14.05.2024 NESMA - PQCS Mutassim Alhisa
Classification I Internal
Classification | Company General Use
1.0 Pre-Inspection Meeting Online Meeting MOM N/A NEOM Sch Q .03 NEOM Sch Q .03 H H H
2.8 Caps Visual and Documention P-MAG01-01 (Ex CMI) Document control and integrity of the goods Delivery Note, DDT,order P-MAG01 H R R
2.9 Technical data plates Visual and Documention P-MAG01-01 (Ex CMI) Document control and integrity of the goods Delivery Note, DDT,order P-MAG01 H R R
2.10 Stickers Visual and Documention P-MAG01-01 (Ex CMI) Document control and integrity of the goods Delivery Note, DDT,order P-MAG01 H R R
3.0 FABRICATION
3.2 Drilling for logs Visual and Documention RDG2 Visual inspection of 100% of the pieces Production program, drawing I-PROS03 H R R
3.6 Flap grinding Visual and Documention - Visual inspection of 100% of the pieces. Production program, drawing I-PROS03 H R R
EN 3834- I-PROS05
3.7 Welding logs Visual and Documention RDG3 Visual Inspection of 100% of the pieces. 2:2021 WPS H R R
CAP.14 AM003.01
I-PROS05
3.8 Longitudinal weld repair Check Visual and Documention - Visual Inspection of 100% of the pieces. Drawing H R R
I-PROS05
3.9 Weld repair check logs Visual and Documention - Visual Inspection of 100% of the pieces. Drawing H R R
I-PROS05
3.10 longtitudinal weld repair check Visual and Documention - 100% control of repair with RT or UT Drawing H R R
I-PROS05
3.11 Weld repair check logs Visual and Documention - 100% control of repair with MT or PT Drawing H R R
3.12 Coupling screws and caps 5000 liters Visual and Documention RDG4 Visual inspection of 100% of the pieces. Drawing I-PROS06 H R R
I-PROS05-03
3.13 Circumferential welding liters 5000 Visual and Documention RDG4 Visual inspection of 100% of the pieces. I-PROS06 H R R
Welding parameters
3.15 Deep drawing caps Visual and Documention RDG5 Visual inspection of 100% of the pieces. Drawing I-PROS04 H R R
3.16 Degreasing Visual and Documention RDG5 Visual inspection of 100% of the pieces. Operational instruction I-PROS04 H R R
3.17 Tapering Visual and Documention RDG5 Visual inspection of 100% of the pieces. Operational instruction I-PROS04 H R R
3.18 Welding of rotation caps Visual and Documention - Visual inspection of 100% of the pieces. Drawing I-PROS04 H R R
I-PROS04-01
3.19 Shell normalization Visual and Documention Daily Chart Visual inspection of 100% of the pieces. I-PROS04 H R R
Normalization parameters
Drawing
I-PROS07
3.30 Foot Welding and accessories horizontal tanks Visual and Documention - Visual inspection of 100% of the pieces EN 3834-2:2021
WPS AM004.01
H R R
cap.10
3.31 Checking and repairing horizontal tanks Visual and Documention - Visual inspection of 100% of the pieces - I-PROS07 H R R
3.32 Final Visual & Dimensional check Visual and Documention 100% of the pieces Specifications and design H W R
3.34 Hydraulic test and tank punching Hydrualic Pressure test RDG6 100% of the pieces Specifications and design I-PROS08 H H W
4.0 FINISHING
4.6 Pneumatic test and draining Visual and Documention RDG8 100% of the pieces Specifications I-PROS14 H R R