13 122001 4800000206 Nap Ele Itp 000006 - 01
13 122001 4800000206 Nap Ele Itp 000006 - 01
13 122001 4800000206 Nap Ele Itp 000006 - 01
To PMC NEOM/AECOM
Rev
Document no. Type Description Action required
no.
Inspection 4800000206/018 - CONSTRUCTION OF Approval Comments
PROJECT (ITP) FOR INSTALLATION
13-122001-4800000206-NAP-ELE- & Test Plan
OF HDPE PIPES IN CONCRETE & 01
ITP-000006 with UNDERGROUND FOR ELECTRICAL Other
Information
Checklist SYSTEM
Signature
PMC’s comments
Signature
Received by Contractor
Name Date
Signature
4800000206/018 - CONSTRUCTION OF
PROJECT (ITP) FOR INSTALLATION OF
HDPE PIPES IN CONCRETE &
UNDERGROUND FOR ELECTRICAL SYSTEM
Document history
Document approval
INSPECTION AND TEST PLAN FOR INSTALLATION OF HDPE PIPES IN CONCRETE AND
UNDERGROUND FOR ELECTRICAL SYSTEM
NEOM QUALITY MANAGEMENT SYSTEM Main Contractor: Nesma & Partners Co. Ltd.
CONSTRUCTION OF PROJECT (ITP) FOR INSTALLATION OF HDPE PIPES
IN CONCRETE & UNDERGROUND FOR ELECTRICAL SYSTEM Sub-Contractor: NA
Contract Rev.
Contract No.: 4800000206/018
Title: Sindalah Island–Superstructure Works for Yacht Club Building at Cluster 2 ITP No.: 13-122001-4800000206-NAP-ELE-ITP-000006
No.:
01 Date: 11-DEC-2022
1.2 IFC & Shop Drawings Approved shop drawing As per approved shop drawing R R R R
1. NEOM-NEN-SCH-005.
Project specifications:
Quality Control Procedure for Installation 13-122001-4200000002-RAM-
1.4 ELE-SPC-000002_02
As per Approved QCP R/H R/H R/H R/H
and Sealing of HDPE PIPES AND FITTINGS.
Section 260543
2- Schedule Q
2 Receiving Material
NPIC-E-001 NEOM ETSD shall be notified on start of this
Receiving of HDPE pipes and Fittings Visual
2.1 Approved Material Submittal H H H H activity.
inspection
Storage, handling, and preservation of HDPE Schedule Q –Appendix C paragraph C05 NPIC-E-001 H Weekly inspection by contractor QC through WIR
2.2 H W W
pipes and fittings Visual inspection
3 Installation
Installation of HDPE pipes with fittings: The 1. Project Specification: NPIC-E-001 NEOM ETSD shall be notified on start of this
13-122001-4200000002-RAM- activity.
Pipe Sleeve routing as per approved survey ELE-SPC-000002_02
3.1 report and approved WIR Visual inspection Section 260543
H H H H
2. NEOM-NEN-SCH-005
3- Schedule Q
Cleaning and sealing conduit/pipe end Visual 1- Project Specification: NPIC-E-001 NEOM ETSD shall be notified on start of this
inspection 13-122001-4200000002-RAM- activity.
ELE-SPC-000002_02
3.2 Section 260543
H H H H
2- NEOM-NEN-SCH-005
3- Schedule Q
Warning Tape Installation Visual Inspection 1- Project Specification: NPIC-E-001 NEOM ETSD shall be notified on start of this
13-122001-4200000002-RAM- activity.
ELE-SPC-000002_02
3.3 Section 260543
H H H H
2- NEOM-NEN-SCH-005
3- Schedule Q
4 Pre-Commissioning
1- Project Specification: NEOM ETSD shall be notified on start of this
13-122001-4200000002-RAM- activity.
ELE-SPC-000002_02
Mandrel Test Visual Inspection Visual Section 260543 H
4.1 NPIC-E-001 H H H
inspection 2- NEOM-NEN-SCH-005
3- Schedule Q
Legend:
S: Responsible for carrying out random surveillance of
H: Contractor must not proceed without approval. R : Responsible for reviewing certification or reports. W: Responsible for / and witnessing all inspection or test.
inspection or test/Random Check.
.
Document No: 13-122001-4800000206-NAP-ELE-ITP-000006 Rev No: 01 Page 5 of 9
Classification | Company General
INSPECTION AND TEST PLAN FOR INSTALLATION OF HDPE PIPES IN CONCRETE AND
UNDERGROUND FOR ELECTRICAL SYSTEM
NEOM QUALITY MANAGEMENT SYSTEM Main Contractor: Nesma & Partners Co. Ltd.
CONSTRUCTION OF PROJECT (ITP) FOR INSTALLATION OF HDPE PIPES
IN CONCRETE & UNDERGROUND FOR ELECTRICAL SYSTEM Sub-Contractor: NA
Contract Rev.
Contract No.: 4800000206/018
Title: Sindalah Island–Superstructure Works for Yacht Club Building at Cluster 2 ITP No.: 13-122001-4800000206-NAP-ELE-ITP-000006
No.:
01 Date: 11-DEC-2022
Legend:
S: Responsible for carrying out random surveillance of
H: Contractor must not proceed without approval. R : Responsible for reviewing certification or reports. W: Responsible for / and witnessing all inspection or test.
inspection or test/Random Check.
.
Document No: 13-122001-4800000206-NAP-ELE-ITP-000006 Rev No: 01 Page 6 of 9
Classification | Company General Use
A
MATERIAL RECEIVING / MATERIAL STORAGE AND HANDLING.
Fill Placement Inspection
Fill Placement
Fill Placement
Inspection
Fill
B B B
B Compaction
INSTALLATION
Inspection
Compaction Inspection
Compaction
Compaction
Inspection
Co
B1 Slope: Pitch ducts a minimum slope of 1:300 down toward manholes and Project
handholes and away from buildings and equipment. Slope ducts from a Specification
high point in runs between two manholes to drain in both directions. 13-122001-
4200000002-
RAM-ELE-SPC-
000002_02
Section 260543
Para 3.5A
B2 Curves and Bends: Use 5-degree angle couplings for small changes in Project
direction. Use manufactured long sweep bends with a minimum radius of Specification
1200 mm, both horizontally and vertically, at other locations, unless 13-122001-
otherwise indicated. 4200000002-
RAM-ELE-SPC-
000002_02
Section 260543
Para 3.5B
B3 Joints: Use Approved joints in ducts and fittings and make watertight Project
according to manufacturer's written instructions. Stagger couplings so Specification
those of adjacent ducts do not lie in same plane. 13-122001-
4200000002-
RAM-ELE-SPC-
000002_02
Section 260543
Para 3.5C
B4 Grout end of pipes into structure walls from both sides to provide Project
watertight entrances. Specification
13-122001-
4200000002-
RAM-ELE-SPC-
000002_02
Section 260543
Document No: 13-122001-4800000206-NAP-ELE-ITP-000006 Rev No: 01 Page 7 of 9
Classification | Company General Use
B B B
C Compaction
Pre-Commissioning
Inspection
Compaction Inspection
Compaction
Compaction
Inspection
Co
REFERENCE DOCUMENTS:
material submittal, IFC, approved shop drawings and project specification.
Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date:
Name, Initials and Date:
QC Supervisor
Quality Record Approved:
Name, Sign and Date: