Problem RR
Problem RR
Problem RR
P1 0 5
P2 1 3
P3 2 1
P4 3 2
P5 4 3
If the CPU scheduling policy is Round Robin with time quantum = 2 unit, calculate the
average waiting time and average turn around time.
Solution-
Gantt Chart-
Ready Queue-
P5, P1, P2, P5, P4, P1, P3, P2, P1
Now, we know-
Turn Around time = Exit time – Arrival time
Waiting time = Turn Around time – Burst time
P1 13 13 – 0 = 13 13 – 5 = 8
P2 12 12 – 1 = 11 11 – 3 = 8
P3 5 5–2=3 3–1=2
P4 9 9–3=6 6–2=4
P5 14 14 – 4 = 10 10 – 3 = 7
Now,
Average Turn Around time = (13 + 11 + 3 + 6 + 10) / 5 = 43 / 5 = 8.6 unit
Average waiting time = (8 + 8 + 2 + 4 + 7) / 5 = 29 / 5 = 5.8 unit
Problem-02:
Consider the set of 6 processes whose arrival time and burst time are given below-
P1 0 4
P2 1 5
P3 2 2
P4 3 1
P5 4 6
P6 6 3
If the CPU scheduling policy is Round Robin with time quantum = 2, calculate the
average waiting time and average turn around time.
Solution-
Gantt chart-
Ready Queue-
P5, P6, P2, P5, P6, P2, P5, P4, P1, P3, P2, P1
Now, we know-
Turn Around time = Exit time – Arrival time
Waiting time = Turn Around time – Burst time
Process Id Exit time Turn Around time Waiting time
P1 8 8–0=8 8–4=4
P2 18 18 – 1 = 17 17 – 5 = 12
P3 6 6–2=4 4–2=2
P4 9 9–3=6 6–1=5
P5 21 21 – 4 = 17 17 – 6 = 11
P6 19 19 – 6 = 13 13 – 3 = 10
Now,
Average Turn Around time = (8 + 17 + 4 + 6 + 17 + 13) / 6 = 65 / 6 = 10.84 unit
Average waiting time = (4 + 12 + 2 + 5 + 11 + 10) / 6 = 44 / 6 = 7.33 unit
Problem-03:
Consider the set of 6 processes whose arrival time and burst time are given below-
P1 5 5
P2 4 6
P3 3 7
P4 1 9
P5 2 2
P6 6 3
If the CPU scheduling policy is Round Robin with time quantum = 3, calculate the
average waiting time and average turn around time.
Solution-
Gantt chart-
Ready Queue-
P3, P1, P4, P2, P3, P6, P1, P4, P2, P3, P5, P4
Now, we know-
Turn Around time = Exit time – Arrival time
Waiting time = Turn Around time – Burst time
P1 32 32 – 5 = 27 27 – 5 = 22
P2 27 27 – 4 = 23 23 – 6 = 17
P3 33 33 – 3 = 30 30 – 7 = 23
P4 30 30 – 1 = 29 29 – 9 = 20
P5 6 6–2=4 4–2=2
P6 21 21 – 6 = 15 15 – 3 = 12
Now,
Average Turn Around time = (27 + 23 + 30 + 29 + 4 + 15) / 6 = 128 / 6 = 21.33 unit
Average waiting time = (22 + 17 + 23 + 20 + 2 + 12) / 6 = 96 / 6 = 16 unit
Problem-04:
Four jobs to be executed on a single processor system arrive at time 0 in the order A, B,
C, D. Their burst CPU time requirements are 4, 1, 8, 1 time units respectively. The
completion time of A under round robin scheduling with time slice of one time unit is-
1. 10
2. 4
3. 8
4. 9
Solution-
A 0 4
B 0 1
C 0 8
D 0 1
Gantt chart-
Ready Queue-
C, A, C, A, C, A, D, C, B, A