Pipe line lifting load distribution calculation

Ground level
Trench level

G1: Ground reaction @1


G2: Ground reaction @2
C1: Crane 1 tension
C2: Crane 1 tension
C3: Crane 1 tension C3 C2
C1
Spool weight 200kg / 1m

18m 24m 24m 30m


G2 W=19200kg G1
96m

Approvals & Signatures ‫ﺍﻻﻋﺗﻣﺎﺩ ﻭﺍﻻﻣﺿﺎءﺍﺕ‬


Reviewed By: Signature: Date:
Hassan Ramadan 27-Oct-2021
‫ﻣﺭﺍﺟﻌﺔ ﺑﻭﺍﺳﻁﺔ‬ ‫ﺍﻻﻣﺿﺎء‬ ‫ﺍﻟﺗﺎﺭﻳﺦ‬
Pipe line lifting load distribution calculation
9m 9m 12m 12m 12m 12m 15m 15m

C3 C2
C1

Ground level
Trench level
18m 24m 24m 30m
G2 W=19200kg G1
96m

Calculation Method (1) Method (1) Verification Calculation Method(2)

ƩM G2= 0 ƩM G2= 0 C1 = (30/2 + 24/2) x 200 =5400KGS


C3 x 18 + C2 x 42 + C1 x 66 + G1 x 96 = 19200 x 48 4200 x 18 + 4800 x 42 + 5400 x 66 + 3000 x 96 = 19200 x 48 C2 = (24/2 + 24/2) x 200 =4800KGS
C3 = (18/2 + 24/2) x 200 =4200KGS
ƩM C3= 0 ƩM C3= 0 G1 = 30/2 x 200 = 3000KGS
C2 x 24 + C1 x 48 + G1 x 78 = 19200 x 30 + G2 x 18 4800 x 24 + 5400 x 48 + 3000 x 78 = 19200 x 30 + 1800 x 18 G2 = 18/2 x 200 = 1800KGS

ƩM C2= 0 ƩM C2= 0 Method (2) Verification (a)


C1 x 24 + G1 x 54 = 19200 x 6 + C3 x 24 + G2 x 42 5400 x 24 + 3000 x 54 = 19200 x 6 + 4200 x 24 + 1800 x 42 W = C1 + C2 + C3 + G1 + G2

ƩM C1= 0 ƩM C1= 0 Method (2) Verification (b)


G1 x 30 + 19200 x 18 = C2 x 24 + C3 x 48 + G2 x 66 3000 x 30 + 19200 x 18 = 4800 x 24 + 4200 x 48 + 1800 x 66 Substitude the value of C1, C2, C3, G1
and G2 in the equations in method (1)
ƩM G1= 0 ƩM G1= 0
C1 x 30 + C2 x 54 + C3 x 78 + G2 x 96 = 19200 x 48 5400 x 30 + 4800 x 54 + 4200 x 78 + 1800 x 96 = 19200 x 48

C1 = 5400KGS C2 = 4800KGS C3 = 4200KGS


G1 = 3000KGS G2 = 1800KGS

Approvals & Signatures ‫ﺍﻻﻋﺗﻣﺎﺩ ﻭﺍﻻﻣﺿﺎءﺍﺕ‬