are fundamental, yet there are gaps in their implementation and practical usefulness that need to be addressed for more effe

While the recommendations are apparent, there is room for improvement in developing a more detailed implementation plan and demonstrating their practic

While the recommendations are evident, there is room for improvement in developing a more detailed implementation plan and demonstrating their practica

The recommendations provided are well-structured and supported by a feasible implementation plan, suggesting their potential to effectively address the ide

The statement acknowledges the presence of recommendations but highlights the need for more detailed planning and assessment of their practical applicati
**Comment:** The statement acknowledges the presence of recommendations but suggests that additional focus is needed on developing a detailed implem

he project provides foundational recommendations, but enhancing the implementation plan and addressing usability gaps would increase their effectiveness

Enhancing the implementation strategy and ensuring the recommendations' practical applicability would improve their effectiveness and relevance, leading

The recommendations regarding Total Quality Management (TQM) with Industry 4.0 are apparent, but there may be less development in terms of their imp
Specific recommendations could have been stated about supply chain surplus concepts

No recommendations is seen

The recommendations are evident, although there may be less detail in terms of their implementation plan or practical usefulness.
Recommendations are apparent, though the implementation plan or practical usefulness may be less developed. This suggests that while actionable suggesti
The recommendations are sound, accompanied by a reasonable implementation plan and potential usefulness. This suggests practical strategies are proposed
Recommendations regarding workforce management and its impact on operational productivity are apparent, but their implementation plan and practical us

The recommendations are basic, with some gaps in implementation or practical usefulness, suggesting that further development and specificity are needed t
The recommendations for Maruti Suzuki's operations and supply chain management practices are clear, but their implementation plan or practical usefulnes
The recommendations provided are fundamental, but there are gaps in their implementation or practical usefulness, indicating a need for further developme

The recommendations for IKEA's operations management are clear, but their implementation plan or practical usefulness may need refinement for optimal

The recommendations are sound, accompanied by a reasonable implementation plan and potential usefulness. This suggests practical strategies are proposed

Basic recommendations with some gaps in implementation


Very basic

gaps in implementation
implementation plan
implementation o

usefulness

implementation

usefulness.

usefulness
implementation

Sound recommendations with a reasonable implementation plan and potential usefulness.

implementation plan
gaps in implementation
gaps in implementation
implementation plan

implementation

inadequate Recommendations, usefulness implementation scheme


Basic recommendations with some gaps in implementation or usefulness.
implementation plan

usefulness
usefulnes
implementation

implementation details are given neatly


implementation
implementation o
gaps in implementation
though the implementation plan
gaps in implementation

usefulness
implementation
implementation
scope for implementation
good implementation scheme

usefulness
Basic recommendations with some gaps in implementation

implementation
give more Recommendations for further researcher

Basic recommendations with some gaps in implementation


Structured project management practices provide a framework for innovation, enabled the development and implementation of new fitness programs, servic
analysed the three independent variables by using regression analysis. require more information about quantitative techniques

Various techniques and approaches are employed in automated code generation, each tailored to specific use cases and requirements.
engaging their staff.
implementation scheme of AI in incident management requires a strategic approach, involving investment in technology, development of AI expertise, and

the recommendations given can be implemented using various tools and technologies. need more clarity of recommendations

protective measures, the company must innovate and market effectively to avoid a decline, especially given the rising popularity of strong competitors like
recommends that the price of the products, discounts and special offers have the most influencing factor on online food ordering
Recommendations are apparent, though the implementation plan
Recommendations are visible, but their implementation plan or practical usefulness may need more development for optimal impact.

The recommendations are sound, accompanied by a reasonable implementation plan and potential usefulness. This suggests practical strategies are proposed

The recommendations are clear, but their implementation plan or practical usefulness may require further development to enhance effectiveness and feasibi
Basic recommendations with gaps in implementation effectiveness for optimizing 3PL logistics.
The recommendations provided are basic, with some gaps in their implementation or practical usefulness. Further refinement in the implementation strategy

Recommendations are apparent, but the implementation plan or practical usefulness may be underdeveloped.

The recommendations are weak, lacking sufficient detail or practicality. Providing more specific and actionable suggestions would improve their effectiven

The recommendations are discernible, although the implementation plan or their practical usefulness may be less developed. Strengthening the implementat

The recommendations are backed by a feasible implementation plan, promising practical improvements in operational efficiency and overall effectiveness.

The recommendations are clear, but there may be room for further development in terms of the implementation plan and demonstrating their practical usefu
give Recommendations, usefulness implementation
need some Recommendations
though the implementation plan

Recommendations given for the future researcher

implementation o

give some Recommendations, usefulness implementation scheme

implementation

implementation

inadequate in Recommendations, usefulness implementation scheme


implementation
implementation
While recommendations are evident, the implementation plan or practical utility may require further development of monetary detailing ideas
No evidence of any recommendations or implementation plan.
The recommendations are clear, but there is room for improvement in the implementation plan's development and practical usefulness.
The recommendations are evident, but there may be less development in terms of their implementation plan or practical usefulness in adopting strategies fo

no evidence of any recommendation


Very useful recommendations for implementation of scheme

Basic recommendations for implementation of the scheme

Basic recommendation used for implementation of scheme

Sound recommendations useful of the implementation of scheme

Useful recommendations with implementation of the scheme


sound recommendations with implementation scheme
weak recommendation of implementation of scheme
sound recommendation with implementation of plan

Sound recommendations with a reasonable implementation of the scheme

sound recommendations useful for implementation of plan


useful recommendations though the implementation of scheme
recommendations with apparent with the implementation of scheme
implementation of recommendations are basic with some gaps

recommendations are apparent with the usefulness of the scheme

Recommendations is useful of the implementation of the scheme

usefulness

Basic recommendations with some gaps in implementation

though the implementation plan

gaps in implementation
Project execution summary is need to give more information of implementation of this project

Apparent recommendations are given with minimal usefulness implementation plans


Apparent recommendations are given and minimal usage of implementation plans
Basic recommendations are given with less usefulness of implementation plans
Basic recommendations with some gaps in the usefulness of the implementation plan
Basic recommendations are given with some usefulness implementation plans

Weak recommendations with lacking in usefulness implementation plans


Recommendations are almost absent

well defined recommendation with clearly implementation


Basic recommendations are given with less developed usefulness scheme
basic recommendations is used
recommendations are useful for the implementation of schemes
Basic recommendations are given with less usefulness implementation plans
Basic Recommendations less constructed with less usefulness implementation scheme
Basic Recommendations with less usefulness implementation scheme
very basic recommendations without usefulness implementation scheme
Inappropriate recommendations and less usefulness implementation scheme
Basic recommendations with minimal usefulness implementation scheme
Basic recommendations with some gaps in implementation
Clear recommendations with apparent usage of implementation plans
Basic recommendations are given with lacking of usefulness
Recommendations are apparent and proper usefulness implementation plans are developed
Apparent recommendations and potential usefulness implementation plans
Enough Recommendations with less usefulness implementation scheme
From the study it is recommended to introduce more flexible policies that let employees use digital tools for remote work or tweaking their schedules to bet
accessibility, efficiency, and engagement, supporting professional development, promoting work-life balance, fostering collaboration, addressing challenges
Strategic Planning, Data Privacy and Security, Vendor Selection, Continuous Monitoring and Optimization were some of the recommendations suggested in
The recommendations and useful implementation of the scheme were clearly stated with three notable points in the study
It is recommended that organizations prioritize the certain areas in their cloud adoption and strategy initiatives to improve which was stated good

The recommendations include gender-inclusive engagement measures, improved communication on artificial intelligence initiatives by using personalized m

It is not recommended with any suggestions and useful implementations stated


The recommendations and useful implementation of the scheme were given focusing the development of the ideal solution to the problem
The research stated with 3 recommendations which provide a greater results for the organization
The recommendations and useful implementation of the scheme were given stating with 6 suggestions for the development and growth of blockchain and cr

The recommendations and suggestions were given focusing the development of the welfare measures to be taken for the employees of the concern chosen.

Higher education institutions that want to raise their ITSM progression levels can for certain follow a consistent system as a result of this evaluation project

The recommendations and useful implementation of the scheme were given focus and provide the ideal suggestions to the problem
approach that prioritizes user needs, innovation, and a secure financial ecosystem
The recommendations and useful implementation of the scheme were not stated in the study
It is recommended to have continual professional development and training programs which are critical for equipping educators with the skills and knowled
The exploration of the impact of Information Technology (IT) on supply chain performance is an ongoing journey that holds immense future potential.
It is recommended to ensure a future where GenAI empowers the IT workforce to achieve remarkable outcomes and build a more efficient, secure, and inno
Nil

Weak recommendations, lacking sufficient detail or practicality


Weak recommendations, lacking sufficient detail or practicality
Weak recommendations, lacking sufficient detail
It is recommended to offer modular or scalable CRM solutions, allowing SMEs to choose functionalities that align with their immediate needs, providing th
It is recommended to enhance the overall customer experience through superior customer service, Improve efficiency and reduce costs in the supply chain,
Weak recommendations, lacking sufficient detail or practicality
Weak recommendations, lacking sufficient detail or practicality.
It is recommended to examine when artificial intelligence (AI) becomes more prevalent in project management, project managers may eventually become o
It is suggested to harness the transformative potential of AI to create a future that is equitable, sustainable, and inclusive for all.
It is recommended with the organizations need to exploit new entryways and cultivate things and administrations in the market to accomplish market accom
inappropriate recommendations, with little consideration of implementation.
inappropriate recommendations, with little consideration of implementation.
Basic recommendations with some gaps in implementation
It is expected to provide the recommendations over the study and it is useful for the timely need
The recommendations were expected to be stated that will help in the further enhancement of the study
The recommendations, challenges and leveraging the opportunities identified in the study, iEnergizer can position itself as a leader in digital transformation
It is recommended that the concerns used with IoT concepts and tools can improve its performance in the future applications
The recommendations and useful implementation of the scheme were given focusing the corporate social responsibilities of bluechip fmcg companies of ind
Recommendations are apparent, though the implementation plan
The recommendations are made that emphasize the importance of stakeholder engagement, phased implementation, and continuous evaluation for organiza
The specific Recommendations was not stated in the study for future development
cryptocurrencies with UPI in digital payments
The study wasn't provided with any recommendations for the future updations
The recommendations and useful implementation of the scheme were stated focusing the development AI in the future.

It is recommended that the company develop a comprehensive training program, a continuous monitoring and optimization strategy to maximize the benefit

It is recommended, as the quantum era approaches, the collective efforts of multiple stakeholders are required to navigate the challenges and harness the po

Basic recommendations with the implementation of schemes

Recommendations are clearly defined and its very usefulness for implementations of scheme

Recommendations may be useful to the future

very well recommendations are implemented

no recommendations for implementation of scheme


Suitable recommendations with the implementation of scheme

useful recommendations for implementation of the schemes

sound recommendations for usefulness of implementation of scheme


Sound recommendations with the implementation of the scheme

sound recommendations with the implementation of the scheme

recommendations are implementation of plan


Recommendations are apparent with the future plan

Recommendations are useful for the implementation and linked with the objectives
Basic recommendations useful of the implementation scheme
very well recommendations is usefulness of the implementation of scheme

Recommendations are apparent though the implementation of scheme


sound recommendations with a reasonable implementation
weak recommendations with reasonable implementations
Basic recommendations are used

sound recommendations with a reasonable implementation

Nil
The project presents very basic or inappropriate recommendations that lack consideration of practical implementation, which limits their effectiveness and r

The recommendations are sound, accompanied by a reasonable implementation plan and potential usefulness, suggesting practical applicability and positive
The project offers sound recommendations accompanied by a reasonable implementation plan, indicating their potential usefulness in addressing the identif
The recommendations are discernible, but their practical implementation and overall usefulness could benefit from further development and detail.

The project offers weak recommendations that lack sufficient detail or practicality, limiting their effectiveness and applicability.
The recommendations are discernible, but refining the implementation strategy could enhance their practicality and effectiveness in the context of Mahindra
The recommendations provided are basic, although they could benefit from a more detailed and practical implementation plan to enhance their effectivenes
The recommendations provided lack depth and fail to address practical implementation strategies effectively.

The recommendations are identifiable, yet their practical implementation and overall usefulness require further development and clarity.

The recommendations are straightforward, yet they could benefit from further development in terms of implementation strategies and practical applicability

No evidence of any recommendations or implementation plan.

The recommendations are discernible, but the implementation plan or practical utility may require further development to enhance their effectiveness and fe

The recommendations regarding the COVID-19 pandemic's impact on the pharmaceutical industry are discernible, but the implementation plan or practical

The study's recommendations could benefit from a more detailed implementation plan to enhance their practical usefulness. Addressing these gaps would en
While recommendations are identifiable, they would benefit from a more detailed implementation plan to enhance their practical usefulness in addressing th

While recommendations are evident, enhancing the implementation plan's detail and practical usefulness is crucial to effectively address the lack of distribu

The study presents sound recommendations with a reasonable implementation plan and potential usefulness, indicating practical applicability in addressing

Enhance the recommendations by providing sufficient detail to ensure clarity and actionable steps in implementing Lean Six Sigma for yield improvement i
Recommendations such as leverage technology is good one but it takes time to implement

There is no recommendations, usefulness implementation scheme

There is no such recommendations, usefulness and implementation scheme


Very limited recommendations, usefulness and implementation

Futuristic approach are also given in the study


Recommendations will implement in the future.

Detailed suggestions were made in the study that will be implemented to improve quality of service
Recommendations are apparent, though the implementation plan or usefulness may be less developed

Strengthening the implementation plan and refining recommendations to ensure practical applicability would enhance their effectiveness in improving after

The project's recommendations are very basic or inappropriate, showing minimal consideration for implementation strategies, which diminishes their practi
While recommendations are identifiable, the implementation plan or practical usefulness may require further development to enhance their effectiveness an

The project offers sound recommendations with a well-structured implementation plan, demonstrating potential usefulness in addressing challenges related
The project's recommendations are apparent, but there is a need for further development in their implementation plan to enhance practical usefulness and ef
The project's recommendations are visible, but there is a need for further development in the implementation plan to enhance practical usefulness and effect

The project offers basic recommendations, but there are gaps in their implementation and practical usefulness that need further development to enhance thei
The project presents basic recommendations, but there are some gaps in their implementation and practical usefulness that require further development to en

The project offers weak recommendations, lacking sufficient detail and practicality, which limits their potential effectiveness and implementation.
Some of the recommendations have been given in the project.

Basic recommendations have been given in the project.

Very basic recommendations have been given in the project.

Some of the recommendations have been given in the project.

the recommendations given can be implemented using various tools and technologies
the suggested recommendations are emphasized as per the AI solution discussed
Basic recommendations have been given in the project
the recommendations given are implemented in future

few recommendations are given

few recommendations were given


few approaches have been used to apply the problem scheme but suggested to give innovative techniques
few recommendations are given

good recommendations are given

Basic recommendations have been given in the project.


Basic recommendations have been given in the project
The recommendations provided are practical and aimed at ensuring successful ERP implementation
Each recommendation follows logically from the conclusions drawn and aligns with the project's goals of developing an accurate and customizable recogni
Basic recommendations have been given in the project
the recommendations given are implemented using various tools and technologies
Very basic recommendations have been given in the project
They include suggestions for further training, improved security practices, and the development of smart automated ethical hacking solutions
Some of the recommendations have been given in the project
Some of the recommendations have been given in the project
the recommendations given are implemented using various tools and technologies
the recommendations given are implemented using various tools and technologies
Basic recommendations have been given in the project
Some of the recommendations have been given in the project
Basic recommendations have been given in the project
Basic recommendations have been given in the project
Basic recommendations have been given in the project

the recommendations are used to be followed in future implementation


no recommendations are suggested
the recommendations given are implemented using various tools and technologies
the recommendations given can be implemented using various tools and technologies
Basic recommendations have been given in the project
the recommendations given are implemented using various tools and technologies
recommendations are given up to the objective criteria
recommendations are given and can be used with various tools
few recommendations given and can be implemented in future
Very basic recommendations have been given in the project

the recommendations are given

various useful recommendations are given


Basic recommendations have been given in the project

various useful recommendations are given


the recommendations given are implemented using various tools and technologies
need useful implementation scheme for the recommendations
Very basic recommendations have been given in the project
the recommendations are need to be emphasized specifically
the recommendations given can be implemented using various tools and technologies
The future of the insurance sector lies in continued innovation, collaboration, and adaptation to technological changes and regulatory requirements.

few recommendations are given

Lacking insufficient recommendations to be given.

Some of the recommendations have been given in the project.


Some of the recommendations have been given in the project.

Lacking insufficient recommendations to be given

Some of the recommendations have been given in the project.

Basic recommendations have been given in the project.


Basic recommendations have been given in the project.
Basic recommendations have been given in the project.
Very basic recommendations have been given in the project.

Basic recommendations have been given in the project.

Basic recommendations have been given in the project.


Some of the recommendations have been given in the project
Some of the recommendations have been given in the project
Basic recommendations have been given in the project

various recommendations are provided related to the objectives


Very basic recommendations have been given in the project
recommendations suggest to have AI technology

Some of the recommendations have been given in the project


the given recommendations fairly useful to be implemented
the recommendations are given but need clear understanding
the findings and recommendations are given
Very basic recommendations have been given in the project
the recommendations given can be implemented using various tools and technologies

Some of the recommendations have been given in the project


the recommendations given are to be specific

need recommendations related to technological implementation


Basic recommendations have been given in the project

the recommendations were given to enhance the effectiveness of cloud adoption technologies
Some of the recommendations have been given in the project

the recommendations are given in application wise

Weak recommendations, lacking sufficient detail.


need some other details about implementation scheme to cutting-edge technologies interact with cloud computing and also across different sectors by cloud
Nonetheless, individuals are unaware of the full implications of bitcoin usage.applications of blockchain technology commonly restricted to the implementa
growers to identify the exact kind of plant, allowing them to cultivate conditions ideal for the plant's further growth
Adequate recommendations has been made for useful implementation of plans.
Weak recommendations, lack in providing sufficient details
implemented, Social media listening tools can be used to identify emerging IT security threats and track Microsoft's real-time response strategies.require mo
software LIFE-CYCLE model encompassed all activities required to define, test, and develop
Strong recommendations are there. May useful when it implemented.
There has been sound recommendation.
study aims to inform decision-making processes, optimized resource allocation, and maximize the societal benefits of smart grid technology
the project implemented an AI-driven personalized learning system to enhance the educational experience for students
Strong recommendations has been made and it will be useful when it is properly implemented

recommended aim to guide stakeholders, policymakers, and industry players in formulating strategies and implementing measures that can improve the digi

the convergence of ITSM and rapid commerce signifies a pivotal junction of prospects for enterprises operating in the era of digitalization.
employed JSP as the technology to implemented this as a web application. require more information about this
Nonetheless, individuals are unaware of the full implications of bitcoin usage.applications of blockchain technology commonly restricted to the implementa
Multiple linear regression model is used contained in this research to investigate the how a facets impact the cloud processing security via SPSS. can be imp
many factors are implemented ,to strengthen information security practices and foster a security-IT environment.

ASAP methodologies used to implement SAP are Conventional and ABAR to solve the problems. need more explanation of it

Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Sound recommendations with a reasonable implementation plan and potential usefulness.

Sound recommendations with a reasonable implementation plan and potential usefulness.


Using cloud computing has resulted in a decrease in IT infrastructure costs. The impact of cloud computing on SMEs offers suggestions that may be put int
Sound recommendations with a reasonable implementation plan and potential usefulness.

Sound recommendations with a reasonable implementation plan and potential usefulness.


Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.
Basic recommendations with some gaps in implementation or usefulness.
recommendations are clear. but require more information about implementation of few approaches for digital transformation in the VCUA world
Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.

Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.


Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.
Sound recommendations with a reasonable implementation plan and potential usefulness.
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.
It involves transferring your existing applications, data, and infrastructure from on-premises or traditional IT environments to the cloud.
The process of setting up and configuring the NetSuite software to meet the specific needs and requirements of a business. This includes tasks such as custo
this research the information gathered is in subjective and in quantitative structure which aides in determining the better outcomes for the examination ventu
Reasonable recommendations are given and the implementation plans are acceptable
Lacking of recommendations and less use of implementation plan
Limited recommendations are given with acceptable level of usefulness of implementation plan
Inappropriate recommendations are made
Inappropriate recommendations
The incorporation of machine learning models had a beneficial effect on the diagnostic process, which led to an improvement in both speed and effectivene
The needs of the customers are clearly defined and the products are customized according to the needs of the customers
the project team should devote significant resources to the pre-project phase of research and analysis to learn all they can about the social media marketing
Regardless of the way that critical deals really occurs through genuine actual stores, anyway strong online channel can expand store organization, giving cli
Strengthening connectivity and awareness among IP and blockchain stakeholders
Suzuki must both improve their present asset levels. Needs to mention technology improvement and business analytics trends
Suggestions are given some of the suggestions needs to focus with various new trends and techniques
Recommendations are apparent, though the implementation plan
usefulness may be less developed.
Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.
Sound recommendations with a reasonable implementation plan and potential usefulness.
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.
The report concluded with recommended for the phased implementation of an ERP system, highlighting the need for stakeholder engagement, thorough trai
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.
Sound recommendations with a reasonable implementation plan and potential usefulness.
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.
Sound recommendations with a reasonable implementation plan and potential usefulness.
Basic recommendations with some gaps in implementation or usefulness.
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.
Basic recommendations with some gaps in implementation or usefulness.
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.
php connected with mysql database. but need more details about implementation scheme
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.
Sound recommendations with a reasonable implementation plan and potential usefulness.
Sound recommendations with a reasonable implementation plan and potential usefulness.
Very basic or inappropriate recommendations, with little consideration of implementation
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.

the recommendations are discussed with the thought of Eco-friendly effective future
Few standard recommendations are given need improvement
the recommended points can be implemented in future
the recommendations given are implemented using various tools and technologies
the recommendations given are implemented using various tools and technologies
the recommendations given are implemented using various tools and technologies
Suggestions and recommendations are good
Implementation not mentioned clearly
Implementation not founded
Implementation not founded
Provided solution not leads to the objectives of the given research study
Implementation scheme not founded
The aim of this survey has been to identify key strategic and operational trends of the BPO industry in India
A depository system benefits investors, issuers, intermediaries, and the nation by reducing time between allotment and transfer of shares
Sound recommendations with a reasonable implementation plan and potential usefulness.
HR analytics tools was implemented for their few objectives. but can involve analytics for talent management using workday
recommended, AI tools are implemented to solve the issues of barriers to adoption in healthcare are complex and multifaceted, involving technical, organi
Basic recommendations with some gaps in implementation
recommended, the findings of the study and are designed to create a balanced approach that maximizes the benefits of AI while safeguarding privacy
researcher mentioned, This study outcomes and recommended may not be applicable to other sectors within the IT services industry. CRM systems can enh
Sound recommendations with a reasonable implementation plan and potential usefulness.
Weak recommendations given which lead to insufficient practicality
Recommendations given by the student is not up to the mark.
recommendations are clear. but implemented few approaches for digital transaction in during covid 19.
recommendations are clear, it have emerged as potential solutions to address the issues that have been raised and to make the most of the opportunities that
Weak recommendations only given by the student. Hence, it may not give any ideas to the future researchers and other people.
need some details for recommendation include the implementation of refined
A factor analysis was implemented on eight variables that reflected the performance of the benefits and difficulties that users encountered when using Trian
Weak recommendation given which lead to insufficient practicality.
Identified the challenges and obstacles that insurance companies face when implementing cloud-based CRM systems is crucial for understanding potential p
Adequate recommendations has been given and some the recommendations may be useful for the scheme implementation
Recommendation made to industry to enhance the inventory level and accuracy
Weak recommendations. The success of any project is depends on the linkage and recommendations
Sound recommendation with implementation leads potential usefulness.
Basic recommendations with some gaps in implementation
Strong recommendations with a reasonable implementation and potential usefulness
Basic recommendations with some gaps in implementation
Some recommendations have been made for the useful implementations.
blockchains and cryptocurrency-related developments, is now becoming more beneficial for corporate leaders facing challenges. need more information abo
Strong recommendation with a reasonable implementation plan and potential usefulness.
Basic recommendations with some gaps in implementation or usefulness.
cycle review strategy was implemented for their few objectives. but can involve more analytics for employee performance
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.
recommended, have been implemented many techniques for decreasing impacts in banking industry. need further clarification on how to use these strategie
Basic recommendations with some gaps in implementation or usefulness.
Very basic or inappropriate recommendations, with little consideration of implementation.
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.
Basic recommendations with some gaps in implementation or usefulness.
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness
implemented advanced encryption techniques to solve the cyber security threats. future clarification on how to implemented it
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.
only few services are given. use another scheme of implementation
researcher mentioned, to overcome many challenges and understanding of edge computing, proactive learning strategies and collaborative approaches are e
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.
Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.
Combining steganography with cryptography is the recommended technique by information security experts as neither method is sufficient on its own. The

Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Based on the findings, the recommendations are listed which are made to further enhance the impact of project is good data
good ideas of Recommendations, usefulness implementation scheme
The research hypothesis that was set for the recommendations is in accordance with the research aim as well as the objective that was set for the recommen

The research hypothesis that was set for the recommendations is in accordance with the research aim as well as the objective that was set for the recommen

This project has delivered valuable insights and actionable recommendations derived from meticulous data analysis techniques.
Based on the findings, the recommendations are listed which are made to further enhance the impact of on-the job training with the support of industry-acad
The project will provide SMEs considering AWS cloud computing with useful advice, understandings, and recommendations.

Add more Recommendations, usefulness implementation scheme of this study.

project has delivered valuable insights and actionable recommendations derived from meticulous data analysis techniques is need some concept
add some content for the usefulness implementation scheme
The research hypothesis that was set for the recommendations is in accordance with the research aim as well as the objective that was set for the recommen

give more points of the research aim as well as the objective that was set for the recommendations.
These recommendations encompass areas such as technology adoption, process optimization, employee training, and continuous improvement initiatives
The recommendations are inadequate, lacking sufficient detail or practicality.
The basic recommendations have some deficiencies in their implementation.
The basic recommendations have some gaps in implementation.
Recommendations with some shortcomings in implementation.
Weak recommendations, lacking sufficient detail
The recommendations are apparent, but the implementation plan is not.
The recommendations are apparent, but the implementation plan is not.
There are suggestions, but there is no concrete plan for their implementation.
Good suggestions with a feasible plan for execution and possible utility.
The recommendations of this study are span organizational, process, and cultural dimensions, encompassing strategies for governance enhancement, skill d
Basic recommendations with some gaps in implementation or usefulness.
This study recommends the educator can go some way towards obliging the necessities of understudies who gain best from changed redesigns.
Recommendations are apparent, though the implementation plan is unclear.
Sound recommendations with a reasonable implementation plan and potential for use.
There are some basic recommendations with some gaps in implementation.
The recommendations are weak and lack sufficient detail.
Though the implementation plan is unclear, the recommendations are apparent.
Recommendations with a feasible implementation strategy and potential utility.
The fundamental recommendations have some gaps in their implementation.
This study includes proposing good recommendations for enhancing overall IT management practices at Real life situations.
The recommendations are sound, accompanied by a reasonable implementation plan and potential uses.
This project has delivered valuable insights and actionable recommendations derived from meticulous data analysis techniques.
The basic recommendations have some gaps in implementation.
Recommendations are obvious, though the implementation plan or usefulness may be less developed.
The recommendations are apparent, though the implementation plan is not clear.
These recommendations encompass areas such as technology adoption, process optimization, employee training, and continuous improvement initiatives.
A reasonable implementation plan and potential usefulness are sound recommendations.
Recommendations backed by solid evidence, with an easy-to-follow plan and proven utility.
Recommendations with a clear implementation scheme and demonstrated usefulness.
This project has delivered valuable insights and actionable recommendations derived from meticulous data analysis techniques.
The basic recommendations have some gaps in implementation.
These recommendations encompass areas such as technology adoption, process optimization, employee training, and continuous improvement initiatives.
Add more ideas of Content for each subject, topic, subtopic should be marked based on complexity
Recommendations are apparent, for implementation of the findings.
Basic recommendations with some gaps in implementation are provided.
Based on the findings, the recommendations are listed which are made to further enhance the impact of on-the job training with the support of industry-acad
give some more Recommendations, usefulness implementation scheme of this study.
The fundamental recommendations have some gaps in their implementation.
The recommendations of this study are span organizational, process, and cultural dimensions, encompassing strategies for governance enhancement, skill d
The analysis yielded comprehensive and well-supported conclusions.
The recommendations are apparent, but the implementation plan is not.
Recommendations are almost absent

Fundamental guidelines with certain implementation gaps.

Simple suggestions with some gaps in their applicability or implementation.


Fundamental suggestions with some limitations in their applicability of the study.

The recommendations are clear, even though the usefulness or implementation strategy may not be as developed.
Fundamental suggestions with some limitations in their applicability of the study.
Weak recommendations, lacking sufficient detail or practicality.

The recommendations are clear, even though the usefulness or implementation strategy may need more work.

Weak recommendations, lacking sufficient detail or practicality

The recommendations are obvious, although the implementation plan or utility may be less developed.
Weak recommendations, lacking sufficient detail or practicality.

Basic recommendations with implementation errors


Basic recommendations with some gaps in implementation or usefulness.
Basic recommendations with some gaps in implementation or usefulness.

The recommendations are obvious, although the implementation plan or utility may be less developed.

Weak recommendations, lacking sufficient detail or practicality.

The recommendations are obvious, but neither the plan for their implementation nor their usefulness may be as developed.

The basic recommendations have some gaps in implementation.

A reasonable implementation plan and sound recommendations.


Basic recommendations with some gaps in implementation or usefulness.

Weak recommendations, lacking sufficient detail or practicality.


Recommendations with a feasible implementation strategy and potential utility.
Recommendations are apparent, though the implementation plan is unclear.
Lacking sufficient information or practicality, weak recommendation.
The recommendations are obvious, but neither the plan for their implementation nor their usefulness may be as developed.
Sound recommendations with a reasonable implementation plan and potential usefulness.

The recommendations are obvious, but neither the plan for their implementation nor their usefulness may be as developed.
Basic recommendations that aren't always put into practice or aren't always useful.

Basic recommendations with some gaps in implementation or usefulness.


Basic recommendations with some gaps in implementation or usefulness.
Basic recommendations with some gaps in implementation or usefulness.

Basic recommendations with some gaps in implementation or usefulness.


Basic recommendations that aren't always put into practice

Recommendations with some shortcomings in implementation.


Recommendations that are either implausible or very basic, without much thought given to their implementation.
Recommendations are obvious, though the implementation plan or usefulness may be less developed.

Basic recommendations with some gaps in implementation or usefulness.


Good ideas with a plan that works well and could be helpful.

Basic recommendations with some gaps in implementation or usefulness


Weak recommendations, lacking sufficient detail or practicality.
Simple suggestions that don't take into account how they will be used.

There are suggestions, but they may not be well-thought-out or useful.

No evidence of any recommendations or implementation plan.

There are some gaps in implementation or usefulness in basic recommendations.


There are suggestions, but the strategy for implementing them or their utility may be less developed.
Weak recommendations, lacking sufficient detail or practicality.
Good recommendations with a reasonable plan to implement them.
The fundamental recommendations contain some deficiencies in their implementation or utility.

A reasonable implementation plan and potential usefulness are sound recommendations.

Basic recommendations with some gaps in implementation or usefulness.


Sound recommendations accompanied by a reasonable implementation strategy and potential utility.
Basic recommendations with some gaps in implementation or usefulness.

The recommendations are inappropriate, with little consideration for implementation.

Basic recommendations with some gaps in implementation


A solid recommendation with a clear implementation plan and demonstrated utility.

Some basic recommendations are lacking in implementation or usefulness.


Recommendations are apparent, though the implementation plan
No evidence of any recommendations

Recommendations are apparent, though the implementation plan

The recommendations are clear, even though the usefulness or implementation strategy may need further work.
Though the execution strategy is unclear, recommendations are clear.

No evidence of any recommendations.


Basic recommendations that are flawed in implementation.
The recommendations are clear, even though the usefulness may need further work.
Fundamental suggestions with some limitations in their applicability.
Basic recommendations were given and implementation strategy may need more work.
The recommendations are clear, even though the usefulness or implementation strategy may need further work.
The recommendations are clear even though the implementation strategy may need further work.
Recommendations are almost absent

Basic recommendations were given and implementation strategy may need more work.
The recommendations are clear, even though the usefulness strategy may need further work.

Fundamental guidelines with certain implementation gaps

The basic recommendations contain some deficiencies.


Recommendations made are apparent though the implementation may be less developed
Recommendations stated in the study is reasonable with potential usefulness.
The research hypothesis that was set for the recommendations is in accordance with the research aim as well as the objective that was set for the recommen
Some recommendations suggested has minor flaws which makes gaps in implementation.
Recommendations with a clear implementation scheme and demonstrated utility.
Based on the findings, the recommendations are listed which are made to further enhance the impact of on-the job training with the support of industry-acad
A reasonable implementation plan and potential usefulness are sound recommendations.
The recommendations of this study are span organizational, process, and cultural dimensions, encompassing strategies for governance enhancement, skill d
Recommendations are virtually absent.
The recommendations of this study are span organizational, process, and cultural dimensions, encompassing strategies for governance enhancement, skill d
The fundamental recommendations contain some deficiencies in their implementation or utility.
Based on the findings, the recommendations are listed which are made to further enhance the impact of on-the job training with the support of industry-acad
There are recommendations, but the implementation plan may be less developed.
The research hypothesis that was set for the recommendations is in accordance with the research aim as well as the objective that was set for the recommen
Based on the findings, the recommendations are listed which are made to further enhance the impact of on-the job training with the support of industry-acad
Only a basic recommendation is reported.
Need more recommendations , usefulness implementation scheme of this study.
Recommendations made can be useful to the logistic company if followed.
Basic recommendations and there is a gap in implementation.
Based on the findings of this study, several recommendations are provided to healthcare organizations planning to undertake cloud migration:
The recommendations mention in the study are apparent.
Very good recommendations with reasonable implementation plans.
Recommendations made in the study is likely related to the objectives framed but it also has no implementation value.
Recommendations made are sufficient, though the usefulness may be less.

The recommendations of this study are span organizational, process, and cultural dimensions, encompassing strategies for governance enhancement, skill d

The research hypothesis that was set for the recommendations is in accordance with the research aim as well as the objective that was set for the recommen
Add more recommendations of this project .

The literature review provides a foundation for understanding key concepts, methodologies, and trends pertinent to enhancing supply chain performance thr
The recommendations of this study are span organizational, process, and cultural dimensions, encompassing strategies for governance enhancement, skill d
These recommendations encompass areas such as technology adoption, process optimization, employee training, and continuous improvement initiatives is

Basic suggestions with some problems with how they are being done.
Basic recommendations with some gaps in implementation
The recommendations are well-founded and have a clear implementation scheme, demonstrating their utility.
No evidence of any recommendations
Recommendations are almost absent
The recommendations are apparent, but the implementation plan is not.
Basic recommendations with some gaps in implementation or usefulness with some gaps in implementation.
Weak recommendations without enough detail.
The basic recommendations have some gaps in implementation.

Recommendations of this project could be made, like ensuring that training is carried out accurately, thoroughly, and with sufficient attention.
Recommendations are obvious, though the implementation plan or usefulness may be less developed.
Recommendations are apparent, though the implementation plan
Based on the findings, the recommendations are listed which are made to further enhance the impact of E- Commerece industry with the support of industry
The research hypothesis that was set for the recommendations is in accordance with the research aim as well as the objective that was set for the recommen
This study includes proposing good recommendations for enhancing overall cloud computing.
This project has delivered valuable insights and actionable recommendations derived from meticulous data analysis techniques.
No evidence of any recommendations
The recommendations are clear, even though the usefulness or implementation strategy may need more work.
Recommendations are apparent, though the implementation plan
The research hypothesis that was set for the recommendations is in accordance with the research aim as well as the objective that was set for the recommen
Recommendations are apparent, though the implementation plan
Good suggestions with a feasible plan for execution and possible utility.
Basic recommendations with some gaps in implementation
The research hypothesis that was set for the recommendations is in accordance with the research aim as well as the objective that was set for the recommen
Weak recommendations, lacking sufficient detail or practicality.
This project has delivered valuable insights and actionable recommendations derived from meticulous data analysis techniques.
Recommendations are apparent, though the implementation plan
The research hypothesis that was set for the recommendations is in accordance with the research aim as well as the objective that was set for the recommen
These recommendations encompass areas such as technology adoption, process optimization, employee training, and continuous improvement initiatives.
Based on the findings, the recommendations are listed which are made to further enhance the impact of on-the job training with the support of industry-acad
Sound recommendations with a reasonable implementation plan and potential utility.
Basic recommendations with some gaps in implementation
The recommendations are clear, even though the usefulness or implementation strategy may need more work.
Basic recommendations with some gaps in implementation
Sound recommendations with a reasonable implementation plan
Weak recommendations, lacking sufficient detail or practicality
Weak recommendations, lacking sufficient detail
These recommendations encompass areas such as technology adoption, process optimization, employee training, and continuous improvement initiatives
There are some basic recommendations with some gaps in implementation.
Basic recommendations with some gaps in implementation or usefulness.
Basic recommendations with some gaps in implementation
Sound recommendations with a reasonable implementation plan
The recommendations are weak and lack sufficient detail.
The recommendations are apparent, though the implementation is unclear.
Recommendations with a feasible implementation strategy and potential utility.
The basic recommendations have some gaps in implementation.
These recommendations encompass areas such as technology adoption, process optimization, employee training, and continuous improvement initiatives.
No evidence of any recommendations
These recommendations may encompass strategies for overcoming challenges, leveraging success factors, adopting best practices, and aligning with emergi

strategic roadmap that complements their business objectives.


Project execution summary is need to give more information of implementation of project
Identify opportunities for future research and innovation in hospital supply chain management to address emerging challenges and trends
One of the primary justifications for organizations to use a variety of management methods is the dynamic and ever-changing nature of the industry.
While recommendations are apparent, enhancing the implementation plan's detail and practical applicability will increase their effectiveness in addressing t
While recommendations are evident, enhancing the implementation plan's detail and practical applicability will increase their effectiveness in addressing po
No evidence of any recommendations

To ensure the successful implementation of lean manufacturing principles, Dell has invested in employee training and development.
No evidence of any recommendations

Manufacturing industries involve the production of tangible goods or products through the transformation of raw materials into finished goods.
While recommendations are identifiable, enhancing the implementation plan's detail and practical applicability will increase their effectiveness in influencin
To implement data-driven decision-making processes for continuous improvement.

The significance of lean manufacturing principles for enhancing operational efficiency cannot be overstated.

for new system.

The supporters need to screen various models and guides to understand the changing impression of the clients

implementation is not provide enough context for understanding what happened during flipkart's journey to clouds
in the right place at the right time

implementation are use in giving security of its information amid transmission


qualifications throughout the verification process

Basic recommendations with some gaps in implementation or usefulness.

Basic recommendations with some gaps in implementation or usefulness.

Recommendations are given

Weak recommendations, lacking sufficient detail or practicality.


Basic recommendations with some gaps in implementation or usefulness.
Weak recommendations, lacking sufficient detail or practicality.

Basic recommendations with some gaps in implementation or usefulness.

Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Basic recommendations with some gaps in implementation or usefulness.

Basic recommendations with some gaps in implementation or usefulness.


Basic recommendations with some gaps in implementation or usefulness.

Weak recommendations, lacking sufficient detail or practicality.

Weak recommendations, lacking sufficient detail or practicality

Basic recommendations with some gaps in implementation or usefulness

Weak recommendations, lacking sufficient detail or practicality.

recommendations given needs to specify implementation scheme of the study


Needs to mention the implementation scheme and recommendation of the AI technology in the financial sector
Sound recommendations with a reasonable implementation plan and potential usefulness.
Recommendations are apparent, though the implementation plan
Recommendations are given needs to mention the usefulness and implementation scheme of the mentioned research.
Sound recommendations with a reasonable implementation plan and potential usefulness.
Weak recommendations, lacking sufficient detail or practicality.
Recommendations are given needs to mention various innovative implementation scheme of the findings
Basic recommendations with some gaps in implementation or usefulness.
Sound recommendations with a reasonable implementation plan and potential usefulness.
Recommendations needs to be precise based on the implementation scheme with various factors
Needs to mention recommendations and usefulness of the implementation scheme
Basic recommendations with some gaps in implementation or usefulness.
Sound recommendations with a reasonable implementation plan and potential usefulness.
Weak recommendations, lacking sufficient detail or practicality.
Sound recommendations with a reasonable implementation plan and potential usefulness.
Sound recommendations with a reasonable implementation plan and potential usefulness.
Recommendations given usefulness of the implementation scheme needs some more key points
Sound recommendations with a reasonable implementation plan and potential usefulness.

Needs to mention some recommendation for implementation of new things and usefulness of the project
Weak recommendations, lacking sufficient detail or practicality.
Recommendations given needs to present the implementation scheme of the study
Basic recommendations with some gaps in implementation or usefulness.
Basic recommendations with some gaps in implementation or usefulness

Basic recommendations with some gaps in implementation or usefulness.


Recommendations given needs to scrutinise the recommendation for obtain the result of the study
Basic recommendations with some gaps in implementation or usefulness.
Basic recommendations with some gaps in implementation or usefulness.
Few recommendation may be not with the implementation scheme

Basic recommendations with some gaps in implementation or usefulness.

Recommendations are given needs to present the usefulness of the implementation scheme
Recommendations are almost absent or entirely inappropriate.
useful only given needs to give more points related to the decentralization of data
Weak recommendations, lacking sufficient detail or practicality.
Basic recommendations with some gaps in implementation or usefulness
Recommendations and usefulness are discussed needs to give some more points on implementation scheme
Weak recommendations, lacking sufficient detail or practicality.
Basic recommendations with some gaps in implementation or usefulness
Recommendations needs to be present in point by point manner, number of recommendation needs to be update for solve the study problem, needs to prese

Basic recommendations with some gaps in implementation or usefulness.


Recommendations are given needs to discuss implementation scheme with various options
Recommendations given needs to specify implementation scheme for the study
Weak recommendations, lacking sufficient detail or practicality.
Weak recommendations, lacking sufficient detail or practicality.
usefulness of the android OS are discussed needs to specify the recommendations for solve the problem scheme
Recommendations are given needs to present implementation scheme
Recommendations are given needs to specify implementations scheme

Weak recommendations, lacking sufficient detail or practicality.

Basic recommendations with some gaps in implementation or usefulness.

Basic recommendations with some gaps in implementation or usefulness.


Basic recommendations with some gaps in implementation or usefulness.

Recommendations are apparent, though the implementation plan or usefulness may be less developed

Basic recommendations with some gaps in implementation or usefulness.

Basic recommendations with some gaps in implementation or usefulness.

Weak recommendations, lacking sufficient detail or practicality

Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Some of the non priority recommendations are given needs to mention some practical scope of the implementation scheme
Some of the recommendation need to precise and needs to mention the implementation scheme

Needs to mention the technology recommendation to implementation of the scheme


Recommendations given needs to focus on the objective of the analysis of data in the project

Well-founded recommendations with a clear implementation scheme and demonstrated usefulness.


Sound recommendations with a reasonable implementation plan and potential usefulness.
Needs to mention some implementation scheme of the study
Recommendations are given needs to specify the implementation scheme
Suggestions given needs to specify implementation scheme with problem solutions
Some of the recommendations needs to present with implementation scheme
Needs to present implementation scheme of the study
Recommendations are apparent, though the implementation plan
recommendations are given needs to specify implementation scheme of the study
Sound recommendations with a reasonable implementation plan and potential usefulness
Sound recommendations with a reasonable implementation plan and potential usefulness.
Sound recommendations with a reasonable implementation plan and potential usefulness.
Sound recommendations with a reasonable implementation plan and potential usefulness.
Sound recommendations with a reasonable implementation plan and potential usefulness.
Recommendations and implementation scheme the study need to improve in this section
Needs to mention various recommendations based on the implementation of the scheme
Basic recommendations with some gaps in implementation or usefulness.
Very basic or inappropriate recommendations, with little consideration of implementation.
Sound recommendations with a reasonable implementation plan and potential usefulness.
Sound recommendations with a reasonable implementation plan and potential usefulness.
Basic recommendations with some gaps in implementation or usefulness.
Sound recommendations with a reasonable implementation plan and potential usefulness.
some of the recommendations needs to precise the problem scheme
Basic recommendations with some gaps in implementation or usefulness.

Weak recommendations, lacking sufficient detail or practicality


The recommendations are apparent, though the implementation plan and their practical usefulness may be less developed. Enhancing these aspects will mak

Basic recommendations with some gaps in implementation or usefulness.


No evidence of any recommendations
The recommendations provided are basic, with noticeable gaps in their implementation strategies, indicating a need for more detailed plans to effectively ad

Assessing microfinance lending necessitates comprehensive evaluation of financial metrics and broader socio-economic impacts to inform effective recomm
Weak recommendations, lacking sufficient detail or practicality.
The recommendations are solid, supported by a reasonable implementation plan, indicating a practical approach to addressing the challenges and opportunit

require a different implementation plan to address the financial impact of leather goods production and inventory.
Recommendations are apparent, though the implementation plan lacks thorough development, necessitating clearer steps and strategies for effective executi
The recommendations provided are basic, but there are noticeable gaps in their implementation strategies or practical usefulness, highlighting the need for m
Project execution summary is need to give more information of implementation of project

Recommendations are apparent, but the implementation plan and practical usefulness need further development.
Recommendations are apparent, though the implementation plan lacks detail or specificity, requiring further elaboration to ensure practicality and effectiven
Recommended, many implementation scheme have been applied for QMS to enhance customer satisfaction in Max Healthcare. need more clarity about thi
Focuses on inventory management to reduce waste and control costs.
Enhance the recommendations by detailing a thorough implementation plan and ensuring their practical usefulness to address the risks faced by the Indian b
In the conceptual framework section, various fundamental concepts related to procurement are discussed, as well as literature review.
It examines the various factors influencing energy consumption patterns, renewable energy integration, and policy frameworks governing urban energy

The key deliverables of this work include a generalized framework for the implementation of TQM that has been modified to align with the quality practice
Enhance recommendations by filling gaps in implementation details to ensure practicality and effectiveness in addressing challenges related to mergers and
The government has started programs to help food processing and make it easier for farmers to sell their products. This will help increase CCI and exports.
While recommendations are evident, enhancing the implementation plan's detail and practical usefulness will strengthen their effectiveness in improving co

While recommendations are evident, improving the implementation plan's detail and practical applicability will enhance their effectiveness in addressing th
No evidence of any recommendations

Weak recommendations, lacking sufficient detail or practicality.


Basic recommendations with some gaps in implementation or usefulness

Basic recommendations with some gaps in implementation or usefulness


Weak recommendations, lacking sufficient detail or practicality.
Basic recommendations with some gaps in implementation or usefulness.

gaps in implementation
implementation

Basic recommendations with some gaps in implementation or usefulness.


Basic recommendations with some gaps in implementation or usefulness

Basic recommendations with some gaps in implementation or usefulness.


Basic recommendations with some gaps in implementation or usefulness.
Basic recommendations with some gaps in implementation or usefulness
Basic recommendations with some gaps in implementation or usefulness.
Weak recommendations, lacking sufficient detail or practicality.
implementation
Recommendations are apparent, though the implementation plan or usefulness may be less developed.
suggestions and recommendations may give more

to give recommendation for useful to the society and for further researcher

some of the Recommendations given


Basic recommendations with some gaps in implementation or usefulness.
Basic recommendations with some gaps in implementation or usefulness.
FINE POINTS PRESENTED
USEFULL
HOW IT SHOULD BE USEFUL AND NEED TO PRESENT FULLY
IMPLICATION IS USEFUL
WELL RECOMMENDED
NOT PRESENTED
YES
OK
USEFUL
USEFUL
Recommendations are almost absent
gaps in implementation
USEFUL
useful
The recommendation is well-founded and has a clear implementation scheme, demonstrating its usefulness.
Recommended solutions that are well-established, have a clear implementation plan, and have been proven to be useful.
Recommendations that are well-founded, have a clear implementation scheme, and have been demonstrated to be useful.
Weak recommendations, lacking sufficient detail
Basic recommendations with some gaps in implementation
Basic recommendations with some gaps in implementation
Basic recommendations with some gaps in implementation
Basic recommendations with some gaps in implementation
Basic recommendations with some gaps in implementation
Basic recommendations with some gaps in implementation
Basicrecommendations with some gaps in implementation
Good suggestions with a feasible plan for execution and possible utility.
well-reasoned suggestions with an understandable implementation plan that have been proven beneficial.
Well-researched suggestions with a definite plan for execution and proven effectiveness.
Basic recommendations with some gaps in implementation
There are clear recommendations, but there may not be as much thought put into their usefulness or implementation strategy.
Recommendations are almost absent or entirely inappropriate.
Weak recommendations, lacking sufficient detail
Good suggestions with a feasible implementation schedule and possible utility.
There are clear recommendations, but there may not be as much thought put into their usefulness or implementation strategy.
Basic recommendations with some gaps in implementation
Recommendations are useful for presenting Scinareo.
Weak recommendations, lacking sufficient detail or practicality.
The recommendations are clear, however the implementation plan and usefulness may not be fully developed.
Customer satisfaction and preferences plays a vital role in company’s growth. If they are highly satisfied then they will stay loyal and they will continue to
implementation.
implementation
implementation.
To study real-world examples of smart cities implementing IoT and extract best practices
sufficient detail
within the mobile payments industry
implementation
Project execution summary is need to give more information of implementation of project
implementation
implementation.
Project execution summary is need to give more information of implementation of project
implementation
Project execution summary is need to give more information of implementation of project
sufficient detail
The current study, despite its limitations, establishes a vital foundation for further academic inquiry and practical application.
Project execution summary is need to give more information of implementation of project
Basic recommendations with some gaps in implementation
it treatments.
They (hotels) should embrace a technological solution immediately before the word hotel only gets attached to rooms and not to the F&B outlets within t
Project execution summary is need to give more information of implementation of this project
This study aims to explore the various impact of emerging technologies on IT audit practices, by understanding key dimensions such as audit methodologie
Weak recommendations, lacking sufficient detail
Basic recommendations with some gaps in implementation
It offers actionable recommendations to enhance cybersecurity frameworks, ensure regulatory compliance, and leverage advanced technologies for improve
Weak recommendations, lacking sufficient detail
Weak recommendations, lacking sufficient detail
Basic recommendations with some gaps in implementation
Basic recommendations with some gaps in implementation
Weak recommendations, lacking sufficient detail
Basic recommendations with some gaps in implementation
Basic recommendations with some gaps in implementation
The study suggests that the very much designed HPWS plays a crucial job in developing domain-relevant, creativity-relevant abilities and encourages a psy
Industry stakeholders should collaborate across sectors to share insights, resources, and best practices for 5G adoption and innovation.
Recommendations to objectives of the study need to give clearly about the project.
Development is crucial for keeping the momentum of digital transformation operations and obtaining long-term success.
absent.
usefulness.
though the implementation plan.
The result of this study will help the Sony Company to rectify their mistakes and to come out with a new plan and promotional activity which helps them to
This assessment is driven by well-defined objectives aimed at establishing the effectiveness of AI integration for business improvement.
Project execution summary is need to give more information of implementation of project
The application of ITIL processes has contributed to higher user satisfaction levels. By establishing clear service level agreements (SLAs) and consistent co
usefulness.
implementation plan.
implementation.
sufficient detail.
Recommendations to objectives of the study need to give clearly about the project.
To assess accepting that there is huge qualification in the perspective on pressure causing factors across direction.
developed.
To understand the need of the data management system and it necessitates according to companies current and future objectives.
implementation plan.
sufficient detail.
By addressing both the opportunities and challenges associated with process automation, businesses can achieve greater efficiency, competitiveness, and cu
Examine challenges faced by organizations during the integration process, including data synchronization issues and system interoperability.
implementation.
sufficient detail.
gaps in implementation
implementation plan.
To elucidate the Fintech industry's adoption of digitalization has affected investors' degree of pleasue
gaps in implementation.
Identify and analyse vulnerabilities inherent in current cybersecurity protocols employed withing IT service management frameworks
sufficient detail.
implementation.
implementation procedure.
absent.
implementation.
E-learning platforms and virtual training sessions were reported as effective methods for continuous employee development.
Collaboration and effective communication are essential for a smooth supply chain.
The study finds that private sector mutual funds have outperformed their public sector counterparts.
models from very positive to slightly negative. Thus, the formal application of a hybrid work model seems to be the best solution.
Consumers increasingly prioritize sustainability, integrating eco-friendly materials and ethical practices into product lines will not only meet consumer dem
sufficient detail.
projects.
implementation.
implementation.
implementation plan.
Collaboration with tech partners and leveraging cloud-based services can also help mitigate some of these challenges by providing access to cutting-edge te
implementation.
Project execution summary is need to give more information of implementation of project
implementation.
implementation.
Recent technology uses and methodology to be address clearly.
implementation plan.
implementation.
The fruitful of total of this entry level position shows that the fate of publicizing and advertising is in the arms of computerized.
Recent technology uses and methodology to be address clearly.
Evaluate their effectiveness in improving public health outcomes, optimizing resource allocation, and enhancing community resilience.
Leveraging predictive analytics can significantly enhance the effectiveness of BTL campaigns.
Data-driven decision-making in healthcare is made possible by embracing cutting-edge technologies like artificial intelligence, machine learning, an
implementation.
implementation.
To implement the designed platform and evaluate its usability, effectiveness, and impact on HCP engagement.
implementation.
Assess customer buy-in for implementing new digital channels and innovation in restaurants

implementation.
To evaluate the benefits and challenges associated with blockchain implementation.
Project execution summary is need to give more information of implementation of project
implementation plan
gaps in implementation
gaps in implementation
website usability.
Project execution summary is need to give more information of implementation of project
gaps in implementation
implementation
implementation plan
implementation
implementation
Recommendations to objectives of the study need to give clearly about the project.
implementation
sufficient detail
implementation plan
Recent technology uses and methodology to be address clearly.
sufficient detail
Project execution summary is need to give more information of implementation of project
Recommendations to objectives of the study need to give clearly about the project.
intelligence and its possibilities.
implementation plan
To promote improved communication and cooperation, managers, project leaders, and team members worldwide receive up-to-date project in
IT and ITSM have significantly streamlined various financial market operations, leading to enhanced efficiency and automation. Automated trading sy
implementation
Project execution summary is need to give more information of implementation of project
gaps in implementation
Project execution summary is need to give more information of implementation of project
implementation

Evaluate the security protocols implemented by Amazon and Flipkart to protect user data

To evaluate the performance of risk management framework and its optimum applications.
sufficient detail.
n

Development delay issues and it will help them with some best practices which can reduce the impact of the delay of the code deployment on the overall pr
To determine the opportunities and problems facing the various players in the ecosystem of digital payments
gaps in implementation.
Project execution summary is need to give more information of implementation of project
Recent technology uses and methodology to be address clearly.
gaps in implementation
though the implementation plan .
though the implementation plan
developed.
Project execution summary is need to give more information of implementation of project
Overall, the objective is to contribute to a better understanding of the role of AI in combating financial crimes and safeguarding the integrity of the
Implementing proactive measures to detect and prevent online fraud incidents within military contexts.
This study aims to achieve several key objectives that collectively contribute to a deeper understanding and robust management of mobile device securi
of these technologies and enhancing their social media marketing endeavours.
Project execution summary is need to give more information of implementation of this project
developed.
Basic recommendations with some gaps in implementation
The results show that customers' perceptions of e-commerce are significantly influenced by social media, and that favorable social media experi
Cyber security is a complicated field to manage and even the most ardent players of cyber security are aware that absolute cyber security.
implementing appropriate collaboration software.
Basic recommendations with some gaps in implementation
Weak recommendations, lacking sufficient detail or practicality.
Basic recommendations with some gaps in implementation
Basic recommendations with some gaps in implementation
Develop recommendations for optimizing IT service delivery at JP Morgan
ERP systems are not just about integrating different business processes; they also include enterprise performance management software that assists in p
The project encompasses a wide range of topics, including data collection and preparation, exploratory data analysis (EDA), model building and evaluation
mainframe systems required administrators to manage access to critical resources manually
Weak recommendations, lacking sufficient detail
Weak recommendations, lacking sufficient detail or practicality
Basic recommendations with some gaps in implementation or usefulness.
Basic recommendations with some gaps in implementation
Basic recommendations with some gaps in implementation
Recommendations to objectives of the study need to give clearly about the project.
decreasing its environmental impact
GIVEN
Weak recommendations, lacking sufficient detail
Weak recommendations, lacking sufficient detail
Basic recommendations with some gaps in implementation
OK
Weak recommendations, lacking sufficient detail or practicality
Weak recommendations, lacking sufficient detail
YES
Weak recommendati ons, lacking sufficient detail or practicality.
Weak recommendations, lacking sufficient detail or practicality
Basic recommendations with some gaps in implementation or usefulness.
Well-founded recommendati ons with a clear implementatio n scheme and demonstrated usefulness.
MANY USEFUL RECOMMENDATIONS PRESENED
Weak recommendations, lacking sufficient detail or practicality.
Basic recommendations with some gaps in implementation
need to be refined
Basic recommendations with some gaps in implementation
Basic recommendations with some gaps in implementation
ok
Basic recommendations with some gaps in implementation or usefulness.
Basic recommendations with some gaps in implementation
USEFUL
Weak recommendations, lacking sufficient detail or practicality.
ok
Basic recommendations with some gaps in implementation
Basic recommendations with some gaps in implementation
finely presented

Basic recommendations with some gaps in implementation or usefulness.


Basic recommendations with some gaps in implementation
Basic recommendations with some gaps in implementation
Basic recommendations with some gaps in implementation
Consider the numbers that would impact your company most like total sales revenue, gross/net profit or loss, customer acquisition cost, and product perform
implementation plan
absent
IT service desks, often referred to simply as "service desks," are centralized units within organizations responsible for managing and resolving ITrelated inc
implementation
The study's findings suggest several strategic recommendations for online banking service providers to enhance client satisfaction, loyalty, and cybersecu
implementation plan
The recommendations provided in this study serve as a roadmap for cyber cafe managers to implement ITSM frameworks and drive sustainable grow
No noteworthy innovation technique used for problem scheme in this project
Examine the diverse sources of data utilized in AI applications, the tools and technologies employed for data analysis, and the techniques used for extractin
media analytics capabilities.
Home energy management infrastructure provides tools to sustainably measure and analyse residents’ behaviour and energy use to provide information emp
absent
By reducing or eliminating the need for cash, digital payment solutions can be adopted more widely.
sufficient detail
IoT has brought significant enhancement in the field of hospitality, but there are some unavoidable pitfalls which need to be mitigate.
The continued evolution of AI will undoubtedly shape the future of construction, making it a more technologically advanced and forward-thinking
implementation
Need to improve research work focus on clear idea about scope of the objectives and data collection methods
Recommendations to objectives of the study need to give clearly about the project.
implementation plan
implementation
Recommendations to objectives of the study need to give clearly about the project.
CIOs must weighing advantages and downsides of Green Cloud computing. They need a shortterm and longterm deployment strategy.
sufficient detail
sufficient detail
Offer practical recommendations or strategies for enhancing personal cyber security hygiene.
The findings of our examination have huge ramifications for TM rehearses.
implementation.
however when it comes to matters of security and privacy, most put their faith in fintech businesses.
absent
sufficient detail.
implementation.
sufficient detail
implementation
implementation

Basic recommendations with some gaps in implementation or usefulness.

Basic recommendations with some gaps in implementation or usefulness.

Recommendati ons are apparent, though the implementatio n plan


Recommendations are apparent, though the implementation plan or usefulness may be less developed.

Basic recommendations with some gaps in implementation or usefulness.

Basic recommendations with some gaps in implementation


Basic recommendations with some gaps in implementation or usefulness
Weak recommendations, lacking sufficient detail or practicality.

Basic recommendations with some gaps in implementation or usefulness.


Recommendations are apparent, though the implementation plan or usefulness may be less developed.

Recommendations are apparent, though the implementation plan


To leverage the findings from the competition analysis and drive strategic decisions, the following recommendations and implementation scheme are propo
Sound recommendations with a reasonable implementation plan and potential usefulness.
Basic recommendations with some gaps in implementation or usefulness.
Ensure that cloud computing initiatives are aligned with the organization's overall business strategy and objectives. This alignment can maximize the benefi
Weak recommendations, lacking sufficient detail or practicality
Weak recommendations, lacking sufficient detail or practicality.
Basic recommendati ons with some gaps in implementation
Basic recommendations with some gaps in implementation
Basic recommendations with some gaps in implementation
The recommendations are actionable and aligned with the study's findings. They offer valuable guidance for businesses looking to enhance their online mar
The recommendations are actionable and aligned with the study's findings. They offer practical guidance for companies looking to leverage AI in their prod
Gain executive sponsorship and support to drive ITIL 4 implementation initiatives.
The defensive measures towards providing security were stated
Weak recommendations, lacking sufficient detail or practicality
Assimilating the cycle of the study, in time, assist with laying out better cycles in business works as well.
Basic recommendations with some gaps in implementation or usefulness
Basic recommendations with some gaps in implementation
It is important to be aware of upcoming trends, understand if and how they can be incorporated, and have a roadmap in place to embrace technology across
The newcomers of this technology users want a exceptional program on which to begin their particular blockchain adventure. It is recommended to user frie
Fundamental suggestions with some limitations in their applicability.
The recommendations are clear even though the implementation strategy may need further work.

Basic recommendations were given and implementation strategy may need more work.
The recommendations are clear, even though the usefulness or implementation strategy may need further work.

Sound recommendations with a reasonable implementation plan and potential usefulness.


Fundamental suggestions with some limitations in their applicability.

Fundamental suggestions with some limitations in their applicability.

Very basic recommendations, with little consideration of implementation


Fundamental suggestions with some limitations in their applicability.
Very basic recommendations with little consideration of implementation
Other subject file
Basic recommendations were given and implementation strategy may need more work.
Other subject file
Basic recommendations with some gaps in implementation.
Other subject file
The recommendations are clear, even though the usefulness or implementation strategy may need further work.

Fundamental suggestions with some limitations in their applicability of the study.

The recommendations are clear, even though the usefulness or implementation strategy may need further work.

Student uploaded assignment questions with answers.

Sound recommendation ons with a reasonable implementation n plan and potential usefulness.
Recommendati ons are apparent, though the implementatio n plan or usefulness may be less developed.
Recommendati ons are apparent, though the implementatio n plan or usefulness may be less developed.

Sound recommendati ons with a reasonable implementatio n plan and potential usefulness
Basic recommendati ons with some gaps in implementatio n or usefulness

need industries. Much more data collection than only project implemented various i

highly recommended of this project to implement various organization and industries.


Recommendations, usefulness implementation scheme of the project is User-generated reviews provide a transparent view of service quality, helping others
recommended of this project to implement various organization and industries.
aspect of their employee retention strategy
exploration, and ad-hoc querying to support data-driven decision-making.

transitioning from a manual, scale-constrained environment to a technology-driven landscape.


businesses to glean insightful information from large and intricate datasets.

partially adopted cloud computing, with a considerable number planning to do so in the near future.

AI in digital marketing will collect data from customer and it will process it and analysis the data and it will provide more meaningful insight about the dig
Sound recommendations with a reasonable implementation plan and potential usefulness.
based on user interactions with the application.
Recommendations of this project is According to the study, digital advertising has a low degree of trustworthiness.
Sound recommendations with a reasonable implementation plan and potential usefulness.
India's journey towards digital currency adoption.
Basic recommendations with some gaps in implementation
foreign regulators to ensure compliance and interoperability.
Basic recommendations with some gaps in implementation

The recommendations are clear, even though the implementation strategy may need further work.
Recommendations are apparent though the implementation plan may be less developed.
achieved through this project.
Recommendations are apparent, though the implementation plan may be less developed.
Other subject file
usefulness implementation scheme Quantum Computing offers efficient data storage and retrieval capabilities through quantum memory systems.
Other subject file
Recommendations of this project is majority of people still either seldom or never use AI in their decision-making processes.
earlier.
Other subject file

Basic recommendations with some gaps in implementation.

Basic recommendations with some gaps in implementation.

Sound recommendations with a reasonable implementation plan and potential usefulness.


Sound recommendations with a reasonable implementation plan and potential usefulness.

The recommendations are clear even though the implementation strategy may need further work.

Recommendations are apparent though the implementation plan may be less developed.

Basic recommendations with some gaps in implementation


Student gave fundamental suggestions with some implementation gaps.
Student gave fundamental suggestions with some implementation gaps.

Fundamental suggestions with some limitations in their applicability.

Student gave fundamental suggestions with some implementation gaps.

Basic recommendations with some gaps in implementation

Fundamental suggestions with some limitations in their applicability of the study

Other subject file


Gig economy can help in the process of empowerment of women in India in following ways: Balance work and family
through the appropriation of cloud computing

conscious practices
to cloud infrastructure
recommended of this project to implement various organization and industries.

highly recommended of this project to implement various organization and industries.

highly recommended of this project to implement various organization and industries.


highly recommended of this project to implement various organization and industries.

implementation of the project Their model serves as a great example of a fashion liking model, regardless of whether they looked at a completed style job o
Recommendations of the project is the key findings, suggestions, and conclusions derived from the comprehensive analysis and interpretation of the survey
and information sharing will help in accelerating the detection technologies and best practice.

documents.
recommended of this project to implement various organization and industries.

recommended of this project to implement various organization and industries.


need more tools this project will improve quality level.

recommended of this project to implement various organization and industries.


this report, we have looked at the various processes in the Bank, wherein AI can be implemented and enormous benefits can be derived
for the valuable utilization of the findings and for future research studies.
Recommendati ons are apparent, though the implementatio n plan or usefulness may be less developed.
Recommendati ons are apparent, though the implementatio n plan or usefulness may be less developed.
Sound recommendations with a reasonable implementation plan and potential usefulness.

Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Recommendations are apparent, though the implementation plan or usefulness may be less developed.

Sound recommendations with a reasonable implementation plan and potential usefulness.

Basic recommendati ons with some gaps in implementatio n

Recommendati ons are apparent, though the implementatio n plan or usefulness may be less developed.

Recommendations are apparent, though the implementation plan or usefulness may be less developed.

Sound recommendations with a reasonable implementation plan and potential usefulness.

Recommendati ons are apparent, though the implementatio n plan

Basic recommendations with some gaps in implementation


Recommendations are apparent, though the implementation plan

Recommendations are apparent, though the implementation plan

Recommendati ons are apparent, though the implementatio n plan

Sound recommendations with a reasonable implementation plan and potential usefulness.

Recommendations are apparent, though the implementation plan or usefulness may be less developed

Basic recommendations with some gaps in implementation


Basic recommendations with some gaps in implementation or usefulness
Recommendations are apparent, though the implementation plan
Recommendations are apparent, though the implementation plan
Recommendations are apparent, though the implementation plan

Basic recommendations with some gaps in implementation or usefulness


Basic recommendations with some gaps in implementation
Basic recommendations with some gaps in implementation

Fundamental suggestions with some limitations in their applicability.


Other subject file.
The COVID-19 pandemic has affected every industry, and has disrupted trade, supply chains, work and business models, employment and consumer behav
The banking sector is the shift towards digitalization. With the advent of online and mobile banking, customers now have access to a wide range of banking
Other subject file
Security is a topic that is gaining more and more interest by organizations and government agencies
Fundamental recommendations with some limitations in their applicability.
Other subject file
A primary reason to consider migrating legacy COBOL code to Java is the cost efficiency of maintaining that code going forward.
The primary purpose of this research is to look at how social media influences purchasing behaviour and to determine the link among various social media
Student gave fundamental suggestions with some implementation gaps.
Basic recommendations with some gaps in implementation.
Copy case(Course book)
Basic recommendations with some gaps in implementation scheme.
It is recommended to carry out a strategic analysis of Recruitment and Selection procedure
Other subject file

The implementation of e-RUPI, all of these citizens will also be able to benefit financially from all of the government's programs in the areas of health
Implementation of MIS is a process of organisational change where the system passes through stages such as unfreezing-which increases the receptivity of
Developing comprehensive regulatory frameworks is essential, requiring collaboration between regulators, blockchain developers, and financial institutions

The first step of creating an excellent technology implementation plan is to identify the issues you need to address through the introduction of new technolo
Other subject file
Fundamental recommendations with some limitations in their applicability.
Product-based companies invest highly in research & development and marketing to create and sell the product, whereas service-based companies require a
Fundamental suggestions with some limitations in their applicability.
Simple recommendations with some gaps in implementation.
A successful strategy is measurable and responsive to customer needs, allowing you to collect feedback, input, and relevant customer performance
Other subject file
The more you listen to others, the better you can address their concerns. It is critical that you let all employees know that your door is always open to them.
Fundamental suggestions with some limitations in their applicability.
Fundamental suggestions with some limitations in their applicability given.
a risk-based and tiered approach to regulating AI that builds on existing laws and standards and on accountable practices of organizations.
Another way e-commerce websites influence consumer behavior is through the use of product recommendations. By analyzing consumer behavior and buy
Student gave basic recommendations with some gaps in implementation.

The recommendations are clear, even though the usefulness or implementation strategy may need further work.

No evidence of any recommendations


No evidence of any recommendations o

Weak recommendations, lacking sufficient detail

The implementation scheme is clear but require provide more explanation


Weak recommendations, lacking sufficient detail

The recommendation are generally good


Weak recommendations, lacking sufficient detail
Weak recommendations, lacking sufficient detail or practicality
Weak recommendations, lacking sufficient detail
Basic recommendations with some gaps in implementation

Recommendations are almost absent


The implementation scheme are clear and recommendations are well presented

The implementation scheme are clear but could be more detail

Weak recommendations, lacking sufficient detail


Basic recommendations with some gaps in implementation

The implementation of JIT principles in this study has increasing the relevance of the findings
Basic recommendations with some gaps in implementation
Basic recommendations with some gaps in implementation

Basic recommendations with some gaps in implementation


Weak recommendations, lacking sufficient detail or practicality

gaps in implementation
Basic recommendations with some gaps in implementation
The recommendations are valuable for future studies

Weak recommendations, lacking sufficient detail


The various recommendations are well presented but could need more thorough analysis
Basic recommendations with some gaps in implementation

Weak recommendations, lacking sufficient detail

The research hypothesis that was set for the recommendations is in accordance with the research aim as well as the objective that was set for the recommen
This project has delivered valuable insights and actionable recommendations derived from meticulous data analysis techniques.
give some more ideas of ecommendations, usefulness implementation scheme
this study are span organizational, process, and cultural dimensions, encompassing strategies for governance enhancement, skill development, tool adoption
add the data to delivered valuable insights and actionable recommendations derived from meticulous data analysis techniques.
Useful recommendations and implementation schemes are provided
The research covered a broad range of AI and digital marketing topics, but in the future, it is possible to assume that the fundamentals have been covered an
Recommendations were provided for future process
Clear recommendations were not specified
Provided useful recommendations to implement

This study provides recommendations for HR professionals and organizations on maximizing the benefits of AI in talent acquisition while mitigating its cha
The research hypothesis that was set for the recommendations is in accordance with the research aim as well as the objective that was set for the recommen

Based on the findings, the recommendations are listed which are made to further enhance the impact of on-the job training with the support of industry-acad
Basic recommendations with implementation of scheme

Weak recommendations for usefulness of implementation of scheme


Basic recommendations for implementation of scheme

sound recommendations for implementation of scheme

Need more recommendations for implementation of scheme

No evidence for any recommendations


Recommendations are apparent, though the implementation plan or usefulness may be less developed.

write strong recommendations based on for future project

good recommendations for future refrers


recommendations are neeed more informations
sound recommendations are written
Sound recommendations with implementation of scheme
good recomendations to be given this studyfor future reference
Basic recommendations used for implementation of scheme
Recommendations are apparent with the implementation of scheme
Recommendations are apparent though the limitation of the scheme

recommendations is good opted for your objectives

Provided necessary and useful recommends to implement.


Provided useful recommends for implementation

recommendations is provide in based on your objectives


Useful recommendations are provided

inappropriate

Proposed useful recommendations to implement


Considering the constraints of the study and the unresolved queries it poses, various potential areas for future research are indicated.
recommendations are provided
provide appropriate recommendations in this study
useful recommendations are mentioned
Useful recommends are provided
write proper recommendations needed
usefulness.
implementation plan

Sound recommendations with a reasonable implementation plan


Recommendations are apparent, though the implementation
Recommends useful suggestions for implementation
provides many useful suggestions for implementation
sufficient recommendations are given

recommendations are also most suitable for based on objective

implementation plan
Sound recommendations with a reasonable implementation plan
Useful recommendations are provided
clear recommends are not provided
Useful recommendations are provided
Basic recommendations with some gaps in implementation
Basic recommendations with some gaps in implementation
Provided useful implementations as recommendations

Basic recommendations with some gaps in implementation

Weak recommendations, lacking sufficient detail

Recommendations are almost absent


Basic recommendations with some gaps in implementation
Sound recommendations with a reasonable implementation plan
the recommendations are listed which are made to further enhance the impact of on-the job training with the support of industry-academia collaboration of h

Need more recommendations, usefulness implementation scheme of this project.


The research hypothesis that was set for the recommendations is in accordance with the research aim as well as the objective that was set for the recommen

The conclusion of this project is very clear


need to give the recommendations of this study are span organizational, process, and cultural dimensions

These recommendations encompass areas such as technology adoption, process optimization, employee training, and continuous improvement initiatives

more data to be needed of sefulness implementation scheme

Based on the findings, the recommendations are listed which are made to further enhance the impact of on-the job training with the support of industry-acad
Recommendations, usefulness implementation scheme arerequired functions keypoints
Based on the findings of this study, several recommendations are provided to healthcare

proposing good recommendations for enhancing overall inventory management practices

Recommendations are apparent, though the implementation plan


Weak recommendations, lacking sufficient detail

Basic recommendations with some gaps in implementation


Basic recommendations with some gaps in implementation
Sound recommendations with areasonable implementation plan
recommendations with areasonable implementation plan
Recommendations are apparent, though the implementation plan
Basic recommendations with some gaps in implementation

Basic recommendations with some gaps in implementation


Weak recommendations, lacking sufficient detail
Basic recommendations with some gaps in implementation
Recommendations are apparent, though the implementation
Basic recommendations with some gaps in implementation
Weak recommendations, lacking sufficient detail
Weak recommendations, lacking sufficient detail
need strong recommendatons for further studies
Weak recommendations, lacking sufficient detail
Recommendations are apparent, though the implementation plan
implementation plan
Recommendations are almost absent

recommendations with a reasonable implementation plan


Recommendations are almost absent
Sound recommendations with a reasonable implementation plan and potential usefulness
Basic recommendations with some gaps in implementation
Recommendations are almost absent

Basic recommendations with some gaps in implementation


Recommendations are apparent, though the implementation plan
Weak recommendations, lacking sufficient detail
Recommendations are almost absent
Recommendations are almost absent
Weak recommendations, lacking sufficient detail

No evidence of any recommendations


Recommendations are apparent, though the implementation plan
Recommendations are almost absent
Recommendations are apparent, though the implementation plan
Recommendations are apparent, though the implementation plan
recommendations with a reasonable implementation plan
The recommendations are good and some of them are unrealistic.

The study provides a valuable recommendation


The recommendations are valuable for future studies
The implementation scheme are clear but could be more detail
The recommendations are valuable for future studies
No evidence of any recommendations
Weak recommendations, lacking sufficient detail

Basic recommendations with some gaps in implementation


Recommendations are apparent, though the implementation plan

Weak recommendations, lacking sufficient detail


implementation plan
recommendations also sufficient
Weak recommendations, lacking sufficient detail

Sound recommendati ons with a reasonable implementatio n plan and potential usefulness.
Sound recommendati ons with a reasonable implementatio n plan and potential usefulness.
Sound recommendati ons with a reasonable implementatio n plan and potential usefulness.
ound recommendati ons with a reasonable implementatio n plan and potential usefulness.
Basic recommendati ons with some gaps in implementatio n or usefulness.

Very basic or inappropriate recommendations, with little consideration of implementation.


Basic recommendations with some gaps in implementation or usefulness.
Basic recommendations with some gaps in implementation or usefulness.

Basic recommendations with some gaps in implementation or usefulness.


Sound recommendations with a reasonable implementation plan and potential usefulness.
Very basic or inappropriate recommendations, with little consideration of implementation.

Very basic or inappropriate recommendations, with little consideration of implementation.


Basic recommendations with some gaps in implementation or usefulness.
Recommendations are apparent, though the implementation plan or usefulness may be less developed.

Recommendations are apparent, though the implementation plan or usefulness may be less developed.

Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Recommendations are apparent, though the implementation plan or usefulness may be less developed.

Recommendations are apparent, though the implementation plan or usefulness may be less developed.

Basic recommendations with some gaps in implementation or usefulness.

Basic recommendations with some gaps in implementation or usefulness.


Basic recommendations with some gaps in implementation or usefulness.

No evidence of any recommendations or implementation plan.


Basic recommendations with some gaps in implementation or usefulness.
Basic recommendations with some gaps in implementation or usefulness
Weak recommendations, lacking sufficient detail or practicality
Basic recommendations with some gaps in implementation or usefulness.
Recommendations are apparent, though the implementation plan or usefulness may be less developed.

Very basic or inappropriate recommendations, with little consideration of implementation.


Basic recommendations with some gaps in implementatio n or usefulness.

Basic recommendations with some gaps in implementation or usefulness.


Develop Clear Ethical Guidelines for Data Use
The ability for companies to quickly and simply scale their services to meet their unique needs is another advantage of moving to the cloud
vendors
Provide recommendations for IT project managers and organizations based on the findings of your study
Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Sound recommendations with a reasonable implementation plan and potential usefulness.

Basic recommendations with some gaps in implementation or usefulness.


Very basic or inappropriate recommendations,
Search for chances to optimize costs by making smart choices in cloud investment, using cloud solutions that are scalable

were seen, including improvements in problem-solving and critical thinking abilities

These tools are essential for quantifying a business's security risk posture and can provide valuable insights for enhancing security controls.
Sound recommendations with a reasonable implementation plan and potential usefulness.

Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Recommendations are apparent, though the implementation plan
Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Basic recommendations with some gaps in implementation or usefulness.
Basic recommendations with some gaps in implementation or usefulness.
We evaluated the implementation organization and approach with current theory to address the issue of how to organize RPA implementation projects

Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Recommendations and usefulness needed on this type

Implementing cloud computing solutions strategically to enhance business agility and efficiency requires careful planning and execution.
This includes prioritizing responsive web design, quick-to-load content, and seamless browsing experiences to keep mobile users engaged and active.
Sound recommendations with a reasonable implementation plan and potential usefulness.
Recommendations are apparent, though the implementation plan or usefulness may be less developed.

Conduct detailed assessments of the current IT environment and data quality to identify potential issues early.
Recommendations are apparent, though the implementation plan or usefulness may be less developed.
preferences can increase consumer engagement and conversion rates.
Communication which matches up well with the general business technique of the organization as an individual element and use the up-sides connected wit
The last objective was to check the intercession effect of burnout between close to home cacophony and turnover aim; profound work and turnover expecta
Sound recommendations with a reasonable implementation plan and potential usefulness.
Putting resources into ability management is critical to the organization, expecting the advantages of every single drive are comprehensive of ladies improv

Recommendations are apparent, though the implementation plan or usefulness may be less developed.
token, or even in the form a measurable number like fingerprint.
characteristics and limits
Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Recommendations are apparent, though the implementation plan or usefulness may be less developed.
providing actionable suggestions for enhancing cyber security practices and preparing for future developments
Basic recommendations with some gaps in implementation or usefulness.

A complete collection process is created by collecting all manual transactions made by users and record holders during the operation of the system.

individuals and break the myth about the same


Green computing trends and emerging technologies play a critical role in lowering the environmental impact of IT operations
of common services and business processes provides standards for development and deployment for all logical application tiers from a User Interface persp
USEFUL
useful
USEFUKL
fine
Basic recommendations with some gaps in implementation
USEFUL
Basic recommendations with some gaps in implementation
ok
fine
Recommendations are almost absent or entirely inappropriate.
useful
Basic recommendations with some gaps in implementation
Sound recommendations with a reasonable implementation plan and potential usefulness.
useful
Sound recommendati ons with a reasonable implementatio n plan and potential usefulness.
Basic
Sound recommendations with a reasonable implementation plan and potential usefulness.
yes some what
Sound recommendations with a reasonable implementation plan and potential usefulness
recommendation have be presented well and leads to reach the objective
Recommendations are apparent, though the implementation plan or usefulness may be less developed.
implementation plan or usefulness may be less developed
sharing information on how GAI utilizes customer data to personalize experiences. This promotes moral marketing techniques and trust

Recommendations are apparent, though the implementation plan or usefulness may be less developed.
implementation plan and potential usefulness.
Basic recommendations with some gaps in implementation or usefulness
Digital transformation has enabled retailers to reach a wider audience beyond traditional geographical boundaries
Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Weak recommendations, lacking sufficient detail or practicality
access controls, and compliance with relevant industry standards and regulations

Sound recommendations with a reasonable implementation plan and potential usefulness


Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Sound recommendations with a reasonable implementation plan and potential usefulness

These practices are important to carry out different tasks between the employees in an organization
Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Each industry faces unique challenges, such as the difficulties in using technology in agriculture and the regulatory hurdles in the healthcare sector.
The raw data have been classified by using Naive Bayes algorithm and for personal behavior data mining and machine learning are used.
ased on our analysis of the growth prospects of mutual funds in India, we have developed several suggestions and recommendations for various stakeh
Sound recommendations with a reasonable implementation plan and potential usefulness.
Recommendations are apparent, though the implementation plan or usefulness may be less developed.
In order to confirm that the transaction has been completed, cardholders should review the bills and invoices they receive. If a person regularly uses credit c
An organization should control and audit PC based information systems because the expenses of mistakes and irregularities that may arise in these systems
developed
n order to help these women reach new heights in their professional endeavors, appropriate assistance and support from the general public as well as from f
Sound recommendations with a reasonable implementation plan and potential usefulness
Incorporate artificial intelligence (AI) in trading platforms to provide personalized investment advice, automate trading processes, and improve market pred
provide recommendations for banks to optimize their IT investments and strategies for maximum impact on customer experience.

Sound recommendations with a reasonable implementation plan and potential usefulness.


Sound recommendations with a reasonable implementation plan and potential usefulness
economically active population that is adaptable to technological changes and diverse in their professional and personal life setups.
Establishing clear communication channels and escalation procedures ensures that issues are resolved in a timely manner and that the collaboration stays on
Recommendations are apparent, though the implementation plan
Sound recommendations with a reasonable implementation plan and potential usefulness.
The recommendations for an additional research center on a thorough examination of the feasibility of effectively integrating a business intelligence (BI) sy
improving test coverage and depth, facilitating CI/CD processes, and ensuring scalability and flexibility, AI-driven testing solutions have demonstrated thei
Weak
Recommendations are apparent, though the implementation plan
This research has sought to evaluate a few essential publications on life insurance concept has brought up data that the insurance industry is India has a boo
Recommendations are apparent, though the implementation plan
AI can recommend personalized payment method, or insurance, or loan type as according to the customer need
calculations.
By planning and scheduling tasks efficiently, project managers ensured that resources were allocated where they were needed most and avoided wastage
Basic recommendations with some gaps in implementation
Users reported higher levels of satisfaction with the chatbot interface and support compared to traditional IT service channels.
Recommendations are apparent, though the implementation plan
Recommendations are apparent, though the implementation plan
Sound recommendations with a reasonable implementation plan and potential usefulness
Sound recommendations with a reasonable implementation plan and potential usefulness.
Sound recommendations with a reasonable implementation plan and potential usefulness
The trainee fills the feedback form and from time to time test are conducted to know the gauge the effectiveness of training to employee to check thei
Recommendations are apparent, though the implementation plan
Basic recommendations with some gaps in implementation
Basic recommendations with some gaps in implementation
Basic recommendations with some gaps in implementation
Basic recommendations with some gaps in implementation

RECOMMENDATIONS ARE VERY USEFUL AND REFLECT THE DIRECT IMPLICATION OF THE SCHEME
Very basic or inappropriate recommendations, with little consideration of implementation
Recommendations are apparent, though the implementation plan or usefulness may be less developed.
useful recommendations is drawn that can be implemented directly
USEFULL RECOMMENDATIONS HAVE BEEN DRAWN
Basic recommendations with some gaps in implementation
Basic recommendations with some gaps in implementation
CERTAIN POINTS ARE ONLY APPLICABLE DIRECTLY TO THE SOCIETY
SOME RECOMMENDATIONS ARE USEFUL
Basic recommendations with some gaps in implementation
MAJOR RECOMMMENDATION THAT ARE MENTIONED ARE USEFUL
FEW RECOMMNDATIONS ARE DIRECTLY APPLICABLE
Recommendati ons are apparent, though the implementatio n plan or usefulness may be less developed.
Basic recommendations with some gaps in implementation
Weak recommendations, lacking sufficient detail.
Weak recommendations, lacking sufficient detail
useful recommendations have been presented
Weak recommendations, lacking sufficient detail or practicality.
some useful recommendations have been presented
Basic recommendations with some gaps in implementation
USEFUL
Weak recommendations, lacking sufficient detail or practicality.
Basic recommendations with some gaps in implementation
Weak recommendations, lacking sufficient detail or practicality.
Basic recommendations with some gaps in implementation
Basic recommendations with some gaps in implementation

YEA
USEFUL
Basic recommendations with some gaps in implementation

Recommendations are apparent, though the implementation plan or usefulness may be less developed.

Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Recommendations are apparent, though the implementation plan or usefulness may be less developed.

To assess the challenges and obstacles hindering the growth of the mutual fund industry, including competition, market volatility, and investor confidence.
To evaluate the role of collateral, guarantees, and other security measures in reducing credit risk.
Recommendations are apparent, though the implementation plan or usefulness may be less developed.
usefulness
Basic recommendations with some gaps in implementation or usefulness.
need

This is the next step after the visible boost of online shopping online bill payments
Recommendations are apparent, though the implementation plan or usefulness may be less developed.
usefulness with the developed concept
be less developed
developed

Further investigation may moreover be done on effect of occupation anxiety on various leveled respect and legitimate liability of workers for progressive de
Instruction is something that is anticipated to be received by both companies and suppliers in order to cultivate an atmosphere that promotes reading and inv
Sound recommendations with a reasonable implementation plan and potential usefulness.
Artificial Intelligence has made significant strides in transforming India's digital payment systems and offering many benefits ranging from enhanced securi
Basic recommendations with some gaps in implementation or usefulness.
Sound recommendations with a reasonable implementation plan and potential usefulness.

regarding the adequacy of education and awareness efforts, institutions should focus on improving communication channels to educate customers about cyb
Sound recommendations with a reasonable implementation plan and potential usefulness.
the project to follow some research project making order to be a best

usefulness.
This the recommendation out of our findings are ok more ways to clearly mentioned
More problems of banking facing to be noted
Recommendations are apparent, though the implementation plan or usefulness may be less developed.

The project useful to mutual funds it may consider with other investments to show the best
Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Basic recommendations with some gaps in implementation or usefulness.
Recommendations are apparent, though the implementation plan or usefulness may be less developed.
The project is useful to home loans taker
Sound recommendations with a reasonable implementation plan and potential usefulness.

The project are some useful to future studies

Sound recommendations with a reasonable implementation plan and potential usefulness.


The project is yes to further discuss in future if it consider more depth
If the problem need more information about future studies
Sound recommendations with a reasonable implementation plan and potential usefulness.
be less developed
recommendations with a reasonable implementation plan and increase usefulness.
Basic recommendations with some gaps in implementation or usefulness.
Basic recommendations with some gaps in implementation or usefulness.

Sound recommendations with a reasonable implementation plan and potential usefulness.


Basic recommendations with some gaps in implementation
Sound recommendations with a reasonable implementation plan and potential usefulness
Weak recommendations, lacking sufficient detail or practicality
Recommendations are apparent, though the implementation plan
Recommendations are apparent, though the implementation plan
Cloud is actually much less mature than outsourcing, which has been taking place for decades, but is considerably revolutionary because it involve
Basic recommendations with some gaps in implementation
Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Basic recommendations with some gaps in implementation or usefulness.
Sound recommendations with a reasonable implementation plan and potential usefulness.
Measuring the effectiveness of your digital marketing campaigns is a crucial and continuous process that can help you achieve your marketing .
Basic recommendati ons with some gaps in implementatio n or usefulness.
AI enables hyper-personalization by analyzing individual customer data to deliver tailored content and recommendations. This level of personalization
The findings of this study have implications for IT and ITES businesses to improve E-HRM exercise measurement
Basic recommendations with some gaps in implementation or usefulness.
Comprehensive Stakeholder Engagement: Ensure active participation and representation from all related stake holders throughout the project life cycle
Basic recommendations with some gaps in implementation or usefulness
Recommendations are apparent, though the implementation plan or usefulness may be less developed
To secure wide and cost effective possible dissemination of messages
The encouraging reports is actually that over the course of the last 12 months, we come across an increase from inside the number of interoperability projec
User interfaces have been designed to be intuitive and user-friendly, with features such as simplified navigation, clear instructions, and visual cues to guide
Business organizations are also showing increasing interest to indulge themselves into using cloud services
Automated ticketing systems can handle routine incidents, allowing IT staff to focus on more complex issues. Predictive analytics further enhance this effic
advancements in technology, will continue to drive the growth and effectiveness of EV charging infrastructure.
Recommendations are apparent, though the implementation plan or usefulness may be less developed
Basic recommendations with some gaps in implementation or usefulness.
customer engagement, and expanding ITIL adoption across departments
Recommendations are almost absent or entirely inappropriate.
Be able to understand the impact of diversity in the workplace and the ability to appreciate diverse perspectives in organizational settings.
Recommendations are apparent, though the implementation plan or usefulness may be less developed.
Q8 Remarks

Linkage of recommendations to objectives is clear

Sufficient linkage

Basic linkage
Basic linkage
All recommendation are not linked to the objectives
Weak linkage
Weak linkage of recommendations to the objectives
Adequate linkage of recommendations to the objectives

No evidence

Basic linkage
Linkage of recommendations to the objective in few
some recommendations not clearly connected to objectives.

Not linked
Linking of recommendations to the few objectives

Linking of recommendations to the few objectives are not

Linkage of recommendations to the few objectives


Basic linkage of recommendations to the objectives

No evidence

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


All recommendations are not linked with objectives
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
No evidence
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Recommendations are not covered all aspects of objectives
Recommendations are not clear linked with objectives

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Recommendations are liked with very minimum objectives


very few recommendation is linked with objective

Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Or Basic linkage, with some recommendations not clearly connected to objectives.

Some recommendations are not clear tot he objectives


Linking of recommendations to the objectives adequate
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Linking of recommendations to the objectives are adequate
few are linked
Recommendations are not offered for few objectives
Basic linking of recommendations to the objectives
No evidence

Linking of recommendations for few objectives


The link between recommendations and objectives are clear

Adequate linkage of recommendations to objectives, though some aspects may be less precise
Basic linkage, with some recommendations not clearly connected to objectives
The link between recommendations and objectives are good but also provide valuable insights
Clear linkage with recommendations of the study
The link between recommendations and objectives are good but also provide valuable insights
Clear linkage with recommendations of the study
Basic linkage, with some recommendations not clearly connected to objectives.
Adequate linkage of recommendations to objectives
Clear linkage with objectives and recommendations of the study

The connection between objectives and recommendations are clear

Basic linkage, with some recommendations not clearly connected to objectives.


The link between recommendations and objectives are good but also provide valuable insights
Basic linkage, with some recommendations not clearly connected to objectives
Basic linkage, with some recommendations not clearly connected to objectives
Linkage recommendations to objectives are good but some of them are not clear

The link between recommendations and objectives are good


Basic linkage, with some recommendations not clearly connected to objectives
Link between recommendations to objectives are good

The connect between recommendations to objectives are appropriate


Strong and clear linkage of recommendations to the initial objectives.

thoroughly developed.

Basic linkage, with some recommendations not clearly connected to objectives.


Weak linkage with recommendation to the objectives
Link between recommendations to objectives are not clear
The link between recommendations and objectives are good but also provide valuable insights
Clear linkage with recommendations to objective of the study

The connection between recommendation and objective are clear


The link between recommendations and objectives are good but also provide valuable insights
The link between recommendations to objectives are good
Clear linkage with recommendations to the objective of the study
The link between recommendations and objectives are good but also provide valuable insights

Clear linkage with recommendations to objectives of the study

The link between recommendations and include objectives are good but also provide valuable insights
The link between recommendations and include objectives are good but also provide valuable insights

Clear linkage with recommendations to the objectives of the study


The link between recommendations and include objectives are good but also provide valuable insights
Few recommendations only liked with objectives
The link between recommendations and include objectives are good but also provide valuable insights
Few recommendations are not linked with objectives
Weak linkage between recommendations to the objectives

minimum recommendations are liked with objectives


All objectives not get proper recommendations

Clear linkage with recommendations to the objectives of the study


few recommendations drawn from the objectives
The link between recommendations and include objectives are good
Clear linkage with recommendations to the abjective of the study
Recommendations provided by the researcher are adequate
Clear link between recommendations to the objectives
Recommendation are drawn for all objectives are very useful
Clear linkage of recommendations to the objectives of the study
Clear linkage with recommendations to the objectives of the study
The link between recommendations and include objectives are good but also provide valuable insights
clear linkage between recommendations to objectives
The link between recommendations and include objectives are good but also provide valuable insights
Clear linkage of recommendations to the objectives of the study
Linking of recommendation to the objectives was not correlated
No data founded in linking of recommendation to the objectives
Recommendation are offered for all objectives
No data founded in linking of recommendation to the objectives

Linking of recommendation to the objectives no data founded


No data linkage between recommendation to the objectives taken
Linkage of recommendation to the objectives is apparent.
No date linkage between recommendation to the objectives was taken related to the topic
No data linkage between recommendation and taken objectives

There is no link between recommendations and objectives

Very basic or incorrect linkage, hindering the coherence of the project.


The link between recommendations and objectives are good but also provide valuable insights
There is no linking of recommendation
The connection between recommendations to objectives are good but need some more clarity
There is no link between recommendation to the objectives
Basic linkage, with some recommendations not clearly connected to objectives
The link between recommendations and objectives are good but also provide valuable insights

Basic linkage, with some recommendations not clearly connected to objectives


Strong and clear linkage of recommendations to the initial objectives
The link between recommendations and objectives are good

Linking of recommendations to the objectives are not clear


Very basic or incorrect linkage, hindering the coherence of the project.

Basic linkage, with some recommendations not clearly connected to objectives.


The link between recommendations and objectives are good but also provide valuable insights
connected to objectives.

The connection of recommendations and objectives are inappropriate


Incorrect linkage

Minimum linkage f recommendations to the objectives


few recommendations are not connected with objectives
Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Very basic linkage to the objectives


Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Very basic linkage
No evidence of linkage between recommendations and objectives.

some recommendations not clearly connected to objectives

No evidence
no evidence

In recommendation few are linked


Weak linkage

No evidence
no evidence
Recommendation liked with objective is weak
no evidence
no evidence
no evidence
no evidence
No evidence
Weak Linkage of recommendations to the obectives
Basic linkage
Linking of recommendation to the objectives was correlated
Linking of recommendation to the objectives was good
All recommendations are based on objectives of the study
Linking of recommendation to the objectives was not correlated
No data founded linking of recommendation to the objectives
No data founded
No data founded
Recommendations are liked with objectives is adequate
Some objectives recommendations are not drawn
No data founded
Linking of recommendation to the objectives was not correlated
No dat founded linking of recommendation to the objectives
Data linkage between recommendation and given taken objectives was correlated
Linking of recommendation to the objectives was correlated
No data linkage between recommendation and taken objectives of the study

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
few recommendation are linked with objectives
Recommendations are offered for some objectives only
Linkage of recommendations to objectives is apparent, though
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Weak linkage, with recommendations appearing disconnected from objectives.
Recommendations are liked with objectives are minimum
Minimum linkage with objectives
Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


Basic linkage is there
Weak linkage, with recommendations appearing disconnected from objectives.
some recommendations are not match with objectives
The linking of the recommendations was made appropriate for the study
In today's increasingly competitive landscape, organizations must prioritize the adoption of cutting-edge technology to effectively meet their objectives and

The linking of the recommendations was made appropriate for the study.

It is recommended that firms should continue implement TQM with all variables, Proper planning and discussion to improve performance
The linking of the recommendations was made appropriate for the study.
The linking of the recommendations was stated well for the study in IVR.

The linking of the recommendations to the objectives was made to be not stated properly for the study

The linking of the recommendations to the objectives was made to be stated properly for the study.

The linking of the recommendations was made appropriate for the study.

The linking of the recommendations to the objectives was made to be stated appropriate for the study were strengthening remote Operations and Training an

The Linking of recommendations to the objectives was not stated well.


No evidence of linkage between recommendations and objectives.

Other subject file

precise.

precise.
precise.
Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be
Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be

Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be

Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be

Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be

Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be

Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be

project.
Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be

trong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be le
Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be

Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be

Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be

Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be

Or Basic linkage, with some recommendations not clearly connected to objectives.

need more link pages


Recommendations to objectives of the study need to give clearly about the project.
To understand the setup of New Establishments and other channels in the multiple locations.
more link page in this project
To scrutinize regulatory compliance measures and risk management strategies employed by e-commerce companies, providing insights into best practi
can better match supply and demand.
no link pages

there is no link pages


more link pages

To concentrate on the Upgrades required in the Infrastructure to make a successful Store network in Indian Retail Industry
To improve efficiency and effectiveness in QA processes,
more link pages
The goal is to assess the level of satisfaction clients have with Jio's offerings.
"Maintenance strategy." Springer Science &Business Media
there is no link pages
The objective is to create sporting electric vehicles (EVs) that satisfy Indian customers' demands and expectations while tackling certain issues th

To evaluate the impact of digitization on banking sector


there is no link pages
"Big Data Analytics in Healthcare"

need more link pages


To analyze the impact of operational risk on financial and non-financial aspect of the bank
Recommendations to objectives of the study need to give clearly about the project.

Recommendations to objectives of the study need to give clearly about the project.
Learn about the types and origins of wastes that are typically generated by the oil and gas projects.
need more link pages

there is no link page

there is no link page


robotic system.

there is no link page


there is no link page
only few link pages
there is no link page

Chemical treatment of tubes to remove scaling and increase heat transfer rate to increase efficiency of boiler.
The industry is going through a technological shift, which seems to become a major barrier transforming the whole operational mode of any automotive ent

there is no link page


Project execution summary is need to give more information of implementation of project

there is no link page


there is no link page
there is no link pages

productivity and can create shortage of products in the market


results from company initiatives
The responses for the questionnaires proved to be crucial for the conclusion of our research as the result were positive and where matching with wh

connected to objectives.

only five link pages only


only 17 link pages

there is no link pages

need more link pages


. Numerous banks rely on the intervention, advice, recommendation,

connected to objectives.

From the above findings about the emotions linked with each colour

there is no link pages


By delving into the importance of customer feedback, the study aims to highlight the value it brings to organizations in terms of improving products, servic

links of objectives are sample size would provide more robust and generalizable results
links of objective are to give in maintain expensive on-premises hardware and infrastructure.
r supportive policies and regulatory frameworks that incentivize sustainable
operations
there is no link pages
A quality management helps to meet the customer expectations and also, improve its effectiveness and efficiency as it is a continuous processes in an organ

KNN, K Nearest Neighbors : Simplified. [online] Analytics


need more link pages

Disclosure policy choice and corporate characteristics


need more link page
Recommendations to objectives of the study need to give clearly about the project.

Recommendations to objectives of the study need to give clearly about the project.
Why Services are so Important, online available;
need more link page
The objective of this study is to assess the efficacy of the different inventory management techniques implemented at HCL.

Recommendations to objectives of the study need to give clearly about the project.
To identify places where there is certainly however place for improvement post-implementation.
To assess the opinions of millennials and Gen Zers on LSQ (Luxury Skin Care Products) used at home, focusing on customer satisfaction and loyalty.

To Find a solution for their risk factors including TQM, Pull System, Kanban, Six Sigma and Automating and Mechanizing Process
oversight and oversight of public buildings using ICT-based systems

industries and sizes.


need more link page
. Overview of Deloitte's Cybersecurity Services
need more ink pages
Recommendations to objectives of the study need to give clearly about the project.
Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be
Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be

Nil

Or Basic linkage, with some recommendations not clearly connected to objectives.


Or Basic linkage, with some recommendations not clearly connected to objectives.

Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be

Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be
Or Basic linkage, with some recommendations not clearly connected to objectives.
Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be
Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be

Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be

Nil
Or Basic linkage, with some recommendations not clearly connected to objectives
Nil

Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be

Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be

Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be

Or Basic linkage, with some recommendations not clearly connected to objectives.

Good
The Linking of recommendations to the objectives was partially stated.
The linking of the recommendations to the objectives was made to be stated properly for the study

The Linking of recommendations to the objectives was good stated.

The linking of the recommendations was not appropriate for the study
The linking of the recommendations to objectives was stated well for the study.

The linking of the recommendations was made appropriate for the study.

the impact of cloud computing adoption on organizational efficiency and cost savings.
The Linking of recommendations to the objectives was not stated well.

The linking of the recommendations was not made appropriate for the study
there is no link page
connected to objectives
The guidelines to the goals of an internet vote casting gadget to focus on their importance

Discuss the importance of continuous monitoring and optimization


retirees, and self-employed people.
A slight male preponderance and a well balanced distribution of genders
there is no links
connected to objectives

connected to objectives

need more links

recommendations are allow


need more links

there is no links

there is no link pages


there is no link pages
need more link pages

there is no link pages

there is no link pages


there is no link pages
precis

precise.

precise.
More depth analysis of project problem

precise.

precise.

The linkage of recommendations to the objectives of the project is good and recommendations are based on the findings & objectives of the project.
There is a moderate level of linkage exist between objectives and recommendations of the projec.
The linkage between objectives and recommendations of the project is good and satisfactory.

No linkage is established between recommendations and objectives of the project study.


The linkage of recommendations to the objectives is satisfactory.
The average linkage is exist between objectives and recommendations of the project.

All recommendations are findings based and well connected with the objectives of the project undertaken.
There is a basic linkage between the project objectives and recommendations given in the project.
Basic linkage is exist between objectives and recommendations of the project
Linking of recommendations to the objectives is apparent,not clearly connected to objectives
need more links
The recommendations offered are well linked with objectives and findings of the project.
good
need more links
good
Linkage between recommendations to the objectives is very limited.
refer more links
though some aspects.
Linkage between objectives of the project and recommendations is very limited. More focus may be given.
The linkage between recommendations to the objectives of the project is moderate.

Moderate level of linkage is established between recommendations and objectives to the study.
Moderate linkage is between recommendations to the objectives
There is a moderate level of linkage of the recommendations to the objectives of the project.
Moderate level of linkage exist between recommendations and objectives of the project.
linkage between recommendations and objectives of the project are up to the expectation.
Low level of linkage between recommendations and the objectives of the project.

Some of the recommendations were connecting to objectives.

Some of the recommendations clearly connecting to objectives.


Some of the recommendations were connecting to objectives.

Some of the recommendations were connecting to objectives.


Some of the recommendations were connecting to objectives.

strong and clear linking of recommendations to the objectives,though some aspects may be less precise
Some of the recommendations clearly connecting to objectives.
Some of the recommendations clearly connecting to objectives.
traditional finance in the long term
Some of the recommendations were connecting to objectives.
Some of the recommendations clearly connecting to objectives.
Some of the recommendations were connecting to objectives.
strong and clear Linking of recommendations to the objectives.
Provide comprehensive training tailored to user roles and needs. Offer online resources, video tutorials, and hands-on sessions to equip users with the know
Linking of recommendations to the objectives apparent ,not connected to objectives.
Linking of recommendations to the objectives aqequate,not connected to objectives
average Linking of recommendations to the objectives
Linking of recommendations to the objectives average, not connected to objectives
System deployment and monitoring for AI and machine learning. Continuous improvement and refinement of the implemented solutions.
not more Linking of recommendations to the objectives
not clear Linking of recommendations to the objectives
Some of the recommendations were connecting to objectives
Some of the recommendations were connecting to objectives.
not more Linking of recommendations to the objectives
clear Linking of recommendations to the objectives
not more Linking of recommendations to the objectives
not more Linking of recommendations to the objectives
Some of the recommendations were connecting to objectives.
Some of the recommendations were connecting to objectives.
not clear Linking of recommendations to the objectives.
not more Linking of recommendations to the objectives

Some of the recommendations were connecting to objectives.

Linking of recommendations to the objectives not clear,not connected to objectives.


Linking of recommendations to the objectives significant

apparent Linking of recommendations to the objectives,not connected to objectives.

clear Linking of recommendations to the objectives


good Linking of recommendations to the objectives

Portable identification across the country, transcending the barrier of region and language.
Linking of recommendations to the objectives not accurate

not clear Linking of recommendations to the objectives


not clear Linking of recommendations to the objectives
adequate Linking of recommendations to the objectives
Linking of recommendations to the objectives apparent,not connected to objectives
Linking of recommendations to the objectives good
Some of the recommendations clearly connecting to objectives.

Some of the recommendations clearly connecting to objectives.

Some of the recommendations were connecting to objectives.

Nothing is presented in the report


No recommendations are given in the project

Moderate level linkage is exist between objectives and recommendations


The linkage of recommendations to the objectives of the project is Good.

No recommendations are offered. Hence, unable to find the linkage between recommendations to the objectives.

The moderate linkage is found between recommendations and objectives of the project study.

The linkage level is not upto the expectations.


No recommendations are given. Hence, unable to connect the recommendations to the objectives of the project study.
No linkage between objectives and recommendations

The study evaluated cryptocurrency programs and revealed many dilemmas and difficulties that jeopardize the financial system.
not clear Linking of recommendations to the objectives
not well defined Linking of recommendations to the objectives

not well clear Linking of recommendations to the objectives

good Linking of recommendations to the objectives,connected to objectives.

good Linking of recommendations to the objectives.The future of authentication is characterized by continuous evaluation.

good Linking of recommendations to the objectives

good Linking of recommendations to the objectives.Include service mesh support for full life cycle API management vendor selection.

good Linking of recommendations to the objectives

The recommendations of the project are based on the project findings and are matched with project objectives.
Linking of recommendation not correlated to the given objective

Linking of recommendation to the objectives correlated to the objectives


Linking of given contents not attain the objectives

No data linkage between recommendation and study objectives

No data linkage between recommendation and given objectives


it is highly recommendations to process everything.

recommended to implement this one Effects of Hybrid Work Model on Employees and Staff’s Work Productivity
objectives of this project is Enhanced customer experience.
objectives of this project is cloud computing technology helps us to attain it are covered in this report

highly recommended of this project it help more efficiency.


journey successfully

Linking of recommendation to the objectives with some limitations


Linking of recommendation correlated to the objectives

Linking of recommendation to the objectives not correlated with objectives


No data linkage between recommendation and topic taken

No data linkage between recommendation and taken objectives


Linking of recommendation to the objectives not correlated.
No data linkage between recommendation and given objective

Linking of recommendation no data provided


Provided solution not leads the objectives of the study work

Linking of recommendation to the objectives was not correlated

No linking of recommendation to the given objective


Linking of recommendation way of implementing objectives not clearly defined

Linking of recommendation to the objectives not correlated


Linking of recommendation to the objectives was good

Nil

Android app recommendation to the objectives are partially fullfiled


Linking of recommendation to the objectives not correlated

Good Linking of recommendation to the objectives

Liking of recommendation to the objectives was good

No data linkage between recommendation to the given objective


No data linkage of recommendation to the given topic

Linking of recommendation to the objectives was good

Linking of recommendation to the objectives was correlated


No data linkage between recommendation and given objective of study
Linking of recommendation to the objectives was correlated
Nil

No data linkage between recommendation and taken objectives


Linking of recommendation to the objectives was good

Linking of recommendation to the objectives was correlated

Linking of recommendation to the objectives was correlated

Linking of recommendation to the objectives no data founded


Linking of recommendation to the objectives was correlated
No data linkage between recommendation and given objective
Suggestions provided solution that not leads to the objectives of given topic

Linking of recommendation to the objectives was not correlated


Linking of recommendation to the objectives was not correlated

Linking of recommendation to the objectives was correlated


Linking of recommendation to the objectives not founded

Linking of recommendation to the objectives was good


No data founded

Linking of recommendation inappropriate

Linking of recommendation to the objectives releted to the topic

No data linkage between recommendation and given objective to the topic

Linking of recommendation to the objectives was not correlated


Provided solution that leads to the given objective
Linking of recommendation to the objectives was not correlated
Linking of recommendation to the objectives no data founded
Linking of recommendation to the objectives was correlated

Linking of recommendation to the objectives not correlated

No data founded

No data linkage between recommendation and given objective


Linking of recommendation not correlate to the objectives

linking of recommendation to the objectives not founded


Linking of recommendation to the objectives no data founded

No data founded linking of recommendation to the objectives

There is a very limited linkage between objectives and recommendations of the project study.

The moderate level of linkage is exist between objectives and recommendations of the project.

The linkage level between objectives and recommendations in the report is very low.

Not able to find the linkage between recommendations and objectives due to lack of presentation of recommendations in the report.
No much linkage between recommendations and objectives of the project.

The moderate linkage is between objectives and recommendations of the project.


The linkage level between objectives and recommendations is satisfactory.

No linkage is established between recommendations and objectives of the project.


The moderate linkage is exist between recommendations and objectives of the project.
The linkage between the recommendations and objectives of the project is good and acceptable.
No

There is a moderate level of linkage exist between recommendations and objectives of the project.
The moderate level of linkage is exist between the recommendations and objectives of the project.

The linkage level between objectives and recommendations is also moderate.


There is a moderate level of linkage between objectives and recommendations of the project
Linking of recommendation to the objectives few are good but it's not enough

Linking of recommendation to the objectives was correlated


Artificial intelligence suggestions are correlated to the business intelligence was good

Linking of recommendation to the objectives was correlated

No data founded in linking of recommendation to the objectives

Linking of recommendation to the objectives was correlated


Yes. two objectives are linked to the objectives
SUGGESIONS GIVEN IS MATCHED WITH THAT ONE OBJECTIVE
Linking of recommendation to the objectives was good
YES. LINKIND WITH OBJECIVES
No data founded in linking of recommendation to the objectives
RECOMMENDATIONS IS BASED ON OBJECTIVES ONLY
GOOD LINKAGE WITH OBJECTIVES
Linking of recommendation to the objectives was not correlated
Linking of recommendation way of implementing the objectives clearly defined
Linking of recommendation to the objectives was not correlated
objectives and recommendations are linked
objectives and recommendations are closely linked
Linking of recommendation to the objectives not correlated
both are closely associated
Linking of recommendation to the objectives was not correlated
satisfactory to the linking of recommendations
Linking of recommendation to the objectives was correlated
closely associated
closely associated with objectives
Data linkage between recommendation to the objectives taken was good
Linking of recommendation to the objectives not correlated
somewhat linked
recommendations is on the basis of objectives
findings ae only based on objectives
Linking of recommendation to the objectives was not correlated
No data linkage betwee n recommendation and study of given objectives

Linking of recommendation to the objectives was not correlated


Linking of recommendation to the objectives was not correlated
No data founded linking of recommendation to the objectives
No linkage between recommendation and study of given topic
Linking of recommendation not correlate to the given objective
Linking of recommendation not correlate to the objectives

Linking of recommendation not correlate with the given objective

Linking of recommendation meet to the given objective

Linking of recommendation to the objectives not founded


Moderate
Linking of recommendation correlated to the given objective

Linking of recommendation not correlate to the given objective


linking of recommendation to the objectives not correlated each other.

Linking of recommendation not founded


Linking of recommendation not correlate to the IT sector culture
Provided solution that leads to the given objective

Linking of recommendation to the objectives given contents partially attain the objectives
No data linkage between recommendation and study work of given
Linking of recommendation are clearly attain the given study
Linking of recommendation to the objectives not correlated
Provided solution leads to the objectives of the study
Linking of recommendation to the objectives some limitations used
Provided solution leads to the objectives of the study.
No data linkage between recommendation and given study objectives
Provided solution that leads to the objectives of the study

The linkage of recommendations to objectives is noticeable, but it lacks thorough development to fully demonstrate how each recommendation directly sup
There is a basic linkage observed, with some recommendations not clearly connected to the stated objectives, indicating a need for clearer alignment to ensu

The linkage of recommendations to objectives is discernible, although it requires further development to fully articulate how each recommendation directly

The linkage between elements, such as recommendations and objectives, is either very basic or incorrect, suggesting a need for clearer alignment and logica

The statement outlines the need for a focused analysis of challenges and suggests a solution-oriented approach but could benefit from clearer alignment betw

The project shows a discernible connection between recommendations and objectives, yet further development could strengthen the alignment for more imp

The project's linkage between objectives and recommendations shows foundational alignment but lacks clarity in some areas, requiring further refinement f
Strengthening the alignment between objectives and recommendations is crucial to ensure coherence and relevance in guiding decision-making processes fo
Strengthening the connection between recommendations and objectives would enhance the coherence and effectiveness of the project, ensuring that the pro

The linkage is foundational, with some recommendations not clearly connected to the objectives of the study
There is a basic linkage, but some recommendations are not clearly connected to the objectives.

The linkage is not completely related needs more conceptual clarity

There is a basic connection between elements, but some recommendations are not clearly aligned with the stated objectives.
There is basic linkage, but some recommendations are not clearly connected to the objectives. This indicates that while there is an attempt to align suggestio
The linkage requires more clarity in connecting recommendations directly to objectives. This entails ensuring that each recommendation explicitly supports
The project suffers from very basic or incorrect linkage, which hinders its overall coherence and effectiveness. Clarifying and strengthening the connections

The project suffers from very basic or incorrect linkage, which hinders its coherence and overall effectiveness in implementing Total Quality Management.
There is weak linkage observed, where recommendations appear disconnected from the objectives, suggesting a need to strengthen alignment and coherenc
Basic linkage, with some recommendations not clearly connected to objectives.

Weak linkage observed between recommendations and objectives in IKEA's operations management, requiring stronger alignment for coherence and effect

There is a strong and clear linkage of recommendations to the initial objectives, ensuring coherence and alignment in promoting green initiatives for electro

thoroughly developed
thoroughly developed.

thoroughly developed.
objectives is apparent
objectives is apparent
Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Linkage of recommendations to objectives is apparent, though not thoroughly developed

strong and clear linkage of recommendations to the initial objectives.

Linkage of recommendations to objectives is apparent, though not thoroughly developed


thoroughly developed.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Linkage of recommendations to objectives is apparent,


objectives is apparent,
thoroughly developed.
thoroughly developed.

thoroughly developed.

Weak linkage of recommendations to the objectives


Linkage of recommendations to objectives is apparent, though not thoroughly developed.
thoroughly developed

thoroughly developed.
thoroughly developed.
thoroughly developed

Objectives are aimed to achieve


objectives is apparent,
thoroughly developed
thoroughly developed
thoroughly developed.
thoroughly developed.
thoroughly developed.
thoroughly developed.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
thoroughly developed.
objectives are clearly focused
objectives are brought over the project

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


Linkage of recommendations to objectives is apparent, though not thoroughly developed.

thoroughly developed.
some points are Linking with Linking

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


Exact linkage with objectives were found in the project
Connecting their recommendations with the specific goals for the factors influencing HUL’s stock price

recommended systems in modern software development, their applications, benefits, and implications for users and businesses. not fully defined,but the rela
the few objectives are linked with knowledge level of the suggested recommendations
The few goals correspond to the degree of familiarity with the recommended strategies.

project objectives were determined to be precisely linked

link with recommendations that seem suitable for the few goals.

The few goals correspond to the degree of familiarity with the recommended strategies.
The knowledge level of the recommended suggestions is related to the few objectives.
There is basic linkage observed, with some recommendations not clearly connected to the objectives. Strengthening the alignment between recommendation
Basic linkage, with some recommendations not clearly connected to objectives of the study ,Needs more clarity

Basic linkage exists, with some recommendations not clearly aligned with objectives.

The project suffers from very basic or incorrect linkage, which hampers its coherence and overall effectiveness. Strengthening the connections between com
There is weak linkage observed, with recommendations appearing disconnected from the objectives, which undermines the coherence and effectiveness of t
There is weak linkage observed, with recommendations appearing disconnected from the objectives, which hampers the coherence and effectiveness of the

Very basic or incorrect linkage hinders the project's coherence. Recommendations appear disconnected from the objectives.

The linkage is very basic or incorrect, hindering the coherence of the project. Strengthening the connections between elements would enhance overall clarit

The linkage of recommendations to objectives is apparent, though it is not thoroughly developed. Further detailing how each recommendation directly supp

The recommendations are strongly linked to the initial objectives, providing a clear pathway towards achieving the intended goals with precision and releva

While there is a visible linkage of recommendations to objectives, it lacks thorough development and alignment to fully articulate their strategic connection
thoroughly developed
insufficient Linking of recommendations to the objectives
recommendations are linked with the objectives

recommendations are liked with the objectives

recommendations are Linked to the objectives

need to like the recommendations to the objectives

thoroughly developed
some of the points were Linking of recommendations to the objectives

thoroughly developed
thoroughly developed

weak in liking of recommendations to the objectives


basic Linking of recommendations to the objectives
thoroughly developed
The recommendations show a basic linkage, but some of them are not clearly aligned with the project objectives. There is a need to strengthen the connectio
No evidence of linkage between recommendations and objectives.
There is a basic linkage observed, although some recommendations are not clearly aligned with the project objectives.
The connection between recommendations and objectives is clear, but it lacks thorough development of strategies

no evidence of recommendations for liking of objectives


recommendations and objectives are apparent

Weak recommendations linking to the objectives

weak linkage of recommendations with the objectives

clear recommendations linking to the objectives

Strong and clear recommendations to the objectives


linkage of recommendations to objectives
Basic linkage with some objectives
linking of recommendations and objectives are apparent

linking of recommendations to the objectives are apparent

objectives and recommendations are apparent


Linkage of recommendations is to apparent with the objectives
Linking of recommendations to objectives is apparent to developed
Linkage of recommendations are apparent with the objectives

Linkage of recommendations are apparent with the objectives

Linkage of recommendations with the objectives are apparent


Linkage is almost absent
though some aspects may be less precise

Strong and clear linkage of recommendations to the initial objectives

Linkage of recommendations to objectives is apparent, though not thoroughly developed

connected to objectives
Recommendations to objectives of the study need to give clearly about the project.
Nil

Linking of recommendations to the objectives is sufficient and clear


A well developed Linkage of recommendations to the objectives is given
Inadequate linkage of recommendations is developed
Basic Linkage of recommendations to the objectives which are not clearly connected
Sufficient Linkage of recommendations to the specified objectives

Inappropriate linkage of recommendations to the objectives


Linkage is almost absent

recommendations are clearly suitable for objectives


Apparent linking of recommendations to the specified objectives
its not enough to the objectives
linking with the recommendations are to the objectives
Inadequate Linkage of recommendations to the objectives
Apparent Linkage of recommendations to the objectives
Linkage of recommendations to the objectives is inappropriate
No Linking of recommendations to the objectives
Linkage of recommendations to the objectives
Inappropriate Linking of recommendations to the objectives
Lacking of linkage to the recommendations to the objectives
Strong linking of recommendations to the objectives is made
Weak linkage of recommendations to the objectives
Linking of recommendations to the objectives is somewhat made
Basic linkage with some recommendations not clearly connected to the objectives
Basic linking of recommendations to the objectives
The linking of the recommendations was made appropriate and good for the study
The linking of the recommendations was stated well for the study
The linking of the recommendations to the objectives was need to be stated well for the study
The linking of the recommendations to the objectives was stated well for the study
The linking of the recommendations to the objectives was stated well for the study

The linking of the recommendations to the objectives was stated appropriate for the study

The linking of the recommendations was not stated well for the study
The linking of the recommendations was made appropriate for the study
The linking of the recommendations was made appropriate for the study
The linking of the recommendations was made well for the study

The linking of the recommendations was made good for the study

The linking of the recommendations was made appropriate for the study

The linking of the recommendations was made appropriate for the study
The linking of the recommendations was made good for the study
The linking of the recommendations was not made appropriately for the study
The linking of the recommendations was made appropriate for the study
The linking of the recommendations was made good for the study
The Linking of recommendations to the objectives was good stated
Nil

Weak linkage, with recommendations appearing disconnected from objectives


Very basic or incorrect linkage, hindering the coherence of the project.
Very basic or incorrect linkage, hindering the coherence of the project
The linking of the recommendations was stated well for the study in CRM.
The linking of the recommendations in the study towards the objectives were stated good
Weak linkage, with recommendations appearing disconnected from objectives
entirely inappropriate
The linking of the recommendations was made appropriate for the study
The linking of the recommendations to objectives was stated well for the study
The linking of the recommendations towards the objectives was stated good for the study
Weak linkage, with recommendations appearing disconnected from objectives
Weak linkage, with recommendations appearing disconnected from objectives
Linkage of recommendations to objectives is apparent, though not thoroughly developed
The linking of the recommendations was need to be stated for the study
The linking of the recommendations to objectives was need to be stated for the study
The linking of the recommendations was made appropriate for the study
The Linking of recommendations to the objectives was good stated
The linking of the recommendations to objectives was stated well for the study
Basic linkage, with some recommendations not clearly connected to objectives.
The linking of the recommendations to objectives was stated good in the study
The linking of the recommendations to objectives was not stated good for the study
The linking of the recommendations to objectives was stated well for the study
The linking of the recommendations to objectives was expected to be stated well for the study
The linking of the recommendations was made appropriate for the study

The linking of the recommendations was stated well for the study

The linking of the recommendations to objectives was stated good for the study

Need more recommendations to clearly connected with the objectives

Recommendations are linked with the objectives

very basic or incorrect linkage

objectives and recommendations are apparent

no evidence to linking recommendations to the objectives


Strong and clear linking recommendations to the objectives

Recommendations and objectives are apparent

recommendations are linked with the objectives


Recommendations and objectives are apparent
Strong and clear recommendations to the objectives

recommendations not clearly

Recommendations are link with the objectives


Linking of recommendations are to connect with the objectives

Linking recommendations with the clear objectives


Very weak link with the recommendations
basic linkage with some recommendations

entirely inappropriate
objectives are not clearly defined
weak linkage with recommendations
Basic linkage with same recommendations

Linking of recommendations with the objectives

Good

Nil

Moderate connectin
The project demonstrates weak linkage, where recommendations appear disconnected from the stated objectives, indicating a need for better alignment to en

While the linkage of recommendations to objectives is apparent, it could benefit from further development to strengthen the alignment and ensure a more co
Basic linkage, with some recommendations not clearly connected to objectives.
The project demonstrates a basic linkage between objectives and recommendations, although some recommendations appear disconnected from the stated o

The project exhibits weak linkage between recommendations and objectives, resulting in a disconnect that undermines the coherence and effectiveness of th
The project demonstrates a visible connection between recommendations and objectives, yet further development is needed to strengthen this linkage and en
The recommendations seem disconnected from the project's objectives, indicating a need for clearer alignment and integration to strengthen their relevance
The recommendations fail to establish a clear connection with the project objectives, leading to a disjointed approach in addressing the core issues.

The recommendations show a clear connection to the objectives, but additional detail and refinement are needed to strengthen their alignment and effectiven

The recommendations show a clear connection to the objectives but lack detailed elaboration on how they align with broader strategic goals or operational p

No evidence of linkage between recommendations and objectives.

While there is a clear linkage of recommendations to objectives, the connection could benefit from further development to fully maximize their alignment a

The study demonstrates basic linkage between recommendations and objectives, although some recommendations may lack clear connection to the stated o
he study demonstrates a clear linkage of recommendations to objectives concerning the COVID-19 pandemic's impact on the pharmaceutical industry, yet f

Enhance the linkage between recommendations and objectives to ensure they are closely aligned and impactful in leveraging Lean Six Sigma for promoting
Strengthen the linkage between recommendations and objectives to ensure they are more thoroughly developed and aligned, thereby enhancing their effecti

Strengthen the linkage between recommendations and objectives to ensure they are more coherent and aligned, enhancing their relevance and effectiveness

Strengthen the linkage between recommendations and objectives to ensure they are more fully developed and aligned.
The study shows basic linkage, with some recommendations not clearly connected to objectives, suggesting a need for improved alignment to enhance their

Establish appropriate linkage between elements to ensure coherence and relevance in the context of implementing Lean Six Sigma for yield improvement in
Exact linkage with objectives were found in the project

Recommendations are not given so there is no linkage between the recommendations and the objectives

There is not such recommendations so that there is no linking recommendations to the objectives
Recommendations are not mentioned so there is no linkage of recommendations to the objectives

Yes. Recommendations are linked to the objectives


Recommendations are linked with the objectives and it will be useful.

There will be a linkage of recommendations to the objectives


Enhancing the connection between recommendations and objectives will strengthen the project's overall framework, ensuring that proposed actions effectiv

Linkage is almost absent or entirely inappropriate


Linkage is almost absent or entirely inappropriate.
Linkage is almost absent or entirely inappropriate.
The linkage between recommendations and objectives is evident, but it requires more thorough development to ensure comprehensive alignment and effecti

The project shows a clear linkage of recommendations to objectives, but there is room for further development to enhance the depth and effectiveness of the
The project demonstrates very basic or incorrect linkage, which hinders the overall coherence and effectiveness of its findings and recommendations.
The project shows clear linkage of recommendations to objectives; however, further development is needed to fully optimize their alignment and effectiven

The project exhibits weak linkage between recommendations and objectives, as recommendations appear disconnected from the overarching goals. Strength
There is weak linkage observed in the project, where recommendations seem disconnected from the stated objectives, highlighting a need for better alignme

The project shows an almost absent or entirely inappropriate linkage, undermining the coherence and alignment between objectives and outcomes.
Some of the recommendations clearly connecting to objectives.

Some of the recommendations clearly connecting to objectives.

Some of the recommendations were connecting to objectives.

Some of the recommendations clearly connecting to objectives.

the few objectives are linked with knowledge level of the suggested recommendations
major recommendations are linked with objectives
Some of the recommendations clearly connecting to objectives
few recommendations are linked with objectives

few objectives are linked with objectives

the few objectives are linked with knowledge level of the suggested recommendations
the few objectives are linked with recommendations
few recommendations are linked with objectives

the major objectives are linked with knowledge level of the suggested recommendations

Some of the recommendations clearly connecting to objectives.


Some of the recommendations clearly connecting to objectives
major recommendations are linked with objectives
The recommendations are linked to the initial objectives, focusing on enhancing the character recognition system and addressing identified challenges.
Some of the recommendations clearly connecting to objectives
the few objectives are linked with the suggested recommendations
Some of the recommendations were connecting to objectives
the few objectives are linked with knowledge level of the suggested recommendations
Some of the recommendations clearly connecting to objectives
Some of the recommendations clearly connecting to objectives
the few objectives are linked with knowledge level of the suggested recommendations
the few objectives are linked with suggested recommendations
Some of the recommendations clearly connecting to objectives
Some of the recommendations clearly connecting to objectives
Some of the recommendations were connecting to objectives
Some of the recommendations clearly connecting to objectives
Some of the recommendations clearly connecting to objectives

the few objectives are linked with knowledge level of the suggested recommendations
no recommendations are suggested
the few objectives are linked with knowledge level of the suggested recommendations
the few objectives are linked with suggested recommendations
Some of the recommendations were connecting to objectives
the few objectives are linked with knowledge level of the suggested recommendations
The recommendations are directly linked to the study’s objectives of ensuring a swift and effective response to disruptions, minimizing downtime, and prot
the few objectives are linked with knowledge level of the suggested recommendations
the few objectives are linked with knowledge level of the suggested recommendations
Some of the recommendations were connecting to objectives

the few objectives are linked with knowledge level of the suggested recommendations

the objectives are linked with knowledge level of the suggested recommendations
Some of the recommendations clearly connecting to objectives

the objectives are linked with knowledge level of the suggested recommendations
the few objectives are linked with knowledge level of the suggested recommendations
few objectives have been linked
Some of the recommendations were connecting to objectives
need linkage of recommendations with objectives
few objectives are linked with recommendations
Recommendations met the objectives

the few objectives are linked with knowledge level of the suggested recommendations

Connection is almost absent of the project.

Some of the recommendations clearly connecting to objectives.


Some of the recommendations were connecting to objectives.

Connection is almost absent of the case study.

Some of the recommendations clearly connecting to objectives.

Some of the recommendations clearly connecting to objectives.


Some of the recommendations clearly connecting to objectives.
Some of the recommendations clearly connecting to objectives.
Some of the recommendations clearly connecting to objectives.

Some of the recommendations were connecting to objectives.

Some of the recommendations were connecting to objectives.


Some of the recommendations clearly connecting to objectives
Some of the recommendations clearly connecting to objectives
Some of the recommendations were connecting to objectives

the major objectives are linked with knowledge level of the suggested recommendations
Some of the recommendations clearly connecting to objectives
the few objectives are linked with knowledge level of the suggested recommendations

Some of the recommendations were connecting to objectives


few recommendations are linked with objectives
few objectives are related with recommendations
the few objectives are linked with knowledge level of the suggested recommendations
Some of the recommendations were connecting to objectives
the few objectives are linked with knowledge level of the suggested recommendations

Some of the recommendations clearly connecting to objectives


few recommendations are linked with the objectives

few objectives are related to the recommendations


Some of the recommendations were connecting to objectives

the few objectives are linked with knowledge level of the suggested recommendations
Some of the recommendations were connecting to objectives

the few objectives are linked with knowledge level of the suggested recommendations

weak linkage of recommendation with the study objectives.


It was a more clear. Nonetheless, the recommendations' relationship to the objective is recognized it.
connection with recommendations that appear to be related to the objectives
The linking of the recommendations to objectives was stated good in the study
Recommendations are less connected with the objectives.
Weak in connection of recommendations with the objectives
focusing on innovation objectives, researchers can gain insights into how technology drives Microsoft's growth, supports digital transformation initiatives, a
not fully defined. but the relationship between the recommendations and the objective is clear
Weak in linkage of recommendations with the objectives
Some of the recommendations given are connected with the objectives.
linking of recommendations coming from a limited number of objectives
recommended to the objectives, highlighted the key aspects, benefits, and challenges of personalized learning systems, as well as their potential impact on t
Weak in linkage of recommendations with objectives

good recommendations for the goal in objectives

the study concluded with recommendations for integrating ITSM more closely with business objectives, with an emphasis on strategic planning, agility, and
A description of the methods and procedures used by the current system is followed by a discussion of the goals and practises of the prospective system
connection with recommendations that appear to be related to the objectives
really simple connecting, with recommendations for their few goals. need more about which are the presssing concern in cloud computing and danger mana
Exact linkage with objectives were found in the project

not fully defined. but the relationship between the recommendations and the objective is clear

Basic linkage, with some recommendations not clearly connected to objectives.


Basic linkage, with some recommendations not clearly connected to objectives.

Basic linkage, with some recommendations not clear


connection with recommendations that appear to be related to the objectives in SMEs
Adequate linkage of recommendations to objectives, though some aspects may be less precise.

Adequate linkage of recommendations to objectives, though some aspects may be less precise.
Adequate linkage of recommendations to objectives, though some aspects may be less precise.
Basic linkage, with some recommendations not clearly connected to objectives.
It was a more clear. Nonetheless, the recommendations' relationship to the objective is recognized it.
Adequate linkage of recommendations to objectives, though some aspects may be less precise.
Basic linkage, with some recommendations not clearly connected to objectives.
Adequate linkage of recommendations to objectives, though some aspects may be less precise.

Adequate linkage of recommendations to objectives, though some aspects may be less precise.
Basic linkage, with some recommendations not clearly connected to objectives.
Strong and clear linkage of recommendations to the initial objectives.
Basic linkage, with some recommendations not clearly connected to objectives.
Strong and clear linkage of recommendations to the initial objectives.
recommendations to the objectives are significant savings in resource, maintenance, and real estate costs
A comprehensive guide on Oracle Netsuite ERP: a unified system that can manage both internal and external resources in a company.
Cyber ethics are nothing but the code of the internet. When we practice these cyber ethics there are good chances of us using the internet
Simple linkage is given which is moderaly connected to the cbjectives of the project
Inappropriate linkage is made to the objectives
Apparent linking of recommendations to the objectives is made
Linking is almost absent
Entirely inappropriate linkage
Building confidence among pathologists and increasing the clinical value of the model are both dependent on the interpretability of the machine learning alg
customer up to an apex limit and by providing the utility of every penny of his money.
A better capacity to manage projects in a changing environment is yours for the taking when you incorporate agile project management principles into your
Data innovation accepts the principle part for the retailer or association to configuration out the model for existing standard model
It is anticipated that these findings will catalyze further dialogue and collaboration between the IP and blockchain communities in India
Same of the points not met to the objective
Few of the recommendations not merge with the objectives
Basic linkage, with some recommendations not clearly connected to objectives.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be
Very basic or incorrect linkage, hindering the coherence of the project.
Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be
Linking of recommendations to the objectives of ERP software is being focused common business processes in their implementation.
Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be
Basic linkage, with some recommendations not clearly connected to objectives.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Or Basic linkage, with some recommendations not clearly connected to objectives.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
There is no proof that the goals and recommendations are related.
Or Basic linkage, with some recommendations not clearly connected to objectives.
Basic linkage, with some recommendations not clearly connected to objectives.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Weak linkage, with recommendations appearing disconnected from objectives.
strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be

the given objectives have been linked with recommendations


the recommendations given are linked with objectives with limited scope
major recommendations are linked with objectives
the few objectives are linked with suggested recommendations
the few objectives are linked with knowledge level of the suggested recommendations
the few objectives are linked suggested recommendations
Linking of recommendation to the objectives provide the solution leads to the objectives
Linking of give contents not attending the objectives
Linking of recommendation way to implement the objectives not clearly mentioned
Adequate method with some limitations used
Recommendation to the objectives was not correlated
Recommendation to the objectives not correlated
The sector has significantly contributed to the nation's growth by reinventing and transforming itself in a short span of time.
It removes the occurrences of forgery, duplicate share certificates, and bad deliveries.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
the scope of the study is focused on organizations that have implemented workday as their primary HR analytics tool. require more recommended to objecti
link with suggestions that appear to be appropriate to the few objectives regarding healthcare. additional clarification is required regarding Examining the v
Basic linkage, with some recommendations not clearly connected to objectives.
really simple connecting, with recommendations for their few goals.
Linking recommended with their few objectives of ensuring a wider reach and acceptance of CRM systems, customer satisfaction with Dr. Ethix Products a
Basic linkage, with some recommendations not clearly connected to objectives
Weak linkages with recommendations appearing disconnected from objectives
Weak linkage with recommendations appearing disconnected from objectives

autonomous vehicle business


Not properly connected the recommendations with the project objectives.
connection with recommendations that appear to be related to the objectives
It was clearly explained how the recommendations were linked to the goals.
No proper linkage has been made with study objectives.
identify the challenges associated with implemented cloud-based CRM systems and provide actionable recommendations for their successful adoption.
some of the recommendations linked with the objectives
some of the recommendations are linked with the objectives
Very basic linkage with the objectives
Recommendations are apparent
There has been lack in linkage of recommendations
Strong linkage of recommendations to the objective
Weak linkage of recommendation to the objectives.
Few objectives are connected with the objectives
link with recommendations that seem suitable for the few goals.
Clear linkage of recommendations to the initial objectives.
employee performance review linked with the objectives that were specified in the original assessment
Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be
slightly clear. connection with recommendations of few goals have been revolutionizing banking operations
Very basic or incorrect linkage, hindering the coherence of the project.
Weak linkage, with recommendations appearing disconnected from objectives.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Strong and clear linkage of recommendations to the initial objectives.
Strong and clear linkage of recommendations to the initial objectives.
Very basic or incorrect linkage, hindering the coherence of the project.
Strong and clear linkage of recommendations to the initial objectives.
Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be
linking of recommended with their few objectives of enhancing network security measures in educational institutions.
Strong and clear linkage of recommendations to the initial objectives.
Adequate linkage of recommendations to objectives, though some aspects may be less precise.
Strong and clear linkage of recommendations to the initial objectives
Strong and clear linkage of recommendations to the initial objectives.
relationship with recommendations coming from a with the best performance based on telecom network operators and network types, call rating and call pe
fully defined. but the relationship between the recommendations and the objective is clear
Strong and clear linkage of recommendations to the initial objectives.
Basic linkage, with some recommendations not clearly connected to objectives.
Connecting their recommendations with the specific goals for the secret keys to encrypt and decrypt information using RSA algorithm

Basic linkage, with some recommendations not clearly connected to objectives.


add some more linking of recommendations to the objectives is need of project
add some more linking of recommendations and objectives of project
There is good linking of recommendations to the objectives of this study.

Give more Linking of recommendations to the objectives of this study.

Give more Linking of recommendations to the objectives of this study.


Give more Linking of recommendations to the objectives of this study.
There is good linking of recommendations to the objectives of this study.

Add more Linking of recommendations to the objectives of this study.

give more Linking of recommendations to the objectives


provide some Linking of recommendations to the objectives
There is good linking of recommendations to the objectives of this study.

more Linking of recommendations to the objectives of this study


add some more Linking of recommendations to the objectives
There appears to be a weak linkage between recommendations and objectives.
Basic linkage, with some recommendations that are not clearly linked to objectives.
Some recommendations are not clearly connected to objectives, with basic linkage.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
There is a weak linkage, with recommendations appearing to be disconnected from objectives.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Weak linkage, with recommendations appearing disconnected from objectives.
Although not thoroughly developed, the linkage of recommendations to objectives is apparent.
Simple linking, with some recommendations ambiguously linked to goals.
There is good linking of recommendations to the objectives of this study
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
There is good linking of recommendations to the objectives of this study.
Although not thoroughly developed, the linkage of recommendations to objectives is apparent.
A robust and precise correlation between the recommendations and the initial objectives.
The link between recommendations and objectives is evident, but it is not thoroughly developed.
Some recommendations lack a clear connection to the goals.
The correlation between recommendations and objectives is evident, albeit not fully developed.
The connections between the suggestions and the initial goals are strong and obvious.
The correlation between recommendations and objectives is evident, albeit not fully developed.
Give more Linking of recommendations to the objectives of this study.
The linkage between recommendations and objectives is evident, though not thoroughly developed.
Give more Linking of recommendations to the objectives of this study.
The linkage is basic, with some recommendations not clearly connected to the objectives.
Strong and clear linkage of recommendations to the initial objectives.
Basic linkage, with some recommendations that are not clearly linked to objectives.
Give more Linking of recommendations to the objectives of this study.
Although not thoroughly developed, the linkage of recommendations to objectives is apparent.
Strong and clear linkage between recommendations and initial objectives.
There is a strong and clear linkage of recommendations to the initial objectives.
Give more Linking of recommendations to the objectives of this study.
Basic linkage, with some recommendations that are not clearly linked to objectives.
Give more Linking of recommendations to the objectives of this study.
N o Linking and recommenadtions of the project
Basic linkage, with the objectives.
Some recommendations don't connect to the objectives clearly.
give more linking of recommendation
Give more Linking of recommendations to the objectives of this study.
Basic linkage, with some recommendations not clearly linked to objectives.
There is good linking of recommendations to the objectives of this study.
The linkage between recommendations and objectives is evident, though not thoroughly developed.
The linkage between recommendations and objectives is evident, though not thoroughly developed.
No evidence of linkage between recommendations and objectives.

Although not fully developed, the relationship between the recommendations and the goals is clear.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


Basic connection with a few suggestions that aren't quite apparent in relation to the objectives.

Although not fully developed, the relationship between the recommendations and the goals is clear.
Very basic or incorrect linkage, hindering the coherence of the project.

Although not fully developed, the relationship between the recommendations and the goals is clear.

Basic linkage, with some recommendations not clearly connected to objectives.

The connection between the recommendations and the objectives is obvious, although not deeply developed. of.
Very basic or incorrect linkage, hindering the coherence of the project.

The connection between the recommendations and the objectives is obvious, although not deeply developed.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Connectivity of recommendations to objectives is apparent, though not thoroughly developed.

Basic linkage, with some recommendations not clearly connected to objectives.

Although some aspects may be less precise, there is an adequate connection between recommendations and objectives.

Although not fully developed, the connection between recommendations and goals is apparent.

There is a strong and clear linkage of recommendations to the initial objectives.


Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Basic linkage, with some recommendations not clearly connected to objectives.


There is a strong and clear linkage of recommendations to the initial objectives.
Although not thoroughly developed, the linkage of recommendations to objectives is apparent.
Linking is either absent or completely inappropriate.
Although not fully developed, the connection between recommendations and objectives is evident.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Although not fully developed, the connection between recommendations and objectives is evident.
Extremely essential or mistaken linkage, frustrating the rationality of the task.

Basic linkage, with some recommendations not clearly connected to objectives.


Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Basic linkage, with some recommendations not clearly connected to objectives.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


Basic connection, with some recommendations not being clearly linked to goals.

Although not fully developed, the connection between recommendations and goals is apparent.
Essential linkage, for certain proposals not obviously associated with targets.
Although not fully developed, the connection between recommendations and goals is apparent.

Basic linkage, with some recommendations not clearly connected to objectives.


The recommendations are connected to the initial goals.

Very basic or incorrect linkage, hindering the coherence of the project.


Weak linkage, with recommendations appearing disconnected from objectives.
There is no clear connection between the recommendations and the goals.

Linkage between recommendations and objectives is apparent, but not well developed.

No evidence of linkage between recommendations and objectives.

Although not thoroughly developed, the linkage of recommendations to objectives is apparent.


Some recommendations lack a clear connection to the goals.
Very basic or incorrect linkage, hindering the coherence of the project.
The recommendations are connected to the initial goals in a clear and strong way.
The correlation between recommendations and objectives is evident, albeit not fully developed.

Although not fully developed, the connection between recommendations and goals is apparent.

Basic linkage, with some recommendations not clearly connected to objectives.


The recommendations are connected to the initial goals.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.

There appears to be a weak linkage between recommendations and objectives.

Weak linkage, with recommendations appearing disconnected from objectives


The connections between the suggestions and the initial goals are strong and obvious.

Basic linkage, with some recommendations that are not clearly linked to objectives.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Linkage is virtually absent.

Linkage of recommendations to objectives is apparent, though not thoroughly developed

Basic connection with a few suggestions that aren't quite apparent in relation to the objectives.

Recommendations are well linked to the objectives, yet certain details could need more clarification.
Although not fully defined, the relationship between the recommendations and the goals is clear.

Linkage is almost absent.


The connection between the recommendations and the objectives is obvious, although not developed in depth.
Linkage is almost absent.
Although there is a clear connection between the recommendations to the objectives, some aspects may be less precise.
Simple connection with recommendations unclearly related to the goals.

Basic connection with a few suggestions that aren't quite apparent in relation to the objectives.
Linkage is almost absent

Simple connection with recommendations unclearly related to the objectives


Simple connection with some recommendations have no clear connection to the objectives.

Although not fully developed, the relationship between the recommendations and the goals is clear.

Basic linkage, with some recommendations not clearly linked to objectives.


Only basic recommendations made and its not clearly connected to the objective.
Objectives framed and mentioned recommendations match well, but it also has some flaws.
There is good linking of recommendations to the objectives of this study.
Objectives framed and the recommendations suggested has a minor linkage issue as its not clearly connected.
The correlation between recommendations and objectives is evident, albeit not fully developed.
There is good linking of recommendations to the objectives of this study.
Although not thoroughly developed, the linkage of recommendations to objectives is apparent.
There is good linking of recommendations to the objectives of this study.
The linkage is largely absent.
There is good linking of recommendations to the objectives of this study.
There is a weak linkage, with recommendations appearing disconnected from objectives.
Give more Linking of recommendations to the objectives of this study.
Although not thoroughly developed, the linkage of recommendations to objectives is apparent.
Give more Linking of recommendations to the objectives of this study.
Give more Linking of recommendations to the objectives of this study.
Recommendation made is very basic.
There is no links of recommendations to the objectives of this study.
Defined objectives basically match with the recommendations provided even though it also has some basic issues.
The recommendations made are appearing disconnected to the objective.
Give more Linking of recommendations to the objectives of this study.
There is a strong linkage to the recommendations mentioned to the objectives stated.
Clear linkage of the recommendations mentioned to the objectives stated initially.
It doesn't seem to fit the stated objectives clearly.
Objectives framed to the linkage of recommendations is apparent.

Give more Linking of recommendations to the objectives of this study.

There is good linking of recommendations to the objectives of this study.


Add more Linking of recommendations to the objectives of this project.

Give more Linking of recommendations to the objectives of this study.

Good Linking of recommendations to the objectives

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


Some recommendations don't connect to the objectives clearly.
Very basic or incorrect linkage, hindering the coherence of the project.
A robust and precise correlation between the recommendations and the initial objectives.
No evidence of linkage between recommendations
No evidence of linkage between recommendations and objectives
Although not thoroughly developed, the linkage of recommendations to objectives is apparent.
The link between recommendations and objectives is evident, but it is not thoroughly developed.
Some recommendations don't connect to the objectives clearly.
Although not thoroughly developed, the linkage of recommendations to objectives is apparent.

Need more Linking of recommendations to the objectives of this project.


The linkage is basic, with some recommendations not clearly connected to the objectives.
Weak linkage, with recommendations appearing disconnected from objectives
The linking of recommendations to the objectives may add more clearence.

need more linking of recommendations to the objectives.


Linking of recommendations to the objectives of this study is good.
No evidence of linkage between recommendations and objectives.
The linkage is basic, with some recommendations not clearly connected to the objectives.
Linkage of recommendations to objectives is apparent, though not thoroughly developed
Give more Linking of recommendations to the objectives of this study.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Simple linking, with some recommendations ambiguously linked to goals.
Weak linkage, with recommendations appearing disconnected from objectives
Give more Linking of recommendations to the objectives of this study.
Weak linkage, with recommendations appearing disconnected from objectives
There is good linking of recommendations to the objectives of this study.
Weak linkage, with recommendations appearing disconnected from objectives
There is good linking of recommendations to the objectives of this study.
Give more Linking of recommendations to the objectives of this study.
There is good linking of recommendations to the objectives of this study.
The correlation between recommendations and objectives is evident, albeit not fully developed.
Weak linkage, with recommendations appearing disconnected from objectives
Simple linking, with some recommendations ambiguously linked to goals.
entirely inappropriate
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Weak linkage, with recommendations appearing disconnected from objectives
Linkage of recommendations to objectives is apparent, though not thoroughly developed
Give more Linking of recommendations to the objectives of this study.
The link between recommendations and objectives is evident, but it is not thoroughly developed.
The linkage is basic, with some recommendations not clearly connected to the objectives.
Linkage of recommendations to objectives is apparent, though not thoroughly developed
Linkage of recommendations to objectives is apparent, though not thoroughly developed
Although not thoroughly developed, the linkage of recommendations to objectives is apparent.
The correlation between recommendations and objectives is evident, albeit not fully developed.
There is a strong and clear linkage of recommendations to the initial objectives.
Although not thoroughly developed, the linkage of recommendations to objectives is apparent.
There is good linking of recommendations to the objectives of this study.
Improve linkage between key elements to strengthen the coherence and flow of the analysis on challenges in appointing and retaining individual agents in th
A key objective of the study is to evaluate Maersk's environmental performance in terms of carbon emissions, energy consumption, and other environmenta

in the modern digital landscape by analyzing trends, problems, opportunities.


Recommendations to objectives of the study need to give clearly about the project implementation phase..
Examine the implications of efficient and resilient supply chain management on patient care outcomes, cost containment, and organizational sustainability.
The optimisation of processes can yield financial benefits, improve customer satisfaction, and confer a competitive edge onto the business in the
Strengthen the linkage between recommendations and objectives to ensure a more robust and coherent alignment in addressing the impact of fintech innova
Strengthen the linkage between recommendations and objectives to ensure a more coherent alignment in addressing portfolio management objectives effect
Linkage is almost absent

The company has achieved significant reductions in inventory levels, lead times, and operational costs, while improving product quality and customer satisf
No evidence of linkage between recommendations and objectives

The product is offered at a competitive price in the market and meets customer expectations.
Strengthen the linkage between recommendations and objectives to ensure clear alignment and coherence in influencing consumer buying behavior towards
To identify and address root causes of process variations for improved product/service quality.

Lean initiatives are shown to align closely with these theoretical concepts, providing a systematic approach to driving operational excellence.

To implement Kanban card to convert present push system of material movement into pull system.

To assess the internet based client obligation programs made by the backers to hold the electronic clients

links in objective is we decide switching over clouds next time around again till eternity
objectives are link in maintaining skill inventory and relationships with individuals

links to the objective of few security-related issues with the cloud which ought to be overseen by the engineer
links are in objectives in some kind of online solution to streamline the verification procedure

Basic linkage, with some recommendations not clearly connected to objectives.

thoroughly developed.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.

thoroughly developed

Basic linkage, with some recommendations not clearly connected to objectives.


Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


Basic linkage, with some recommendations not clearly connected to objectives.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


Very basic or incorrect linkage, hindering the coherence of the project.

Weak linkage, with recommendations appearing disconnected from objectives.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Weak linkage, with recommendations appearing disconnected from objectives.

some of the recommendation needs to meet the objective of the project


Needs to specify recommendations linked with the objective of the study
Basic linkage, with some recommendations not clearly connected to objectives.
Basic linkage, with some recommendations not clearly connected to objectives.
Partial recommendations not linked with the objectives
Basic linkage, with some recommendations not clearly connected to objectives.
Weak linkage, with recommendations appearing disconnected from objectives.
Some the recommendation needs to be change to met the objectives
Weak linkage, with recommendations appearing disconnected from objectives
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Recommendations needs to be scrutinise with the objective of the study
Recommendation not linked with the objectives
Basic linkage, with some recommendations not clearly connected to objectives.
Basic linkage, with some recommendations not clearly connected to objectives.
Basic linkage, with some recommendations not clearly connected to objectives.
Basic linkage, with some recommendations not clearly connected to objectives.
Basic linkage, with some recommendations not clearly connected to objectives.
Recommendations are linked with the objectives
Basic linkage, with some recommendations not clearly connected to objectives.

Partial recommendations not linked with the objectives


Basic linkage, with some recommendations not clearly connected to objectives.
Some of the recommendations limited to the objectives
Basic linkage, with some recommendations not clearly connected to objectives.
Basic linkage, with some recommendations not clearly connected to objectives.

Basic linkage, with some recommendations not clearly connected to objectives.


few of the recommendations not link with the objectives
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Basic linkage, with some recommendations not clearly connected to objectives.
Partial recommendation linking with objective of the study

Basic linkage, with some recommendations not clearly connected to objectives..

Few of the recommendations linked with the objectives of the study


No evidence of linkage between recommendations and objectives.
Recommendations given needs to present details to fulfil the objective of the study
Weak linkage, with recommendations appearing disconnected from objectives.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Few of the recommendations not meet the objectives
Very basic or incorrect linkage, hindering the coherence of the project.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Few of the recommendations needs to be scrutinize to link the objective of the study

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


few of the recommendations needs to be scrutinize for linking the objectives
Few of the recommendations needs to be inspect the linking to the objectives of the study
Weak linkage, with recommendations appearing disconnected from objectives.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Needs more clarity on the objective of the study link with the recommendations
few of the recommendations needs to link with the objectives
Some of the points need to link with the objectives

Weak linkage, with recommendations appearing disconnected from objectives.

Basic linkage, with some recommendations not clearly connected to objectives.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


Basic linkage, with some recommendations not clearly connected to objectives.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Basic linkage, with some recommendations not clearly connected to objectives.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Weak linkage, with recommendations appearing disconnected from objectives.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


Some of the recommendations were linked with the objectives
Some of the recommendation points linked with the objectives

Recommendation needs to focus on the major objectives, some of the recommendations need to give technology advancement of the problem scheme
Some of the recommendations beyond the level of the project scope

Strong and clear linkage of recommendations to the initial objectives.


Adequate linkage of recommendations to objectives, though some aspects may be less precise.
Needs to mention more recommendation to link with the objective of the study
Some of the recommendations needs to precise for the objective of the study
Needs to specify some of the the recommendation focus on the objectives
Partial recommendations needs to focus on the objectives
Integration is the key part then some of recommendation needs to improve the implementation scheme
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
partial recommendations points are fulfil the objectives
Basic linkage, with some recommendations not clearly connected to objectives.
Basic linkage, with some recommendations not clearly connected to objectives.
Basic linkage, with some recommendations not clearly connected to objectives.
Basic linkage, with some recommendations not clearly connected to objectives.
Basic linkage, with some recommendations not clearly connected to objectives.
most of the recommendations not linked with the objectives
some of the recommendation needs to scrutinise for make valuable link with objectives
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Very basic or incorrect linkage, hindering the coherence of the project.
Very basic or incorrect linkage, hindering the coherence of the project.
Basic linkage, with some recommendations not clearly connected to objectives.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Basic linkage, with some recommendations not clearly connected to objectives.
some of the recommendations needs to link with the objective of the research study
Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Basic linkage, with some recommendations not clearly connected to objectives.


The linkage of recommendations to objectives is evident but requires further development for enhanced coherence and effectiveness.

Basic linkage, with some recommendations not clearly connected to objectives.


No evidence of linkage between recommendations and objectives.
The linkage between objectives and recommendations is basic, with some recommendations not clearly aligned with the stated objectives, necessitating a m

Effective assessment of microfinance lending requires ensuring that recommendations are closely aligned with the objectives set forth, enhancing the releva
Basic linkage, with some recommendations not clearly connected to objectives.
The linkage between objectives and recommendations is basic, with some suggestions lacking clear alignment, necessitating a more cohesive integration to

That was more lucid. However, the connection between the recommendations and the goal is acknowledged.
The project suffers from very basic or incorrect linkage, which undermines the overall coherence and logical flow of the study, highlighting the need for im
The project demonstrates a basic linkage between objectives and recommendations, with some suggestions lacking clear alignment to the stated objectives,
Recommendations to objectives of the study need to give clearly about the project.

The linkage is basic, with some recommendations not clearly connected to the objectives.
The linkage is very basic or incorrect, hindering the project's coherence; refining connections between sections is essential for a cohesive and logical flow.
connected with recommendations of goals have been revolutionizing actionable roadmap for enhancing customer satisfaction through the implementation o
Improve staff training and development programs, ensuring high service standards.
Strengthen the linkage of recommendations to objectives by developing more detailed connections, ensuring that each recommendation clearly addresses sp
To analyze the impact of procurement technology on procurement performance, including the benefits of leveraging technology for procurement optimizati
The secondary objectives include exploring the challenges and barriers to sustainable energy adoption and proposing recommendations for policyma

ending process that is based on continuous improvement.


Improve linkage by ensuring all recommendations are directly connected to objectives, enhancing the coherence and relevance of strategies for mergers and
Decreasing the amount of food that gets thrown away at every step of the process will help farmers and others make more money and have a better life.
Enhance linkage between recommendations and objectives to improve coherence and relevance in strategies for consumer perceptions of e-banking services

Strengthen the linkage between recommendations and objectives to ensure coherence and alignment in achieving the intended outcomes effectively.
No evidence of linkage between recommendations and objectives

Basic linkage, with some recommendations not clearly connected to objectives.


Basic linkage, with some recommendations not clearly connected to objectives.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


Very basic or incorrect linkage, hindering the coherence of the project.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.

thoroughly developed

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


Very basic or incorrect linkage, hindering the coherence of the project.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Basic linkage, with some recommendations not clearly connected to objectives.
Weak linkage, with recommendations appearing disconnected from objectives.
recommendations are linked with the objectives
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
thoroughly developed

Weak linkage of objectives to recommendations

thoroughly developed.
Basic linkage, with some recommendations not clearly connected to objectives.
Basic linkage, with some recommendations not clearly connected to objectives.
LINKED WELL
LINKED
OK
FINELY LINKED
NOT COMPLETELY LINK
NO
EVERYTHING IS NOT LINKED
LINKED WELL
YES
WELL LINKED
Recommendations are almost absent
Basic linkage, with some recommendations not clearly connected to objectives.
OK LINKED
linked
The recommendations should be firmly connected to the initial objectives, and the recommendations should be sufficiently connected to the objectives, eve
Robust and distinct connection between suggestions and the original goals.
Adequate linkage of recommendations to objectives, although some aspects may be less precise.

Basic linkage, with some recommendations not clearly connected to objectives.


Basic linkage, with some recommendations not clearly connected to objectives.
Basic linkage, with some recommendations not clearly connected to objectives.
Basic linkage, with some recommendations not clearly connected to objectives

Linkage of recommendations to objectives is apparent, though not thoroughly developed


Basic linkage, with some recommendations not clearly
recommendations have a strong and obvious connection to the original goals.
Recommendations are adequately linked to the objectives, although some details might need more clarity.
The recommendations are well connected to the objectives, although some elements may lack precision.
Basic linkage, with some recommendations not clearly connected to objectives.
Strong and obvious connection made between the proposals and the original goals.
Very basic or incorrect linkage, hindering the coherence of the project.
Basic linkage, with some recommendations not clearly connected to objectives.
Suggestions and objectives are sufficiently linked, while some details would need more clarity.
Alright, a few things need to be changed.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Recommendations are weak, lacking detail and practicality.
Basic linkage, with some recommendations not clearly connected to objectives.

Recommendations to objectives of the study need to give clearly about the project.
disconnected from objectives.
disconnected from objectives.
disconnected from objectives.
To investigate key IoT applications in smart cities, including smart transportation, energy management, healthcare, and infrastructures.
disconnected from objectives.
particularly in underserved or unbanked populations
disconnected from objectives.
Recommendations to objectives of the study need to give clearly about the project.
thoroughly developed.
precise.
Recommendations to objectives of the study need to give clearly about the project.
connected to objectives.
Objectives of the study need to give more clearly.
connected to objectives.
The findings of this study, therefore, serve as a useful platform for ongoing academic efforts aimed at mastering the complex and evolving domain of outso
The project will focus on a specific industry or set of industries where artificial intelligence (AI) and machine learning (ML) technologies are
Weak linkage, with recommendations appearing disconnected from objectives
The deployment of new innovative Cloud solutions with attractive businesses designs will create level that is high of satisfaction and unmatched ad
It is also recommended that hotels spend more money on getting their staff trained, inform them of the reality of the F & B department in terms of profitabi
Recommendations to objectives of the study need to give clearly about the project.
critical areas like Income Leakage etc
Weak linkage, with recommendations appearing disconnected from objectives
Linkage of recommendations to objectives is apparent, though not thoroughly developed
Contribute to the ongoing efforts to secure the financial infrastructure of India against evolving cyber threats.
Linkage of recommendations to objectives is apparent, though not thoroughly developed
Weak linkage, with recommendations appearing disconnected from objectives
Basic linkage, with some recommendations not clearly connected to objectives
Weak linkage, with recommendations appearing disconnected from objectives
incorrect linkage, hindering the coherence of the project.
Basic linkage, with some recommendations not clearly connected to objectives.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
The research has established a reason for studying the relationship between the HPWS and the CPB of employees in the Indian information techno
By addressing these challenges collaboratively, stakeholders can unlock the full potential of 5G to create a more connected, efficient, and pro
Objectives of the study need to give more clearly.
Digital transformation requires utilizing digital technologies to promote company innovation and growth.
almost absent.
thoroughly developed.
thoroughly developed.
This study intends to provide insights into the needs of two groups of customers, repeat buyers and operations of the brand, to help corporations deve
Recommendations to objectives of the study need to give clearly about the project.
Analyze big data systems' architecture, considering analytic platforms, data processing frameworks, and storage systems.
The project will entail a detailed exploration of the fundamental principles, concepts, and components of the ITIL framework.
disconnected from objectives.
thoroughly developed.
objectives is apparent, t
disconnected from objectives.
To implement a hierarchical structure of key distribution techniques in IoT.
To assess expecting that there is huge difference in the perspective on pressure controlling strategies across direction.
thoroughly developed.
To identify the challenges that were experienced when the first version of the data management was deployed.
objectives.
disconnected from objectives.
One technology that is particularly notable for its ability to simplify operations, cut costs, and improve customer service is Robotics Process Automation (R
Assess intangible benefits such as enhanced supply chain responsiveness derived from the integration process
thoroughly developed
disconnected from objectives.
thoroughly developed.
thoroughly developed.
Exploratory research was conducted to review the existing literature on the subject in order to determine the objectives and scope of the study.
thoroughly developed.
Conduct a thorough examination of contemporary cybersecurity threats within the context of IT service management.
thoroughly developed.
thoroughly developed.
Determine which organizational departments stand to benefit the most from these technologies in terms of cost and performance benefits.
disconnected from objectives.
thoroughly developed.
Maintaining engagement in virtual teams requires deliberate effort and innovative approaches.
This summary delves into the key impacts, obstacles, and future research areas to provide a comprehensive understanding of IT's role in supp
size and returns over the last five years.
The focus was on employees’ preferences and attitudes, and not exclusively on the reasons for their inclinations. The use of qualitative methods to be
To enhance the accuracy and timeliness of decisions related to product development, marketing, and inventory management.
disconnected from objectives.
This research study suggest that remote working can be a successful and effective model for many roles in information technology project

thoroughly developed.
thoroughly developed.
Recommendations to objectives of the study need to give clearly about the project.
thoroughly developed.
To understand the advertising tools of the company and what makes social media marketing better than traditional marketing styles.
thoroughly developed.
thoroughly developed.
Recommendations to objectives of the study need to give clearly about the project.
thoroughly developed.
connected to objectives.
Recommendations to objectives of the study need to give clearly about the project.
Recommendations to objectives of the study need to give clearly about the project.
sparities and promoting equity in crisis response.
As IoT devices collect vast amounts of data, ensuring customer privacy and data security is paramount.
Dedicated technical support teams can also provide prompt advice and direction to handle staff issues and guarantee optimal system operation.
connected to objectives.
connected to objectives.
To design a user-friendly and effective digital engagement platform that facilitates seamless communication and collaboration between HCPs and pharma c
thoroughly developed.
Usage of technology in digital dining such as tablet menus, self-service kiosks, food ordering apps, QR codes and digital payments.
Project execution summary is need to give more information of implementation of project
almost absent
Explores the fundamental principles of blockchain technology, its applications in finance, benefits, challenges, and future prospects.
Recommendations to objectives of the study need to give clearly about the project.
connected to objectives.
connected to objectives.
thoroughly developed.
Identify and assess the key usability issues affecting the performance of Amazon and eBay.
Recommendations to objectives of the study need to give clearly about the project.
disconnected from objectives.

thoroughly developed.
thoroughly developed.
thoroughly developed.
To evaluate the NPAs of SBI and HDFC financial. To understand the factors adding to the large NPAs in PSBs.
thoroughly developed.
thoroughly developed.
disconnected from objectives.
To enhance network scalability and flexibility through cloud integration.
disconnected from objectives.
effect individual to individual communication goals are having on the lodge section.
Cloud computing offers various advantages, such flexible use of information and solutions, scalability, and cost-efficiency.
To find out the difficulties and chances of computer based intelligence driven HRM practices of the Indian IT area.
disconnected from objectives.
To create a MIS for examining consumer grievances and businesses
Financial institutions can now analyze vast amounts of market data in real-time, enabling more informed investment decisions and risk management strate.
thoroughly developed
Identify key ethical considerations surrounding GenAI implementation in IT service management, focusing on areas like data privacy, algorithmic bias,
thoroughly developed.
Understand the drivers behind consumers' inclination towards using social commerce platforms.
thoroughly developed
Recommendations to objectives of the study need to give clearly about the project.
Identify similarities and differences in their approaches to online business.
thoroughly developed.
To analyze the risks and explore the possible AI tools to deal with the consequences of the identified risks
thoroughly developed.
thoroughly developed.
thoroughly developed.
Project execution summary is need to give more information of implementation of project
To assess the economic impact on e-commerce platforms and various merchants and how they are adopting to newer payment systems.
disconnected from objectives.
Recommendations to objectives of the study need to give clearly about the project.
Recommendations to objectives of the study need to give clearly about the project.
thoroughly developed.
thoroughly developed.
thoroughly developed.
objectives.
Recommendations to objectives of the study need to give clearly about the project.
It underscores the importance of leveraging AI technologies to enhance transaction security, mitigate fraud risks, and maintain trust and confidence in the f
Strengthening organizational support systems to acknowledge stress from cyber crime and take active steps to manage it to enhance resilience and cop
By analyzing the strengths and limitations of these solutions, the study seeks to identify best practices and recommend the most effective technica
This study aims to identify and analyse the challenges and limitations faced by organizations and marketers in India in the realm of social media ma
Recommendations to objectives of the study need to give clearly about the project.
disconnected from objectives.
Very basic or incorrect linkage, hindering the coherence of the project.
E-commerce has emerged as a viable alternative to established business models for the purchase of items that consumers would rather acquire offline.
technology, evolving threat landscapes, and changes in regulatory environments.
Platforms such as Google Drive, Dropbox, and OneDrive that enable secure file sharing and storage.
Very basic or incorrect linkage, hindering the coherence of the project.
Very basic or incorrect linkage, hindering the coherence of the project.
Basic linkage, with some recommendations not clearly connected to objectives.
Basic linkage, with some recommendations not clearly connected to objectives.
Based on the analysis and bench marking, formulate actionable recommendations for optimizing the IT service management system
To explore the effectiveness of integration between ERP systems and other technology tools used by SMEs.
Based on the findings and analysis, the project provides practical recommendations and actionable insights for stakeholders to optimize decision-making pr
breaches, insider threats, and other cyber security incidents.
Very basic or incorrect linkage, hindering the coherence of the project
Very basic or incorrect linkage, hindering the coherence of the project.
Very basic or incorrect linkage, hindering the coherence of the project.
Very basic or incorrect linkage, hindering the coherence of the project.
Basic linkage, with some recommendations not clearly connected to objectives.
Recommendations to objectives of the study need to give clearly about the project.
Energy-efficient systems and technologies, such smart grids and sophisticated cooling methods, can help organizations drastically reduce their energy consu
WELL LINKED

Very basic or incorrect linkage, hindering the coherence of the project.

YES
Linkage is almost absent or entirely inappropriate
Very basic or incorrect linkage, hindering the coherence of the project.
WELL LINKED
Very basic or incorrect linkage, hindering the coherence of the project.
Linkage is almost absent or entirely inappropriate
Weak linkage, with recommendations appearing disconnected from objectives.
all the objectives are related closely to recommendations
RECOMMENDATIONS WERE LINKING ALL THE GOALS AND RESULTS
Basic linkage, with some recommendations not clearly connected to objectives.

ok

Basic linkage, with some recommendations not clearly connected to objectives


not completely linked
Very basic or incorrect linkage, hindering the coherence of the project.

LINKED
Basic linkage, with some recommendations not clearly connected to objectives.
wel linked
Basic linkage, with some recommendations not clearly connected to objectives.
Basic linkage, with some recommendations not clearly connected to objectives.
ok

Basic linkage, with some recommendations not clearly connected to objectives


Very basic or incorrect linkage, hindering the coherence of the project
Very basic or incorrect linkage, hindering the coherence of the project.

tables to disseminate the analytical findings to the stakeholders in a practical manne.


thoroughly developed.
almost absent
The concept of IT service management (ITSM) has evolved significantly over the years, driven by advancements in technology and changes in organization
connected to objectives.
Current techniques need to implement and analysis in this project.
thoroughly developed.
Adoption of a suitable ITSM framework such as ITIL to standardize operations and enhance service delivery
Email research, limits and offers, and other tactics can help retain the dependable clientele.
decision-making, as well as the challenges and hurdles faced during implementation, such as high costs and data privacy concerns.
Exploring the differences in consumer behavior and engagement across various social media platforms and how Myntra can tailor its strategies for e
energy usage
almost absent
Recommendations to objectives of the study need to give clearly about this project.
disconnected from objectives.
Influence innovation and strategic implementation of IoT solutions for the betterment of society and economy
This evolution aligns with the overarching objective of fostering sustainable and intelligent built environments, paving the way for a more innov
thoroughly developed.
Recommendations to objectives of the study need to give clearly about the project.
Study methodology procedure are partially explained
thoroughly developed.
disconnected from objectives.
Information Technology, paving the way for more sophisticated services and continuous product and process innovations in the future.
Environmentally friendly Cloud computing improvement the means people buy and employ it providers.
project.
thoroughly developed.
Evaluate the relevance and necessity of cyber security in the current and future contexts.
The study's findings reasoned that TM expects an essential part in fulfilling and propelling workers, which thus helps over haul their skills.
project.
Consequently, it is crucial for digital transaction/payment organizations to maintain service quality, so clients constantly feel happy and trust the
objectives.
disconnected from objectives.
almost absent
disconnected from objectives.
disconnected from objectives.
thoroughly developed.

Linkage of recommendations to objectives is apparent, though not thoroughly developed

Weak linkage, with recommendations appearing disconnected from objectives

Linkage of recommendations to objectives is apparent, though not thoroughly developed


Linkage of recommendations to objectives is apparent, though not thoroughly developed

Linkage of recommendations to objectives is apparent, though not thoroughly developed

Weak linkage, with recommendations appearing disconnected from objectives


Linkage of recommendations to objectives is apparent, though not thoroughly developed
Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Weak linkage, with recommendations appearing disconnected from objectives


Weak linkage, with recommendations appearing disconnected from objectives

Linkage of recommendations to objectives is apparent, though not thoroughly developed


Implementation: Deploy tools like Crayon or Kompyte to automate the tracking of competitor activities, product launches, pricing changes, and marketing c
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Weak linkage, with recommendations appearing disconnected from objectives
Recommendation: Implement robust cost management practices.
Weak linkage, with recommendations appearing disconnected from objectives
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Weak linkage, with recommendations appearing disconnected from objectives
Weak linkage, with recommendations appearing disconnected from objectives
Weak linkage, with recommendations appearing disconnected from objectives
Recommendation: Conduct Detailed Consumer Surveys and Behavioral Analysis
Implement AI-enabled natural language processing (NLP) for analyzing customer feedback and generating creative insights for product enhancements.
Establish a culture of continuous improvement, feedback loops, and performance measurement to refine ITIL 4 processes and drive efficiencies.
The Linking of recommendations to the objectives was well stated
Weak linkage, with recommendations appearing disconnected from objectives
The linking of the recommendations was made appropriate for the study
Linkage of recommendations to objectives is apparent, though not thoroughly developed
Linkage is almost absent
The Linking of recommendations to the objectives was good stated
The linking of the recommendations was made appropriate for the study
Simple connection with some recommendations have no clear connection to the objectives.
Recommendations are well linked to the objectives, yet certain details could need more clarification.

Basic connection with a few suggestions that aren't quite apparent in relation to the objectives.
Although there is a clear connection between the recommendations to the objectives, some aspects may be less precise.

Recommendations are well linked to the objectives, yet certain details could need more clarification.

Simple connection with some recommendations have no clear connection to the objectives.

Weak linkage with recommendations appearing disconnected from objectives


Basic connection with a few suggestions that aren't quite apparent in relation to the objectives.
Weak linkage with recommendations appearing disconnected from objectives.
Other subject file

Other subject file


Simple connection with some recommendations have no clear connection to the objectives.
Other subject file
Although there is a clear connection between the recommendations to the objectives, some aspects may be less precise.

Simple connection with some recommendations have no clear connection to the objectives.

Although there is a clear connection between the recommendations to the objectives, some aspects may be less precise.

Student uploaded assignment questions with answers.

Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be

objectives of the project is y focus on how IT-IoT integration can improve customer experience management (CXM).

implementation of a teacher review website.


inefficiencies.
implement various organization and industries.
implement and maintain.

recommended of this project to implement various organization and industries.


recommended of this project to implement various organization and industries.

recommended of this project to implement various organization and industries.

Recommendations, usefulness implementation Ai created in the field of digital marketing and study how it works.
Recommendations are well linked to the objectives, yet certain details could need more clarification.

The pie chart is used to show the actual presentation of the data.
Strong and clear linkage of recommendations to the initial objectives.
highly recommended of this project to implement various organization and industries.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
of this project to implement various organization and industries.
Basic linkage with some recommendations not clearly connected to objectives.
recommendations to the objectives The role of the banking industry is crucial to the growth of the Indian economy
Recommendations are well linked to the objectives, yet certain details could need more clarification.
Basic linking of recommendations to the objectives.
recommend investing in advanced marketing automation tools.
Adequate linkage of recommendations to objectives, though some aspects may be less precise.
Other subject file
Quantum Computing offers elevated privacy standards through advanced encryption and cryptographic techniques.
Other subject file
establish comprehensive ethical guidelines.
Other subject file

Linking of recommendations to the objectives is almost absent.


Basic connection with a few suggestions that aren't quite apparent in relation to the objectives.
Linking of recommendations to the objectives is almost absent

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


Strong and clear linkage of recommendations to the initial objectives

Simple connection with some recommendations have no clear connection to the objectives.

Basic linkage of recommendations to the objectives not clearly connected to objectives.

Linkage is almost absent.


Simple connection with recommendations unclearly related to the goals.
Simple connection with recommendations unclearly related to the goals.
Simple connection with recommendations unclearly related to the goals.

Recommendations are well linked to to the objectives, yet certain details might need more clarification.

Although there is a clear connection between the recommendations to the objectives, some aspects may be less precise.
Basic connection with a few suggestions that aren't quite apparent in relation to the objectives.

Linkage of recommendations to the objectives is almost absent


Simple connection with some recommendations have no clear connection to the objectives.

Other subject file


The gig economy provides a labor force that is able to directly match the company to the freelancer
recommended of the project to implement various industries.

highly recommended of this project to implement various organization and industries.


and within established guidelines
critical to get subjective improvement the monetary state of poor in the metropolitan region.

recommendations to the objectives The key performance indicators on CBA with data mining and Machine Learning are accuracy, processing time, and so

treatments service providers

recommended of this project to implement various organization and industries.

Networks and hybrid models both do very well.


recommended of this project to implement various organization and industries.
highly recommended of this project to implement various organization and industries.

highly recommended of this project to implement various organization and industries.


supply chain sector.

This robust structure underpins blockchain's transformative potential across various industries.

recommendations to the objectives of implement various organization and industries.


recommended of this project to implement various organization and industries.
recommendations to the objectives is if people are helpful and will stay with the association or quit to join different associations
Weak linkage, with recommendations appearing disconnected from objectives
Basic linkage, with some recommendations not clearly connected to objectives.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


Basic linkage, with some recommendations not clearly connected to objectives.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Weak linkage, with recommendations appearing disconnected from objectives.

Very basic or incorrect linkage, hindering the coherence of the project.

Basic linkage, with some recommendations not clearly connected to objectives.

Linkage of recommendations to objectives is apparent, though not thoroughly developed

Linkage of recommendations to objectives is apparent, though not thoroughly developed

Basic linkage, with some recommendations not clearly connected to objectives.


Linkage of recommendations to objectives is apparent, though not thoroughly developed

Basic linkage, with some recommendations not clearly connected to objectives.

Basic linkage, with some recommendations not clearly connected to objectives.

Basic linkage, with some recommendations not clearly connected to objectives.

Weak linkage, with recommendations appearing disconnected from objectives

Very basic or incorrect linkage, hindering the coherence of the project.


Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Weak linkage, with recommendations appearing disconnected from objectives
Weak linkage, with recommendations appearing disconnected from objectives
Linkage of recommendations to objectives is apparent, though not thoroughly developed

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


Very basic or incorrect linkage, hindering the coherence of the project.
Linkage of recommendations to objectives is apparent, though not thoroughly developed

Simple connection with some recommendations have no clear connection to the objectives.
Other subject file.

Information and communication technologies together with computer science to enable banks to offer better services to its customers in a secure, reliable an
Other subject file
The difficulty involved in information security depends on various factors, including the potential threats, the value it holds, the level of sensitivity of inform

Other subject file


It proposes an incremental migration approach that transforms code to maintainable Java while maintaining the same functionality.
An active social media presence enhances how people view a brand. Posting positive customer reviews, feedback, and testimonials can boost e-commerce c
Basic connection with a few suggestions that aren't quite apparent in relation to the objectives.
simple connection with some recommendations unclearly related to the objectives.
Copy case(Course book)
No evidence of linkage between recommendations and objectives.
This document is a project report on a study of employee satisfaction towards the recruitment process
Other subject file

It is a cashless and contactless method for digital payment. · The users will be able to redeem the voucher without needing a card
The objectives of an MIS are to assist staff with the daily decision making process, to maintain better accountability and control of resources
It can enable more transparent governance, decreased processing times, lower capital requirements and reduced risks of fraud, human error, and overall cou

New technologies help in transforming enterprises into a digital world. This technology is mainly helpful in manufacturing, energy and mobility markets.
Other subject file

The product based company list includes Microsoft, Google, Amazon, Apple, Cisco, Adobe, and similar companies.
Simple connection with some recommendations have no clear connection to the objectives.
Simple connection with some recommendations have no clear connection to the objectives.
The objective of customer engagement is to encourage loyalty and promote business through word of mouth marketing.
Other subject file
Strategic HR management plays an important role in business operations by aligning human resource policies and practices with the overall strategic object
Basic connection with a few recommendations that aren't quite apparent in relation to the objectives.
Student gave simple connection with some recommendations have no clear connection to the objectives.
the study indicates that AI has the ability to dramatically improve the banking business by enhancing efficiency, precision, and decision-making
The study is about to analyse the gradual changes in the online consumer purchase behaviour due to improvised digital payment tools.
No evidence of linkage between recommendations and objectives.

simple connection with some recommendations unclearly related to the objectives.

No evidence of linkage between recommendations and objectives.


No evidence of linkage between recommendations and objectives.

Incorrect linkage, hindering the coherence of the project.

The link between recommendations and objectives are good but also provide valuable insights
Weak linkage, with recommendations appearing disconnected from objectives.

The link between recommendations and objectives are good


Weak linkage, with recommendations appearing disconnected from objectives
Basic linkage, with some recommendations not clearly connected to objectives.
Basic linkage, with some recommendations not clearly connected to objectives.
Very basic or incorrect linkage, hindering the coherence of the project.

Linkage is almost absent


The link between recommendations and objectives are good but also provide valuable insights

The recommendations are similar to the objectives

Basic linkage, with some recommendations not clearly connected to objectives.


Basic linkage, with some recommendations not clearly connected to objectives

The conclusions are clearly linked to the objectives and also informative
Basic linkage, with some recommendations not clearly connected to objectives.
Very basic or incorrect linkage, hindering the coherence of the project.

Very basic or incorrect linkage, hindering the coherence of the project.


Very basic or incorrect linkage, hindering the coherence of the project.

Very basic or incorrect linkage, hindering the coherence of the project.


Very basic or incorrect linkage, hindering the coherence of the project
The link between recommendations and objectives is clear

Very basic or incorrect linkage, hindering the coherence of the project.


The recommendations are clearly connected with the objectives
Basic linkage, with some recommendations not clearly connected to objectives.

Very basic or incorrect linkage, hindering the coherence of the project.

add more linking of recommendation to the project


add more points of Linking of recommendations to the objectives
Give more Linking of recommendations to the objectives of this study.
Linking of recommendations to the objectives are need to add more
Give more Linking of recommendations to the objectives of this study.
Linked the recommends to the objectives that have taken
Linked properly with the objectives taken
Linked the objectives taken with the recommendations
objectives and recommendations are linked.
Linked recommendations with the objectives

Give more Linking of recommendations to the objectives of this study.


Linking of recommendations to the objectives of this project is well.
There is good linking of recommendations to the objectives of this study.

There is good linking of recommendations to the objectives of this study.


Linkage of recommendations to the objectives are apparent

Linkage is almost absent or entirely inappropriate


Linkage of recommendation is apparent with the objectives

Strong and clear recommendations linkage of objectives

Basic linkage of recommendations to the objectives

no evidence of linkage of recommendations


Linkage of recommendations to objectives is apparent, though not thoroughly developed.Or Basic linkage, with some recommendations not clearly connect
some recommendations not clearly with objective

write clear recommendations based on your objectives

Strong and clear linkage of recommendations to the initial objective


recommendations is adequate for based on your objectives
give strong recommendations based on your objectives
good and suitable recomendations to be given for based on ypur objectives
Linkage of recommendation with the the objectives are same
good recommendations are provided in this study based on your objactives
Linkage of recommendations to the objectives are apparent
Linkage of recommendations to the objectives are apparent
Linkage of recommendations to objectives is apparent

good and clear recomendations is given in your study

Linked the recommendations to the objectives taken


Well linked the recommendations with the objectives

Basic linkage, with some recommendations not clearlyconnected to objectives.


Proper links are provided for recommends with the objectives

write appropriate recommendations needed

Objectives and recommends are linked


Recommendations for Social Entrepreneurs, Policymakers and Future Research are provided
Objectives and recommends are linked
Linkage of recommendations to objectives is apparent, though not thoroughly developed
Linked recommends and objectives
Linked recommends with the objectives
need strong recommendations based on your objectives
Basic linkage, with some recommendations not clearly connected to objective
Linkage of recommendations to objectives is apparent, though not thoroughly developed

writing clear recommendations based on your objective of the study


provide suitable recommendations based on your objectives
Linked objectives with the recommends
Linked recommends with the objectives
recommendations are more suitable with your objectives

Strong and clear linkage of recommendations to the initial objectives

Strong and clear linkage of recommendations to the initial objectives.


thoroughly developed
Linked recommends with the objectives
recommends should meet the objectives taken
Linked the recommends with the objectives
Basic linkage, with some recommendations not clearly connected to objectives.
Weak linkage, with recommendations appearing disconnected from objectives
Linked the recommends suggested with the objectives taken

Basic linkage, with some recommendations not clearly connected to objectives

Weak linkage, with recommendations appearing disconnected from objectives.

Weak linkage, with recommendations appearing disconnected from objectives


Basic linkage, with some recommendations not clearly connected to objectives.
Strong and clear linkage of recommendations to the initial objectives
need more Linking of recommendations to the objectives

Give more Linking of recommendations to the objectives of this study.


There is good linking of recommendations to the objectives of this study.

There is good linking of recommendations to the objectives of this study


good ideas of Linking of recommendations to the objectives

Good
Give more Linking of recommendations to the objectives of this study.

give some Linking of recommendations to the objectives

add more linking of recommendations to the objectives


add more Linking of recommendations to the objectives
Based on the findings of this study, several recommendations are provided to key points system management

recommendations to the objectives of this study are need more information of project

Linkage of recommendations to objectives is apparent, though not thoroughly developed


Weak linkage, with recommendations appearing disconnected from objectives

Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Strong and clear linkage of recommendations to the initial objectives.


Strong and clear linkage of recommendations to the initial objectives
Basic linkage, with some recommendations not clearly connected to objectives.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Basic linkage, with some recommendations not clearly connected to objectives


Basic linkage, with some recommendations not clearly connected to objectives.
Very basic or incorrect linkage, hindering the coherence of the project.
thoroughly developed
Very basic or incorrect linkage, hindering the coherence of the project.
Very basic or incorrect linkage, hindering the coherence of the project.
incorrect linkage, hindering the coherence of the project.
weak recommendations nased on your objectives
Weak linkage, with recommendations appearing disconnected from objectives

Strong and clear linkage of recommendations to the initial objectives


Weak linkage, with recommendations appearing disconnected from objectives

Strong and clear linkage of recommendations to the initial objectives.


Linkage is almost absent
strong recommendations are in this project based on objectives
only Basic linkage, with some recommendations not clearly connected to objectives.
Linkage is almost absent

incorrect linkage, hindering the coherence of the project.


Basic linkage, with some recommendations not clearly connected to objectives
Linkage is almost absent
Linkage is almost absent
Weak linkage, with recommendations appearing disconnected from objectives
Weak linkage, with recommendations appearing disconnected from objectives

No evidence of linkage between recommendations and objectives.


Basic linkage, with some recommendations not clearly connected to objectives
Linkage is almost absent
Linkage of recommendations to objectives is apparent, though not thoroughly developed
Strong and clear linkage of recommendations to the initial objectives
Strong and clear linkage of recommendations to the initial objectives.
The recommendation mostly linked to the research objectives

The link between the recommendation and objectives is good


The recommendations are clearly linked with the research objectives
The link between recommendations and objectives are good but also provide valuable insights
The recommendation and objectives is clear
No evidence of linkage between recommendations and objectives.
Weak linkage, with recommendations appearing disconnected from objectives

Linkage of recommendations to objectives is apparent, though not thoroughly developed


Basic linkage, with some recommendations not clearly connected to objectives

Weak linkage, with recommendations appearing disconnected from objectives


Linkage of recommendations to objectives is apparent, though not thoroughly developed
Linkage of recommendations to objectives is apparent, though not thoroughly developed
Weak linkage, with recommendations appearing disconnected from objectives

Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be
Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be
Or Basic linkage, with some recommendations not clearly connected to objectives.
Or Basic linkage, with some recommendations not clearly connected to objectives.
Or Basic linkage, with some recommendations not clearly connected to objectives.

Very basic or incorrect linkage, hindering the coherence of the project.


Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


Adequate linkage of recommendations to objectives, though some aspects may be less precise.
Weak linkage, with recommendations appearing disconnected from objectives.

Very basic or incorrect linkage, hindering the coherence of the project.


Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Basic linkage, with some recommendations not clearly connected to objectives.

Very basic or incorrect linkage, hindering the coherence of the project.


Weak linkage, with recommendations appearing disconnected from objectives.

No evidence of linkage between recommendations and objectives.


Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Very basic or incorrect linkage, hindering the coherence of the project.
Basic linkage, with some recommendations not clearly connected to objectives.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Weak linkage, with recommendations appearing disconnected from objectives.


Linkage of recommendations to objectives is apparent, though not thoroughly developed

Weak linkage, with recommendations appearing disconnected from objectives.


Establish robust communication channels and feedback mechanisms to engage donors continuously.
strategic plan, the presence of strong leadership, and the preservation of steady development are all necessary components for the successful implementation
The project employed a qualitative approach to gather comprehensive insights, complemented by quantitative analysis of survey data.
future research
Weak linkage, with recommendations appearing disconnected from objectives.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


Linkage is almost absent
This means that there is a high degree of linear relationship between cloud investment and material/inventory carrying cost, and they tend to move in oppos
this goal by providing a comprehensive analysis of the ethical challenges and proposing practical solutions to navigate them effectively
The findings of this study revealed important insights that contribute to the ever-changing environment of educational technology.

The Identification Function aids in developing an organizational understanding for managing digital security risk that may arise due to various elements like
Or Basic linkage, with some recommendations not clearly connected to objectives.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Weak linkage, with recommendations appearing disconnected from objectives.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
This conclusion further emphasizes the need of evaluating models for implementation and the activities that are part of them to make sure that important iss

Weak linkage, with recommendations appearing disconnected from objectives.


Digitization ensures data can be accessed from anywhere with an internet connection.

Creating an implementation scheme for strategic deployment of cloud computing solutions to enhance business agility and efficiency involves a step-by-ste
information, they make more reliable predictions about future financial performance, supporting informed decision-making and long-term planning initiativ
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Use real-time monitoring tools to track progress and address issues promptly during the migration process.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
their products or services on social media platforms, effectively leveraging their reach and credibility
There is a pressing need to infuse objectivity in CSR reporting particularly in annual reports where a ton of statements are impressions of intent and articula

The most important one is the lack of distributed cooperation among many points in the network.
Linkage is almost absent or entirely inappropriate.
Comparative study of ability management rehearses for ladies headway across different ventures

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


A cloud provider must manage the risks associated with the cloud computing environment in order to identify, assess, and prioritize those risks in order to r
It is possible that the study will be impacted by resource limits such as a lack of available financial resources or restricted access to specialized hardware or
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
The decentralized nature of blockchain technology provides robust protection against data tampering and unauthorized access
Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Organizations often rely on a single key person or group of individuals to create and operate information systems

As many individuals are not aware about the mutual funds the AMCs and other financial institutions should conduct to know the preference of the investor
software developers' rising concern for energy efficiency.
Applications can be submitted by various providers for emplacement along with furnishing information of infrastructure, facilities, medical and para-medic
YES
linked
LINKED
rateaw
Basic linkage, with some recommendations not clearly connected to objectives.
LINKED
Basic linkage, with some recommendations not clearly connected to objectives.
linked
linked
Very basic or incorrect linkage, hindering the coherence of the project.
linked
Basic recommendations with some gaps in implementation
Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be
linked
Linkage of recommendations to objectives is apparent, though not thoroughly developed. Or Basic linkage, with some recommendations not clearly connec
Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be
Linkage of recommendations to objectives is apparent, though not thoroughly developed. Or Basic linkage, with some recommendations not clearly connec
linked
Linkage of recommendations to objectives is apparent, though not thoroughly developed. Or Basic linkage, with some recommendations not clearly connec
Clear and conclusions are derived from the analysis.
Linkage of recommendations to objectives is apparent, though not thoroughly developed. Or Basic linkage, with some recommendations not clearly connec
Linkage of recommendations to objectives is apparent, though not thoroughly developed. Or Basic linkage, with some recommendations not clearly connec
It is advised that you create a plan for modifying your GAI approach as technology advance
address challenges and ensure a smooth transition.
Linkage of recommendations to objectives is apparent, though not thoroughly developed. Or Basic linkage, with some recommendations not clearly connec
Linkage of recommendations to objectives is apparent, though not thoroughly developed. Or Basic linkage, with some recommendations not clearly connec
Linkage of recommendations to objectives is apparent, though not thoroughly developed. Or Basic linkage, with some recommendations not clearly connec
Implement advanced inventory management systems to optimize stock levels, reduce stock outs, and improve overall inventory turnover rates
Linkage of recommendations to objectives is apparent, though not thoroughly developed. Or Basic linkage, with some recommendations not clearly connec
Linkage of recommendations to objectives is apparent, though not thoroughly developed. Or Basic linkage, with some recommendations not clearly connec
They achieved greater data availability, scalability, and cost savings by transitioning from an outdated infrastructure to a modern cloud-based platform.
Provide training and awareness programs for employees and managers on the benefits of diversity and inclusion
Linkage of recommendations to objectives is apparent, though not thoroughly developed. Or Basic linkage, with some recommendations not clearly connec
Linkage of recommendations to objectives is apparent, though not thoroughly developed. Or Basic linkage, with some recommendations not clearly connec
Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be
are hesitant to switch to digital payment methods.
performance evaluation sheet.
Strong and clear linkage of recommendations to the initial objectives. Or Adequate linkage of recommendations to objectives, though some aspects may be
Or Basic linkage, with some recommendations not clearly connected to objectives.
guide for researchers, corporate leaders, and lawmakers to strategically utilize AI in order to advance sustainable development and improve quality of life
Admin can use this data for future analysis and future improvements to use more suitable algorithms which can achieve higher accuracy in predict personal
comparative studies have revealed that a majority of public sector mutual fund schemes have underperformed in comparison with private sector schemes
Or Basic linkage, with some recommendations not clearly connected to objectives.
Or Basic linkage, with some recommendations not clearly connected to objectives.
he model used must be simple and fast enough to detect the anomaly and classify it as a fraudulent transaction as quickly as possible.
ach study has always a limitation and they are mainly because of each problem statement has various aspects which are hard to cover in stipu
Linkage of recommendations to objectives is apparent, though not thoroughly developed. Or Basic linkage, with some recommendations not clearly connec
These opportunities, in particular, extend to low risk, low specialized knowledge, and guaranteed markets
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Develop a dynamic regulatory framework that adapts to technological advancements and emerging trading practices
Considering the impact of regulatory requirements and compliance standards on the implementation of IT tools and strategies in the banking sector.
the literature evaluation, which guarantees that the study is based on accepted practices and expertise.
Linkage of recommendations to objectives is apparent, though not thoroughly developed
Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Promoting the adoption of the helpline system requires targeted outreach and marketing efforts to raise awareness and attract users.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Contribution to the host company Data is easier to get than before. In order to enhance the effectiveness of business procedures, all organisations gather per
address key areas such as tool development, implementation strategies, integration with existing processes, user training, and future research directions.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
The research purchased Compared to households with stronger social security but lower education levels, those in rural areas with educated heads and lowe
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
AI can provide highly customized financial services by analyzing enormous volumes of customer data.
regarding receipts and payments across different departments

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


These findings and conclusions highlight the significant impact of AI-based chat bots on IT service management processes and underscore their strategic im
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Linkage of recommendations to objectives is apparent, though not thoroughly developed
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Strong and clear linkage of recommendations to the initial objectives
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
More and more workers are looking for employers who can help them increase their knowledge and skills.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Basic linkage, with some recommendations not clearly connected to objectives.

Basic linkage, with some recommendations not clearly connected to objectives.


Weak linkage, with recommendations appearing disconnected from objectives

SOMEWHAAT THE OBJECTS ARE LINKED BUT NOT COMPLETELY MAPPED


Basic linkage, with some recommendations not clearly connected to objectives.
Weak linkage, with recommendations appearing disconnected from objectives
Some objectives are linked
ALL THE OBJECTIVES HAVE BEEN PROPOERLY LINKED WITH OBJECTIVE
connected to objectives.
Very basic or incorrect linkage, hindering the coherence of the project.
ALL THE OBJECTIVES ARE LINKED WITH THE RECOMMENDATION
EVERY OBJECTIVE IS LINKED TO THE OUTCOME
Very basic or incorrect linkage, hindering the coherence of the project
ALL THE OBJECTIVES ARE MAPPED TO THE RECOMMENDATION
RECOMMENDATIONS ARE ALL LINKED WELL WITH THE OBJECTIVE
Adequate linkage of recommendations to objectives, though some aspects may be less precise.
Basic linkage, with some recommendations not clearly connected to objectives.
Basic linkage, with some recommendations not clearly connected to objectives.
all the objectives are linked with recommendations
Very basic or incorrect linkage, hindering the coherence of the project.
every aim is LINKED with therecommendations
Basic linkage, with some recommendations not clearly connected to objectives.
WELL EXPLAINED
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Basic linkage, with some recommendations not clearly connected to objectives.

Basic linkage, with some recommendations not clearly connected to objectives.


Basic linkage, with some recommendations not clearly connected to objectives.
Basic linkage, with some recommendations not clearly connected to objectives.
LINKED
LINKED
Very basic or incorrect linkage, hindering the coherence of the project.

Weak linkage, with recommendations appearing disconnected from objectives.

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


Linkage of recommendations to objectives is apparent, though not thoroughly developed.

To identify the key factors driving the growth of mutual funds in India, such as regulatory reforms, investor awareness, and technological advancements.
To understand the effectiveness and limitations of different risk assessment models.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
connected to objectives
Or Basic linkage, with some recommendations not clearly connected to objectives.
connected to objectives.
mitigate potential revenue impacts
different levels to ensure that the data is not lost anywhere outside.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
recommendations of objectives is under , though not complete developed.Or Basic linkage,the recommendations some clearly connected to objective
connected to objectives
connected to objectives.
connected to objectives.
Advancement system should be incredibly clear and express. It should be given suitably to all the workers. It will stop unsettling and ridiculous sensation o
This is especially true when it comes to selecting suppliers, negotiating agreements, and maintaining outsourced solutions.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Bio metric authentications in AI technologies such as fingerprint scanning are employed for bio metric authentication in digital payment systems, enhancing
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
connected to objectives.
themselves in the market
Strong and clear linkage of recommendations to the initial objectives
object also more important in project to fill the solution of what we expect to cover

More the object concentration of problems solving and results


The objective are focused more Deep problem and scope
Evidence for problem to finalize and take a action is a project
Strong and clear linkage of recommendations to the initial objectives.

More sufficient problems solving with the limited source to define


Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Adequate bibliography, with some notable omissions or inaccuracies.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
The objective may consider more depth problem
Linkage of recommendations to objectives is apparent, though not thoroughly developed.

The objective follow available sources consideration

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


The objective to enable with source of information available
The objective may consider source of information available
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
connected to objectives effective
Linkage of recommendations in objectives is apparent, though more thoroughly developed.
Weak linkage, with recommendations appearing disconnected from objectives.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.

Strong and clear linkage of recommendations to the initial objectives.


Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Linkage of recommendations to objectives is apparent, though not thoroughly developed
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Strong and clear linkage of recommendations to the initial objectives.
The processor may then participate sub-processors to simply help it fulfill its contract using the consumer.
Strong and clear linkage of recommendations to the initial objectives
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Linkage of recommendations to objectives is apparent, though not thoroughly developed
Linkage of recommendations to objectives is apparent, though not thoroughly developed
These tools enable you to track and optimize your online advertising campaigns across different platforms and channels.
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Invest in AI-driven social media analytics tools that offer comprehensive data processing capabilities, including sentiment analysis, predictive analytics, and
ey execution markers hugely affected hierarchical execution and among interesting pointers benefit had a bigger effect
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Develop a robust change management strategy to address resistance, foster acceptance, and promote user adoption
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Linkage of recommendations to objectives is apparent, though not thoroughly developed
To inform and educate people about the policies, programmed and achievements of the Government of India though multi-media publicity
The use of blockchain innovation was increasing daily. Like a outcome, more folks are enrolling in blockchain curriculum.
Collaboration with Stakeholders: Collaboration with banks, government agencies, and industry stakeholders can address user adoption barriers by providing
A method to overcome these problems needs proper attention and sometimes handling of unbalanced data sets leads to biased conclusion
across the organization
The integration of advanced information technology in electric vehicles is revolutionizing the automotive industry, enhancing performance, user experience
Linkage of recommendations to objectives is apparent, though not thoroughly developed.
Weak linkage, with recommendations appearing disconnected from objectives.

Linkage is almost absent or entirely inappropriate.


problem-solving and decision-making to the current work environment.
Or Basic linkage, with some recommendations not clearly connected to objectives.
Q9 Remarks

Weak bibliography

Sufficient bibliography

Adequate bibliography
Adequate bibliography
Adequate bibliography
Adequate bibliography
Sufficient bibliography
Bibliography is sufficient

Adequate bibliography

Bibliography is enough
Adequate bibliography
Adequate bibliography

Adequate bibliography
Very basic bibliography

Adequate bibliography

Sufficient bibliography
Adequate bibliography

No evidence

Adequate bibliography, with some notable omissions or inaccuracies.


Sufficient bibliography
Adequate bibliography, with some notable omissions or inaccuracies.
Weak bibliography
Adequate bibliography, with some notable omissions or inaccuracies.
Bibliography are adequate
Bibliography was sufficient

Adequate bibliography, with some notable omissions or inaccuracies.


Adequate bibliography, with some notable omissions or inaccuracies.

Sufficient bibliography
Bibliography is enough

Adequate bibliography, with some notable omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies.

clear bibliography
sufficient Bibliography
Adequate bibliography, with some notable omissions or inaccuracies.
Bibliography is adequate
adequate Bibliography
Bibliography is adequate
Bibliography is adequate
Bibliography is fine

Not covered all sources


Bibliography are adequate to the study

Bibliography is almost absent or entirely inappropriate


good bibliography reference is given
Bibliography are generally good but need diverse sources
Bibliography are generally good but need diverse sources
Bibliography are good but need to include recent research field
Adequate bibliography with notable ommissions
Well-constructed bibliography with minor omissions or inaccuracies
strong bibliography is needed
Adequate bibliography with some inaccuracies reference

need more bibligraphy for future reference


Bibliography are generally good but need diverse sources

strong bibliography is given for refernce


Bibliography are good but need to include recent research field

adequate biliography is used in this study for reference


Adequate bibliography with notable ommission
Adequate bibliography, with some notable omissions or inaccuracies.

Bibliography adequate but need to give more diverse source

Bibliography are good but required to give recent sources

Weak bibliography ,lacking 0f references


Well-constructed bibliography with minor omissions

inaccuracies.
Bibliography is almost absent
Bibliography is almost absent or entirely inappropriate
Weak bibliography need more references
Weak bibliography need proper reference
Bibliography are good but need to include recent research field
Bibliography are generally good but need diverse sources

Bibliography are generally good but need diverse sources


Bibliography are good but need to include recent research field
Bibliography are generally good but need diverse sources
Lack of bibliography ,need diverse sources
Bibliography are good but need to recent research references

Bibliography are generally good but need diverse sources

Bibliography are good but need to recent research field


Bibliography are generally good but need diverse sources

Bibliography are appropriate but need diverse sources


Bibliography are good but need to recent research field
well structured bibliography
Bibliography are good but need to recent research reference
Sufficient bibliography
Lack of bibliography need more reference

Bibliography is sufficient
Bibliography is sufficient

Bibliography are good but need to recent research reference


Bibliography is sufficient but not good
Bibliography are generally good but need diverse sources
Lack of bibliography need to give diverse source
Bibliography is adequate
Bibliography are generally good but need diverse sources
Bibliography are wrote good
Lack of bibliography need to give more reference for further studies
Bibliography are generally good but need diverse sources
Weak bibliography need more reference
Bibliography are generally good
Lack of bibliography ,required to give more reference
Bibliography are good but need to recent research reference
Some more references could be included
Study is conducted based on appropriate references
Bibliography are sufficient
Suggest to refer more articles, journal and magazines

Some more references could be included suggest to refer more articles, journal and magazines
All the references are used good for research work
Bibliography data not founded
Study is conducted based on appropriate references work
Study is conducted based on appropriate references
Basic bibliography, with several omissions or inaccuracies.
Week bibliography need reliable sources
Basic bibliography, with several omissions or inaccuracies.

Adequate bibliography but there is some notable inaccuracies


Bibliography is not given
Bibliography are generally good but need diverse sources
Bibliography is missing

Bibliography are clear


Basic bibliography, with several omissions or inaccuracies.
No evidence of any bibliography
Adequate bibliography, with some notable omissions or inaccuracies.
Bibliography are generally good but need diverse sources
strong bibliography used in this project

Weak bibliography is given need reliable sources


Adequate bibliography, with some notable omissions or inaccuracies.

strong bibligraphy is given


Bibliography are good but need to include recent research field
Weak bibliography, lacking key references or proper citation.

Weak bibliography ,lacking of key reference


Bibliography is fine

Bibliography is adequate
Bibliography is enough
Adequate bibliography, with some notable omissions or inaccuracies.

Sufficient bibliography
Adequate bibliography, with some notable omissions or inaccuracies.
Adequate bibliography
Adequate bibliography

adequate biliography

Bibliography is fine
Bibliography is sufficient

Primary bibliography
weak bibliography

Basic bibliography
Adequate bibliography
adequate bibliography
Bibliography is fine
adequate bibliography
adequate bibliography
Bibliography is fine
Bibliography is normal
Weak bibliography
Adequate bibliography
Study is conducted based on appropriate references work was good
Some more references could be included
Adequate bibliography
Some more references could be included
Suggest to refer more articles, journal and magazines also weblinks
Study is conducted based on appropriate references
All the references are used good
Bibliography was clear
Bibliography preparation is adequate
Refer more articles, journal and magazines for research work
Suggest to refer more articles, journal and magazines
Suggest to refer more articles, journal and magazines
Some more references could be included
Some more references could be included
Study is conducted based on appropriate references work

Adequate bibliography, with some notable omissions or inaccuracies.


Adequate bibliography, with some notable omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.
Bibliography is sufficient
Bibliography is adequate
Adequate bibliography, with some notable omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies
Adequate bibliography, with some notable omissions or inaccuracies.
Bibliography is clear
Bibliography is good
Adequate bibliography, with some notable omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies.


Bibliography is sufficient
Adequate bibliography, with some notable omissions or inaccuracies.
Sufficient reference
The magazines, books, journals and web links referred for the study was mentioned good. Need more references to be added
The Journals referred and web links were stated enough and need to search more for the study.

The web links referred for the study was mentioned good.

The web links referred for the study was mentioned good.
The magazines, books, journals and web links referred for the study was mentioned good. Need more references to be added

The web links referred for the study was not mentioned properly.

The Journals referred and web links were stated good and need to search more for the study.

The Journals referred and web links were stated enough and need to search more for the study.

The magazines, books, journals and web links referred for the study was not mentioned good. Need more references to be added
The student gave well-constructed bibliography with minor omissions

Other subject file

inaccuracies.

inaccuracies.
inaccuracie
Well-constructed bibliography with minor omissions or inaccuracies.
Well-constructed bibliography with minor omissions or inaccuracies.

Well-constructed bibliography with minor omissions or inaccuracies

Well-constructed bibliography with minor omissions or inaccuracies.

Well-constructed bibliography with minor omissions or inaccuracies.

Well-constructed bibliography with minor omissions or inaccuracies.

Well-constructed bibliography with minor omissions or inaccuracies.


Well-constructed bibliography with minor omissions or inaccuracies.

Well-constructed bibliography with minor omissions or inaccuracies.


Well-constructed bibliography with minor omissions or inaccuracies.

Good
Good

Well-constructed bibliography with minor omissions or inaccuracies.

Well-constructed bibliography with minor omissions or inaccuracies.

Good
Well-constructed bibliography with minor omissions or inaccuracies.
Good
Basic bibliography, with several omissions or inaccuracies.
Good
need more bibliography
Study is conducted based on appropriate references.
Refer more articles, journal and web-links for related to project
more bibliography
Study is conducted based on appropriate references.
Refer more articles, journal and web-links for related to project
there is no bibliography

there is no bibliography
Shaping the future of distributed ledgers and decentralized technologies

Study is conducted based on appropriate references.


Processes:
more bibliography
Study is conducted based on appropriate references.
management studies in the construction industry." Journal ofQuality in Maintenance Engineering, 19(4), 404-429
reliability of the research
Study is conducted web-based references only.

Refer more articles, journal and web-links for related to project


there is no bibliography
The Promise and Potential of Big Data Analytics in Healthcare

need more bibliography


Study is conducted based on appropriate references.
Study is conducted based on appropriate references.

Many articles, journals are need to give clearly in this project


Study is conducted based on appropriate references.
there is more bibliography is good

need more bibliography

only few bibliography


Refer more articles, journal and web-links for related to project

only few bibilography


more bibliography
only few bibliography
more bibliography

Refer more articles, journal and weblinks for related to project


Study is conducted based on appropriate references.

only few bibliography


Many articles, journals are given in this project

only few bibliography


need more biblography
only few bibliography

Study is conducted based on appropriate references.


Many articles, journals are need to give clearly in this project
Refer more articles, journal and web-links for related to project

of sources.

need more bibliography


need more bibliography

need more bibliography

need more bibliography


need more bibliography

omissions or inaccuracies

need more bibliography

need more bibliography


Many articles, journals are given in this project

mentions some new books and web sites.


specify some clear new books and websites also
analysis. Journal of Purchasing and Supply Management,
Refer more articles, journal and web-links for related to project
there is no bibliography
Refer more articles, journal and web-links for related to project

more information of bibliography


Introduction to Cloud Computing. In Cloud Computing: Principles and Paradigms

need more bibliography


Engineering and Technology,
Refer more articles, journal and web-links for related to project

Refer more articles, journal and web-links for related to project


need more bibilography
Indian Express Digital news paper
Data collection was conducted through semi-structured interviews with managers, observations, online resources, books, and journal articles. Many articles

Not mention any of books, journal, articles used for the project work. Many articles, journals are need to give clearly in this project
Bibliography information are provided well.
Many articles, journals are given in this project

Bibliography information are provided well.


need more bibliography

Many articles, journals are need to give clearly in this project


need more bibliography
need more bibliography
"Global Economic Prospects: A Fragile Recovery." World Bank Group,
Many articles, journals are need to give clearly in this project
Well-constructed bibliography with minor omissions or inaccuracies.
Well-constructed bibliography with minor omissions or inaccuracies.

Good
No referance
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Good

Well-constructed bibliography with minor omissions or inaccuracies.


Need better formation

Good
Well-constructed bibliography with minor omissions or inaccuracies.
Well-constructed bibliography with minor omissions or inaccuracies.
Well-constructed bibliography with minor omissions or inaccuracies
Well-constructed bibliography with minor omissions or inaccuracies.
Good
Well-constructed bibliography with minor omissions or inaccuracies.

Need to improve

Need better formation


Need to improve
Nil
Basic bibliography, with several omissions or inaccuracies.
Good
Need better fomation
Need better formation

Well-constructed bibliography with minor omissions or inaccuracies.

Well-constructed bibliography with minor omissions or inaccuracies.


Good
Good
Good

Well-constructed bibliography with minor omissions or inaccuracies.

Basic bibliography, with several omissions or inaccuracies.

Good
The Journals referred and web links were stated enough and need to search more for the study.
The Journals referred and web links were stated good and need to search more for the study.
Good
The Journals referred and web links were stated enough and need to search more for the study.

Need better formation


The Journals referred and web links were stated enough and need to search more for the study.
The journals referred for the study was mentioned good.

The Journals referred and web links were stated enough and need to search more for the study.
The web links referred for the study was mentioned good.

The linking of the recommendations was not made appropriate for the study.
need more bibliography
omissions or inaccuracies.
need more bibliography

excellent bibliography
need more bibliography
need more bibliography
need more bibliography

omissions or inaccuracies

need more bibliography

notable submissions or inaccuracies and relevant books of explanation needed


need more bibliography

need more bibliography

need more bibliography


need more bibliography
need more bibliography

need more bibliography

need more bibliography


need more bibliography
inaccuracies.

inaccuracies.

inaccuracies.
More suitable website are available and may use more books

inaccuracier

inaccuracies.

More reference materials are reviewed and presented in the project report under Bibliography section of the report.
Less number of reference materials are reviewed. This part may be given more focus.
Good number of reference materials are reviewed and presented in the bibliography section of the report.

More reference materials are reviewed on solar energy system and management.
Reference materials are sufficient. They are mentioned in the report under bibliography section.
More reference materials are given in the project report. It shows that bibliography part is remarkable one.

Reference materials like books, journals, websites, conference proceedings and research papers are reviewed and they are clearly shown in the bibliography
Sufficient reference materials are reviewed and referred. In bibliography section, they are quoted with appropriate citations.
Reference materials are not adequate. Extensive reference is lack.
adequate bibliography,with 14 books refered.
need more data
Reference materials are limited. Needs more reference for this innovative title.
need more references
refer more data
refer more bools
Reference materials are enough. More reference materials are referred and given bibliography section.
refer more data
refer more data and books
Reference materials are very limited. In bibliography , only 13 references are given.
Reference materials given are more in number .but usage of reference materials to understand the concepts and key areas is not satisfactory.

Reference materials given are satisfactory. Needs to review more reference to have a better understanding about the concepts and key areas.
Reference Materials are satisfactory. Needs to refer more journal research articles.
No bibliography part in the project report.
Bibliography is not properly presented in the project report.
Reference section is sufficient. More number of recent articles may be reviewed for better understanding of concepts and key areas.
Adequate e-reference materials are refereed and reviewed. Lack of reference of journals, books and research reports

Sufficient bibliography has been given.

Sufficient bibliography has been given.


Very basic bibliography is provide.

Sufficient bibliography has been given.


Adequate bibliography with some proper citation has been given

accurate bibliography with proper 24 books referred with proper citation.


Bibliography is provided in this project.
Bibliography is provided in this project.
many books referred.
Very basic bibliography is provided in this project.
Sufficient bibliography has been given.
Bibliography is provided in this project.
many books referred
not more book refereces given
8 books referred
more web references given
10 books referred
more book and web references given
more web references given.
more web references and book references given
not more book references and web references given
Bibliography is provided in this project.
Sufficient bibliography has been given
14 book references given
34 book references given
more book references and journal articles link given
more web references given
Bibliography is provided in this project.
Very basic bibliography is provide.
27 book references given
not more book and web references given.

Very basic bibliography is provided.

more book references given.


web references and book references used

book and web references used

book references and web references given


book references and web references given

many web references given


more book references and we references given

12 books referred
13 Book references given
various book references given
need more book references
need more book and web references
Adequate bibliography with some proper citation has been given.

Bibliography is provided in this project.

Bibliography is provided in this project.

Few reference materials are given in the bibliography section.


Reference materials reviewed and presented in the bibliography section.

Adequate reference materials are listed out in the bibliography section.


More reference materials are given in bibliography section of the project report.

Reference materials are sufficient.

Reference materials given in bibliography are satisfactory.

Needs more reference materials.


Reference materials given are not satisfactory.
No bibliography section in the report.

30 Book references given


11 book references given
many books, journals and websites can know cloud computing properly and get information about it.

many book references given

many book references given.

many book references given

various book references given

various book and web references given

20 book references given

Adequate number of reference materials are given under bibliography section with proper citation.
More references need to include articles,journal and magazines

All the references are used good


Some inaccurate bibliography are used. Suggest to avoid it.

Some more references could be included in future

More articles, journal and books are need to refer the research work.
need more publication Research and Development of Online Examination System.

need more number of publication it help quality of the project


need some more publications it helps project quality level.
need more no of publications it si help quality of project

have publication need some more publication helps quality of the project
need some more no of publication helps quality of the project.

Website links only used in future refer more articles, magazines and books
Need to include more journal, articles and magazines for reference
Need to improve
Good
All the references are used good
Suggest to refer latest journal and articles
Good
Good
All the references are used good for research work
Some inaccurate bibliography are used. Suggest to avoid it.
Some more references could be included
Good
Good
Refer more articles, journal and weblinks for related to study work
Suggest refer latest journal and articles, your few bibliography 20 years before it's not good for today research work
Good
Include more journal articles and magazines
Need to improve
Some more references could be included
Suggest to refer more articles, journal and magazines
Good
Good
Some more references could be included for research work
Some more references could be included
Need to improve
Nil
Need to improve
Good
Some more references could be included
Suggest few more articles, journal and magazines are refer for research work
Need to improve
Some more references could be included articles, journal and magazines
Good
Need to improve
All the references are used good
Need to improve
Good
Some more references could be included
All the references are used good
Need to improve
All the references are used good suggest to refer more articles, journal and magazines
Need to improve
Study is conducted based on appropriate references was good
Study is conducted based on appropriate references
Study is conducted based on appropriate references work
Need to improve
Good
Some more references could be included
Need to improve
All the references are used good

Refer articles, journal and magazines also for research work

All the references are used good

All the references are used good


Some more references could be included
Need to refer more articles, journal and magazines for research work
Some more references could be included, refer more articles, journal and magazines

Some more references could be included


All the references are used good

Some more references could be included


Suggest to refer more articles, journal and magazines
Need to iprove
Good
Good
good
good
average
good
average
All the references are used good

good
Refer more articles, journal and magazines
good
Refer more articles journal and magazines
good
Study is conducted based on appropriate references work
need to improve
good
need to improve
Suggest to refer more articles, journal and magazines
good
need to improve
Some more references could be included more articles, journal and magazines
All the references are used good
Study is conducted based on appropriate references work good
Refer more articles, journal and magazines for research work
Some more references could be included
good
Some more references could be included
average
Refer more articles, journal and magazines
need to improve
need to improve
Study methodology is conducted based on appropriate references
All the references are used good
need to improve
All the references are used good
Reference data not founded
good
average
Some more references could be included for research work
need to improve
average
need to improve
average
Only a very few reference materials are given in bibliograhy section in the report.

More reference materials are referred and reviewed. They are presented in the report under bibliography section. Reference part is good.

Proper reference materials are not mentioned in the bibliography section of the report.

Reference part is satisfatory.


No bibliography part is given in the project report.

Adequate reference materials are given in the bibliography section of the report.
Adequate reference materials are given in the report. Bibliography part is satisfactory.

Sufficient reference materials are given in the report under bibliography section of the report.
The reference materials are sufficient. they are list out in the bibliography section of the project.
Reference materials reviewed are enough to have complete understanding about the climate change and agricultural productivity.
No bibliography section in the report.

Sufficient reference materials are given in the project.


Adequate reference materials are referred and reviewed. They are given in the project report under Bibliography.

The reference materials given are not sufficient and needs improvements.
Reference part needs more improvement.
Some more references could be included for research work it's not enough
Good
Bibliography no data founded
Study work is conducted based on appropriate references
Need to improve
Refer more articles, journal and magazines for research work
Need to improve
Refer few more articles, journal and weblinks
Need to improve
All the references are used good
Bibliography was used in the study
3 RELEVANT BIBLIOGRAPHY GIVEN
Reference are used good for study work
BOOKS AND WEB SOURCES GIVEN
Some more references could be included
SATISFIED WITH THE BIBILIOGRAPHY GIVEN
ADEQUATE BIBILIOGRAPHY GIVEN
All the references are used good, study is conducted based on appropriate references
Study is conducted based on appropriate references work was good
Reference are not clearly given, suggest to refer more articles, journal and magazines in future
bibliography given is relevant to the topic selected
correct bibliography given
Some more references could be included.
relevant bibliography is given
Suggest to avoid 15 years back articles and journal refer latest journal and articles
ways the bibliographyis not satisfied
Some more references could be included
references only given
references only given
Study is conducted based on appropriate references
All the reference are used good for research work
right bibliography given
relevant bibliographies
bibliography is correct
Bibliography no data founded
Some more references could be included
Need to improve
Some more references could be included
Study is conducted based on appropriate references work
Some more references could be included for research work
Bibliography data not founded
Bibliography not mentioned
All the reference are used good refer weblinks magazine in future
Need to improve
Reference is not enough refer more number of Articles, journal and magazines
Need to improve
Good
Good
Limited number of journal weblinks and books used need to refer more references
good
Refer more number of journal, weblinks, magazine etc in future
Need to improve
Refer more number of journal weblinks and books in future
Need to improve
good
Reference are used good refer more magazines and weblinks etc
study is conducted based on appropriate references.
good
need to improve
need to improve
All the reference are used good
All references are used good refer more magazines and websites etc in future
All the references are used good
Good
All the references are used good
Some more references could be included
All the references are used good for research work
Some more references could be included
All references are used good
All the references are used good for research work
All the references are used good for research work
Some more references could be included
All the references are used good
Good

The bibliography provided is basic, though it contains several omissions and inaccuracies that need to be addressed for completeness and accuracy.
The bibliography is weak, as it lacks key references and proper citations, compromising the credibility and thoroughness of the sources used in the study.

The bibliography is weak, as it lacks essential references and proper citations, which are crucial for supporting claims and ensuring the credibility of the inf

The bibliography is very basic or incorrect, which significantly impacts the reliability and credibility of the sources used in the study. This undermines the o

The bibliography provided is basic, but it contains several omissions and inaccuracies, which may impact the thoroughness and credibility of the research.

The bibliography presented is weak, as it lacks key references and proper citations, which may undermine the credibility and thoroughness of the research
The bibliography provides a foundational base for the research, though it would benefit from addressing the identified omissions and inaccuracies to strengt

No evidence of any bibliography.


Improving the alignment between recommendations and objectives is essential for ensuring that the proposed actions effectively address the project's goals,

The bibliography is rudimentary, containing several omissions or inaccuracies of articles and books
needs more article references from national and international journals

need more books and articles for reference

The bibliography is adequate, but it contains some notable omissions or inaccuracies that could impact the thoroughness and reliability of the references use
Basic bibliography, with several omissions or inaccuracies needs more article references
Weak bibliography needs more national,international articles and books
The bibliography is basic, but it contains several omissions and inaccuracies that need to be addressed for completeness and reliability.

No evidence of any bibliography


The bibliography is basic, with several omissions and inaccuracies that need correction for completeness and accuracy.
The bibliography is well-constructed overall, with minor omissions or inaccuracies that should be addressed for completeness and accuracy.

Weak bibliography, lacking key references or proper citation.

The bibliography is comprehensive and accurately cited, ensuring proper referencing and credibility in the study of green initiatives .

notable omissions
Adequate bibliography

adequate bibliography,
Adequate bibliography
Adequate bibliography
notable omissions

comprehensive and accurate bibliography with proper citation.

comprehensive and accurate bibliography with proper citation.

Adequate bibliography, with some notable omissions or inaccuracies

bibliography with proper citation.


notable omissions or inaccuracies

notable omissions

adequate Bibliography is given


bibliography with proper citation.
lacking key references or proper citation.
notable omissions

No evidence of any bibliography

basic Bibliography
Adequate bibliography, with some notable omissions or inaccuracies
notable omissions or inaccuracies

notable omissions or inaccuracies


clear Bibliography needed
lacking key references

neat collection books


minimum Bibliography given
Adequate bibliography
Basic bibliography,
basic bibliography,
Basic bibliography,
Adequate bibliography,
notable omissions
Adequate bibliography is given
Adequate bibliography
neatly given
good bibliography

adequate bibliography
omissions

adequate Bibliography given


adequate Bibliography is given

adequate bibliography, with some notable omissions or inaccuracies.


Very limited bibliography was found. require more reputed journal and book references
few website links are given. more reputed journals are needed

Bibliography is not given


few journals are mentioned. require more website links and reference books
not mention any reputed journals, articles and website links

few website links are mentioned. require more reputed journal and book reference

bibliography was given very well

many website links are mentioned. but need more reputed journals and book references
few journals are mentioned. require more website links and book references
Weak bibliography, lacking key references or proper citation
Comprehensive and accurate bibliography with proper citation supporting the study

Basic bibliography, with several omissions need more articles and books reference

Weak bibliography, lacking key references or proper citation need articles and books more
Adequate bibliography, with some notable omissions or inaccuracies.
Weak bibliography, lacking key references or proper citation of articles and books

The bibliography is weak, lacking key references and proper citations. Improving the citation quality and including essential sources would strengthen the p

The bibliography is adequate, but there are some notable omissions or inaccuracies that should be addressed for completeness and reliability.

The bibliography is comprehensive and accurately cited, reflecting proper citation practices.

A comprehensive and accurate bibliography with proper citation ensures the credibility and reliability of the sources used in the research or study.

There is a weak linkage observed, as recommendations seem disconnected from the stated objectives, requiring a more cohesive alignment to ensure they ef
Adequate bibliography
adequate Bibliography used
Adequate bibliograph

adequate Bibliography given

inadequate Bibliography

adequate Bibliography drawn

notable omissions
adequate Bibliography given

notable omissions
Bibliography drawn

adequate Bibliography used


basic Bibliography drawn
notable omissions or inaccuracies
Bibliography is stated strongly with suitable data for study
No evidence of any bibliography.
The bibliography is foundational but contains several omissions or inaccuracies that detract from its completeness and reliability.
The bibliography is notably weak as it lacks crucial references and fails to adhere to proper citation practices.

Adequate bibliography with same objectives


comprehensive and adequate bibliography is drawn

comprehensive bibliography with relevant objectives

adequate bibliography with some inaccuracy

Comprehensive and accurate bibliography with relevant objectives

Adequate bibliography with related to the objectives


Comprehensive and accurate bibliography
Adequate bibliography with objectives
Adequate bibliography with notable some omission

Weak bibliography need more reference

Adequate bibliography is drawn


Adequate bibliography with relevant with the objectives
adequate bibliography with some notable omission
Basic bibliography with suitable for objectives

Adequate bibliography with suitable for objectives

Weak bibliography for lacking of reference


bibliography with proper citation.
bibliography with proper citation.

notable omissions or inaccuracies

omissions or inaccuracies

notable omissions or inaccuracies.


Study is conducted web-based references only.
Need to improve

Good

Good

Good
Good
Need to improve

Good

Good

Good

Good

Appropriate bibliography is given with enough sources of information


Adequate bibliography is given with some inaccuracies
Very basic bibliography is given with insufficient resources
Basic bibliography without any required e-resources
Adequate bibliography is done with enough e-resources
Need to impriove
Weak bibliography is given with insufficient references
Enough bibliography is given
Good
comprehensive and accurate bibliography
Basic bibliography is given with less inaccuracies
adequate bibliography with notable to your study
Weak bibliography , its very basic bibliography
Weak bibliography is given with many inaccuracies
Adequate bibliography is given
Basic Bibliography with more inaccuracies is given
Basic Bibliography is given with minor inaccuracies
Adequate bibliography is given without e-references
Basic bibliography is given with many inaccuracies
Weak bibliography is given without mentioning enough sources
Basic bibliography with insufficient citations
Entirely inappropriate bibliography is given
Adequate bibliography is given
Adequate bibliography with some inaccuracies
Simple bibliography with not enough references
The journals and web links referred for the study were mentioned good.
The journals referred for the study was mentioned good.
The Journals referred and web links were stated good and need to search more for the study.
The Journals referred and web links were stated good and need to use more for the study.
The Journals referred and web links were not stated good and need to search and use more for the study.
Far
The web links referred for the study was mentioned good, expected to refer journals more for the study
Need to improve
Good
The references for the study was not mentioned.
The journals and web links referred for the study was mentioned brief and need to use more for the study.
The journals and web links referred for the study was mentioned good. Need more references to be added
The journals referred for the study was mentioned good. Need to be used more for the study
Good
Good
The Journals referred and web links were stated but need to search more for the study.
Good
The Journals referred and web links were stated enough and need to search more for the study.

The Journals referred and web links were stated enough and need to search more for the study.
The Journals referred were stated enough and need to use more for the study will be good.
The web links referred for the study was need to be improved.
The journals referred for the study was mentioned good.
The Journals referred were stated good enough for the study
The Journals referred and web links were stated enough and need to search more for the study.

Good
Good
Good
Good
Good
Good
Good

Good
Good
Good

Good

Need to improve
Nil
Good

Good

Need to improve
Good

Good
Need to improe

Nil

Good

Good

Good

Good
Good

Good

Good
Weak bibliography, lacking key references or proper citation
Weak bibliography, lacking key references or proper citation
Weak bibliography, lacking key references
The journals that were referred for the study was mentioned good.
The journals referred for the study was mentioned good.
Very basic or incorrect bibliography, significantly impacting the reliability of sources.
Weak bibliography, lacking key references
The web links referred for the study was mentioned good and need to refer more journals and articles
The journals referred and used was needed to be mentioned more for the study.
The journals referred for the study was mentioned good.
Weak bibliography, lacking key references or proper citation
Weak bibliography, lacking key references or proper citation
Basic bibliography, with several omissions or inaccuracies
The journal references were used and stated well in the study
The journals that referred to be increased for the study and used were mentioned.
The journals and web links referred for the study was mentioned good.
The Journals referred and web links were stated enough and need to search more for the study.
The journals and web links referred for the study was mentioned good and expected to use more references.
Basic bibliography, with several omissions or inaccuracies
The journals referred for the study was mentioned good.
The web links referred for the study was mentioned but need to use more referred journals and articles for the study
The journals referred for the study was mentioned good.
The journals and web links referred are need to be improved for the study
The journals and web links referred for the study was mentioned good.
Good
Good
The web links referred for the study was mentioned good. Need more to be involved for the study.
Good
The journals referred for the study was mentioned good. Need more references to be considered.
Good
Far
Good
Good

comprehensive and proper bibliography

Basic bibliography is suitable for objectives

weak bibliography

Adequate bibliography is suitable with the objectives

Basic bibliography with the suitable objectives


Weak bibliography

Enough and adequate bibliography suitable with the objectives

only limited bibliography is suitable with the objectives


Adequate bibliography is suitable for objectives
Need more relevant bibliography with relevant objectives

Adequate bibliography, with linked with the objectives

weak bibliography
Weak bibliography need improvements

Adequate bibliography
need more reference connect with the objectives
Adequate bibliography

very weak bibliography


Adequate bibliography
Adequate bibliography with notable
Weak bibliography

adequate bibliography with suitable objectives

Need to align properly

Good
Need to improve

Good

Good
Good

Good

Need to improve

Need to improve

Nil
Good
Good
Good
Good

Good
Need to improve

Good

Good

Need to improve

Need to improve
Good

Good
The project's bibliography is very basic or incorrect, which severely impacts the reliability of its sources. This undermines the project's scholarly credibility

The project features a comprehensive and accurate bibliography with proper citations, enhancing the credibility and reliability of the sources used in the res
The bibliography is very basic and contains inaccuracies, which greatly affects the reliability and credibility of the sources cited in the project.
The bibliography is adequate overall, but there are notable omissions or inaccuracies that could be addressed to enhance the reliability and completeness of

The bibliography in the project is weak, as it lacks key references and proper citations, which could impact the reliability and credibility of the sources used
The bibliography is sufficient, though it lacks some key references or may contain inaccuracies that could impact the overall reliability of the sources cited.
The bibliography lacks essential references, undermining the depth and credibility of the research.
The bibliography provides a foundational reference list but lacks key sources and proper citations necessary for bolstering the reliability and credibility of th

The bibliography adequately supports the project but requires attention to address notable omissions and inaccuracies for enhanced credibility.

The bibliography is adequate overall, though there are noticeable omissions and inaccuracies that could be addressed for improved reliability and comprehe

The bibliography provided is rudimentary, with noticeable omissions and inaccuracies. Strengthening it by including relevant and accurate sources is essent

The bibliography provided is basic and contains several omissions or inaccuracies, highlighting the need for comprehensive sourcing to ensure a thorough a

The bibliography requires thoroughness and accuracy in sourcing, ensuring all relevant literature is included with proper citations to support the study's find
Enhance the bibliography by including key references that provide robust support and depth to the study

Enhance the bibliography by addressing notable omissions to ensure a comprehensive coverage of relevant literature on supply chain logistics innovation an
The bibliography provided is basic and contains several omissions, indicating a need for comprehensive sourcing to strengthen the study's credibility and de

*Improvement Needed: Strengthen the bibliography by including comprehensive and relevant sources to bolster the study's credibility and depth of research
Adequate Bibliography are found.

Limited references are given in the study

Very limited bibliography was found


No references were made in the project

Limited references were given in the study


Limited references were given. All the references are related to the specified objectives

Minimum references were made in the study


The project's bibliography needs significant improvement with essential references and accurate citations to bolster its scholarly credibility and support its f

Need more references of books and articles


Bibliography is almost absent or entirely inappropriate.
The project's bibliography is weak, lacking essential references and proper citations, which undermines the credibility and scholarly rigor of the research pr
The project features a comprehensive and accurate bibliography, meticulously citing relevant sources to bolster the scholarly integrity and reliability of the

The project features a comprehensive and accurately cited bibliography, ensuring scholarly integrity and reliability in the research presented.
The project's bibliography is very basic or incorrect, significantly impacting the reliability and scholarly credibility of its sources and research findings.
No evidence of any bibliography

The project's very basic or incorrect bibliography significantly undermines the reliability and credibility of its sources and research findings. Strengthening
The project's weak bibliography diminishes its scholarly credibility and reliability due to inadequate references and citations.

The project has a weak bibliography, lacking key references and proper citations, which undermines its scholarly credibility and reliability.
Sufficient bibliography has been given.

Bibliography is provided in this project.

Very basic bibliography is provide

Sufficient bibliography has been given.

various e-resources and journals have been referred


eresources have been referred
Very basic bibliography is provided in this project
various e-resources and journals have been referred

few resources are referred but not link is given

various e-resources and journals have been referred


various e-resources and journals have been referred
few resources are referred

various e-resources and journals have been referred

Sufficient bibliography has been given.


Very basic bibliography is provided in this project
various resources have been referred
major resources are referred
Sufficient bibliography has been given
few resources have been referred

various e-resources and journals have been referred


Sufficient bibliography has been given
Sufficient bibliography has been given
few e-resources and journals have been referred
various e-resources and journals have been referred
Very basic bibliography is provided in this project
Sufficient bibliography has been given
Sufficient bibliography has been given
Adequate bibliography with some proper citation has been given
Very basic bibliography is provided in this project

various e-resources and journals have been referred


few resources have been referred
various e-resources and journals have been referred
few e-resources and journals have been referred
Very basic bibliography is provided in this project
various e-resources and journals have been referred
few e-resources and journals have been referred
provided few eresources

Very basic bibliography is provided in this project

various e-resources and journals have been referred

various e-resources and journals have been referred


Very basic bibliography is provided in this project

various e-resources and journals have been referred


various e-resources and journals have been referred
eresources have been referred
Very basic bibliography is provide
various e-resources and journals have been referred
various e-resources and journals have been referred
well written Bibliography

need more eresources

Internet links only provided and reference books have been missing in this bibliography.

Sufficient bibliography has been given


Internet links only provided and reference books have been missing in this bibliography.

There is no evidence of any bibliography

Adequate bibliography with some proper citation has been given.

Internet links only provided and reference books have been missing in this bibliography.
Adequate bibliography with some proper citation has been given.
Sufficient bibliography has been given.
Bibliography is provided in this project.

Sufficient bibliography has been given.

Very basic bibliography is provided in this project.


Adequate bibliography with some proper citation has been given
Very basic bibliography is provided in this project
Very basic bibliography is provided in this project.

various e-resources and journals have been referred


Adequate bibliography with some proper citation has been given
eresources have been referred

Very basic bibliography is provide


eresources only referred
only eresources are given
various e-resources and journals have been referred
Very basic bibliography is provided in this project
various e-resources and journals have been referred

Very basic bibliography is provided in this project


eresources have been referred

need clarity in giving references


Adequate bibliography with some proper citation has been given

various eresources are referred


Very basic bibliography is provided in this project

various eresources and journals are referred

Bibliography is well constructed


not enough for providing the link in this project. need more reputed journals.
journals are given. need more website links and reference books
need more reputed journal and website links
Accurate bibliography has given with good citation.
Weak bibliography, lack in key references.
require some other reference links
book references only mentioned. need more reputed journals and website links
Lacking of key references in the bibliography part.
Lack in key references and proper citation.
need some other reference the reputed journal and website links
not enough for providing the reputed journals.needed web site link in this project
Adequate bibliography with some notable omissions.

limited bibliography are given

not enough for providing the reputed journals. needed web site link in this project
more reputed journals are needed
journals are given. need more website links and reference books
reputed journal are written.need more website links
require additional references connection and reputable publication

few book reference and web site links are mentioned. need to search and use more for the study.

Basic bibliography, with several omissions or inaccuracies.


Basic bibliography, with several omissions or inaccuracies.

Basic bibliography, with several omissions or inaccuracies.


journal references only given. need more website links and reference books
Comprehensive and accurate bibliography with proper citation.

Basic bibliography, with several omissions or inaccuracies.


Comprehensive and accurate bibliography with proper citation.
Basic bibliography, with several omissions or inaccuracies.
needed other cited journal and website links for this project
Comprehensive and accurate bibliography with proper citation.
Basic bibliography, with several omissions or inaccuracies.
Well-constructed bibliography with minor omissions or inaccuracies.

Well-constructed bibliography with minor omissions or inaccuracies.


Basic bibliography, with several omissions or inaccuracies.
Well-constructed bibliography with minor omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Well-constructed bibliography with minor omissions or inaccuracies.
e-references are taken
E-references are taken
E-references are taken
Neatly specified bibliography with proper e-references
Clearly constructed bibliography is given with reliable sources of information
Well organized bibliography with enough sources of data
Incorrect bibliography with irrelevant sources
Very basic bibliography with minor inaccuracies
He used number of references are good to need website links
To need more references on this project
He used number of references are good
He used few references only
He used number of references are good
Needs to mention book references
Needs to mention some book and website references
Basic bibliography, with several omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.
Well-constructed bibliography with minor omissions or inaccuracies.
Comprehensive and accurate bibliography with proper citation.
Comprehensive and accurate bibliography with proper citation.
No evidence of any bibliography.
Well-constructed bibliography with minor omissions or inaccuracies.
not enough for providing the website link and reputed journal in this project
Adequate bibliography, with some notable omissions or inaccuracies.
Comprehensive and accurate bibliography with proper citation.
Well-constructed bibliography with minor omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Comprehensive and accurate bibliography with proper citation.
Weak bibliography, lacking key references or proper citation
Weak bibliography, lacking key references or proper citation
Bibliography is not given
Adequate bibliography, with some notable omissions or inaccuracies.
Very basic or incorrect bibliography, significantly impacting the reliability of sources.
Comprehensive and accurate bibliography with proper citation.
Weak bibliography, lacking key references or proper citation.
Weak bibliography, lacking key references or proper citation.

journal references are provided


only few e-resources given
various resources and journals are referred
various e-resources and journals have been referred
various e-resources have been referred
various eresources are referred
Bibliography reference was good
Refer more number of Articles and magazines it's also help to improve research work
Books, magazine and website resources are not used for reference work
All references are not used good refer more website,books and magazines in future
Refer latest journal and magazines
Reference was not enough only two links used Refer more journal,books etc
Good e-reference are taken
books,journals,Magazines are taken
Well-constructed bibliography with minor omissions or inaccuracies.
not enough for providing the link for this project
Bibliography was provided in good manner.
Basic bibliography, with several omissions or inaccuracies.
journals are given. need more website links and reference books
journal are given. but need more website links and references books
Basic bibliography, with several omissions or inaccuracies.
The student gave basic bibliography with several omissions or inaccuracies
The student gave very basic bibliography with some omissions and inaccuracies.
bibliography was given very well
not enough for providing the link in this project.
Bibliography given by the student is elementary. Reference relating to unpublished thesis, reputed journals and magazines are not given in the bibliography
Very limited bibliography was found
needed other cited journal and website links for this project
There are many omissions and lack in sequential order in the bibliography part.
not enough for providing the link in this project. need more cited journals.
The student Gave basic bibliography with some needed omissions
weak bibliography and key reference are lacking.
Key references are lack
Adequate bibliography with some notable omissions.
Adequate bibliography with proper citation
well constructed bibliography with minor omissions
Weak bibliography.Website link only given in the project. It seems student has not reviewed any books, journal and magazine.
Sufficient bibliography with notable omissions.
bibliography was given very well
Accurate bibliography with proper citation.
Very basic or incorrect bibliography, significantly impacting the reliability of sources.
only few books and web site links are given.Needed more cited journal, articles and website links
Adequate bibliography, with some notable omissions or inaccuracies.
Bibliography is not given
Adequate bibliography, with some notable omissions or inaccuracies.
Very basic or incorrect bibliography, significantly impacting the reliability of sources.
Comprehensive and accurate bibliography with proper citation.
Well-constructed bibliography with minor omissions or inaccuracies.
Comprehensive and accurate bibliography with proper citation.
Adequate bibliography, with some notable omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies
Basic bibliography, with several omissions or inaccuracies
few journal are mentioned. need more website links, books, and references of reputed journals
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Bibliography is not given
mentioned few reputed journal list and online link regarding this project
Basic bibliography, with several omissions or inaccuracies
Basic bibliography, with several omissions or inaccuracies
references journal are given. need more website links and book.

Basic bibliography, with several omissions or inaccuracies.


the bibliography is good response
good ideas of Bibliography
Add more book references and journals for others usage.

Very good references are listed and need to add some more web links related to this study.

Add more book references and journals for others usage.


Add more book references and journals for others usage.
Very good references are listed and need to add some more web links related to this study.

Add more references and web links related to this study.

Bibliography is good

Good
Need to improve
Need to improve
Bibliography of the project is clear
Very good references of Bibliography
Nil
more Bibliography is needed
the content of Bibliography is good
A sufficient bibliography, with some notable omissions.
The bibliography is weak and lacks key references.
Weak bibliography, lacking key references
Proper citation and a comprehensive bibliography.
Weak bibliography, lacking key references
Bibliography is lacking important sources.
Adequate bibliography, with some notable omissions
Adequate bibliography, with some notable omissions
Adequate bibliography, with some notable omissions
Add more book references, web links and case studies related to this study.
An adequate reference list, with some notable omissions.
Add more some web links to others usage.
Accurate and thorough bibliography with proper citation.
The bibliography is adequate, although there are some notable omissions.
Bibliography was weak and lacking key references

Adequate bibliography, with some notable omissions


A comprehensive and accurate bibliography with appropriate citations.
Weak bibliography, lacking key references.
Lots of web links and articles are listed and add some more book references to others research.
A comprehensive and accurate bibliography with appropriate citations.
Add more book references, web links and case studies related to this study.
There is an adequate bibliography, with some notable omissions.
There is an adequate bibliography, with some notable omissions.
Adequate bibliography, with some notable omissions
Add more book references, web links and case studies related to this study.
Bibliography is adequate, with some notable omissions or inaccuracies.
A comprehensive and precise bibliography that incorporates appropriate citations.
A decent bibliography, with some notable omissions.
Very good references are listed and need to add some more web links related to this study.
The bibliography is adequate, although there are some notable omissions.
Give more references to others usage.
There is no Bibliography of this project

Bibliography is lacking key references.


The bibliography is good response of this project
Add more book references, web links and case studies related to this study.
There is an adequate bibliography, with some notable omissions.
Give some more related journals and articles.
Lacking key references, weak bibliography.
The link between recommendations and objectives is evident, but it is not thoroughly developed.
No evidence of any bibliography.

A sufficient bibliography that lacks a few important entries

A sufficient bibliography that lacks a few important entries

A sufficient bibliography that lacks a few important entries


Adequate bibliography, with some notable omissions or inaccuracies.

A sufficient bibliography that lacks a few important entries

Basic bibliography, with several omissions or inaccuracies.

Adequate bibliography, with some important omissions.


Weak bibliography, lacking key references or proper citation.

Bibliography was adequate with some notable omissions


Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.

Sufficient bibliography provided

Weak bibliography, lacking key references or proper citation.

Sufficient bibliography are given

Some notable omissions or inaccuracies are noted in the bibliography.

Bibliography is adequate, with some notable omissions or inaccuracies.


Basic bibliography, with several omissions or inaccuracies.

No evidence of any bibliography.


Appropriate reference list provided
Bibliography is adequate, with some notable omissions or inaccuracies.
There is a weak bibliography, lacking key references or proper citation.
A sufficient bibliography, with some notable errors or omissions.
Adequate bibliography, with some notable omissions or inaccuracies.

Sufficient list of sources, for certain eminent oversights or mistakes.


Basic bibliography with numerous errors or omissions.

Basic bibliography, with several omissions or inaccuracies.


Adequate bibliography, with some notable omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.

Basic bibliography, with several omissions or inaccuracies.


Basic bibliography with numerous errors or omissions.

An adequate reference list, with some notable omissions.


A lackluster bibliography and key references
Bibliography is adequate, with some notable omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies.


A complete and correct list of sources with proper citations.

Weak bibliography, lacking key references or proper citation. Or Very basic


Weak bibliography, lacking key references or proper citation.
Very basic bibliography

The bibliography is adequate, although there are some notable omissions.

No evidence of any bibliography.

The bibliography is adequate, with some notable omissions.


An adequate reference list, with some notable omissions.
Basic bibliography, with several omissions or inaccuracies.
The bibliography is adequate, although there are some notable omissions.
There is an adequate bibliography, with some notable omissions.

There is an adequate bibliography, with some notable omissions.

Adequate bibliography, with some notable omissions or inaccuracies.


A comprehensive and accurate bibliography with proper citations is provided.
Adequate bibliography, with some notable omissions or inaccuracies.

The bibliography is inadequate, lacking crucial references and proper citation.

Very basic or incorrect bibliography, significantly impacting the reliability of sources.


Accurate and thorough bibliography with proper citation.

There is an adequate bibliography, with some notable omissions.


Basic bibliography, with several omissions or inaccuracies.
There isn't much information about books.

Basic bibliography, with several omissions or inaccuracies.

Poor bibliographies with no important references were included.


A thorough, reliable bibliography that is properly cited.

Basic bibliography with several omissions or inaccuracies.


Adequate bibliography, with some notable omissions.
Basic bibliography with several omissions.

Very basic bibliography which has a big influence on the validity of the sources. Need to add some more references.

Adequate bibliography, with some notable omissions

A sufficient bibliography that lacks a few important entries

The bibliography is adequate, although there are some notable omissions.


Basic reference with lack of proper citation and flaws.
Bibliography in the study has some noticeable omissions and Proper Citation is required.
Add more book references, web links and case studies related to this study.
Bibliography stated in the study is comprehensive.
A comprehensive and precise bibliography that incorporates appropriate citations.
Lots of web links and articles are listed and add some more book references to others research.
There is an adequate bibliography, with some notable omissions.
Very good references are listed and need to add some more web links related to this study.
The bibliography is inadequate and deficient in key references.
Add more book references, web links and case studies related to this study.
There is an adequate bibliography, with some notable omissions.
Add some more web links and articles related to this study.
The bibliography is adequate, with some notable omissions.
Very good references are listed and need to add some more web links related to this study.
Add more references related to this project.
Basic Bibliography with notable mistakes are done in the repot.
Add more web links and refer more book references related to this study.
Adequate bibliography , it has several omissions in it.
There are some noticeable omissions in the bibliography.
Add more book references, articles and journals to this study.
Bibliography stated in the study is lacking key reference.
The bibliography presented is lacking the key references.
Bibliography presents lacks the key points which is necessary.
Bibliography constructed also has some minor corrections.

Add more web links and articles related to this study.

Add more web links and articles related to this study.


Very good references are listed and need to add some more web links related to this study.

Add more references related to this study.


The references of this project are mentioned very well.
Bibliography of this project is good

Linkage of recommendations to objectives is apparent, though not thoroughly developed.


Poor bibliography, without key references or proper citation.
Very basic or incorrect bibliography, significantly impacting the reliability of sources.
A comprehensive and accurate bibliography with appropriate citations.
Bibliography is almost absent
Weak bibliography, lacking key references or proper citation.
There is an adequate bibliography, with some notable omissions.
There is an adequate bibliography, with some notable omissions.
Poor bibliography, without key references or proper citation.
Some notable omissions or inaccuracies are noted in the bibliography.

The references of this project are very helpful to others reference.


There is currently no evidence of a bibliography.
Basic bibliography, with several omissions or inaccuracies
Add more references related to this project for others usage.
Add more references based on this study.
Add more book references , web links and case studies related to this study.
Add more book references and journals for others usage.

There is an adequate bibliography, with some notable omissions.


Adequate bibliography, with some notable omissions or inaccuracies
very good references are listed and need to add some more web links related to this study.
Adequate bibliography, with some notable omissions or inaccuracies
A weak bibliography without key references or a proper citation.
Weak bibliography, lacking key references or proper citation
Add more book references and journals for others usage.
Weak bibliography, lacking key references or proper citation
Add more book references , web links and case studies related to this study.
Weak bibliography, lacking key references or proper citation
Add more book references and journals for others usage.
Add more book references , web links and case studies related to this study.
Add more book references , web links and case studies related to this study.
The bibliography is adequate, but there are some notable omissions or inaccuracies.
Weak bibliography, lacking key references or proper citation
A sufficient bibliography that lacks a few important entries
Bibliography is almost absent
Adequate bibliography, with some notable omissions or inaccuracies
Weak bibliography, lacking key references or proper citation
Adequate bibliography, with some notable omissions or inaccuracies
Very good references are listed and need to add some more web links related to this study.
Bibliography is adequate, with some notable omissions.
The basic bibliography is lacking several essential elements.
Adequate bibliography, with some notable omissions or inaccuracies
Basic bibliography, with several omissions or inaccuracies.
Comprehensive and accurate bibliography with proper citation.
The bibliography is adequate, although there are some notable omissions.
Proper citation and a comprehensive bibliography.
Key references are missing from the bibliography.
Add some book references related to this study.
Enhance the bibliography by addressing notable omissions to ensure a more comprehensive coverage of relevant sources on challenges in appointing and re
Many articles, journals are need to give clearly in this project.

Many articles, journals are given in this project


Refer more articles, journal and web-links for related to project
Bibliography information are provided well.
Many articles, journals are given in this project
Improve the bibliography by addressing notable omissions and inaccuracies to ensure a more comprehensive and accurate foundation for studying the impa
Enhance the bibliography by including key references and ensuring proper citations to strengthen the foundation of the comparative study on portfolio mana
Enhance the bibliography by correcting inaccuracies and including comprehensive sources to ensure the reliability and credibility of the study on the workf

Bibliography information are provided well.


Improving the bibliography with accurate and comprehensive sources is essential to enhance the reliability and credibility of the analysis on mutual fund pe

Study is conducted based on appropriate references.


Enhance the bibliography by including essential references and ensuring proper citation practices to strengthen the credibility and reliability of the study on
Many articles, journals are given in this project

Bibliography information are provided well.

Study is conducted web-based references only.

Bibliography information are provided well.

give some more clear articles and web sites link


Not clear in books and articles

specify new books and articles


journals and articles are not clear, specify some new books and web links

Adequate bibliography, with some notable omissions or inaccuracies.

give more references

Basic bibliography, with several omissions or inaccuracies.

thoroughly developed

Basic bibliography, with several omissions or inaccuracies.


Adequate bibliography, with some notable omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies.


Adequate bibliography, with some notable omissions or inaccuracies.

Basic bibliography, with several omissions or inaccuracies.


Basic bibliography, with several omissions or inaccuracies.

Basic bibliography, with several omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies.

Basic bibliography, with several omissions or inaccuracies.

bibliography given needs to mention some web or book references


conclusion drawn needs to specify web or book reference in this section
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Needs to mention more reference the bibliography section
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
case study and web reference given needs to mention journal reference in this section
Weak bibliography, lacking key references or proper citation.
Basic bibliography, with several omissions or inaccuracies.
Needs to mention some journal or book reference
Bibliography given needs to use it in the review process
Adequate bibliography, with some notable omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Bibliography mentioned needs to specify some web and book references
Basic bibliography, with several omissions or inaccuracies.

Bibliography given needs to mention some book reference for the project
Basic bibliography, with several omissions or inaccuracies.
may be present some web references or book references in this section
Adequate bibliography, with some notable omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies.


Needs to present some book references , web references in the section
Basic bibliography, with several omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.
Needs to present more reference for the use of AI tools

Basic bibliography, with several omissions or inaccuracies.

Bibliography needs to mention some book references and web references


No evidence of any bibliography
bibliography not given in the study report
Basic bibliography, with several omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.
Bibliography discussed
Adequate bibliography, with some notable omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Needs to specify some book reference for review the problems

Adequate bibliography, with some notable omissions or inaccuracies.


Needs to specify some journal and book reference for customer reaction reviews
Needs to specify some web or book reference or case study
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Bibliography discussed needs to link with the solution of the problem scheme
References given needs to link with the literature review
Bibliography are discussed

Adequate bibliography, with some notable omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies.

Basic bibliography, with several omissions or inaccuracies.


Adequate bibliography, with some notable omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies.

Basic bibliography, with several omissions or inaccuracies

Basic bibliography, with several omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies.


Needs to mention web and book reference in the bibliography
Needs to mention book and web reference and various journal references

Needs to mention some book reference of the project


Needs to mention more number of reference in journal, website or blogs

Basic bibliography, with several omissions or inaccuracies.


Basic bibliography, with several omissions or inaccuracies.
Needs to mention some web references and books
Bibliography drawn in good manner
Needs to specify some book references
Needs to specify some book and web references in this section
Bibliography drawn
Basic bibliography, with several omissions or inaccuracies.
Bibliography given needs to present some books and web reference of the project
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Bibliography mentioned but needs to link with the reference of the literature review
bibliography drawn needs to specify some book reference
Adequate bibliography, with some notable omissions or inaccuracies.
Very basic or incorrect bibliography, significantly impacting the reliability of sources.
Very basic or incorrect bibliography, significantly impacting the reliability of sources.
Basic bibliography, with several omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
bibliography drawn
Basic bibliography, with several omissions or inaccuracies.

Basic bibliography, with several omissions or inaccuracies.


The bibliography is weak, lacking key references and proper citation. Strengthening it with essential references will enhance the credibility and completene

Adequate bibliography, with some notable omissions or inaccuracies.


The bibliography is adequate, but it contains some notable omissions that could be addressed to strengthen the completeness and credibility of your research
The bibliography is basic, with several notable omissions, highlighting the need to include additional relevant sources to strengthen the depth and credibility

The bibliography is well-constructed but could benefit from addressing minor omissions for greater completeness in assessing microfinance lending.
Adequate bibliography, with some notable omissions or inaccuracies.
The bibliography is basic and lacks several key references, which should be included to strengthen the foundation and credibility of the research findings.

books and few website links are given. need some other references link and reputed journal
No evidence of any bibliography.
The bibliography is well-constructed overall, but it contains a few minor omissions that could be addressed to enhance the comprehensiveness and reliabilit
Refer more articles, journal and web-links for related to project

The bibliography is basic, but it contains several omissions and inaccuracies that need to be addressed for completeness and accuracy.
No evidence of any bibliography.
few references and links are given. require more reputed journals
Study is conducted based on appropriate references.
Enhance the bibliography by addressing several omissions and ensuring all relevant sources are included to support the study on the evolution of the Indian
Many articles, journals are need to give clearly in this project
Study is conducted based on appropriate references.

Bibliography information are provided well.


Enhance the bibliography by including additional pertinent sources and verifying completeness to strengthen the foundation of research on mergers and acq
Refer more articles, journal and web-links for related to project
Enhance the bibliography by addressing several omissions and ensuring all relevant sources are included to support the comparative analysis of consumer p

Enhance the bibliography by addressing omissions and inaccuracies, ensuring all relevant sources are included to strengthen the foundation of research com
Correct and expand the bibliography to include accurate and diverse sources, ensuring the reliability and credibility of information in the study of Small Fin

Basic bibliography, with several omissions or inaccuracies.


Adequate bibliography, with some notable omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies.


Basic bibliography, with several omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.

basic Bibliography
adequate Bibliography

Basic bibliography, with several omissions or inaccuracies.


Adequate bibliography, with some notable omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies.


Adequate bibliography, with some notable omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
basic Bibliography drawn
Adequate bibliography, with some notable omissions or inaccuracies.
to give recent journals and publications

need clear Bibliography

give some more current year journal


Adequate bibliography, with some notable omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.
UP TO DATE
TO BE UPDATED
NOT PRESENTED
GOOD
PRESENTED
NOT COMPLETELY PRESENTED
PRESENTED
REFERENCE IS UPTODATE
UPTO DATE
WELL REFERED

UPTO DATE
uptodate
A bibliography that contains all relevant information with correct citations
ALL NEEDED REFERENCE CITED
A bibliography that is comprehensive and accurate and includes proper citations
Very basic or incorrect bibliography, significantly impacting the reliability of sources.
Basic bibliography, with several omissions or inaccuracies.

Basic bibliography, with several omissions or inaccuracies.

Basic bibliography, with several omissions or inaccuracies


Adequate bibliography, with some notable omissions or inaccuracies
Adequate bibliography, with some notable omissions or inaccuracies
perfectly constructed bibliography with minor inaccuracies
An exhaustive, precise bibliography that is properly cited.
A thorough and precise bibliography containing appropriate citations.
Basic bibliography, with several omissions or inaccuracies.
The bibliography is current and includes all necessary citations.
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
a well-written bibliography containing a few little errors or omissions.
The bibliography is either completely improper or nonexistent.
Basic bibliography, with several omissions or inaccuracies.
Bibliographic information is up to date.
Basic bibliography, with several omissions or inaccuracies.
Complete and precise bibliography with relevant citations.
Project Study is conducted web-based references only.
references or proper citation.
notable omissions or inaccuracies.
notable omissions or inaccuracies.
Study is conducted based on appropriate references.
of sources.
Many articles, journals are given in this project
notable omissions or inaccuracies.
Many articles, journals are need to give clearly in this project
notable omissions or inaccuracies.
references or proper citation.
Study is conducted based on appropriate references.
omissions or inaccuracies.
Study is conducted web-based references only.
omissions or inaccuracies.
Study is conducted based on appropriate references.
Many articles, journals are given in this project
Weak bibliography, lacking key references or proper citation
Bibliography information are provided well.
Many articles, journals are given in this project
Study is conducted web-based references only.
Study is conducted web-based references only.
Weak bibliography, lacking key references or proper citation
Adequate bibliography, with some notable omissions or inaccuracies
Bibliography information are provided well.
Adequate bibliography, with some notable omissions or inaccuracies
Basic bibliography, with several omissions or inaccuracies
Basic bibliography, with several omissions or inaccuracies
Adequate bibliography, with some notable omissions or inaccuracies
incorrect bibliography, significantly impacting the reliability of sources.
Adequate bibliography, with some notable omissions or inaccuracies
Adequate bibliography, with some notable omissions or inaccuracies
Many articles, journals are given in this project
Many articles, journals are need to give clearly in this project
Many articles, journals are not used in this project
Many articles, journals are need to give clearly in this project
references or proper citation.
notable omissions or inaccuracies.
notable omissions or inaccuracies.
Study is conducted based on appropriate references.
Many articles, journals are need to give clearly in this project
Study is conducted web-based references only. need to refer books and journals in recent editions
Many articles, journals are given in this project
references or proper citation.
notable omissions or inaccuracies.
notable omissions or inaccuracies.
Very basic or incorrect bibliography,
Many articles, journals are given in this project
Study is conducted based on appropriate references.
notable omissions or inaccuracies.
Study is conducted based on appropriate references.
bibliography with proper citation.
references or proper citation
Many articles, journals are need to give clearly in this project
Study is conducted based on appropriate references.
omissions or inaccuracies.
references or proper citation.
notable omissions or inaccuracies.
notable omissions or inaccuracies.
Study is conducted based on appropriate references.
notable omissions or inaccuracies.
Many articles, journals are need to give clearly in this project
notable omissions or inaccuracies.
notable omissions or inaccuracies.
Many articles, journals are given in this project
references or proper citation.
notable omissions or inaccuracies.
Many articles, journals are given in this project
Study is conducted based on appropriate references.
Study is conducted based on appropriate references.
Study is conducted based on appropriate references.
Many articles, journals are need to give clearly in this project.
notable omissions or inaccuracies.
Many articles, journals are need to give clearly in this project
notable omissions or inaccuracies.
notable omissions or inaccuracies.
notable omissions or inaccuracies.
Study is conducted based on appropriate references.
notable omissions or inaccuracies.
Refer more articles, journal and weblinks for related to project
notable omissions or inaccuracies.
notable omissions or inaccuracies.
Many articles, journals are given in this project
notable omissions or inaccuracies.
notable omissions or inaccuracies.
Refer more articles, journal and web-links for related to project
Many articles, journals are need to give clearly in this project
Study is conducted based on appropriate references.
Refer more articles, journal and web-links for related to project
Refer more articles, journal and web-links for related to project
omissions or inaccuracies.
references or proper citation.
Refer more articles, journal and weblinks for related to project
notable omissions or inaccuracies.
Study is conducted based on appropriate references.
Study is conducted based on appropriate references.
references or proper citation.
Study is conducted based on appropriate references.
Refer more articles, journal and weblinks for related to project
notable omissions or inaccuracies.
references or proper citation
notable omissions or inaccuracies.
Study is conducted based on appropriate references.
Many articles, journals are given in this project
references or proper citation.
references or proper citation
references or proper citation.
notable omissions or inaccuracies.
omissions or inaccuracies.
Study is conducted based on appropriate references.
notable omissions or inaccuracies
notable omissions or inaccuracies.
notable omissions or inaccuracies.
Many articles, journals are need to give clearly in this project
references or proper citation.
Many articles, journals are need to give clearly in this project
Many articles, journals are need to give clearly in this project
Many articles, journals are need to give clearly in this project
references or proper citation.
Study is conducted web-based references only.
Many articles, journals are need to give clearly in this project
notable omissions or inaccuracies
Study is conducted based on appropriate references.
references or proper citation
Many articles, journals are given in this project
notable omissions or inaccuracies
Many articles, journals are given in this project
Study is conducted web-based references only.
notable omissions or inaccuracies.
Study is conducted based on appropriate references.
notable omissions or inaccuracies.
references or proper citation.
notable omissions or inaccuracies.
Study is conducted based on appropriate references.
Study is conducted based on appropriate references.
references or proper citation
Study is conducted web-based references only.
Refer more articles, journal and web-links for related to project
bibliography with proper citation.
references or proper citation.
notable omissions or inaccuracies.
bibliography with proper citation.
Study is conducted based on appropriate references.
Many articles, journals are given in this project
Study is conducted based on appropriate references.
Bibliography information are provided well.
Many articles, journals are given in this project
Many articles, journals are given in this project
references or proper citation.
Basic bibliography, with several omissions or inaccuracies.
Many articles, journals are given in this project.
Many articles, journals are need to give clearly in this project
Many articles, journals are need to give clearly in this project
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Bibliography information are provided well.
Bibliography information are provided well.
Many articles, journals are given in this project
Many articles, journals are given clearly in this project
Basic bibliography, with several omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Many articles, journals are given in this project
Study is conducted based on appropriate references.
FEW MAY BE INLUDED
Basic bibliography, with several omissions or inaccuracies
Basic bibliography, with several omissions or inaccuracies
Basic bibliography, with several omissions or inaccuracies.
WELL REFERED
Basic bibliography, with several omissions or inaccuracies.
Very basic or incorrect linkage, hindering the coherence of the project.
UP TO DATE
Basic bibliography, with several omissions or inaccuracies.
Very basic or incorrect bibliography, significantly impacting the reliability of sources.
Very basic or incorrect bibliography, significantly impacting the reliability of sources.
WELL RERESEARCHED and all the papers needed are cited
WELL RESEARCHED AND IT IS UPTODATE

Basic bibliography, with several omissions or inaccuracies.


uptodate
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
reference is ok
Basic bibliography, with several omissions or inaccuracies.

RESEARCH
Basic bibliography, with several omissions or inaccuracies.
good
Adequate bibliography, with some notable omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
uptodate
No evidence of any bibliography.
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.

Refer more articles, journal and weblinks for related to project


notable omissions or inaccuracies.
almost absent
No Bibliography mention in this project, Refer more articles, journal and weblinks for related to project.
notable omissions or inaccuracies.
Many articles, journals are given in this project
notable omissions or inaccuracies.
Bibliography information are provided well.
Many articles, journals are need to give clearly in this project
need to Refer more articles, journal and web-links for related to project
Study is conducted based on appropriate references.
No bibliography used in this project, Refer more articles, journal and weblinks for related to project
references or proper citation.
Refer more articles, journal and web references for related to project
references or proper citation.
Many articles, journals are given in this project
Many articles, journals are given in this project
omissions or inaccuracies.
Many articles, journals are need to give clearly in this project
Study is conducted web-based references only.
notable omissions or inaccuracies.
references or proper citation.
Study is conducted web-based references only.
Study is conducted based on appropriate references.
references or proper citation.
notable omissions or inaccuracies.
Many articles, journals are need to give clearly in this project
Study is conducted based on appropriate references.
references or proper citation.
Many articles, journals are given in this project
references or proper citation
notable omissions or inaccuracies.
references or proper citation.
notable omissions or inaccuracies.
references or proper citation.
omissions or inaccuracies.

Basic bibliography, with several omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies

Basic bibliography, with several omissions or inaccuracies.


Adequate bibliography, with some notable omissions or inaccuracies

Adequate bibliography, with some notable omissions or inaccuracies

Basic bibliography, with several omissions or inaccuracies


Basic bibliography, with several omissions or inaccuracies
Adequate bibliography, with some notable omissions or inaccuracies

Basic bibliography, with several omissions or inaccuracies


Adequate bibliography, with some notable omissions or inaccuracies

Adequate bibliography, with some notable omissions or inaccuracies


E-References are taken
Basic bibliography, with several omissions or inaccuracies
Weak bibliography, lacking key references or proper citation
E-Reference
incorrect bibliography, significantly impacting the reliability of sources.
Adequate bibliography, with some notable omissions or inaccuracies
Weak bibliography, lacking key references or proper citation.
Adequate bibliography, with some notable omissions or inaccuracies
Weak bibliography, lacking key references or proper citation
Good references are taken
Good reference are taken
Good referencesare taken
The references in the study were well stated to solve the problem chosen
Weak bibliography, lacking key references or proper citation
The journals referred for the study was mentioned good.
Basic bibliography, with several omissions or inaccuracies
Weak bibliography, lacking key references or proper citation
The Journals referred and web links were stated enough and need to search more for the study.
The Journals referred were stated enough for the study.
Very basic bibliography which has a big influence on the validity of the sources.

Comprehensive and accurate bibliography with proper citation.

Adequate bibliography with some notable omissions.

No evidence of any bibliography.


Other subject file

Other subject file


Other subject file
Student gave adequate bibliography with some notable omissions.

Student gave weak bibliography, lacking proper citation.

Student gave well-written bibliography with a little omissions.

Student uploaded assignment questions with answers.

Adequate bibliography, with some notable omissions or inaccuracies

nothing to specify need much more publication based this research.

Need much more publication it helps quality of the project.


Need much more publication it helps quality of the project.
much more publication it helps quality of the project.
much more publication it helps quality of the project.
need much more publications.

Need much more publication it helps quality of the project.


more publication it helps quality of the project.

much more publication it helps quality of the project.

much more publication it helps quality of the project.


A well-written bibliography with a few little omissions.
Need much more publication it helps quality of the project.
Need much more publication it helps quality of the project.
Well-constructed bibliography with minor inaccuracies.
Need much more publication it helps quality of the project.
Well-constructed bibliography with minor omissions.
Need much more publication it helps quality of the project.
Basic bibliography with several omissions or inaccuracies
need more publications its help quality of the project.

Basic bibliography with several omissions.


Need much more publication it helps quality of the project.
Well-constructed bibliography with minor omissions.
Other subject file
Need much more publication it helps quality of the project.
Other subject file
Need much more publication it helps quality of the project.
Need much more publication it helps quality of the project.
Other subject file

Adequate bibliography with some notable omissions.


Well-written bibliography with a little omissions.
Adequate bibliography with some notable omissions.

Well-constructed bibliography with minor omissions.


Well-constructed bibliography with minor omissions given.

Comprehensive and accurate bibliography with proper citation.

Adequate bibliography, with some notable omissions.

Weak bibliography lacking key references or proper citation.


Student used basic bibliography that has a number of omissions
Student used basic bibliography that has a number of omissions.
Student used basic bibliography that has a number of omissions.

Student used basic bibliography that has a number of omissions.


Student didnot give any bibliography.

Very basic bibliography which has a big influence on the validity of the sources. Need to add some more references.
Bibliography is missing.

A simple bibliography containing a number of omissions.

Other subject file


E-references are taken
need more no of publication helps quality of the project.

Need much more publication it helps quality of the project.


Need much more publication it helps quality of the project.
Need much more publication it helps quality of the project.

Need much more publication it helps quality of the project.

more publication it helps quality of the project.


Need much more publication it helps quality of the project.
publication it helps quality of the project.

Need much more publication it helps quality of the project.


more publication it helps quality of the project.
Need much more publication it helps quality of the project.

more publication it helps quality of the project.


need more no of publications it helps quality increase project.

have lot of publication its help project development.


need much more publication its improve project quality level.

much more publication it helps quality of the project.


Need much more publication it helps quality of the project.
Need much more publication it helps quality of the project.
Adequate bibliography, with some notable omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.

Basic bibliography, with several omissions or inaccuracies.


Adequate bibliography, with some notable omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies.

Weak bibliography, lacking key references or proper citation.

Adequate bibliography, with some notable omissions or inaccuracies

Adequate bibliography, with some notable omissions

Adequate bibliography, with some notable omissions or inaccuracies

Basic bibliography, with several omissions or inaccuracies.

Basic bibliography, with several omissions or inaccuracies.


Basic bibliography, with several omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies

Basic bibliography, with several omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies

Weak bibliography, lacking key references or proper citation

Adequate bibliography, with some notable omissions or inaccuracies


Adequate bibliography, with some notable omissions or inaccuracies
Weak bibliography, lacking key references or proper citation
Adequate bibliography, with some notable omissions or inaccuracies
Basic bibliography, with several omissions or inaccuracies

Basic bibliography, with several omissions or inaccuracies.


Adequate bibliography, with some notable omissions or inaccuracies
Adequate bibliography, with some notable omissions or inaccuracies

A simple bibliography containing a number of omissions.


Other subject file.
e-references are taken
e papers are taken
Other subject file

to include some more appropriate references .


Other subject file
Books,Articles are reffered
. Books and Articles are refered
A simple bibliography containing a number of omissions.

Copy case(Course book)


Student used basic bibliography that has a number of omissions.
Book references are taken
Other subject file

E-References are taken


Books:Journal Articles are taken
E-references are taken

Websites and e-reference are taken


Other subject file

References are taken from internet


Student gave very basic bibliography which has a big influence on the validity of the sources. Need to add some more references.

more references are taken


Other subject file
So many references are taken
Very basic bibliography which has a big influence on the validity of the sources. Need to add some more references.

E-references are taken


Books and Other References are taken
Student gave simple bibliography containing a number of omissions.

Weak bibliography, lacking key references or proper citation.


Entirely inappropriate.

Weak bibliography, lacking key references or proper citation.

Bibliography are good but need to include recent research field


Weak bibliography, lacking key references or proper citation.

Bibliography are good but need to include recent research field


Adequate bibliography, with some notable omissions.
Basic bibliography, with several omissions or inaccuracies.
Very basic or incorrect bibliography, significantly impacting the reliability of sources

almost absent
Bibliography are good but need to include recent research field

Bibliography are good

Basic bibliography, with several omissions or inaccuracies.


Basic bibliography, with several omissions or inaccuracies.

Bibliography are good but need to include recent research field

Very basic or incorrect bibliography, significantly impacting the reliability of sources.

Very basic or incorrect bibliography, significantly impacting the reliability of sources.


Very basic or incorrect bibliography, significantly impacting the reliability of sources.
Need to include more primary source

Very basic or incorrect bibliography, significantly impacting the reliability of sources.


Bibliography are generally good but need diverse sources
Basic bibliography, with several omissions or inaccuracies.

Basic bibliography, with several omissions or inaccuracies.

Bibliography is good response of this project


Bibliography o this project is clear concept
the good answer script of Bibliography
Bibliography is good
the good reference of Bibliography
Proper references are not mentioned
Referred articles related for the topics.
Opted articles are referred as reference
Articles were used as references
Articles are referred for the references.

A very good references part added for this study.


Very good references are listed and need to add some more web links related to this study.
Very good references are listed and need to add some more web links related to this study.
Good
Give more web links and journals related to this study.

Need to improve the formation


Good
Need to improve the formation
Need proper formation

Good

Good

Good

Good
Adequate bibliography is relevant with the thesis

Weak bibliography for reference of the objectives


comprehensive and accurate bibliography

Adequate bibliography is suitable or objectives

Weak bibliography need improve with reference

Adequate bibliography need more reference


Comprehensive and accurate bibliography with proper citation.OrWell-constructed bibliography with minor omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.

write adequate bibliography for further studies for proper resource

Adequate bibliography, is given good


bibliography informations is good and also to add some sources for your future studies
need bibliography for your study
good bibligraphy is used in this study
Adequate bibliography with some notable reference
give some addditional bibliography for your study
Adequate bibliography
Adequate bibliography with some objectives
Adequate bibliography with some reference

adequate bibliography is used

SufficientwWebsites and articles are referred for the study


Referred many articles for the research work

provide detailed bibligraphy for this study


referred many journals for the research

write appropriate bibliography

Articles are referred regarding the study


Articles are provided as references
Articles and websites are referred
insufficient explanation of bibliography
Articles are referred for the work
Web links are provided as references
need strong bibliography for this project

notable omissions or inaccuracies.

give some additional bibliography for this study


inadequate bibliography in this thesis
Journals are referred for the research
Articles, books and websites are referred
GIVE SUFFICIENT BIBLIOGRAPHY FOR THIS PROJECT

insufficient bibliography sources

add more bibliography for this study


adequate bibliography is given
Articles are provided as references
many articles are used as references
Many articles are referred for the research work
Adequate bibliography, with some notable omissions or inaccuracies
Basic bibliography, with several omissions or inaccuracies
Journals are referred for the study

Adequate bibliography, with some notable omissions or inaccuracies

Basic bibliography, with several omissions or inaccuracies

Basic bibliography, with several omissions or inaccuracies


Basic bibliography, with several omissions or inaccuracies
adequate bibliography is also given
add some more Bibliography

Add more articles and journals based on this study for others usage.
Add more web links and articles related to this study.

Good

nice answer of this project Bibliography

Good
Good
good response of the Bibliography
Good
Need to improve
Good
add some more key points of Bibliography

Bibliography is clear of project


Need to improve the formation

add more ideas of Bibliography


assume more points of Bibliography of this project concept
good answer script of Bibliography

give some more data for Bibliography

Adequate bibliography, with some notable omissions or inaccuracies


Bibliography is almost absent

Basic bibliography, with several omissions or inaccuracies


insufficient bibliophagy informations
Adequate bibliography, with some notable omissions
good and adequate biliography is pointed
Adequate bibliography, with some notable omissions or inaccuracies
Adequate bibliography, with some notable omissions or inaccuracies

Basic bibliography, with several omissions or inaccuracies


Basic bibliography, with several omissions or inaccuracies.
Very basic or incorrect bibliography, significantly impacting the reliability of sources.
Adequate bibliography, with some notable omissions or inaccuracies.
Weak bibliography, lacking key references or proper citation.
Weak bibliography, lacking key references or proper citation
Adequate bibliography, with some notable omissions or inaccuracies
need more biliography reference
Basic bibliography, with several omissions or inaccuracies
Adequate bibliography, is needed

Basic bibliography, with several omissions or inaccuracies

bibliography is miising
Bibliography is almost absent
adequate bibliography is in this project
bibliography is not sufficient
Weak bibliography, lacking key references or proper citation.

Basic bibliography, with several omissions or inaccuracies


add some extra source of biliography
Basic bibliography, with several omissions or inaccuracies
Weak bibliography, lacking key references or proper citation.
Weak bibliography, lacking key references or proper citation
Weak bibliography, lacking key references or proper citation

No evidence of any bibliography.


Basic bibliography and ise many other sources
Incorrect bibliography, significantly impacting the reliability of sources.
Adequate bibliography, with some notable omissions or inaccuracies
Adequate bibliography, with some notable omissions or inaccuracies.
Well-constructed bibliography with minor omissions
Some bibliography sources are outdated.

The bibliography is generally good but some of them are difficult to follow
Bibliography is adequate and some of them are difficult to follow
Bibliography are good but need to include recent research field
Bibliography is adequate
No evidence of any bibliography.
Basic bibliography, with several omissions or inaccuracies

Adequate bibliography, with some notable omissions or inaccuracies


Adequate bibliography, with some notable omissions or inaccuracies

Weak bibliography, lacking key references or proper citation


bibliography is adequate
Adequate bibliography, for this study
Weak bibliography, lacking key references or proper citation

Well-constructed bibliography with minor omissions or inaccuracies.


Well-constructed bibliography with minor omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Well-constructed bibliography with minor omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies.


Adequate bibliography, with some notable omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies

Adequate bibliography, with some notable omissions or inaccuracies.


Weak bibliography, lacking key references or proper citation.
Weak bibliography, lacking key references or proper citation.

Bibliography is almost absent


Basic bibliography, with several omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies.


Adequate bibliography, with some notable omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies.

Basic bibliography, with several omissions or inaccuracies.

Basic bibliography, with several omissions or inaccuracies.


Adequate bibliography, with some notable omissions or inaccuracies.

Bibliography is almost absent or entirely inappropriate.


Adequate bibliography, with some notable omissions or inaccuracies.
Very basic or incorrect bibliography, significantly impacting the reliability of sources.
Basic bibliography, with several omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.

Very basic bibliography, significantly impacting the reliability of sources.


Adequate bibliography, with some notable omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies.


To need more references on this project
The references are good
To need more references and website links
The references are good
Basic bibliography, with several omissions or inaccuracies.
Comprehensive and accurate bibliography with proper citation.

Adequate bibliography, with some notable omissions or inaccuracies.


Adequate bibliography, with some notable omissions or inaccuracies.
To need more references on this project
To need more references and website links
The references are good to add more website links

He used number of references are good


Adequate bibliography, with some notable omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies.


Adequate bibliography, with some notable omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.
The references are good

Adequate bibliography, with some notable omissions or inaccuracies.


To need more references

To need more website links


To need more references on this project
Adequate bibliography, with some notable omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.

She used number of references are well


Adequate bibliography, with some notable omissions or inaccuracies.
To need more references on this project and include web site links
They have used number of references on this project
To need more website links
To need more website links
Adequate bibliography, with some notable omissions or inaccuracies.
They have used number of references are good

Adequate bibliography, with some notable omissions or inaccuracies.


They have used number of references are well
They have used many references are good need to more website links
Adequate bibliography, with some notable omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.
He used number of references are good
Adequate bibliography, with some notable omissions or inaccuracies.

The references are good

He used only web site links to need more author references on this project
To need more references and web sites links reference
The used many references are good
UPTODATE
well aadded
UPTODate
UPTODATE
Adequate bibliography, with some notable omissions or inaccuracies.
NOT UPTODATE
Adequate bibliography, with some notable omissions or inaccuracies.
uptodate
fine
Very basic or incorrect bibliography, significantly impacting the reliability of sources.
need to improve
Basic bibliography, with several omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies. Or Basic bibliography, with several omissions or inaccuracies.
uptodate
No evidence of any bibliography.
Adequate bibliography, with some notable omissions or inaccuracies. Or Basic bibliography, with several omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies. Or Basic bibliography, with several omissions or inaccuracies
listed the needed
Comprehensive and accurate bibliography with proper citation. Or Well-constructed bibliography with minor omissions or inaccuracies.
recent and needed references are all cited.
Comprehensive and accurate bibliography with proper citation. Or Well-constructed bibliography with minor omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies. Or Basic bibliography, with several omissions or inaccuracies.
He used number of references are good
He used number of references
Adequate bibliography, with some notable omissions or inaccuracies. Or Basic bibliography, with several omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies. Or Basic bibliography, with several omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies. Or Basic bibliography, with several omissions or inaccuracies.
To need more references on this project
Adequate bibliography, with some notable omissions or inaccuracies. Or Basic bibliography, with several omissions or inaccuracies.
Weak bibliography, lacking key references or proper citation. Or Very basic or incorrect bibliography, significantly impacting the reliability of sources.
To need more references and websites links
He not used references and websites
Adequate bibliography, with some notable omissions or inaccuracies. Or Basic bibliography, with several omissions or inaccuracies.
Weak bibliography, lacking key references or proper citation. Or Very basic or incorrect bibliography, significantly impacting the reliability of sources.
Adequate bibliography, with some notable omissions or inaccuracies. Or Basic bibliography, with several omissions or inaccuracies
He used number of references are good
To need more author reference and web sites
Adequate bibliography, with some notable omissions or inaccuracies. Or Basic bibliography, with several omissions or inaccuracies
Basic bibliography, with several omissions or inaccuracies.
He used only website links
He used only references to need more websites
To need more references on this project
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
To need more references on this project
To need website links in this project
bibliography with proper citation.
To need more references on this project
Adequate bibliography, with some notable omissions or inaccuracies
He used many websites need to references on this project
To need more website links
To need more references on this project
Bibliography not discussed
Only Few Reference are included
He used many references need to websites links
The references are good
Adequate bibliography, with some notable omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.
To need more references this project
He used number of references are good
Adequate bibliography, with some notable omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.
To need more references on this project
Adequate bibliography, with some notable omissions or inaccuracies
To need more references on this project
To need more references on this project
To need more web sites links on this project
Adequate bibliography, with some notable omissions or inaccuracies.
To need more references on this project
Adequate bibliography, with some notable omissions or inaccuracies
Adequate bibliography, with some notable omissions or inaccuracies.
Comprehensive and accurate bibliography with proper citation
Comprehensive and accurate bibliography with proper citation
Comprehensive and accurate bibliography with proper citation.
To need more references and website links
Adequate bibliography, with some notable omissions or inaccuracies
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.

ALL THE BIBLOGRAPHY ARE NOT RECENT BUT SOME WHAT NEEDED REFERENCE ARE ALL CITED
Basic bibliography, with several omissions or inaccuracies
Basic bibliography, with several omissions or inaccuracies
recerence need to be updated
REFERENCES ARE UPTO DATE
Basic bibliography, with several omissions or inaccuracies

RECERENCES ARE WELL UPDATED


REFERENCES ARE UPTODATE

ALL RECENT AND NEEDED REFERENCES ARE PRESENTED


RECENT REFERENCE HAVE BEEN PRESENTED AND ALL ARE upto date
Comprehensive and accurate bibliography with proper citation
Basic bibliography, with several omissions or inaccuracies.
Basic bibliography, with several omissions or inaccuracies.
references are up-to-date.

needed references are all cited

OK

Basic bibliography, with several omissions or inaccuracies.


Basic bibliography, with several omissions or inaccuracies.

UPTODATE
UPTODAT
Basic bibliography, with several omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies.

Adequate bibliography, with some notable omissions or inaccuracies.


Adequate bibliography, with some notable omissions or inaccuracies.

Refer more articles, journal and web-links for related to project


Bibliography information are partially provided well.
Adequate bibliography, with some notable omissions or inaccuracies.
omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.
notable omissions few more bibliography by using books and notable website
The references are good need more website links
He used only website links to need more references on this project
Adequate bibliography, with some notable omissions or inaccuracies.
omissions or inaccuracies
omissions or inaccuracies
omissions or inaccuracies

They have used many references are good


He used number of references are good
Comprehensive and accurate bibliography with proper citation.
To need web site links. references are good
Adequate bibliography, with some notable omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.

The references are good to need more website links


Comprehensive and accurate bibliography with proper citation.
the bibliography are to cover more of new paper magazine and popular web site we use

The bibliography part need more sources to get a correct


Bibliography part need to be written more accurate books and journals web pages we used
Only mention secondary source only web sites mention books article
Comprehensive and accurate bibliography with proper citation.

This part covers web page and book you may use articles too
Adequate bibliography, with some notable omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.
Weak bibliography, lacking key references or proper citation. Or Very basic or incorrect bibliography, significantly impacting the reliability of sources.
More best website and magazines to a good research
Adequate bibliography, with some notable omissions or inaccuracies.

The bibliography are more comment able web site and Book use

Comprehensive and accurate bibliography with proper citation.


The bibliography part too with more books of research and articles
Bibliography part need books of reference more
Comprehensive and accurate bibliography with proper citation.
omissions are to rectify
Well-constructed bibliography with minor omissions are to rectify
Adequate bibliography, with some notable omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.

Comprehensive and accurate bibliography with proper citation


Comprehensive and accurate bibliography with proper citation
Adequate bibliography, with some notable omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies.
Adequate bibliography, with some notable omissions or inaccuracies
Comprehensive and accurate bibliography with proper citation.
He used number of references are good
Adequate bibliography, with some notable omissions or inaccuracies
Comprehensive and accurate bibliography with proper citation
Comprehensive and accurate bibliography with proper citation.
Adequate bibliography, with some notable omissions or inaccuracies
Used number of references are good
Comprehensive and accurate bibliography with proper citation
To need more references on this project
Used number of references are good
Comprehensive and accurate bibliography with proper citation
To need more references on this project
Weak bibliography, lacking key references or proper citation
Adequate bibliography, with some notable omissions or inaccuracies
To need more book references on this project
They have used number references are good
To need more website links in this project
To need more references are good
He used limited references to add more website links
They have use many references
Comprehensive and accurate bibliography with proper citation
Adequate bibliography, with some notable omissions or inaccuracies.
To need more references on this project
Weak bibliography, lacking key references or proper citation. Or Very basic or incorrect bibliography, significantly impacting the reliability of sources.
To need more references and website links
Basic bibliography, with several omissions or inaccuracies.
Q2 Re-Val Marks Q3 Re-Val Marks Q4 Re-Val Marks Q5 Re-Val Marks Q6 Re-Val Marks Q7 Re-Val Marks
Dr. A. Aruljothi .
S Umadevi S
Dr. A. Aruljothi .
S Umadevi S
Dr. A. Aruljothi .
S Umadevi S
S Umadevi S
S Umadevi S
S Umadevi S
S Umadevi S
S Umadevi S
Dr. A. Aruljothi .
Dr. A. Aruljothi .
S Umadevi S
Dr. A. Aruljothi .
S Umadevi S
S Umadevi S
S Umadevi S
Dr. A. Aruljothi .
S Umadevi S
S Umadevi S
Dr. A. Aruljothi .
S Umadevi S
Dr. A. Aruljothi .
S Umadevi S
S Umadevi S
Dr. A. Aruljothi .
S Umadevi S
Dr. A. Aruljothi .
Dr. A. Aruljothi .
S Senthilkumar
S Umadevi S
S Senthilkumar
S Umadevi S
S Senthilkumar
S Umadevi S
S Umadevi S
Dr. A. Aruljothi .
Dr. A. Aruljothi .
S Senthilkumar
S Senthilkumar
Dr. A. Aruljothi .
S Umadevi S
S Umadevi S
Dr. A. Aruljothi .
S Senthilkumar
Dr. A. Aruljothi .
S Senthilkumar
Dr. A. Aruljothi .
S Umadevi S
S Umadevi S
S Senthilkumar
S Umadevi S
S Umadevi S
S Umadevi S
Dr. A. Aruljothi .
S Umadevi S
S Umadevi S
Dr. A. Aruljothi .
S Umadevi S
R Krishnaveni R
Dr. A. Aruljothi .
P Mohanambal P
P Mohanambal P
R Krishnaveni R
R Krishnaveni R
R Krishnaveni R
R Krishnaveni R
P Mohanambal P
P Mohanambal P
R Krishnaveni R
Dr. A. Aruljothi .
Dr. A. Aruljothi .
P Mohanambal P
R Krishnaveni R
Dr. A. Aruljothi .
P Mohanambal P
R Krishnaveni R
P Mohanambal P
P Mohanambal P
R Krishnaveni R
P Mohanambal P
Dr. A. Aruljothi .
R Krishnaveni R
P Mohanambal P
R Krishnaveni R
Dr. A. Aruljothi .
R Krishnaveni R
P Mohanambal P
Dr. A. Aruljothi .
Dr. A. Aruljothi .
P Mohanambal P
P Mohanambal P
P Mohanambal P
R Krishnaveni R
R Krishnaveni R
R Krishnaveni R
R Krishnaveni R
Dr. A. Aruljothi .
R Krishnaveni R
R Krishnaveni R
R Krishnaveni R
R Krishnaveni R
R Krishnaveni R
Dr. A. Aruljothi .
R Krishnaveni R
Dr. A. Aruljothi .
R Krishnaveni R
R Krishnaveni R
Dr. A. Aruljothi .
Dr. A. Aruljothi .
R Krishnaveni R
R Krishnaveni R
S Umadevi S
R Krishnaveni R
S Umadevi S
R Krishnaveni R
Dr. A. Aruljothi .
S Umadevi S
S Umadevi S
Dr. A. Aruljothi .
R Krishnaveni R
S Umadevi S
R Krishnaveni R
R Krishnaveni R
S Umadevi S
R Krishnaveni R
S Umadevi S
R Krishnaveni R
R Krishnaveni R
R Krishnaveni R
R Krishnaveni R
R Krishnaveni R
R Krishnaveni R
S Santhoshkumar
S Santhoshkumar
S Umadevi S
S Santhoshkumar
Dr. A. Aruljothi .
S Santhoshkumar
S Santhoshkumar
S Santhoshkumar
S Santhoshkumar
S Santhoshkumar
P Kathirvel P
R Krishnaveni R
P Kathirvel P
P Kathirvel P
R Krishnaveni R
R Krishnaveni R
R Krishnaveni R
R Krishnaveni R
P Kathirvel P
R Krishnaveni R
P Kathirvel P
P Mohanambal P
P Mohanambal P
R Krishnaveni R
P Mohanambal P
Dr. A. Aruljothi .
Dr. A. Aruljothi .
R Krishnaveni R
P Mohanambal P
Dr. A. Aruljothi .
P Mohanambal P
R Krishnaveni R
P Mohanambal P
Dr. A. Aruljothi .
R Krishnaveni R
Dr. A. Aruljothi .
S Umadevi S
Dr. A. Aruljothi .
S Umadevi S
S Umadevi S
S Senthilkumar
Dr. A. Aruljothi .
Dr. A. Aruljothi .
S Umadevi S
S Senthilkumar
S Umadevi S
S Umadevi S
Dr. A. Aruljothi .
S Umadevi S
Dr. A. Aruljothi .
S Umadevi S
S Umadevi S
Dr. A. Aruljothi .
S Umadevi S
S Umadevi S
Dr. A. Aruljothi .
S Umadevi S
S Umadevi S
S Umadevi S
S Umadevi S
S Umadevi S
S Umadevi S
S Umadevi S
S Umadevi S
S Umadevi S
S Umadevi S
S Santhoshkumar
S Santhoshkumar
S Umadevi S
S Santhoshkumar
S Santhoshkumar
S Santhoshkumar
S Santhoshkumar
S Umadevi S
S Umadevi S
S Santhoshkumar
S Santhoshkumar
S Santhoshkumar
S Santhoshkumar
S Santhoshkumar
S Santhoshkumar
Dr. A. Aruljothi .
S Senthilkumar
S Senthilkumar
S Senthilkumar
S Umadevi S
S Umadevi S
S Senthilkumar
S Senthilkumar
S Senthilkumar
S Senthilkumar
S Umadevi S
S Umadevi S
S Senthilkumar
Dr. A. Aruljothi .
S Senthilkumar
S Umadevi S
S Senthilkumar
S Umadevi S
KA Poornima
KA Poornima
KA Poornima
C Sasikumar C
Dr. P. Komaladevi .
KA Poornima
Dr. P. Komaladevi .
KA Poornima
KA Poornima
KA Poornima
Dr. P. Komaladevi .
Dr. P. Komaladevi .
C Sasikumar C
C Sasikumar C
C Sasikumar C
KA Poornima
Dr. P. Komaladevi .
KA Poornima
C Sasikumar C
C Sasikumar C
KA Poornima
Dr. P. Komaladevi .
C Sasikumar C
KA Poornima
C Sasikumar C
Dr. P. Komaladevi .
Dr. P. Komaladevi .
KA Poornima
Dr. P. Komaladevi .
Dr. P. Komaladevi .
C Sasikumar C
KA Poornima
C Sasikumar C
C Sasikumar C
Dr. P. Komaladevi .
KA Poornima
KA Poornima
Dr. P. Komaladevi .
Dr. P. Komaladevi .
KA Poornima
KA Poornima
C Sasikumar C
KA Poornima
C Sasikumar C
Dr. P. Komaladevi .
Dr. P. Komaladevi .
KA Poornima
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
KA Poornima
Dr. P. Komaladevi .
KA Poornima
Dr. P. Komaladevi .
KA Poornima
Dr. P. Komaladevi .
C Sasikumar C
Dr. P. Komaladevi .
C Sasikumar C
KA Poornima
Dr. R. Logambal .
KA Poornima
KA Poornima
C Sasikumar C
Dr. R. Logambal .
KA Poornima
KA Poornima
C Prabhu C
C Prabhu C
K Madheswaran
C Prabhu C
K Madheswaran
K Madheswaran
K Madheswaran
K Madheswaran
Dr. N. Sakthivel .
C Prabhu C
C Prabhu C
C Prabhu C
Dr. N. Sakthivel .
C Prabhu C
Dr. N. Sakthivel .
C Prabhu C
K Madheswaran
C Prabhu C
C Prabhu C
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
C Prabhu C
C Prabhu C
K Madheswaran
C Prabhu C
K Madheswaran
C Prabhu C
K Madheswaran
Dr. N. Sakthivel .
Dr. N. Sakthivel .
C Prabhu C
K Madheswaran
Dr. N. Sakthivel .
C Prabhu C
C Sasikumar C
C Sasikumar C
K Madheswaran
Dr. N. Sakthivel .
Dr. N. Sakthivel .
C Sasikumar C
Dr. N. Sakthivel .
Dr. N. Sakthivel .
K Madheswaran
K Madheswaran
C Sasikumar C
Dr. N. Sakthivel .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
C Sasikumar C
K Madheswaran
C Sasikumar C
K Madheswaran
C Sasikumar C
Dr. N. V. Poovendhiran .
K Madheswaran
Dr. N. V. Poovendhiran .
K Madheswaran
Dr. N. V. Poovendhiran .
K Madheswaran
B Logeswaran B
B Logeswaran B
K Madheswaran
B Logeswaran B
B Logeswaran B
K Madheswaran
Dr. K. Kalaiselvi .
K Madheswaran
K Madheswaran
Dr. K. Kalaiselvi .
B Logeswaran B
K Madheswaran
K Madheswaran
B Logeswaran B
K Madheswaran
K Madheswaran
B Logeswaran B
Dr. K. Kalaiselvi .
B Logeswaran B
K Madheswaran
K Madheswaran
Dr. K. Kalaiselvi .
K Madheswaran
B Logeswaran B
B Logeswaran B
Dr. K. Kalaiselvi .
B Logeswaran B
B Logeswaran B
K Madheswaran
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
K Madheswaran
Dr. K. Kalaiselvi .
K Madheswaran
Dr. K. Punitha .
B Logeswaran B
Dr. K. Punitha .
Dr. K. Punitha .
K Madheswaran
K Madheswaran
K Madheswaran
K Madheswaran
Dr. K. Punitha .
Dr. K. Punitha .
B Logeswaran B
B Logeswaran B
Dr. K. Punitha .
K Madheswaran
B Logeswaran B
Dr. K. Punitha .
K Madheswaran
K Madheswaran
K Madheswaran
Dr. K. Punitha .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. K. Punitha .
B Logeswaran B
B Logeswaran B
B Logeswaran B
Dr. K. Punitha .
Dr. K. Punitha .
C Prabhu C
Dr. K. Punitha .
Dr. K. Punitha .
K Madheswaran
K Madheswaran
Dr. K. Punitha .
Dr. K. Punitha .
K Madheswaran
Dr. K. Punitha .
K Madheswaran
K Madheswaran
Dr. K. Vasudevan .
C Prabhu C
Dr. K. Vasudevan .
K Madheswaran
Dr. K. Vasudevan .
K Madheswaran
B Logeswaran B
Dr. K. Kalaiselvi .
K Madheswaran
K Madheswaran
K Madheswaran
B Logeswaran B
K Madheswaran
B Logeswaran B
Dr. K. Kalaiselvi .
K Madheswaran
K Madheswaran
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
K Madheswaran
K Madheswaran
B Logeswaran B
Dr. K. Kalaiselvi .
B Logeswaran B
K Madheswaran
K Madheswaran
B Logeswaran B
Dr. K. Kalaiselvi .
B Logeswaran B
B Logeswaran B
B Logeswaran B
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
B Logeswaran B
K Madheswaran
Dr. K. Kalaiselvi .
B Logeswaran B
K Madheswaran
K Madheswaran
K Madheswaran
B Logeswaran B
K Madheswaran
K Madheswaran
C Sasikumar C
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
K Madheswaran
K Madheswaran
Dr. N. V. Poovendhiran .
C Sasikumar C
C Sasikumar C
C Sasikumar C
K Madheswaran
Dr. N. V. Poovendhiran .
C Sasikumar C
Dr. N. V. Poovendhiran .
K Madheswaran
K Madheswaran
K Madheswaran
K Madheswaran
Dr. N. V. Poovendhiran .
K Madheswaran
C Sasikumar C
Dr. N. V. Poovendhiran .
C Sasikumar C
C Sasikumar C
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
K Madheswaran
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
C Sasikumar C
K Madheswaran
C Sasikumar C
K Madheswaran
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
C Sasikumar C
K Madheswaran
C Sasikumar C
K Madheswaran
C Sasikumar C
Dr. N. V. Poovendhiran .
KA Poornima
KA Poornima
Dr. N. V. Poovendhiran .
KA Poornima
C Sasikumar C
C Sasikumar C
C Sasikumar C
Dr. N. V. Poovendhiran .
KA Poornima
KA Poornima
C Sasikumar C
KA Poornima
C Sasikumar C
C Sasikumar C
Dr. P. Komaladevi .
KA Poornima
KA Poornima
Dr. P. Komaladevi .
KA Poornima
K Madheswaran
C Prabhu C
K Madheswaran
Dr. K. Vasudevan .
K Madheswaran
K Madheswaran
K Madheswaran
K Madheswaran
C Prabhu C
Dr. K. Vasudevan .
Dr. K. Vasudevan .
C Prabhu C
Dr. K. Vasudevan .
Dr. K. Vasudevan .
K Madheswaran
Dr. K. Vasudevan .
C Prabhu C
K Madheswaran
Dr. K. Vasudevan .
K Madheswaran
C Prabhu C
K Madheswaran
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
C Prabhu C
C Prabhu C
Dr. K. Vasudevan .
C Prabhu C
Dr. K. Vasudevan .
C Prabhu C
K Madheswaran
K Madheswaran
C Prabhu C
C Prabhu C
C Prabhu C
Dr. K. Vasudevan .
Dr. K. Vasudevan .
K Madheswaran
Dr. K. Vasudevan .
K Madheswaran
K Madheswaran
K Madheswaran
C Prabhu C
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. N. Sakthivel .
C Prabhu C
C Prabhu C
C Prabhu C
Dr. N. Sakthivel .
C Prabhu C
K Madheswaran
Dr. N. Sakthivel .
K Madheswaran
C Prabhu C
Dr. N. Sakthivel .
C Prabhu C
K Madheswaran
C Prabhu C
K Madheswaran
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. M. Sathyapriya .
Dr. N. P. Revathi .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. N. P. Revathi .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. N. P. Revathi .
Dr. K. Vasudevan .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. K. Vasudevan .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. K. Vasudevan .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. K. Vasudevan .
Dr. M. Sathyapriya .
Dr. K. Vasudevan .
Dr. M. Sathyapriya .
Dr. K. Vasudevan .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. Vasudevan .
Dr. M. Sathyapriya .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. K. Vasudevan .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. N. P. Revathi .
Dr. K. Vasudevan .
Dr. N. P. Revathi .
Dr. K. Vasudevan .
Dr. N. P. Revathi .
Dr. K. Vasudevan .
Dr. N. P. Revathi .
Dr. K. Vasudevan .
Dr. N. P. Revathi .
Dr. K. Vasudevan .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. Prakash .
Dr. P. Komaladevi .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. N. Prakash .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. N. Prakash .
Dr. P.E. Elango .
Dr. P. Komaladevi .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. P.E. Elango .
Dr. P. Komaladevi .
Dr. P.E. Elango .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. Prakash .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Prakash .
Dr. N. Sakthivel .
Dr. N. Prakash .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Sakthivel .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. P. Revathi .
Dr. N. Sakthivel .
Dr. N. Sakthivel .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. N. Prakash .
Dr. P. Komaladevi .
Dr. N. Prakash .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. N. Prakash .
Dr. P. Komaladevi .
Dr. N. Prakash .
Dr. P. Komaladevi .
Dr. N. Prakash .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. V. Poovendhiran .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. D. Jayamma .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. D. Jayamma .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. D. Jayamma .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. D. Jayamma .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. G. A. Mylavathi .
Dr. D. Jayamma .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. D. Jayamma .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. G. A. Mylavathi .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. G. A. Mylavathi .
Dr. K. A. Senthildevi .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. K. A. Senthildevi .
Dr. D. Jayamma .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. D. Jayamma .
Dr. K. A. Senthildevi .
Dr. D. Jayamma .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. D. Jayamma .
Dr. K. A. Senthildevi .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
P Kalaivani
P Kalaivani
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
P Kalaivani
Dr. T. K. Sumathi .
P Kalaivani
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
P Kalaivani
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
P Kalaivani
P Kalaivani
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
P Kalaivani
P Kalaivani
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
P Kalaivani
Dr. T. K. Sumathi .
P Kalaivani
P Kalaivani
P Kalaivani
P Kalaivani
Dr. T. K. Sumathi .
P Kalaivani
Dr. T. K. Sumathi .
P Kalaivani
P Senthilkumar
P Senthilkumar
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
P Senthilkumar
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
P Senthilkumar
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
P Senthilkumar
Dr. V. K. Narendirakumar .
N Balusamy
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
N Balusamy
N Balusamy
N Balusamy
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
N Balusamy
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
N Balusamy
P Kalaivani
Dr. T. K. Sumathi .
P Kalaivani
P Kalaivani
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
N Balusamy
N Balusamy
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
N Balusamy
N Balusamy
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
N Balusamy
N Balusamy
N Balusamy
N Balusamy
N Balusamy
N Balusamy
N Balusamy
Dr. T. K. Shanmugam .
N Balusamy
N Balusamy
N Balusamy
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
N Balusamy
N Balusamy
N Balusamy
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
N Balusamy
N Balusamy
Dr. T. K. Shanmugam .
N Balusamy
N Balusamy
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
N Balusamy
N Balusamy
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
N Balusamy
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. U. Jayaprakash .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
N Balusamy
N Balusamy
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
N Balusamy
N Balusamy
N Balusamy
N Balusamy
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
P Kalaivani
Dr. T. K. Sumathi .
P Kalaivani
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
P Kalaivani
Dr. T. K. Sumathi .
P Kalaivani
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
P Kalaivani
P Kalaivani
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
P Kalaivani
Dr. T. K. Sumathi .
P Kalaivani
P Kalaivani
P Kalaivani
Dr. T. K. Sumathi .
P Kalaivani
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
P Kalaivani
P Kalaivani
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
P Kalaivani
P Kalaivani
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
P Kalaivani
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
P Kalaivani
P Kalaivani
P Kalaivani
P Kalaivani
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
P Kalaivani
Dr. T. K. Sumathi .
N Balusamy
Dr. T. K. Shanmugam .
N Balusamy
N Balusamy
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
N Balusamy
N Balusamy
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
N Balusamy
N Balusamy
N Balusamy
N Balusamy
N Balusamy
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
N Balusamy
N Balusamy
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
N Balusamy
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
N Balusamy
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. G. N. Prasaath .
Dr. K. P. Shanmugapriya .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. G. N. Prasaath .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. G. N. Prasaath .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. G. N. Prasaath .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. G. N. Prasaath .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. G. N. Prasaath .
Dr. K. P. Shanmugapriya .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. K. P. Shanmugapriya .
Dr. G. N. Prasaath .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. K. A. Senthildevi .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. K. A. Senthildevi .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. G. N. Prasaath .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. M. Sathyapriya .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. M. Sathyapriya .
Dr. K. Vasudevan .
Dr. M. Sathyapriya .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. Vasudevan .
Dr. M. Sathyapriya .
Dr. K. Vasudevan .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. Vasudevan .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. Kalaiselvi .
Dr. M. Sathyapriya .
Dr. K. Kalaiselvi .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. Punitha .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. Vasudevan .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. Vasudevan .
Dr. M. Sathyapriya .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. K. Vasudevan .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. Vasudevan .
Dr. M. Sathyapriya .
Dr. K. Vasudevan .
Dr. M. Sathyapriya .
Dr. K. Vasudevan .
Dr. M. Sathyapriya .
Dr. K. Vasudevan .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. K. Punitha .
Dr. M. Sathyapriya .
Dr. K. Punitha .
Dr. A. Sivakumar .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
D Vinoth
D Vinoth
Dr. G. A. Mylavathi .
D Vinoth
Dr. G. A. Mylavathi .
D Vinoth
Dr. G. A. Mylavathi .
D Vinoth
D Vinoth
D Vinoth
Dr. G. A. Mylavathi .
D Vinoth
D Vinoth
D Vinoth
Dr. G. A. Mylavathi .
D Vinoth
D Vinoth
D Vinoth
D Vinoth
D Vinoth
Dr. R. Aravind .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr. T. K. Sumathi .
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
G Prabhu
G Prabhu
D Vinoth
D Vinoth
D Vinoth
D Vinoth
D Vinoth
D Vinoth
D Vinoth
Dr. G. A. Mylavathi .
D Vinoth
D Vinoth
D Vinoth
D Vinoth
D Vinoth
D Vinoth
D Vinoth
D Vinoth
Dr. G. A. Mylavathi .
D Vinoth
D Vinoth
D Vinoth
D Vinoth
D Vinoth
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. K. P. Shanmugapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. M. Sathyapriya .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. N. Prakash .
Dr. R. Aravind .
Dr. R. Aravind .
D Vinoth
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
D Vinoth
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
D Vinoth
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. G. A. Mylavathi .
Dr. A. Sivakumar .
D Vinoth
Dr. G. A. Mylavathi .
D Vinoth
Dr. G. A. Mylavathi .
D Vinoth
D Vinoth
D Vinoth
D Vinoth
D Vinoth
D Vinoth
D Vinoth
D Vinoth
Dr. G. A. Mylavathi .
D Vinoth
D Vinoth
D Vinoth
D Vinoth
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
D Vinoth
D Vinoth
Dr. G. A. Mylavathi .
Dr. G. A. Mylavathi .
D Vinoth
R Santhosh
R Santhosh
R Santhosh
G Sri Sakthinayaki G
G Sri Sakthinayaki G
G Sri Sakthinayaki G
G Sri Sakthinayaki G
G Sri Sakthinayaki G
G Sri Sakthinayaki G
G Sri Sakthinayaki G
G Sri Sakthinayaki G
G Sri Sakthinayaki G
G Sri Sakthinayaki G
G Sri Sakthinayaki G
G Sri Sakthinayaki G
R Santhosh
G Sri Sakthinayaki G
G Sri Sakthinayaki G
R Santhosh
R Santhosh
R Santhosh
G Sri Sakthinayaki G
G Sri Sakthinayaki G
R Santhosh
G Sri Sakthinayaki G
R Santhosh
G Sri Sakthinayaki G
G Sri Sakthinayaki G
G Sri Sakthinayaki G
G Sri Sakthinayaki G
N Balusamy
N Balusamy
G Sri Sakthinayaki G
N Balusamy
R Santhosh
R Santhosh
N Balusamy
R Santhosh
R Santhosh
G Malathi G
G Malathi G
G Malathi G
G Malathi G
G Malathi G
G Malathi G
G Malathi G
G Malathi G
G Malathi G
R Santhosh
G Malathi G
R Santhosh
G Malathi G
G Malathi G
G Malathi G
G Malathi G
G Malathi G
G Malathi G
G Malathi G
R Santhosh
G Malathi G
R Santhosh
G Malathi G
G Malathi G
G Malathi G
R Santhosh
G Malathi G
G Malathi G
G Malathi G
R Santhosh
G Malathi G
R Santhosh
R Santhosh
G Malathi G
G Malathi G
R Santhosh
R Santhosh
G Malathi G
R Santhosh
G Malathi G
G Malathi G
Dr. R. Logambal .
Dr. R. Logambal .
G Malathi G
Dr. R. Logambal .
G Malathi G
Dr. R. Logambal .
KA Poornima
KA Poornima
G Malathi G
Dr. R. Logambal .
Dr. S. Krishnakumar .
KA Poornima
G Malathi G
KA Poornima
Dr. S. Krishnakumar .
KA Poornima
G Malathi G
Dr. S. Krishnakumar .
KA Poornima
KA Poornima
G Malathi G
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
KA Poornima
KA Poornima
KA Poornima
KA Poornima
KA Poornima
KA Poornima
G Malathi G
KA Poornima
Dr. S. Krishnakumar .
KA Poornima
KA Poornima
KA Poornima
G Malathi G
KA Poornima
G Malathi G
KA Poornima
KA Poornima
G Malathi G
Dr. S. Krishnakumar .
KA Poornima
KA Poornima
Dr. S. Krishnakumar .
G Malathi G
G Malathi G
G Malathi G
G Malathi G
Dr. S. Krishnakumar .
KA Poornima
G Malathi G
G Malathi G
KA Poornima
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
KA Poornima
Dr. S. Krishnakumar .
G Malathi G
KA Poornima
G Malathi G
G Malathi G
G Malathi G
KA Poornima
KA Poornima
Dr. S. Krishnakumar .
KA Poornima
KA Poornima
G Malathi G
KA Poornima
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
G Malathi G
KA Poornima
G Malathi G
KA Poornima
Dr. S. Krishnakumar .
KA Poornima
KA Poornima
G Malathi G
G Malathi G
Dr. S. Krishnakumar .
G Malathi G
G Malathi G
KA Poornima
KA Poornima
G Malathi G
KA Poornima
KA Poornima
Dr. S. Krishnakumar .
G Malathi G
Dr. S. Krishnakumar .
KA Poornima
KA Poornima
KA Poornima
G Malathi G
KA Poornima
KA Poornima
KA Poornima
Dr. U. Jayaprakash .
G Malathi G
KA Poornima
KA Poornima
G Malathi G
Dr. U. Jayaprakash .
G Malathi G
KA Poornima
Dr. U. Jayaprakash .
KA Poornima
KA Poornima
KA Poornima
C Sasikumar C
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Logambal .
KA Poornima
C Sasikumar C
C Sasikumar C
C Sasikumar C
C Sasikumar C
KA Poornima
C Sasikumar C
Dr. R. Logambal .
C Sasikumar C
C Sasikumar C
G Malathi G
KA Poornima
KA Poornima
Dr. R. Logambal .
G Malathi G
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Logambal .
KA Poornima
Dr. R. Logambal .
Dr. R. Logambal .
KA Poornima
KA Poornima
KA Poornima
KA Poornima
KA Poornima
G Malathi G
KA Poornima
G Malathi G
G Sri Sakthinayaki G
G Sri Sakthinayaki G
R Santhosh
G Sri Sakthinayaki G
G Malathi G
R Santhosh
G Malathi G
R Santhosh
G Malathi G
R Santhosh
G Malathi G
R Santhosh
G Malathi G
R Santhosh
R Santhosh
G Sri Sakthinayaki G
R Santhosh
G Sri Sakthinayaki G
G Sri Sakthinayaki G
R Santhosh
G Sri Sakthinayaki G
G Sri Sakthinayaki G
G Sri Sakthinayaki G
G Sri Sakthinayaki G
G Sri Sakthinayaki G
G Sri Sakthinayaki G
R Santhosh
G Sri Sakthinayaki G
G Sri Sakthinayaki G
G Sri Sakthinayaki G
R Santhosh
G Sri Sakthinayaki G
G Sri Sakthinayaki G
G Sri Sakthinayaki G
R Santhosh
G Sri Sakthinayaki G
R Santhosh
R Santhosh
R Santhosh
KA Poornima
Dr. U. Jayaprakash .
G Malathi G
Dr. U. Jayaprakash .
G Malathi G
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
G Malathi G
G Malathi G
G Malathi G
G Malathi G
KA Poornima
R Santhosh
G Malathi G
Dr. U. Jayaprakash .
R Santhosh
R Santhosh
R Santhosh
R Santhosh
G Malathi G
G Malathi G
Dr. U. Jayaprakash .
R Santhosh
Dr. U. Jayaprakash .
G Malathi G
Dr. U. Jayaprakash .
R Santhosh
Dr. U. Jayaprakash .
R Santhosh
Dr. U. Jayaprakash .
R Santhosh
R Santhosh
R Santhosh
G Malathi G
Dr. U. Jayaprakash .
G Malathi G
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
R Santhosh
G Malathi G
G Malathi G
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
G Malathi G
G Malathi G
G Malathi G
G Malathi G
R Santhosh
Dr. G. N. Prasaath .
B Logeswaran B
G Prabhu
B Logeswaran B
B Logeswaran B
B Logeswaran B
B Logeswaran B
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
G Prabhu
B Logeswaran B
Dr. G. N. Prasaath .
G Prabhu
B Logeswaran B
Dr. G. N. Prasaath .
B Logeswaran B
Dr. K. Kalaiselvi .
G Prabhu
G Prabhu
G Prabhu
G Prabhu
B Logeswaran B
G Prabhu
G Prabhu
B Logeswaran B
Dr. K. Kalaiselvi .
G Prabhu
G Prabhu
G Prabhu
G Prabhu
B Logeswaran B
Dr. K. Kalaiselvi .
Dr. K. Kalaiselvi .
K Madheswaran
K Madheswaran
Dr. K. Kalaiselvi .
K Madheswaran
K Madheswaran
Dr. K. Kalaiselvi .
Dr. S. Krishnakumar .
G Prabhu
G Prabhu
G Prabhu
G Prabhu
G Prabhu
Dr. D. Jayamma .
G Prabhu
G Prabhu
Dr. S. Krishnakumar .
G Prabhu
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
G Prabhu
G Prabhu
G Prabhu
Dr. S. Krishnakumar .
Dr. D. Jayamma .
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
G Prabhu
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
Dr. D. Jayamma .
Dr. D. Jayamma .
Dr. S. Krishnakumar .
G Prabhu
G Prabhu
Dr. D. Jayamma .
Dr. D. Jayamma .
G Prabhu
Dr. S. Krishnakumar .
Dr. D. Jayamma .
Dr. S. Krishnakumar .
G Prabhu
Dr. S. Krishnakumar .
G Prabhu
Dr. D. Jayamma .
G Prabhu
G Prabhu
G Prabhu
D Vinoth
D Vinoth
G Prabhu
D Vinoth
Dr. S. Krishnakumar .
G Prabhu
Dr. S. Krishnakumar .
D Vinoth
G Prabhu
G Prabhu
Dr. S. Krishnakumar .
D Vinoth
Dr. S. Krishnakumar .
D Vinoth
D Vinoth
G Prabhu
D Vinoth
Dr. A. Sivakumar .
G Prabhu
Dr. S. Krishnakumar .
G Prabhu
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. S. Krishnakumar .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
G Prabhu
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
G Prabhu
Dr. A. Sivakumar .
Dr. S. Krishnakumar .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
G Prabhu
Dr. S. Krishnakumar .
G Prabhu
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
G Prabhu
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
G Prabhu
Dr. A. Sivakumar .
Dr. S. Krishnakumar .
G Prabhu
G Prabhu
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
G Prabhu
G Prabhu
G Prabhu
G Prabhu
G Prabhu
Dr. A. Sivakumar .
Dr. S. Krishnakumar .
G Prabhu
Dr. A. Sivakumar .
Dr. S. Krishnakumar .
Dr. A. Sivakumar .
Dr. A. Sivakumar .
G Prabhu
Dr. A. Sivakumar .
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
G Prabhu
G Prabhu
Dr. S. Krishnakumar .
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
Dr. S. Krishnakumar .
C Sasikumar C
C Sasikumar C
C Sasikumar C
C Sasikumar C
C Sasikumar C
Dr. S. Krishnakumar .
Dr.V. Azhaharasan .
Dr. S. Krishnakumar .
C Sasikumar C
Dr.V. Azhaharasan .
G Prabhu
G Prabhu
C Sasikumar C
C Sasikumar C
C Sasikumar C
G Prabhu
G Prabhu
C Sasikumar C
D Vinoth
D Vinoth
G Prabhu
G Prabhu
G Prabhu
G Prabhu
G Prabhu
D Vinoth
G Prabhu
D Vinoth
D Vinoth
D Vinoth
D Vinoth
D Vinoth
G Prabhu
G Prabhu
Dr. S. Krishnakumar .
D Vinoth
D Vinoth
D Vinoth
Dr. S. Krishnakumar .
D Vinoth
G Prabhu
Dr. S. Krishnakumar .
G Prabhu
Dr. D. Jayamma .
Dr. S. Krishnakumar .
Dr. G. N. Prasaath .
G Prabhu
G Prabhu
Dr. S. Krishnakumar .
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
G Prabhu
Dr. G. N. Prasaath .
Dr. S. Krishnakumar .
Dr. G. N. Prasaath .
G Prabhu
B Logeswaran B
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
B Logeswaran B
G Prabhu
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
B Logeswaran B
G Prabhu
G Prabhu
B Logeswaran B
Dr. G. N. Prasaath .
B Logeswaran B
B Logeswaran B
G Prabhu
B Logeswaran B
Dr. G. N. Prasaath .
B Logeswaran B
Dr. G. N. Prasaath .
G Prabhu
Dr. G. N. Prasaath .
Dr. G. N. Prasaath .
G Prabhu
G Prabhu
G Prabhu
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
G Prabhu
Dr. A. Sivakumar .
Dr. A. Sivakumar .
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
Dr. A. Sivakumar .
G Prabhu
G Prabhu
G Prabhu
G Prabhu
Dr. D. Jayamma .
Dr. D. Jayamma .
G Prabhu
G Prabhu
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
G Prabhu
G Prabhu
G Prabhu
G Prabhu
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
Dr. D. Jayamma .
Dr. S. Krishnakumar .
Dr. D. Jayamma .
G Prabhu
G Prabhu
G Prabhu
Dr. D. Jayamma .
G Prabhu
G Prabhu
G Prabhu
Dr. D. Jayamma .
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
P Kathirvel P
P Kathirvel P
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
P Kathirvel P
P Kathirvel P
P Kathirvel P
P Kathirvel P
P Kathirvel P
P Kathirvel P
P Kathirvel P
P Kathirvel P
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
P Kathirvel P
Dr. V. P. Ananthi .
P Kathirvel P
P Kathirvel P
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
P Kathirvel P
Dr. V. P. Ananthi .
P Kathirvel P
Dr. V. P. Ananthi .
Dr. V. K. Narendirakumar .
P Senthilkumar
P Senthilkumar
P Senthilkumar
Dr. V. K. Narendirakumar .
P Senthilkumar
Dr. V. K. Narendirakumar .
P Senthilkumar
Dr. V. K. Narendirakumar .
P Senthilkumar
P Senthilkumar
Dr. V. K. Narendirakumar .
P Senthilkumar
Dr. V. K. Narendirakumar .
P Senthilkumar
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
P Senthilkumar
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
P Senthilkumar
P Senthilkumar
Dr. V. K. Narendirakumar .
P Senthilkumar
P Senthilkumar
P Senthilkumar
P Senthilkumar
P Senthilkumar
P Senthilkumar
P Senthilkumar
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
P Senthilkumar
P Senthilkumar
P Senthilkumar
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
P Senthilkumar
P Senthilkumar
P Senthilkumar
P Senthilkumar
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
P Senthilkumar
Dr. V. K. Narendirakumar .
P Senthilkumar
P Senthilkumar
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
P Senthilkumar
P Senthilkumar
P Senthilkumar
P Senthilkumar
Dr. V. K. Narendirakumar .
P Senthilkumar
Dr. V. K. Narendirakumar .
P Senthilkumar
P Senthilkumar
Dr. V. K. Narendirakumar .
P Senthilkumar
P Senthilkumar
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
P Senthilkumar
Dr. V. K. Narendirakumar .
P Senthilkumar
P Senthilkumar
P Senthilkumar
Dr. V. K. Narendirakumar .
P Senthilkumar
Dr. V. K. Narendirakumar .
P Senthilkumar
P Senthilkumar
Dr. V. K. Narendirakumar .
P Senthilkumar
P Senthilkumar
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
P Senthilkumar
P Senthilkumar
Dr. V. K. Narendirakumar .
P Senthilkumar
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
P Senthilkumar
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
P Senthilkumar
P Senthilkumar
P Senthilkumar
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
P Senthilkumar
P Senthilkumar
P Senthilkumar
P Senthilkumar
P Senthilkumar
Dr. V. K. Narendirakumar .
P Senthilkumar
P Senthilkumar
P Senthilkumar
Dr. V. K. Narendirakumar .
P Senthilkumar
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
P Senthilkumar
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
P Senthilkumar
Dr. V. K. Narendirakumar .
P Senthilkumar
Dr. V. K. Narendirakumar .
P Senthilkumar
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
P Senthilkumar
Dr. V. K. Narendirakumar .
P Senthilkumar
P Senthilkumar
P Senthilkumar
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
P Senthilkumar
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
P Senthilkumar
P Senthilkumar
P Senthilkumar
P Senthilkumar
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
P Senthilkumar
P Kathirvel P
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
P Kathirvel P
P Kathirvel P
P Kathirvel P
P Kathirvel P
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
P Kathirvel P
P Kathirvel P
P Kathirvel P
P Kathirvel P
P Kathirvel P
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
Dr. V. P. Ananthi .
P Kathirvel P
P Kathirvel P
P Kathirvel P
Dr. V. P. Ananthi .
P Kathirvel P
P Kathirvel P
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
P Kathirvel P
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
P Kathirvel P
P Kathirvel P
Dr. V. P. Ananthi .
P Kathirvel P
P Kathirvel P
Dr. V. P. Ananthi .
P Kathirvel P
P Kathirvel P
Dr. V. P. Ananthi .
P Kathirvel P
Dr. V. P. Ananthi .
P Kathirvel P
P Kathirvel P
Dr. V. P. Ananthi .
P Kathirvel P
P Kathirvel P
P Kathirvel P
P Kathirvel P
P Kathirvel P
Dr. V. K. Narendirakumar .
P Senthilkumar
P Senthilkumar
Dr. V. K. Narendirakumar .
P Senthilkumar
Dr. V. K. Narendirakumar .
P Senthilkumar
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
P Senthilkumar
Dr. V. K. Narendirakumar .
P Senthilkumar
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
P Senthilkumar
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
P Senthilkumar
P Senthilkumar
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
P Senthilkumar
P Senthilkumar
Dr. V. K. Narendirakumar .
Dr. V. K. Narendirakumar .
P Senthilkumar
Dr. V. K. Narendirakumar .
P Senthilkumar
P Senthilkumar
P Senthilkumar
P Senthilkumar
P Senthilkumar
P Senthilkumar
Dr. R. Aravind .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. T. K. Shanmugam .
Dr. U. Jayaprakash .
Dr. T. K. Shanmugam .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. T. K. Shanmugam .
Dr. T. K. Shanmugam .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Aravind .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Aravind .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. R. Logambal .
Dr. R. Aravind .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Aravind .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Aravind .
Dr. R. Logambal .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. R. Logambal .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. P.E. Elango .
Dr. P. Komaladevi .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. P.E. Elango .
Dr. P. Komaladevi .
Dr. P.E. Elango .
Dr. R. Logambal .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. R. Logambal .
Dr. P.E. Elango .
Dr. R. Logambal .
Dr. P.E. Elango .
Dr. R. Logambal .
Dr. P.E. Elango .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. P.E. Elango .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. P.E. Elango .
Dr. R. Logambal .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. R. Logambal .
Dr. P.E. Elango .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. P.E. Elango .
Dr. R. Logambal .
Dr. P.E. Elango .
Dr. R. Logambal .
Dr. P.E. Elango .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. R. Logambal .
Dr. R. Aravind .
Dr. P.E. Elango .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. P. Komaladevi .
Dr. P.E. Elango .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. P. Komaladevi .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. P. Komaladevi .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. P.E. Elango .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. U. Jayaprakash .
Dr. R. Aravind .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. R. Logambal .
Dr. R. Aravind .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Aravind .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. R. Logambal .
Dr. R. Aravind .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Aravind .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Aravind .
Dr. R. Logambal .
Dr. R. Aravind .
Dr. R. Logambal .
Dr. R. Logambal .
Dr. R. Aravind .
Dr. R. Aravind .
Dr. R. Logambal .
Dr. R. Aravind .
Dr. R. Logambal .
Dr. R. Aravind .
Dr. A. Aruljothi .
Dr. A. Aruljothi .
P Senthilkumar
P Senthilkumar
Dr. A. Aruljothi .
P Senthilkumar
Dr. A. Aruljothi .
R Krishnaveni R
P Senthilkumar
Dr. A. Aruljothi .
R Krishnaveni R
P Senthilkumar
Dr. A. Aruljothi .
P Kathirvel P
P Kathirvel P
P Kathirvel P
Dr. A. Aruljothi .
P Kathirvel P
R Krishnaveni R
Dr. A. Aruljothi .
R Krishnaveni R
Dr. A. Aruljothi .
P Kathirvel P
P Kathirvel P
Dr. A. Aruljothi .
Dr. A. Aruljothi .
Dr. A. Aruljothi .
R Krishnaveni R
P Kathirvel P
P Kathirvel P
Dr. A. Aruljothi .
P Kathirvel P
P Kathirvel P
Dr. A. Aruljothi .
P Kathirvel P
P Kathirvel P
R Krishnaveni R
Dr. A. Aruljothi .
P Kathirvel P
R Krishnaveni R
P Kathirvel P
Dr. A. Aruljothi .
P Kathirvel P
Dr. A. Aruljothi .
KA Poornima
KA Poornima
KA Poornima
KA Poornima
R Santhosh
R Santhosh
R Santhosh
R Santhosh
R Santhosh
Dr. A. Aruljothi .
Dr. A. Aruljothi .
Dr. A. Aruljothi .
Dr. A. Aruljothi .
Dr. A. Aruljothi .
G Sri Sakthinayaki G
G Sri Sakthinayaki G
R Santhosh
R Santhosh
R Santhosh
N Balusamy
R Santhosh
G Sri Sakthinayaki G
N Balusamy
N Balusamy
G Sri Sakthinayaki G
R Santhosh
G Sri Sakthinayaki G
R Santhosh
G Sri Sakthinayaki G
R Santhosh
N Balusamy
N Balusamy
R Santhosh
N Balusamy
R Santhosh
R Santhosh
N Balusamy
R Santhosh
N Balusamy
G Sri Sakthinayaki G
N Balusamy
P Kalaivani
G Sri Sakthinayaki G
P Kalaivani
P Kalaivani
G Sri Sakthinayaki G
R Santhosh
P Kalaivani
R Santhosh
G Sri Sakthinayaki G
G Sri Sakthinayaki G
R Santhosh
P Kalaivani
G Sri Sakthinayaki G
P Kalaivani
P Mohanambal P
P Mohanambal P
R Santhosh
P Mohanambal P
R Santhosh
P Mohanambal P
P Mohanambal P
P Mohanambal P
P Mohanambal P
P Kalaivani
P Mohanambal P
P Kalaivani
P Kalaivani
P Kalaivani
P Kalaivani
P Kalaivani
P Mohanambal P
R Santhosh
Dr. A. Aruljothi .
Dr. A. Aruljothi .
P Kalaivani
P Mohanambal P
Dr. A. Aruljothi .
P Kalaivani
P Mohanambal P
P Kalaivani
Dr. A. Aruljothi .
P Kalaivani
P Kalaivani
Dr. A. Aruljothi .
Dr. A. Aruljothi .
P Mohanambal P
Dr. A. Aruljothi .
Dr. A. Aruljothi .
P Mohanambal P
P Mohanambal P
P Mohanambal P
P Kalaivani
P Mohanambal P
P Mohanambal P
Dr. A. Aruljothi .
Dr. A. Aruljothi .
P Mohanambal P
P Kalaivani
P Mohanambal P
P Kalaivani
P Mohanambal P
P Mohanambal P
Dr. A. Aruljothi .
Dr. A. Aruljothi .
Dr. A. Aruljothi .
P Senthilkumar
P Senthilkumar
Dr. A. Aruljothi .
Dr. A. Aruljothi .
P Senthilkumar
Dr. A. Aruljothi .
Dr. A. Aruljothi .
Dr. A. Aruljothi .
P Senthilkumar
Dr. A. Aruljothi .
Dr. A. Aruljothi .
Dr. A. Aruljothi .
Dr. A. Aruljothi .
Dr. A. Aruljothi .
Dr. A. Aruljothi .
P Senthilkumar
P Senthilkumar
P Mohanambal P
R Santhosh
G Sri Sakthinayaki G
R Santhosh
R Santhosh
G Sri Sakthinayaki G
G Sri Sakthinayaki G
G Sri Sakthinayaki G
N Balusamy
G Sri Sakthinayaki G
R Santhosh
G Sri Sakthinayaki G
G Sri Sakthinayaki G
N Balusamy
G Sri Sakthinayaki G
G Sri Sakthinayaki G
N Balusamy
R Santhosh
N Balusamy
N Balusamy
N Balusamy
R Santhosh
G Sri Sakthinayaki G
G Sri Sakthinayaki G
G Sri Sakthinayaki G
R Santhosh
N Balusamy
G Sri Sakthinayaki G
R Santhosh
R Santhosh
R Santhosh
G Sri Sakthinayaki G
G Sri Sakthinayaki G
G Sri Sakthinayaki G
R Santhosh
G Sri Sakthinayaki G
P Senthilkumar
P Senthilkumar
Dr. A. Aruljothi .
P Senthilkumar
P Mohanambal P
P Mohanambal P
P Mohanambal P
P Senthilkumar
P Senthilkumar
Dr. A. Aruljothi .
P Senthilkumar
P Senthilkumar
P Senthilkumar
P Mohanambal P
P Senthilkumar
P Senthilkumar
P Senthilkumar
P Mohanambal P
P Senthilkumar
P Mohanambal P
P Mohanambal P
P Senthilkumar
Dr. A. Aruljothi .
P Mohanambal P
P Senthilkumar
P Mohanambal P
P Mohanambal P
P Senthilkumar
Dr. A. Aruljothi .
P Senthilkumar
P Mohanambal P
P Senthilkumar
P Senthilkumar
P Senthilkumar
P Senthilkumar
Dr. A. Aruljothi .
P Senthilkumar
Dr. A. Aruljothi .
P Mohanambal P
P Senthilkumar
P Senthilkumar
P Mohanambal P
P Mohanambal P
R Krishnaveni R
Dr. A. Aruljothi .
R Krishnaveni R
R Krishnaveni R
R Krishnaveni R
R Krishnaveni R
P Senthilkumar
P Senthilkumar
Dr. A. Aruljothi .
P Senthilkumar
P Senthilkumar
Dr. A. Aruljothi .
P Senthilkumar
P Mohanambal P
P Mohanambal P
P Senthilkumar
G Prabhu
G Prabhu
G Prabhu
K Madheswaran
K Madheswaran
K Madheswaran
K Madheswaran
K Madheswaran
KA Poornima
Dr.V. Azhaharasan .
C Sasikumar C
S Senthilkumar
S Senthilkumar
Dr.V. Azhaharasan .
S Senthilkumar
C Sasikumar C
C Sasikumar C
Dr.V. Azhaharasan .
C Sasikumar C
C Sasikumar C
S Senthilkumar
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
S Senthilkumar
Dr.V. Azhaharasan .
S Senthilkumar
S Senthilkumar
Dr.V. Azhaharasan .
C Sasikumar C
S Senthilkumar
Dr.V. Azhaharasan .
Dr. S. Krishnakumar .
Dr.V. Azhaharasan .
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
C Sasikumar C
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
Dr. S. Krishnakumar .
C Sasikumar C
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
C Sasikumar C
C Sasikumar C
Dr. S. Krishnakumar .
Dr.V. Azhaharasan .
S Senthilkumar
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
S Senthilkumar
S Senthilkumar
B Logeswaran B
S Senthilkumar
S Senthilkumar
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
B Logeswaran B
Dr.V. Azhaharasan .
S Senthilkumar
B Logeswaran B
B Logeswaran B
S Senthilkumar
S Senthilkumar
S Senthilkumar
S Senthilkumar
S Senthilkumar
Dr.V. Azhaharasan .
B Logeswaran B
S Senthilkumar
Dr.V. Azhaharasan .
B Logeswaran B
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
S Senthilkumar
S Senthilkumar
B Logeswaran B
B Logeswaran B
Dr.V. Azhaharasan .
S Senthilkumar
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
B Logeswaran B
S Senthilkumar
Dr.V. Azhaharasan .
B Logeswaran B
B Logeswaran B
S Senthilkumar
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
S Senthilkumar
S Senthilkumar
Dr.V. Azhaharasan .
S Senthilkumar
B Logeswaran B
Dr.V. Azhaharasan .
B Logeswaran B
B Logeswaran B
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
P Kathirvel P
Dr. V. P. Ananthi .
P Kathirvel P
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
P Kathirvel P
Dr. V. P. Ananthi .
P Kathirvel P
S Santhoshkumar
Dr. V. P. Ananthi .
S Santhoshkumar
S Santhoshkumar
S Santhoshkumar
Dr. V. P. Ananthi .
S Santhoshkumar
Dr. V. P. Ananthi .
S Santhoshkumar
S Santhoshkumar
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
S Santhoshkumar
S Santhoshkumar
S Santhoshkumar
Dr.V. Azhaharasan .
S Santhoshkumar
S Santhoshkumar
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
S Santhoshkumar
S Santhoshkumar
S Santhoshkumar
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
S Santhoshkumar
S Santhoshkumar
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
S Santhoshkumar
S Santhoshkumar
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
S Santhoshkumar
Dr.V. Azhaharasan .
S Santhoshkumar
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
S Santhoshkumar
S Santhoshkumar
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
S Santhoshkumar
S Santhoshkumar
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
S Santhoshkumar
S Santhoshkumar
Dr.V. Azhaharasan .
S Santhoshkumar
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
S Santhoshkumar
Dr.V. Azhaharasan .
S Santhoshkumar
S Santhoshkumar
S Santhoshkumar
S Santhoshkumar
S Santhoshkumar
Dr.V. Azhaharasan .
S Santhoshkumar
P Kathirvel P
P Kathirvel P
P Kathirvel P
P Kathirvel P
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
P Kathirvel P
P Kathirvel P
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
P Kathirvel P
P Kathirvel P
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
P Kathirvel P
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
P Kathirvel P
P Kathirvel P
P Kathirvel P
Dr. V. P. Ananthi .
P Kathirvel P
Dr. V. P. Ananthi .
P Kathirvel P
Dr. V. P. Ananthi .
P Kathirvel P
P Kathirvel P
P Kathirvel P
P Kathirvel P
P Kathirvel P
P Kathirvel P
Dr. V. P. Ananthi .
Dr. V. P. Ananthi .
P Kathirvel P
B Logeswaran B
B Logeswaran B
S Senthilkumar
B Logeswaran B
S Senthilkumar
S Senthilkumar
B Logeswaran B
B Logeswaran B
B Logeswaran B
S Senthilkumar
C Prabhu C
S Senthilkumar
C Prabhu C
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
S Senthilkumar
C Prabhu C
C Prabhu C
C Prabhu C
C Prabhu C
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
S Senthilkumar
Dr.V. Azhaharasan .
S Senthilkumar
S Senthilkumar
C Prabhu C
Dr.V. Azhaharasan .
S Senthilkumar
C Prabhu C
Dr.V. Azhaharasan .
C Prabhu C
C Prabhu C
C Prabhu C
S Senthilkumar
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
C Prabhu C
S Senthilkumar
S Senthilkumar
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
S Senthilkumar
C Prabhu C
S Senthilkumar
Dr.V. Azhaharasan .
C Prabhu C
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
S Senthilkumar
C Prabhu C
C Prabhu C
S Senthilkumar
C Prabhu C
C Prabhu C
S Senthilkumar
S Senthilkumar
Dr.V. Azhaharasan .
C Prabhu C
C Prabhu C
Dr.V. Azhaharasan .
S Santhoshkumar
S Santhoshkumar
S Santhoshkumar
S Santhoshkumar
S Santhoshkumar
S Santhoshkumar
Dr.V. Azhaharasan .
S Santhoshkumar
S Santhoshkumar
S Santhoshkumar
S Santhoshkumar
Dr.V. Azhaharasan .
S Santhoshkumar
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
S Santhoshkumar
Dr.V. Azhaharasan .
S Santhoshkumar
S Santhoshkumar
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
Dr.V. Azhaharasan .
S Santhoshkumar
S Senthilkumar
Dr.V. Azhaharasan .
S Senthilkumar
Dr.V. Azhaharasan .
S Senthilkumar
Q8 Re-Val Marks Q9 Re-Val Marks Q1 Re-Val Remarks Q2 Re-Val Remarks Q3 Re-Val Remarks Q4 Re-Val Remarks
Q5 Re-Val Remarks Q6 Re-Val Remarks Q7 Re-Val Remarks Q8 Re-Val Remarks Q9 Re-Val Remarks Revaluation Faculty Id
Re-Evaluation Count Re-Evaluation Reason
0
0 Average
0
0 Good
0
0 Good
0 Average
0 Good
0 Average
0 Below Average
0 Good
0
0
0 Average
0
0 Average
0 Good
0 Average
0
0 Below Average
0 Average
0
0 Good
0
0 Good
0 Average
0
0 Below Average
0
0
0 Average
0 Average
0 Good
0 Below Average
0 Below Average
0 Good
0 Average
0
0
0 Average
0 Average
0
0 Good
0 Average
0
0 Average
0
0 Average
0
0 Average
0 Good
0 Good
0 Good
0 Average
0 Good
0
0 Good
0 Average
0
0 Average
0 Good
0
0 Average
0 Good
0 Good
0 Good
0 Average
0 Good
0 Good
0 Good
0 Good
0
0
0 Good
0 Good
0
0 Good
0 Good
0 Good
0 Good
0 Average
0 Very Good
0
0 Good
0 Good
0 Good
0
0 Good
0 Very Good
0
0
0
0 Average
0 Average
0 Below Average
0 Below Average
0 Good
0 Good
0
0 Good
0 Good
0 Good
0 Good
0 Good
0
0 Good
0
0 Good
0 Good
0
0
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0
0 Good
0 Average
0
0 Good
0 Good
0 Good
0 Good
0
0 Good
0
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Average
0
0 Average
0
0 Average
0 Good
0 Good
0 Good
0 Good
0 Good
0 Below Average
0 Good
0 Good
0 Good
0 Wrong Answer
0 Average
0 Below Average
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0
0
0 Average
0 Average
0
0 Good
0 Good
0 Good
0
0 Average
0
0 Average
0
0 Average
0 Good
0 Average
0
0
0 Average
0 Average
0 Good
0 Average
0
0 Good
0
0 Average
0 Average
0
0 Average
0 Average
0
0 Average
0 Average
0 Average
0 Below Average
0 Below Average
0 Below Average
0 Average
0 Below Average
0 Average
0 Average
0 Very Good
0 Good
0 Good
0 Average
0 Average
0 Good
0 Average
0 Average
0 Good
0 Below Average
0 Good
0 Good
0 Good
0 Very Good
0 Good
0
0 Good
0 Average
0 Average
0 Good
0 Average
0 Good
0 Good
0 Good
0 Average
0 Average
0 Average
0 Good
0
0 Average
0 Average
0 Average
0 Average
0 Average
0 Average
0
0
0
0 Average
0
0 Average
0 Average
0 Average
0
0
0
0
0
0
0
0 Average
0
0
0 Average
0
0
0 Average
0
0
0
0 Good
0
0
0
0 Average
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 Below Average
0
0
0
0 Other subject File
0
0
0
0
0 Good
0
0 Good
0 Good
0 Good
0 Good
0
0
0
0
0
0
0
0
0 Good
0
0
0
0
0
0
0
0
0
0
0
0 Good
0
0 Good
0
0 Good
0
0
0
0 Good
0
0
0 Good
0
0
0
0
0
0
0
0 Good
0 Good
0
0
0 Very Good
0 Very Good
0
0 Good
0
0 Good
0
0 Very Good
0 Good
0 Below Average
0
0 Excellent
0 Good
0 Very Good
0 Good
0 Good
0 Very Good
0 Good
0 Average
0
0 Average
0 Average
0
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0
0 Very Good
0 Good
0 Good
0
0 Good
0 Good
0 Good
0
0 Good
0 Good
0 Average
0
0
0 Average
0
0 Average
0
0 Good
0
0
0 Average
0 Good
0 Good
0 Average
0
0
0 Good
0 Good
0
0 Good
0 Very Good
0
0 Good
0 Good
0 Good
0
0
0
0
0
0
0 Good
0 Very Good
0 Average
0
0
0 Good
0
0
0 Good
0
0
0
0 Good
0
0 Good
0
0
0 Good
0
0 Good
0
0 Good
0 Very Good
0
0 Good
0 Good
0 Good
0 Good
0 Average
0 Very Good
0
0 Good
0 Average
0
0
0
0 Good
0 Average
0 Good
0
0 Good
0 Average
0 Average
0 Very Good
0
0 Average
0 Very Good
0 Good
0
0
0 Very Good
0 Average
0
0 Good
0 Good
0 Average
0 Good
0 Very Good
0 Good
0 Good
0
0 Below Average
0 Excellent
0 Good
0 Good
0 Good
0
0
0
0 Good
0 Average
0
0 Average
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Good
0
0 Good
0
0
0 Very Good
0 Below Average
0 Below Average
0 Good
0 Average
0 Average
0 Below Average
0
0 Good
0
0 Good
0 Very Good
0 Good
0 Good
0
0 Good
0
0 Good
0
0 Excellent
0 Average
0 Average
0 Good
0 Good
0
0
0
0 Good
0 Average
0 Average
0
0 Average
0
0
0
0 Average
0 Average
0
0 Average
0 Good
0 Average
0 Good
0
0 Good
0 Good
0 Good
0 Good
0 Average
0
0
0 Average
0
0
0 Good
0
0 Good
0 Good
0
0 Good
0
0 Good
0
0
0
0
0
0
0
0
0
0 Good
0 Good
0
0
0
0
0
0 Good
0
0 Good
0 Good
0 Good
0
0
0
0
0
0
0
0
0
0 Good
0
0
0 Good
0
0
0 Good
0
0 Good
0
0
0 Average
0 Below Average
0 Good
0
0
0
0
0 Below Average
0 Average
0 Average
0
0
0
0 Excellent
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Very Good
0 Good
0 Good
0 Good
0 Very Good
0 Good
0 Good
0
0
0 Good
0 Average
0 Good
0 Below Average
0 Good
0 Good
0
0
0
0
0
0
0
0
0
0
0
0 Average
0
0
0
0 Good
0 Average
0
0
0
0
0
0
0 Average
0 Good
0
0 Good
0 Good
0 Average
0 Good
0 Average
0 Average
0 Average
0 Good
0 Average
0 Good
0 Good
0 Very Good
0 Average
0 Very Good
0 Very Good
0 Average
0 Average
0 Average
0 Good
0 Good
0 Good
0 Good
0 Average
0 Average
0 Average
0 Good
0
0 Below Average
0
0
0 Average
0 Good
0
0
0 Good
0
0 Good
0 Good
0
0 Good
0 Good
0
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0
0 Average
0
0
0
0
0
0
0
0
0 Average
0
0
0
0
0
0
0
0
0 Below Average
0 Below Average
0
0 Below Average
0
0 Good
0
0
0 Below Average
0
0
0
0 Below Average
0
0 Good
0 Below Average
0 Wrong Answer
0
0
0 Good
0 Good
0 Good
0
0
0
0 Good
0
0 Good
0
0 Good
0
0 Good
0
0 Good
0
0 Good
0
0
0
0
0 Very Good
0 Good
0
0 Good
0 Good
0
0
0
0 Average
0
0
0
0 Average
0 Good
0
0 Good
0 Good
0 Good
0
0
0
0 Good
0
0 Very Good
0
0
0
0 Good
0 Good
0 Below Average
0 Average
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Average
0 Good
0 Below Average
0 Good
0 Average
0 Average
0 Good
0 Very Good
0 Good
0 Average
0 Very Good
0 Below Average
0 Below Average
0 Excellent
0 Very Good
0 Good
0 Good
0 Below Average
0 Good
0 Below Average
0 Very Good
0 Very Good
0 Below Average
0 Very Good
0 Good
0 Average
0 Average
0 Very Good
0 Below Average
0 Good
0 Very Good
0 Very Good
0 Below Average
0 Very Good
0 Average
0 Good
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 Very Good
0
0
0 Good
0
0 Good
0
0
0
0
0 Good
0 Good
0 Average
0 Average
0
0
0 Good
0 Good
0
0 Very Good
0 Below Average
0 Good
0 Very Good
0 Very Good
0 Excellent
0 Excellent
0 Average
0 Good
0 Average
0 Good
0 Average
0 Very Good
0 Average
0 Very Good
0
0 Very Good
0 Good
0 Good
0 Very Good
0 Good
0 Average
0 Very Good
0 Average
0 Average
0 Good
0 Average
0 Average
0 Good
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Average
0 Good
0 Very Good
0 Good
0 Average
0 Below Average
0 Very Good
0 Average
0 Average
0 Good
0 Average
0 Very Good
0 Average
0 Good
0
0
0 Good
0
0 Below Average
0
0 Below Average
0 Below Average
0
0
0
0 Good
0 Good
0
0 Below Average
0 Good
0 Good
0 Wrong Answer
0
0
0
0 Good
0 Average
0
0
0
0 Average
0 Good
0 Good
0 Below Average
0 Good
0 Very Good
0 Below Average
0 Good
0 Very Good
0 Good
0 Very Good
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Average
0 Very Good
0 Good
0 Good
0 Good
0 Very Good
0 Very Good
0 Good
0 Very Good
0 Average
0 Good
0 Good
0 Very Good
0 Good
0 Good
0 Average
0 Average
0 Very Good
0 Very Good
0 Average
0 Good
0 Below Average
0 Good
0
0 Good
0 Average
0 Average
0 Average
0 Below Average
0 Average
0 Below Average
0 Good
0 Good
0 Good
0 Very Good
0 Average
0 Below Average
0 Good
0 Below Average
0 Average
0 Average
0 Good
0 Average
0 Good
0 Average
0 Good
0 Good
0 Good
0 Average
0 Good
0 Average
0 Very Good
0 Average
0 Very Good
0 Good
0 Excellent
0 Good
0 Very Good
0 Good
0
0 Very Good
0 Average
0
0 Good
0
0
0 Good
0
0
0 Good
0
0
0 Good
0 Very Good
0
0
0
0
0 Good
0 Average
0 Good
0
0
0
0
0 Good
0 Good
0
0 Good
0
0 Good
0 Good
0 Good
0 Good
0
0
0
0
0
0
0 Average
0 Good
0 Good
0
0
0
0
0
0 Good
0
0
0
0
0 Good
0
0
0
0
0 Good
0 Good
0 Good
0 Good
0
0
0
0
0 Very Good
0
0
0 Very Good
0
0
0
0 Very Good
0
0
0
0
0
0 Very Good
0 Good
0
0
0 Very Good
0
0
0
0 Good
0 Good
0 Good
0
0 Very Good
0
0
0
0
0 Good
0
0
0 Average
0 Good
0 Good
0
0 Very Good
0 Good
0 Good
0
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Good
0 Good
0 Good
0 Good
0
0 Very Good
0 Good
0
0
0
0 Good
0 Good
0
0 Good
0 Good
0 Good
0
0
0
0
0
0 Average
0 Good
0 Good
0
0 Good
0
0 Good
0
0 Good
0 Good
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 Good
0 Good
0
0
0
0 Good
0
0
0
0 Average
0 Good
0 Average
0
0
0 Average
0
0
0 Good
0
0
0 Good
0
0 Very Good
0
0 Good
0
0
0
0
0 Good
0 Good
0 Good
0
0
0 Very Good
0
0 Average
0
0
0
0 Good
0
0 Good
0 Average
0
0
0 Good
0 Good
0
0
0
0
0 Average
0 Very Good
0 Good
0 Good
0 Below Average
0 Average
0 Good
0
0
0
0 Average
0 Average
0
0
0 Good
0
0 Below Average
0
0
0 Very Good
0
0
0
0
0
0
0
0
0 Very Good
0 Good
0
0
0
0 Below Average
0 Average
0
0
0 Good
0
0 Very Good
0 Very Good
0 Average
0 Average
0
0 Average
0
0 Good
0 Good
0 Very Good
0
0
0 Good
0
0
0
0 Good
0
0
0
0 Good
0 Average
0 Below Average
0
0
0
0 Average
0
0 Average
0
0 Very Good
0 Good
0 Below Average
0
0 Very Good
0
0
0 Good
0
0 Average
0
0
0 Very Good
0
0 Good
0 Good
0 Average
0 Good
0 Good
0 Good
0 Average
0 Average
0 Good
0 Very Good
0 Average
0 Average
0 Good
0 Average
0 Good
0 Average
0 Average
0 Average
0 Average
0 Average
0 Good
0 Average
0 Good
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Average
0 Good
0 Below Average
0 Good
0 Average
0 Good
0 Average
0 Good
0 Good
0 Good
0 Very Good
0 Very Good
0 Good
0 Good
0 Good
0 Very Good
0 Good
0 Good
0 Average
0 Good
0 Good
0 Good
0
0 Average
0 Average
0 Good
0 Very Good
0 Good
0 Very Good
0 Average
0
0 Average
0 Good
0 Very Good
0
0
0 Good
0
0
0
0 Below Average
0 Below Average
0 Good
0
0 Excellent
0
0
0
0 Good
0 Very Good
0
0 Excellent
0 Good
0
0 Below Average
0
0
0
0 Good
0
0
0 Very Good
0
0
0
0 Good
0
0
0
0
0 Below Average
0 Very Good
0
0
0 Below Average
0
0
0 Good
0 Average
0 Average
0 Average
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Average
0 Average
0 Average
0 Good
0 Good
0 Good
0 Average
0 Good
0 Very Good
0 Good
0 Average
0 Good
0 Average
0 Good
0 Very Good
0 Average
0 Average
0 Very Good
0 Average
0 Good
0 Average
0 Good
0 Good
0
0
0 Good
0
0 Very Good
0
0
0 Average
0
0 Good
0
0
0
0
0 Average
0 Good
0
0
0 Very Good
0
0 Good
0 Good
0 Very Good
0
0 Good
0
0
0 Good
0 Good
0
0
0 Average
0 Below Average
0
0
0
0
0 Good
0
0
0
0 Average
0 Good
0 Average
0 Good
0
0
0 Good
0
0 Very Good
0
0 Very Good
0 Below Average
0
0 Average
0
0 Excellent
0 Average
0
0 Very Good
0
0
0 Below Average
0
0 Good
0
0 Below Average
0 Below Average
0 Very Good
0 Average
0 Below Average
0
0
0 Good
0 Good
0
0 Good
0
0
0 Average
0
0 Below Average
0
0
0
0
0
0
0
0 Below Average
0
0
0
0 Average
0
0
0 Good
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 Average
0
0 Very Good
0 Good
0 Good
0
0
0
0 Average
0 Good
0 Good
0 Very Good
0
0
0 Good
0
0
0
0 Good
0
0
0 Below Average
0
0
0 Good
0
0
0
0 Good
0
0
0
0 Good
0 Good
0
0
0 Good
0
0 Very Good
0 Good
0
0 Good
0 Good
0
0 Good
0
0 Average
0 Average
0
0 Good
0 Good
0
0
0 Average
0
0
0
0
0 Good
0
0 Good
0
0 Good
0
0 Below Average
0 Below Average
0 Average
0 Very Good
0
0 Very Good
0 Good
0 Average
0
0
0
0
0
0 Good
0 Good
0
0
0
0
0 Good
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 Average
0
0 Average
0
0
0
0
0
0
0
0 Average
0
0
0
0
0
0
0 Good
0
0
0 Good
0 Good
0 Good
0 Good
0
0
0
0
0 Average
0
0
0 Average
0 Average
0
0
0
0
0 Average
0
0
0
0
0
0
0
0 Good
0
0
0
0 Average
0 Average
0 Average
0 Average
0 Average
0 Average
0 Below Average
0 Average
0 Very Good
0 Very Good
0 Average
0 Average
0 Good
0 Good
0 Average
0 Average
0 Average
0
0 Good
0 Below Average
0 Average
0 Average
0 Good
0
0 Average
0 Average
0 Average
0 Below Average
0
0 Average
0
0 Average
0 Average
0
0 Good
0 Good
0 Average
0 Average
0 Average
0 Good
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 Good
0
0 Average
0
0
0
0
0
0 Average
0
0
0
0
0
0
0 Average
0 Average
0
0
0 Below Average
0
0
0 Good
0
0 Average
0 Average
0 Average
0
0
0 Average
0
0 Average
0
0
0
0 Average
0 Good
0 Good
0 Good
0
0 Good
0 Good
0 Good
0
0 Good
0 Average
0 Good
0 Good
0 Average
0 Good
0
0
0
0 Good
0 Average
0
0 Average
0 Good
0
0 Good
0 Very Good
0
0
0 Good
0
0 Below Average
0 Good
0
0 Very Good
0 Good
0 Below Average
0 Good
0 Average
0 Below Average
0 Good
0 Very Good
0 Average
0 Good
0
0 Very Good
0
0 Good
0
0
0
0
0
0
0 Average
0 Average
0 Good
0 Good
0
0
0 Average
0
0
0
0 Average
0 Good
0
0 Good
0 Very Good
0 Very Good
0
0 Good
0 Very Good
0 Good
0 Good
0 Very Good
0 Very Good
0 Very Good
0
0 Very Good
0 Very Good
0 Very Good
0 Good
0 Very Good
0 Good
0 Good
0 Very Good
0 Average
0 Average
0 Average
0 Average
0 Average
0 Good
0 Good
0 Good
0 Good
0
0 Good
0 Good
0 Average
0 Below Average
0 Very Good
0 Very Good
0 Very Good
0 Good
0 Very Good
0 Good
0 Very Good
0 Good
0 Excellent
0 Good
0 Average
0 Very Good
0 Good
0 Very Good
0 Below Average
0 Very Good
0 Good
0 Very Good
0 Below Average
0 Very Good
0
0
0
0
0
0 Good
0 Average
0 Average
0 Average
0 Average
0 Average
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Average
0 Very Good
0 Good
0 Good
0 Average
0 Good
0 Good
0 Very Good
0 Very Good
0 Very Good
0 Below Average
0 Average
0 Good
0 Good
0 Below Average
0 Very Good
0 Good
0 Below Average
0 Good
0 Good
0 Average
0 Below Average
0 Good
0 Average
0 Good
0 Good
0 Good
0 Good
0 Good
0 Below Average
0 Good
0 Very Good
0 Good
0 Average
0 Below Average
0 Very Good
0 Very Good
0 Very Good
0 Average
0 Very Good
0 Very Good
0 Good
0 Very Good
0 Good
0 Very Good
0 Very Good
0 Below Average
0 Very Good
0 Very Good
0 Very Good
0 Good
0
0 Good
0 Very Good
0 Very Good
0 Good
0
0
0
0
0
0
0
0
0
0
0
0
0 Good
0
0
0 Good
0 Good
0 Good
0
0
0 Good
0
0 Good
0
0
0
0
0 Good
0 Very Good
0
0 Very Good
0 Good
0 Good
0 Good
0 Average
0 Good
0 Average
0 Good
0 Good
0 Very Good
0
0 Very Good
0 Good
0 Good
0 Excellent
0 Good
0 Average
0 Very Good
0 Good
0 Excellent
0 Good
0 Average
0 Very Good
0 Excellent
0 Excellent
0 Very Good
0 Very Good
0 Good
0 Very Good
0 Very Good
0 Good
0 Good
0 Excellent
0 Excellent
0 Excellent
0
0 Average
0 Good
0 Average
0 Average
0 Good
0 Good
0 Average
0 Very Good
0 Good
0 Excellent
0 Good
0 Below Average
0 Average
0 Average
0 Below Average
0 Good
0 Average
0
0
0 Very Good
0 Below Average
0 Average
0
0 Excellent
0
0 Average
0
0 Good
0 Below Average
0
0
0 Average
0 Good
0 Good
0
0
0
0
0
0
0 Very Good
0
0 Average
0
0
0
0 Very Good
0
0 Average
0
0
0 Very Good
0 Good
0
0
0 Average
0 Very Good
0 Very Good
0 Below Average
0 Good
0 Very Good
0
0 Average
0 Average
0
0 Good
0 Good
0 Average
0
0 Good
0 Good
0
0 Very Good
0 Average
0 Very Good
0
0
0 Good
0
0
0 Excellent
0
0 Good
0 Average
0 Average
0
0 Very Good
0
0 Wrong Answer
0
0
0 Excellent
0 Very Good
0 Average
0 Excellent
0 Very Good
0
0
0 Excellent
0
0
0 Good
0 Excellent
0 Good
0
0
0
0 Below Average
0
0
0
0 Good
0 Excellent
0
0
0 Good
0 Good
0 Wrong Answer
0
0 Good
0
0
0
0
0 Below Average
0 Average
0 Average
0
0
0
0
0
0
0
0 Good
0
0
0 Excellent
0
0
0 Below Average
0 Very Good
0 Below Average
0 Below Average
0 Good
0 Average
0 Average
0 Below Average
0
0 Average
0 Average
0
0
0
0
0
0 Average
0
0 Good
0 Average
0 Good
0 Good
0 Very Good
0 Excellent
0 Good
0 Very Good
0 Very Good
0 Below Average
0 Good
0 Average
0 Good
0 Good
0 Good
0 Good
0 Below Average
0 Below Average
0 Good
0 Good
0 Good
0 Below Average
0 Very Good
0 Below Average
0 Good
0
0
0 Good
0
0
0
0
0
0
0
0 Average
0
0 Good
0 Good
0 Good
0
0 Average
0 Good
0 Average
0 Excellent
0 Wrong Answer
0 Wrong Answer
0 Very Good
0 Good
0 Good
0 Very Good
0
0 Good
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Below Average
0 Very Good
0 Good
0 Good
0 Very Good
0 Very Good
0 Good
0 Good
0 Good
0 Very Good
0 Good
0 Good
0 Good
0 Very Good
0 Excellent
0 Good
0 Very Good
0 Average
0 Very Good
0 Average
0 Average
0 Very Good
0 Good
0 Good
0 Average
0 Good
0 Excellent
0 Good
0 Excellent
0 Very Good
0 Very Good
0 Below Average
0 Good
0
0 Good
0 Below Average
0 Good
0 Very Good
0 Good
0 Good
0 Average
0
0 Good
0 Good
0
0 Good
0 Good
0 Very Good
0
0
0
0
0
0 Excellent
0
0
0 Good
0
0
0
0
0
0 Very Good
0
0
0 Good
0 Good
0
0 Good
0 Good
0
0 Average
0
0
0
0
0
0 Very Good
0
0
0 Good
0
0 Very Good
0
0
0
0
0 Average
0 Good
0 Average
0
0
0
0 Good
0
0 Good
0 Good
0
0 Good
0 Good
0
0
0 Average
0
0
0
0
0
0 Average
0
0 Good
0
0 Average
0
0
0
0 Good
0 Average
0 Very Good
0 Good
0 Good
0 Good
0 Average
0 Average
0 Average
0 Very Good
0 Average
0 Below Average
0 Good
0 Very Good
0 Average
0 Very Good
0 Good
0 Very Good
0 Very Good
0
0 Average
0 Average
0 Good
0 Good
0 Good
0
0
0
0
0 Average
0
0
0 Good
0 Good
0 Good
0 Good
0
0 Good
0
0
0
0 Good
0 Below Average
0 Below Average
0 Average
0 Good
0 Very Good
0 Average
0 Good
0 Good
0
0 Good
0 Good
0 Good
0 Average
0 Average
0 Below Average
0 Average
0 Average
0
0
0
0 Average
0
0
0 Good
0
0
0
0
0 Good
0 Average
0
0
0 Good
0
0
0 Good
0
0
0
0
0
0 Average
0
0 Good
0
0
0 Good
0 Average
0
0
0
0 Average
0 Average
0
0 Very Good
0 Good
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Very Good
0 Very Good
0 Good
0 Good
0 Below Average
0 Average
0 Good
0 Average
0 Very Good
0 Good
0 Good
0 Very Good
0 Good
0 Good
0
0
0 Average
0 Good
0
0
0 Good
0 Average
0 Good
0
0 Good
0 Average
0 Good
0
0 Good
0 Good
0 Very Good
0 Average
0
0 Good
0 Good
0 Very Good
0
0
0 Good
0 Average
0 Good
0 Very Good
0
0 Good
0 Very Good
0 Good
0 Good
0
0 Good
0 Below Average
0
0
0
0 Average
0 Good
0
0
0
0 Good
0 Average
0 Good
0
0
0
0
0
0 Good
0 Very Good
0
0
0 Average
0 Good
0
0
0
0
0 Average
0 Good
0 Good
0 Good
0 Average
0 Good
0 Good
0 Good
0
0
0
0 Average
0
0
0
0 Good
0 Average
0 Good
0 Good
0 Average
0 Below Average
0 Average
0 Average
0 Copy Case-Internet/Course Book
0 Average
0 Very Good
0 Excellent
0 Excellent
0 Below Average
0 Very Good
0 Very Good
0 Very Good
0 Excellent
0 Excellent
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Excellent
0 Good
0 Good
0 Below Average
0 Good
0 Good
0 Good
0 Good
0 Excellent
0 Good
0 Excellent
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Average
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Average
0 Good
0 Good
0 Very Good
0 Good
0 Very Good
0 Good
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Average
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Average
0 Good
0 Good
0 Good
0 Very Good
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Average
0 Average
0 Good
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Good
0 Good
0 Very Good
0 Good
0 Good
0 Very Good
0 Very Good
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Good
0 Good
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Good
0 Good
0 Below Average
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Very Good
0 Good
0 Good
0 Good
0 Very Good
0 Good
0 Good
0 Good
0 Very Good
0 Very Good
0 Good
0 Very Good
0 Good
0 Average
0 Good
0 Very Good
0 Good
0 Average
0 Average
0 Good
0 Good
0 Average
0 Very Good
0 Good
0 Good
0 Good
0 Average
0 Very Good
0 Very Good
0 Good
0 Good
0 Very Good
0 Very Good
0 Good
0 Very Good
0 Wrong Answer
0 Very Good
0 Very Good
0 Very Good
0 Very Good
0 Good
0 Good
0 Below Average
0 Good
0 Good
0 Very Good
0 Good
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Very Good
0 Good
0 Average
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Good
0 Good
0 Very Good
0 Good
0 Below Average
0 Good
0 Copy Case-Internet/Course Book
0 Good
0 Copy Case-Internet/Course Book
0 Good
0 Good
0 Good
0
0
0
0 Good
0
0
0 Average
0
0
0
0 Very Good
0
0 Good
0
0 Good
0
0 Good
0 Very Good
0 Good
0
0 Good
0 Very Good
0
0
0
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Average
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Average
0 Good
0 Good
0 Average
0 Good
0
0 Below Average
0 Average
0
0 Very Good
0 Below Average
0
0
0
0
0
0
0
0 Average
0
0 Below Average
0 Below Average
0 Below Average
0 Other subject File
0 Good
0 Other subject File
0 Below Average
0
0 Other subject File
0 Good
0 Below Average
0 Below Average
0
0 Good
0
0
0 Only Questions written
0
0
0
0 Very Good
0 Average
0 Very Good
0
0 Very Good
0 Very Good
0
0 Average
0
0 Good
0 Very Good
0 Very Good
0 Good
0 Good
0
0
0
0
0
0
0 Very Good
0 Good
0
0
0 Good
0
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Good
0 Average
0 Good
0 Below Average
0 Good
0 Good
0 Good
0 Good
0 Good
0 Other subject File
0 Good
0 Other subject File
0 Good
0 Good
0 Other subject File
0
0 Below Average
0 Below Average
0 Average
0
0
0 Very Good
0 Very Good
0
0 Average
0
0 Average
0
0 Below Average
0 Average
0 Average
0 Average
0 Average
0
0
0 Below Average
0 Below Average
0
0
0
0 Below Average
0 Below Average
0
0
0
0
0 Below Average
0 Average
0
0
0 Other subject File
0 Good
0
0
0
0 Good
0 Good
0 Good
0
0 Good
0
0
0
0
0 Good
0 Good
0 Good
0
0
0 Good
0 Good
0 Good
0
0
0
0 Good
0 Good
0
0
0
0 Good
0 Good
0
0 Good
0 Good
0 Very Good
0 Very Good
0 Very Good
0 Very Good
0
0 Very Good
0 Very Good
0
0 Very Good
0
0 Very Good
0
0 Good
0
0 Good
0
0 Good
0
0 Good
0
0
0
0 Good
0 Very Good
0
0
0 Very Good
0
0 Very Good
0
0
0
0 Very Good
0
0
0 Good
0
0
0
0 Good
0 Good
0 Good
0 Good
0 Good
0
0 Good
0 Good
0 Good
0
0 Average
0 Other subject File
0 Good
0 Good
0 Other subject File
0 Good
0 Average
0 Other subject File
0 Good
0 Good
0 Average
0 Average
0 Copy Case-Internet/Course Book
0 Below Average
0 Good
0 Other subject File
0 Average
0 Good
0 Good
0 Good
0 Average
0 Good
0 Other subject File
0 Below Average
0 Good
0 Below Average
0 Below Average
0 Good
0 Other subject File
0 Good
0 Average
0 Average
0 Good
0 Good
0 Below Average
0
0 Below Average
0
0
0
0 Below Average
0 Below Average
0
0 Good
0
0 Good
0 Good
0
0 Good
0 Good
0
0 Very Good
0 Good
0 Good
0
0
0 Good
0
0 Good
0
0 Good
0 Good
0
0
0
0 Good
0 Good
0 Good
0
0 Good
0 Very Good
0
0 Good
0 Good
0 Good
0
0 Good
0 Good
0 Good
0
0 Good
0
0
0
0
0
0 Good
0 Good
0 Good
0 Very Good
0 Good
0 Very Good
0 Very Good
0 Good
0 Average
0 Good
0
0
0 Good
0 Good
0 Good
0 Good
0 Good
0
0 Very Good
0 Average
0
0
0
0
0
0
0 Very Good
0 Average
0
0 Very Good
0
0
0 Excellent
0
0 Good
0
0 Average
0 Average
0
0 Average
0 Very Good
0
0
0 Very Good
0
0
0
0
0 Good
0
0 Average
0 Good
0 Good
0
0 Average
0
0 Good
0 Good
0 Average
0 Very Good
0 Very Good
0 Good
0 Average
0 Good
0 Good
0
0
0 Good
0
0 Very Good
0 Very Good
0
0 Good
0 Very Good
0
0 Average
0
0 Very Good
0
0
0 Good
0 Average
0 Good
0 Good
0 Very Good
0 Average
0 Very Good
0 Good
0
0 Good
0 Average
0 Good
0 Good
0 Good
0
0 Good
0
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Good
0 Good
0 Good
0
0 Good
0
0
0
0 Good
0
0
0
0
0
0
0 Good
0 Good
0 Good
0 Average
0
0 Good
0 Good
0
0
0
0 Excellent
0
0 Very Good
0
0
0 Good
0
0
0 Very Good
0 Good
0 Very Good
0 Below Average
0 Very Good
0 Good
0
0
0
0 Good
0 Good
0
0 Very Good
0 Good
0 Good
0
0
0
0 Good
0
0 Good
0 Good
0
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Average
0 Very Good
0 Good
0 Very Good
0 Good
0
0 Good
0 Very Good
0 Very Good
0 Good
0 Good
0
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0
0 Below Average
0
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0
0 Good
0 Good
0 Good
0 Good
0 Below Average
0 Good
0
0 Good
0 Good
0
0 Good
0 Good
0 Good
0 Good
0
0
0
0 Good
0 Good
0 Good
0 Good
0 Good
0
0
0 Good
0 Average
0 Average
0
0 Average
0
0
0
0 Average
0 Good
0 Good
0
0
0
0 Average
0
0 Average
0 Good
0
0
0 Good
0
0 Good
0
0 Average
0 Average
0
0
0
0 Average
0 Good
0 Average
0 Good
0 Good
0 Good
0
0
0
0 Average
0 Good
0
0
0 Good
0 Good
0 Good
0 Good
0 Average
0 Good
0
0 Average
0 Average
0 Good
0 Good
0 Good
0
0 Good
0 Good
0
0
0 Average
0 Good
0 Good
0 Below Average
0 Good
0 Good
0
0 Good
0 Average
0
0 Good
0 Good
0 Good
0 Very Good
0
0
0 Good
0 Average
0 Good
0 Good
0 Good
0 Good
0
0 Good
0 Good
0
0
0 Good
0 Good
0 Good
0 Average
0 Average
0 Good
0 Good
0
0 Good
0
0
0 Good
0 Very Good
0 Good
0 Very Good
0 Very Good
0 Average
0 Very Good
0 Good
0 Good
0 Very Good
0 Very Good
0 Average
0 Below Average
0 Good
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Copy Case-Internet/Course Book
0 Good
0 Good
0 Very Good
0 Good
0
0 Good
0 Average
0 Good
0 Good
0 Good
0 Good
0 Average
0 Good
0
0 Very Good
0 Very Good
0 Very Good
0 Good
0 Good
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Good
0 Good
0 Very Good
0 Good
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Very Good
0 Good
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Average
0 Very Good
0 Good
0 Good
0 Very Good
0 Good
0 Good
0 Very Good
0 Good
0 Good
0 Good
0
0 Good
0 Good
0 Good
0 Good
0 Good
0 Average
0 Average
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Average
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Good
0 Very Good
0 Good
0 Good
0 Very Good
0 Good
0 Below Average
0 Good
0 Very Good
0 Very Good
0 Good
0 Good
0 Good
0 Very Good
0 Average
0 Good
0
0
0 Average
0
0 Average
0 Average
0
0 Good
0 Good
0 Average
0 Good
0 Average
0 Good
0 Good
0 Good
0 Average
0 Very Good
0 Good
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Average
0 Good
0 Good
0 Good
0 Good
0
0
0
0 Good
0 Good
0 Good
0
0
0 Good
0 Good
0 Average
0
0
0 Good
0 Very Good
0 Good
0
0 Good
0
0
0 Good
0 Good
0 Good
0 Good
0 Very Good
0 Good
0 Average
0 Below Average
0
0
0
0
0 Very Good
0 Good
0 Very Good
0 Below Average
0 Good
0 Good
0 Good
0 Average
0 Good
0 Good
0 Very Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Good
0 Average
0 Good
0 Good

You might also like