Project:-Rehabilitation of Aba'Ala General Hospital
Project:-Rehabilitation of Aba'Ala General Hospital
Project:-Rehabilitation of Aba'Ala General Hospital
February, 2024
Contractor:-
Total
Vat (15 %)
GRAND TOTAL
Contractor:-
A. SUBSTRUCTURE
Sum A
B. SUPER-STRUCTURE
1 Concrete Work
2 Finishing Work
3 Pipes, fittings, valves, and accessories
4 Testing and commissioning
Sum B
Sum A+B
Rebate (…….%)
Total
Vat (15 %)
GRAND TOTAL
Contractor:-
Amount
Item no. Description Unit QTY Rate (Euro)
(Euro)
Note :- All materials specified on the drawing is subjected to
the engineer approval prior to production and installation work.
A. SUBSTRUCTURE
Clear of the site to remove top soil and vegetable materials for
1.1 the reservoir, valve room and surrounding pavement with
2
drain areasto an average depth of 20cm. m 125.00
1.3 Ditto as item no. 1.3 but for foundation in soft rock m3 25.00
1.4 Ditto as item no. 1.3 but for foundation in hard rock m3 25.00
Carried to Summery
2. CONCRETE WORK
Contractor:-
Amount
Item no. Description Unit QTY Rate (Euro)
(Euro)
Cast RC concrete in C-30 with OPC of grade 42.5 N or above
(with minimum 28-days 15cm cube compressive strength of
30MPa), 430kg of cement /m3 of concrete & filled in to
2.3 formwork and vibrated around reinforcements. Formwork and
reinforcements shall be measured separately; for all sub-
structural part of reservoir and valve room members
m3 16.00
Carried to Summery
3. MASONRY WORKS
Carried to Summery
B. SUPER-STRUCTURE
1. CONCRETE WORK
Contractor:-
Amount
Item no. Description Unit QTY Rate (Euro)
(Euro)
Steel reinforcements bar with minimum yield strength of
400MPa for dia. >6mm according to the drawing, price shall
1.3
include cutting, bending, placing in position, using tying wires
and spacers.
a F 8 mm deformed bar. Kg -
b F 10 mm deformed bar. Kg 1,749.00
c F 12 mm deformed bar. Kg 2,988.00
d F 14 mm deformed bar. Kg -
e F 16 mm deformed bar. Kg 56.00
Carried to Summery
2. FINISHING WORK
Apply two coats of cement sand mortar rendering with 1:3 ratio
2.3
to all external walls of the reservoir and valve room m2 76.00
2.7 Ditto to item 2.6 but to the buried portions of the valve room m2 4.00
Supply and install 1 1/2 inch stainless steel ladder for internal
2.9 access and with all accessories on the details as shown on
the working drawing LS 1.00
Contractor:-
Amount
Item no. Description Unit QTY Rate (Euro)
(Euro)
Supply and install 1 1/2-inch stainless steel ladder for external
2.10 ladder, safety cage and with all accessories as shown on the
details of the working drawing LS 1.00
Carried to Summery
Supply and install 2-inch galvanized iron drain pipes with 0.5m
3.2
length for the top of the reservoir No 4.00
Carried to Summery
Carried to Summery
Contractor:-
A. SUBSTRUCTURE
Sum A
B. SUPER-STRUCTURE
1 Concrete Work
2 Block work
3 Roof Work
4 Metal and Steel Structure Work
5 Plastering and Painting Work
6 Paving and Flooring
7 Painting
Sum B
Sum A+B
Rebate (…….%)
Total
Vat (15 %)
GRAND TOTAL
Contractor:-
A. SUB-STRUCTURE
1.1 Clear of the site to remove top soil and vegetable materials to an average
2
depth of 20cm. m 49.00
1.2 Bulk excavation in ordinary soil (medium stiff to stiff, reddish brown high
plastic clayey silt) to an average depth not more than 150 cm from stripped
3
level. m 24.00
1.3 Provide, Backfill back fill and compact selected granular material under
excavated area and around masonry . Selected material shall be non-
expansive granular selected material fill with maximum PI value of 12, well
compacted in layers of 20 cm by sprinkling water to ensure a proctor density
3
of 95%. m 27.00
1.4 Cart away surplus excavated material and deposit at a suitable place outside
3
the compound. m 34.00
Carried to Summery
2. CONCRETE WORK
2.1 5cm thick lean concrete in C-5, 150kg of cement/m3 of concrete under:
2.2 Concrete in C-25 with OPC of grade 42.5N or above (with minimum 28-
days 15cm cube compressive strength of 25MPa), 360kg of cement /m3 of
concrete & filled in to formwork and vibrated around reinforcements.
Formwork and reinforcements shall be measured separately.
2.3 Concrete in C-20 , 320kg of cement /m3 of concrete & filled in to formwork
and vibrated around reinforcements. Formwork and reinforcements shall be
measured separately.
a In RC slab m3 3.00
2.4 Provide, cut and fix in position sawn wooden formwork or equivalent to get
fair face concrete
2
a To foundation pads and column m 10.00
2
b To ground floor beams m 7.00
c To ramp m2 4.00
2.6 Steel reinforcements bar with minimum yield strength of 450MPa for dia.
>6mm according to the drawing, price shall include cutting, bending, placing
in position, using tying wires and spacers.
Carried to Summary
3. MASONRY WORKS
3.1 50cm thick basaltic or equivalent stone masonry foundation below NGL,
3
bedded and jointed in cement and sand mortar, 1:4. m 12.00
3.3 Construct half ditch 30 cm diameter with C-20 as shown on drawings. ml 5.00
3.4 Construct C-20 concrete manholes for surface water drainage as where
shown on the drawing with reinforced concrete wall ( diameter 10 Center to
Center 200mm both ways horizontal and vertical) and bottom slab complete
with medium concrete manhole cover ,benching and all assistance civil
works. price shall include 6 meter circular RC pipe to connect from manhole
to manhole
Size :- 50x50x80cm
No 2.00
3.5 Supply, cut and fix in position 100x10mm chip wood or Styrofoam as joint
separator between basement beam and basement floor slab. m 16.00
Carried to Summary
B. SUPER-STRUCTURE
1. CONCRETE WORK
1.1 Concrete in C-25 with OPC of grade 42.5N or above (with minimum 28-
days 15cm cube compressive strength of 25MPa), 360kg of cement /m3 of
concrete filled in to formwork and vibrated around reinforcements. Formwork
and reinforcements shall be measured separately.
1.3 Provide, cut and fix in position sawn wooden formwork or equivalent to get
fair face concrete
Carried to Summary
2. BLOCK WORK
2.1 Supply and lay 20cm thick hollow concrete block wall in Class-C in cement-
sand mortar 1:4 and both sides left for plastering.
m2 48.00
Carried to Summary
3. ROOFING WORK
3.1 Fix Roof cover in EGA - 400, 0.5mm thick fixed to RHS purlins with standard
hooks and washers. Roof cover measured in horizontal projection. Price
includes ridge cover, two coats of anti rust & two coats of metal paint and all
the necessary material and workmanship to make the work complete.
m2 20.00
3.2 Supply & fix G-28 galvanized flat metal sheet gutter of dev. Length 660mm
spliced at joints and painted two coat of anti-rust and two coats of metal
paint. m 5.00
3.3 Supply and fix diam.110mm uPVC down pipe. Price shall include fixing
accessories in every 80 cm interval. m 8.00
Carried to Summary
Supply and fix truss made of steel structure placed for generator house as
shown on the drawing. Joints shall be well welded. Price shall include two
coats of anti rust and two coats of metallic paint. Price shall also include all
the necessary material, labor and any incidental civil work required for secure
installation and make all the system complete.
All materials specified on the drawing is subjected to the engineer approval
prior to production and installation work.
a) Size:- 60 x 40 x 2 mm kg 133.00
b) Size:- 40 x 40 x 2 mm kg 76.00
Size: 200X260cm.
No 1.00
4.7 Supply and fix 38 mm metal LTZ section window frame 1 mm grooved metal
sheet cover fixed metal louver as shown on the drawing. The door consists of
anchor bars where necessary. Price shall includes hooks for pad lock,
anchoring bolts, lock and handles, and other necessary accessories for
completing the work as shown on the drawing,
Price shall also include two coats of anti rust paint and spray paint finish in
chosen color.
Carried to Summary
5. PLASTERING Work
5.1 Apply two coats of plaster in cement sand mortar 1:3 to internal and external
2
HCB wall and concrete surface. m 72.00
Carried to Summary
6.1 Cast minimum 5cm thick cement sand screed to ground floor slab of
generator house. m2 16.00
Carried to Summary
7. PAINTING
7.1 Apply Three coats of plastic paint to exposed plastered surface according to
manufacturers instruction. Material color to be approved by designer prior to
application. Price shall include all incidental works thereto.
m2 72.00
Carried to Summary
Contractor:-
Option -1
Sum
Rebate (…….%)
Total
Vat (15 %)
GRAND TOTAL
Contractor:-
Item DESCRIPTION
UNIT QTY Unit Rate Amount Remark
no.
3. Supply and Installation of Pump and Generator
Option -1
Supply and install 4 HP/3KW Surface pump with dry running protection and all other
5 accessories to lift water from the Ground reservoir to the existing elevated water tanker.
The pump shall conform to an ISO 5199 (and ISO 2858). No 1.00
Supply and installation of best quality float switch to the existing elevated water tank with
6
cables and connections to the surface pump for the existing No 1.00
Carried to Summery
Contractor:-
Sum
Rebate (…….%)
Total
Vat (15 %)
GRAND TOTAL
Contractor:-
Supply and install Class B 3 " GI pipe which conform with ISO
1 1461 standards for the Rising main from the Submersible pump to
the wellhead. ML 200.00
Supply and install Class B 3 " GI pipe which conform with ISO
2 1461 standard fittings for the Rising main from the well head to the
HDPE Riser pipe. ML 12.00
Supply and install 3'' flanged water meter with all the necessary
3 fittings which conform with ISO 4064-1:2014 standard fittings.
NO 1.00
Supply and install 3'' flanged non return valve with all the
4 necessary fittings which conform with ISO 4064-1:2014 standard
fittings. NO 1.00
Supply and install PN 20 HDPE 90mm for the riser pipe from the
well head to the Gound reservoir. The price shall include the
9
excavation work up to the depth of 60cm, the back fill, cart away,
and all other necessary works. ML 270.00
Supply and fix GI 2" water meter which conforms with ISO 4064-
16
1:2014 standards. NO 1.00
Supply and fix 2'' GI gate valve which conforms with ISO
17
standards. NO 2.00
Contractor:-
Supply and fix 2'' PPR pipe from ground reservoir to the elevated
20 reservoir, the price shall includes all the necessary fitting.
ML 90.00
Carried to Summary
Contractor:-
A. SUBSTRUCTURE
Sum
Rebate (…….%)
Total
Vat (15 %)
GRAND TOTAL
Contractor:-
A. SUB-STRUCTURE
1.1 Clear of the site to remove top soil and vegetable materials to an average
2
depth of 20cm. m 42.00
1.2 Pit excavation in ordinary soil (medium stiff to stiff, reddish brown high plastic
clayey silt) to an average depth not more than 150 cm from stripped level.
3
m 9.00
1.3 Provide, Backfill back fill and compact selected granular material around
column. Selected material shall be non-expansive granular selected material
fill with maximum PI value of 12, well compacted in layers of 20 cm by
sprinkling water to ensure a proctor density of 95%. m3 9.00
1.4 Cart away surplus excavated material and deposit at a suitable place outside
the compound. m3 18.00
Carried to Summery
2. CONCRETE WORK
2.1 5cm thick lean concrete in C-5, 150kg of cement/m3 of concrete under:
2.2 Concrete in C-25 with OPC of grade 42.5N or above (with minimum 28-
days 15cm cube compressive strength of 25MPa), 360kg of cement /m3 of
concrete & filled in to formwork and vibrated around reinforcements.
Formwork and reinforcements shall be measured separately.
2.4 Provide, cut and fix in position sawn wooden formwork or equivalent to get
fair face concrete
2.5 Steel reinforcements bar with minimum yield strength of 450MPa for dia.
>6mm according to the drawing, price shall include cutting, bending, placing
in position, using tying wires and spacers.
Contractor:-
Carried to Summary
3. FINISHING WORKS
3.1 Apply two coats of plaster in cement sand mortar 1:3 to internal and external
HCB wall and concrete surface. m2 80.00
3.2 Apply Three coats of plastic paint to exposed plastered surface according to
manufacturers instruction. Material color to be approved by designer prior to
application. Price shall include all incidental works thereto.
2
m 80.00
3.3 Supply and fix pre cut 2.5 mm thick galvanized wire mesh for fence
compound attached to the RC pillars and supporting angle iron . Price shall
include Angle iron of size 50x2 mm every 2 meter spacing both in horizontal
and vertical side and for the angle iron price shall include 30x30x30 concrete
stand according to the detail drawing. Price shall include two coats of anti
rust and metal paint of angle iron and other accessories to complete the wok
. m
2
93.00
3.4 Supply and fix Geneatour house compound Pedestrian gate metal grilled
door made of RHS size 60x40x2 mm thick horizontal and vertical frame as
shown on the drawing. The door consists of 20x20x2mm RHS interior vertical
direction frames at 15 cm maximum interval and anchor bars where
necessary. Price shall includes hooks for pad lock, anchoring bolts, lock and
handles, and other necessary accessories for completing the work as shown
on the drawing, Price shall also include two coats of anti rust paint and spray
paint finish in chosen colour.
3.5 Supply and fix Geneatour house compound Main gate metal grilled door
made of RHS size 60x40x2.5mm thick horizontal and vertical frame as
shown on the drawing. The door consists of 20x20x2mm RHS interior vertical
direction frames at 15 cm maximum interval and anchor bars where
necessary. Price shall includes hooks for pad lock, anchoring bolts, lock and
handles, and other necessary accessories for completing the work as shown
on the drawing, Price shall also include two coats of anti rust paint and spray
paint finish in chosen colour.
Carried to Summary