Analysis & Rates
Task Work or Out Tirn
S.noParticulars of items Quantity Per Day Brick Work in cement or lime mortar in foundation 1 1 .25cum (45cuft) per mason and plinth Brick Work in cement or lime mortar in 2 1cum (35cuft) per mason superstructure 3 Brick work in mud mortar in foundation & plinth 1.5cum (55cuft) per mason 4 Brick work in mud mortar in superstructure 1.25cum (45cuft) per mason 5 Brick in cement or lime mortar in arches 0.55cum (20cuft) per mason 6 Brick in cement or lime mortar in jack arches 0.55cum (20cuft) per mason 7 Half brick wall in partition 5sqm (50sqft ) per mason Coursed rubble stone masonry in lime cement 8 0.8cum (30cuft) per mason mortar including dressing Random rubble stone masonry in lime or Cement 9 1cum (35cuft) per mason mortar 10 Ash lars masonry in lime or cement mortar 0.4cum (15cuft) per mason 11 Stone arch work 0.4cum (15cuft) per mason 12 Lime concrete in foundation or floor 8.5cum (300cuft) per mason 13 Lime concrete in roof terracing 6cum (200cuft) per mason 14 Lime concrete 1:2:4 5cum (175cuft) per mason 15 RB work 1cum (35cuft) per mason 16 RCC work 3cum (125cuft) per mason 17 12mm (1/2) plastering with cement or lime mortar 8sqm (80sqft) per mason 18 Pointing with cement or lime mortar 10sqm (100sqft) per mason 19 White washing or colour washing coats 70sqm (700sqft ) per white washer 20 White washing or colour washing coats 200sqm (2000sqft) per white washer 21 Painting or varnishing doors or windows one coat 2.5sqm (250sqft ) per painter 22 Coal tarring or soli gum painting one coat 35sqm (350sqft) per painter 23 Painting large surface one coat 35sqm (350sqft) per painter 24 Distemper in g one coat 35sqm (350sqft ) per painter 25 2.5 cm ( 1 ’) CC floor 75sqm (75sqft ) per painter Flag store floor laying with lime or cement mortar 26 10sqm (100sqft) per painter excluding LC Brick on edge in floor lime or cement mortar 27 7sqm 70sqft per painter excluding LC 28 Brick bat floor as in above 8sqm 80sqft per painter 29 Timber framing sal or teak wood 0.07cum 2.5cuft per Carpenter 30 Timber framing sal or country wood 0.15cum 5cuft per Carpenter 31 Door & Windows Shutters Paneled or glazed 0.15sqm 7sqft per Carpenter 32 Door and window shutters paneled or battened 0.8sqm 0.8sqft per Carpenter 33 Sawing hard wood 4sqm 40sqft per pair of sawers 34 Sawing soft wood 6sqm 60sqft per pair of sawers 35 Single allahabad tiling or mangalore tiling 6sqm 60sqft per tile layer 36 Double allahabad tiling 4sqm 40sqft per tile layer 37 Breaking of brick ballest 40mm (11/2”) 0.75cum 35cuft per Labour or braker 38 Breaking of brick ballest 2.5mm (1”) 0.55cum 20cuft per Labour or braker 39 Breaking of stone ball est 40mm (11/ 2” ) 0.4cum 10cuft per Labour or braker 40 Breaking of stone ballest 25mm (1”) 0.25cum 10cuft per Labour or braker 41 Ash lar stone dressing 0.7cum 25sqft per stone cutter 42 Flag stone dressing 1.5sqm 25sqft per stone cutter 43 Earthwork in excavation in hard soil 3cum 100cuft per beldars 44 Earthwork in excavation in hard soil 2cum 75cuft per beldars 45 Excavation in soil 1cum 25cuft per beldars Number of bricks laid by a mason brick work up to a 600brick per 46 height of 3m(10”) mason 47 Amount of work done by a mazdoor helper per day Mix 3cum 100cuft mortar per mandazoor Delivery Brick 4000nos Delivery Mortar 5.5cum 200cuft per Mazdoor Scaffolding cost for single storey building 48 0.5cum per 100cuft mortar per mandazoor item labor efficiency work to be item description no time executed gang hr 1 Excavation & Earth Work 1.1 site clearing to 20cm depth 1 DL 8hrs 10 m2 1.2 Trench excavation in ordinary soil to a depth of 1.2 m 1 DL 8hrs 1.25 m3 to a depth of 2.2m 1 DL 8hrs 1.00 m3 to a depth of 3m 1 DL 8hrs 0.75 m3 bulk excavation in ordinary soil to a depth 1.3 1 DL 8hrs 1.50 m3 of 1.5m 1.4 cart away to a distance of 500m 1 DL 8hrs 1.50 m3 to a distance of 1000m 1 DL 8hrs 1.00 m3 hard coding 25cm thick 1 M 4 DL 8hrs 18 m2 1.5 backfill around foundation loose soil 1 DL 8hrs 2.00 m3 aggregate 1 DL 8hrs 1.50 m3 2 Concrete Work 2.1 lean concrete 5cm thick 1M 6DL 8hrs 20 m2 8cm thick 1M 6DL 8hrs 15 m2 2.2 Floor Slab 8cm thick 1M 6DL 8hrs 15 m2 10cm thick 1M 6DL 8hrs 12.5 m2 15cm thick 1M 6DL 8hrs 10 m2 ground beam 1M 6DL 8hrs 1.50 m3 footing 1M 6DL 8hrs 1.50 m3 foundation column 1M 6DL 8hrs 1.25 m3 upper tie beam 1M 6DL 8hrs 1.50 m3 lentils 1M 6DL 8hrs 1.00 m3 column up to 2m 1M 6DL 8hrs 1.00 m3 column above 2m 1M 6DL 8hrs 1.25 m3 3 Masonry Work 3.1 sub structure 40cm thick 2M 6DL 8hrs 5 m2 50cm thick 2M 6DL 8hrs 6 m2 60cm thick 2M 6DL 8hrs 7 m2 3.2 super structure 40cm thick 2M 6DL 8hrs 3 m2 50cm thick 2M 6DL 8hrs 4 m2 60cm thick 2M 6DL 8hrs 5 m2 3.3 Brick masonry wall for plastering 25cm thick up to 2m 1M 3DL 8hrs 7 m2 12cm thick up to 2m 1M 3DL 8hrs 9 m2 25cm thick up to 2-4m 1M 3DL 8hrs 5 m2 12cm thick up to 2-4m 1M 3DL 8hrs 7 m2 Hollow Block Masonry Wall for 3.4 plastering 20cm up to 2m 1M 2DL 8hrs 10 m2 15cm up to 2m 1M 2DL 8hrs 10 m2 10cm up to 2m 1M 2DL 8hrs 8 m2 20cm thick up to 2-4m 1M 2DL 8hrs 8 m2 15cm thick up to 2-4m 1M 2DL 8hrs 8 m2 10cm thick up to 2-4m 1M 2DL 8hrs 6 m2 4 Roofing Work 4.1 Leaf covering (G.C.I) 1C 2DL 8hrs 40m2 4.2 Ridge cover 1C 2DL 8hrs 70ml 4.3 Valley cover 1C 2DL 8hrs 70ml 4.4 Gutter fixing 1C 2DL 8hrs 30ml Joining eucalyptus truss up to 10m span on 4.5 the ground 1C 2DL 8hrs 4tress 4.6 Down pipe fixing 1C 2DL 8hrs 40ml 4.7 Truss erecting 1C 2DL 8hrs 15tress 4.8 Fixing corrugated asbestos 1C 2DL 8hrs 25m2 4.9 Fixing EGA sheet joining 1C 2DL 8hrs 30m2 Joining Zigba Truss up to 10m span on 4.10 ground 1C 2DL 8hrs 3tress 4.11 Zigba truss erecting 1C 8DL 8hrs 15tress 4.12 Facial board fixing 1C 2DL 8hrs 70ml 5 Joinery - Work 5.1 Leaf covering (G.C.I) 1C 2DL 8hrs 3pcs 5.2 Ridge cover 1C 2DL 8hrs 4pcs 5.3 Valley cover 1C 2DL 8hrs 10m2 5.4 Gutter fixing 1C 2DL 8hrs 10m2 Joining eucalyptus truss 5.5 up to 10m span on ground 1C 2DL 8hrs 13m2 6 Metal Work metal door fixing 1C 2DL 8hrs 3pcs metal window fixing 1C 2DL 8hrs 4pcs french window fixing 1C 2DL 8hrs 2pcs 7 Plastering and Pointing 7.1 1st coat plastering 1PL 2DL 8hrs 35 m2 7.2 2nd coat plastering 1PL 2DL 8hrs 10 m2 7.3 3rd coat plastering 1PL 2DL 8hrs 14 m2 7.4 pointing on brick wall 1PL 2DL 8hrs 8 m2 7.5 pointing on hollow concrete block 1PL 2DL 8hrs 14 m2 7.6 pointing on dressed stone 1PL 2DL 8hrs 12 m2 7.7 rendering 1PL 2DL 8hrs 20 m2 8 Flooring 8.1 cement screed 1M 2DL 8hrs 14 m2 8.2 ceramic tile fixing 1M 2DL 8hrs 10 m2 8.3 plastic tile fixing 1M 2DL 8hrs 17 m2 8.4 per quiet flooring 1M 2DL 8hrs 15 m2 8.5 wooden flooring 1M 2DL 8hrs 8 m2 8.6 ceramic wall tile 1M 2DL 8hrs 7 m2 8.7 plastic wall tile 1M 2DL 8hrs 40 ml 8.8 cement tile skirting 1M 2DL 8hrs 12 ml 8.9 marble slate flooring 1M 2DL 8hrs 12 ml 8.10 marble slate skirting 1M 2DL 8hrs 16 ml 8.11 fixing pre cat windows will 1M 2DL 8hrs 10 ml 9 Glazing cutting 1P 2DL 8hrs 50m2 fixing 1P 2DL 8hrs 20m2 10 Painting a)Plastic Paint 10.1 Painting plastered wall 3 coats 1P 1DL 8hrs 30m2 10.2 Painting Rendered wall surface 1P 1DL 8hrs 25m2 10.3 Painting Abujedid wall 1P 1DL 8hrs 20m2 10.4 Painting Hard board obi 1P 1DL 8hrs 20m2 10.5 Painting Cheap board ceiling 1P 1DL 8hrs 20m2 b) Synthetic paint 10.6 Plastered wall surface in 3 coats 1P 1DL 8hrs 25m2 10.7 Wooden surface 1P 1DL 8hrs 25m2 10.8 Metal surface 1P 1DL 8hrs 25m2 11 Sanitary work 11.1 G.1. pipe laying in Ground ½ - 11/4 1P 2DL 8hrs 120m2 11.2 Fixing – Bath tube Shower complete, wash 1P 1DL 8hrs 1pcs 12 Electrical Installation 12.1 Fixing conduits 1E 1DL 8hrs 40ml 12.2 pulling wires 1E 1DL 8hrs 50ml 12.3 Fixing switch &out-lets 1E 1DL 8hrs 20pcs 12.4 Fixing fittings 1E 1DL 8hrs 10pcs 12.5 Fitting distribution board 1E 1DL 8hrs 10pcs 13 Site Work 13.1 Drain laying 0.10 - 0.30m 1M 3DL 8hrs 30ml 0.40 - 0.60 m 1M 3DL 8hrs 20ml 0.80 - 1.00 m 1M 3DL 8hrs 10ml 13.2 Curb Stone 1M 3DL 8hrs 30ml 13.3 0.60 x 0.60 x 0.60m manhole out of brick 1M 3DL 8hrs 3pcs 0.60 x 0.60 x 0.60m manhole out of hollow 8hrs 13.4 1M 3DL 2pcs block 13.5 Fencing with Galv.fencing net 1C 2DL 8hrs 50m2 MATERIALS FOR DIFFERENT ITEMS OF WORKS The requirement of materials for different items of works is as given below:- Sl # Particulars Quantity Bricks (9”x4½“x3” or 20cmx10cmx10cm 1 5000nos per %cum (500nos per cum) nominal size) for brick work 2 Dry mortar for brick work 30% 30cum for 100cum 3 Stone for rubble stone masonry 125% 125cum for 100cum 4 Dry mortar for rubble stone masonry 42% 42cum for 100cum 5 Bricks for brick ballast for lime concrete 3700cum for 100cum 6 Brick bats or brick ballast for lime concrete 150cum for 100cum 7 Brick ballast for lime concrete 100cum for 100cum Dry mortar for lime concrete in foundation and 8. 35cum for 100cum floor 35% Dry mortar for lime concrete in roof terracing 9. 45cum for 100cum 45% 10 . Materials for cement concrete 1:2:4 Ballast or grit 88% 88cum for 100cum Sand 44% 44cum for 100cum Cement 22% 22cum (60bags) for 100cum 11. Materials for 2.5cm(1”) cc 1 : 2 : 4 floor Stone grit 2.4cum for 100cum Sand 1.2cum for 100cum Cement 0.08cum (24bags) for 100cum 12 . Bricks for RB work 42000nos/%cum (420mps (erci) 13 . Dry mortar for R B work 45% 45cum for 100cum 14 Dry mortar for 12mm (1/2) plastering 2cum for 100cum 15. Dry mortar for pointing in brick work 0.6cum for 100cum 16 . Lime for white washing one coat 10kg for 100sqm 17 . Dry distemper for is t coat 6.5kg for 100sqm 18 . Dry distemper for 2nd coat 5kg for 100sqm 19 . Snow Cem for 1st coat 30kg for 100sqm 20 . Snow - Cem for 2nd coat 20kg for 100sqm 21. Paint ready mixed for painting one coat 10ltr for 100sqm 22 . Paint (stiff) for painting one coat 10kg for 100sqm Bricks (20x10x10cm) for brick floor or half 23 . 500nos for 100sqm brick wall 24 . Dry mortar for brick floor or half brick wall 3.2cum for 100sqm 25. Bricks (9”x4½“x3”) for brick flat work 3500nos for 100sqm 26 . Dry mortar for brick flat floor 2.25cum for 100cum Bricks (9”x4½“x3”) required for honey comb 27 . 3250nos for 100sqm wall 28 . Dry mortar for honey comb wall 2.5cum for 100sqm Materials for 2cm (3/4”) thick damp proof 29 . course of 1:2 cement mortar Cement 0.9cum (27bags) for 100cum Sand 1.8cum for 100sqm Compound or impermo @ 1kg per bag of 2 7kg for 100sqm cement Materials for 2.5cm (1”) cc 1:1½:3 damp proof 30 . course Stone grit 2.25cum for 100cum Sand coarse 1.13cum for 100cum Cement 0.75cum for (221/2bags) for 100cum Compound or impermo@ 1kg per bag of 22½ kg for 100sqm cement Bitumen or asphalt for painting on DPC or on 31. 150kg for 100sqm roof – 1st coat 2nd coat 100kg for 100sqm 32 . GGI sheet for roof 128sqm for 100sqm 33 . AG corrugated sheet for roof 115sqm for 100sqm Timber for paneled door shutter 4cm (1½”) 34 . 4.5cum for 100cum thick Timber for battend door shutter 4cm (1½”) 35. 4cum for 100cum thick Timber for paneled & glazed shutter 4cm (1½”) 36 . 3cum for 100cum thick Timber for fully glazed shutter 4cm (1½”) thick 2cum for 100cum