Sr. No DESCRIPTION
1. INTRODUCTION
2. LOCATION
3. SCOPE OF WORK
6. RESULTS
1.2 The proposed Test Pile is 1200 mm Dia. and depth 21.00 Mtr.
has already been constructed and Test was proposed to be
conducted up to Design load 304.70 x 1.5 = 457.05 MT load in
compression Vertical.
2.0 LOCATION:
The Pile Load Test Is Proposed At CH: 394+560, FLYOVER
THALIKULAM - KODUNGALLUR, Kerala.
V. Ground Level : NA
= 457.05 X 1000
1508.78
6.1 Discussion.
III. Graph of Load v/s Settlement, Log Sheet, Tables are enclosed.
SHEET NO 01
LOAD
TIME DIAL GAUGE READING IN MM SETTELEMENT
APPLIED
Kg Cm2 LOAD 1 2 3 4 IN MM
Date :- 27-05-2024 Average
15.00 0.0 0.0 0.01 0.01 0.01 0.01 0.01
550.0
500.0
450.0
400.0
350.0
LOAD IN MT
300.0
250.0
200.0
150.0
100.0
50.0
0.0
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0
SETTLEMENT IN MM
SETT LOAD
0.00 0.00
2.99 75.44
3.27 150.88
3.62 226.32
4.25 301.76
5.15 377.20
5.16 452.64
5.59 467.72
5.59 452.64
5.59 377.20
5.57 301.76
5.51 226.32
5.38 150.88
5.09 75.44
4.62 0.00
Name: Name:
Signature: Signature:
Designation: Designation:
END OF DOCUMENT.
THANKING YOU.
TEST CONDUCTED
MR. MARMIK SONI.
(B.TECH CIVIL)