Sls - JSG Daily Pre-Task Planning Eform: (Updated Eform Since 09feb24)
Sls - JSG Daily Pre-Task Planning Eform: (Updated Eform Since 09feb24)
This eForm shall be completed by Schindler Frontline Manager / Supervisor (or) the appointed "Site Safety
Responsible (SSR)" before the start of every work shift daily, along with the completion of the physical Pre-task
Planning and Briefing form and other applicable form such as Lifting Plan etc.
Each form can be used for up to 3 different tasks in the same work shift. For more than 3 tasks, a new form
has to be submitted.
When there is a change of original work plan or the task nature after this meeting during the shift, a new
form must be submitted.
When additional worker(s) arrive to jobsite after this meeting during the shift, a new form must be
submitted.
Purpose of submission *
OC / Contractor *
SLS - Singapore
XJE - Singapore
12/6/2024
City *
Singapore
Business *
NI - New Installation
MOD - Modernisation
EI - Repair
Other
Rajib
10
563023
11
Engineer
Supervisor
Certified Fitter
Other
12
Installation method *
INEX
Scaffoldless Other
Scaffold
Other
13
1.Arafat
2.Raj
3.Rajib
1. 571407
2.20090803
3.563023
15
A task = a particular work activity performed by a team of worker together. Example, working
in 2 lift shafts by 2 separate teams = 2 tasks, a team of workers doing machine hoisting = 1
task.
16
Task No #1 - Product *
Elevator
17
18
19
20
Rajib
21
563023
22
23
- Use anti-cut level 3 hand gloves during handling. - Wear safety shoes at all times -Wear long
sleeve uniforms or sleeve pads during installation work
24
No
Yes
25
Task No #2 - Product *
Elevator
26
27
Housekeeping
28
29
Raj
30
20090803
31
32
Supervisor to check work are ensure housekeeping practice is adhere - Waste bin to be provide
for proper disposal - Conduct housekeeping before & after commence of
33
No
Yes
34
Notes:
All persons on
site have all
necessary PPEs
and safety tools
according to
Schindler
requirement
All hoisting
equipment are
certified, labelled
and in good
condition. (load
rating must be
visible on the
equipment -
stamped or
tagged)
All electrical
tools to be used
for the task(s)
are in good
condition
If there is lifting activity, ensure that Lifting Plan is completed and briefed to all personnel
involved in the activity. Keep the copy of completed Lifting Plan as reference.
Yes
No
This content is created by the owner of the form. The data you submit will be sent to the form owner. Microsoft is
not responsible for the privacy or security practices of its customers, including those of this form owner. Never give
out your password.
Microsoft Forms | AI-Powered surveys, quizzes and polls Create my own form
Privacy and cookies | Terms of use