0% found this document useful (0 votes)
35 views1 page

Blank CTR

Blank Cost, Time, Resource sheet allows you to work out your project bids with ease.

Uploaded by

3rabltd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views1 page

Blank CTR

Blank Cost, Time, Resource sheet allows you to work out your project bids with ease.

Uploaded by

3rabltd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Project -

CTR No: Revision No: 0 Pjt. Code:

Project Title:

Project Description:

Revision Description:
Rev0 Issued for approval

Engineering Support
Item: Description: Unit: Qty: Rate Total
1 Pre-Job Engineering inc Pre Project Brief Day £ - £ -
2 Report Writing / Submission Day £ - £ -
3 On-going Support Day £ - £ -
4 Travel Day £ - £ -
5 Sundries Day £ - £ -

Sub Total £ -

Labour
Item: Discipline / Vendor Unit: Qty: Duration: Rate Total
1 Day £ - £ -
2 Day £ - £ -
3 Day £ - £ -
4 Day £ - £ -

Sub Total £ -

Equipment (Non P&E Fee items)


Item: Description Unit: Qty: Duration: Rate: Total:
1 £ - £ -
2 £ - £ -
3 £ - £ -
Sub Total £ -
Materials
Item: Description: Qty: Duration: Rate: Total
1 £ - £ -
2 £ - £ -
3 £ - £ -
Sub Total £ -

Summary
Item: Description Total
1 Support £ -
2 Labour £ -
3 Equipment £ -
4 Materials £ -
CTR Total £ -
Completed By: Approved By (1): Approved By (2):
Name: Name: Name:

Sign: Sign: Sign:

Date: Date: Date:


Client (1) - Approved By: Client (2) Approved By:

.xlxs spreadsheet available Name: Name:


from: [email protected] Sign: Sign:

Date: Date:

You might also like