wpc65 Total-Free Cyanide - Method-Statement
wpc65 Total-Free Cyanide - Method-Statement
Determinand:
Determination of Total and Free Cyanide
Matrix:
Sample Types: drinking waters, groundwaters, surface waters and bottled waters.
Principle of Method:
This method uses Skalar Sans ++ cyanide system.
Cyanides may be present in groundwaters as ionic cyanide such as some of the group one simple
metal cyanides but also as complex transition metal cyanides. Complex cyanides can be quite stable
compounds in which cyanide acts as a ligand around a central metal ion, usually a transition series
metal of which Iron maybe the most common but could also be zinc, copper, nickel etc. Before the
cyanide can be liberated as HCN the ligands must first be dissociated from the central metal ion,
something that happens to little or no extent with simple steam distillation. The stability of complex
cyanides will vary greatly depending on the central metal ion and on the configuration of the cyanide
ligands. Lesser stable complex cyanides may even breakdown under relatively mild conditions such
as those used when determining the easily liberated ionic cyanides.
In practice, ‘total cyanides’ are defined by the analytical conditions under which they are liberated.
Total Cyanide is the sum of organically bound cyanides, free cyanide ions, complex compounds and
the cyanide bound in simple metal cyanides, with the exception of cyanide bound in cobalt
complexes. Thiocyanate is not included. The sample is decomposed at a pH of 3.8 by UV-B light. A
UV-B lamp (312nm) and a borosilicate glass coil are used to eliminate UV light with a wavelength less
than 290nm, thus preventing the conversion of thiocyanate to cyanide. The hydrogen cyanide present
at pH 3.8 is separated by on line distillation at 125°C. The hydrogen cyanide is then determined
photometrically by the reaction of cyanide with chloramine-T to form cyanogen chloride, which reacts
with pyridine-4-carboxylic and 1,3-dimethylbarbituric acid to give a blue dye whose absorbance is
measured at 600nm.
Free cyanide is the sum of cyanide ions and the cyanide bound in simple metal cyanides, which is
determined according to this standard. Organic cyanides are not included. The UV lamp is switched
off when determining free cyanide content. Before distillation a zinc sulphate solution is added to the
sample in order to precipitate any iron cyanides present as the zinc-cyanoferrate complex. The
hydrogen cyanide present at pH 3.8 is separated by on line distillation at 125°C. The hydrogen
cyanide is then determined photometrically by the reaction of cyanide with chloramine-T to form
cyanogen chloride, which reacts with pyridine-4-carboxylic and 1,3-dimethylbarbituric acid to give a
blue dye whose absorbance is measured at 600nm.
Interferences
The distillation process whereby hydrogen cyanide is liberated from the test portion of sample and
then “fixed” in a sodium hydroxide solution essentially removes many of the potential interferences.
Performance of Method:
Range of Application:
LOQ - 60µg/l CN-
This range may be extended by sample dilution with 0.1M sodium hydroxide solution.
Limit of Quantification:
Statistically obtained limit of quantification for free cyanide of 1.18 µg/l CN-
Statistically obtained limit of quantification for total cyanide of 1.11 µg/l CN-
Total CN:
Mean sample Mean sample Conc. of Spike recovery Bias
Sample type
result (µg/L) spike result (µg/L) spike (µg/L) (%) (%)
Soft- Langsett 0.509 47.977 50 94.94 -
Medium- Wakefield Tap 0.485 47.530 50 94.09 -
Hard- Bristol (Purton) 0.400 46.591 50 92.38 -
Surface- Derwent 0.292 46.675 50 92.77 -
Borehole- Ainderby 0.418 46.890 50 92.94 -
Pure- MilliQ 0.265 46.973 50 93.41 -
12 μg/l Std CN 12.101 - - - 0.84
48 μg/l Std CN 48.020 - - - 0.04
References:
Standard Methods for the Examination of Water and Wastewater. 19th edition. Method 4500 CN - D.
APHA. Washington. USA. ISBN 0 87553 223 3.
Spectrophotometric Determination of Cyanide with Isonicotinic Acid and Barbituric Acid. Intern. J.
Environ. Anal. Chem., 1981, Vol. 10, pp. 99-106 Anal. Chem., 1981, Vol. 10, pp. 99-106
Auto Analyser Method no. G-259-01 Rev. 15
Water Quality-Sampling-Part 3: Guidance on the Preservation and Handling of Water Samples. BS EN
ISO 5667-3-2012.
15.5 Water quality — Determination of total cyanide and free cyanide using flow analysis (FIA and
CFA) - Part 2: Method using continuous flow analysis (CFA) ISO 14403-2:2012