Abstract - Any construction project to begin which starts The aim of the project is to plan with elevation and
with the layout of the building or structure followed by the section which includes all the details of proposed building as
design and analysis of the structure which is succeeded by the well as its full estimation. The design will be done as per the
cost of estimation and planning for the project. This project limit state method as per recommended IS 456-2000. This
involves the planning, design, analysis, scheduling, 3D gives as a complete study to build a residential building and
modeling and also the cost estimation and as well as the complete design like design of footing, columns, beams, slabs
labour and material management of (G+1) Residential etc. After designing those components we will estimate the
building located at malini nagar kanbargi road belagavi. approximate cost of proposed building.
© 2020, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2680
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 08 | Aug 2020 www.irjet.net p-ISSN: 2395-0072
2. PLANNING
© 2020, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2681
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 08 | Aug 2020 www.irjet.net p-ISSN: 2395-0072
© 2020, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2682
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 08 | Aug 2020 www.irjet.net p-ISSN: 2395-0072
3.1 ANALYSIS AND DESIGN RESULTS The below figure 7 shows the plan results after analyzing it
by applying certain load cases and combinations. The pink
The below fig 5 and fig 6 tells about the maximum bending color indicates the safe results of the column.
moment in 3-3 direction and shear force applied in 2-2
direction after analyzing the model. The figure 8 showing the 3D view of the plan along with the
percentage longitudinal reinforcement required.
© 2020, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2683
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 08 | Aug 2020 www.irjet.net p-ISSN: 2395-0072
© 2020, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2684
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 08 | Aug 2020 www.irjet.net p-ISSN: 2395-0072
4. SCHEDULING
5. ESTIMATION
© 2020, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2685
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 07 Issue: 08 | Aug 2020 www.irjet.net p-ISSN: 2395-0072
BIOGRAPHIES
© 2020, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2686