Control Room Revision 02
Control Room Revision 02
S-01
ELEVATION 03 ELEVATION 03 GENERAL NOTES
GENERAL
A B C D E F A B C D E F
4,400 5,400 5,400 4,100 4,100
24,800
23,600
16,600 8,200 1 This drawing is protected under the copyright act
4,400 5,400 5,400 4,100 4,100 200 16,200 200 8,000 200 and cannot be used or reproduced in part or in
200 4,200 200 10,600 200 whole without the authors consent
800
pv pv
200
200
1 1
Ladies WC
200
200
(porcelain les f.f) pv 2 Read only figured dimensions.
pv
3 All construcon work is to comply with the latest
2,000
pv pv pv
4,100
3,900
4,100
4,100
K.B.S. standard code of prac ce, local authority
pv pv By- Laws, and fire regulaons.
Control room/Console area
pv Gents WC
(porcelain les f.f)
2,600
8,000
(porcelain les f.f)
2 2 4 P.v. denotespermanent venl laon and must be
200
1,800
4,100
3,900
4,100
4,100
Instrumenta on
1,800
pv cable trench 5 All walls to be reinforced with hoop iron alterna ng
pv in & out
courses
16,400
16,200
16,400
ELEVATION 02
ELEVATION 04
ELEVATION 02
ELEVATION 04
2,100
3 3 6 Water meters to be 300mm above ground level.
pv
200
200
7 D.p.c. denotes damp proof course and to be of
2,000
4,100
4,100
4,100
pv 1,800 pv bituminous felt placed under every wall and must be
atleast 150mm above ground level
22,800
24,000
23,600
24,000
Power distribu on panels Roof terrace
(epoxy power-floated f.f) (epoxy power-floated f.f)
8,000
8,000
8 All r.c. works to structural engineers details
2,450
4 4
4,100
4,100
1,500
in & out
pv pv unless otherwise shown.
800
pv pv 10 Contractors must verify all figured dimensions and
200
5 pv pv 5 level on site before commencement of works and
1,150
200
200
1,000
200
2,000
(epoxy power-floated f.f)
1,500
kplc transformer room
1,000
generator room 11 All levels shown are finished levels unless otherwise
6,200
6,000
1,800
6,000
6,200
6,400
6,200
7,200
7,600
(epoxy
3,000
power-floated f.f) stated
1,500
pv pv pv 12 All surface beds to be cast on well compacted and
1,400
1,000
2,000 1,500 2,000 1,500 2,000 1,500 2,000 1,500 4,000 well consolidated filling
pv pv pv pv pv
6 6 13 Depth of foundaon to be decided on site and
200
800
200
trenches to be minimum 600mm below reduced
200
200
1,500 2,000 3,700 2,000 1,500 2,000 1,500 2,000 1,500 2,000 3,900 ground level.
200 24,400 200
4,400 5,400 5,400 4,100 4,100
200 5,000 200 18,000 200 24,800
14 All pipes and services passing under road works to
23,600 be encased in 150mm thick concrete surround and
atleast 450mm below reduced ground level.
ELEVATION 01 ELEVATION 01
S-01
S-01
GROUND FLOOR PLAN ROOF TERRACE FLOOR PLAN 15. GROUND FLOOR AREA - 402 sq M
A B C D E F 1 2 3 4 5 6
P.V P.V P.V P.V P.V P.V P.V P.V P.V P.V P.V P.V P.V P.V P.V
Rev. No. Date Revision
01 13/01/2024 Spa al reorganiza on
Ground floor Ground floor Ground floor Ground floor 02 18/01/2024 Detailed Specifica ons
0 0 0 0
4,400 5,400 5,400 4,100 4,100 4,100 4,100 4,100 4,100 6,200
Project;
ELEVATION 01 ELEVATION 02
F E D C B A 6 5 4 3 2 1
PROPOSED 45,000 METRIC TONS LPG
STORAGE TERMINAL FOR TAIFA GAS SEZ
INVESTMENTS
Roof terrace Roof terrace Roof terrace
3,600 3,600 3,600
P.V P.V P.V P.V P.V P.V P.V P.V P.V P.V P.V Client:
TAIFA GAS INVESTMENT
SEZ LIMITED.
P.O. BOX 40462 - 00232,
Ground floor Ground floor Ground floor Ground floor
0 0 0 0 NAIROBI, KENYA.
4,100 4,100 5,400 5,400 4,400 6,200 4,100 4,100 4,100 4,100
ELEVATION 03 ELEVATION 04 Consultant:
F E D C B A 1 2 3 4 5 6
1,050
150 1,050
1,050 mm high parapet wall 150mm RC slab to S.E details & specifica ons
450
P.V P.V P.V P.V P.V R.C beam to S.E's detail P.V P.V P.V P.V P.V P.V
Title:
3,600
3,000
P.V
SUBSTATION CONTROL ROOM
200 mm masonry wall
150 750 150
150
Scale: Drawn: Project. No.:
1:100 O.W.N
4,100 4,100 5,400 5,400 4,400 4,100 4,100 4,100 4,100 6,200 Date: Approved: Drg. No.
18/01/2024 A.M.N SC-01
Founda on done to S.E's specifica ons & details SECTION 02 1,800 mm wide cable trench False floor 900 mm above the concrete floor SECTION 01 1,800 mm wide cable trench
GSPublisherVersion 0.55.100.100