0% found this document useful (0 votes)
28 views1 page

Control Room Revision 02

Uploaded by

Brian Maundu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views1 page

Control Room Revision 02

Uploaded by

Brian Maundu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

S-01

S-01
ELEVATION 03 ELEVATION 03 GENERAL NOTES
GENERAL
A B C D E F A B C D E F
4,400 5,400 5,400 4,100 4,100
24,800
23,600
16,600 8,200 1 This drawing is protected under the copyright act
4,400 5,400 5,400 4,100 4,100 200 16,200 200 8,000 200 and cannot be used or reproduced in part or in
200 4,200 200 10,600 200 whole without the authors consent

800
pv pv

200

200
1 1
Ladies WC
200

200
(porcelain les f.f) pv 2 Read only figured dimensions.
pv
3 All construcon work is to comply with the latest

2,000
pv pv pv
4,100
3,900

4,100

4,100
K.B.S. standard code of prac ce, local authority
pv pv By- Laws, and fire regulaons.
Control room/Console area
pv Gents WC
(porcelain les f.f)

2,600

8,000
(porcelain les f.f)
2 2 4 P.v. denotespermanent venl laon and must be
200

pv pv provided above all openings where indicated or


shown
locker room

1,800
4,100
3,900

4,100

4,100
Instrumenta on

1,800
pv cable trench 5 All walls to be reinforced with hoop iron alterna ng
pv in & out
courses

16,400
16,200
16,400
ELEVATION 02

ELEVATION 04

ELEVATION 02

ELEVATION 04
2,100
3 3 6 Water meters to be 300mm above ground level.
pv
200

200
7 D.p.c. denotes damp proof course and to be of

2,000
4,100

4,100

4,100
pv 1,800 pv bituminous felt placed under every wall and must be
atleast 150mm above ground level
22,800

24,000

23,600

24,000
Power distribu on panels Roof terrace
(epoxy power-floated f.f) (epoxy power-floated f.f)
8,000

8,000
8 All r.c. works to structural engineers details

2,450
4 4

9 Provide atleast one row of precast concrete


1,800

cable trench power


600x600x50mm paving slabs around the building
cable trench
4,100

4,100

4,100
1,500
in & out
pv pv unless otherwise shown.

800
pv pv 10 Contractors must verify all figured dimensions and

200
5 pv pv 5 level on site before commencement of works and

1,150
200

200
1,000
200

any descripancy must be reported to the architect

2,000
(epoxy power-floated f.f)

S-02 S-02 S-02 S-02

1,500
kplc transformer room

pv pv cable trench cable trench pv for clarificaon.


4,400

1,000

generator room 11 All levels shown are finished levels unless otherwise
6,200
6,000

1,800
6,000
6,200
6,400

6,200

7,200
7,600
(epoxy
3,000
power-floated f.f) stated

1,500
pv pv pv 12 All surface beds to be cast on well compacted and
1,400

1,000

2,000 1,500 2,000 1,500 2,000 1,500 2,000 1,500 4,000 well consolidated filling
pv pv pv pv pv
6 6 13 Depth of foundaon to be decided on site and
200

800
200
trenches to be minimum 600mm below reduced

200

200
1,500 2,000 3,700 2,000 1,500 2,000 1,500 2,000 1,500 2,000 3,900 ground level.
200 24,400 200
4,400 5,400 5,400 4,100 4,100
200 5,000 200 18,000 200 24,800
14 All pipes and services passing under road works to
23,600 be encased in 150mm thick concrete surround and
atleast 450mm below reduced ground level.
ELEVATION 01 ELEVATION 01
S-01

S-01
GROUND FLOOR PLAN ROOF TERRACE FLOOR PLAN 15. GROUND FLOOR AREA - 402 sq M
A B C D E F 1 2 3 4 5 6

16. ROOF TERRACE AREA - 437 sq M


Roof terrace Roof terrace Roof terrace Roof terrace
3,600 3,600 3,600 3,600

P.V P.V P.V P.V P.V P.V P.V P.V P.V P.V P.V P.V P.V P.V P.V
Rev. No. Date Revision
01 13/01/2024 Spa al reorganiza on

Ground floor Ground floor Ground floor Ground floor 02 18/01/2024 Detailed Specifica ons
0 0 0 0
4,400 5,400 5,400 4,100 4,100 4,100 4,100 4,100 4,100 6,200
Project;
ELEVATION 01 ELEVATION 02
F E D C B A 6 5 4 3 2 1
PROPOSED 45,000 METRIC TONS LPG
STORAGE TERMINAL FOR TAIFA GAS SEZ
INVESTMENTS
Roof terrace Roof terrace Roof terrace
3,600 3,600 3,600

P.V P.V P.V P.V P.V P.V P.V P.V P.V P.V P.V Client:
TAIFA GAS INVESTMENT
SEZ LIMITED.
P.O. BOX 40462 - 00232,
Ground floor Ground floor Ground floor Ground floor
0 0 0 0 NAIROBI, KENYA.
4,100 4,100 5,400 5,400 4,400 6,200 4,100 4,100 4,100 4,100
ELEVATION 03 ELEVATION 04 Consultant:

F E D C B A 1 2 3 4 5 6

1,050

150 1,050
1,050 mm high parapet wall 150mm RC slab to S.E details & specifica ons

Roof terrace Roof terrace Roof terrace


3,600 3,600 3,600

450
P.V P.V P.V P.V P.V R.C beam to S.E's detail P.V P.V P.V P.V P.V P.V
Title:

3,600

3,000
P.V
SUBSTATION CONTROL ROOM
200 mm masonry wall
150 750 150

150
Scale: Drawn: Project. No.:
1:100 O.W.N

4,100 4,100 5,400 5,400 4,400 4,100 4,100 4,100 4,100 6,200 Date: Approved: Drg. No.
18/01/2024 A.M.N SC-01
Founda on done to S.E's specifica ons & details SECTION 02 1,800 mm wide cable trench False floor 900 mm above the concrete floor SECTION 01 1,800 mm wide cable trench
GSPublisherVersion 0.55.100.100