Final Exam - Attempt Review UGRD-CPE6499 CpE Design Project 2 (Project Implementation)
Final Exam - Attempt Review UGRD-CPE6499 CpE Design Project 2 (Project Implementation)
Final Exam - Attempt Review UGRD-CPE6499 CpE Design Project 2 (Project Implementation)
Question 1
Correct
To maintain and improve our technical competence and to undertake _______________ tasks for others only if qualified by training and
experience, or after disclosure of pertinent limitations.
Select one:
a. Technical
b. Technology
c. Technological
Question 2
Correct
Demonstration projects must be properly monitored. An effective monitoring mechanism, using clear and readily measured indicators
has to be put in place from inception in order to capture, and synthesis lessons of experience. To provide a sound baseline, the "pre-
project" situation should be carefully documented.
Select one:
a. Financing
b. Indicating
c. Monitoring
semestralexam.amaes.com/2322/mod/quiz/review.php?attempt=143652&cmid=8126&showall=1 1/21
6/20/24, 1:53 PM Final Exam: Attempt review
Question 3
Correct
The immediate impact of demonstration projects is often limited because they are, by definition, small-scale interventions. But the
potential gains from up-scaling and replication are enormous, with clear _____________ benefits.
Select one:
a. Efficiency
b. Efficient
c. Efficacy
Question 4
Correct
To plan and schedule project activities and tasks, the project _________ needs to set up activities and define relationships between
activities.
Select one:
a. Employer
b. Manager
c. Participant
Question 5
Correct
Select one:
a. Primary
b. Priority
c. Secondary
semestralexam.amaes.com/2322/mod/quiz/review.php?attempt=143652&cmid=8126&showall=1 2/21
6/20/24, 1:53 PM Final Exam: Attempt review
Question 6
Correct
All demonstration projects are projects, but not all projects are demonstrations. Demonstration projects are designed from the
beginning to serve as demonstrations of new ways of doing things and hence the features to be demonstrated are explicitly featured
in the design, as are the elements of quick implementability.
Select one:
a. Short project cycle
b. Small scale
c. Demonstration ex-ante
Question 7
Correct
The final step in project activity planning and scheduling requires the project manager to define and estimate an amount of working
time required for accomplishing each identified activity.
Select one:
a. Estimate Time
b. Estimate Duration
c. Estimate Resources
semestralexam.amaes.com/2322/mod/quiz/review.php?attempt=143652&cmid=8126&showall=1 3/21
6/20/24, 1:53 PM Final Exam: Attempt review
Question 8
Correct
To assist colleagues and co-workers in their professional development and to support them in following the code of _____________.
Select one:
a. Value
b. Ethics
c. Ethical
Question 9
Correct
Demonstration projects are deliberately small in scale and limited in scope, so that planning, financing and implementation is easier
and quicker than for full-size projects; this also makes possible a short project cycle, so that the "demonstration" benefits can be
reaped quickly and the risks and management burdens of implementation are lesser.
Select one:
a. Small scale
b. Demonstration Project
Question 10
Correct
The ______ elements in formulating successful demo projects are proper design, feasible financing, and effective monitoring and
documentation.
Select one:
a. Key
b. Previous
c. Main
semestralexam.amaes.com/2322/mod/quiz/review.php?attempt=143652&cmid=8126&showall=1 4/21
6/20/24, 1:53 PM Final Exam: Attempt review
Question 11
Correct
The input for this process will be the __________. The project manager can use this document to define high-level activities that will be
used later in creating the project implementation schedule.
Select one:
a. Statement
c. Agreement
Question 12
Correct
The manager will use project activities lists, the milestones list and the______________ to define relationships among the activities.
Select one:
a. Product scope
b. Product statement
semestralexam.amaes.com/2322/mod/quiz/review.php?attempt=143652&cmid=8126&showall=1 5/21
6/20/24, 1:53 PM Final Exam: Attempt review
Question 13
Correct
Demonstration projects have to be monitored consistently so that the lessons of experience can be properly captured and
documented. This requires that monitoring be designed in from the outset and that monitoring activities be executed and sustained
throughout.
Select one:
a. Short cycle project
b. Demonstration ex-ante
Question 14
Correct
Select one:
a. Estimate
b. Calculate
c. Formulate
semestralexam.amaes.com/2322/mod/quiz/review.php?attempt=143652&cmid=8126&showall=1 6/21
6/20/24, 1:53 PM Final Exam: Attempt review
Question 15
Correct
The first step of project activities planning and scheduling requires the project manager to define what amount of actions and tasks
are necessary for producing project deliverables in a timely manner.
Select one:
a. Bring up Activities
b. Set up Activities
c. Put up Activities
Question 16
Correct
To facilitate _________and up-scaling of innovative approaches, projects are consciously designed to demonstrate new and better
approaches and solutions, they will provide a sound basis for replication and up-scaling.
Select one:
a. Study
b. Replication
c. Application
Question 17
Correct
Select one:
a. Formulation
b. Formula
c. Focus
semestralexam.amaes.com/2322/mod/quiz/review.php?attempt=143652&cmid=8126&showall=1 7/21
6/20/24, 1:53 PM Final Exam: Attempt review
Question 18
Correct
Demonstration projects can be financed through a variety of funds perhaps catalyzed through seed capital or leveraged by small
grants or cost-shared through partnership arrangements. The way in which demonstration projects are financed often has
implications on their sustainability and for the feasibility of up-scaling and replication.
Select one:
a. Monitoring
b. Financing
c. Indicating
Question 19
Correct
To _______ responsibility in making engineering decisions consistent with the safety, health and welfare of the public, and to disclose
promptly factors that might endanger the public or the environment.
Select one:
a. Practice
b. Prove
c. Accept
semestralexam.amaes.com/2322/mod/quiz/review.php?attempt=143652&cmid=8126&showall=1 8/21
6/20/24, 1:53 PM Final Exam: Attempt review
Question 20
Correct
In cooperation with experts and the project team, the ___________ should make project activities lists that will be the output of the
process for project activities planning and scheduling.
Select one:
a. Student
b. Manager
c. Researcher
Question 21
Correct
Project activities planning and scheduling is the _____________ process group of project time management.
Select one:
a. One
b. Only
c. First
semestralexam.amaes.com/2322/mod/quiz/review.php?attempt=143652&cmid=8126&showall=1 9/21
6/20/24, 1:53 PM Final Exam: Attempt review
Question 22
Correct
Demonstration projects should have a thorough post-hoc evaluation to analyze them in respect to the original objectives and project
design parameters. This _________ and evaluation will provide the foundation for a sound process of replication and up-scaling.
Select one:
a. Monitoring
b. Participation
c. Evaluation
Question 23
Correct
To ________, accept, and offer honest criticism of technical work, to acknowledge and correct errors, and to credit properly the
contributions of others.
Select one:
a. See
b. Find
c. Seek
Question 24
Correct
To treat fairly all persons regardless of such factors as race, religion, gender, disability, age, or ____________origin.
Select one:
a. Common
b. National
c. International
semestralexam.amaes.com/2322/mod/quiz/review.php?attempt=143652&cmid=8126&showall=1 10/21
6/20/24, 1:53 PM Final Exam: Attempt review
Question 25
Correct
Through actual _________on the ground, effective partnerships which build on comparative advantages of different stakeholders will
emerge.
Select one:
a. Coordination
b. Cooperation
c. Consideration
Question 26
Correct
Select one:
a. Beneficiaries
b. Researcher
c. Participant
Question 27
Correct
Select one:
a. Evaluations
b. Duration
c. Estimations
semestralexam.amaes.com/2322/mod/quiz/review.php?attempt=143652&cmid=8126&showall=1 11/21
6/20/24, 1:53 PM Final Exam: Attempt review
Question 28
Correct
The next step for planning project activities and tasks requires the project manager to make a sequence of all the activities.
Select one:
a. Connection
b. Communication
c. Define Relationships
Question 29
Correct
Demonstration projects are small in scale and short-term in implementation, lessons can readily be drawn from them - lessons of
experience which can highlight weaknesses and/or gaps as well as strong points and unforeseen.
Select one:
a. Development
b. Measurement
c. Opportunity
Question 30
Correct
Scale and project cycle, ____________ for small-scale actions which can be completed quickly with a short project cycle.
Select one:
a. Conference
b. Preference
c. Difference
semestralexam.amaes.com/2322/mod/quiz/review.php?attempt=143652&cmid=8126&showall=1 12/21
6/20/24, 1:53 PM Final Exam: Attempt review
Question 31
Correct
Manifested by local partner inputs and strong participation of stakeholders in project formulation and implementation.
Select one:
a. Local ownership
b. Ownership
c. Local
Question 32
Correct
The __________________ model is suitable for promoting good practices and approaches.
Select one:
a. Demo-Replication
b. Demonstration
c. Replication
semestralexam.amaes.com/2322/mod/quiz/review.php?attempt=143652&cmid=8126&showall=1 13/21
6/20/24, 1:53 PM Final Exam: Attempt review
Question 33
Correct
To _____________ the understanding of technology, its appropriate application, and potential consequences.
Select one:
a. Encourage
b. Improve
c. Disprove
Question 34
Correct
To provide a learning framework for ________ solutions and approaches demonstration projects show case approaches and solutions
that can inspire and further catalyse change.
Select one:
a. Better
b. Bad
c. Good
semestralexam.amaes.com/2322/mod/quiz/review.php?attempt=143652&cmid=8126&showall=1 14/21
6/20/24, 1:53 PM Final Exam: Attempt review
Question 35
Correct
To avoid real or perceived conflicts of interest whenever possible, and to disclose them to ___________parties when they do exists.
Select one:
a. Affection
b. Affected
c. Effect
Question 36
Correct
To avoid injuring others, their property, reputation, or employment by false or malicious _______.
Select one:
a. Action
b. Connection
c. Reaction
Question 37
Correct
Select one:
a. Monitoring
b. Indicators
c. Indicating
semestralexam.amaes.com/2322/mod/quiz/review.php?attempt=143652&cmid=8126&showall=1 15/21
6/20/24, 1:53 PM Final Exam: Attempt review
Question 38
Correct
To focus on "_________"demonstration projects enable stakeholders to see for themselves what and how much they can do. By coming
together and pooling their resources, stakeholders will discover latent capacities for real change.
Select one:
a. Research
b. Action
c. Project
Question 39
Correct
The real changes effected on the ground, though limited in scale, will underscore the implementation focus of the process and
thereby create ___________.
Select one:
a. Integrity
b. Morality
c. Credibility
semestralexam.amaes.com/2322/mod/quiz/review.php?attempt=143652&cmid=8126&showall=1 16/21
6/20/24, 1:53 PM Final Exam: Attempt review
Question 40
Correct
Demonstration projects can be replicated from issue to issue, or from one geographic area to another, or from a small-scale to a
larger-scale. But because they are designed and implemented specifically to "__________" an approach, they make an important
contribution to transparency, just as their small-scale and local orientation enhance local participation and hence civic engagement.
Select one:
a. Demonstrate
b. Illustrate
c. Describe
Question 41
Correct
The project manager should also work on developing ______________templates that help simplify the process of project scheduling and
planning.
Select one:
a. Job
b. Task
c. Project Activities
semestralexam.amaes.com/2322/mod/quiz/review.php?attempt=143652&cmid=8126&showall=1 17/21
6/20/24, 1:53 PM Final Exam: Attempt review
Question 42
Correct
Select one:
a. Professional
b. Physical
c. Individual
Question 43
Correct
__________ management includes two high-level groups of processes for planning and scheduling project activities and tasks necessary
for timely completion of the project.
Select one:
a. Project time
b. Project management
c. Project scale
Question 44
Correct
Substantiated by built-in institutional arrangements to ensure proper management of project outputs and effective delivery of
services resulting from the project.
Select one:
a. Delivery
b. Project
c. Sustainability
semestralexam.amaes.com/2322/mod/quiz/review.php?attempt=143652&cmid=8126&showall=1 18/21
6/20/24, 1:53 PM Final Exam: Attempt review
Question 45
Correct
With the ____________, firmly based on real experience, the demonstrated project approach can more confidently be repeated, both
more widely and on a larger scale replication and up-scaling.
Select one:
a. Conclusion
b. Information
c. Demonstration
Question 46
Correct
Select one:
a. Secondary
b. Tertiary
c. Second
Question 47
Correct
To be _________ and realistic in stating claims or estimates based on available data and to reject bribery in all its forms.
Select one:
a. Honest
b. Fruitful
c. Faithful
semestralexam.amaes.com/2322/mod/quiz/review.php?attempt=143652&cmid=8126&showall=1 19/21
6/20/24, 1:53 PM Final Exam: Attempt review
Question 48
Correct
At this step, the project manager needs to review stakeholder requirements and the product scope statement to estimate an amount
of resources required for performing project activities and tasks.
Select one:
a. Estimate Budget
b. Estimate Projection
c. Estimate Resources
Question 49
Correct
A key challenge in the ___________ of a demonstration project is to ensure that it reflects the principles.
Select one:
a. Research
b. Design
c. Project
Question 50
Correct
There is also a _______ to define dependencies between the activities, dependencies can be internal and external.
Select one:
a. Use
b. Demand
c. Need
semestralexam.amaes.com/2322/mod/quiz/review.php?attempt=143652&cmid=8126&showall=1 20/21
6/20/24, 1:53 PM Final Exam: Attempt review
Jump to...
semestralexam.amaes.com/2322/mod/quiz/review.php?attempt=143652&cmid=8126&showall=1 21/21