All piles within a stack shall be in groups of the same length and
on approved supports. All operations such as handling,
transporting and pitching of piles shall be carried out in a manner
such that no damage occurs to piles and their coatings. Piles that
are damaged during handling and transporting shall be replaced
by the Contractor at his own expense. All damaged and rejected
piles shall be removed from the Site forthwith.
5.6.3. Workmanship
(i) The Contractor shall submit for approval, full details of the
welding procedures and electrodes with Drawings and
schedules as may be necessary. Tests shall be undertaken
as may be required by the S.O. and shall be in accordance
with the requirements of BS EN 288
(ii) For spirally welded piles, one (1) of the following tests shall
be carried out:
The protective coating system shall comply with BS EN ISO 12944-5 and
shall comprise of at least:
5.6.4.2. Two (2) layers of Intermediate coating 0.08mm thick epoxy for
each layer