ci.1uf\:q "-1~1:q "-1-.

ilqraf tuft4cfi,t:01
( flfcfi qftcl8'1 afn' (I.Jtq1,f a:iSIIM4, \fm1 fl(i.fiH )
National Highways Authority of India
(Ministry of Road Transport and Highways, Govt. of India)
qfttn:.it'11 i.fil4f.cl4'1 ~ , <14'J( -11
Office of Project Director, Project Implementation Unit, Raipur-II
3ffl 4'1°e4ill ~fl qftfl<, ~.~.-30, $ii~, ~ , J\itHi (14CJ(-493661 ( lJ.lf.)
Old Montfort School Campus, NH-30, Jhankl, Abhanpur, Dist. Ralpur-493661 (C.G.)
Telephone : 0771-2288602/1, E-mail : [email protected], Web : www.nhal.gov.ln

NHAI/PIU-Raipur-11/DRA (Pkg-B)/ROB /2024/128 I. Dt.10.05.2024


To,
The Authorized Signatory,
M/ s Kalyan Toll Infrastructure Ltd. &
Shelke Construction Pvt. Ltd.-JV
Base Camp at Bhelwadih,
near CSPTCL Substation Bhelwadih
Jungle Safari Back Side,
Abhanpur Chhattisgarh -493661

Sub: Construction 6-lane Durg-Raipur-Bypass section of NH-53 from design Ch.44+500 (Vill
Parsada) to design Ch.92+230 (Vill Paragaon) in the State of Chhattisgarh on EPC
Mode under Bharatmala (Package-B) - Approval of GAD of ROB at Highway Ch.
0+395.295 on Ramp SA (Railway Ch. 16+685 between Railway station Kendri-
Abhanpur) by SECR- Reg.
Ref: SECR, Raipur letter no. SECR/R/Engg.Drg. /7DS/377 dated 06.05.2024
Sir,
With reference to above cited subject, it is to inform that Sr. Divisional Engineer
(I) of South East Central Railway, Raipur vide letter dtd. 06.05.2024 at reference has
conveyed approval of the GAD of proposed ROB (GAD No
BR/R/16+68 5/OB/5034/2 024) at Highway Ch. 0+395.295 on Ramp SA (Railway Ch.
16+685 between Railway station Kendri-Abhanpur). Copy of approved GAD is
attached herewith for your further necessary action.
Contractor is requested to submit detail Design & Drawing of approved GAD
of ROB to this office after third Party Vetting from any IIT / NIT for further submission
to Railway Authority for approval
This is for information and necessary action.

Thanking you,
ully
Encl. as above
\ ._p'111

(S Nag)
GM(T) & Project Director

Copy to: 1. CGM Tech. cum Regional Officer, Raipur for kind information.
2.Team Leader, (Pkg-B), M/ s Bloom Companies LLC JV with Almondz Global Infra
Consultant. Limited - for information & necessary follow-up (Encl copy of approved GAD).

cfal4f<'14: ~-5 6, ~-1CJ slHcfal, ':rf - 110075 e 91-11-25074100 /25074200 aatfil$e: http://www.nhai.gov.in
Corporate office: G..S & 6, Sector-10, Dwarka, New Delhi -110075,e91-11-25074100 / 25074200 Website: http://www.nhal.gov.ln
~ . xlq~x {9.ll.) - 49200a
SOUTH EAST CENTRAL RAILWAY~ RAIPUR (C.G.J -492 008
~'ijftPJ~RJI <t>l~ftii~ : qfi_ Ji\St'i ~ - (wf.)/-< I~~-<
ENGINEERING Office of the : Sr. DEN (Co-ord)/Raipur

Date: 06.05. 2024


No. SECR /R/Eng g.Drg. /7DS/3 77

To,
GM(Te ch) cum Project Directo r,
Nation al Highw ay Author ity of India
Office of the Project Directo r,
Project Implem entatio n Unit, Dhamt ari,
Block F-5, Shivra j Greens , Sihawa Road,
Dh~ta ri-493 773 (C.G.)
0
Compo sit
Sub:- Supply of HQ/BS P's approv ed GAD of propos ed ROB (1X36m
(

station s Kendri -
Girder) at Railwa y Km 16+685 betwee n Railwa y
Abhan pur at Ch: 0+349. 295 of Durg-R aipur section of NH-53 .

Ref:- CE/BS P's appro~ ed drg. no. BR/R/ 16+68 5/OB/ 5034/2 024.
of HQ
In connec tion to the above subjec t under referen ce, paper print
office record and
approv ed dtd. 06.05. 2024 drawin g is enclose d herewi th for your
future referen ce please.

Encl:- As above.

r. Divil. Engine er (I)


S.E.C.R ly, Raipur .

~sAutb

o.JS
r7
Rai
DURG
A1 P1 A2 RAIPUR
PCE SANCTION TO BE TAKEN
BEFORE EXECUTION OF WORK

PRECAST PSC GIRDER

DETAIL-1 DETAIL-2

1200MM DIA BORED


CAST IN SITU PILES

SECTION A-A SECTION B-B


COMPOSITE GIRDER PSC GIRDER
LONGITUDINAL ELEVATION

DETAIL-2
DETAIL-1

PROW

PROW PROW
PROW

L
=-

AL

L
31
N

AL
A1

W
0
P1

W
A2

RE

RE
BH 18 W E
RAIPUR
DURG S RDSO REFERENCE DRAWINGS:-
A
OW

·
Y.R

OW

B BH 17
RL

Y.R
RL

BH 16
RAM

R=-310
P JHANKI
5A
R=æ

JHANKI
RE WALL

Signature block
SHAILENDRA PRASAD Digitally signed by SHAILENDRA
11.5

P CHIEF BRIDGE
B RE WALL PRASAD
ENGINEER
Date: 2024.05.06 12:22:22 +05'30'
P

HALF TOP PLAN PROW PROW PROW PROW


HQ-DYCE-BR-B PALIVELA GOPI Digitally signed by PALIVELA GOPI
OW

61000

61100

61300
61200
PLAN
Y. R

HALF BOTTOM PLAN SP Date: 2024.04.22 13:52:08 +05'30'


W

KEY PLAN
RL

.RO

PROW PROW
PROW KALICHARAN PANIGRAHI Digitally signed by KALICHARAN
Y

HQ-XEN-BR-DE
RL

A PANIGRAHI
SIGN-BSP
Date: 2024.04.18 13:23:18 +05'30'
SANJEEV KUMAR Digitally signed by SANJEEV KUMAR
DRM-R
Date:2023.12.31 10:47:20 +05'30'
ABHANPUR KENDRI
CE'S DRAWING NO:-BR/R/16+685/OB/5034/2024
NARAYAN LAL Digitally signed by NARAYAN LAL
SRDEN-CORD-R
Date:2023.12.29 14:12:29 +05'30'
ANURAG TIWARI Digitally signed by ANURAG TIWARI
SRDEE-TRD-R
Date:2023.12.21 18:05:08 +05'30'
RAVI SHANKAR GOYAL Digitally signed by RAVI SHANKAR
SRDSTE-R GOYAL
Date:2023.08.16 11:41:20 +05'30'
T/G

PULKIT SINGHAL Digitally signed by PULKIT SINGHAL


SR-DOM-R
T/P

Date:2023.08.15 12:15:50 +05'30'


SOUTH EAST CENTRAL RAILWAY (SECR)
MAHAVIR KUMAR JAIN Digitally signed by
SRDEE-RS&G-R
MAHAVIR KUMAR JAIN Date:2023.08.11 17:37:52 +05'30'
BH-16 (RAMP) BH-17 (RAMP) BH-18 (RAMP) ADITYA KUMAR TRIPATHI Digitally signed by ADITYA DIVISION: RAIPUR SECTION: KENDRI - ABHANPUR

T/P
SRDEN-I-R
KUMAR TRIPATHI Date:2023.08.14 16:13:18 +05'30' PROJECT: Durg-Raipur Section of NH-53

T/G
Consultancy Services for preparation of Detailed Project Report for development of Economic
MANISH LAWANKAR Digitally signed by MANISH LAWANKAR
DYCE-C-I-R Corridors, Inter Corridors, Feeder Routes to improve the efficiency of freight movement in India
Date:2023.12.01 11:04:57 +05'30' (Lot-3/Chhattisgarh/Package-1) under Bharatmala Pariyojna
LEGEND:-
ANKIT SINGH Digitally signed by ANKIT SINGH DURG - RAIPUR SECTION OF NH-53
DCEE CON NGP
g= ³ g= ³ g= ³ TEMPORARY SIGNALING AND SPEED Date:2023.08.28 17:04:05 +05'30'
RESTRICTION DIAGRAM RAVI BHUSHAN PRASAD Digitally signed by RAVI BHUSHAN TITLE:
DCSTE CON nqxZ [kaM dsUæh
PRASAD
SDL
Date:2023.08.24 19:08:23 +05'30' LVs'kUk® izLRkkfOkRk
SUNIL VASANTRAO PATIL Digitally signed by SUNIL
GM-TECH-NHAI
VASANTRAO PATIL Date:2023.08.11 17:22:04 +05'30' GENERAL ARRANGEMENT DRAWING OF PROPOSED ROB AT RAILWAY Km
g= ³ g= ³ g= ³ 16+685 BETWEEN RAILWAY STATIONS KENDRI-ABHANPUR AT ROAD CH.
0+349.295 OF DURG-RAIPUR SECTION OF NH-53
CONSULTANTS: ROAD AUTHORITY:
SCALE: 1:100 SPAN : 1 X36.0 M COMPOSITE GIRDER
DRAWING NO : DR/0+349.295/ROB-101
BORE LOG DETAILS Transys Consulting Pvt. Ltd. National Highways DATE : 22-07-2023 SHEET: 1 OF 1
Accrete Consulting Engineers Pvt. Ltd. Authority of India DESIGNED (A) DRAWN (B) CHECKED (C) APPROVED (D)
12th Floor, JMD Regent Square, MG Road, Gurugram - 122002,
e-mail - [email protected]; web - www.transys.in
(Ministry of Road Transport & Highways) VARUN INFANTO AMITH CHETAN NAIK