0% found this document useful (0 votes)
25 views1 page

Testplan

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views1 page

Testplan

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Components

of Test Plan
* Test Autom
Objective: it aim
Technique
ation * Effort
estimation * s to describe the s: Integr
Deliverables -
contents of the
project. and, it i ation testi
> Document/ s also called as li ng State
Template st/index. -Lis
ts the all tasks an Transition
d their goals. Methodologie
s: Waterfall
Spiral V mo
del Agile Int Assumption: in
this component, t
eractive RAD esters assumption
Incremental s should be made
Scope: it has the . eg: tester ne
* Objective - appr information about
oach of the projec ed support from t
the coverage of ar
t * Scope * Met
hodologies * Tec
ea that the project Risks:
he dev team or bu
siness team.
/ teams can expl
hniques * Assum ore in side or outsi
ptions * Risks * de. In-scope:
Risk Mitigation pla the modules cove
n * Roles & Resp

Risk Mitigation * Risks will happe


Plan: it is a plan n when the assum
to overcome or by ptions are failed.
pass the risks. the * Time is insuffic
purpose to avoid ient * Lack of co
the risks r to mmunication and
resolve the cooperation. * te
risks. * we go ba ster is incompeten

Schedule: prep Test Automation


are the schedule : here, we find t
to complete the t he functionalities
asks/issues. its suits to the auto
Tester: *revie about the projec mation. eg: Re
Estimations:
w & verify the pla t beginning to en peated TCs, Reu
n * attends the
plan
sable TCs.the
d timings.
meetings * ope efforts both
n the assigned ta men power
sks/issues * ge Test Environment and
nerate the feedb : it is all about
acks the software and financials.
hardware require Deliverables: it i
Roles & Responsib ment to conduct t s the final outco
ilities: The respo esting. * OSs
* Automations too me to provide to
nsibilities are diffe the customer. it
rent for different r ls & versions * Ha
oles . Test Ma
consists all the r
Defect Tracking: Entry & Exit eports derived in
nager: *Prepar it is a very impor Criteria: in this,
es the test plan. the test plan.
tant component th we check the both
* Conducts the m at arises the defec entry level
ts, bugs, errors in conditions with
the software. if th exit level
ere is any defect o conditions are
ccurs, it must be r perfectly matching

You might also like