Internship of Divgi
Internship of Divgi
-
Vision & Mission
❑Values :
1. Respect for each other
2. Passion for excellence
3. Responsibility to our communities
4. Power of collaboration
5. Personal integrity
❑Vision :
❑Mission :
07-07-2020
Slide # 2
Divgi-TTS Policies
Customer Satisfaction
❑Quality Policy: Quality Product
Continual Improvement.
07-07-2020
Slide # 4
Quality System Basic
07-07-2020
Slide # 5
Contents for '' I " level Training Module
Work standardization.
07-07-2020
Slide # 6
Contents for '' I " level Training Module PPT
07-07-2020
Slide # 7
Definition of Gear Engraving
Definition of Engraving
07-07-2020
Slide # 9
Working Principle
Engraving Tool
The working principles of
engraving involves cutting or
carving a design, pattern, or text
into a materials surface using
different techniques they are
preparation,design,tool selection,
engraving process,finishing
07-07-2020
Slide # 10
How to Start the Machine
Instruction for Machine start
07-07-2020
Slide # 12
Loading & Unloading of the part
• Loading • UnLoading
Clean the resting area of the part and Load the job After the part is engraved, unclamp the engraved part
on the machine surface and press start button in & Inspect the part
machine
07-07-2020
Slide # 13
Daily Preventive Maintenance ?
07-07-2020
Slide # 14
Daily Preventive Maintenance Check Sheet
07-07-2020
Slide # 15
Daily Preventive Maintenance Check Sheet
07-07-2020
Slide # 16
Daily Preventive Maintenance Check Sheet
CLEAN THE MACHINE CHECK THE STYLET CHECK THE PNEUMATIC VERIFY THE WORKING OF
DOWNWARD PRESSURE POKA-YOKE
07-07-2020
Slide # 17
Work Center Standardization.
Work Center Standardization.
ENGRAVING
07-07-2020
Slide # 19
Process Documents
Quality check standard
3
4
5
1 6
2
7
8
10
9
07-07-2020
Slide # 21
What to look Quality check standard
07-07-2020
Slide # 22
Special Characteristics
07-07-2020
Slide # 24
Control Plan
Specifications
Process No
& Name
Inspection Control
Freq Method
Product
Machine , Characterisics
Fixture &
Tools
07-07-2020
Slide # 25
Understanding Control Plan and its Content
07-07-2020
Slide # 26
S.O.S & J.E.S
07-07-2020
Slide # 27
What to Look in SOS
1. Sequence of operation or steps to complete the operation
2. Takt time
3. Quality checks
07-07-2020
Slide # 28
S.O.S & J.E.S
07-07-2020
Slide # 29
What to see in JES
1) What to do.
2) How to do.
3) Why to do.
07-07-2020
Slide # 30
Gauge least Count & Calibration
Identifying the Least Count of Dials
07-07-2020
Slide # 32
Documents to be maintained by Operating Engineer
Inspection of the component FP/LP
Contents -
• Part Name and Number
• Remark
07-07-2020
Slide # 34
Tool life monitoring & Maintaining
Contents -
• Part Name and Number M-241
• Type of Tool
• Qty / Sharp
• Remark
07-07-2020
Slide # 35
Documents maintain by operating engineer- DPR
ENGRAVING
07-07-2020
Slide # 36
NRFT Handling Procedure
Different NRFT Tags
07-07-2020
Slide # 38
NRFT ( Not Right Frist Time ) Procedure
Re
Ap Paint
d
ply
INFORM TO
SUPERVISOR
W hy,
Fill U
rit
W y on
W ck p
rejec the
e
h t Tag
Ba de
si
07-07-2020
Slide # 39
NRFT ( Not Right Frist Time ) Procedure
Tag with job
Keep in
Red Tray
07-07-2020
Slide # 40
Setup approval and Contents
Contents -
• Part name & no.
• Hob/cutter/broach T- No
• Check for lead error, lead variation, max. lead error and profile error
• Check for all parameters covered in FP & LP, PMC and Check sheet as per
MPL
• Check for 5 parts parameters plotted in PMC and Check sheet as per MPL
• Demagnetise fixture
07-07-2020
Slide # 41
What are 5S’s
• Sort
Sort means to remove all items from the workplace that are not needed for current production.
• Set in order
• Set in order means arranging necessary items so they are easy to use and anyone can find them and put them away.
• Shine
Shine means removing dirt, grime and dust from the workplace by wiping, sweeping and mopping. It means cleaning machinery and equipment as well as shelves,
drawers and lockers too.
• Standardize
Standardize is the method used for maintaining the first three Ss: Sort, Set in Place and Shine. It means creating a system where everyone knows exactly what they
are responsible for doing and exactly when, where and how to do it.
• Sustain
Sustain is the glue that makes 5S stick. It is undoubtedly the hardest part of implementing 5S. When organizations fail, they claim that it does because of
problems with sustain.
07-07-2020
Slide # 42
Thank You
PRODUCT LEADERSHIP
LIKE NO OTHER
07-07-2020
Slide # 43
WEL- COME
LASER AUTOMATION
(Engraving)
“L” LEVEL- Training Module.
Rev-01 Dated 08.05.2023
-
Contents for ‘’ L " level Training Module
07-07-2020
Slide # 45
Machine Technical specification
2 Power Supply Separate 24VDC 3A Power Adapter for Prieumatic and 24V 5A Power
3 Cooling High Speed Fan provided.
4 Machine Connection Robust Military Grade Round Bayonet Connectors Display: 7" Resistive
Touch Screen Display.
5 5 Inputs for automatic design selection
Inputs
6 2 Outputs, end of
Outputs marking, machine ready for marking & error.
7 Unlimited Storage
Storage
07-07-2020
Slide # 46
Operating Panel
1.TAB
7 2.SHIFT
3.DELETE
4.ALT
1 3
5.CTRL
6
6.ENTER
2
7.ESC
5 8
4
8.SPACE
07-07-2020
Slide # 47
Operating Panel
1.DESIGN
2.BLK NO
3.UNIT NO
1 7
4.STATUS IDLE
2 8
5.PLC INPUT SIGNAL
3 9
6.DATE
4
5 7.PROD CNT
6 8.F1:HELP MEMU
9.END NO
07-07-2020
Slide # 48
Work Instruction
07-07-2020
Slide # 49
Work Instruction
07-07-2020
Slide # 50
Work Instruction
07-07-2020
Slide # 51
Work Instruction
07-07-2020
Slide # 52
Work Instruction
M180-J
M230-I (CLC 200SZ) M225-H
M213-G M235-F (PROFILATOR)
07-07-2020
Slide # 53
Work Instruction
TRACEABILITY INDEX
XX XX X X
MACHINE CODE (EX,U,V,X.T)
Eg:-01 OV DUS
07-07-2020
Slide # 54
Thank You
PRODUCT LEADERSHIP
LIKE NO OTHER
07-07-2020
Slide # 55