PURCHASE ORDER
PO Number PO Date
Graha Mandiri 22nd Floor, Jl. Imam Bonjol No. 61, Jakarta Pusat 10310 PO-B.2205-0239 20-Apr-24
Phone: (021) 3193 6795 | Fax: (021) 3193 6807 | Email: [email protected] PR-B.2205-0236 Page No. 1 of 1

Vendor : PT. Fortuna Satu Indonesia Project : Repair PT. MKAI


Jl. Pangeran Tubagus Angke No. 20/B-37 Kawasan Suryacipta City of Industry
RT/RW. 016/010, Jelambar Baru, Grogol Petamburan Karawang 41363
Jakarta Barat 11460

PIC : Roberto; (m) 0813 6602 2229 Delivery to : Project Site Contract Type
Phone : (021) 2708 3194 PIC : Ardho; 0821 2366 7469 Measurement 
Fax : (021) 2708 3194 Schedule : May 20 ~June 14, 2024 Lump Sump R
Email : [email protected] Payment Term : 100% After Completion 
Monthly Progress Payment R
• Advance Payment : 30.00 % Currency
Trade : Subcontractor • Retention : 5.00 % (12 months) IDR

No. Code Description Specification Remark Unit Quantity Rate Amount


Waterproofing for Roof Top Area

01 7.2.8.5 Waterproofing for Roof Top Area m² 1,967.70 490,000 964,173,000


• AXSP (AX-2 0.8kg/m², SP-1 1.2kg/m², TP-1 0.3kg/m²)
• Gray Color of Top Coat
High-strength spray urethane rubber composite waterproofing membrane
• 10 years warranty for water leaking
• 5 years for TopCoat
Notes : Based on quotation from PT. Fortuna Satu Indonesia Subtotal - 1 964,173,000
ref. no. 012/SPH/SGN-III/2024 dated Mar 20, 2024 Discount (29,173,000)
Subtotal - 2 935,000,000
• Regular payments are on the 15th of each month, for invoices received by no later than the 25th of the previous month. PPN (VAT) 11% 102,850,000
• Payments of Advance Payment and Labour-only (Mandor Borong) can be held on 15th and 30th in every month,
for invoices received no later than 10 (ten) calender days prior to these dates. Total 1,037,850,000

PURCHASING PROJECT DIVISION/DEPARTMENT BOARD OF DIRECTOR VENDOR CONFIRMATION


PT. FORTUNA SATU INDONESIA

April 20, 2024

GUNADI ARDHO D.H. DENY M. RAMDAN KATSUSHI TANAKA


Section Manager Project Manager Eng. & Const. Division President Director
Notes: The Vendor shall stamp and sign on 2 (two) sets of Purchase Order. One set shall be retained by the vendor and one set shall
be returned to PT. Tokyu Construction Indonesia within 7 (seven) days from the date of this Purchase Order
1 of 1

COST CONTROL & PURCHASING Form No. :

COMPARISON SHEET Page No. :

Project Code : B.2205


Project Name : Repair MKAI
Kind of Works : Waterproofing for Roof Top (7.2.8.5)
Budget Proposed / Selected Vendor Competitor Vendor Competitor Vendor
Work Code Description Specification Remark
Unit Quantity Rate Amount Rate Amount Rate Amount Rate Amount

Waterproofing for Roof Top (7.2.8.5)


Flexible Bitumen Membrane
7.2.8.5.3 Flexible Bitumen Membrane Wall m² 109.26 180,000 19,667,016
7.2.8.5.4 Flexible Bitumen Membrane Slab m² 1,435.79 180,000 258,442,409
Mortar Screed MU440 t = 30 mm
Wiremesh M5
Mortar Screed MU440 t = 50 mm
7.2.8.5.5 Wiremesh
7.2.8.5.5.1 Wiremesh M.5-150 sht 133.00 550,000 73,150,000
7.2.8.5.5.2 Install Wiremesh M.5-150 m² 2,864.29 10,000 28,642,874
7.2.8.5.5.3 Rebar kg 2,663.79 9,000 23,974,086
7.2.8.5.5.4 Bar bending unit.day 2.66 500,000 1,331,894
7.2.8.5.5.5 Bar cutter unit.day 2.66 500,000 1,331,894
7.2.8.5.5.6 Install rebar kg 2,663.79 2,000 5,327,575
7.2.8.5.5.7 Bendrat / kawat beton kg 39.96 20,000 799,136
7.2.8.5.5.8 Material Support lot 1.00 13,455,746 13,455,746
7.2.8.5.6 Concreate Screed Fc' 18 t = 80 mm 0 0.00 0 0
7.2.8.5.6.1 Concrete Fc' 18 NFA m³ 120.30 820,000 98,646,059
7.2.8.5.6.2 Pouring concrete m³ 114.57 75,000 8,592,862
7.2.8.5.6.3 Vibrator concrete unit.day 11.46 500,000 5,728,575
7.2.8.5.6.4 Equipment ( Crane & CP ) & Material support lot 1.00 16,945,124 16,945,124
7.2.8.5.6.5 Finising Surface Concrete Screed m² 1,432.14 50,000 71,607,186
7.2.8.5.6.6 Grove Line + Aspalt Material m 1,181.60 45,000 53,172,000
7.2.8.5.6.7 Plestered Concrete Parapet Cover Waterproofing Vertical +m²Chiken mesh 75.96 200,000 15,192,835

7.2.9.12.4 Dog House - Waterproofing m² 29.59 180,000 5,326,200


7.2.9.13.4 Dog House - Waterproofing m² 16.59 180,000 2,986,200
7.2.9.14.4 Dog House - Waterproofing m² 9.53 180,000 1,715,400
7.2.9.15.4 Dog House - Waterproofing m² 8.69 180,000 1,564,200
7.2.9.16.4 Dog House - Waterproofing m² 8.21 180,000 1,477,800
7.2.9.17.4 Dog House - Waterproofing m² 10.01 180,000 1,801,800
7.2.9.18.4 Dog House - Waterproofing m² 19.91 180,000 3,583,800
7.2.9.19.4 Dog House - Waterproofing m² 10.01 180,000 1,801,800
7.2.9.20.4 Dog House - Waterproofing m² 7.76 180,000 1,396,800
717,661,270

PO-B.2205-0239
Waterproofing for Roof Top PT. Fortuna Satu Indonesia
7.2.8.5 Waterproofing for Roof Top Area m² 1,967.70 490,000 964,173,000
AXSP (AX-2 0.8kg/m², SP-1 1.2kg/m², TP-1 0.3kg/m²)
Gray Color of Top Coat
Special Discount (29,173,000)
935,000,000

30% AP, Monthly Progress, & 5%


Term of Payment
Retention (12 months)
Delivery Schedule May 20 ~June 14, 2024
8,501,000,000

Remaining
Remaining Quantity
Waterproofing for Roof Top (7.2.8.5)
7.2.8.5 Waterproofing for Roof Top Area 0.00 0 0
0

Balance (217,338,730)

Notes
Prepared by: Checked by: Accepted by: Approved by:
Purchasing Project Manager E&C Division Mgr. President Director

Gunadi Ardho D.H. Deny M. Ramdan Katsushi Tanaka


Date: April 20, 2024 Date: Date: Date:
REPAIR MKAI PROJECT
DEMOLISH WORK
(R.13_2024-04-03)
ID Task Name Duration Start Finish
2023 2024
Half 1, 2023 Half 2, 2023 Half 1, 2024 Half 2, 2024
D J F M A M J J A S O N D J F M A M J J A S O N
1 REPAIR MKAI-PROJECT 526 days 09 Feb '23 15 Aug '24 09/02 15/08
2 DEMOLISH WORKS 257 days 09 Feb '23 06 Nov '23 09/02 06/11
3 Temporary Works 160,88 days 09 Feb '23 02 Aug '23 09/02 02/08
14 Demolish Architecture Works 94 days 15 Mar '23 30 Jun '23 15/03 30/06
26 Demolish MEP Works 63,25 days 15 Mar '23 31 May '23 15/03 31/05
41 Demolish Structure Works 127 days 03 Jul '23 06 Nov '23 03/07 06/11
85 TIGHTENING COLUMN LINE I 183 days 26 Mar '23 08 Oct '23 26/03 08/10
117 STRENGTHTENING COLUMN FACTORY BY CFRP 191 days 11 Nov '23 02 Jun '24
118 Approved Method 0 days 08 Nov '23 08 Nov '23 08/11
119 CFRP Works 191 days 11 Nov '23 02 Jun '24 11/11 02/06
120 TEMPORARY OFFICE (24 X 26) 212 days 11 Feb '23 24 Sep '23 11/02 24/09
194 IMB (BUILDING PERMIT) 30 days 14 Sep '23 13 Oct '23 14/09 13/10
195 RECONSTRUCTION OFFICE 287 days 20 Oct '23 15 Aug '24 20/10 15/08
196 Structure Work 183 days 20 Oct '23 03 May '24 20/10 03/05
197 Earth Works 83 days 20 Oct '23 10 Jan '24 20/10 10/01
198 Pilling Works 60 days 20 Oct '23 18 Dec '23 20/10 18/12
199 Soil Works 14 days 12 Dec '23 25 Dec '23 12/12 25/12
200 Sand Bed 30 days 12 Dec '23 10 Jan '24 12/12 10/01
201 Lean Concrete 30 days 12 Dec '23 10 Jan '24 12/12 10/01
202 1st Floor Structure 108 days 15 Dec '23 31 Mar '24 15/12 31/03
203 Pilecap 25 days 15 Dec '23 08 Jan '24 15/12 08/01
204 Tie Beam 30 days 28 Dec '23 26 Jan '24 28/12 26/01
205 Slab 30 days 13 Jan '24 11 Feb '24 13/01 11/02
206 Column 13 days 12 Feb '24 24 Feb '24 12/02 24/02
207 Staircase 14 days 18 Mar '24 31 Mar '24 18/03 31/03
208 2nd Floor 36 days 12 Feb '24 18 Mar '24 12/02 18/03
209 Beam 30 days 12 Feb '24 12 Mar '24 12/02 12/03
210 Slab 30 days 12 Feb '24 12 Mar '24 12/02 12/03
211 Column 19 days 29 Feb '24 18 Mar '24 29/02 18/03
212 Top Roof 47 days 04 Mar '24 03 May '24 04/03 03/05
213 Beam 32 days 04 Mar '24 04 Apr '24 04/03 04/04
214 Slab 32 days 04 Mar '24 04 Apr '24 04/03 04/04
215 Parapet 14 days 20 Apr '24 03 May '24 20/04 03/05
216 Architecture Works 96 days 24 Apr '24 28 Jul '24 24/04 28/07
217 Wall Work 40 days 24 Apr '24 02 Jun '24 24/04 02/06

Update: Page 1 R.12 Adjustment Structure


R9. Update Strengthening Line I & Demolition
R13. Revise Sequence WP & ACP
R10. Update Temporarty Office MKAI
R10.a Revise 2nd FL Column
R11. Revisi CFRP R12. Adjustment Architecture Work
REPAIR MKAI PROJECT
DEMOLISH WORK
(R.13_2024-04-03)
ID Task Name Duration Start Finish
2023 2024
Half 1, 2023 Half 2, 2023 Half 1, 2024 Half 2, 2024
D J F M A M J J A S O N D J F M A M J J A S O N
218 Ceiling Work 60 days 24 May '24 22 Jul '24 24/05 22/07
219 Floor Work 50 days 07 Jun '24 26 Jul '24 07/06 26/07
220 Wall Ceramic tile 35 days 08 May '24 11 Jun '24 08/05 11/06
221 Door & Window Work 30 days 28 Jun '24 27 Jul '24 28/06 27/07
222 Exterior window glass 75 days 15 May '24 28 Jul '24 15/05 28/07
223 Waterproofing 31 days 15 May '24 14 Jun '24 15/05 14/06
224 Toilet 1st FL 15 days 15 May '24 29 May '24 15/05 29/05
225 Toilet 2nd FL 15 days 30 May '24 13 Jun '24 30/05 13/06
226 Canopy Lobby 5 days 10 Jun '24 14 Jun '24 10/06 14/06
227 Roof & Parapet 25 days 20 May '24 09 Jun '24 20/05 09/06
228 Painting 60 days 27 May '24 25 Jul '24 27/05 25/07
229 Almunium Composite Panel 94 days 26 Apr '24 28 Jul '24 26/04 28/07
230 Steel structure support 35 days 26 Apr '24 30 May '24 26/04 30/05
231 ACP Panel include frame 50 days 09 Jun '24 28 Jul '24 09/06 28/07
232 Final Cleaning 14 days 19 Jul '24 01 Aug '24 19/07 01/08
233 MEP Works 211 days 14 Dec '23 25 Jul '24 14/12 25/07
234 Mechanical Works 197 days 14 Dec '23 11 Jul '24 14/12 11/07
235 Electrical Works 197 days 14 Dec '23 11 Jul '24 14/12 11/07
236 Testing, Commisioning, Repairing 14 days 12 Jul '24 25 Jul '24 12/07 25/07
237 Mesco & MKAI Inspection 7 days 29 Jul '24 04 Aug '24 29/07 04/08
238 Repair Punch List 11 days 05 Aug '24 15 Aug '24 05/08 15/08
239 HAND OVER NEW OFFICE BUILDING 0 days 15 Aug '24 15 Aug '24 15/08
240 MKAI MOVING FROM CONTAINER TO NEW OFFICE BUILDING 7 days 16 Aug '24 22 Aug '24 16/08 22/08

241 Demolition Temporary Office MKAI 31 days 23 Aug '24 22 Sep '24 23/08 22/09
242 Demolition Office Container 31 days 23 Aug '24 22 Sep '24 23/08 22/09
243 Take of MEP 7 days 23 Aug '24 29 Aug '24 23/08 29/08
244 Moving Container 14 days 30 Aug '24 12 Sep '24 30/08 12/09
245 Demolition Lean Concrete & Pedestal 7 days 13 Sep '24 19 Sep '24 13/09 19/09
246 Levelling Soil 7 days 16 Sep '24 22 Sep '24 16/09 22/09
247 Demolition Temporary Office MKAI 20 days 30 Aug '24 18 Sep '24 30/08 18/09
248 Take of MEP 5 days 30 Aug '24 03 Sep '24 30/08 03/09
249 Demolition Office 7 days 04 Sep '24 10 Sep '24 04/09 10/09
250 Demolition Lean Concrete 5 days 11 Sep '24 15 Sep '24 11/09 15/09
251 Levelling Soil 5 days 14 Sep '24 18 Sep '24 14/09 18/09

Update: Page 2 R.12 Adjustment Structure


R9. Update Strengthening Line I & Demolition
R13. Revise Sequence WP & ACP
R10. Update Temporarty Office MKAI
R10.a Revise 2nd FL Column
R11. Revisi CFRP R12. Adjustment Architecture Work
1 1A 2 2A 2B 2C 3 4 5
70000
8000 8500 8750 8750 8750 8750 9250 9250
3950 4050 4250 4250 4375 4375 4375 4375 4375 4375 4375 4375 4625 4625 4675 4575

EXISTING AREA EXISTING AREA

PARAPET WALL EXPANSION JOINT EXPANSION JOINT PARAPET WALL


150

150
+9193 ~ +9208

+9193 ~ +9208
50

50
300x500~400

300x500~400
I

B16c

B13c
+9193 ~ +9208

+9193 ~ +9208
300x500~400

300x500~400
+9193 ~ +9208

+9193 ~ +9208

+9193 ~ +9208

+9193 ~ +9208

+9193 ~ +9208

+9193 ~ +9208

+9193 ~ +9208

+9193 ~ +9208

+9193 ~ +9208

+9193 ~ +9208

+9193 ~ +9208

+9193 ~ +9208

+9193 ~ +9208
2000

2000
1800

1800
300x500~400

300x500~400

300x500~400

300x500~400

300x500~400

300x500~400

300x500~400

300x500~400

300x500~400

300x500~400

300x500~400

300x500~400

300x500~400
+9205 +9205 +9205
+9205 +9205 +9205 +9205 +9205 +9205
B13c

B13c
B18 B18 B18

640
B16c

B13c

B16c

B13c

B16c

B13c

B16c

B13c

B16c

B13c

B16c

B13c

B16c
B18 B18 B18 B18 B18 B18
300X400 300X400 300X400
C13 300X400 C13 300X400 C13 C13 C13 300X400 C13 C13 300X400 C13 300X400 300X400 C13
I'
640

640

640

640

640
2780 150 TOC C13
PARAPET WALL

PARAPET WALL
150 SFL +9187 150
+9188 DOG HOUSE +9188 DOG HOUSE +9188 +9188 DOG HOUSE +9188 +9188 +9188 +9188

2480
DOG HOUSE DOG HOUSE DOG HOUSE
B14 760 B14 760 B14 975 B14 B14 760 B14 B12 760 B12
OUT DOOR AC OUT DOOR AC OUT DOOR AC OUT DOOR AC OUT DOOR AC
400X700 400X700 400X700 400X700 400X700 400X700 400X800 400X800
3950

3950
PEDESTAL PEDESTAL PEDESTAL 1 PEDESTAL PEDESTAL
1700 1805
+9107 ~ +9187 320
2550

2550

2550

2550
300x600
B13

1740
270
262.5 +9164
4300

4300
B18
8000

8000
300X400

6000
6300

6600
1750

1750
STEEL +9149
+9149 +9149 +9149 +9149 +9149 +9149 +9149 LADDER +9149 +9149 +9149 +9149 +9149
B19
1700 +9149 +9149
+9107 ~ +9187

10000
B19 B19 B19 B19 B19 B19 B19 +9147 B19 B19 B19 B19 B19 B19 B19
250X500

3450
250X500 250X500 250X500 250X500 250X500 250X500 250X500 B18 250X500 250X500 250X500 250X500 250X500 250X500 250X500
300x600

3750
4050

4050
B13

+9107 ~ +9187
300X400

+9107 ~ +9187
+9112 ~ +9189

+9107 ~ +9187

+9112 ~ +9189

+9112 ~ +9189

+9107 ~ +9187

+9112 ~ +9189

+9112 ~ +9189

+9107 ~ +9187

+9112 ~ +9189

+9107 ~ +9187

+9112 ~ +9189

+9107 ~ +9187
1380 DOG HOUSE
+9112 ~ +9189

300x600
300x600
320
300x600

300x600

300x600

300x600

300x600

300x600

300x600

300x600

300x600

300x600

300x600

300x600
300x600

B13
B13
B16

B13

B16

B16

B13

B16

B16

B13

B16

B13

B16

B13
1700
B16

1500
1385

C11 C11 C11 C11 C11 C11 C11 C11

600
J1 1280
525 C11 TOC C11
SFL +9107
2687

2687
+9108 +9108 +9108 +9108 +9108 +9108 +9108 +9108
B14 B14 B14 B14 B14 B14 B12 B12

3400
400X700 400X700 400X700 400X700 400X700 400X700 400X800 400X800
+9006 ~ +9107

+9006 ~ +9107
+9006 ~ +9107

+9006 ~ +9107

+9006 ~ +9107

+9006 ~ +9107

+9006 ~ +9107

+9006 ~ +9107

+9006 ~ +9107
400x850

400x850
+9082
2688

2688
400x850

400x850

400x850

400x850

400x850

400x850

400x850
+9082 +9082 +9082 +9082 +9082 +9082 +9082
B11

B11
B17 1800
B11

B11

B11

B11

B11

B11

B11
B17 B17 B17 B17 B17 B17 B17
300X600
300X600 300X600 300X600 300X600 300X600 300X600 300X600
200
10750

10750
2688

2688
+9055 +9055 +9055 +9055 +9055 +9055 +9055 +9055
B17 +9029 B17 +9029 +9029 B17 +9029 B17 B17 +9029 B17 +9029 B17 +9029 B17 +9029
300X600 B17 300X600 B17 B17 300X600 B17 300X600 300X600 B17 300X600 B17 300X600 B17 300X600 B17
300X600 300X600 300X600 300X600 300X600 300X600 300X600 300X600

D:\PROJECT MKAI\MKAI RENOVATION\SHOP DRAWING MKAI RENOVATION (ROOF)\MKAI-BL-STR-0015 ROOF FLOOR BEAM & SLAB PLAN (UPDATE)R1.dwg
2687

2687
+9000 +9000 +9000 +9000 +9000 +9000 +9000 +9000
B14 B14 B14 B14 B14 B14 TOC C12 B12 B12
400X700 400X700 400X700 400X700 400X700 400X700 SFL +9000 400X800 400X800
S11a S11a S11a
C12 C12 C12 C12 C12 C12 C12 C12 C12
K1
1250

1250
K2 600 ROOF STRAINER GUTTER PARAPET WALL ROOF STRAINER PARAPET WALL GUTTER ROOF STRAINER 600
8000 8500 8750 8750 8750 8750 9250 9250

PARTIAL - 02
PARTIAL - 01 PARTIAL - 03
(MKAI-BL-STR-015-02)
(MKAI-BL-STR-015-01) (MKAI-BL-STR-015-03)

2nd FLOOR COLUMN PLAN


ROOF FLOOR BEAM & SLAB PLAN LEGEND: NOTE : NOTE COLUMN :
NOTES :
EXISTING AREA B11 = 400X850 C11 = 650X650
NEW AREA (OFFICE BUILDING) B12 = 400X800 C12 = 650X650 Top Level Of Slab
Y
OUT DOOR AC PEDESTAL B13 = 300X600 C13 = 600X600
-
B13c = 300X500~400 -
GUTTER -
B14 = 400X700 Thick Of Slab
B16 = 300X600
W X COLUMN NOTE :
- R/C SLAB (S11Rev.) t=150mm + WATERPROOFING
B16c = 300X500~400
Type Of Slab

B17 = 300X600 Top Level Of Beam


- R/C SLAB (S11a) t=170mm + WATERPROOFING
S B18 = 300X400
-
N NOTE :
B19 = 250x500
-
-
Type Of Beam

AXIS X&Y DETAIL FLOOR BEARING CAPACITY 200kg/m2 (ROOF FLOOR)


Dimension Of Beam
E ( FBC = FLOOR BEARING LIVE CAPACITY / LIVE LOAD)

01 CHANGES TO THE DOG HOUSE 2024/03/20 OWNER: PROJECT NAME: SUBMITED BY :


CHECK & ACKNOWLEDGED BY : CHECK & ACKNOWLEDGED BY : YU
CONST RUC

OFFICE RECONSTRUCTION
T

PT. TOKYU CONSTRUCTION INDONESIA

TOK
SHOP DRAWING

IO
MESCO PT. MITSUI KINZOKU ACT INDONESIA

N
MKAI
CLASSIFICATION OF WORKS: PREPARED BY : CONFIRMED BY :
PREPARED : M. Sopyan
STRUCTURAL CHECKED CHECKED
DRAWING TITLE:
DRAWING NO : MKAI-BL-STR-015
PT. MITSUI KINZOKU ACT INDONESIA 2nd FLOOR COLUMN PLAN
SURYACIPTA CITY OF INDUSTRY - EAST KARAWANG
( ................................ ) ( ................................ ) ( ................................ ) NO DESCRIPTION BY APPR. DATE DATE : 02 Februari 2024
ROOF FLOOR BEAM & SLAB PLAN ( Yan / Nauval) ( Ardho D. H ) ( AIHARA )
1
765
SFL +10027 120
765 90 1
40D=400 D10-200
1

20

140
120
D13
D10-200 40D=400
D13

145
937
5D10
2D13

30
Top of Slab Top of Slab Waterproofing
SFL +9090 40D=400 SFL +9090 D10-150

40
40

D10-200 D10-200

150
170

70
90

500
15D=150

890
1700

40
2D13
40

150 150 D10-150 45 805 805 45

1340
Embedded
300 20D=200 20D=200 20D=200

1221
Plate

850
D10-150
Waterproofing Waterproofing
D10-100

25
200

200
R/C Slab (S11) D10-200 R/C Slab (S11)

215
t=150mm D10-500 D10-500 D10-500 t=150mm 120 120
(B14) D10-200
400 400X700
(B13) 15 15
300X600
Column C11 20D=200 20D=200 20D=200 105 105

330

330
525
650X650
400 SECTION a-a Waterproofing Waterproofing
350 650

SECTION 1-1
40D=400 40D=400
D13 D13

600

600
970
SFL +10550
20

880 90
1
SECTION 3-3 (DOG HOUSE B)

140

D:\PROJECT MKAI\MKAI RENOVATION\SHOP DRAWING MKAI RENOVATION (ROOF)\MKAI-BL-STR-015-4 ~015-25 SECTION ROOF BEAM (LAYOUT 01-25)R1.dwg
1 40D=400
D13 220 2D13 (B13) 300
200 120 D10-200 300X600
30

SFL +10027 1A
1010

350
1340

1221

D13
25

290

D10-200 a
822

D10-200
5D10 4300
15 105 105 15 355 500 500 500 500 500 500 500 355
Waterproofing
330

339

225 640
SFL +9208
SFL +9205 D10-150
1%
200

243
300 D13 D13 D10-150 SFL +9149 D10-200 1% D13

40
D10-500
15D=150

700 15D=150

150
70
150
400

40D=400

150
D10-150 D13 40D=400
40D=400

150
D10-150

500
D13

40
150 a R/C Slab (S11)
(B19) t=150mm
(B18) 300 250X500
300X400 (B13c)
250
300X500~400
(B13)
(B14) 400 (B13)
300X600
400X700 300X600

Column C13
600X600
50
150 150 1650 3950 4050
2000 8000

SECTION 2-2
I I'
01 2024/03/20 OWNER: PROJECT NAME: SUBMITED BY :
CHECK & ACKNOWLEDGED BY : CHECK & ACKNOWLEDGED BY : CHANGE PARAPET & TOP DOG HOUSE YU
CONST RUC

OFFICE RECONSTRUCTION
T

PT. TOKYU CONSTRUCTION INDONESIA

TOK
SHOP DRAWING

IO
MESCO

N
PT. MITSUI KINZOKU ACT INDONESIA

MKAI
CLASSIFICATION OF WORKS: PREPARED BY : CONFIRMED BY :
PREPARED : M. Sopyan
STRUCTURAL CHECKED CHECKED
DRAWING TITLE:
DRAWING NO : MKAI-BL-STR-015-19
PT. MITSUI KINZOKU ACT INDONESIA SECTION 1-1, SECTION 2-2 & SECTION 3-3
SURYACIPTA CITY OF INDUSTRY - EAST KARAWANG
( ................................ ) ( ................................ ) ( ................................ ) NO DESCRIPTION BY APPR. DATE DATE : 02 Februari 2024
SECTION a-a ( Yan/Nauval ) ( Ardho D. H ) ( AIHARA )
1 K1 K2
650 925
I 325 325 120
SFL +10027

66
15
200 120
SFL +10027

15
66
D13

200
1

200
D10-200

200
D13

1127
200

200
D10-200 760
822

5D10
SFL +9000
200

200
SFL +9208 225 300
Waterproofing 1% Waterproofing 1%

100 208
40
SFL +9205 Top of Slab

40
Chamfer

200
SFL +9006 150

39
SFL +8900

15D=150
40 150
70
150
70

15D=150
D13
400

170
40D=400 R/C Slab (S11) 150

40
R/C Slab (S11)
t=150mm
t=150mm 15D=150 40D=400
2D13

800
300 (B12) 300 Embedded
(B18)
350 (B13c) Waterproofing 400X800 Plate
300X400
300X500~400 D10-150

35
D10-100

25
Roof Strainer
Chamfer 25 250 400
R/C Slab (S11a)
with mortar
t=170mm

SECTION 11-11 Chamfer Detail SECTION 10-10


Column C12
650X650

325 925
1250

D:\PROJECT MKAI\MKAI RENOVATION\SHOP DRAWING MKAI RENOVATION (ROOF)\MKAI-BL-STR-015-4 ~015-25 SECTION ROOF BEAM (LAYOUT 01-25)R1.dwg
1 K1 K2
650 925
1
12 15 325
20

Sealant &
V Groove
V Groove Top of Slab (S11)
SFL +9000 298 120
Out side 15
44 210 44
28
387

SFL +9000
12

Chamfer
20

10 20 Waterproofing WP WP

100
Out side Roof side
120

Top of Slab (S11a)

45°
35
35

35
Gutter SFL +8900
25

25
SFL +9640 10
Sealant Sealant

170
Chamfer 25 25 Chamfer
15

135
15 with mortar with mortar 240
Roof side Sealant

Chamfer Detail 145

70
(B12)
Crack Control Groove Parapet 400 400X800

120

Roof Strainer Detail

01 2024/03/20 OWNER: PROJECT NAME: SUBMITED BY :


CHECK & ACKNOWLEDGED BY : CHECK & ACKNOWLEDGED BY : CHANGE PARAPET & DETAIL YU
CONST RUC

OFFICE RECONSTRUCTION
T

PT. TOKYU CONSTRUCTION INDONESIA

TOK
SHOP DRAWING

IO
MESCO

N
PT. MITSUI KINZOKU ACT INDONESIA

MKAI
CLASSIFICATION OF WORKS: PREPARED BY : CONFIRMED BY :
PREPARED : M. Sopyan
STRUCTURAL CHECKED CHECKED
DRAWING TITLE:
DRAWING NO : MKAI-BL-STR-015-25
PT. MITSUI KINZOKU ACT INDONESIA SECTION 10-10 & SECTION 11-11
SURYACIPTA CITY OF INDUSTRY - EAST KARAWANG
( ................................ ) ( ................................ ) ( ................................ ) NO DESCRIPTION BY APPR. DATE DATE : 02 Februari 2024
& DETAIL ( Yan/Nauval ) ( Ardho D. H ) ( AIHARA )
600
1 1A 2 2A 2B 2C 3 4 5 600
8000 8500 8750 8750 8750 8750 9250 9250
W 4025 3975 3685 4815 4560 4190 5365 3385 4800 3950 4375 4375 4625 4625 4600 4650
1690 3125 2400 2160
S
N
E
Expansion Joint Expansion Joint

+4500 +4500 +4500 +4500 +4500 +4500 +4500 +4500 +4500 +4500 +4500 +4500 +4500 +4500 +4500 +4500 +4500
B8 B8 B8 B8 B8 B8 B8 B8 B8 B8 B8 B8 B8 B8 B8 B8 B8
300x400 300x400 300x400 300x400 300x400 300x400 300x400 300x400 300x400 300x400 300x400 300x400 300x400 300x400 300x400 300x400 300x400
+4500 +4500

375
375

B3c B3c
EXISTING AREA

50
350x500~400 350x500~400

I
2000

2000
1575

1575
+4500 +4500 +4500 +4500 +4500 +4500 +4500 +4500 +4500 +4500 +4500 +4500 +4500 +4500 +4500
50

B6c
300x500~400
B3c
350x500~400
B8c
300x400
B8c
300x400
B6c
300x500~400
B3c
350x500~400
B6c
300x500~400
VOID B3c
350x500~400
B6c
300x500~400
B3c
350x500~400
B6c
300x500~400
B3c
350x500~400
B6c
300x500~400
B3c
350x500~400
B6c
300x500~400

I'
C13 C13 +4500 C13 C13 C13 C13 C13 C13 C13

4570 300x600

350x600
+4500 +4500 +4500 +4500 +4500 +4500 +4500 +4500 +4500 +4500 +4500

+4500

+4500
2660

B4
S1 S1 S1

B6

B3
B4 400X700 B3c B4 B4 B4 150 B4 150 B2 150 B2

250x500

250x500
VOID

+4500

+4500
350x600

350x600
+4600

400X700 350x500~400 400X700 400X700 400X700 400X700 450x800 450x800

+4600

4000
+4500

B5

B5
B3

B3
B8

+4500

300x600
300x600

+4644

+4500
150
+4500

300x400

150

300x600

350x600

350x600

350x600
B6

300x600

300x600

300x600
B6

+4500

+4500

+4500

+4500
+4500

+4500

+4500
+4600 +4500 +4500
350x600

B6

B3

B3

B3
B6

B6

B6
+4500

S1
150 B5 B5
B3

S1
1340

S1
250x500 250x500
+4500
8000

8000
B8c

300x600
+4500
300x400

B6
+4500 +4500
S1 +4500

1145
2325

+4500 +4500 150 B5 +4500 S2 +4500 +4500 +4500 +4500 +4500 +4500
B5 B5 B5 150 B5 B5 B5 B5 B5 B5
250x500
250x500 250x500 250x500 250x500 250x500 250x500 250x500 250x500 250x500

250x500
+4500

4000
350x600

+4500

B5
B3

350x600
+4500
+4500 +4500 +4500 +4500 +4500
S1 S1 S1 S1

B3
S1

2285
150 +4500 150 150 150 150
+4600
938 1675

S1 +4500 +4500 +4500 +4644 B8


150 B8 B8 S1 300x400
B8 150
300x400 300x500 300x400

J1
C11 C11 C11 C11 C11 C11 C11 C11 +4500
C11
+4500 +4500 +4500 +4500 +4500 +4500
2550

2687
B4 +4600 B4 B4 +4500 B4 B4 +4500 B2 B2
S1 +4500 S1 S1 450x800
400x700 150 400x700 +4500 400x700 150 400x700 400x700 150 450x800
S1 B4 +4644
150 S1a
400x700 170
3325

+4500
B8c
300x400
+4500
+4500 B7 +4500 +4500 +4500 +4500 +4500 +4500

2688
450x850
450x850

450x850

450x850

450x850

450x850

450x850

+4644
+4500

+4500

+4500

+4500

+4500

+4500
B6c 300x600 B7 B7 B7 +4500 B7 B7a +4500 B7a

B1
B1

B1

B1

B1

B1

B1
300x500~400 +4500 S1 S1 350x700
300x600 S1 300x600 300x600 150 300x600 350x700 150
150
10750

10750
450x850
+4600
B1

VOID
+4500 +4500 +4500 +4500 +4500 +4500 +4500

2688
663 5453 1885 +4500 B7 +4500 B7 B7 +4500 B7 B7 +4500 B7a B7a
350x700
S1 300x600 S1 300x600 300x600 S1 300x600 300x600 S1 350x700
150 150 150 150
6488

450x850
+4500
B1

+4500 +4500 +4500 +4500 +4500 +4500 +4500

2687
+4500 +4500
B7 B7 +4500 B7 B7 S1 B7 B7a S1 B7a
+4644 +4644 +4644 S1 +4644 +4644 150 +4644 +4644 150 +4644 350x700
300x600 300x600 150 300x600 300x600 300x600 350x700
B2a B2a B4 B4 B4 B4 B2 B2
400x800 400x800 400x700 400x700 400x700 400x700 450x800 450x800
C12 C12 C12 C12 C12 C12 C12 C12 C12
K1

D:\TOKYU CONSTRUCTION INDONESIA\2022_MKAI\002 Shop Drawing\03. Re-Countruction\STR\MKAI-BL-STR-011_2nd Floor Beam & Slab Plan.dwg
1250

1250
K2 +4496~4376
SB20c S1a
+4644
170
SB20 S20 150 SB20c S1a
+4644
S1a
+4644
170 170

PARTIAL - 01 PARTIAL - 02 PARTIAL - 03


"MKAI-BL-STR-011-01" "MKAI-BL-STR-011-02" "MKAI-BL-STR-011-03"
SB20c SB20 SB20c
12345

SB20c SB20 SB20c


SB21b

SB21b

LEGEND: NOTE :
SB20c SB20 SB20c = EXISTING AREA B1 = 450X850 B5 = 300X500
= SLAB TYPE S1 (SFL. +4500) B2 = 450X800 B6 = 300X600
SC20 SC20 B2a= 400X800 B6c = 300X500~400
Y = SLAB TYPE S1 (SFL. +4600)
CC20 SB22 CC20 B3 = 350X600 B7 = 300X600
= SLAB TYPE S1 (SFL. +4644)
Ka' B3c= 350X500~400 B7a = 350X700
1250

SB22c SB22c NOTES : = SLAB TYPE S1a (SFL. +4644)


B4 = 400X700 B8,c = 300X400
TOP LEVEL OF BEAM = SLAB TYPE S2 (SFL. +4500)
X COLUMN
TYPE OF BEAM NOTE: NOTE : NOTE :
2040 810 PARTIAL - 04 R/C SLAB (S1) t=150 ; FBC = 350kg/m2 SB20,20c = WF 250X125X6X9 C11 = 650X650
DIMENSION OF BEAM
2850 6290 810 R/C SLAB (S2) t=150 ; FBC = 500kg/m2 SB21b,21c = WF 450X200X9X14 C12 = 650X650
TOP LEVEL OF SLAB R/C SLAB (S1a) t=170 ; FBC = 350kg/m2 SB22,22c = WF 250X125X6X9 C13 = 600X600
1' 1A' R/C SLAB (S20) t=150 ; FBC = 100kg/m2
THICK OF SLAB (FBC = FLOOR BEARING LIVE CAPACITY NOTE :
TYPE OF SLAB / LIVE LOAD) SC20 : H 250X250X9X14 --> CC20 = 450X450

OWNER: PROJECT NAME: SUBMITED BY :


CHECK & ACKNOWLEDGED BY : CHECK & ACKNOWLEDGED BY : CONST RUC

REPAIR MKAI PROJECT YU T

PT. TOKYU CONSTRUCTION INDONESIA

TOK
SHOP DRAWING

ION
MESCO PT. MITSUI KINZOKU ACT INDONESIA

MKAI
CLCL.SIFICATION OF WORKS: PREPARED BY : CONFIRMED BY :
PREPARED : Funggal
STRUCTURE WORK CHECKED CHECKED
DRAWING TITLE:
DRAWING NO : MKAI-BL-STR-011
PT. MITSUI KINZOKU ACT INDONESIA 1st FLOOR COLUMN PLAN
SURYACIPTA CITY OF INDUSTRY - ECL.T KARAWANG
( ................................ ) ( ................................ ) ( ................................ ) NO DESCRIPTION BY APPR. DATE DATE : 30 January 2024
2nd FLOOR BEAM & SLAB PLAN ( Yan/Nauval ) ( Ardho D. H ) ( AIHARA )
Pekerjaan Waterproofing
Untuk

MKAI OFFICE ROOFTOP WATERPROOFING PROJECT

Metode penyemprotan komposit Poliurethan berkekuatan tinggi

Membran Komposit Waterproofing

[Metode AXSP]

Kontraktor Utama

PT. TOKYU CONSTRUCTION INDONESIA

Sub Kontraktor

PT. FORTUNA SATU INDONESIA


DAFTAR ISI

1. Penggunaan Mesin & Bahan

2. KONTEN KONSTRUKSI

3. Proses Konstruksi (Pengerjaan Permukaan)

4. Proses Konstruksi (Pollishing Concrate & Pencucian dengan Watterjet)

5. Proses Konstruksi (Pengecatan waterproofing AX-2 )

6. Proses Konstruksi (Penyemprotan waterproofing SP-1 )

7. Proses Konstruksi Pengaplikasian TP-1 (TOP COAT LAYER)

8. Pengukuran Ketebalan lapisan Waterproofing/ test ketebalan lapisan (AXSP)

9. WATER SOAK TEST (Test Rendam / Uji Kebocoran)

10. Diagram alir manajemen kualitas AXSP


PENGGUNAAN MESIN & BAHAN

1. Mesin/Peralatan
Nama Poin Penggunaan Standar Jumlah
SP-M Semprotan uretan biliquid 3-fase 380V x 35A 1
bertekanan tinggi
One head Mesin pemoles sedang 220V x 21,5A – 2
140 Kg
SJ – 200 Penyedot debu berukuran besar 220V x 20A – 70 2
Kg
PISTON Mesin kompressor udara 380V 1
FUSHENG
LODE – STAR Mesin pengering udara 220V 1
MEIJI APE-25A Mesin cuci bertekanan tinggi 230V – 3.3Kw 1
Mixer Mesin pengaduk cat 220v 1

2. Bahan yang Digunakan


Nama Produk Penggunaan Standar Pabrikan Jumlah
per set
AX – 2 (lapisan Bahan uretan Resin FoneN 34m2/set
penyangga) / Asdox aspal -karet 5,5kg/kaleng Co.,Ltd (Resin +
Pengeras Pengeras)
22kg/kaleng
Sp-1 (lapisan utama Kekuatan Resin FoneN 340m2/set
waterproofing/Super tinggi 200kg/kaleng Co.,Ltd (Resin +
Paleo) Bahan uretan Pengeras Pengeras)
210kg/kaleng
TP-1 (lapisan Lapisan Resin FoneN 60m2/set
atas/mantel) uretan akrilik 2kg/kaleng Co.,Ltd (Resin +
termasuk 2 Pengeras Pengeras)
cairan 16kg/kaleng
Sealing uretan Bahan sealing 600 ml BOSTIC 10 x 10 6m
uretan satu
humoral

3. Peralatan Pemeriksaan
Nama Nama Standar Kinerja Syarat
Mesin
Moisture HI-520-2 Daya Baterai Pengukuran Konsentrasi
Meter/Alat kelembaban/kadar kelembaban
Pengukur air tanah kurang dari
Kelembaban waterproof 6%
KONTEN KONSTRUKSI
1. Deskripsi Spesifikasi

Lapisan ke-3: TP-1 (lapisan pelindung atas)

Lapisan ke-2: SP-1 (lapisan utama waterproofing/ urethane Super Paleo)

Lapisan ke-1: AX-2 (lapisan penyangga)

Metode Standar AXSP

No. Proses Nama Metode


1 Pengerjaan permukaan Metode F-MAX FK
2 Pencucian air bertekanan -
tinggi(waterjet)

Spesifikasi Standar AXSP

No. Nama Produk Jumlah yang


digunakan
1 AX-2 (Lapisan Penyangga) / Asdox 0.8kg/m2
2 SP-1 (Lapisan utama waterproofing/Super Paleo) 1.2kg/m2
Konstruksi atap tahan air
3 TP-1 (Top Coat lapisan atas) 0.3kg/m2

2. Area Konstruksi

Lokasi Konstruksi Metode Jumlah


Konstruksi AXSP 1967.7 m2
Waterproofing
PROSES KONSTRUKSI

1. Mempersiapkan mesin dan persediaan untuk pemeriksaan proses


memasukkan bahan waterproofing
Pengujian keamanan listrik manajemen konstruksi.

2. Pemeriksaan rencana konstruksi sebelum konstruksi waterproofing


Pengujian keamanan listrik manajemen konstruksi.
2.1.Periksa apakah tepi-tepinya berpotongan sudut (chamfer) atau tidak (1-2cm)

2.2. Periksa permukaan konstruksi: Tidak terdapat retak dan lubang kecil jika terdapat
retak ataupun lubang kecil, kami akan mengisinya dengan Sealant bahan Uretan.
2.3.Sebelum waterproofing, permukaan mortar harus sudah selesai minimal dalam 120
jam (5 hari)

3. Pelaksanaan pengerjaan Pemolesan permukaan

Menggunakan mesin pemoles sedang dan poles kecil /Gerinda Tangan untuk
menghilangkan lapisan laitance (lapisan lapuk pada permukaan luar konkrit baru)
4. Pencucian dan pembersihan permukaan
4.1.Menyiapkan mesin pencucian
Persiapan sumber air, selang air, dan mesin cuci bertekanan tinggi

4.2.Pelaksanaan pencucian
Menggunakan mesin cuci bertekanan tinggi, mencuci lantai dan dinding untuk
membersihkan permukaan

• Pencucian dengan air ber tekanan tinggi/ water jet (Pembersihan permukaan Rooftop)

5. Pengaplikasian lapisan AX-2


5.1.Memastikan kelembaban beton pondasi
*Pemeriksaan kelembaban dengan alat ukur Moisture Meter/Alat Pengukur
Kelembaban HI-520-2

Jika kemembapan kurang dari 6%, lakukan pengecatan.


5.2.Pengaplikasian Butil Tape/Sealant pada area sambungan/Expansion Joint Area
(PENERAPAN HANYA UNTUK BANGUNAN LAMA)

5.3.Persiapan Bahan
Mempersiapkan peralatan: Spreader roller, alat penyapu/pembersih air, timbangan,
dan pengaduk.
5.4.Pemeriksaan bahan
Jumlah bahan yang digunakan: 0.16kg/m2 dan 0.64kg/m² (0.8kg/㎡)
Rasio campuran bahan AX-2 dengan skala berat = A1:B4
Pengaduk digunakan (1300 putaran per menit) selama 3 hingga 5 menit
Memastikan jumlah bahan yang digunakan dengan menghitung kaleng kosong
5.5.Pengaplikasian Lapisan AX-2
Setiap lantai dicat menggunakan alat penyapu air dan bagian vertikal menggunakan rol
Setelah pengaplikasian selesai, keringkan selama 6 hingga 8 jam
*Selama 8 jam bahan baku benar-benar kering dan dicat dengan AX-2
Detail untuk pipa di lantai. Bagian dalam pipa pembuangan air sekitar 5cm (jika
memungkinkan).
*Aplikasikan bahan AX-2 *Aplikasikan untuk pipa pembuangan

6. Penyemprotan waterproofing SP-1

6.1.Persiapan mesin dan bahan


Siapkan listrik 380V tiga fase untuk mesin semprot
Siapkan bahan, mesin semprot, dan selang mesin

6.2.Mesin semprot
Jumlah bahan yang digunakan: 1.2 kg/m2
Rasio campuran bahan SP-1 dengan mesin semprot A1:B1
(Dicampur secara otomatis dengan mesin semprot SP)
Semprotkan persamaan SP-1 (jumlah yang disemprotkan berdasarkan bahan 1 SET
340m2)
Penghitungan bahan menggunakan mesin 100L=100kg bahan
*Penyemprotan SP-1 pada lantai

*Penyemprotan SP-1 sekitar saluran pembuangan

*Hasil Penyemprotan SP-1


7. Pengaplikasian TP-1 (TOP COAT LAYER)

7.1. Persiapan Bahan


Persiapan bahan dan roller
Rasio campuran bahan TP-1 menggunakan skala berat = A1:B8
Aduk campuran bahan dengan pengaduk (1 hingga 3 menit)

7.2. Spray dan Spreader Roller


Jumlah bahan yang digunakan: 0,3 kg/㎡ (Warna GRAY)
Aplikasikan persamaan TP-1 (Aplikasikan jumlah bahan:1 SET 90 m2)
Pastikan jumlah bahan dengan menghitung jumlah kaleng kosong

*Aplikasi TP-1 menggunakan spreader roller (Contoh Warna Topcoat White)


8. Pengukuran Ketebalan lapisan Waterproofing/ test ketebalan lapisan (AXSP)

Ketebalan : ( 1.6mm~2mm)

(Standard ketebalan adalah 1.6mm , makin tebal makin bagus)


9.WATER SOAK TEST (Test Rendam selama 24jam / Uji Kebocoran)
10. DIAGRAM ALIR MANAJEMEN KUALITAS AXSP
Pengawasan
Supervisi
Fortuna Konst Foto
Satu ruktor
utama
Memastikan • Memastikan apakah terdapat kebocoran dan
konstruksi posisi yang rusak secara signifikan atau tidak
permukaan • Apakah terdapat noda yang signifikan atau tidak O O -
seperti minyak (bersihkan dengan cara memoles jika
terdapat noda minyak)
Perawatan • Kami akan melakukan perawatan terhadap
posisi goresan kotor dan kerusakan dengan lapisan atau O - -
konstruksi plester
Persiapan • Koneksi daya (papan distribusi atau generator
mesin 50KVA)
pemoles - Sambungkan setelah memeriksa sambungan
O - -
operasi
• Menyiapkan peralatan dan bahan sesuai dengan
area konstruksi
Pemolesan
Pastikan konstrusi permukaan
Pondasi

• Bersihkan lapisan laitance dan debu serta bagian


O O O
rapuh pada permukaan
• Pastikan proses pembersihan lapisan laitance dan
debu serta bagian rapuh pada permukaan
• Poles kembali jika masih belum mencukupi
Pencucian • Bersihkan permukaan beton dengan mesin cuci
bertekanan bertekanan tinggi
tinggi • Periksa debu dan bagian yang kotor O O O
Pastikan konstrusi permukaan

Aplikasi • Mengukur permukaan konstruksi apakah masih


lapisan basah atau tidak menggunakan moisture meter (tingkat
penyangga/A kelembaban kurang dari 6%)
X-2 (jika permukaan tidak kering, tidak dapat diaplikasikan
AX-2)
• Aplikasikan AX-2: 0.8kg/m2 (dengan tembok O O O
pembatas menggunakan roller)
• Pastikan jumlah bahan yang digunakan dengan
menghitung kaleng yang kosong
• Keringkan selama 8 jam setelah mengaplikasikan
AX-2
• Jika diperkirakan hujan, pekerjaan harus selesai
sebelum 6 jam
Pastikan konstrusi permukaan

• Pastikan apakah terdapat lubang kecil atau cat


yang belum kering pada permukaan
• Isi lubang kecil atau bagian retak tersebut dengan
resin
• Jika bahan AX-2 tidak kering, kami akan
membersihkan bagian tersebut dan mengaplikasikan
AX-2 kembali.

Aplikasikan • Semprotkan SP-1 dengan mesin


lapisan utama 2
semprot :1.2kg/m
waterproofing • Pastikan jumlah bahan yang digunakan dengan
/SP-1 menghitung kaleng yang kosong
• Sesuaikan konfigurasi mesin semprot sebelum
penyemprotan (kontrol suhu dalam sebesar 65oC±5oC
untuk mesin semprot)
• Sesuaikan konfigurasi mesin semprot sebelum
penyemprotan (tekanan sebesar 110 bar untuk mesin
semprot)
• Setelah penyemprotan, periksa apakah kering
atau tidak O O O
Pemeriksaan permukaan setelah
penyemprotan

• Periksa apakah terdapat lubang kecil atau cat


yang tidak kering pada permukaan
• Isi lubang kecil atau bagian retak tersebut dengan
resin
• Jika bahan Sp-1 tidak kering, kami akan
membersihkan bagian tersebut dan mengaplikasikan
SP-1 kembali.
Aplikasikan • Semprotkan TP-1 dengan roller: 0,3kg/m2
lapisan • pastikan jumlah bahan yang dipakai dengan
atas/mantel/T menghitung kaleng yang kosong
P-1 • pembatasan pada permukaan yang dicat setelah
pelapisan topcoating selama 4 jam.
• Jika diprediksi hujan, pekerjaan harus selesai
sebelum 1 jam.
• Periksa apakah terdapat lubang kecil atau cat
yang belum kering atau tidak pada permukaan
Pastikan konstrusi permukaan

• Semprotkan lapisan mantel kembali pada bagian


yang kabur
• Jika bahan TP-1 tidak kering, kami akan
membersihkan bagian tersebut dan mengaplikasikan
TP-1 kembali.
Penyelesaian O O O
COMPANY PROFILE
PROJECT REFERENCE
DAFTAR REFERENSI PROYEK DI INDONESIA
OVERSEAS
PT. FORTUNA SATU INDONESIA

PERFORMANCE
No
工事名称 元請 工法 下地種類 面積 年
Nama Kontruksi Kontraktor Metode Jenis Dasar Luas Tahun
1 TABLE
Permanent Mission of Thailand to ASEAN
(THAI EMBASSY JAKARTA)
PT. JAYA OBAYASHI AXSP Concrete 507 ㎡ 2019

2 INOAC Factory new construction work PT. SHIMIZU BANGUN CIPTA KONTRAKTOR AXSP Concrete 716 ㎡ 2020

3 ATI Factory rooftop repair work PT. SHIMIZU BANGUN CIPTA KONTRAKTOR SPAX Metal 3.077 ㎡ 2021

4 PT. KANSAI PRAKARSA COATING


PT. JAYA OBAYASHI AXSP Concrete 709 ㎡ 2021
Employee Facility Building motor parking lots repair work

5 MRT Fase 1 D04 Building metal roof repair work PT. TOKYU CONSTRUCTION INDONESIA SPAX Metal 1.886 ㎡ 2022

6 MRT Fase 1 D05 Building metal roof repair work PT. TOKYU CONSTRUCTION INDONESIA SPAX Metal 754 ㎡ 2022

7 PT. KANSAI PRAKARSA Factory gutter repair work PT. JAYA OBAYASHI SPAX Metal 161 ㎡ 2022

8 JULIA SPOZA HOUSE DIMAZ ARCHITECT SPAX Metal 102 ㎡ 2022

9 PT. BRIDGESTONE TIRE INDONESIA PT. JAYA OBAYASHI SPAX Metal 270 ㎡ 2023

10 PT. EPSON INDONESIA (LC WAREHOUSE) PT. TAKENAKA INDONESIA AXSP Concrete 367 ㎡ 2023

11 IRIS DATA CENTER PT. SHIMIZU BANGUN CIPTA KONTRAKTOR AXSP Concrete 710 ㎡ 2023

12 PT. EPSON INDONESIA (MACHINE AREA) PT. TAKENAKA INDONESIA AXNT Concrete 100 ㎡ 2023

13 PT. MARUICHI OFFICE ROOFTOP PT. TAKENAKA INDONESIA AXSP Concrete 688 ㎡ 2023
DAFTAR REFERENSI PROYEK DI INDONESIA
OVERSEAS
PT. FORTUNA SATU INDONESIA

PERFORMANCE
No
工事名称 元請 工法 下地種類 面積 年
Tahun
Nama Kontruksi Kontraktor Metode Jenis Dasar Luas
14 TABLE
PT. SUMMITMAS BUILDING 1 (ROOFTOP) PT. JAYA OBAYASHI AXSP Concrete 1.157㎡ 2023

15 FACTORY PT. MATSUZAWA PELITA FURNITURE INDONESIA PT. TAKENAKA INDONESIA SPAX Metal 3380 ㎡ 2023

16 OFFICE PT. MATSUZAWA PELITA FURNITURE INDONESIA PT. TAKENAKA INDONESIA SPAX Metal 720 ㎡ 2023

17 PT. BRIDGESTONE TIRE INDONESIA PT. YOGATAMA WAHANA KARYA SPAX Metal 562㎡ 2023

18 KARAWANG OUTLET MALL PT. SHIMIZU BANGUN CIPTA KONTRAKTOR AXTP Metal 223㎡ 2023