0% found this document useful (0 votes)
15 views13 pages

WAMC QRO 01-Punch List

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views13 pages

WAMC QRO 01-Punch List

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

Printed on Mon May 13, 2024 at 11:26 am CDT

Job #: 2200700 WAMC QRO 01


AVENIDA INDUSTRIAL NO 81 FRACCIONAMIENTO VYMSA QUERETARO INDUSTRAIL PARK MPIO
EL MARQUES .
WEITZ ABITAT MISSION CRITICAL
Calle Vito Alessio Robles 51-101, Col.
Exhacienda de Guadalupe Chimalistac, Alc.
Alvaro Obregon, Ciudad de México 01050
Mexico
1-602-206-5156

Punch Items for 2200700 - WAMC QRO 01 24 Items

#488: Retiro de postes de concreto

Type: Location:
WAMC Internal SITE - West

Date Created: Due Date:


05/13/2024 05/17/2024

Priority: Status:
High Work Required

Creator: Reference:
Luis Hermenegildo

Punch Item Manager: Final Approver:


Luis Hermenegildo Luis Hermenegildo

Ball in Court: Assignee Name:


Angeles Quinterio, Miriam
Miriam Yanet Angeles Yanet (VOLTRAK ENERGIA S A
Quinterio (VOLTRAK ENERGIA DE C V)
S A DE C V) Work Required
Adan Roberto Mata Puente Mata Puente, Adan Roberto
(VOLTRAK ENERGIA S A DE C (VOLTRAK ENERGIA S A DE C
V) V)
Work Required

Description:
Se solicita a VOLTRAK el retiro de los últimos dos postes de
concreto que se encuentran a lado norte del ADMIN. Su apoyo a
darnos una fecha compromiso, esta actividad lleva pendiente
mucho tiempo.

#487: Cut off old anchors and seal holes

Type: Location:

Date Created: Due Date:


05/10/2024 05/14/2024

Priority: Status:
Work Required

Creator: Reference:
Daniel Ambrocio
Punch Item Manager: Final Approver:
Daniel Ambrocio Daniel Ambrocio

Ball in Court: Assignee Name:


Angeles Quinterio, Miriam
Miriam Yanet Angeles
Yanet (VOLTRAK ENERGIA S A
Quinterio (VOLTRAK ENERGIA
DE C V)
S A DE C V)
Work Required

Description:

Drawing QRO01-C-C1-01: Site Rev.0

#486: Relocate exit sign to where it’s more visible

Type: Location:

Date Created: Due Date:


05/10/2024 05/14/2024

Priority: Status:
Work Required

Creator: Reference:
Daniel Ambrocio

Punch Item Manager: Final Approver:


Daniel Ambrocio Daniel Ambrocio Drawing QRO01-A-D-00-1: Colo 1 Rev.23

Ball in Court: Assignee Name:


Angeles Quinterio, Miriam
Miriam Yanet Angeles
Yanet (VOLTRAK ENERGIA S A
Quinterio (VOLTRAK ENERGIA
DE C V)
S A DE C V)
Work Required

Description:
Exit sign is blocked by cable tray on

#473: Entrance rooms/IER CEI cabinets - Ground bar acrylics missing/damaged. - Report03 - Issue#14

Type: Location:
Design Team NCI

Date Created: Due Date:


05/03/2024 05/07/2024

Priority: Status:
High Work Required

Creator: Reference:
Carina Villasenor

Punch Item Manager: Final Approver:


Carina Villasenor Carina Villasenor

Ball in Court: Assignee Name:


Aguilar Torres, Rafael
(VOLTRAK ENERGIA S A DE C
V)
Joey Enright (BURNS AND
Ready for Review
MCDONNELL)
Enright, Joey (BURNS AND
MCDONNELL)
Work Required

Description:
14. Ground bar acrylics missing/damaged.
a. Location: Entrance rooms/IER CEI cabinets
b. General Contractor to see below for corrective actions:
• Install/replace ground bar protection acrylics.
#471: Entrance/IER CEI cabinets - Conduit seals missing - Report 03 - Issue #12

Type: Location:
Design Team NCI WTB

Date Created: Due Date:


05/03/2024 05/07/2024

Priority: Status:
High Work Required

Creator: Reference:
Carina Villasenor

Punch Item Manager: Final Approver:


Carina Villasenor Carina Villasenor

Ball in Court: Assignee Name:


Enright, Joey (BURNS AND
Joey Enright (BURNS AND MCDONNELL)
MCDONNELL) Work Required
Rafael Aguilar Torres Aguilar Torres, Rafael
(VOLTRAK ENERGIA S A DE C (VOLTRAK ENERGIA S A DE C
V) V)
Work Required

Description:
12. Conduit seals missing.
a. Location: Entrance rooms/IER CEI cabinets/WTB
b. General Contractor to see below for corrective actions:
• Mechanical seals placed in conduit stub ups.

#468: ER02/CE01 RW03 - Unconnected, excess slack grounding wire. - Report03 - Issue#09

Type: Location:
Design Team NCI

Date Created: Due Date:


05/03/2024 05/07/2024

Priority: Status:
Work Required

Creator: Reference:
Carina Villasenor

Punch Item Manager: Final Approver:


Carina Villasenor Carina Villasenor

Ball in Court: Assignee Name:


Aguilar Torres, Rafael
Rafael Aguilar Torres (VOLTRAK ENERGIA S A DE C
(VOLTRAK ENERGIA S A DE C V)
V) Work Required
Joey Enright (BURNS AND Enright, Joey (BURNS AND
MCDONNELL) MCDONNELL)
Work Required

Description:
9. Unconnected, excess slack grounding wire.
a. Location: ER2/COLO1 Cell1 Row3
b. General Contractor to see below for corrective actions:
• Terminate grounding conductor and remove excess.

#416: All power reels should have 3 plug-in spaces

Type: Location:

Date Created: Due Date:


04/17/2024 04/21/2024

Priority: Status:
Work Not Accepted

Creator: Reference:
Daniel Ambrocio

Punch Item Manager: Final Approver:


Daniel Ambrocio Daniel Ambrocio Drawing QRO01-A-D-00-1: Colo 1 Rev.23

Ball in Court: Assignee Name:


Aguilar Torres, Rafael
Rafael Aguilar Torres
(VOLTRAK ENERGIA S A DE C
(VOLTRAK ENERGIA S A DE C
V)
V)
Work Not Accepted

Description:

#412: Missing GCFI receptacle

Type: Location:

Date Created: Due Date:


04/17/2024 04/21/2024

Priority: Status:
Work Not Accepted

Creator: Reference:
Daniel Ambrocio

Punch Item Manager: Final Approver:


Daniel Ambrocio Daniel Ambrocio Drawing QRO01-A-D-00-1: Colo 1 Rev.23

Ball in Court: Assignee Name:


Aguilar Torres, Rafael
Rafael Aguilar Torres
(VOLTRAK ENERGIA S A DE C
(VOLTRAK ENERGIA S A DE C
V)
V)
Work Not Accepted

Description:
#411: Cable tray for most equipment does not have the correct support

Type: Location:

Date Created: Due Date:


04/17/2024 04/21/2024

Priority: Status:
Work Not Accepted

Creator: Reference:
Daniel Ambrocio

Punch Item Manager: Final Approver:


Daniel Ambrocio Daniel Ambrocio Drawing QRO01-A-D-00-1: Colo 1 Rev.23

Ball in Court: Assignee Name:


Aguilar Torres, Rafael
Rafael Aguilar Torres
(VOLTRAK ENERGIA S A DE C
(VOLTRAK ENERGIA S A DE C
V)
V)
Work Not Accepted

Description:
Each section of cable tray should have a support

#407: Lighting controls not working properly

Type: Location:

Date Created: Due Date:


04/17/2024 04/21/2024

Priority: Status:
Work Required

Creator: Reference:
Daniel Ambrocio

Punch Item Manager: Final Approver:


Daniel Ambrocio Daniel Ambrocio Drawing QRO01-A-D-00-A: Admin Rev.0

Ball in Court: Assignee Name:


Aguilar Torres, Rafael
Rafael Aguilar Torres
(VOLTRAK ENERGIA S A DE C
(VOLTRAK ENERGIA S A DE C
V)
V)
Work Required

Description:

#405: Install light fixtures as per ifc drawings

Type: Location:

Date Created: Due Date:


04/17/2024 04/21/2024
Priority: Status:
Work Not Accepted

Creator: Reference:
Daniel Ambrocio

Punch Item Manager: Final Approver:


Daniel Ambrocio Daniel Ambrocio

Ball in Court: Assignee Name:


Aguilar Torres, Rafael
Rafael Aguilar Torres
(VOLTRAK ENERGIA S A DE C
(VOLTRAK ENERGIA S A DE C
V) Drawing QRO01-A-D-00-A: Admin Rev.0
V)
Work Not Accepted

Description:

#404: Lighting controls not working properly

Type: Location:

Date Created: Due Date:


04/17/2024 04/21/2024

Priority: Status:
Work Required

Creator: Reference:
Daniel Ambrocio

Punch Item Manager: Final Approver:


Daniel Ambrocio Daniel Ambrocio Drawing QRO01-A-D-00-A: Admin Rev.0

Ball in Court: Assignee Name:


Aguilar Torres, Rafael
Rafael Aguilar Torres
(VOLTRAK ENERGIA S A DE C
(VOLTRAK ENERGIA S A DE C
V)
V)
Work Required

Description:

#403: Light switch not working

Type: Location:

Date Created: Due Date:


04/17/2024 04/21/2024

Priority: Status:
Work Required
Creator: Reference:
Daniel Ambrocio

Punch Item Manager: Final Approver:


Daniel Ambrocio Daniel Ambrocio

Ball in Court: Assignee Name:


Aguilar Torres, Rafael
Rafael Aguilar Torres
(VOLTRAK ENERGIA S A DE C
(VOLTRAK ENERGIA S A DE C
V)
V)
Work Required

Description: Drawing QRO01-A-D-00-A: Admin Rev.0

#402: Lighting controls not working properly

Type: Location:

Date Created: Due Date:


04/17/2024 04/21/2024

Priority: Status:
Work Required

Creator: Reference:
Daniel Ambrocio

Punch Item Manager: Final Approver:


Daniel Ambrocio Daniel Ambrocio Drawing QRO01-A-D-00-A: Admin Rev.0

Ball in Court: Assignee Name:


Aguilar Torres, Rafael
Rafael Aguilar Torres
(VOLTRAK ENERGIA S A DE C
(VOLTRAK ENERGIA S A DE C
V)
V)
Work Required

Description:

#401: Light switch not working

Type: Location:

Date Created: Due Date:


04/17/2024 04/21/2024

Priority: Status:
Work Required

Creator: Reference:
Daniel Ambrocio

Punch Item Manager: Final Approver:


Daniel Ambrocio Daniel Ambrocio

Ball in Court: Assignee Name:


Rafael Aguilar Torres Aguilar Torres, Rafael
(VOLTRAK ENERGIA S A DE C (VOLTRAK ENERGIA S A DE C
V) V)
Work Required

Description:

#400: Emergency light turns off when switch flipped. Light should stay on

Type: Location:

Date Created: Due Date:


04/17/2024 04/21/2024

Priority: Status:
Work Not Accepted

Creator: Reference:
Daniel Ambrocio

Punch Item Manager: Final Approver:


Daniel Ambrocio Daniel Ambrocio Drawing QRO01-A-D-00-A: Admin Rev.0

Ball in Court: Assignee Name:


Aguilar Torres, Rafael
Rafael Aguilar Torres
(VOLTRAK ENERGIA S A DE C
(VOLTRAK ENERGIA S A DE C
V)
V)
Work Not Accepted

Description:

#398: Light switch not working properly

Type: Location:

Date Created: Due Date:


04/17/2024 04/21/2024

Priority: Status:
Work Required

Creator: Reference:
Daniel Ambrocio

Punch Item Manager: Final Approver:


Daniel Ambrocio Daniel Ambrocio Drawing QRO01-A-D-00-A: Admin Rev.0

Ball in Court: Assignee Name:


Rafael Aguilar Torres Aguilar Torres, Rafael
(VOLTRAK ENERGIA S A DE C (VOLTRAK ENERGIA S A DE C
V)
V)
Work Required

Description:

#397: Light switch is flipped.

Type: Location:

Date Created: Due Date:


04/17/2024 04/21/2024

Priority: Status:
Work Required

Creator: Reference:
Daniel Ambrocio

Punch Item Manager: Final Approver:


Daniel Ambrocio Daniel Ambrocio Drawing QRO01-A-D-00-A: Admin Rev.0

Ball in Court: Assignee Name:


Aguilar Torres, Rafael
Rafael Aguilar Torres
(VOLTRAK ENERGIA S A DE C
(VOLTRAK ENERGIA S A DE C
V)
V)
Work Required

Description:

#396: Receptacles at wrong location. Coordinate height with owner provided bench

Type: Location:

Date Created: Due Date:


04/17/2024 04/21/2024

Priority: Status:
Work Required

Creator: Reference:
Daniel Ambrocio

Punch Item Manager: Final Approver:


Daniel Ambrocio Daniel Ambrocio Drawing QRO01-A-D-00-A: Admin Rev.0

Ball in Court: Assignee Name:


Rafael Aguilar Torres Aguilar Torres, Rafael
(VOLTRAK ENERGIA S A DE C (VOLTRAK ENERGIA S A DE C
V)
V)
Work Required

Description:

#375: Adjust cover plate.

Type: Location:

Date Created: Due Date:


04/10/2024 04/14/2024

Priority: Status:
Work Required

Creator: Reference:
Daniel Ambrocio

Punch Item Manager: Final Approver:


Zane Mason Daniel Ambrocio Drawing QRO01-A-D-00-1: Colo 1 Rev.23

Ball in Court: Assignee Name:


Aguilar Torres, Rafael
Rafael Aguilar Torres
(VOLTRAK ENERGIA S A DE C
(VOLTRAK ENERGIA S A DE C
V)
V)
Work Required

Description:

#263: Light fixture damage

Type: Location:
ADMIN>01-043 ER-1

Date Created: Due Date:


02/21/2024 02/25/2024

Priority: Status:
Work Required

Creator: Reference:
Nate Thornton

Punch Item Manager: Final Approver: Drawing QRO01-A-D-00-A: Admin Rev.0


Nate Thornton Nate Thornton

Ball in Court: Assignee Name:


Rafael Aguilar Torres Aguilar Torres, Rafael
(VOLTRAK ENERGIA S A DE C
(VOLTRAK ENERGIA S A DE C
V)
V)
Work Required

Description:
Lamp shades damaged need repaired

#262: Box on wall

Type: Location:
ADMIN>01-041 LOADING
DOCK

Date Created: Due Date:


02/21/2024 02/25/2024

Priority: Status:
Work Required

Creator: Reference:
Nate Thornton
Drawing QRO01-A-D-00-A: Admin Rev.0
Punch Item Manager: Final Approver:
Nate Thornton Nate Thornton

Ball in Court: Assignee Name:


Aguilar Torres, Rafael
Rafael Aguilar Torres
(VOLTRAK ENERGIA S A DE C
(VOLTRAK ENERGIA S A DE C
V)
V)
Work Required

Description:
Box needs covered or removed

#259: Conduit incomplete

Type: Location:
ADMIN>01-041 LOADING
DOCK

Date Created: Due Date:


02/21/2024 02/25/2024

Priority: Status:
Work Required

Creator: Reference:
Nate Thornton
Drawing QRO01-A-D-00-A: Admin Rev.0
Punch Item Manager: Final Approver:
Nate Thornton Nate Thornton

Ball in Court: Assignee Name:


Aguilar Torres, Rafael
Rafael Aguilar Torres
(VOLTRAK ENERGIA S A DE C
(VOLTRAK ENERGIA S A DE C
V)
V)
Work Required

Description:
Conduit missing

#69: Ceiling Component Damage

Type: Location:

Date Created: Due Date:


02/19/2024 02/23/2024

Priority: Status:
Work Required

Creator: Reference:
Zane Mason

Punch Item Manager: Final Approver:


Zane Mason Zane Mason Drawing QRO01-A-D-00-1: Colo 1 Rev.23

Ball in Court: Assignee Name:


Aguilar Torres, Rafael
Rafael Aguilar Torres
(VOLTRAK ENERGIA S A DE C
(VOLTRAK ENERGIA S A DE C
V)
V)
Work Required

Description:

You might also like