Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
19 views
6 pages
2022 Jun FPlant
Plant engineering -Factories
Uploaded by
Dumi Jacob
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download
Save
Save 2022JunFPlant For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
0 ratings
0% found this document useful (0 votes)
19 views
6 pages
2022 Jun FPlant
Plant engineering -Factories
Uploaded by
Dumi Jacob
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Carousel Previous
Carousel Next
Download
Save
Save 2022JunFPlant For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
Download
Save 2022JunFPlant For Later
You are on page 1
/ 6
Search
Fullscreen
higher education & training Department: Higher Education and Training REPUBLIC OF SOUTH AFRICA NON-NATIONAL CERTIFICATE: ENGINEERING CERTIFICATE OF COMPETENCY PLANT ENGINEERING: FACTORIES (8190316) 1 June 2022 (X-paper) 09:00-12:00 | i 100348 Ml CLOSED-BOOK EXAMINATION 02027265 Alpha-numerical or programmable calculators may not be used. Nonprogrammable calculators may be used, This question paper consists of 6 pages and an information sheet, pasc==-=i |_307Q1J2201 j Copyright reserved a = 0 SPOTS 20701 Please tum over(8190316) 307Q1J2201000348 SECTION A (COMPULSORY) QUESTION 1 1.1 Name FIVE defects or conditions to check inside a fire-tube steam generator (coal fired) on the fire side when carrying out a periodic internal inspection and discuss corrective actions to be taken. (10) 1.2 Asteam generator generates steam at an average rate of 50 000 kg/hour at a Pressure of 3 000 kPa. The blow down is 10% of the steam generator’s feedwater. The fuel consumption is 8 000 kg of coal per hour with a heating value 20 000 kJ/kg. What fuel saving in kilogram of coal per year will result from the installation of a blowdown heat-recovery system which will reduce the blowdown water temperature to 39 °C? STEAM PROPERTIES Pos | te Va fr a ee So kPa [°C [mig TkJkg | kikg | kJkg _| kuikg K | klikg. K 7 {39 [20,53 [163 [2410 [2573 }0,559 18277 3.000 [233.8 | 0.06663 1 008 [1794 [2802 12.646 [6 1a4 (10) [20] QUESTION 2 A three phase, 6 600 V feeder supplies power exclusively to a pump station consisting ofa number of pump and motor units. When all the original pump and motor units operate Simultaneously the feeder carries a load of 1 000 kVA at a power factor of 0,8 lagging. An additional 600 kVA synchronous motor is installed in the pump station to drive an extra pump. When run unloaded this motor absorbs 60 KW. The pump to be powered by the synchronous motor requires 270 kW to drive it. When delivering 270 kW the motor is 90% efficient. 21 Calculate, when all the original pumps are in operation and the synchronous motor is driving its pump, the 241.4 total line current in the feeder (10) 1027285, 2.1.2 the power factor of the feeder at the pump station (1) 2.2 When all the original pumps are in operation and the synchronous motor is uncoupled from its pump and runs unloaded, determine the 2.21 total line current in the feeder (8) 2.2.2 power factor of the feeder at the pump station (1) [20] Copyright reserved CA A 1S a86-30/GN ZAIN Please tum over(8190316) 4 307142201000348 QUESTION 3 3.1 The SANS/ISO 45001:2018: Occupational Health and Safety Management System is a good document and the enforcement thereof is very important to enhance compliance to the Occupational Health and Safety Act. What can be done to enforce compliance to the SANS/ISO 45001:2018: Occupational Health and Safety Management System? (4) 3.2 Inthe case of non-routine activities in SANS/ISO 45001:2018, workers have to be trained on the changes incorporated in the infrastructure, equipment, materials, physical conditions of the workplace and hazards arising from these changes. If the situation persists for a longer period, should these non-routine activities be considered as having become routine? Substantiate your answer, (3) 3.3. Based on SANS/ISO 45001:2018, give THREE examples of harassment. @) 3.4 A gas monitor wat used to detect a leak during the normal operation of an electric generator that is cooled by hydrogen gas. The generator needs to be shut down to detect the origin of the leak and to repair it. Draw up a working procedure on how to make the generator safe for the repairs to be done. (10) [20] TOTAL SECTION A: 60 SECTION B Answer any TWO questions in SECTION B. QUESTION 4 41 A truck is fitted with an A-frame of which the legs are hinged to the truck at their lower ends and joined together at their upper ends to form an apex to which ‘one end of the cable from the winch is fixed. A load of 4 KN is suspended from the apex with an overhang of 800 mm. Each of the legs is 2,5 m long and their lower ends are 1,5 m apart. Calculate the force in the cable and in each leg (12) 4.2 Youneed to investigate an incident where the goods hoist rope broken. Compile a list of FOUR possible causes why the rope failed and how one would investigate each cause. @) [20] Copyright reserved Please tum over VIANA IIE(8190316) 5 307Q142201000348 QUESTION 5 8.1 A single-phase transformer has 1 000 tums on the primary and 200 turns on the secondary winding. The no-load current is 3 A at a power factor 0,2 lagging, Calculate the primary current and power factor when the Secondary current is 280 A at a power factor of 0,8 lagging. Assume the voltage drop in the windings to be negligible, (10) 5.2 Give TWO requirements for the installation of cables for circuits that operate at voltages exceeding 1 000 V. @) 5:3 Name FIVE items that must be visually inspected on a transformer annually. ©) 5.4 What are the THREE main purposes for using oil inside transformers? & QUESTION 6 6.1 A shrink fits to be used to secure a steel boss of 100 mm outer diameter and 50 mm length on a hollow steel shaft of 50 mm outer diameter and 20 mm inner diameter. A phosphor bronze gear that must transmit 90 kW and has a 150 mm. pitch circle diameter is to be bolted to the boss. ‘The tensile stress caused by the shrink fit must be limited to 85 MPa. The steel on steel coefficient of friction between shaft and boss is taken as 0,28. For both shaft and boss Poisson's ratio is 0,3 and Young's modulus 200 GPa. Determine the 6.1.1 Smallest permissible inner diameter of the boss (14) 61.2 Lowest speed at which the shaft can rotate to transmit 90 kW ) [20] QUESTION 7 71 Name FOUR factors that will change the characteristics of insulation oil inside a switchgear when in use. (4) 7.2 How is energy saved in the lift and escalator industry? @) 73 A battery of 120 cells with an overcharge current, |, of 17 A, is mounted on a stand where the battery and stand occupy approximately 3 m® in a room with dimensions 4 m x 2 m x 3 m. 7.3.1 Calculate the concentration of gas in the room after 1 hour. V=NXx1Ix0,00045 m> (3) Copyright reserved Please turn over CMAN "STUraHo- SOO(8190316) 6 30701J2201000348 7.3.2 Ifthe concentration of hydrogen is below 0,8%, what should the change rate be? (3) 7.4 Name the FOUR most common types of batteries that used for uninterrupted power supplies. (4) 7.5 You have an electrical motor in a hazardous location with the following information on the motor data plate: E Ex de IIB T4 Gb Explain the meaning of the following letters or numbers used on the product: 75.1 E 752 Ex 753 de 7.54 i 755 B 7568 14 (Ax 6) (3) [20] QUESTION 8 8.1 A standby three-phase, 600 kVA alternator has a rated terminal voltage of 3.300 V (line). The stator winding is star-connected and has a resistance of 0,37 Qiphase and a synchronous impedance of 4,3 Qiphase. Calculate the Voltage regulation for a load with a power factor of 84.1 unity ©) 81.2 0,8 lagging (4) 8.2 A straight conveyor belt at a gypsum factory is inclined at 15° to the horizontal and has a length of 76 m between loading and discharge point. The conveyor travels at 1,1 m/s. The angle of wrap round the tandem pulleys is 420° and the Coefficient of friction is 0,3. Ifthe slack side tension is maintained at 3 150 N by means of a counter-weight and there is a 5% loss due to friction in the idlers, calculate the maximum hourly rate in kg that could be transported by the belt. (10) [20] TOTAL SECTION B: 40 GRAND TOTAL: 100 Copyright reserved ME(8190316) Ae 307Q1J2201000348 INFORMATION SHEET P=V3Vicos@ te ati (Hts - H95) Q=mcat C=bn P=(-T)v T= o4As pv=mRT Bg 88 d= , weuly AP = eT goa PF T- Ty, Atin = tout = rota) ta aba 25D "Rtas M_o_E arora Ty R = Pp, Puy Ma Pa vet x= fe w' 2g w 2g Copyright reserved {000.000
You might also like
PQ Eee 325
PDF
No ratings yet
PQ Eee 325
28 pages
6500+ MCQs Electrical Engineering (English) - Nodrm
PDF
No ratings yet
6500+ MCQs Electrical Engineering (English) - Nodrm
888 pages
ME - EC Test 6 QCAB
PDF
No ratings yet
ME - EC Test 6 QCAB
56 pages
VI Semester Electrical
PDF
No ratings yet
VI Semester Electrical
59 pages
UPSC IES 2012 Electrical Engg Paper 2 Objective Type Question Paper PDF
PDF
No ratings yet
UPSC IES 2012 Electrical Engg Paper 2 Objective Type Question Paper PDF
24 pages
Bee 2nd Semester R.G CSE-A
PDF
No ratings yet
Bee 2nd Semester R.G CSE-A
64 pages
MENG231 Chapter 2 Tutorials
PDF
No ratings yet
MENG231 Chapter 2 Tutorials
4 pages
Ese 2021: Prelims Exam: Mechanical
PDF
No ratings yet
Ese 2021: Prelims Exam: Mechanical
12 pages
Aee - Electrical Engineering Paper - III
PDF
No ratings yet
Aee - Electrical Engineering Paper - III
21 pages
Summer 22
PDF
No ratings yet
Summer 22
5 pages
REE Copy PDF
PDF
No ratings yet
REE Copy PDF
9 pages
WWW - Manaresults.Co - In: Utilization of Electrical Energy
PDF
No ratings yet
WWW - Manaresults.Co - In: Utilization of Electrical Energy
4 pages
1331
PDF
No ratings yet
1331
18 pages
Power Plant Equipment
PDF
No ratings yet
Power Plant Equipment
32 pages
Principles of Electrical and Electronic Engineering
PDF
No ratings yet
Principles of Electrical and Electronic Engineering
23 pages
2018 March4
PDF
No ratings yet
2018 March4
6 pages
DRDO Paper 2 Mains 2019 15-Dec-2019 21-27-21
PDF
No ratings yet
DRDO Paper 2 Mains 2019 15-Dec-2019 21-27-21
8 pages
Electritian PDF
PDF
No ratings yet
Electritian PDF
7 pages
Tutorial 1
PDF
No ratings yet
Tutorial 1
4 pages
Esas 2021
PDF
No ratings yet
Esas 2021
20 pages
Paper 3 - Set A Key
PDF
No ratings yet
Paper 3 - Set A Key
18 pages
Nov 2017 Plant
PDF
No ratings yet
Nov 2017 Plant
8 pages
1542285789787-Jr. Instructor Electrical 10092016
PDF
No ratings yet
1542285789787-Jr. Instructor Electrical 10092016
5 pages
June 2018 GCC Factories Plant-1
PDF
No ratings yet
June 2018 GCC Factories Plant-1
5 pages
Sample c1 Et
PDF
No ratings yet
Sample c1 Et
6 pages
2022 June GCC Factories Plant Engineering Exam PDF
PDF
No ratings yet
2022 June GCC Factories Plant Engineering Exam PDF
6 pages
Ee - Module 7 - April 2012
PDF
No ratings yet
Ee - Module 7 - April 2012
4 pages
2020 Nov FPlant Q
PDF
No ratings yet
2020 Nov FPlant Q
9 pages
2021 May FPlant
PDF
No ratings yet
2021 May FPlant
8 pages
University of Petroleum and Energy Studies: Note: All Questions Are Compulsory For Section A and B
PDF
No ratings yet
University of Petroleum and Energy Studies: Note: All Questions Are Compulsory For Section A and B
8 pages
Jr. Engg. Electrical-A
PDF
No ratings yet
Jr. Engg. Electrical-A
16 pages
Eng. Science N2 X Paper Nov 2011 1
PDF
No ratings yet
Eng. Science N2 X Paper Nov 2011 1
8 pages
AMIETE - ET (Current Scheme) : Code: Ae55 Subject: Principles of Electrical Engineering
PDF
No ratings yet
AMIETE - ET (Current Scheme) : Code: Ae55 Subject: Principles of Electrical Engineering
2 pages
EE Sept 2018
PDF
No ratings yet
EE Sept 2018
6 pages
Certc Refresher Exam Ee
PDF
No ratings yet
Certc Refresher Exam Ee
8 pages
Utilization of Electrical Energy
PDF
No ratings yet
Utilization of Electrical Energy
8 pages
N5 Mechanotechnics August 2022 Question Paper
PDF
No ratings yet
N5 Mechanotechnics August 2022 Question Paper
9 pages
PYQ 2022-23 7th Semester Exam Paper
PDF
No ratings yet
PYQ 2022-23 7th Semester Exam Paper
14 pages
400L EE Pass Q by Ahmad Ridwan
PDF
No ratings yet
400L EE Pass Q by Ahmad Ridwan
27 pages
2 3 Energy Transfers NTkXMMT3wSFjXSBZ
PDF
No ratings yet
2 3 Energy Transfers NTkXMMT3wSFjXSBZ
27 pages
2023 QP
PDF
No ratings yet
2023 QP
10 pages
Be Electrical Sem-Viii Dec 2019.
PDF
No ratings yet
Be Electrical Sem-Viii Dec 2019.
3 pages
JKSSB Je Ee 2015 104 A Series 2d4b74df
PDF
No ratings yet
JKSSB Je Ee 2015 104 A Series 2d4b74df
18 pages
Electrical PYQs
PDF
No ratings yet
Electrical PYQs
12 pages
Je Electrical Paper 2014
PDF
No ratings yet
Je Electrical Paper 2014
16 pages
Npcil Electrician
PDF
No ratings yet
Npcil Electrician
7 pages
2.3 Energy Transfers - 2-3-energy-transfers-7XtFwX9LKr-319sr PDF
PDF
No ratings yet
2.3 Energy Transfers - 2-3-energy-transfers-7XtFwX9LKr-319sr PDF
27 pages
7.3 - Induced Potential, Transformers and The National Grid - 2-3-Energy-transfers-nTkXMMT3wSFjXSBZ
PDF
No ratings yet
7.3 - Induced Potential, Transformers and The National Grid - 2-3-Energy-transfers-nTkXMMT3wSFjXSBZ
27 pages
Access Point - Ee Refresher 3
PDF
100% (1)
Access Point - Ee Refresher 3
16 pages
17.1-Energy Work Power-Cie Igcse Physics Ext-Theory-qp
PDF
No ratings yet
17.1-Energy Work Power-Cie Igcse Physics Ext-Theory-qp
10 pages
ACCESS POINT EVALUATION 9 (Keys)
PDF
No ratings yet
ACCESS POINT EVALUATION 9 (Keys)
8 pages
Electro N6 Study Pack
PDF
No ratings yet
Electro N6 Study Pack
58 pages
Ete - Sem6 2
PDF
No ratings yet
Ete - Sem6 2
6 pages
141 15 Compressed
PDF
No ratings yet
141 15 Compressed
12 pages
Physics - 2025 - Old-Questions
PDF
No ratings yet
Physics - 2025 - Old-Questions
40 pages