Daily Work Progress Report of STP Dated 10th June

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Siddababa Tunnel Project

Daily Progress Report


Date: Monday, June 10, 2024 Day: Sunny/Cloudy/ Rainy
Rainfall: Max. Temp: 38°C Min Temp. : 25°C Humidity: 45%
Working Time from 07:00 AM to 06:00 PM (Day Shift) , 07:00 to 6:00AM(Night Shift)
1.1 Personnel-Technical Staff 1.2 Personnel-Service & Support 1.3 Personnel-Operator
S.N. Description Name Nos S.N. Description Nos S.N. Description Nos
Public Relation Officer (Mr. Mahendra Poudel)
1. Project Manager Mr.Zhou He You 1 11. 1 19. Driver 5

20. Operator 6
Mr.Yan Wei Safety Engineer/ Manager/Officer
2. Procurement Officer 2 12. 1
Mr. Zheng Hongjiang (Mr.Huang Yi Cheng)

13. Translator (Mr. Abhishek Sharma , Mr.Jit Tamang, Mr.


3. Warehouse Manager Mr.Li Jin Lian 1 4
Ranjit Regmi,Mr. Ramesh Pandey)

4. Accountant Mr.Lin Jiang Feng 1 14. Account Helper(Nisha Pandey) 1

5. Geologist Mr.Ganga Ram Maharjan 1 15. IPC engineer(Suman Gautam) 1

Mr. Su Guo Fa , 16. Cook 5


Mr.Liang Hao, 17. Cleaner 2
Mr. Zhao Chen Peng, 18. Security Guard 6
Mr.Lei Hong Jun
Mr. Chen Shao Lin
Mr. Li Tang Pei
Mr. Xu Xiao Po
Mr. Yudhisthir Panthi
Mr. Shreejesh Poudel
6. Tunnel/Site/Civil Engineers Mr. Hunag Yichen 18
Mr.Huang Guiping
Mr.Huang Hudi Mo
Mr.Wu Jian Guo
Mr.San jui(shotcrete operator)
Mr. Kaushal Raut
Mr. Deepak Sunar
Mr. Kaushal Raut
Mr.Suresh Ayer

7. Mechanical/Material Engineer Mr.Kshitiz Khanal 1

Mr. Zhang Ze Peng


Mr. Mohan Bohara
8. Surveyor 5
Mr. Harka Bista .

Mr.Zhang Jin Gui


Mr.Aklesh Kr. Sahani,
9. Lab Engineer/Technician Mr.Sandip Kandel 4
Mr.Deepak Bastola

10. QA/QC Engineer Kushal Gautam 1


Total 35 Total 21 Total 11
21. North Portal Site 22. Main Tunnel /South Portal Site

Welder/Carpenter/ Barbender/ Shotcrete


Driller/Shotcrete worker 7 2 Shotcretor/ Mason Skilled/scaffolder 6 Electrician/welder 2
worker/Traffice Controller

14 14
Electrician/operators 0 Shotcretor/ Mason Unskilled Driller 0 Operator 3

Technician/Supervisor 3 Extra technician 2 Technician/ Supervisor 3 Extra technician 0

23. Workshop 24. By-Pass 2

Welder /skilled 2 Electrician Helper Worker 4 Driller

Shotcretor/ Mason
Worker 2 Operators 6 Technical/Supervisior 2 6
Unskilled

Technician/Supervisor 2 Extra Technician Electrician Safety officer

25. Slope Protection MR 1 & Road maintenace work 26. BY-Pass 1and By-pass 3
Driller/Shotcrete worker Driller in By-Pass
6 Worker at road maintenace 10 Worker in By-Pass 3 5 4
in MR-1 1
Workers/Operators in MR- 22 Technical/Supervisi 13
4 0 Technical/Supervisior in By-Pass 3 2 2
1 or in By-Pass 1
Technician/Supervisor in
2 0 Electrician/welder
MR-1
Grand Total 142

2. Major Equipment at site

Hrs. Down Description Down


S.N. Description Nos Hrs. Down time S.No. Description Nos Down time S.N. Description Nos Hrs. S.No. Nos Hrs.
time time

Concrete High Pressure Double


Excavator 12+12 0 4+4+4 0 Pneumatic Jaak Hammer 12X5+3
1. 5 7. Transit 3 13. 32 0 19. Fluid Grouting Pump 1 0 0
+12 X6
Mixer
Drilling
2. Hydraulic Pressure Breaker 3 12+14 0 8. Machine 2 0 0 14. Concrete Batching Plant 1 4 0 20. Dry Shotcrete machine 4 4+0+0+0 0
(ROC)/DTH
10+10 Ground Robotic Shotcrete
3. Hilux / Pickup 5 +10+1 0 9. Concrete 1 2 0 15. Generator (400 KW) 1 0 0 21. 1 4 0
Machine
0+10 Pump

Air
4. Tripper 11 6X11 0 10. 4 12+0+0+0 0 16. Generator (600 KW) 1 0 0 22. Core cutter 8 0 18
Compressor

Grouting
5. Wheel Loader 3 6+6+2 0 11. Machine 1 0 0 17. Electric Compressor 1 0 0 23. Potable air compressor 1 12 0
(Low

6. Jumbo drill 1 0 0 12. Jet Fan 2 5+2 0

Add: No.15 Sanlihe Road, Haidian District, Beijing, china Post code: 100029 Tel: +86-10-8649 6111/6222 Fax: +86-10-8649 6100 Email: [email protected] Website: www.cscec.com
Siddababa Tunnel Project
Daily Progress Report
Date: Monday, June 10, 2024 Day: Sunny/Cloudy/ Rainy
Rainfall: Max. Temp: 38°C Min Temp. : 25°C Humidity: 45%
Working Time from 07:00 AM to 06:00 PM (Day Shift) , 07:00 to 6:00AM(Night Shift)

Conducted Ref. Description


S.N. Test/Sampling/Inspect Ref. Standard Description (Test code) Test Machine S.N. Test/Sampling/ Inspect Test Machine
No. of Test Standard (Test code)

7 days Compressive strength


CSCEC-STP-ST-20240603-
1. test of shotcrete C25/30 at EN 12390-3 Automatic compressive strength test machine. 3.
1
North main tunnel

7 days Compressive strength


CSCEC-STP-ST-20240603-
2. test of shotcrete C25/30 at EN 12390-3 Automatic compressive strength test machine. 3.
2
south main tunnel

28 days Compressive strength


test of M30 mortar gewi bar CSCEC-STP-MT-
3. EN 12390-3 Automatic compressive strength test machine. 3.
grouting at south 20240513-1
portal,K0+911-930

7 days Compressive strength


CSCEC-STP-MT-
4. test of M30 mortar gewi bar Automatic flexural & compressive strength test machine 3.
20240603-1
grouting at MR1

7 days Compressive strength


test of early strength mortar CSCEC-STP-MT-
5. EN 445 Automatic flexural & compressive strength test machine 3.
Rockbolt grouting at North 20240603-1
main tunnel.

3 days Compressive strength


test of early strength mortar CSCEC-STP-MT-
6. EN 12390-3 Automatic compressive strength test machine. 3.
Rockbolt grouting at south 20240607-1
main tunnel.

Particle density & water


absorption test of coarse CSCEC-STP-CA-20240609-
7. EN 1097-6 Pycnometer
aggregate (8/4) mm after 24 1
hours.

Blasting Material log

S.N Detonator Delay No. Quantity Aviable Unit Quantity Demanded Consumed Quantity Remaining Quantity

1 9986 54 9932
NED-1 Nos.
2 2206 24 2182
NED-3 Nos.
3 3674 24 3650
NED-5 Nos.
4 9904 54 9850
NED-7 Nos.
5 9238 43 9195
NED-9 Nos.
6 12839 43 12796
NED-11 Nos.
7 13545 64 13481
NED-13 Nos.
8 0 0 0
NED-15 Nos.
Emulsion-(Power
9 33392 400 32992.0
Gel)32mm Kg.
10 ED 1340 3 1337
Nos.
11

12

Add: No.15 Sanlihe Road, Haidian District, Beijing, china Post code: 100029 Tel: +86-10-8649 6111/6222 Fax: +86-10-8649 6100 Email: [email protected] Website: www.cscec.com
Siddababa Tunnel Project
Daily Progress Report
Date: Monday, June 10, 2024 Day: Sunny/Cloudy/ Rainy
Rainfall: Max. Temp: 38°C Min Temp. : 25°C Humidity: 45%
Working Time from 07:00 AM to 06:00 PM (Day Shift) , 07:00 to 6:00AM(Night Shift)

5. Material available (Permanent works)

Balancce Quantity Up Quantity Production/ Remain-ing


S.N. Material Unit QA/QC Ref. available Consumption Qty this Day QA/QC Supply Ref Remarks
to previous day Supply this day Qty

CSCEC-STP-CA-
1. Aggregates(8 mm) MT -7,453.78 -62.25 -7,516.03
20231004-1

CSCEC-STP-CA-
2. Aggregates(16mm) MT 30.05 30.05
20231004-2

CSCEC-STP-CA-
3. Aggregates(22.4mm) MT 108.57 108.57
20231005-1

CSCEC-STP-FA-
4. Sand MT -735.69 -87.38 -823.07
20231009-1

CSCEC-STP-C-20231008-
5. Cement MT -162.02 -37.760 -199.78
1

CSCEC-STP-R-20231014-
6. Rebar 6mm(500 D) Kg -4,220.26 -330.00 -4,550.26
1

CSCEC-STP-R-20231014-
7. Rebar 8mm Fe500D Kg 6,418.00 6,418.00
2

CSCEC-STP-R-20231013-
8. Rebar 12mm Fe500D Kg -2,743.58 -25 -2,768.27
1

CSCEC-STP-R-20231013-
9. Rebar 20mm Fe500D Kg 5,051.19 5,051.19
3

CSCEC-STP-R-20231013-
10. Rebar 25mm Fe500D Kg -29,034.17 -124.00 -29,158.17
4

11. Plate 3.60mm-4.00 4X16 Kg 40,922.10 40,922.10

12. BL Pipe 6.00'' (H) m -84.00 -84.00

13. BL Pipe 8.00'' (H) m 21.20 21.20

CSCEC-STP-SA-
2. I-Beam (100 by 180) Kg 42,594.67 -319.68 42,274.99
20231014-1

Chemicals-PCA-1
15. Kg -5,571.83 4572/079/080 -5,571.83
Admixture

233 Pcs of DCP Gewi bar CSCEC-STP-ANC-


16. pcs 29.00 29.00
with complete accessories 20231216-1

17. Plate 12mm x4x8 kg 5,800.00 5,800.00

6. Material available (Temporary works)

Balancce Quantity Quantity Production/ Remain-ing Remark


S.N. Material Unit QA/QC Ref. available Consumption Qty This Day QA/QC Supply Ref
Up to previous day Supply this Day Qty s

1.
Cement MT 0.00 0.00

2. Sand MT 4.83 4.83

3. Aggregates(8 mm) MT 48.98 48.98

4. Aggregates(16mm) MT 0.00 0.00

5. Aggregates(22.4mm) MT 49.35 49.35

6. Rebar 6mm(500 D) kg

7. Rebar 20mm(500 D) kg

Add: No.15 Sanlihe Road, Haidian District, Beijing, china Post code: 100029 Tel: +86-10-8649 6111/6222 Fax: +86-10-8649 6100 Email: [email protected] Website: www.cscec.com
Siddababa Tunnel Project
Daily Progress Report
Date: Monday, June 10, 2024 Day: Sunny/Cloudy/ Rainy
Rainfall: Max. Temp: 38°C Min Temp. : 25°C Humidity: 45%
Working Time from 07:00 AM to 06:00 PM (Day Shift) , 07:00 to 6:00AM(Night Shift)

7. Work Progress for General Works

S.N.
Description of
Ref. Map or Layout Codes in Lay Out Work Description Unit L B H Quantity Remarks
Item

Main Tunnel(south)

Blasting work kg 250.00


K0+1+032
Mucking work m3 260.00

i. DD-MT-19-A1 Sheet 1 of 2 K1+004.5-009.5 Shotcrete C25/30 m3 34.00 South main tunnel

Installation of MS-III-A support cycle 6.00


K0+934.5-939.3
Shotcrete C25/30 m3 13.00

ii DD-SP-03-A2 South Slope protection work

Bypass
Blasting work kg 75
iii. DD-BP-04-A3 Sheet 1 of 1 L1K0+035.8 By-Pass 1
Mucking work m3 45

Installation of BS-III support cycle 4

Installation of 25mm dia. @ 2m length


iv. DD-BP-05-A2 Sheet 1 of 1 L2K0+016-021 nos 16 By-Pass 2
rockbolt

Shotcrete C25/30 m3 18

Blasting work kg 75
v. DD-BP-06-A2 Sheet 1 of 1 L3K0+0027 By-Pass 3
Mucking work m3 30

MR-1

Spraying C25/30 dry shotcrete at H9.5-7.5 m3 18


Sheet no.
vii. DD-RA-10-A1 K0+820-800
8,9,10,11,12,13 of 51

Main Tunnel North

Blasting work kg 250.00

viii. DD-MT-19-A1 Sheet 1 of 2 K1+935.4 Mucking work m3 280.00 North main tunnel

9. RFI Note:

10. Social Issues If any:

11. Photos

Photo No. 1: Shotcrete work Photo No. 2:South main tunnel spraying shotcrete

Photo No. 3:By-Pass 1 tunnel face Photo No. 4:Benching support work at South main tunnel

Add: No.15 Sanlihe Road, Haidian District, Beijing, china Post code: 100029 Tel: +86-10-8649 6111/6222 Fax: +86-10-8649 6100 Email: [email protected] Website: www.cscec.com