0% found this document useful (0 votes)
14 views2 pages

SPM Endsem

End semester question paper of software project management

Uploaded by

DHIRAJ kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views2 pages

SPM Endsem

End semester question paper of software project management

Uploaded by

DHIRAJ kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

wI211004 (orrt)

Motilal Nehru National Institute of Technology Allalhabad


Prayagraj - 211004 (India)
Department of CSE
End Semester Exanination, Session 202.3-24 (ODD)
Programme: MCA Branch: Semester: 5h
Course Name: Sofvare Projcct Management
Course Code: CS3S04 Max. Marks: 50
Time: 150 Min Registration No.:

Instructions
1. Attempt allquestions.

Q1 lethe context of cost estimation models answer the following questions:


A software project of application generator category with estimated size of 100 KLOC has
to be developed. The scale factor (B) has high percedentness, high development flexibility.
Other factors are nominal. The cost drivers are high reliability, medium database size, high
Personnel capability, high analyst capability. The other cost drivers are nominal. Calculate
the effort in Person-Months for the development of the project.
b Compute the function point value for aproject with the following information domain 6
characteristics.
Number of user inputs = 30 1
Number of user outputs = 42
Number of user enquiries = 08
Number of files 07
Number of external interfaces =6
Assume that all complexity adjustment values are moderate
8
Aproject with estimated 400KLOC embedded system has to be developed. Project
manager has achoice of hiring from two pools of developers: Very highly capable with
very little experience in the programming language being used or Developers of low quality
but alot of experience with the programming language. What is the impact of hiring all
developers from one or the other p0ol?
Q2 What is a baseline in the context of software configuration management? After a revision of 4
any configuration items, explain how a baseline can be updated to form a new baseline?
b ldentify the factors that make managing software projects much more challenging,
compared to many other types of projects such as a project to lay out a 10Okm concrete
road on an existing non-concrete road.
What is Agile software Development? Discuss the reasons for which it can be difficult to 4

introduce agile methods into large companies. 4


Why is it difficult to estimate system development costs accurately during the early
stages ofa project? Discuss the two types of techniques used for making estimates?
4
Q3 a Briefly explain the COCOMO 2 model, In what aspects is it an improvement over the
original COCOMO model? 4
What do you understand bysliding window planning? Explain using afew examples the
types of projects for which this form of planning is especially suitable. Is sliding window
planning appropriate for small projects? What are its advantages over conventional
planning? 4
Explain how Putnam's model can be usedto compute the change in project cost with
project duration. What are the main disadvantaoes of using the Putnam's model to compute
the additional costs incurred due to schedule compression? How can you overcome them?
Multiplier values for effort calcuations
RATINGS
Cost Drivers Extra
Very Low Low Nominal High Very
High High
Product Attributes
RELY 0.75 0.88 1.15 1.4

DATA 0.94 1 1.08 1.16

CPLX 0.7 0.85 1.15 1.3 1.65

Computer Attributes
TIME 1.11 1.3 1.66

STOR 1.06 1.21 1.56

VIRT 0.87 1 1.15 1.3

TURN 0.87 1 1.07 1.15

Personnel Attributes

ACAP 1.46 1.19 1 0.86 0.71

AEXP 1.29 1.13 0.91 0.82

PCAP 1.42 1.17 0.86 0.7

VEXP 1.21 1.1 0.9

LEXP 1.14 1.07 0.95

Project Attributes
MODP 1.24 1.1 1 0.91 0.82

TOOL 1.24 1.1 0.91 0.83

SCED 1.23 1.08 1.04 1.1