Civil Work need to know scope Before P.O, clarify the scope
of work in the budgeted amount otherwise amount will
1.12 vary 1 Lot 65,000.00 65,000.00
Parking area cantilever type with cloth ( only for steel
1.13 structure and top cover cloth/Net) 48 nos 7,500.00 360,000.00
1.14 Paint and PVC wood- need to know abount Scope of work 1 lot 80,000.00 80,000.00
1,293,850.00