SCALE 1:30

THEORETICAL EXCAVATION LINE


JET FAN PRIMARY SUPPORT (DEPENDING UPON ROCK CLASS)

30mm GEOTEXTILE WATER PROOFING MEMBRANE

300mm FINAL CONCRETE LINING (M30)


+4.771 FINISHED LEVEL

PUBLIC ADDRESS SYSTEM

MAINTENANCE PHONE

LEAKY FEEDER CABLE

CCTV (STAGGERED) CCTV (STAGGERED)

3500

LED LIGHTING LED LIGHTING FIXTURE


FIXTURE

CABLE TRAY CABLE TRAY

FIRE HYDRANT PIPE

ILLUMINATED ESCAPE
3500

ROUGE SIGN
TUNNEL

LIGHT SWITCH Reinforcement detail drawing


OF

of RCC Pavement Cast-in-situ


Cover Slab of Signal of Escape Tunnel Road is to


cable trenches EMERGENCY PHONE be required
(Precast)
Reinforcement detail
drawing is to be 1-PHASE AND 3-PHASE POWER SOCKET
500 700
required ± ROAD LEVEL
450 100

SIGNAL NO FINES CONCRETE


CABLES

400 SIDE DRAIN PERFORATED PIPE (Ø 200)


NO FINES CONCRETE
-1.000 DRAIN LEVEL
CENTER DRAINAGE PIPE Ø400

292 359 1453 1453 359 292


2104 2104
4208

CROSS SECTION FOR ESCAPE TUNNEL (WITHOUT INVERT)


SCALE 1:30