0% found this document useful (0 votes)
182 views3 pages

Collector GuideLine Rate

The document provides guidance on determining the estimated construction rate for calculating Karmakar fee in Madhya Pradesh, India. It gives an example using a residential building case in Bhopal district, where the construction cost per square meter is estimated based on guidelines for that district and slab area. This estimated cost is then used to calculate the 1% Karmakar fee amount.

Uploaded by

SHASHANK
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
182 views3 pages

Collector GuideLine Rate

The document provides guidance on determining the estimated construction rate for calculating Karmakar fee in Madhya Pradesh, India. It gives an example using a residential building case in Bhopal district, where the construction cost per square meter is estimated based on guidelines for that district and slab area. This estimated cost is then used to calculate the 1% Karmakar fee amount.

Uploaded by

SHASHANK
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Estimated Construction Rate for Karmakar fee calculation

Derive the Estimated


Guideline Pdf will open
Construction Rate for
Click on Link to District with all Mohalla/
Select Particular District Karmakar fee
Wise Market Valuation Colony/ Society/ Road /
(For eg. Bhopal) calculation & Enter in
Guidelines 2020-2021 Village in the selected
the Collector guideline
district
Rate field

Link to District Wise Market https://mpigr.gov.in/MarketValueGuideline2020-21.html


Valuation Guidelines 2020-2021

An Example for determining Estimated Construction Rate for Karmakar fee calculation is shown for a
case in Bhopal District.
In this example, respective building is intended to be used for Residential Purpose & Type of Building is
RCC Residential Type.
Guideline Pdf with all Mohalla/ Colony/ Society/ Road / Village in the Bhopal district

Plot Building Residential Construction Cost (Rs per SQM)


(Rs per (Rs per SQM)
SQM)
Residen RCC Calculation
tial
1900 11400 11400-1900=9500
9500
Enter the derived Construction Rate as per the guideline
Example
An Example for determining Estimated Construction Rate for Karmakar fee calculation is shown for a
case in Bhopal District.
In this example, respective building is intended to be used for Residential Purpose & Type of Building is
RCC Residential Type.

If the total slab area = 150 Sq.m


(Estimated Cost as per the above example Rs 9,500 per Sq.m)
Then the total Estimated Construction Cost = 150 x 9,500
=Rs. 14,25,000
Karmakar kalyan Fee = 1% of total Estimated Construction Cost
= 14,25,000*1%
= 14,250/-
This amount of 14,250 will be auto-generated by the system in demand note, if the Estimated
construction cost entered by applicant is less than 14,25,000