DAY 10
Requirements Modeling via Use Cases
Modeling
Benefits
Concepts
Symbols
Process
Project Management
USE CASE MODELING
User Center Development – A process of developing a
system based on understanding the needs of the Project
Stakeholders and the reasons why the system should be
developed.
Steps
Identify Business Actors.
Identify Business Use Cases.
Construct Use-Case Model Diagram.
Documents Business Requirements Use-Case Narratives.
1 – IDENTIFY BUSINESS ACTORS
For identifying actors:
Who or what provides inputs to the system?
Who or what receives outputs from the system?
Are interfaces required to other systems?
Are there events that are automatically triggered at a
predetermined time?
Who will maintain information in the system?
Evaluation Criteria:
1. Significant impact on the architectural design.