22 For Website PPRAF2015 Final
22 For Website PPRAF2015 Final
22 For Website PPRAF2015 Final
Project Title:
Project Summary:
Database Number:
Implementing Entity (IE)
[name]:
Type of IE:
Country(ies):
Relevant Geographic Points
(i.e. cities, villages, bodies of
water):
Project Milestones
Milestone
AFB Approval Date:
AFB Approval Date:
IE-AFB Agreement
Signature Date:
Start of Project/Programme:
Mid-term Review Date (if
planned):
Terminal Evaluation Date:
Project contacts:
National Project
Manager/Coordinator
Name:
Email:
Date:
Government DA
Name:
Email:
Date:
Implementing Entity
Name:
Email:
Date:
Executing Agency
Name:
Email:
Date:
Executing Agency
Name:
Email:
Date:
Executing Agency
Name:
Email:
Date:
Project Performance Report (PPR)
Implementation of Concrete Adaptation Measures to Reduce Vulnerability of Livelihoods and Economy of Coastal Communities of Tanzania
Tanzania is impacted by climate change mainly through its effects on rainfall patterns, temperature extremes and sea level rise. The direct impacts of these changes are
droughts, the destruction of infrastructures in the coast and inland through flooding, inundation, erosion and storms; if no action is taken, the socio-economic impacts w
water availability and quality, and losses of lives and livelihoods, as well as the accelerated degradation of ecosystems that form the basis of the Tanzanian economy. T
project proposal to adapt to the climate change in the coast of Dar es salaam. In December 2011 the Adaptation Fund Board considered the proposal and approved a five
Implementation of the project started in 1 November 2012.
The project consists of the following outcomes, supported by on the ground activities implemented primarily in the vicinity of Dar Es Salaam:
1. Adverse impacts of SLR and floods on coastal infrastructures and settlements are reduced.
2. Coastal ecosystems are rehabilitated and Integrated Coastal Area Management is implemented.
3. Knowledge of climate impacts and adaptation is increased.
The project is being implemented by the United Nations Environment Programme (UNEP) and executed by the Vice Presidents Office (Division of Environment) in clo
Dar es Salaam City Council and Municipalities of Ilala, Temeke and Kinondoni.
AFB-5060-1111-2G48
UNEP
MIE
United Republic of Tanzania
Dar es Salaam City (Ocean Road; Kigamboni-Mwalimu Nyerere Memorial Institute; Kinondoni Municipality:Tandale street in Tandale ward and Kawe street in Kawe
Buguruni ward; Temeke Municipality: Miburani-Mtoni Bustani streets in Mtoni ward and Butiama street (Butiama drainage) in Kijichi ward;Sarender Bridge, Kunduch
14-Dec-11
14-Dec-11
1-Nov-12
http://www.unep.org/climatechange/adaptation/AccessToAdaptationFinance/AdaptationFundProjects/Tanzania
Eng. Ladislaus Kyaruzi
[email protected]
31-Oct-2015
DISBURSEMENT OF AF GRANT
FUNDS
How much of the total AF grant as noted in Project Document plus any project preparation grant
has been spent to date?
Estimated cumulative total 1,324,200
disbursement as of 31st October
2015(USD)*
$1,324,200 is the amount disbursed by UNEP to VPO.
Cumulative expenditures until October 31st, 2015 (i.e.
funding spent by VPO) is $1,128,717.34
Add any comments on AF Grant
Funds. (word limit=200)
INVESTMENT INCOME
Amount of annual investment income generated from the Adaptation Fund’s grant
EXPENDITURE DATA
List ouput and corresponding
amount spent for the current ITEM / ACTIVITY / ACTION AMOUNT
reporting period
Output 1.1: Sea wall raised,
rehabilitated and constructed in
621,403.40
areas showing particular damage
PLANNED EXPENDITURE
SCHEDULE
ACTUAL CO-FINANCING (If the MTR or TE have not been undertaken this reporting period,
DO NOT report on actual co-financing.)
How much of the total co-financing Co-financing is not applicable to the project
as committed in the Project
Document has actually been
realized?
IDENTIFIED RISKS
List all Risks identified in project preparation phase and what steps are being taken to mitigate them
Identified Risk Current Status Steps Taken to Mitigate Risk
Operational: The multiple Low The appointed National Project Coordinator, Senior Technical
ongoing initiatives on climate Adviser and assistant administrative and financial manager as a
adaptation in Tanzania could dedicated team for project coordination ensure that the project
cause operational delays for this maintains its objectives. In addition the realisation of the Project
project Steering Committee (PSC) has helped to resolve pending issues
allowing a smooth progress of the planned activities. The
Chairperson of the PSC who is the Permanent Secretary of the
Vice President's Office ensures that no unnecessary delays of
this project. PSC has been able to meet in 3rd March 2014, 22nd
July 2014 and 16 February 2015. Focal points have been
appointed from the project sites that are Ilala, Temeke,
Kinondoni municipalities and Dar es salaam city council.
Political: District-level Low The Project Steering Committee was established among others,
stakeholders and administrations to provide overall guidance with regard to implementation of the
show low engagement for project activities. Its members are: Permanent Secretary– Vice
adaptation measures President’s Office (Chair); Director of Environment-Vice
President’s Office; Director of Environment- First Vice
President’s Office –Zanzibar; Director- Dar es Salaam City
Council; District Executive Director – Pangani District Council;
District Executive Director – Bagamoyo District Council;
District Executive Director – Rufiji District Council; Municipal
Executive Director – Temeke Municipal Council; Municipal
Executive Director – Ilala Municipal Council; Director of Forest
– Ministry of Natural Resources and Tourism; Director of Water
Resources – Ministry of Water; Director- Ministry of Works;
UNEP Task Manager of the Project; and Assistant Director of
Environmental Assessment- Vice President’s Office (Secretary).
The Steering Committee met on 3rd March 2014, 22nd July
2014 and 16th February 2015. Also, Dar es Salaam City
Council, Ilala, Temeke and Kinondoni Municipal Councils each
appointed a focal person for this project. The trainings to the
district representatives of the coastal communities, fishermen
associations, municipal planners, forest officers and
environment of the Municipalities of Ilala, Kinondoni and
Temeke municipalities and Dar es Salaam City Council
enhanced their engagement for adaptation measures on the
coastal amd marine environment. trainings were conducted in
December 2014.
Political: the project could Low The dedicated personnel for project management been
experience difficulties in established through the Vice President‘s Office coordinates and
coordination and oversight for monitors the project outputs and activities. Close collaboration
activities delivered at various among various ministries and stakeholders is provided through
sectors, levels of governments or among others the project steering committee. With the
by multiple partners realisation of the first, second and third Project Steering
Committee meetings and appointement of the Focal Points from
the project areas, a greater cross-intitunional coordination has
been achieved.
Environmental: Extreme weather Medium The preliminary designs of the protective infrastructure
events such as tropical storms, rehabilitation have been designed according to the best available
floods or droughts could hinder technical standards and using the best available technology. The
progress in ecosystem baseline study provided appropriate data and information to be
rehabilitation and infrastructure used. In addition all foreseen ecosystem rehabilitation works
activities will be carried out in startight collaboration with NGOs and
communities who will be supporting the project in case of
extreme weathar event that could equire additional labour input.
Finally, working conditions for all key activities of ecosystem
and infrastructure rehabilitation will be such to take into
consideration and minimize the impacts of any eventual
disruption caused by extreme climate/meteorological event.
Topographical and geotechnical surveys scheduled for February
2016 before the construction starts will provide further guidance
on how to take into account extreme weather events.
Financial: market and price Low The feasibility study has established the possible costs for the
fluctuations could cause price project activities. The estimate costs shows the seawalls' budget
variations and variations in costs is within the budget but the drainage works have highest costs
of certain project activities, compared to the initial budget. Environmental Impact
leading to budgetary constraints. Assessment (EIA) has developed a risk management and
contingency plans. The baseline study was completed in
September 2014 with updated information on the current
situation. The management response to the baseline study was
endoresed by the Project steering committee on 16 February
2015 and responds to most isues on market and price
fractuations. In this case all consultancies including
rehabilitation of coral reefs and mangroves are balanced as per
the budget of the consultancies. Seawalls budget is acceptable.
Estimate costs on drainage works have lead to reducing sites
from five (5) to two (2) sites.
Risk Measures: Were there any risk mitigation measures employed during the current reporting
period? If so, were risks reduced? If not, why were these risks not reduced?
Add any comments relevant to risk mitigation (word
limit = Due
Yes. 500)to the delays in the procurement processes observed during the past period, a formal partnership
with the VPO procurement unit was established by including a specific budget in the revised project budget to
cover any unforeseen costs during the procurement processes. Although this measure has enabled the VPO
Procurement Unit to carry out several procurement processes in simultaneous, unfortunately the risks were
not fully reduced and delays persisted. One of the major causes identified was the inabiility of establishing a
fasttrack mechanism to hasten the procurement process by reducing the time required by Government Law for
public advertisement and contract. Considering that the next major procurements to follow will be related to
the construction/rehabilitation of infrastructures (sea walls and drainage systems), a decision was made to
partnership with the UNOPS through an MoU so to gurantee speedy implementation. An agreement with
UNOPS was signed on 30th January 2015. In this case and antecipating any delays a Project Steering and
Technical committees representing the GoT-VPO was suggested to be introduced and responsible for the
constant monitoring of the works to be developed under the UNOPS MoU.
RATING ON IMPLEMENTATION PROGRESS
For rating definitions please see bottom of page.
Coral reef rehabilitation and protection Restore live coverage, using in situ techniques for
coral breeding and transplantation.
Undertake awareness raising to fisheries and local
government officers in order to further reduce
unsustainable fishing methods and reef uses.
Analyse on lab-agri research.
Shoreline stabilization through Replant native and resilient trees including bushes
reforestation and grasses in sufficient density, along the shore with
a particular focus on the rehabilitated infrastructures
Procure coastal climate adaptation consultant.
Shoreline stabilization labour cost.
Coastal monitoring and assessment Technical assessment of the viability and resilience
of proposed actions.
Monitoring the key determinants of vulnerability i.e.
SLR, water availability and precipitation patterns.
Create Climate Change Observatory
for Tanzania (CCOT). Organize
meetings of CCOT.
Establish project management team Establish the National project management team.
Procure the Senior
Technical Advisor.
Please Provide the Name and Contact information of person(s) reponsible for completeling the Rating section
Name: Eng. Ladislaus Kyaruzi
Email: [email protected]
Please justify your rating. Outline the positive and negative progress made by the project since it started. Provide specific recommendations for next steps. . (word
limit=500)
Engagement of UNOPS to construct and seawalls and drainage systems marked the biggest achievement as a process to implement the biggest component of the project. It is
engagement of UNOPS to lead infrastructure work will improve effectiveness of delivery for infrastructure component. The appointment of the officer within UNOPS respon
project has helped ensuring the assignment is implemented. Already UNOPS has procured ARUP to undertake feasibility study of seawalls and TRES Consult (T) Limited ha
to undertake EIA study. Draft EIA and feasibility study reports are available. This is a good step. Establishment of the procurement partnership between the project and the V
unit has improved the procurement process. As a result, procurement at this moment is not be a big challenge since 87.5% of all the required consultants have signed the contr
working . TORs of all urgent consultancies have been finalized. Although already the project face some delays, the work plan has been revised to ensure the project will be c
planned.
Dedicated key personnel of the management team: The National Project Coordinator is responsible for the overall day to day management of the project; Finance and adminis
provides finance and administration support; Senior Technical Adviser provides overall technical guidance and support; and Focal persons at Dar es salaam City Council, Ilal
Kinondoni municipalities support overall implementation of the project activities in their areas. Joint Project Steering Committee of AF and LDCF projects formed with mem
President's Office, Dar es Salaam City Council and its three municipalities of Ilala, Kinondoni and Temeke, Ministry of Works, Ministry of Natural Resources and Tourism is
the objectives of the project are met. Trainings to officers and community representatives of Ilala, Temeke and Kinondoni municipalities and Dar es salaam city council has b
to make sure the direct people to be involved in project areas have understanding to support the implementation of the project activities.
Project work plan and procurement plan has been integrated in Vice President's Office (VPO) plans. The baseline study consultancy procurement has been finalized and the w
baseline and targets of the project finalized in September 2014. The Revision of Results Framework and Management Response have been done to respond to the comments
study. The framework and management response were endorsed by the Steering Committee in February 2015 and communicated to AFSec. The draft EBICAM Action Plan i
Please Provide the Name and Contact information of person(s) reponsible for completeling the Rating section
Name: Lars Christiansen, UNEP TM
Email: [email protected]
Other
Please Provide the Name and Contact information of person(s) reponsible for completeling the Rating section
Name:
Email:
Rating Definitions
Highly Satisfactory
(HS)
Project actions/activities planned for current reporting period are progressing on
exceeding expectations to acheive all major outcomes/outputs for given reportin
without major shortcomings. The project can be presented as “good practice”.
Satisfactory (S)
Project actions/activities planned for current reporting period are progressing on
achieve most of its major outcomes/outputs with only minor shortcomings.
Marginally
Satisfactory (MS) Project actions/activities planned for current reporting period are progressing on
achieve most major relevant outcomes/outputs, but with either significant shor
modest overall relevance.
Marginally
Unsatisfactory (MU) Project actions/activities planned for current reporting period are not progressin
achieve major outcomes/outputs with major shortcomings or is expected to ac
some of its major outcomes/outputs.
Unsatisfactory (U)
Project actions/activities planned for current reporting period are not progressin
achieve most of its major outcomes/outputs.
Highly Unsatisfactory
(U) Project actions/activities planned for current reporting period are not on track a
it is failing to achieve, and is not expected to achieve, any of its outcomes/outpu
N PROGRESS
m of page.
Overall Rating MS
evement as a process to implement the biggest component of the project. It is expected the
rastructure component. The appointment of the officer within UNOPS responsible for the
P to undertake feasibility study of seawalls and TRES Consult (T) Limited has been procured
Establishment of the procurement partnership between the project and the VPO procurement
big challenge since 87.5% of all the required consultants have signed the contracts and start
ce some delays, the work plan has been revised to ensure the project will be completed as
ble for the overall day to day management of the project; Finance and administration assistant
l guidance and support; and Focal persons at Dar es salaam City Council, Ilala, Temeke and
oint Project Steering Committee of AF and LDCF projects formed with members from Vice
nd Temeke, Ministry of Works, Ministry of Natural Resources and Tourism is active to ensure
, Temeke and Kinondoni municipalities and Dar es salaam city council has been undertaken
mplementation of the project activities.
ans. The baseline study consultancy procurement has been finalized and the work to establish
work and Management Response have been done to respond to the comments of the baseline
ebruary 2015 and communicated to AFSec. The draft EBICAM Action Plan is available.
MS
See above.
U
See above.
See above.
MS
See above.
See above.
MS
See above.
MS
See above. MS
See above. MS
See above. MS
See above. S
See above.
See above. S
Overall Rating MS
completeling the Rating section
sen, UNEP TM
@dtu.dk
s behind schedule, 2015 has seen very encouraging developments that will
notable being: 1. The MoU signed with UNOPS for delivery of infrastructure
y delayed for various reasons, is already showing positive results and should
s outlined by the NPC above. A major concern is that the activity on drainage
t as cost (or more correctly scope of needed interventions in each site) were
This in turn will necessitate a revision of the quantitative target and number
ave been, if not resolved, then made irrelevant by the current completion rate
bove. The MTR currently ongoing will provide further recommendations on
oject delivery and impact ahead of project completion.
ctivities planned for current reporting period are not progressing on track to
utcomes/outputs with major shortcomings or is expected to achieve only
outcomes/outputs.
ctivities planned for current reporting period are not progressing on track to
ts major outcomes/outputs.
ctivities planned for current reporting period are not on track and shows that
hieve, and is not expected to achieve, any of its outcomes/outputs.
PROJECT Indicators
Please provide all indicators being tracked for the project as outlined in the project document
Length of drainage channels A total length of 6650m An agreement with UNOPS to upgrade coastal
contructed, rehabilitated and showing severe protection was signed on 30th January 2015. A draft
upgraded (m) degradation. This is a feasibility study and cost estimates were delivered in
total length of four sites December 2015, and UNOPS, VPO and UNEP are
of Butiama: 1650m, currently in discussion on how to adapt the scope of
Quantitative Kawe: 2650m, Bungoni: works to the available budget (see above). Training
1050m and Mtoni: on economystem based coastal adaptation for
1300m. Commuinity -level and District level training was
conducted from18-22 December 2014.
Km of shoreline rate of coastal Replant native and resilient trees including bushes and
stabilized using erosion estimated grasses in sufficient density, along the shore with a particular
vegetation between 3 and focus on the rehabilitated infrastructures will start in June
2016. Procure coastal climate adaptation consultant will be
8m per year
Quantitative according to
done by April 2016.
recent site
specific surveys
Effective implementation of No baseline data Members of CCOT established and its TORs developed. The
clearing house function project will support the first meeting of CCOT scheduled by
February 2016. TOR's of the coastal rehabilitation specialist
developed. Procurement of the coastal rehabilitation
specialist to advise on the establishment of CCOT was done
Qualitative in July 2015. The consultant has submitted the inception
report that was approved in October 2015 for further action.
Cost-effective measures are No baseline data Coastal rehabilitation specialist procured in July 2015 to
identified for upscaling and policy identify cost effective measures. The consultant submitted
uptake the inception report that was approved in October 2015. The
Qualitative climate change knowledge management speciaist was
procured to work with the coastal rehabilitation specialist.
number of policy briefs provided to No baseline data Inception workshop held from 29-30 November
key sectors and regulators; number 0 workshops 2012.Project brief provided to stakeholders. The
of workshops stakeholders consultative workshop on development of
EBICAM Action Plan of Dar es Salaam Region was held
from 23-24 April 2015.Policy briefs prepared on: on
Quantitative appropriate alternative energy technologies (efficient
cookstoves, small solar and other efficient systems found
appropriate.
Number of reports developed 0 Trainings to district budget and planning officers on district
through the AF project on required financing and budgeting including how to manage
district budget allocations to rehabilitated infrastructures and integrating adaptation
concerns in local planning held from 18-22 December 2014
maintain infrastructure for
to local government officers from Dar es salaam city
adaptation to climate change. council, Ilala, Temeke and Kinondoni municipal councils.
The coastal rehabilitation specialist was procured to review
Quantitative infrastructure maintenance programs of Ilala, Temeke and
Kinondoni where the project activities are being
implemented. The report will be available by December
2016.
Number of plans approved no plans yet available TORs of the task force to develop EBICAM Action Plan of
but ICZM capacity exists Dar es Salaam region developed. The team of the task force
was established and developed the plan. The draft of
EBICAM Action Plan of Dar es Salaam region developed.
The stakeholders validated the draft during the EBICAM
Quantitative workshop in April 2015. The draft EBICAM action Plan will
be expanded to cover all coastal regions of Tanzania (Dar es
Salaam, Lindi, Mtwara, Tanga and Coast).
ect document
ts
1400 linear meters of seawall rehabilitated
along Ocean Road and Kingamboni
At least 1 report.
How have gender considerations been taken into Within the national team, a finance and administration
consideration during the reporting period? What assistant is a woman which is equal to 50%. In the national
have been the lessons learned as a consequence of inception workshop, approximately 32% of the participants
inclusion of such considerations on project were women. 40% participants of the EBICAM validation
performance or impacts? workshop were women. Trainings of the project have brough
so far 37% of the participants and out of five facilitators, one
(20%) was a woman. Efficient cookstove will be provided to
1500 households through a woman of each household.
Goal: Assist developing-country Parties to the Kyoto Protocol that are particularly vulnerable to the adverse effects of climate change in meeting the costs of concrete adaptation projects and programmes in order to implement
climate-resilient measures.
Impact: Increased resiliency at the community, national, and regional levels to climate variability and change.
Important: Please read the following guidance document (also posted on the Adaptation Fund website) before entering your data
Link: http://www.adaptation-fund.org/sites/default/files/Results%20Framework%20and%20Baseline%20Guidance%20final.pdf
Project ID AFB-5060-1111-2G48
Implementing Entity UNEP
Type of implementing entity MIE
Country Tanzania
Region Africa
Sector Coastal management
Direct beneficiaries supported by the Indirect beneficiaries supported by Direct beneficiaries supported by the Indirect beneficiaries supported by the Direct beneficiaries supported by Indirect beneficiaries supported by Direct beneficiaries supported by Indirect beneficiaries supported
Total (direct + indirect beneficiaries) Total (direct + indirect beneficiaries) Total (direct + indirect beneficiaries) Total (direct + indirect beneficiaries)
project the project project project the project the project the project by the project
Impact: Increased resiliency at the Total 1,835,050.00 440,050.00 1,395,000.00 Total 1,835,050.00 440,050.00 1,395,000.00 Total Total
community, national, and
Core Indicator: No. of beneficiaries
regional levels to climate
variability and change
% of female beneficiaries 51.28% 51.28% 51.28% % of female beneficiaries 50.00% 50.00% 50.00% % of female beneficiaries % of female beneficiaries
% of Youth beneficiaries 33.00% 33.00% 33.00% % of Youth beneficiaries 33.00% 33.00% 33.00% % of Youth beneficiaries % of Youth beneficiaries
Hazards information generated and Hazards information generated and Hazards information generated and Hazards information generated
Number of targeted stakeholders Overall effectiveness Number of targeted stakeholders Overall effectiveness Number of targeted stakeholders Overall effectiveness Number of targeted stakeholders Overall effectiveness
disseminated disseminated disseminated and disseminated
% of female targeted 50.00% % of female targeted 50.00% % of female targeted % of female targeted
Coastal flooding 4: Effective Coastal flooding 4: Effective
No. of projects/programmes that conduct No. of projects/programmes that conduct No. of projects/programmes that conduct
No. of projects/programmes that conduct and
Sector Scale Status and update risk and vulnerability Sector Scale Status and update risk and vulnerability Sector Scale Status and update risk and vulnerability Sector Scale Status
update risk and vulnerability assessments
Output 1.1 Risk and vulnerability assessments assessments assessments
Indicator 1.1: No. of projects/programmes that conduct and
assessments conducted and
update risk and vulnerability assessments
updated 5 Multi-sector National 3: Risk and vulnterability assessments completed or updated Coastal management National 3: Risk and vulnterability assessments completed or updated 5 Multi-sector National
3: Risk and vulnterability assessments
completed or updated
No. of adopted Early Warning Systems Category targeted Hazard No. of adopted Early Warning Systems Category targeted Hazard No. of adopted Early Warning Systems Category targeted Hazard No. of adopted Early Warning Systems Category targeted Hazard
No. of adopted Early Warning Systems Category targeted Hazard No. of adopted Early Warning Systems Category targeted Hazard No. of adopted Early Warning Systems Category targeted Hazard No. of adopted Early Warning Systems Category targeted Hazard
Output 1.2 Targeted population Number of municipalities Number of municipalities Number of municipalities Number of municipalities
groups covered by adequate risk Core Indicator 1.2: No. of Early Warning Systems
reduction systems No. of adopted Early Warning Systems Category targeted Hazard No. of adopted Early Warning Systems Category targeted Hazard No. of adopted Early Warning Systems Category targeted Hazard No. of adopted Early Warning Systems Category targeted Hazard
No. of adopted Early Warning Systems Category targeted Hazard No. of adopted Early Warning Systems Category targeted Hazard No. of adopted Early Warning Systems Category targeted Hazard No. of adopted Early Warning Systems Category targeted Hazard
Number of staff targeted Sector Capacity level Number of staff targeted Sector Capacity level Number of staff targeted Sector Capacity level Number of staff targeted Sector Capacity level
Outcome 2: Strengthened
institutional capacity to reduce Indicator 2: Capacity of staff to respond to, and mitigate Total Total Total Total
risks associated with climate- impacts of, climate-related events from targeted institutions
induced socioeconomic and increased 529 60 57
environmental losses
% of female targeted 42.53% % of female targeted 50.00% % of female targeted 37.00% % of female targeted
Coastal management 2: Low capacity Coastal management 2: Low capacity Coastal management 3: Medium capacity
Total staff trained % of female staff trained Type Total staff trained % of female staff trained Type Total staff trained % of female staff trained Type Total staff trained % of female staff trained Type
Indicator 2.1.1: No. of staff trained to respond to, and
Output 2.1 Strengthened capacity mitigate impacts of, climate-related events
of national and sub-national 0 0.00% Public 60 50.00% Public 57 37.00% Public
centres and networks to respond
rapidly to extreme weather Type Scale Sector Capacity level Type Scale Sector Capacity level Type Scale Sector Capacity level Type Scale Sector Capacity level
events Indicator 2.1.2: No. of targeted institutions with increased
capacity to minimize exposure to climate variability risks
Local Coastal management 2: Low capacity Local Coastal management 2: Low capacity Local Coastal management 3: Medium capacity
Public Public Public
Outcome 3: Strengthened Percentage of targeted population applying adaptation measures Sector Percentage of targeted population applying adaptation measures Sector Percentage of targeted population applying adaptation measures Sector Percentage of targeted population applying adaptation measures Sector
awareness and owernship of Indicator 3.1: Increase in application of appropriate
adaptation and climate risk adaptation responses
reduction processes 20.00% Coastal management 50% Coastal management
Output 3: Targeted population No. of targeted beneficiaries % of female participants targeted Level of awareness No. of targeted beneficiaries % of female participants targeted Level of awareness No. of targeted beneficiaries % of female participants targeted Level of awareness No. of targeted beneficiaries % of female participants targeted Level of awareness
Indicator 3.1.1: Percentage in targeted population awareness
groups participating in adaptation
of predicted adverse impacts of climate change, and of
and risk reduction awareness
appropriate responses
activities
1,835,050.00 51.28% 3: Partially aware 1,835,050.00 51.28% 3: Partially aware
Baseline information Target performance at completion Target performance at completion Target performance at completion
Project/programme sector Geographical scale Response level Project/programme sector Geographical scale Response level Project/programme sector Geographical scale Response level Project/programme sector Geographical scale Response level
Indicator 4.1: Increased responsiveness of development
sector services to evolving needs from changing and variable
climate
Coastal management Local Coastal management Local
2: Partially responsive (Lacks most elements) 4: Mostly responsive (Most defined elements)
Sector Targeted asset Changes in asset (quantitative or qualitative) Sector Targeted asset Changes in asset (quantitative or qualitative) Sector Targeted asset Changes in asset (quantitative or qualitative) Sector Targeted asset Changes in asset (quantitative or qualitative)
Number of services Type Sector Number of services Type Sector Number of services Type Sector Number of services Type Sector
Outcome 5: Increased ecosystem Natural resource improvement level Sector Type Natural resource improvement level Sector Type Natural resource improvement level Sector Type Natural resource improvement level Sector Type
Indicator 5: Ecosystem services and natural resource assets
resilience in response to climate
maintained or improved under climate change and
change and variability-induced
variability-induced stress 3: Moderately effective Coastal management biological assets
stress
Total number of natural assets or ecosystems Effectiveness of Total number of natural assets or Total number of natural assets or Effectiveness of Total number of natural assets or Effectiveness of
Natural asset or Ecosystem (type) Unit Natural asset or Ecosystem (type) Unit Effectiveness of protection/rehabilitation Natural asset or Ecosystem (type) Unit Natural asset or Ecosystem (type) Unit
protected/rehabilitated protection/rehabilitation ecosystems protected/rehabilitated ecosystems protected/rehabilitated protection/rehabilitation ecosystems protected/rehabilitated protection/rehabilitation
Lars Christiansen:
why can't we provide zero as the baseline here??
Mangroves 4 ha rehabilitated 2: Partially effective Mangroves 40 ha rehabilitated 4: Effective Mangroves 1 ha rehabilitated 2: Partially effective
Total number of natural assets or ecosystems Effectiveness of Total number of natural assets or Total number of natural assets or Effectiveness of Total number of natural assets or Effectiveness of
Natural asset or Ecosystem (type) Unit Natural asset or Ecosystem (type) Unit Effectiveness of protection/rehabilitation Natural asset or Ecosystem (type) Unit Natural asset or Ecosystem (type) Unit
Lars Christiansen: protected/rehabilitated protection/rehabilitation ecosystems protected/rehabilitated ecosystems protected/rehabilitated protection/rehabilitation ecosystems protected/rehabilitated protection/rehabilitation
Corals are not an option so
have left out
Output 5: Vulnerable ecosystem Other 1 ha rehabilitated 2: Partially effective Other 1 ha rehabilitated 4: Effective
services and natural resource
assets strengthned in response to Core Indicator 5.1: Natural Assets protected or rehabilitated
climate change impacts, including
Total number of natural assets or ecosystems Effectiveness of Total number of natural assets or Total number of natural assets or Effectiveness of Total number of natural assets or Effectiveness of
variability Natural asset or Ecosystem (type)
protected/rehabilitated
Unit
Lars Christiansen: protection/rehabilitation
Natural asset or Ecosystem (type)
ecosystems protected/rehabilitated
Unit
Lars Christiansen: Effectiveness of protection/rehabilitation Natural asset or Ecosystem (type)
ecosystems protected/rehabilitated
Unit
protection/rehabilitation
Natural asset or Ecosystem (type)
ecosystems protected/rehabilitated
Unit
protection/rehabilitation
see above why can't this be Cannot provide 1.5, which is the
0? accurate target for shoreline
rehabilitation. Very hard to use
Coasts 1 km rehabilitated 2: Partially effective Coasts this template with so many 4: Effective Coasts 1 2: Partially effective
restrictions on format!
Total number of natural assets or ecosystems Effectiveness of Total number of natural assets or Total number of natural assets or Effectiveness of Total number of natural assets or Effectiveness of
Natural asset or Ecosystem (type) Unit Natural asset or Ecosystem (type) Unit Effectiveness of protection/rehabilitation Natural asset or Ecosystem (type) Unit Natural asset or Ecosystem (type) Unit
protected/rehabilitated protection/rehabilitation ecosystems protected/rehabilitated ecosystems protected/rehabilitated protection/rehabilitation ecosystems protected/rehabilitated protection/rehabilitation
No. of targeted households % of female headed households Improvement level No. of targeted households % of female headed households Improvement level No. of targeted households % of female headed households Improvement level No. of targeted households % of female headed households Improvement level
Indicator 6.1: Increase in households and communities
having more secure access to livelihood assets
% increase in income level vis-à-vis % increase in income level vis-à-vis % increase in income level vis-à-vis % increase in income level vis-à-vis
No. of targeted households % of female headed households Alternate Source No. of targeted households % of female headed households Alternate Source No. of targeted households % of female headed households Alternate Source No. of targeted households % of female headed households Alternate Source
baseline baseline baseline baseline
Outcome 6: Diversified and % increase in income level vis-à-vis % increase in income level vis-à-vis % increase in income level vis-à-vis % increase in income level vis-à-vis
strengthened livelihoods and No. of targeted households % of female headed households Alternate Source No. of targeted households % of female headed households Alternate Source No. of targeted households % of female headed households Alternate Source No. of targeted households % of female headed households Alternate Source
baseline baseline baseline baseline
sources of income for vulnerable
people in targeted areas
Indicator 6.2: Increase in targeted population's sustained
climate-resilient alternative livelihoods % increase in income level vis-à-vis % increase in income level vis-à-vis % increase in income level vis-à-vis % increase in income level vis-à-vis
No. of targeted households % of female headed households Alternate Source No. of targeted households % of female headed households Alternate Source No. of targeted households % of female headed households Alternate Source No. of targeted households % of female headed households Alternate Source
baseline baseline baseline baseline
% increase in income level vis-à-vis % increase in income level vis-à-vis % increase in income level vis-à-vis % increase in income level vis-à-vis
No. of targeted households % of female headed households Alternate Source No. of targeted households % of female headed households Alternate Source No. of targeted households % of female headed households Alternate Source No. of targeted households % of female headed households Alternate Source
baseline baseline baseline baseline
Indicator 6.1.1: No. and type of adaptation assets created or Number of Assets Type of Assets Sector Adaptation strategy Number of Assets Type of Assets Sector Adaptation strategy Number of Assets Type of Assets Sector Adaptation strategy Number of Assets Type of Assets Sector Adaptation strategy
strengthened in support of individual or community
livelihood strategies
Number of households (total number in the Number of households (total number in the Number of households (total number in the Number of households (total number in the
Income source Income level (USD) Income source Income level (USD) Income source Income level (USD) Income source Income source
project area) project area) project area) project area)
Number of households (total number in the Number of households (total number in the Number of households (total number in the Number of households (total number in the
Income source Income level (USD) Income source Income level (USD) Income source Income level (USD) Income source Income source
project area) project area) project area) project area)
Sector Scale Type Sector Scale Type Sector Scale Type Sector Scale Type
Indicator 7.1: No. of policies introduced or adjusted to No. of Policies introduced or adjusted No. of Policies introduced or adjusted No. of Policies introduced or adjusted No. of Policies introduced or adjusted
address climate change risks
5 Multi-sector National Environmental policy
Output 7:Improved integration of
climate-resilience strategies into
country development plans No. of Development strategies Regulation Effectiveness No. of Development strategies Regulation Effectiveness No. of Development strategies Regulation Effectiveness No. of Development strategies Regulation Effectiveness
Indicator 7.2: No. of targeted development strategies with
incorporated climate change priorities enforced
4 3: Partially enforced (Some elements implemented) 3: Moderately effective 2 4: Enforced (Most elements implemented) 4: Effective
D92: Lars Christiansen:
Corals are not an option so have left out
7.1. Number/Sector