Sls - JSG Daily Pre-Task Planning Eform: (Updated Eform Since 09feb24)

Method_Of_Statement_For_Electrical_Systems

Uploaded by

Aung Khine Lynn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views11 pages

Sls - JSG Daily Pre-Task Planning Eform: (Updated Eform Since 09feb24)

Method_Of_Statement_For_Electrical_Systems

Uploaded by

Aung Khine Lynn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

SLS - JSG Daily Pre-Task Planning eForm

(UPDATED eForm since 09Feb24)

This eForm shall be completed by Schindler Frontline Manager / Supervisor (or) the appointed "Site Safety
Responsible (SSR)" before the start of every work shift daily, along with the completion of the physical Pre-task
Planning and Briefing form and other applicable form such as Lifting Plan etc.

Each form can be used for up to 3 different tasks in the same work shift. For more than 3 tasks, a new form
has to be submitted.
When there is a change of original work plan or the task nature after this meeting during the shift, a new
form must be submitted.
When additional worker(s) arrive to jobsite after this meeting during the shift, a new form must be
submitted.

Purpose of submission *

Start of work shift

Change of work plan

Additional worker(s) arrive during the shift

OC / Contractor *

SLS - Singapore

XJE - Singapore

Store Info Account


Other

https://forms.office.com/Pages/ResponsePage.aspx?id=59w N6xD8WO5UQjUyWlNYUEE1WlNFRUpWUVBORThCVEEzRC4u 12/6/24, 11 14 AM


Page 1 of 11
:
G
3

Select the DATE today *

12/6/2024

Job Site Name *

6 Kim Chuan Terrace

City *

Singapore

Business *

NI - New Installation

MOD - Modernisation

EI - Repair

Other

https://forms.office.com/Pages/ResponsePage.aspx?id=59w N6xD8WO5UQjUyWlNYUEE1WlNFRUpWUVBORThCVEEzRC4u 12/6/24, 11 14 AM


Page 2 of 11
:
G
7

Number of Schindler Employees on-site (type only the number) *

Number of Subcontractors on-site (type only the number) *

Name of Site Safety Responsible *

Rajib

10

Schindler ID number (SAP ID) of Site Safety Responsible *

563023

11

Job designation of Site Safety Responsible *

https://forms.office.com/Pages/ResponsePage.aspx?id=59w N6xD8WO5UQjUyWlNYUEE1WlNFRUpWUVBORThCVEEzRC4u 12/6/24, 11 14 AM


Page 3 of 11
:
G
Manager

Engineer

Supervisor

Certified Fitter

Certified Technician (Level 2 and above)

Other

12

Installation method *

INEX

SLIM (False Car)

Scaffoldless Other

Scaffold

Other

13

Name of Attendees (eg; 1) Name 2) Name ...) *

1.Arafat
2.Raj
3.Rajib

https://forms.office.com/Pages/ResponsePage.aspx?id=59w N6xD8WO5UQjUyWlNYUEE1WlNFRUpWUVBORThCVEEzRC4u 12/6/24, 11 14 AM


Page 4 of 11
:
G
14

ID of Attendees (eg; 1) EMP ID 2) EMP ID) *

1. 571407
2.20090803
3.563023

15

Number of tasks for the day / shift *

A task = a particular work activity performed by a team of worker together. Example, working
in 2 lift shafts by 2 separate teams = 2 tasks, a team of workers doing machine hoisting = 1
task.

16

Task No #1 - Product *

Elevator

Escalator or Moving Walk

Other, not working with equipment

17

Task No #1 - Lift Shaft / Elevator / Escalator number *

https://forms.office.com/Pages/ResponsePage.aspx?id=59w N6xD8WO5UQjUyWlNYUEE1WlNFRUpWUVBORThCVEEzRC4u 12/6/24, 11 14 AM


Page 5 of 11
:
G
SL2

18

Task No #1 - Task title *

Controller Wiring & Installation

19

Task No #1: number of workers involved *

20

Task No #1 - Schindler/Subcon Certified person name *

Rajib

21

Task No #1 - Schindler/Subcon Certified person Schindler ID number (SAP


ID) *

563023

22

Task No #1 - Hazard And Risk Involve *

https://forms.office.com/Pages/ResponsePage.aspx?id=59w N6xD8WO5UQjUyWlNYUEE1WlNFRUpWUVBORThCVEEzRC4u 12/6/24, 11 14 AM


Page 6 of 11
:
G
Sharp Edges

23

Task No #1 - Control Measures *

- Use anti-cut level 3 hand gloves during handling. - Wear safety shoes at all times -Wear long
sleeve uniforms or sleeve pads during installation work

24

Is there Task #2? *

No

Yes

25

Task No #2 - Product *

Elevator

Escalator or Moving Walk

Other, not working with equipment

26

Task No #2 - Lift Shaft / Elevator / Escalator number *

https://forms.office.com/Pages/ResponsePage.aspx?id=59w N6xD8WO5UQjUyWlNYUEE1WlNFRUpWUVBORThCVEEzRC4u 12/6/24, 11 14 AM


Page 7 of 11
:
G
Storage Area

27

Task No #2 - Task title *

Housekeeping

28

Task No #2: number of workers involved *

29

Task No #2 - Schindler/Subcon Certified person name *

Raj

30

Task No #2 - Schindler/Subcon Certified person Schindler ID number (SAP


ID) *

20090803

31

Task No #2 - Risk and Hazard Involve *

https://forms.office.com/Pages/ResponsePage.aspx?id=59w N6xD8WO5UQjUyWlNYUEE1WlNFRUpWUVBORThCVEEzRC4u 12/6/24, 11 14 AM


Page 8 of 11
:
G
Slipping & Tripping

32

Task No #02 - Control Measures *

Supervisor to check work are ensure housekeeping practice is adhere - Waste bin to be provide
for proper disposal - Conduct housekeeping before & after commence of

33

Is there Task #3? *

No

Yes

34

General Safety check

Notes:

Yes = all are in good order at the time of checking;


Yes, after Action taken = there was issue at the time of checking, but, action
was taken to correct it;
Not applicable = not needed for the tasks for the day / shift

https://forms.office.com/Pages/ResponsePage.aspx?id=59w N6xD8WO5UQjUyWlNYUEE1WlNFRUpWUVBORThCVEEzRC4u 12/6/24, 11 14 AM


Page 9 of 11
:
G
Yes, after
Not
Yes ACTION
Applicable
taken

All persons on
site have all
necessary PPEs
and safety tools
according to
Schindler
requirement

All hoisting
equipment are
certified, labelled
and in good
condition. (load
rating must be
visible on the
equipment -
stamped or
tagged)

All electrical
tools to be used
for the task(s)
are in good
condition

All hand tools


are in good
condition for use

https://forms.office.com/Pages/ResponsePage.aspx?id=59w N6xD8WO5UQjUyWlNYUEE1WlNFRUpWUVBORThCVEEzRC4u 12/6/24, 11 14 AM


Page 10 of 11
:
G
35

Any lifting activity? *

If there is lifting activity, ensure that Lifting Plan is completed and briefed to all personnel
involved in the activity. Keep the copy of completed Lifting Plan as reference.

Yes

No

This content is created by the owner of the form. The data you submit will be sent to the form owner. Microsoft is
not responsible for the privacy or security practices of its customers, including those of this form owner. Never give
out your password.
Microsoft Forms | AI-Powered surveys, quizzes and polls Create my own form
Privacy and cookies | Terms of use

https://forms.office.com/Pages/ResponsePage.aspx?id=59w N6xD8WO5UQjUyWlNYUEE1WlNFRUpWUVBORThCVEEzRC4u 12/6/24, 11 14 AM


Page 11 of 11
: