DFM Report Sample For Injection Molding
DFM Report Sample For Injection Molding
Language:
EN
Preferred language to fill in the DFM Report is English. Usage of other language is applicable if upfront agreed with BSH
End Customer BSH Mould BSH Serial No 4059953
Project Name TE300 Planned Machine (T) 500
Part Name L-Housing 30 Cavities 2
Part material PA Durethan BKV30F 000000 Part CQP Clasification [ A, B, C ] B
Customer (if not BSH) Eurel Basic Tool Dimensions (BHT) 296x346x343
Mould Maker Shanghai Weihong Injection system Cold runner system
8.1 Cavity No. typ, size and Location YES Novak, 2016-04-25
8. Product Engrave 8.2 / YES Novak, 2016-04-25
8.3 Adjustable model version sign typ, size and Location YES Novak, 2016-04-25
9.1 Input data for mold flow analysis , mesh and material parameters YES Zorec, 2016-04-28
9.2 Fill time YES Zorec, 2016-04-28
9.3 Pressure drop Mold flow analysis YES Zorec, 2016-04-28
9.4 Weld Lines YES Zorec, 2016-04-28
9. Mold flow analysis 9.5 Air Traps YES Zorec, 2016-04-28
9.6 Sink Marks YES Zorec, 2016-04-28
9.7 Warping YES Zorec, 2016-04-28
See
9.8 With Cooling no /
*CRITERIA
10. Remarks 10 Other remarks no /
*CRITERIA: (Classification A,B,C - see BSH data on pg.1)
1. For A parts: Necessary
2. For B and C parts: If without cooling process part warps more than are allowable tolerances on drawing then COOL-analysis HAS TO BE PERFORMED
A … filled in by BSH
B … filled in by supplier
BSH
Decision/Comments
OK / NOK
Name,
dd.mm.yy
BSH
Decision/Comments
OK / NOK
Name,
dd.mm.yy
BSH
Decision/Comments
OK / NOK
Name,
dd.mm.yy
BSH
Decision/Comments
Description cavity lifter
and moving direction OK / NOK
Name,
dd.mm.yy
Examples:
BSH
Decision/Comments
OK / NOK
Name,
dd.mm.yy
Venting channels
Ventingchannels
channels
Venting
(blue colored)
(bluecolored)
colored)
(blue
BSH
Decision/Comments
OK / NOK
Name,
dd.mm.yy
BSH
Decision/Comments
OK / NOK
Name,
dd.mm.yy
If proposal for drawing change exist it must be clarified and confirmed here. Check 2D drawing characteristics and specially:
• control dimension analysis;
• tolerance analysis;
• how to reach the requirements?
• changeable inserts / separate inserts?!?
• surface finish analysis.
BSH
Decision/Comments
OK / NOK
Name,
dd.mm.yy
Separate cooling
Cooling of central core in hot-nozzle area
Cooling
of main
cavity
insert
Cooling of central pin Injection side
BSH
Decision/Comments
OK / NOK
Name,
dd.mm.yy
Examples:
Problematic radius
Solution proposal
BSH
Decision/Comments
OK / NOK
Name,
dd.mm.yy
BSH
Decision/Comments
OK / NOK
Name,
dd.mm.yy
BSH
Decision/Comments
OK / NOK
Name,
dd.mm.yy
Fill in other remarks or proposals that are important for achieving manufacturing
process as foreseen with the requirements.
BSH
Decision/Comments
IMPORTANT NOTE: If there are no remarks to the technical requirements or other related documentation OK / NOK
submitted by BSH, it is assumed, that supplier confirms to achieve required product, tool and process Name,
specifications. dd.mm.yy