Pilot System Pressure - Test and Adjust (RENR7981-07)
Pilot System Pressure - Test and Adjust (RENR7981-07)
Pilot System Pressure - Test and Adjust (RENR7981-07)
PSP
202 -000A
Always replace the floorplate when performing tests.
3
RE 0:47+ 5
Do not hold pressure gauges in your hand or lap when checking
pressure readings.
N
© 2 R79 08:00
Introduction 024 81
Cat
Oil for the pilot system comes from the fan pump and from the resolver network.
Illustration 1 g01106077
Tooling (A)
https://sis2.cat.com/#/print-preview/service/17e3c7bd-9e9e-4076-a5a3-83ce7bdee477 1/5
3/25/24, 1:30 PM SIS 2.0
Illustration 2 g02087998
(B) 198-4240 Digital Pressure Indicator Gp
Table 1
Tool Item Part Number Description Qty
Pressure Gauge
A1 8T-0855 1
(0 to 4,000 kPa (0 to 580 psi))
Pressure Gauge
A2 8T-0856 1
(0 to 6,000 kPa (0 to 870 psi))
A3 6V-3989 Fitting 1
A4 6V-4143 Quick Connect Coupler 2
A5 177-7860 Hose As (10 ft) 1
B 198-4240 Digital Pressure Indicator Gp 1
B1 198-4234 Digital Pressure Indicator Gp 1
Pressure Sensor
B2 198-4237 1
0 to 3447 kPa (0 to 500 psi)
B3 198-4236 Adapter Cable As 1
Machine Preparation
1. Move the machine to a smooth horizontal location.
6. Turn the key to the ON position, but do not start the engine.
8. Move the control levers through the full range of travel several times. This will relieve any
pressure that may be present in the implement hydraulic system.
9. Make sure that the pressure in the entire hydraulic system has been released.
Illustration 3 g02100816
Electrohydraulic Valve
(HPS) Pressure tap
(1) Adjustment screw (pilot system)
(2) Adjustment screw (pressure reducing valve)
12. Install the floorplate. Make sure that the floorplate does not interfere with the hoses for the test
gauge.
https://sis2.cat.com/#/print-preview/service/17e3c7bd-9e9e-4076-a5a3-83ce7bdee477 3/5
3/25/24, 1:30 PM SIS 2.0
4. The pressure should read 3930 ± 170 kPa (570 ± 25 psi) at pressure tap (HPS).
6. Stop the engine and monitor the pressure at pressure tap (HPS). Turn the key to the ON
position in order to activate the electronic controls.
7. Move the bulldozer control lever from NEUTRAL position to RAISE position and hold for three
seconds. This will drain the pilot pressure in the accumulator.
9. The pressure at pressure tap (HPS) should be 2070 ± 150 kPa (300 ± 20 psi).
https://sis2.cat.com/#/print-preview/service/17e3c7bd-9e9e-4076-a5a3-83ce7bdee477 4/5
3/25/24, 1:30 PM SIS 2.0
Worksheet
Table 2
PSP-000A4FC7
2024/03/25
05:30:16+08:00
i01778599
© 2024 Caterpillar Inc.
https://sis2.cat.com/#/print-preview/service/17e3c7bd-9e9e-4076-a5a3-83ce7bdee477 5/5