3. ELECTRICAL TESTS:
FUNCTION TEST:
SL.NO. Description Checked
1 Display function / Key button operation Ok
a) VOLTMETER TEST :
Expected
Injected Measured (V) % Error
Sl. (V)
% Voltage (a) ((a-b)/b)*100
No. (b)
(V)
Ph A Ph B Ph C Ph A/B/C Ph A Ph B Ph C
1 50 33.2 33.200
2 75 49.8 49.800
3 100 66.4 66.400
4 125 83.0 83.000
Accuracy = 0.25%
Tested by: Witnessed by: CSD Engineer Witnessed by: Consultant Engineer
Name: Engr. Ganesan Selvam Name: Engr. Mohamed Salim Name: Engr. Hamdy Bassry Name: Engr. Reda Eyada
Signature & Date : Signature & Date : Signature & Date : Signature & Date :
SITE INSPECTION AND TEST RECORD
Description: End Client: Date:
Revenue Meter SEC-WOA 04/11/2012
(Elster – A3 RAQ)
Panel Ref: Sheet:
ALGIHAZ CO. LTD 2 of 5
Site: Device ID: project no.:
132/13.8kV Tabuk University S/S 580/00
b) AMMETER TEST:
Expected
Injected Measured (Amps) % Error
(Amps)
SL. (a) ( (a-b)/b)*100
% Current (b)
No.
(Amps)
Ph A Ph B Ph C Ph A/B/C Ph A Ph B Ph C
1 25 0.25 0.250
2 50 0.50 0.500
3 75 0.75 0.750
4 100 1.00 1.000
5 125 1.25 1.250
Accuracy = 0.25%
Tested by: Witnessed by: CSD Engineer Witnessed by: Consultant Engineer
Name: Engr. Ganesan Selvam Name: Engr. Mohamed Salim Name: Engr. Hamdy Bassry Name: Engr. Reda Eyada
Signature & Date : Signature & Date : Signature & Date : Signature & Date :
SITE INSPECTION AND TEST RECORD
Description: End Client: Date:
Revenue Meter SEC-WOA 04/11/2012
(Elster – A3 RAQ)
Panel Ref: Sheet:
ALGIHAZ CO. LTD 3 of 5
Site: Device ID: project no.:
132/13.8kV Tabuk University S/S 580/00
e) KW METER TEST
KW = Vph * Iphase*cos(angle between voltage and current )/1000
Tested by: Witnessed by: CSD Engineer Witnessed by: Consultant Engineer
Name: Engr. Ganesan Selvam Name: Engr. Mohamed Salim Name: Engr. Hamdy Bassry Name: Engr. Reda Eyada
Signature & Date : Signature & Date : Signature & Date : Signature & Date :
SITE INSPECTION AND TEST RECORD
Description: End Client: Date:
Revenue Meter SEC-WOA 04/11/2012
(Elster – A3 RAQ)
Panel Ref: Sheet:
ALGIHAZ CO. LTD 4 of 5
Site: Device ID: project no.:
132/13.8kV Tabuk University S/S 580/00
Tested by: Witnessed by: CSD Engineer Witnessed by: Consultant Engineer
Name: Engr. Ganesan Selvam Name: Engr. Mohamed Salim Name: Engr. Hamdy Bassry Name: Engr. Reda Eyada
Signature & Date : Signature & Date : Signature & Date : Signature & Date :
SITE INSPECTION AND TEST RECORD
Description: End Client: Date:
Revenue Meter SEC-WOA 04/11/2012
(Elster – A3 RAQ)
Panel Ref: Sheet:
ALGIHAZ CO. LTD 5 of 5
Site: Device ID: project no.:
132/13.8kV Tabuk University S/S 580/00
SL. No. Test equipment used SL.NO. of Test equipment Calibration valid up to
1 FREJA 300 9502067 17-07-2013
Tested by: Witnessed by: CSD Engineer Witnessed by: Consultant Engineer
Name: Engr. Ganesan Selvam Name: Engr. Mohamed Salim Name: Engr. Hamdy Bassry Name: Engr. Reda Eyada