Group 9
Group 9
Group Members:
Percentage
80
70
60
50
40
30
20
10
0 0 0 0 0 0 0
0
F C C+ B- B- B+ A A+
CLOs Achievement %
100
90
80
70
[%]
60
50
40
30
20
10
0 0 0 0 0 0 0 0 0 0 0 0
0
CLO-1 CLO-2 CLO-3 CLO-4 CLO-5 CLO-6 CLO-7 CLO-8 CLO-9 CLO-10 CLO-11 CLO-12
PLOs Achievement %
100
90
80
70
[%]
60
50
40
30
20
10
0 0 0 0 0 0 0 0 0 0 0 0
0 1 2 3 4 5 6 7 8 9 10 11 12
Project Supervisor:
Head of Department :
Grading Criteria: 1.Very Poor 2.Poor 3.Fair 4.Good 5.Excellent Proposal 7th End 8th Mid Final Viva
Total 32 0 0 0 0 42 0 0 0 0 62 0 0 0 0 64 0 0 0 0
Department of Civil Engineering, BZU Multan
FYP Proposal Evaluation (Form-1)
Construction planning and scheduling of a residential building project on primavera
Project Title: P6 software
Lec.Engr.Maria Iqbal Civil Engg.
Project Supervisor: Dept. BZU, Multan Session: 2020-2024
Date: Time:
Venue:
Comments:
CLO-5 Effectively ANALYZE collected data especially with due Environment and 7
consideration to environmental impacts Sustainability
CLO-6 Discussion on 1
DISCUSS on results obtained from data analysis
Results
CLO-7 DEVELOP conclusion from the discussion on results and Conclusion and 3
formulation of recommendation Recommendation
CLO-8 Sources 8
REFER and acknowledge the sources of information
Aknowledgement
CLO-9 Interpersonal 9
WORK efficiently as an individual and as team member
Skills
CLO-10 MANAGE different activities in systematic and effective Task Plan and 11
manner Time Management
CLO-12 DEFEND his/her project with presentable output (poster, Report Writing 10
presentation, article, report and/or drawings) and Defence
Grading
Very Poor (1) Poor (2) Fair (3) Good (4) Excelent (5)
Criteria
Department of Civil Engineering, BZU Multan
FYP Proposal Evaluation
Construction planning and scheduling of a residential building project on primavera
Project Title: P6 software
Lec.Engr.Maria Iqbal Civil Engg.
Project Supervisor: Dept. BZU, Multan Session: 2020-2024
CLO-1 5 0 0 0 0
CLO-2 5 0 0 0 0
CLO-3 3 0 0 0 0
CLO-4 0 0 0 0 0
CLO-5 0 0 0 0 0
CLO-6 0 0 0 0 0
CLO-7 0 0 0 0 0
CLO-8 3 0 0 0 0
CLO-9 3 0 0 0 0
CLO-10 3 0 0 0 0
CLO-11 5 0 0 0 0
CLO-12 5 0 0 0 0
Total 32 0 0 0 0
Date: Time:
Venue:
Comments:
CLO-5 Effectively ANALYZE collected data especially with due Environment and 7
consideration to environmental impacts Sustainability
CLO-6 Discussion on 1
DISCUSS on results obtained from data analysis
Results
CLO-7 DEVELOP conclusion from the discussion on results and Conclusion and 3
formulation of recommendation Recommendation
CLO-8 Sources 8
REFER and acknowledge the sources of information
Aknowledgement
CLO-9 Interpersonal 9
WORK efficiently as an individual and as team member
Skills
CLO-10 MANAGE different activities in systematic and effective Task Plan and 11
manner Time Management
CLO-12 DEFEND his/her project with presentable output (poster, Report Writing 10
presentation, article, report and/or drawings) and Defence
Grading
Very Poor (1) Poor (2) Fair (3) Good (4) Excelent (5)
Criteria
Department of Civil Engineering, BZU Multan
FYP Evaluation 7th Semester
Construction planning and scheduling of a residential building project on primavera P6
Project Title: software
Lec.Engr.Maria Iqbal Civil Engg.
Project Supervisor: Dept. BZU, Multan Session: 2020-2024
CLO-1 3 0 0 0 0
CLO-2 5 0 0 0 0
CLO-3 3 0 0 0 0
CLO4 5 0 0 0 0
CLO-5 5 0 0 0 0
CLO-6 0 0 0 0 0
CLO-7 0 0 0 0 0
CLO-8 3 0 0 0 0
CLO-9 3 0 0 0 0
CLO-10 5 0 0 0 0
CLO-11 5 0 0 0 0
CLO-12 5 0 0 0 0
Total 42 0 0 0 0
Date: Time:
Venue:
Comments:
CLO-5 Effectively ANALYZE collected data especially with due Environment and 7
consideration to environmental impacts Sustainability
CLO-6 Discussion on 1
DISCUSS on results obtained from data analysis
Results
CLO-7 DEVELOP conclusion from the discussion on results and Conclusion and 3
formulation of recommendation Recommendation
CLO-8 Sources 8
REFER and acknowledge the sources of information
Aknowledgement
CLO-9 Interpersonal 9
WORK efficiently as an individual and as team member
Skills
CLO-10 MANAGE different activities in systematic and effective Task Plan and 11
manner Time Management
CLO-12 DEFEND his/her project with presentable output (poster, Report Writing 10
presentation, article, report and/or drawings) and Defence
Grading
Very Poor (1) Poor (2) Fair (3) Good (4) Excelent (5)
Criteria
Department of Civil Engineering, BZU Multan
FYP Evaluation Mid 8th Semester
Construction planning and scheduling of a residential building project on primavera
Project Title: P6 software
Lec.Engr.Maria Iqbal Civil Engg.
Project Supervisor: Dept. BZU, Multan Session: 2020-2024
CLO-1 3 0 0 0 0
CLO-2 3 0 0 0 0
CLO-3 5 0 0 0 0
CLO-4 5 0 0 0 0
CLO-5 5 0 0 0 0
CLO-6 10 0 0 0 0
CLO-7 10 0 0 0 0
CLO-8 3 0 0 0 0
CLO-9 3 0 0 0 0
CLO-10 5 0 0 0 0
CLO-11 5 0 0 0 0
CLO-12 5 0 0 0 0
Total 62 0 0 0 0
Date: Time:
Venue:
Comments:
CLO-5 Effectively ANALYZE collected data especially with due Environment and 7
consideration to environmental impacts Sustainability
CLO-6 Discussion on 1
DISCUSS on results obtained from data analysis
Results
CLO-7 DEVELOP conclusion from the discussion on results and Conclusion and 3
formulation of recommendation Recommendation
CLO-8 Sources 8
REFER and acknowledge the sources of information
Aknowledgement
CLO-9 Interpersonal 9
WORK efficiently as an individual and as team member
Skills
CLO-10 MANAGE different activities in systematic and effective Task Plan and 11
manner Time Management
CLO-12 DEFEND his/her project with presentable output (poster, Report Writing 10
presentation, article, report and/or drawings) and Defence
Department of Civil Engineering, BZU Multan
FYP Evaluation Final 8th Semester
Construction planning and scheduling of a residential building project on primavera P6
Project Title: software
Lec.Engr.Maria Iqbal Civil Engg.
Project Supervisor: Dept. BZU, Multan Session: 2020-2024
Grading
Very Poor (1) Poor (2) Fair (3) Good (4) Excelent (5)
Criteria
CLO-1 5 0 0 0 0
CLO-2 3 0 0 0 0
CLO-3 5 0 0 0 0
CLO-4 5 0 0 0 0
CLO-5 5 0 0 0 0
CLO-6 10 0 0 0 0
CLO-7 10 0 0 0 0
CLO-8 3 0 0 0 0
CLO-9 3 0 0 0 0
CLO-10 5 0 0 0 0
CLO-11 5 0 0 0 0
CLO-12 5 0 0 0 0
Total 64 0 0 0 0
External Examiner
ROLL
SR# STUDENT NAME NUMBE
R
2020-
1 Ali Hassan
CE-26
2020-
2 Abdullah Bin Waseem
CE-28
2020-
3 Muhammad Danish
CE-38
0 0 0
Form-1 (Proposal)
Criteria
#REF!
#REF!
#REF!
#REF!
Proposal Defence Mid 7th (50)
Year: #REF!
Department of Civil Engineering, BZU Multan
FYP Evaluation Performa
Project Title: Construction planning and scheduling of a residential building project on primavera P6 software
Total 32 42 62 64 200
Student Name
Roll Number
CLO-1
CLO-2
CLO-3
CLO-4 - - - -
CLO-5 - - - -
CLO-6 - - - -
CLO-7 - - - -
CLO-8
CLO-9
CLO-10
CLO-11
CLO-12
Total
Comments: