Monthly HSE Statistic Report May 2024

Download as pdf
Download as pdf
You are on page 1of 9
Ghent ll aa yal ail 6 A RTE RCN, Project Company EPC Contractor AY ERCE- @cs AL GHUBRAH III LLC Project No, Project , voz001 ‘Al Ghubrah Ill IWP ~ RO Desalination Plant Date Rev. | Pae. ° Document n°/Tite 03/06/2024] 01 1 ° G3-GSI-MP-HS-0000-00003_Monthly HSE Report & Statistics - May 2024 a Monthly HSE Report Monthly HSE Report & Statistics - May 2024 ‘o1__| 037062024 First issue aK Rev. Date Description Created Reviewed | Approved Issue: Edited For: Design (IFD) Information | x Construction (IFC) Bid Request (1FB) Approval Purchase (IFP) Ghent pepusloll ctl Jy aulon ya en Pa RE RENEE, Project Company AY ERCE- EPC Contractor @s AL GHUBRAH III LLC Project No, Project voz001 ‘Al Ghubrah Ill IWP ~ RO Desalination Plant Date Rev. | Pae. ° Document n°/Tite 03/06/2024] o1_ | 2 9 63-6S1-mi }P-HS-0000-00003_Monthly HSE Report & Statistics - May 2024 Conti ents GENERAL HSE STATISTIC... HSE OBSERVATIONS. SUMMER ARRANGEMENTS AT SITE. HSE TRAINING & AWARENESS, MONTHLY INSPECTIONS, ‘SUMMARY. lent Project Company Te Conacor Sea AV EPLe. G65 nino aL GHUBRAH MLC © Projecto Proc vp2001 ‘Al Ghubrab Ill WP — RO Desalination Plant Date Rev. | Pag. a Document ne G3-GSI-MP-HS-0000-00003_Monthly HSE Report & Statistics - May 2024 03/06/20z4) O1_ 3 ° 1, GENERAL HSE STATISTIC Description Units Current Month PTD Total No. of Employees Nos 106 106 Total No. of employee (Male) Nos 104) 104 Total No. of Employee (Female) Nos: 2 2 Total No. of Project HSE Employees Nos: 5 5 Total No. of Risk Assessment reviewed and revised Nos 8 9 Total No. of Kilometer driven km 34,082 47,766 Total No. of Safe Man-hours Worked Nos 17,770 22,304 Total No. of Man Hours Worked since last LT! Nos. = : Total No. of Free days without LTI Nos. 31 91 Total No. of Emergency Drills Conducted Nos. o 0 Total No. of HSE Meetings (Internal/External) Nos 1 1 Total No. of HSE Audits (Internal/External) Nos 0 0 Total No. of Employees/Visitors Received HSE Induction Nos 123, 123 Total No. of Employees Received HSE Training / Awareness | Nos 7 7 Total No. of HSE Observations Nos 65 65 Total No. of Positive Observations Nos, 2 2 Total No. of HSE Inspection (Walk-through) Nos 4 4 Total No. of Machinery / Equipment Inspections Nos 7 7 Total No. of Permit to Work (PTW) Issued Nos. 32, 32 Total No. of Hours of HSE Training / Awareness Hrs. 3 3 Total No. of TaTs conducted Nos 75 75 Total No of Staff Visited Clinic (workcrelated) Nos ° ° General Waste Disposed (Non-Hazardous) KG 45000 45000 Concrete Waste (Construction) Disposed KG o 0 Hazardous Waste Disposed of (Chemical water) ltr 0 o Hazardous Waste Disposed (waste oil) Ltr 9 9 Sewage Waste Disposed GIN #350 #350 Total Electricity consumed Kwh 0 0 Service water consumed GIN 7080 77080 Bottled Water consumed GIN 2084 2084 Total Petrol consumed ltr 656.105, 656.105 Total Diesel consumed (Vehicle & equipment) ter 374m a7aza Generator Diesel consumed Ltr 1637 1637 cient Prec Company Te Gonraco Sea ARLE. 6S inne aL cHUBRAH WLC Prec No ake vo2001, ‘Al Ghubrah Ill IWP - RO Desalination Plant Date Rev. | Pag. a Document Te G3-GSI-MP-HS-0000-00003_Monthly HSE Report & Statistics - May 2024 03/06/2024) O1_ 4 ® Description Units] Current Month PID Total No. of Near Miss Nos 9 0 Total No.of Fatality Incidents Nos 3 0 Total No. of Lost Time Injury (CT Nos ° 0 Total No. of Restricted Work Case/Modified Case Nos o o Total No. of Medical Treatment Case (MTC) Nos. o o Total No. of First Aid Cases (FAC) Nos. o o Total No. of Serious Occupational lines Nos 0 0 Total No. of Equipment/Property Damage Nos 0 0 Total No.of Fire Incident Cases Nos ° 0 Total No. of Environmental Incidents Nos o o Total No. of Road Traffic Accidents (RTC) Nos. o o Total No. of Lost Time Injury Frequency Rate (LTIFR) Nos. o o Total No. of Road Traffic Accident Frequency (RTAF) Nos 0 0 Total No. of Unsafe Conditions Nos a m Total No, of Unsafe Acts Nos 5 5 Total No. of Asset Damage Case Nos o o 2. HSE OBSERVATIONS Safety Observations 63 0 63 Positive Observations 2 0 0 Environmental Non-Compliances 0 0 0 Tien Project Company BP Conacor enact jl esos Da : eae 4 DCo. 6S joins at cHUBRAH WLC Project No. Project ‘vp2001 ‘Al Ghubrah Il WP — RO Desalination Plant Date Rev. | Pag. of Document n Tie 03/06/2024 | 01. 5 9 63-GSLMP-HS-0000-00008_ Monthly HSE Report & Statistics - May 2024 - 3. SUMMER ARRANGEMENTS AT SITE. Subcontractors Conducted Heat Stress Training & Prevention Provided. Gent Projet Company BC Coniraor enol cl ua oe EPC conducted Permit Applicant and Permit Holder training on the 9" of May 2024. > AL-Nehad conducted Safe driving training conducted on 15 May 2024, wo Documents May 207 Safe driving training was conducted on 27 May 2024, lent Project Company EPC Contractor epusloll col Jy aul yal en PAE URE REA ce 6S Inia AL GHUBRAH IH LLC Project No, Project . voz001, ‘Al Ghubrah Ill IP - RO Desalination Plant Date Rev. | Pae. ° Document n°/Tite 663-GSI-MP-HS-0000-00003_Monthiy HSE Report & Statistics -May 2024 __|°3/06/2024) ot. 8 9 5. MONTHLY INSPECTIONS > Subcontractor carried out monthly inspection color coding power tools and lifting gears. ‘Subcontractor carried out monthly inspection color coding power tools, and lifting gears. Ghent Project Company EPC Contractor a CDCo. 6S bnirve AL GHUBRAH II LUC epusloll col Jy aula ya en Pa RE RENEE, Project No, Project , voz001 ‘Al Ghubrah Ill IWP ~ RO Desalination Plant Date Rev. | Pae. ° Document n°/Tite 03/06/2024] 01 ° ° G3-GSI-MP-HS-0000-00003_Monthly HSE Report & Statistics - May 2024 a 6, SUMMARY. > EPC conducted Permit Applicant and Permit Holder training on the 9" and 13" of May 2024. v AL-Nehad conducted Safe driving training conducted on 15 May 2024. > The subcontractor carried out monthly inspection color coding for all fire extinguishers, ladders, power tools, and lifting gears. > The Ministry of Heritage visited the site on the 22" of May 2024 in relation to the NOC to be issued. > Subcontractors conducted Heat Stress Campaigns during the month of May 2024.

You might also like