Painting To S.V.Temple Gopurams, Arches at Upamaka (V), Nakkapalli (M), Anakapalli District For The Year 2024-25
Painting To S.V.Temple Gopurams, Arches at Upamaka (V), Nakkapalli (M), Anakapalli District For The Year 2024-25
Painting To S.V.Temple Gopurams, Arches at Upamaka (V), Nakkapalli (M), Anakapalli District For The Year 2024-25
TTD-61022(31)/10/2024-EE-X SEC-TTD
TIRUMALA TIRUPATI
DEVASTHANAMS TIRUPATI
ENGINEERING DEPARTEMNT
Indent NO:
e – tender
e - tender
SSTT
A A
N NDDAARRDDBB I DD
ID DOOCCUUMMEENNTT
INDEX
4. CONDITIONS OF CONTRACT.
TENDER
A) General
B) Time for completion.
C) Quality Control
D) Cost Control
E) Finishing the Contract
F) Special conditions.
5. TECHNICAL SPECIFICATIONS
6. FORMATS OF SECURITIES
7. BILL OF QUANTITIES
8. SCHEDULE-A
10. DRAWINGS
ENGINEERING DEPARTMENT
********
NOTICE INVITING TENDERS (NIT)
1. DEPARTMENT NAME : TIRUMALA TIRUPATI DEVASTHANAMS –
ENGINEERING
1. Transaction fee: All the participating bidders shall pay a transaction fee (non-
refundable) on - line (non-refundable) (Generated Online) in favour M/s APTS,
Vijayawada.
2. E.M.D. ₹ 100/- to be mandatorily paid through Online payment only,
DD/BC/PO are not accepted and summarily rejected (The scanned copy will
only be accepted). .
3. The successful bidder has to pay the balance EMD @ 1.5 % of ECV/TCV at
the time of conclusion of the Agreement in the shape of crossed DD in favour
of E.O., TTD, Tirupati.
4. If, the tenderer submits 1% EMD through Online payment at the time of
tender and successful, the total balance EMD of 1 1/2 % is to be paid in the form
of DD in favour of E.O., TTD, Tirupati.
5. The successful bidder shall pay 0.04% of estimate contract value towards e-
procurement corpus fund in the shape of demand draft in favour of Managing
Director, Andhra Pradesh Technology Services, Vijayawada at the time of
conclusion of agreement.
6. Class of contractor Eligible: TTD Registered Contractors / Government
Department of State / Central / Other state Contractor who are eligible to quote
for this value of work and have registered in category mentioned as per G.O.
Ms. No. 521, dated: 10-12-1984 or Eligible contractors as per GO. Ms No. 132,
T R&B (R.I) Department, dated: 11-08-1998, GO. Ms. No: 178 I&CAD, dated:
27-09-1997, GO. Ms. No: 8 (R&B), dated: 08-01-2003, GO. Ms. No: 94 I&CAD,
dated: 01-07-2003. The successful tenderer should register in T.T.D. before
entering into agreement if he is not already registered with T.T.D). The eligible
intending bidders would be required to enroll themselves on the e-procurement
market place www.apeprocurement.gov.in and submit their bids online only.
7. Any other condition regarding receipt of tenders in conventional method
appearing in the tender documents may please be treated as not applicable.
8. “The bidder shall authenticate the bid with his digital certificate for submitting
the bid electronically on e-procurement platform and the bids not authenticated
by digital certificate of the bidder will not be accepted on the e-procurement
platform.” (G.O.Ms.No.6, dated 28/02/2005 of IT & C Dept., Govt. of AP).
INSTRUCTIONS TO TENDERERS
A-GENERAL
Name of work:- Painting to S.V.Temple Gopurams, Arches at Upamaka (V), Nakkapalli (M), Anakapalli
District for the year 2024-25.
Scope of work:
a) Give brief description and location of work
TTD has decided to take up the work of
Painting to S.V.Temple Gopurams, Arches at Upamaka (V), Nakkapalli (M), Anakapalli District for the year
2024-25.
d) Reimbursable Provisions.
i) Technical Personnel : Not applicable
iii) BOCW cess : As specified in clause 102 of General conditions.
IV) GST : As specified in clause 101 of General conditions.
a. The Executive Engineer-X, TTDs, Visakhapatnam invites tenders for the above works vide ADV
No.01/D3/CE/TTD/2024-25, Dt:07-06-2024 NIT No. 14/EE-X/TTD/VZG/2024-25
Online bids for the above work will be received from the TTD registered Contractors / Firms, /
registered contractors / Firms in Government of Andhra Pradesh / Central / Others states
contractors. The eligible Contractors / Firms shall submit bids online on www.eprocurement.gov.in
before the date and time stipulated in Notice Inviting Tender [NIT].
The online bids will be opened by the Executive Engineer –X, TTD or his nominee at his office, on
the dates mentioned in NIT. If the Office happens to be closed on the dates, the opening of tenders
gets automatically postponed to the next working date, the time being unaltered, unless extended by
a notification published in News papers or sent through Fax / telegrams to all those who purchased
the tender documents.
a.The successful tenderer is expected to complete the work within the time period specified in the
NIT.
ii) are not blacklisted or debarred or suspended by the Government for whatever the
reason, prohibiting them not to continue in the contracting business
iii) have complied with the eligibility criteria specified in the NIT.
are the eligible tenderers.
ii) The Tenderer who has employed any retired officer as mentioned above shall be considered
as an ineligible tenderer.
iii) The contractor himself or any of his employees is found to be Gazetted Officer who retired
from Government Service and had not obtained permission from the Government for
accepting the contractor’s employment within a period of 2 years from the date of his
retirement.
iv) The Contractor or any of his employees is found at any time after award of contract, to be
such a person who had not obtained the permission of the Government as aforesaid before
submission of the tender or engagement in the Contractor’s service.
v) Contractor shall not be eligible to tender for works in the division / circle where any of
his near relatives are employed in the rank of Assistant Engineer or Assistant Executive
Engineers and above on the Engineering side and Divisional Accounts Officer and above on
the administrative side. The Contractor shall intimate the names of persons who are working
with him in any capacity or are subsequently employed. He shall also furnish a list of
Gazetted /Non-Gazetted, State Government Employees related to him. Failure to furnish
such information tenderer is liable to be removed from the list of approved contractors and
his contract is liable for cancellation.
b) Attested copies of documents relating to the Registration of the firm, Registration as Civil
Contractor, Partnership deed, Articles of Association, VAT Registration, PAN Card
c) Note: The Partnership firms, which are registered as Contractors shall intimate the change
in partnership deed, if any, as per GO Ms No.58, I & CAD, dt.23.4.2002 within one month of such
change. Failure to notify the change to the registration authority in time will entail the firms to
forfeit their registration and their tender will be rejected. The intimation of change of partners if
any and the acceptance by the Registration authority may be enclosed.
e) availability of key personnel for administration / site management and execution viz., technical
personnel required for the work (Statement - VI);
f) information regarding any litigation, with Government during the last five years, in which the
Tenderer is involved in (Statement - VII);
.
b. Even though the tenderers meet the above qualifying criteria, they are
liable to be disqualified / debarred / suspended / blacklisted if they have
Furnished false / fabricated particulars in the forms, statements and / annexure submitted in
proof of the qualification requirements and/or
Not turned up for entering into agreement, when called upon.
record of poor progress such as abandoning the work, not properly completing the contract,
inordinate delays in completion, litigation history or financial failures etc. and/or
participated in the previous bidding for the same work and had quoted unreasonably high tender
percentage and
even while execution of the work, if found that the work was awarded to the Contractor based on
false / fake certificates of experience, the Contractor will be blacklisted and work will be taken
over invoking clause 61 of PS to APSS.
c. Tenders with an excess of above 5% of the estimated contract value shall
not be allowed to quote in online.
d. For tenders up to 25% less than the estimated contract value of work, no additional security
deposit is required. But for tenders less than 25% of the estimated Contract Value of work, the
difference between the tendered amount and 75% of the estimated contract value, shall be paid
by the successful tenderer at the time of concluding agreement as an additional security to fulfill
the contract through a Bank Guarantee or Demand Draft on a Nationalized Bank / Scheduled
bank in the prescribed format valid till completion of the work in all respects
a) If the percentage quoted by a tenderer is found to be either abnormally high or within the permissible
ceiling limits prescribed but under collusion or due to unethical practices adopted at the time of
tendering process, such tenders shall be rejected.
b) A tenderer submitting a Tender which the tender accepting authority considers excessive and or
indicative of insufficient knowledge of current prices or definite attempt of profiteering will render him
liable to be debarred permanently from tendering or for such period as the tender accepting authority
may decide. The tenderer overall percentage should be based on the controlled prices for the
materials, if any, fixed by the Government or the reasonable prices permissible for the tenderer to
charge a private purchaser under the provisions of clause-6 of the hoarding and profiteering
prevention ordinance of 1943 as amended from time to time and on similar principle in regard to
labour supervision on the construction.
5. Cost of Tendering
The Tenderer shall bear all costs associated with the preparation and submission of his Tender and
the tender inviting authority will in no case be responsible and liable for those costs.
6. Site Visit.
The Tenderer, at the Tenderer’s own responsibility and risk is advised to visit and examine the Site
of Work and its surroundings and obtain all information that may be necessary for preparing the
Tender for entering into a contract, for construction of the work. The costs of visiting the site shall be
at the Tenderer’s own expense.
B. TENDER DOCUMENT
Technical bid
1) Notice Inviting Tenders (NIT)
2) Instruction to Tenderers
3) Qualification information
4) Conditions of Contract.
5) Specifications.
6) Drawings.
7) Forms of Securities. i.e., EMD, Additional Security etc.
Price bid
Bill of Quantities and Price bid.
b. Any addendum/amendments issued by the Tender Inviting Officer shall be part of the Tender
Document and it shall either be communicated in writing to all the purchasers of the Tender
documents or notified in the News Papers/ e-Procurement site in which NIT was published.
C. PREPARATION OF TENDERS.
a. Bill of Quantities called Schedule “A” and the bid offer accompanies the tender document as
Volume - II. It shall be explicitly understood that the Tender Inviting Officer does not accept
any responsibility for the correctness or completeness of this schedule ‘A’ and this schedule
‘A’ is liable to alterations by omissions, deductions or additions at the discretion of the
Superintending Engineer or as set forth in the conditions of the contract. The Schedule “A”
shall contain the items of work indicated as part– I and LS provisions as part–II. The
percentage quoted by the contractor shall be applicable only to part –I. However, the
provisions contained in the part –II will be operable basing on the conditions provided in the
Tender Document. The tenderers will have to state clearly their willingness to execute the
work at certain specific percentage of excess or less or at par of the ECV indicated in Part-I
at the space provided therein in Schedule ‘A’. The L.S. amounts indicated in part-II are
maximum reimbursable amounts. The tenderer should however quote his lump sum tender
based on this schedule of quantities. He should quote his offer as a overall tender
percentage. The over all tender percentage should be written both in words and figures.
b. The Schedule –A (or Price-bid) contains not only the quantities but also the rates worked out
by the Department and the amount for each item and total value of the estimated contract.
The tenderer should workout his own rates keeping in view the work, site conditions and
quote his overall tender percentage with which he intends to execute the work.
c. The bid offer shall be for the whole work and not for individual items / part of the work.
d. All duties, taxes, and other levies payable by the contractor as per State / Central
Government rules, shall be included in the tender percentage quoted by the tenderer,
however keeping in view the maximum reimbursable amounts specified in Part.II of Price
bid.
e. The tendered contract amount as computed based on overall tender percentage is subject to
variation during the performance of the Contract in accordance with variation in quantities
etc.
b. During the above mentioned period no plea by the tenderer for any sort of modification of the
tender based upon or arising out of any alleged misunderstanding of misconceptions or
mistake or for any reason will be entertained.
c. In exceptional circumstances, prior to expiry of the original time limit, the Tender Inviting
Officer may request the bidders to extend the period of validity for a specified additional
period. Such request to the Tenderers shall be made in writing. A Tenderer may refuse the
request without forfeiting his E.M.D. A Tenderer agreeing to the request will not be
permitted to modify his Tender, but will be required to extend the validity of his E.M.D. for a
period of the extension.
b. Demand Drafts furnished towards EMD for BIDDING the tender shall be valid for a period of
six months from the date of tender notice.
c. The earnest money deposited by the successful tenderer will not carry any interest and it will
be dealt with as provided in the conditions stipulated in the tender.
d. The Successful tenderer has to pay the Balance EMD @ 1.5 % of ECV/TCV at the time of
conclusion of the Agreement
D. SUBMISSION OF TENDERS.
13. Submission of Tenders:
a. The tenderer shall invariably ensure that the scanned copies of the following documents are
uploaded and attached online:
a) Check slip
Bids submitted in offline sealed cover system shall not be considered for evaluation.
b. The Superintending Engineer / Chief Engineer, TTDs, may extend the dates for Bid
submission / Price bid opening of Tenders by issuing an amendment in which case all rights
and obligations of the Superintending Engineer/Chief Engineer will remain same as
previously.
b. No Tenderer shall contact the Superintending Engineer or any authority concerned with
finalization of tenders on any matter relating to its Tender from the time of the Tender
opening to the time the Contract is awarded. If the Tenderer wishes to bring additional
information to the notice of the Superintending Engineer, It should be done so in writing.
c. Before recommending / accepting the tender, the tender recommending / accepting authority
shall verify the correctness of certificates submitted to meet the eligibility criteria and
specifically experience. The authenticated agreements of previous works executed by the
lowest tenderer shall be called for.
F. AWARD OF CONTRACT
20. Award Criteria
a. The Executive Engineer / Superintending Engineer / Chief Engineer will award or
recommend to the Competent tender accepting authority for award of the contract to the
Tenderer who is found Technically qualified as per the Tender conditions and whose price
bid is lowest.
b. The tender accepting authority reserves the right to accept or reject any Tender or all
tenders and to cancel the Tendering process, at any time prior to the award of Contract,
10
without thereby incurring any liability to the affected Tenderer or Tenderers or any obligation
to inform the affected Tenderer or Tenderers of the reasons for such action.
b. When a tender is to be accepted the concerned tenderer shall attend the office of the
Executive Engineer / Superintending Engineer concerned on the date fixed in the Letter of
acceptance. Upon intimation being given by the Executive Engineer / Superintending
Engineer / Chief Engineer, of acceptance of his tender, the tenderers shall make payment of
the balance E.M.D., and additional security deposit wherever needed by way of Demand
Draft or unconditional and irrevocable Bank Guarantee obtained from a Nationalized /
Scheduled Bank with a validity period of months, and sign an agreement in the form
prescribed by the department for the due fulfillment of the contract. Failure to attend the
Executive Engineer / Superintending Engineer’s office on the date fixed, in the written
intimation, to enter into the required agreement shall entail forfeiture of the Earnest Money
deposited. The written agreement to be entered into between the contractor and the
T.T.Devasthanams shall be the foundation of the rights and obligations of both the parties
and the contract shall not be deemed to be complete until the agreement has first been
signed by the contractor and then by the proper officer authorized to enter into contract on
behalf of the T.T.Devasthanams.
c. The successful tenderer has to sign an agreement within a period of 15 days from the date
of receipt of communication of acceptance of his tender. On failure to do so his tender will
be cancelled duly forfeiting the E.M.D., paid by him without issuing any further notice and
action will be initiated for black listing the tenderer.
(a) Define for the purposes of the provision, the terms set forth below as follows:
(i) “Corrupt practices” means the offering, giving, receiving or soliciting of any thing of value to
influence the action of a T.T.Devasthanams official in procurement process or in contract
execution: and
(b) Will reject a proposal for award if it determines that the Tenderer recommended for award has
engaged in corrupt or fraudulent practices in competing for the contract in question.
(c) Will blacklist / or debar a firm, either indefinitely or for a stated period of time, if at any time
determines that the firm has engaged in corrupt or fraudulent practices in competing for, or in
executing a T.T.Devasthanams Contract.
(d) Further more, Tenderers shall be aware of the provisions stated in the General Conditions of
Contract.
11
QUALIFICATION INFORMATION
Annexure –I
DECLARATION
I / WE hereby declare that, I / WE have not been blacklisted / debarred / Suspended / demoted in any
department in Andhra Pradesh or in any State due to any reasons.
12
CONDITIONS OF CONTRACT
1. Interpretation
1.1 In interpreting these Conditions of Contract, singular also means plural, male also means female,
and vice-versa. Headings have no significance. Works have their normal meaning under the
language of the contract unless specifically defined. The Engineers-in-charge will provide
instructions clarifying queries about the conditions of Contract.
1.2 The documents forming the Contract shall be interpreted in the following order of priority:
1) Agreement
2) Letter of Acceptance, notice to proceed with the works
3) Contractor’s Tender (Technical bid)
4) Conditions of contract
5) Specifications
6) Bill of quantities (Price-bid)
7) Any other document listed as forming part of the Contract.
8) EMD.
2. Engineer-in-Charge’s Decisions:
2.1 Except where otherwise specifically stated, the Engineer-in-charge will decide the contractual
matters between the Department and the Contractor in the role representing the Department.
3. Delegation
3.1 The Engineer-in-charge may delegate any of his duties and responsibilities to other officers and
may Cancel any delegation by an official order issued.
4. Communications
4.1 Communications between parties, which are referred to in the conditions, are effective only when in
writing. A notice shall be effective only when it is delivered (in terms of Indian Contract Act).
5. Sub-contracting
5.1 If the prime contractor desires to sub-let a part of the work, he should submit the same at the time
of filing tenders itself or during execution, giving the name of the proposed Sub-contractor, along
with details of his qualification and experience. The Tender Accepting Authority should verify the
experience of the Sub-contractor and if the Sub-contractor satisfies the qualification criteria in
proportion to the value of work proposed to be sub-let, he may permit the same. The total value of
works to be awarded on sub-letting shall not exceed 50% of contract value. The extent of
subletting shall be added to the experience of the sub-contractor and to that extent deducted from
that of the main contractor.
6. Other contractors
6.1 The Contractor shall cooperate and share the Site with other contractors, Public authorities, utilities,
and the Department. The Contractor shall also provide facilities and services for them as directed
by the Engineer-in-charge.
7. Personnel
7.1 The Contractor shall employ the required Personnel approved by the Engineer-in-charge to carry out
the functions stated in the Schedule.
7.2 Failure to employ the following minimum required technical personal by the contractor, the following
amounts will be recovered from contractor’s bills as it is included in the estimate rate under contractor
over heads.
Value of work Technical staff to be employed Amount to be recovered per
month
Up to Rs. 0.50 lakh Nil Nil
Up to Rs. 1.00 lakh One ITI [civil] certificate holder CSSR 2023-24
Up to Rs. 5.00 lakhs One Diploma [Civil] holder CSSR 2023-24
Above Rs. 5.00 lakhs One Degree [Civil] or two Diploma [civil] CSSR 2023-24
holder
7.30The technical personnel should be on full time and available at site whenever required by Engineer in
Charge to take instructions.
7.40 In case the contractor is already having more than one work on hand and has undertaken more than
one work at the same time, he should employ separate technical personnel on each work.
7.50 If the contractor fails to employ technical personnel the work will be suspended or department will
engage a technical personnel and recover the cost thereof from the contractor.
7.60 If the Engineer-in-charge asks the Contractor to remove a person who is a member of Contractor’s
staff or his work force stating the reasons the Contractor shall ensure that the person leaves the site
forthwith and has no further connection with the work in the contract.
13
8. Contractor’s Risks
8.1 All risks of loss of or damage to physical property and of personnel injury and death, which arise
during and in consequence of the performance of the Contract, are the responsibility of the
Contractor.
15. Ramps
15.1 Ramps required during execution may be formed wherever necessary and some are to be removed
after completion of the work. No separate payment will be made for this purpose.
Works in accordance with the programme submitted by the Contractor, as updated with the
approval of the Engineer-in-Charge, and complete the work by the Intended Completion Date.
18. Safety
18.1 The Contractor shall be responsible for the safety of all activities on the Site.
19. Discoveries
19.1 Anything of historical or other interest or of significant value unexpectedly discovered on the Site is
the property of the Government / T.T. Devasthanams. The Contractor is to notify the Engineer-in-
charge of such discoveries and carry out the Engineer-in-Charge’s instructions for dealing with
them.
20. Possession
20.1 The Department shall give possession of the site to the Contractor. If possession of a part site is
given, the Department will ensure that the part site so handed over is amenable to carry out the
work at site by the Contractor.
22. Instructions
22.1 The Contractor shall carry out all instructions of the Engineer-in-charge and comply with all the
applicable local laws where the Site is located.
15
subsequently found necessary to alter this program, the contractor shall submit sufficiently in
advance the revised program incorporating necessary modifications and get the same approved by
the Engineer-in-charge. No revised program shall be operative without approval of Engineer-in-
charge.
25.2 The Executive Engineer shall have all times the right, without any way violating this contract, or
forming grounds for any claim, to alter the order of progress of the works or any part thereof and
the contractor shall after receiving such directions proceed in the order directed. The contractor
shall also report the progress to the Executive Engineer within 7 days of the Executive Engineer’s
direction to alter the order of progress of works.
25.3 The Contractor shall give written notice to the Engineer-in-Charge whenever planning or progress
of the works is likely to be delayed or disrupted unless any further drawings or order including a
direction, instruction or approval is issued by the Engineer-in-Charge within a reasonable time. The
notice shall include details of the drawing or order required and of why and by when it is required
and of any delay or disruption likely to be suffered if it is late.
17
C. QULAITY CONTROL
32. Identifying the defects
32.1 The Engineer-in-Charge shall check the Contractor’s work and notify the Contractor of any Defects
that are found. Such checking shall not affect the Contractor’s responsibilities. The Engineer-in-
Charge may instruct the Contractor to verify the Defect and to uncover and test any work that the
Engineer considers may be a Defect.
33. Tests
33.1 If the Engineer-in-Charge instructs the Contractor to carry out a test not specified in the
Specification to check whether any work has a Defect and the Contractor shall pay for the test and
any samples.
D. COST CONTROL
37. Bill of quantities
37.1 The Bill Quantities shall contain items for the construction work to be done by the Contractor.
37.2 The Contractor is paid for the quantity of the work done at the estimate rate in the Bill of Quantities
for each item plus or minus Tender percentage.
1 Where ever additional items not contingent on the main work and outside the scope of original
agreement are to be entrusted to the original contractor dispensing with bids and if the value of
such items exceeds the limits up to which the officer is empowered to entrust works initially to
contractor without calling for tenders, approval of next higher authority shall be obtained.
Entrustment of such items on nomination shall be at rates not exceeding the estimated rates
2 Entrustment of the additional items contingent on the main work will be authorized by the
officers up to the monetary limits up to which they themselves are competent to accept items in
the original agreement so long as the total amounts up to which they are competent to accept in
an original agreement rates for such items shall be worked out in accordance with the
procedure (I) For all items of work in excess of the quantities shown in the Bill of Quantities of
the Tenders, the rate payable for such items shall be estimate rates for the items (+) or (-) over
all tender percentage accepted by the competent authority
3 Entrustment of either the additional or supplemental items shall be subject to the provisions of
the agreement entered into by a Competent Authority after the tender is accepted. The
Superintending Engineer being the authority next higher to the Executive Engineer, who
entered into the agreement, approves the rate for the items / variation in quantity in the current
agreement. The items shall not be ordered by an officer on his own responsibility if the revised
estimate or deviation statement providing for the same requires the sanction of higher authority.
Note: It may be noted that the term Estimate Rate used above means the rate in the sanctioned
estimate with which the tenders are accepted, or if no such rates is available in the estimate, the
rate derived will be with reference to the Standard Schedule of Rates adopted in the sanctioned
estimate with which tenders are accepted.
40. Cash Flow forecasts
40.1 When the program is updated, the contractor is to provide the Engineer-in-charge with an updated
cash flow forecast
42. Payments
42.1 Payment for the work done by the contractor will be made for the finished work based on the
measurements recorded in measurement books by any officer of the department not lower in rank
than a Assistant Engineer and check measured by any officer not lower in rank than a Deputy
Executive Engineer. The measurement shall be recorded at various stages of the work done and
also after work is completed. The contractor shall be present at the time of recording of each set of
measurement and their check measurement and accept them then and there so as to avoid
disputes at a later stage. If the contractor is not available at the work spot at the time of recording
measurements or check measurements the particulars of measurements shall be signed by the
authorised agent of contractor based on which the contractor shall accept the set of measurements
without any further dispute. If for any reason the contractor’s authorised agent is also not available
at site when the department decides to suspend the work recording of measurements in the
absence of the contractor or his authorised representative the department shall not entertain any
claim from the contractor for any loss incurred by him on this account. The Contractor shall
however note that the Department cannot indefinitely wait for recording the measurement due to
the absence of the Contractor and his authorised agent and check measure them even in the
absence of the contractor
42.2 The actual volume of stone and aggregates shall be computed after deducting the following
percentages from the volume computed by stack measurements.
Sl Standard size of aggregate and stone Percentage reduction in volume computed by stack
N measurements to arrive at the volume to paid for
o
1 Stone 40
2 40 mm and 25 mm 10
3 20mm, 12mm, 10mm & 6mm 5
4 Fine aggregate Nil
5 Gravel 20
[ Note: The above Table may be modified depending on the type of work.]
Unless otherwise directed, measurements shall not be taken until sufficient materials for use on
work have been collected and stacked. Immediately after measurement, the stack shall be marked
by white wash or other means as directed by the Engineer-in-charge
42.3 Payments & Certificates
1 Payments shall be adjusted for recovery of advance payments, liquidated damages in terms of
tender conditions and security deposit for the due fulfillment of the contract. Payment will be
made to the Contractor under the certificate to be issued at reasonably frequent intervals by the
Engineer-in-Charge, and intermediate payment will be the sum equal to 92½% of the value of
work done as so certified and balance of 7½% will be withheld and retained as security for the
due fulfillment of the contractor under the certificate to be issued by the Engineer-in-Charge.
On completion of the entire works the contractor will receive the final payment of all the moneys
19
due or payable to him under or by virtue of the contract except earnest money deposit retained
as security and a sum equal to 2½ percent of the total value of the work done. The amount
withheld from the final bill will be retained under deposits and paid to the contractor together
with the earnest money deposit retained as security after a period of 12 months as all defects
shall have been made good according to the true intent and meaning thereof.
2 In case of over payments or wrong payment if any made to the contractor due to wrong
interpretation of the provisions of the contract, APSS or Contract conditions etc., such
unauthorized payment will be deducted in the subsequent bills or final bill for the work or from
the bills under any other contracts with the T.T.Devasthanams / Government or at any time
thereafter from the deposits available with the Government / T.T Devasthanams.
3 Any recovery or recoveries advised by the Government Department either state or central, due
to non-fulfillment of any contract entered into with them by the contractor shall be recovered
from any bill or deposits of the contractor.
4 No claim shall be entertained, if the same is not represented in writing to the Engineer-in-
Charge within 15 days of its occurrence.
5 The contractor is not eligible for any compensation for inevitable delay in handing over the site
or for any other reason. In such case, suitable extensions of time will be granted after
considering the merits of the case
42.4 Intermediate Payments
1 For intermediate Stage of work, only part rates as fixed by the Engineer-in-Charge will be paid.
2 Part rates shall be worked out for the work done portion based on the actual operations
involved keeping in view the value of the balance work to be done, to avoid unintended benefit
to the Contractor in initial Stage
3 Full rate shall be paid when the work is completed to the full profile as noted in the drawings.
4 For earthwork in cutting, 10% of the quantity will be with-held for intermediate payments and
the same will be released after completing the work to the profiles as per drawings and disposal
of the spoil material at the specified places and handing over the balance useful stone.
5 For earthwork, embankment formation work, 10% of the quantity will be withheld for
intermediate payments and the same will be released after completing the bund to the profiles
as per drawings including trimming of side slopes and all other works contingent to the bund
profile.
6 For the structure works either with masonry or concrete where the height of structure is more
than three meters, the quantities executed in the lower level will be withheld at the rate of one
percent for every three meters height, if the balance height o the structure work is more than
three meters in being over the executed level and the same will be released only after the entire
work is completed as certified by the Engineer-in-Charge.
7 For C.M. & C.D. works and for lining works, spread over more than 2 Km. In length 5 percent of
the concrete and Masonry quantities will be with held and the same will be released after
completion of all C.M. & C.D. works and lining for the entire length certified by the Engineer-in-
Charge
8 Where payment is intended for aggregates by Bill of Quantities item based on stack
measurements, 10% of the quantity measured will be withheld. No payment or advance will be
made for unfixed materials when the rates are for finished work in site
20
outstanding work in that part of the Works during the period of Maintenance.
47. Retention
47.1 The department shall retain from each payment due to the contractor @ the rate of 7.5% of bill
amount until completion of the whole of the Works
47.2 On completion of the whole of the Works, out of 7 ½ % retention amounts, 5% will be re-paid to the
Contractor and remaining 2 ½ % will be released, when the Defects Liability Period has passed and
the Engineer-in-Charge has certified that all the Defects notified by the Engineer-in-Charge to the
Contractor before the end of this period have been corrected.
47.3 On completion of the whole works, the Contractor may substitute retention money with an “on
demand” Bank Guarantee.
55. Termination
55.1 The Department may terminate the Contract if the contractor causes a fundamental breach of the
Contract
55.2 Fundamental breaches of Contract include, but shall not be limited to the following
a The Contractor stops work for 28 days when no stoppage of work is shown on the current
program and the stoppage has not been authorised by the Engineer-in-Charge.
b) The Contractor is made bankrupt or goes into liquidation other than for a reconstruction or
amalgamation.
c) The Engineer-in-Charge gives Notice that failure to correct a particular Defect is a fundamental
breach of Contract and the Contractor fails to correct it within a reasonable period of time
determined by the Engineer-in-Charge.
d) The Contractor does not maintain a security which is required.
e) The Contractor has delayed the completion of works by the number of days for which the
maximum amount of liquidated damages can be paid as defined.
f) If the contractor, in the judgment of the Department has engaged in corrupt or fraudulent
practices in competing for or in the executing the contract
For the purpose of this paragraph: “corrupt practice” means the offering, giving, receiving or
soliciting of anything of value to influence the action of a public official in the procurement
process or in contract execution. “Fraudulent practice” means a misrepresentation of facts in
order to influence a procurement process or the execution of a contract to the detriment o the
Government and includes collusive practice among tenderers (prior to or after Tender
submission) designed to establish Tender prices at artificial non-competitive levels and to
deprive the Government of the benefits of free and open competition
55.3 Notwithstanding the above the Department may terminate the contract for convenience.
55.4 If the Contract is terminated, the Contractor shall stop work immediately, make the Site safe and
secured leave the Site as soon as reasonably possible.
57. Property
57.1 All materials on the Site, Plant, Equipment, Temporary Works and Works are deemed to be the
property of the Department if the Contract is terminated because of Contractor’s default.
F. SPECIAL CONDITIONS
59. Water supply
59.1 It is the responsibility of the Contractor to make his own arrangements for water supply for the work
and labour, at his own cost. The Department will not take any responsibility to arrange for water at
work site. However In case the department supply is available at nearby point, the contractor will be
permitted to draw water from this point subjected to availability and the contractor has to make
necessary arrangements for drawl of water by providing pipe line and installing a pump set form the
source at his cost and the contractor has to pay the charges at 0.25% of the grass value of the
works, which will be deducted from the running bills on pro-rata basis.
59.2 The water used for the construction shall be complied with, as per the relevant standards. The rates
quoted by the contractor are deemed to be inclusive of all the above costs and operations and no
22
61. Land
61.1 Land for Contractor’s use:
The contractor will be permitted to use T.T.Devasthanams / Government land for execution of work.
The contractor shall have to make his own arrangements for acquiring and clearing the site,
leveling, providing drainage and other facilities for labour staff colonies, site office, work-shop or
stores and for related activities. The Contractor shall apply to the Department within a reasonable
time after the award of the contract and at least 30 days in advance of its use, the details of land
required by him for the work at site and the land required for his camp and should any private land
which has not been acquired, be required by the contractor for his use. The same may be acquired
by the contractor at his own cost by private negotiations and no claim shall be admissible to him on
this account
The Engineer-in-Charge reserves the right to refuse permission for use of any government land for
which no claim or compensation shall be admissible to the contractor. The contractor shall,
however, not be required to pay cost or any rent for the T.T.Devasthanams / Government land
given to him
61.2 Surrender of Occupied Land
a. The T.T.Devasthanams / Government land as here in before mentioned shall be surrendered to
the Engineer-in-Charge within seven days, after issue of completion certificate. Also no land shall
be held by the contractor longer than the Engineer-in-Charge shall deem necessary and the
contractor shall on the receipt of due notice from the Engineer-in-Charge, vacate and surrender the
land which the Engineer-in-Charge may certify as no longer required by the Contractor for the
purpose of the work.
b. The contractor shall make good to the satisfaction of the Engineer-in-Charge any damage to
areas, which he has to return or to other property or land handed over to him for purpose of this
work. Temporary structures may be erected by the contractor for storage sheds, offices, residences
etc., for non-commercial use, with the permission of the Executive Engineer on the land handed
over to him at his own cost. At the completion of the work these structures shall be dismantled site
cleared and handed over to the Executive Engineer. The land required for providing amenities will
be given free of cost from Government lands if available otherwise the contractor shall have to
make his own arrangements
61.3 Contractor not to dispose off Spoil etc
The contractor shall not dispose off or remove except for the purpose of fulfillment of this contract,
sand, stone, clay ballast, earth, trees and shrubs or other materials obtained in the excavation
made or lying on the site of the work, and all such materials and produce shall remain property of
the T.T.Devasthanams / Government. The Department may upon request from the contractor, or if
23
so stipulated in the conditions of the contract allow the contractor to use any of the above materials
for the works either free of cost or after payment as may be specifically mentioned or considered
necessary during the execution of the work
62. Roads
62.1 In addition to existing public roads and roads Constructed by T.T.Devasthanams / Government, if
any, in work area all additional approach roads inside work area and camp required by the
Contractor shall be constructed and maintained by him at his own cost. The layout design,
construction and maintenance etc. of the roads shall be subject to the approval of the Engineer-in-
Charge. The contractor shall permit the use of these roads by the T.T.Devasthanams /
Government free of charge
62.2 It is possible that work at, or in the vicinity of the work site will be performed by the
T.T.Devasthanams / Government or by other contractors engaged in work for the Government
during the contract period. The contractor shall without charge permit the government and such
other contractor and other workmen to use the access facilities including roads and other facilities,
constructed and acquired by the contractor for use in the performance of the works.
62.3 The contractor’s heavy construction traffic or tracked equipment shall not traverse any public roads
or bridges unless the contractor has made arrangement with the authority concerned. In case
contractor’s heavy construction traffic or tracked equipment is not allowed to traverse any public
roads or bridges and the contractor is required to make some alternative arrangements, no claim on
this account shall be entertained.
62.4 The contractor is cautioned to take necessary precautions in transportation of construction
materials to avoid accidents
24
4 Providing masks to workers at granulates or at other locations where too much fine dust is floating
about and sprinkling water at frequent intervals by water hoses on all stone crushing area and storage
bins abate to dust.
5 Getting the workers in such jobs periodically examined for chest trouble due to too much breathing in
to fine dust.
6 Taking such normal precautions like fencing and lightening in excavation of trenches, not allowing rolls
and metal parts of useless timber spread around, making danger areas for blasting providing whistles
etc,.
7 Supply work men with proper belts, ropes etc., when working in precarious slopes etc.
8 Avoiding named electrical wire etc., as they would electrocute the works.
9 Taking necessary steps towards training the workers concerned on the machinery before they are
allowed to handle them independently and taking all necessary precautions in around the areas where
machines hoists and similar units are working
3 The contractor shall not with-standing the revisions of any contract to the contrary cause to be paid to
the labour, in directly engaged on the work including any labour engaged by the sub-contractor in
connection with the said work, as if the labourers had been directly employed by him
4 In respect of labour directly or indirectly employed in the works for the purpose of the contractors part
of the agreement the contractor shall comply with the rules and regulations on the maintenance of
suitable records prescribed for this purpose from time to time by the Government. He shall maintain
his accounts and vouchers on the payment of wages to the labourers to the satisfaction of the
Executive Engineer
5 The Executive Engineer shall have the right to call for such record as required to satisfy himself on
the payment of fair wages to the labourers’ and shall have the right to deduct from the contract
amount a suitable amount for making good the loss suffered by the worker or workers by reason of
the “fair wages” clause to the workers
6 The contractor shall be primarily liable for all payments to be made and for the observance of the
regulations framed by the Govt. from time to time without prejudice to his right to claim indemnity
from his sub-contractors
7 As per contract labour (Regulation and abolition) Act. 1970 the contractor has to produce the license
obtained from the licensing officers of the labour department along with the tender or at the time of
agreement
8 Any violation of the conditions above shall be deemed to be a breach of his contract
9 Equal wages are to be paid for both men and women if the nature of work is same and similar
10 The contractor shall arrange for the recruitment of skilled and unskilled labour local and imported to
the extent necessary to complete the work within the agreed period as directed by the Executive
Engineer in writing.
70. Salient features of some major labour laws applicable to establishment engaged in buildings
and other construction work
a) Workmen compensation Act 1923: The Act provides for compensation in case if injury by
accident arising out of and during the course of employment.
b) Payment of Gratuity Act 1972: Gratuity is payable to an employee under the Act on satisfaction of
certain conditions on separation if any employee has completed 5 years service or more, or on
death, the rate of 15 days wages for every completed year of service. The Act is applicable to all
establishments, employing 10 or more employees
c) Employees P.F. and Miscellaneous provision Act 1952: The Act provides for monthly contributions
by the Department plus workers @ 10% or 8.33%. The benefits payable under the Act are
i) Pension or family pension on retirement or death, as the case may be.
ii) Deposit linked insurance on the death in harness of the worker.
iii) Payment of P.F. accumulation on retirement/death etc.
d) Maternity Benefit Act 1951:The Act provides for leave and some other benefits to women
employees in case of confinements or miscarriage etc,.
e) Contract Labour (Regulation & Abolition) Act 1970: The Act provides for certain welfare
measures to be provided by the contractor to contract labour and in case the Contractor fails to
provide, the same are required to be provided by the Principal Department by Law. The Principal
Department is required to take certificate of Registration and the contractor is required to take
license from the designated Officer. The Act is applicable to the establishments or Contractor of
Principal Department if they employ 20 or more contract labour.
f) Minimum wages Act 1948: The Department is supposed to pay not less than the Minimum
wages fixed by appropriate Government as per provisions of the Act if the employment is a
scheduled employment construction of Buildings, Roads, Runways are scheduled employments.
g) Payment of wages Act 1936:It lays down as to by what date the wages are to be paid, when it will
be paid and what deductions can be made from the wages of the workers.
h) Equal Remuneration Act 1979: The Act provides for payment of equal wages for work of equal
nature to Male or Female workers and for not making discrimination against Female employee in
the matters of transfers, training and promotions etc.
i) Payment of Bonus Act 1965: The Act Is applicable to all establishments employing 20 or more
employees. The Act provides for payment of annual bonus subject to a minimum of 8.33% of wages
and maximum of 20% of wages to employees drawing Rs. 3500/- per month or less. The bonus to
be paid to employees getting Rs.2500/- per months or above and up to Rs.3500/- per month shall
be worked out by taking wages as Rs.2500/- per monthly only. The Act does not apply to certain
establishments. The newly set-up establishments are exempted for five years in certain
circumstances. Some of the State Governments have reduced the employment size from 20 to 10
for the purpose of applicability of this Act.
j) Industrial Disputes Act 1947: The Act lays down the machinery and procedure for resolution of
Industrial disputes, in what situations a strike or lock- out becomes illegal and what are the
requirements for laying off or retrenching the employees or closing down the establishment.
k) Industrial Employment (Standing Orders) Act 1946: It is applicable to all establishments employing
100 or more workmen (employment size reduced by some of the State and Central Government to
50). The Act provides for laying down rules governing the conditions of employment by the
Department on matters provided in the Act and get the same certified by the designated Authority.
l) Trade Unions Act 1926: The Act lays down the procedure for registration of trade unions of
workmen and Departments. The Trade Unions registered under the act have been given certain
immunities from civil and criminal liabilities.
m) Child Labour (Prohibition & Regulation) Act 1986: The Act prohibits employment of children
below 14 years of age in certain occupations and processes and provides for regulation of
employment of children in all other occupations and processes; Employment Child Labour is
prohibited in Building and Construction Industry.
n) Inter-State Migrant workmen’s (Regulation of Employment & Conditions of service) Act 1979: The
Act applicable to an establishment, which employs 5 or more inter-state migrant workmen through
an intermediary (who has recruited workmen in one state for employment in the establishment
situated in another State). The inter State migrant workmen, in an establishment to which this Act
becomes applicable, are required to be provided certain facilities such as housing, medical aid,
traveling expenses from home up to the establishment and back, etc.
o) The Building and Other Construction workers (regulation of Employment and conditions of service)
Act 1996 and the CESS Act of 1996: All the establishments who carryon any building or other
construction work and employs 10 or more workers are covered under this Act. All such
establishments are required to pay CESS at the rate not exceeding 2% of the cost of construction
as may be modified by the Government. The Department of the establishment is required to
provide safety measures at the Building or construction work and other welfare measures, such as
Canteens, First-aid facilities, Ambulance, Housing accommodations for workers near the work
place etc. The Department to whom the Act applies has to obtain a registration certificate from the
Registering Officer appointed by the Government.
p) Factories Act 1948: The Act lays down the procedure for approval of plans before setting up a
factory, health and safety provisions, welfare provisions, working hours, annual earned leave and
rendering information regarding accidents or dangerous occurrences to designated authorities. It is
applicable to premises employing 10 person or more with aid of power or 20 or more persons
without the aid of power engaged in manufacturing process.
26
71.3 The contractor shall at all times indemnify the Govt. of A.P. against all claims which may be made
under the workmen’s compensation act or any statutory modification thereafter or rules there under
or otherwise consequent of any damage or compensation payable in consequent of any accident or
injuries sustained or death of any workmen engaged in the performance of the business relating to
the contractor.
74. Relationship
74.1 Contractor shall have to furnish information along with tender, about the relationship he is having
with any officer of the Department, Government of Andhra Pradesh of the rank Assistant Engineer
and above engaged in the work and any officer of the rank of Assistant Secretary and above of the
Department of Government of Andhra Pradesh
of the contractor.
28
period including nights, Sundays and holidays for duration of the contract.
e) Other contractors working on the site concurrently with the contractor will provide security for their
own plant and materials. However, their security provisions shall in no way relieve the contractor of
his responsibilities in this respect.
f) Separate payment will not be made for provision of security services.
6.Fire fighting measures
a) The contractor shall provide and maintain adequate firefighting equipment and take adequate fire
precaution measures for the safety of all personnel and temporary and permanent works and shall
take action to prevent damage to destruction by fire of trees shrubs and grasses.
b) Separate payment will not be made for the provision of fire prevention measures.
87. Sanitation
87.1 The contractor shall implement the sanitary and watch and ward rules and regulations for all forces
employed under this contract and if the Contractor fails to enforce these rules, the Engineer-in-
Charge may enforce them at the expenses of the Contractor.
29
areas by equipment. Care shall be taken by the Contractor in felling trees authorised for removal to
avoid any unnecessary damages to vegetation and tress that are to remain in place and to structures
under construction or in existence and to workmen.
b) All the produce from such cutting of trees by the contractor shall remain the property of Government
and shall be properly stacked at site, approved by the Engineer-in-Charge. No payment whatsoever
shall be made for such cutting and its stacking by the Contractor. If any produce from such cutting is
not handed over to the Government by the contractor, he shall be charged for the same at the rates to
be decided by the Engineer-in-Charge. The recovery of this amount shall be made in full from the
intermediate bill that follows.
c) The contractor shall also make arrangements of fuel deposits for supply of required fuel for the
labourer to be employed for cooking purpose at his own cost in order to prevent destruction of
vegetation growth in the surrounding area of the work site.
30
construction of the work along with a separate print-out of the time table showing earliest and latest
start and finish dates of various activities. He should submit a detailed layout plan with drawings for
the diversion and care of river during construction of work. The above arrangements shall be at
contractor’s cost.
99. Income tax
a) During the currency of the contract deduction of income tax at 2.00% + Surcharge as in force shall be
made from the gross value of each bill of the contract, the contract value of which is in excess of
Rs.20, 000/- for deduction of tax at rates lower than 2.00% procedure stipulated under section 194-
C(4) of Income Tax Act, 1961 shall be followed.
b) Income Tax clearance certificate should be furnished before the payment of final bill. Otherwise final
payment will be with held.
c) to such deductions thereof as may be imposed on him by such laws and regulations. The contractor’s
staff, personnel and labour will be liable to pay personnel income taxes in respect of their salaries and
wages as are chargeable under the laws and regulations for the time being in force, and the
contractor shall perform such duties in regard.
100. The contractor should procure metal from quarries permitted by the Mines and Geology
2 Department.
100. The contractor will no longer be required to produce clearance certificate from Mines Department
3 and Seigniorage charges will be deducted by the concerned works department from the bills of the
contractor for the materials used on the work only.
100. As and when the recovery is affected in the bills, the Seigniorage charges will be remitted to the
4 Government.
101. GST.
1. The Contractor, shall comply to the provisions of GST and related charging mechanism
procedures of GST Act.
2. The Contractor has to mention the GST number of TTD in the tax invoice to be issued to
TTD. After, that the same has to be uploaded properly in the monthly / Quarterly returns to
be filed by the Contractor, . If the said amount is not recorded in the GST 2AE TTD shall
recover, the amounts from the Contractor, from time to time.
3. The rates included in BOQ (Schedule-A) are exclusive of GST.
4. The percentage quoted by the contractor, is exclusive of Goods and Service Tax (GST)
but inclusive of all other, taxes on all materials that the contractor, will have to purchase
for performance of this contract.
5. The contractor must have an active /valid registration number, with the GST authorities
within the State of Andhra Pradesh and shall provide copy of registration to TTD and the
applicable GST shall be paid by the contractor, to the department concerned. If in case not
already registered shall under, take by affidavit to cause registered before Price bid
finalization and letter of acceptance for entering of contract agreement and for, any such
default not only forfeiture of EMD but also be made liable for, other, civil and penal
consequences.
6. The contractor will submit regular, Invoice / Bill fulfilling all conditions of GST amended
from time to time clearly indicating GST registration number, E GST classification rate and
amount of GST and shall produce proof of deposit of GST in respect of preceding bills
received from TTD to the TTD so as to claim the GST amount of the current bill from TTD.
The contractor shall produce documental evidence that GST amount in respect of the
preceding bills is remitted to the Government and reflected in GST portal.
7. Estimate is prepared based on SOR rates/ quotation rates for mater ials , labour
31
charges , machinery hire charges etc., which are basic prices only (excluding GST). In
case of open tenders where the bidders have to quote individual item rates by them the
Bidders / Tenderers shall quote rates File No.6193/D16/CE/MC/2017 excluding GST only
but including all other taxes.
8. The GST liability is as per the rates of tax applicable (if the contract is not exempted from
GST concerned ) as per of the G.O.Ms.No.58 Finance(WR.I), Dept. dt.08-05-2018 and
other relevant GOs/ Circulars/ Clarifications / amendments etc., being issued from time to
time by the Government of Andhra Pradesh/ GOI. The contractors are requested to
ascertain themselves regarding the applicability of GST and the prevailing rates thereof
while tendering and more so while making the payment of GST to the department. In this
regard, TTD will not undertake any responsibility whatsoever.
9. The service provider / contractor is liable to pay GST which can be deducted at source
under Sec.51-GST Act 2017 on every respective bill payment made by client which
includes all components as per, Sec.15(2) -GST Act 2017.
10. It is the responsibility of the contractor, to pay the applicable GST in time and TTD will not
be responsible in the regard. Any delay in payment of GST by the tenderer for whatsoever
reasons , the responsibility lies on the tenderer and any penalties interest levied in this
regard shall be borne by the tenderer only and such penalties interest will not be paid by
TTD. Even if the contractor pays any extra amount towards GST than the applicable GST,
the payment from TTD will be limited to the applicable GST only. There shall not be any
excess payments to the agency on account of GST and Para (8) of G.O.Ms No. 58
Finance (WR.I)Dept. dt.08-05-2018 specifies that the tax liability under, GST shall be
taken into consideration at the time of invoicing and payment there on as per the terms
and conditions of the agreement between the contractor and TTD. Department shall
ensure that there shall not be any excess payments to the contractor
11. The contractor shall pay the applicable GST and shall satisfy TTD w.r.t GST claims.
12. All the rules as per, GST ACT2017 and its amendments and all Notifications / Government
Orders (GOs) issued from time to time by the Govt. of India (GOI) and Govt. of Andhra
Pradesh with regard to GST are applicable.
13. Revenue Department , Govt. of Andhra Pradesh has issued a notification on tax deduction
at source of section 51 of GST Act and the guidelines for deduction and deposits of TDS
w.e.f 01-10-2018 vide GO MS No.482 Revenue (Commercial Taxes-II) Dept. date 24-09-
2018. As per, the present guidelines GST at 2% (CGST at 1% and SGST at 1%) for
intrastate or, 2% at IGST for, inter, state transactions will be deducted on the taxable
amount payable and necessary TDS certificate will be issued. Any amendments in this
regard issued from time to time will apply.
14. As per clause 60 of APSSE the contractor, is bound to produce as required by the
employer, all invoices receipts, bills, accounts, vouchers , licenses, permissions etc.
compliance of labour Laws applicable if any safety and standard certificates applicable if
any and produce all the above and also any exemption from GST for, GST/CGST/IGST
availed by and or available to him for, GST in so far, as the works contract concerned with
TAN & respective Registration particulars, seigniorage, NAC, Labour Cess etc. to even
any component or any part of the contract works in so far, as the works contract
concerned.
15. The deposits (EMD /FSD) of the work will be released only when the contractor produces
the documental evidence that GST in respect of final bill received is remitted to the
Government and reflected in GST portal.
16. During course of contract , if the contractor claims any exemption towards GST the same
must be intimated to the employer and to the extent GST (Works Contract) will not be paid
separately.
17. The TTD will pay GST (Works Contract) at the applicable rates from time to time and as
per the provisions of the agreement. The bidders are advised to quote their most
competitive rates duly considering the input tax credit due to payment of GST on
materials, machinery, services etc. for due fulfillment of the contract.
Note:- The above conditions are applicable, where tenders are invited to quote excluding GST. In
the case of tender invited / works awarded with inclusive of GST, the above conditions shall be
suitably modified and adopted.
32
10 Once the contractor buys the tender schedules, he will not be permitted to return the tender
5 schedules. He has to compulsorily submit his tender duly fulfilling all the tender conditions after
buying the tender schedules. If a contractor does not tender for the work, suitable action will be
initiated.
10 The TTD reserves the right to engage the services of the consultants during the course of the work,
6 for Engineering or Architectural services and the contractor is bound to carry out such instructions as
may be given by consultants from time to time.
10 Preliminary specifications of APSS shall apply to all agreements entered by the contractor with an
7 inseparable condition of the contract. The tenderer is expected to examine closely the relevant
specifications of the APSS and the special specifications of ISS before submitting the unit tender
rates.
10 All the items of work including materials and workmanship should be executed as per relevant
8 A.P.D.S.S. and I.S.I. code. If there are any variation between the above two specifications, the
decision of the Executive Engineer is final and binding on the contract.
10 Scaffolding and gangways will have to be arranged by the contractor at his own whenever they are
9 considered desirable or necessary by the Engineer-in-Charge of the work to facilitate the work.
11 PATENT RIGHT: In the event of any claim or demand being made or action being brought against
0 the TTD for infringement of letter of patent, registration for infringement of design or trade mark in
respect of any machines, plant, work materials or things or method of using or working of such
machine, plant work materials or things belonging to the contractor shall indemnify the owner against
all costs and expenses arising from or incurred by reason of any such claim provided that the owner
shall notify the contractor immediately any claim is made and that the contractor shall be at liberty, if
he so desires with the assistance of the owner if required but at the contractor’s expenses, to
conduct all negotiations for the settlement of same or any litigation that may arise there from and
provided that no such machine, plant, works materials or things shall be used by the owner for any
purpose or any manner other than that for which they have been supplied by the contractor and
specified under his contract.
11 The TTD will also assist the contractor in securing priorities for deliveries transport etc., where such
3 are needed. The TTD will not however be responsible for the non-availability of any of the above
facilities or delay in this behalf and for claims either in cost or time on account of such failures or
delays and the contractor is not entitled for any claim against the owner.
11 In case of contradiction between the clauses included in this specification and the clauses of PS to
4 APSS, the former will prevail over the latter and is binding on the tenderer.
BILL OF QUANTITIES
1 The Bill of Quantities shall be read in conjunction with the instructions to tenderers, General and
Special conditions of Contract.
2 The quantities given in the Bill of Quantities are estimated and provisional and are given to provide
common basis for tendering. The quantities here given are those upon which the lump sum tender
cost of the work is based but they are subject to alterations, omissions, deductions or additions as
provided for in the conditions of this contract and do not necessarily show the actual quantities of
work to be done. The basis of payment will be actual quantities of work ordered and carried out as
measured by the Contractor and verified by the Engineer and valued at the estimate rate plus or
minus tender percentage quoted in the Bill of Quantities where applicable, and otherwise at such
rates and prices as the Engineer-in-Charge may fix within the terms of Contract.
3 The estimate rates in the Bill of Quantities shall, except in so-far as it is otherwise provided under the
Contract include cost of all constructional material, labour, machinery, transportation, erection,
maintenance, profit, taxes and duties together with all general risks, liabilities and obligations set out
or implied in the Contract
4 The plans enclosed with the tender are liable to be altered during execution of work as per necessity
of site conditions. The Tender percentage quoted by the tenderer shall hold good for execution of
work even with altered plans.
5 The whole cost of complying with the provisions of the Contract shall be included in the estimated
rates for items provided in the Bill of Quantities and where no items are provided in the Bill of
Quantities, their cost shall be deemed to be distributed among the estimate rates entered for the
related items of work.
6 General directions and descriptions of work and materials are not necessarily repeated nor
summarised in the Bill of Quantities. References to the relevant sections of the Contract
33
documentation shall be made before entering estimate rate against each item in the Bill of Quantities.
7 The method of measurements of completed work for payment shall be in accordance with the
relevant B.I.S. Codes & A. P. S. Specifications.
8 All items of work are to be executed as per the drawings / specifications supplied with the contract
documents. If there is any contradiction between the drawings and the text of the specifications, the
later shall prevail.
9 The Tenderer should inspect and select the quarries of his choice before he quotes the tender
percentage in the Schedule of Bill of Quantities and satisfy himself about the availability of required
quantum of materials.
10 Diversion drains should be excavated before completion of the embankments and the useful soils
should be used in the nearby embankments.
11 The actual mix proportion by weight to be adopted during execution will be got designed in the
laboratories to suit the grade of concrete and mortar to be used. It will be the responsibility of the
contractor to manufacture concrete and mortar of required strength.
12 The quantum of measurement for all items of earthwork involving conveyance manually or by
machinery shall be as assessed by level measurement. The measurements for the embankment will
be for the consolidated banks only.
13 Wherever bailing out of water is involved either for excavation or for foundations or for constructions,
the percentage quoted shall take into account the dewatering charges necessary. No separate
payment will be made for dewatering.
14 Wherever embankment work is involved, useful soils approved by the Engineer-in-Charge from the
cutting reaches and diversion drains shall be taken and used for forming nearby embankments soils
used for constructions will be at free of cost.
15 The quoted tender percentage shall also include the work of any kind necessary for the due and
satisfactory construction, completion and maintenance of the works according to the drawings and
these specifications and further drawings and orders that may be issued by the Engineer-in-Charge
from time to time. The quoted tender percentage shall include compliance by the Contractor with all
the general conditions of contract, whether specifically mentioned or not in the various clauses of
these specifications, all materials, machinery, plant, equipment, tools, fuel, water, strutting, timbering,
transport, offices, stores, workshop staff, labour and the provision of proper and sufficient protective
works, diversions, temporary fencing and lighting. It shall also include safety of workers, first aid
equipments suitable accommodation for the staff and workmen, with adequate sanitary
arrangements, the effecting and maintenance of all insurances, the payment of all wages, salaries,
fees, royalties / Taxes, duties or other charges arising out of the execution of works and the regular
clearance of rubbish, reinstatement and clearing-up of the site as may be required on completion of
works safety of the public and protection of the works and adjoining land. The work of Building in
quality control / assurance shall be deemed to be covered in the quoted percentage.
16 The Contractor shall ensure that, the quoted tender percentage shall cover all stages of work such as
setting out, selection of materials, selection of construction methods, selection of equipment and
plant, deployment of personnel and supervisory staff, quality control testing etc. The work quality
assurance shall be deemed to be covered in the tender percentage.
17 a The special attention of the tenderer is drawn to the conditions in the tender notices wherein
reference has been made to the Andhra Pradesh Standard Specifications [APSS] and the
Standard preliminary specifications containing therein. These preliminary specifications shall
apply to the agreement to be entered into between the contractor and the Government of Andhra
Pradesh and shall form an in-separable condition of the contract along with the estimate. All these
documents taken together shall be deemed to form one contract and shall be complimentary to
another.
b The tenderer shall examine, closely the A.P.S.S. / MORTH and also the standard preliminary
specifications contained therein and sign the Executive Engineer’s office copy of the APSS /
MORTH and its addenda volume in token of such study before submitting his overall tender
percentage which shall be for finished work in-situ. He shall also carefully study the drawings and
additional specifications and all the documents, which form part of the agreement to be entered
into by the successful tenderer. The APSS / MORTH and other documents connected with
contract such as estimate plans, specifications, can be seen on all working days in the office of the
Executive Engineer –X, T.T.Ds, Visakhapatnam.
18 The tenderer attention is directed to requirements for materials under the clause ‘materials and
workmanship’ in the preliminary specifications of APSS. Materials conforming to the Bureau of Indian
Standards specifications, APSS etc., shall be used on the work and the tenderer shall quote his
overall tender percentage accordingly.
19 The tenderer has to do his own testing of materials and satisfy himself that they conform to the
specifications of respective I.S.I. Codes before tendering.
20 The contractor shall himself procure the required construction materials of approved quality including
the earth for formation of embankment and water from quarries / sources of his choice. All such
quarries / sources of materials required for the work shall be got approved by the Engineer-in-Charge
in writing well before their use of the work.
21 The contractor shall himself procure the steel, cement, Bitumen, Blasting materials, sand, metal,
soils, etc., and such other materials required for the work well in advance. The contractor has to bear
the cost of materials for conveyance. The department will not take any responsibility for fluctuations
in market in cost of the materials, transportation and for loss of materials etc.
22 Inspection of site and quarries by the tenderer: Every tenderer is expected before quoting his overall
tender percentage, to inspect the site of proposed work. He should also inspect the quarries and
satisfy himself about the quality, and availability of materials. The best class of materials to be
34
obtained from quarries, or other sources shall be used on the work. In every case the materials must
comply with the relevant standard specifications. Samples of materials as called for in the standard
specifications or in this tender notice, or as required by the Executive Engineer, in any case, shall be
submitted for the Executive Engineer’s approval before the supply to site of work is begun.
23 The tenderer’s particular attention is drawn to the sections and clauses in the A.P. standard
specification dealing with: 1] Test, inspection and rejection of defective materials and work. 2]
Carriage 3] Construction plant 4] Water & lighting 5] Cleaning up during the progress and for
delivery. 6] Delays 8] Payment particulars.
The contractor should closely peruse all the specification clauses, which govern the overall tender
percentage he is tendering.
24 The period of contract in terms of GO Ms.No.8, T.R&B Dept., dt: 8.1.2003 is twenty four months for
capital works and twelve months for maintenance works.
25 The estimate rates for items shown in the Schedule “A” include all construction materials. No
escalation in rates will be paid unless specified in the tender document. The tenderer has to quote an
overall tender percentage considering all the aspects of the tender to complete the finished item of
work as per the APSS / MORTH / B.I.S. specifications, the special specifications appended, Drawings
etc.
26 If there is any contradiction between APSS / MORTH and B.I.S. specifications, listed and detailed
technical specifications, the latter shall prevail.
27 In case of a job for which specifications are not available with the Schedule or in APSS / MORTH or
B.I.S. code and are required to be prescribed, such work shall be carried out in accordance with the
written instructions of the Engineer-in-charge.
28 The contractor should use the excavated useful soils and stone for construction purpose. Soils used
for construction either for homogeneous section in hearting or in casing zone based on the suitability
will be at free of cost and the cost of stone used for construction purpose will be recovered from the
contractors bill.
The contractor should quote his tender percentage keeping in view of the above aspects.
29 Additions and alternations by the Tenderer in the Schedule of quantities will disqualify the tender.
30 In the case of discrepancies between the written description of the item in the Schedule “A” and the
detailed description in the specification of the same item, the latter shall be adopted.
31 The Unit rates noted below are those governing payment of extras or deductions for omissions
according to the conditions or the contract as set-forth in the preliminary specifications of the A.P.
standard specifications and other conditions of specification of this contract.
32 It is to be expressly understood that the measured work is to be taken according to the actual
quantities when in place and finished according to the drawings or as may be ordered from time to
time by the Executive Engineer and the cost calculated by measurement or weight at their respective
rates without any additional charge for any necessary or contingent works connected works
connected herewith. The Percentage Excess or less on ECV quoted are for works in situ and
complete in every respect.
33 For all items of work in excess of the quantities indicated the rates payable for such excess quantities
will be tendered rates i.e., estimate rates plus or minus tender percentage.
34 For all items of work, intermediate payment will be made provisionally as per relevant clause. Full-
accepted agreement rates will be paid only after all the items of works are completed.
35 The contractor is bound to execute all supplemental works that are found essential incidental and
inevitable during execution of main work.
36 The payment of rates for supplement items of work will be regulated as under.
1 Supplemental items directly deductible from similar items in the original agreement.
The rates shall be derived by adding to or subtracting from the agreement rate of such similar item
the cost of the difference in the quantity of materials labour between the new items and similar
items in the agreement worked out with reference to the schedule of rates adopted in the
sanctioned estimate with which the tenders are compared.
2 a) Similar items but the rates of which cannot be directly deducted from the original agreement.
b) Purely new items which do not correspond to any item in the agreement
3 The rate of all such items shall be estimated rates plus or minus overall tender percentage.
37 ENTRUSTMENT OF ADDITIONAL ITEMS
a Where ever additional items not contingent on the main work and outside the scope of original
agreement are to be entrusted to the original contractor dispensing with tenders and if the value of
such items exceeds the limits up.
b to which the officer is empowered to entrust works initially to contractor without calling for tenders
approval of next higher authority shall be obtained. Entrustment of all such items on nomination
shall be rates not exceeding the estimate rates.
c Entrustment of supplement items contingent on the main work will be authorized by the officers up
to the monetary limits up to which they themselves are competent to accept items in the original
agreement so long as the total amounts up to which they are competent to accept in an original
agreement rates for such items shall be worked in accordance with the procedure prescribed in
GO Ms.No.1493 PWD, dated:25.10.1971 and as amended in Govt. Memo number 544 cod 72-22
dt:6.7.1973.
d Entrustment of either the additional supplemental items shall be further subject to the provisions
under para 176(b) of APWD Code Viz., the items shall not be ordered by an officer on his own
responsibility if the revised estimate or deviation statement providing for the same requires the
sanction of higher authority.
Note: It may be noted that the term estimate rate used above means the rate in the sanctioned estimate
with which the tender’s compared or if no such rate is available in the estimate the rate derived will
be with reference to the schedule of rates adopted in the sanctioned estimate with which tenders
are compared.
35
SCHEDULE – A
SCHEDULE OF RATES AND APPROXIMATE QUATITIES
The quantities here given are those up to which the lumpsum tender cost of
the work is based, but they are subject to alterations, omissions, deductions or
additions as provided for in the conditions of this contract and not so necessarily
show the actual quantities of work to be done. The Unit rates noted below are
those governing, payment for extras of deductions or omissions according to the
conditions of the contract as set forth in the preliminary specifications of the A.P.
Detailed Standard Specifications and other conditions Specifications of this
contract.
36
37
38
a 158.00 -do- Single coat for Old Iron work -do- Single coat for Old Iron work -do- Single coat for NA 35.32 Sqm 5580.56
Old Iron work
b 409.00 -do- Single coat for Old wood work & -do- Single coat for Old wood work & -do- Single coat for NA 37.77 Sqm 15447.93
Old plastered surface Old plastered surface Old wood work & Old
plastered surface
4 15.00 Polishing two or more coats for old wood Polishing two or more coats for old Polishing two or more NA 146.76 Sqm 2201.40
work with best French Spirit polish of wood work with best French Spirit coats for old wood
approved quality and make including polish of approved quality and make work with best French
brushes to have an even shade and including brushes to have an even Spirit polish of
including linseed oil, boiled, stopping shade and including linseed oil, approved quality and
cloth, cost and conveyance of all boiled, stopping cloth, cos
materials as directed during execution
etc., complete.
Rupees Four Lakhs eleven thousand one hundred fifty three and paisa ninety nine only 4,11,153.99
Submitted:-
A draft tender schedule for the work of “Painting to S.V.Temple Gopurams, Arches at Upamaka (V), Nakkapalli (M), Anakapalli District for the year 2024-25” is prepared and
submitted for approval.
EE-X (i/c)
39