MSCMS Issue 6 Rev-0 List

MSCMS issue 6 Rev-0 List

Uploaded by

Joe Ps
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
568 views32 pages

MSCMS Issue 6 Rev-0 List

MSCMS issue 6 Rev-0 List

Uploaded by

Joe Ps
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 32

Ref. : TP/TED/CBPM/MASTERSHEET/MSCMS/3.2.

0/Sheet 1/2
TRANSMISSION ENGINEERING DEPARTMENT PROCESS MAPS- MATERIAL APPROVAL (CIVIL, MEP, FLPS & ELECTRICAL) Date: 12 JAN 2020

Notes

1. All material shall be approved as per


DEWA specification requirements.
1 1.1 Material Sample (as applicable)
Submit non standard material Conditions:
1.2 Material approval submittal form
Consultant/Contractor As per MSCMS issue 6 Rev 0 1. Contractor should propose more than 3 vendors 1.3 Technical catalogues
(one main and other alternates for reinforcement steel) 1.4 Test report
2 as per attached MSCMS issue 6, Rev 0. 1.5 Representative samples
TED Design Engineer 2. Contractor to propose 2 vendors (main and alternate 1.6 Applicator/supplier as applicable
Submit standard material
for concrete design mix) as per attached MSCMS 1.7 Compliance of DEWA SPEC. /
As per MSCMS issue 6 Rev 0 requirement
3. Contractor / consultant shall submit the standard
Ref: (CE/SCADANAME/MS/C/15/0
materials with specific one manufacturer name and
CE/SCADANAME/MS/M/16/284
model or product code for each materials as per MSCMS 2. Representative sample signed by DEWA
CE/SCADANAME/MS/M/18/300 NO Is submittal Issue 6 Rev 0. The standard material submission is for Engineer shall be kept at site sample room.
CE/SCADANAME/MS/E/18/301
In order? information only. However, Considering time for
CE/SCADANAME/MS/E/5/311)
verification of information and documentation, 3. An approved copy of material shall be
contractor can proceed in using the submitted material sent to DEWA site engineer assigned to that
YES project applicable for non-standard
at site after 2 working days from the submission date.
Acknowledge acceptance/sample approval material..
4. Standard materials shall be sole responsibility of
By in-charge Engineer
contractor/consultant. No comments from DEWA in 7
3 working days shall not relieve contractor from his
Consultant / Contractor responsibility. Noncompliance of the standard materials
(as per MSCMS issue 6, Rev 0) shall be rejected by
DEWA/Consultant at any stage of project.
5. Material submittal procedure for all the standard and
Submit Acknowledged non standard materials shall be followed as per
Material Submittal MSCMS – Issue 6, Rev -0.
6. DEWA TED have the right to revoke any approval at any
stage of the project due to underperformance of the
4 vendor or non compliance with specification or
Management System Section non compliance with MSCMS Issue 6, Rev 0.. Legend
7. Contractor / consultant shall submit the standard
materials in three submissions each for civil, HVAC, LSP,
FPS & Electrical.
Fax signed material approval 8. Approved manufacturer list is for information; and it
sheet with approval status. does not discourage the contractor from proposing new
2 CC: TED site eng, TCD.& PTD manufacturers.
Management System Section 9. If any approved material missed in above list, contractor External process
shall submit the proposal along with earlier DEWA TED
5 approved document issued from 2018 onwards.
Consultant / Contractor 10. Submissions schedule: Contractor / consultant shall x
“X” Box Number
submit both Standard and Non-standard materials as
per the below the day & time for each category
materials.
Enter in Database and forward to Process Map not
MEP & FPS– Every Monday from 08:00AM to 01:00PM
Concerned TED / TCD site engineer for Provide signed sample (if any) at site Required
Civil – Every Tuesday from 08:00AM to 01:00PM
information
Electrical – Every Wednesday from 08:00AM to
& further action
01:00PM.
6 Standard materials – Every Monday to Wednesday from Process Map Available
TED / TCD Site Eng. 08:00AM to 01:00PM
11.The approval for the standard materials list is valid up
to 31st December 2020 until unless another MSCMS Output
3 list issued from DEWA TED.
Study the 12. Substations chosen by DEWA TP management for
TED / TCD Site Engineer Document & verify sample submission of materials through new system / process Start/End
shall be intimated individually to the concerned
stakeholders.

Study the 7 TOTAL WORKING DAYS


Document Execution Stage
7 WD for Non Standard materials
2 WD for Standard materials
4
Execution Stage

KS BRS Total Details related to TED

Resources
Prepared by: Approved by: 3
Material in list

Initiative Owner Department Head Material not in list 3

© Transmission Engineering Department-2017 Issue3 Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Material Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Related to Source / Manufacturer Product / Model No: T-Spec Ref General Description Use Location of usage General Comments Sample Remarks
ID Category inspection

STANDARD MATERIALS LIST

Respective
CE MS C 15 0 Civil Standard Materials
substation

M/s. BASF Construction Chemicals UAE LLC, Dubai Masterseal GG470 & PG470
Master seal NP 472
Masterseal NP 473U

M/s. Wurth FZE, Dubai 08921611-Painter Acryl White 1. PG(pouring grade) to be used for horizontal joints and GG(gun grade) to be used for
As per tender
vertical joints.
M/s. Dow Corning , Belguium Dow Corning 813C document which
Respective Composition for use in sealing joints in concrete Internal joint (Horizontal 2. Backing rod shall be used at the joints, prior to application of sealant, if applicable.
CE MS C 15 1 Joint Sealant Civil Sealant Substation ever is applicable Seal Joints No Site
substation members and block works & vertical) 3. UV resistant joint sealant to be proposed for external joints.
M/s. Henkel Polybit Industries, UAE or KSA. Polyseal PS (GG & PG), Polyseal PU for repsective
4. Surface preparation, priming & application shall be as per manufacturer's instruction.
project.
M/s. Sikaflex Construction (D), Dubai Sikaflex-UV, Sikaflex precast 5. The color of the(PG & GG) shall match with the approved wall/floor painting color.
6. Work shall be in full compliance with the manufacturer's method statement.
Nitoseal-PU220
M/s. Al Gurg Fosroc LLC, Dubai
Nitoseal 290

M/s. Emirates Specialities,Co, LLC, Dubai Specseal

1. The color of sealant - internal & external" used to fill the gap between door/window frames
M/s. Wurth FZE, Dubai Wurth PU Construction Sealant H.P
to block or concrete surface shall match with the approved wall painting color code.
As per tender
Masterseal 470 GG & PG, Sonolastic NP2, 2. The color of sealant to use on horizontal joints at external area can be approved for roof
M/s. BASF Construction Chemicals UAE LLC, Dubai document which
Respective Masterseal NP 473 U expansion joint.
CE MS C 15 4 UV Resistant Joint Sealant Civil Sealant Substation ever is applicable Sealant with excellent resistant to UV Seal gaps externally External gaps No Site
substation M/s. Henkel Polybit Industries, UAE/KSA Polyseal PS GG & PG 3. Fire proof resistant sealant should be used for the fire rated doors.
for repsective
4. Surface preparation, priming & application shall be as per manufacturer's instruction.
Dow Corning 816C project.
M/s. DOW Coring, Belgium. 5. Work shall be in full compliance with the manufacturer's method statement.
Dow Corning 813
6. Mock up to be prepared & obtain approval from DEWA site engineer prior to proceed with work.
M/s. Sika, Dubai Sikaflex Construction+

M/s. Dow Corning , Belgium Firestop 400, Fire stop 700

M/s. Henkel Polybit Industries, UAE/KSA Polyseal PS


As per tender
1. Surface preparation shall be done as per manufacturer recommendations.
M/s. Sika, Dubai Sikacryl FS-265, Sikasil – 670 document which Internal perimeter
Respective Fire resistant acrylic sealant .A fire rating of up 2. Sealant shall be applied by gun.
CE MS C 15 5 Fire Resistant Sealant Civil Sealant Substation ever is applicable Joint Sealant pointing around door & No Site
substation M/s. Hilti Emirates L.L.C, Dubai UAE CP 606 to 2 hours to be achieved. 3. The color of sealant shall match with approved wall paint system
for repsective window frames
project.
M/s. Tremco ILLBRUCK LLC, UK Dymeric 240 FC

M/s. Wurth,FZE, Dubai Art No: 0892-1701

Manufacturer:
M/s. Gulf Extrusions, UAE 1. Shop drawings to be prepared in line with engineering drawing & actual site measurements
M/s. White Aluminium Extrusion LLC and shall be submitted to supervising engineer at site for reviewing prior to start work at site.
As per tender
Fabricator: 2. Approved samples duly signed by DEWA engineer to be kept at site for ready reference.
document which
Respective Aluminium U Channel Size 25x15x1.5mm M/s. Inventure, Dubai External Surface & 3. Guarantee as per specification shall be furnished in due course.
CE MS C 15 6 Civil Aluminum Substation Shall Comply with civil specification ever is applicable To define architectural elements Grooves and Louvers Yes Site
substation or 20x10x1.5 mm M/s. Al Gurair, Dubai Parapet 4. Location of grooves shall be as per approved architectural drawings.
for repsective
M/s. Gulf Aluminium Rolling Mill, KSA 5. Aluminum Channel shall be power coated as per approved color scheme
project.
M/s. Champion Building material ,Sharjah (for external works).
M/s. Hussain aluminium Co, Sharjah 6. Sunken stainless steel screws shall be used to fix the channel
M/s. Star Tech Aluminium, Ajman
Manufacturer:
1. Aluminium claustra construction shall be as per DEWA practice.
M/s. Gulf Extrusions Co. LLC, Dubai
Aluminum profile section of maximum opening 2. Aluminium claustra ( Powder coating) shall be as per approved colour scheme
Fabricator:
As per tender size 40mm with powder coating to approved (for elevation).
M/s. Alba Tower Aluminium Factory, Dubai
document which color shade supported by aluminum panel 3. Certificate for anodizing and powder coating shall be submitted.
Respective M/s. Inventure LLC, metal product ind., Dubai IDT ,ET & Reactor front
CE MS C 15 8 Aluminium Claustra with Galvanized Mesh Civil Aluminium Substation Shall Comply with civil specification ever is applicable frame. Architectural Element 4. Shop drawing to be prepared in line with approved engineering drawings & actual site Yes Site
substation M/s. Fattah Aluminum Factory, Sharjah enclusure
for repsective Galvanized mesh fencing of opening size not measurements and the same shall be submitted a site for approval.
M/s. Al Barary Aluminium & Glass LLC, Dubai
project. more than 25 x 25 mm of 3.5 mm dia rod to be 5. Sections/Details shall be as per approved sample / drawing.
M/s. Technical glass & aluminium Co LLC, Dubai
fixed behind Claustra 6. Approved samples duly signed by DEWA engineer to be kept at site for ready reference.
M/s IKM dsc Engineering AS Norway
7. Guarantee as per specification shall be furnished in due course.

Type: Baab, Model: Alpo


1. The overhead door should be industrial type and vertical lift model.
M/s. Middel East Insulation , Dubai Motor: Marantec STA 1-11-19, IP 65 ,
2. Colour for internal should be as per Specification/DEWA approval and for external side
Germany / STAC-1-10-30, Germany / TORNADO-
shall be as per DEWA/Developer approval.
SD-100.24
3. Top seal and bottom seal should be provided to avoid entry of air, dust etc.
M/s. Indupart Ltd. UK Model: Ranger 91 RS05 4. Sandwich panel with rigid polyurethane foam infill between two aluminium skins of
thickness 0.70mm (min.) or steel skins of 0.50mm (min.) shall be used as recommended by

M/s. Richards - Wilcox Canada Inc., Canada Thermlume T200A the manufacturer.
As per tender
5. Shop drawings to be prepared in line with engineering drawing and actual site
document which
Respective Steel or Aluminium Insulated Polyurethane sandwich aluminum measurements and the same shall be submitted for review and final approval.
CE MS C 15 10 Insulated Overhead Door Civil Substation ever is applicable overhead door in GIS room 132kV GIS room Yes Site
substation (Sandwich Panel) panels with electrical/manual operation 6. Heavy duty hand chain to be used for hand operation.
for repsective
7. Each panel of door shall be provided with wind load bar to withstand prevailing wind load
project.
8. Considering maintenance point, the location of motor shall be easily accessible either
from crane platform or alternate arrangement should be made as per site conditions.

M/s. Kingspan, Belgium ACCESSA 9. Guarantee as per specification to be furnished in due course.
10. Approved sample duly signed by DEWA engineer to be kept at site for ready reference
11. The hot dip galvanized steel or aluminium skins shall be powder / epoxy coated backed up with 10 years guarantee.
12. Door shall be operated electrically as well as manually.
13. Motor protection class shall be IP 65.

©Transmission Engineering Department-2020 1 OF 24 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Material Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Related to Source / Manufacturer Product / Model No: T-Spec Ref General Description Use Location of usage General Comments Sample Remarks
ID Category inspection

Manufacturer:
M/s. Hindalco Industries Limited, India
1. Color shade of profile sheet should be as per DEWA/Developer approved colour
M/s. Onyx Industries, Sharjah UAE
scheme.
Fabricator:
2. Aluminium Profile sheet shall be 0.70mm ( minimum thickness) with “TSS 45/150”
M/s. Technical Supplies & Services, Dubai
trapezoidal profile and Purlin (Z12215)
M/s. National Shed Manuf. & Steel Material Co.,
3. Both sides of the profile to be protected as per manufacturer’s
Sharjah As per tender
recommendation/DEWA specification.
M/s. Rigidal Industries, Dubai. 0.70mm ( minimum thickness) with “45/150” document which
Respective Saw tooth roofing for IDT & 4. Fixing procedure shall be as per DEWA specification / manufacturer’s instructions.
CE MS C 15 12 Aluminium Profile Sheeting Civil Aluminum Substation M/s Pioneer profile, cont, Ind LLC, Sharjah trapezoidal ever is applicable 0.7mm thick aluminum sheet ET & IDT Roof Yes Site
substation ET bays 5. Screws to be fixed on the ridge of profile with chairs below.
M/s. Roofing Middle East FZE, Sharjah profile and Purlin (Z12215) for repsective
6. Shop drawing with fixing details to be prepared as per actual site measurements and to
M/s. Lootah Industries, Ajman project.
be furnished to the supervising engineer at site for review.
M/s. Standard Fabrication & Engg. Works, Dubai UAE
7. Washers to be provided in appropriate positions to avoid bimetallic corrosion.
M/s. Maha Metallic Industries Co LLC , Sharjah , UAE
8. Approved sample duly signed by DEWA engineer to be kept at site for ready reference.
M/s. Roof Metal Industries LLC, Sharjah
9. Guarantee as per specification shall be furnished in due course.
M/s. Link Middle East, UAE
M/s. Middle East Factory, Dubai
M/s. Profiles RH Factory LLC, Dubai

M/s. Hager, USA 520S 1. Extruded and silver anodized aluminium smoke sealed threshold-model no.IS4220
As per tender ( 125mm wide) saddle type with silicon rubber gasket to be used under steel doors
M/s.Lorient/Australia IS4220si document which Suitable profile with a smoke seal, of in basement as per approved architectural drawing.
Respective Steel Doors frame in
CE MS C 15 15 Smoke Sealed Threshold Civil Steel Substation ever is applicable approximitlay 12cm width, powder coated to To seal agaist smoke 2. Fixing shall be as per manufacturer's instructions. Yes Site
substation M/s. Pluto Products , Australia IS4220 Basement
for repsective the same color shade as the steel door. 3. Approved sample duly signed by DEWA engineer shall be kept at site for ready
project. reference.
M/s. Dormakaba, Australia IS4220si
4. Stainless steel screws shall be used to fix the threshold in position.

1. Floor Hatch door should carry two hours fire rating certification from concern
authority.
M/s. Extra Co., Sharjah
CHILT/A06138 2. One mock-up door to be fixed at site and offered for inspection by DEWA site
supervising Engineer at site. Bulk installation shall be proceeded after approval of
As per tender
Square floor hatch door 914x914 mm . mock-up door only.
M/s. BILCO, USA JFR-4 document which Fire escape exit from Basement of 11kV
Respective Fire Rated Floor Hatches Provided with emergancy exit facilities in 3. Extendable ladder to be provided to escape easily from basement to ground floor.
CE MS C 15 16 Civil Steel Substation ever is applicable Basement to the Ground Switchgear & 132kV GIS No Site
substation Size: 914 X 914mm accordance with NFPA 80 , having fire rating for 4. Installation shall be full compliance with manufacturer's instructions.
for repsective floor Room
minimum 2 hours 5. Detailed shop drawing should be submitted to the DEWA site engineer for review
project.
and approval.
M/s. Gorter Australia WA-ST-FR 7. Color shall be as per civil defense approval.
8. Fixing location shall be as per approved drawing.
9. Guarantee should be furnished in due course of time.
1. Ironmongeries must be made as mentioned in the list for “country of origin” of the
manufacturer.
JC603, 8100/6501, 8100/6621/6679. 115F, 151F, 2. Material must be offered to supervising engineers from the DEWA for inspection
M/s. Dormakaba, Germany, M/s. Dormakaba, Italy, 952, TS93G EN2-5, TS93G EN2-5HO, 9700FL, As per tender prior to unloading at site.
Ironmongery shall indicate the fittings to the
M/s.Dormakaba,Canada, M/s. Union, UK 9800FL, 9800 FL ETR, ZT08, ZT23, DEC-160-MK- document which 3. Slot to receive cylinder shall be compatible with the DEWA master key system.
Respective doors such as pull/push door handles, panic Fixed to the Steel /
CE MS C 15 17 Ironmongery Civil Steel Substation M/s. Dormakaba, USA HN3510800K, DEC-160-MK-DN3535Do0k, ever is applicable Subsation Buildings 4. Delivery note of the supplied materials to confirm the country of origin shall be submitted. Yes Site
substation door closure, locks etc from internationally Aluminum Doors
M/s. Elite, Germany 825235359 DM WC, 8070-FB-SS, TA 214, XDS 100 for repsective 5. One set of approved ironmongery to be fixed to a door at site in due course and
reputed manufacturer.
M/s. Global, Uk SS, XDS 102 SS, DEC160-MK-HN35108000K+DPS- project. shall be offered to DEWA site engineer before going for bulk installation.
ECO, TA104MD. 6. Approved sample duly signed by DEWA engineer to be kept at site for ready reference.
7. 10 years warranty as per DEWA specification shall be provided in due course.
8. All the ironmongeries should be fixed as per approved building door elevation drawings.

1. Chain link fence mesh 25x25mm of min. 2.5mm core diameter and 3.55mm with PVC
coating to be used.
2. Size and thickness of G.I. Pipes shall be as per approved architectural drawing.
3. Plate of size thickness shall be used as per the approved architectural
drawing.
M/s. Link Middle East, Dubai 4. Line wire shall be PVC coated wire dia 3.55/4.75mm, Stirrup wire dia 2.2/3.2mm dia &
M/s. Al Maha Metallic Industries, Dubai tire wire shall be PVC coated wire dia 1.8/2.6mm to secure fence fabric to line wire at
M/s. Overseas Distribution Services, Dubai 300mm centres.
Chain link fence mesh shall be 25x25mm of dia
M/s. Hi Tech Steel Industries LLC, Dubai - UAE As per tender 5. All metal to be hot dip galvanized and polyester powder coated with RAL 6005 green
2.50mm core wire – dia 3.55mm with PVC coating. GI
M/s Intercare limited , UAE document which Woven fence usually made from coated steel color.
Respective posts for the fence shall be of outer dia 88.9mm
CE MS C 15 18 Chain Link fence Civil Metalic Substation M/s. Standard Fabrication ever is applicable wire, having maximum opening 30mm fixied to Isolate capacitor Banks Capacitor Room 6. Factory inspection to be carried out before galvanization ( as per specification) of all Yes Site
substation (4mm thick) and outer dia 60mm (3.9mm thick). All
M/s. Middle East Ltd., UAE for repsective the panel frame of GI pipes posts.
metal parts shall be hot dip galvanized and painted in
M/s. Link Middle East LTD, Dubai project. 7. Color of fence to be as per the approved code.
approved RAL color.
M/s. Extraco , Sharjah 8. Work to be carried out by specialized team from the manufacturer/installer as per
M/s. NOTREDAME METAL Construction Co. LLC, the approved method statement.
DUBAI, UAE 9. Delivery note should be submitted to the site supervising engineer.
10. Shop drawings in line with actual site measurements and approved engineering
drawings to be furnished to supervising engineer at site for review.
11. Guarantee as per specification to be furnished in due course.
12. Approved sample board duly signed by DEWA engineer to be kept at each site for
ready reference.

Manufacturer:
M/s. Lionweld Meiser LLC, Dubai
M/s. caparo merchant barserated,
M/s. CAG celik demir Ve celik and
M/s. Llych iron steel works
M/s. Hyundai steel, Korea
M/s. JSC MITTAl steel Temirtau, Kazakhstan
M/s. ONC metal, turkey. M/s. Steel mould shrjah ltd,
UAE.
M/s. Dongbu Steel Co., Ltd, Korea
1. Grating (with non-slippery tooth) of size 45x5mm thick with spacing of 100x30mm for basement and Grade-S275JR
Fabricator:
shall be used.
M/s. Reliable Fabricators LLC, Dubai
2. Grating (with non-slippery tooth) of size 40x5mm thick with spacing of 25x25x5mm for IDT & ET transformer and
M/s. Danway Electrical and mechanical engg. LLC,
Grade-S275JR shall be used.
Dubai
3. Chequered plate of 8mm thick shall be used at locations as per approved drawing.
M/s. Notredame metal construction Co LLC, Dubai
4. Location of usage shall be as per approved drawings.
M/s. Standard Fabrication Engineering EST, Dubai
5. Inspection to be offered after welding, blasting & before proceeding galvanization.
M/s. Link Midlle East Limited, Dubai
6. Finishing shall be to the satisfaction of DEWA supervising engineer.
M/s. Link power building contracting LLC, Dubai Hot dipped chequered plate shall of minimum 8mm
As per tender 7. Blasting, Galvanization and coatings shall be done as per DEWA specification and by approved agency.
M/s. Galadari Engineering Works Ltd, Dubai thickness.
document which Transformer Bays, 8. Coating of Galvanization to be checked at site before placing at the corresponding location.
Respective M/s. Shams Al Sabah Steel Construction Contracting, Grating (with non-slippery tooth) of size 45x5mm Trench Cover
CE MS C 15 19 GI Gratings / GI Chequered Plate Civil Steel Substation ever is applicable Hot dip galvanized Industrial type heavy section Basement & other 9. Approved sample duly signed by DEWA engineer to be kept at site for ready reference Yes Site
substation Sharjah thick with spacing of 100x30mm and size 40x5mm Openings Cover
for repsective with non slippery tooth. openings. 10. Mill certificates shall be produced with material.
M/s Saqliya Steel Construction Contracting Dubai thick with spacing of 25x25x5mm with Grade-

©Transmission Engineering Department-2020 2 OF 24 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Material Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Related to Source / Manufacturer Product / Model No: T-Spec Ref General Description Use Location of usage General Comments Sample Remarks
ID Category inspection
M/s. Saqliya Steel Construction Contracting, Dubai thick with spacing of 25x25x5mm with Grade
project. 11. Samples of all materials shall be tested and copies of the test reports giving physical and chemical properties issued
M/s. System engineering LLC, Dubai S275JR shall be used.
to the engineer for approval.
M/s. Super Engineering Industry LLC & Al Jazira
12. Welding shall be done by certified welders in accordance with American welding society AWS D1.1
Industries Co. LLC
13. DEWA might ask for welding testing if required.
M/s. YMS Engineering, Dubai
14. The bolts connecting galvanized members shall be hot dipped galvanized.
M/s. Al Deraa Structural Steel and contracting LLC,
15. DEWA ITP shall be followed during fabrication as well as for installation.
Dubai
16. Actual site measurement shall be taken at site prior to start fabrication.
M/s. Diplomat Heavy Industries FZE, Sharjah
17. Material shall be delivered to site with proper packing to avoid damage during transportation and handling.
M/s. Gulf Steel Industries FZC, Sharjah
M/s. Technical Steel Engineering LLC, RAK
M/s. Lootah Industries (steel fabrication div.), Ajman
M/s. Future Metal Industries LLC, Dubai ( Minor
Works)
M/s. Oasis Metal Manufacturing LLC, Dubai ( Minor
Works)
M/s. Techno Fab, Dubai ( Minor works)M/s. Al
M/s. Maha Metalic Inudstries
M/s. Middle East Factory LLC, Dubai

As per tender 1. Polypropylene steps to be used only in shallow manholes.


M/s. R.B Agarwala Co. India
document which Manholes, cable pits and 2. GRP ladder to be proposed for approval to use in tanks (e.g: Oil-water/collection pits,
Respective Polypropylene step M/s. RSI Limited, Calcuta, India Galvanised (Hot Dipped) Iron steps with Facilitate access for
CE MS C 15 21 Civil Steel Substation KGM-16G ever is applicable IDT/ET/Reactor sump fire tanks & deep pits). Yes Site
substation reinforced with 16mm dia. steel. M/s. Ducast Factory LLC, Dubai polypropylene cover maintenance and inspection.
for repsective pits. 3. The sample, duly signed by the DEWA engineer to be available at site.
M/s. KGM Associates, India
project. 4. Location of use shall be as per approved RFC drawing.

M/s. Habas Sinai Ve Tibbi Istanbul, Turkey


M/s. Ekincler Iron & Steel Inc. Turkery
1. Mill certificate for each lot shall be provided to the consultant/DEWA supervising engineer
M/s. Emirates Iron & Steel Factory - Abu Dhabi
before unloading the material at site.
M/s. Saudi Iron & Steel Company - Saudi Arabia As per tender
2. Welded wire mesh fabric A252 ( 200x200x8mm weighing 3.9kg/sq.m) shall be used in
M/s. Sharq Sohar Steel Mill LLC, Oman A252 document which
Respective Sking Reinforcement in floor as shrinkage reinforcement for secondary concrete at locations indicated in the
CE MS C 15 22 Mesh Fabric (Non galvanized) Civil Steel Substation M/s. Al Ittefaq Steel Products Company,Saudi Arabia 8mm bar @ 200mm spacing ever is applicable 132kV Switchgear room Structural screed concrete Yes Site
substation secondary concrete approved drawing.
M/s. Conares Metal Supply Limited, Dubai. Weighing 3.9 kg/sq-meter for repsective
3. Storing of steel mesh fabric at site shall be as per manufacturer’s instructions.
M/s Sohar Steel LLC , Oman project.
4. Cut edges to be touched with the approved material.
M/s. Hamriyah Steel FZC, Sharjah
M/s. Jindal Shadeed Iron and Steel LLC, Oman

Site mix As per specification

M/s. Conmix Ready-Mixed PreMixed, Sharjah BRC, CRC-MS


1. Surface preparation, mixing, application, curing shall be as per specifications and
M/s. Dubai Plaster Dry Mix LLC, Dubai DP 140, DP 140HP As per tender manufacturer's instructions.
document which 2. Necessary tests should be done to ensure the flexural, compressive strength as per
Respective M/s. Lootah Cementation, Ajman LCBRC Surface preparation for for RCC vertical surface and
CE MS C 15 23 Rush Coat Civil Plastering Substation ever is applicable Background for Cement Plaster. specifications, BS standards and submit the test reports to the DEWA supervising No Site
substation plastering ceiling
M/s. RAKFIX LLC, Ras al khaimah RAKFIX014 for repsective engineer at site.
project. 3. Integral waterproofing agent to be mixed/applied as per specification.
M/s. Arkan Building Material Co. Dubai, UAE Arkan 300

M/s. Minotti Dry Mix Factory RAK, UAE MINO 140

M/s. Plaxit Dry Mix Co., Dubai Plaxit 114

Site mix As per specification


1. Work shall be carried out under the direct supervision of the manufacturer's representative.
M/s. Conmix Ready-Mixed PreMixed, Sharjah CP2 2. Mixing, placing and curing should be as per the manufacturer’s method statement.
3. Application shall be as per specifications and manufacturer’s method statement which shall
As per tender
M/s. RAKFIX LLC, Ras al khaimah RAKFIX 020, 025 be submitted to DEWA site engineer. Specialized applicator shall be proposed separately.
document which Internal wall surface of
Respective M/s. Plaxit Dry Mix Co., Dubai Plaxit 150 WP Background to recive 4. Delivery note of the materials shall be submitted to DEWA site engineer for confirmation
CE MS C 15 24 Internal Plaster Civil Plastering Substation ever is applicable Retarded semihydrate gypsum-plaster. substation building No Site
substation internal paint of the material.
M/s. Lootah Cementation, Ajman LCSCR for repsective (block work & RCC)
5. Plaster accessories to be used shall be as per the DEWA approved material for this
project.
M/s. Dubai Plaster Dry Mix LLC, Dubai DP 200/HP, DP 200 project.
6. Onsite sampling shall be done, witnessed by supervising Engineer and tested by approved
M/s. Arkan Building Material Co. Dubai, UAE ARKAN 200
laboratory to satisfy with compressive and flexural strength.
M/s. Minotti Dry Mix Factory RAK, UAE MINO 200

As per specification
Site mix
M/s. Conmix Ready-Mixed PreMixed Plaster 1. Application shall be as per specifications and manufacturer’s method statement which shall
CP2 (WP ), CP2 HP
const.,Sharjah be submitted to DEWA site engineer. Specialized applicator shall be proposed separately.
M/s. Plaxit Dry Mix Co., Dubai Plaxit 150/1 External wall 2. Mixing, placing and curing should be as per the manufacturer’s method statement.
As per tender Background to recive
Cement , mortar mix ratio 1:4 , added with a Sufrace,pump housewalls, 3. Delivery note of the materials to be submitted at site office for confirmation of the material.
M/s. Lootah Cementation Ajman, UAE LCSCR-WP document which external paint
Respective waterproofing agent. capacitor room & IDT 4. Bonding rush coat shall be used on the concrete/block surfaces prior to plastering.
CE MS C 15 25 External Plaster Civil Plastering Substation ever is applicable - Provide insulation to No Site
substation Consists of portland cement, expanded perlite, (block work & RCC) 5. Plaster accessories to be used shall be as per the DEWA approved material for this project.
DP 222, DP 200/HP, DP-230/HP for repsective external surfaces of concrete
M/s. Dubai Plaster Dry Mix L.L.C processed sand and chemical additives. - External Cloumn & 6. Onsite sampling shall be done, witnessed by supervising Engineer and tested by approved
project. cloumns
RAKFIX 025WP Beams laboratory to satisfy with compressive and flexural strength.
M/s. RAKFIX LLC, Ras al khaimah
7. Work shall be carried out under the direct supervision of the manufacturer's representative.
M/s. Arkan Building Material Co. Dubai, UAE Arkan 200 8. Thermal conductivity of the material shall be in line with DM regulations.

M/s. Minotti Dry Mix Factory RAK, UAE MINO 200HP

©Transmission Engineering Department-2020 3 OF 24 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Material Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Related to Source / Manufacturer Product / Model No: T-Spec Ref General Description Use Location of usage General Comments Sample Remarks
ID Category inspection

JOTUN:
Internal Painting System:
Ceiling & Beams:
i) 1 coat x Acrylic Primer
ii) 2 coat x Durathane White
Walls & Columns:
i) 1 coat x PVA Primer
ii)2 coats x Stucco
iii)2 coats x Fenomastic Emulsion Matt
iv) Color code Off white (As per approved internal
color scheme)
M/s. Jotun Paints , Dubai
Walls & Columns - Epoxy paint system (up to
2000mm from skirting) in 11kV SWGR & 132kV GIS
room.
i) 1 x Penguard clear sealer , 1 x Penguard HB
(A+B).
ii) 1 x Penguard Texo.
iii) 2 x Penguard Topcoat.
(Color - As per approved internal color scheme).
External Painting System
i) 1x Acrylic Emulsion Primer
ii) 1x Texo Compound
iii) 2x Durathane ( Color code as per approved color
scheme )

NATIONAL:
Internal Painting System
i) Walls & Columns:
a] 1 coat x National PVA Primer
white.
b] 2 coats x National Stucco
filler.
c] 1 coat x National Matt Emulsion.
d] 1 coat x Eggshell Emulsion Matt.
e] Color Code 801 off white.
ii) Ceiling & Beams: Washable emulsion paint with approved color
1 coat x National PVA Primer white. coating shall be applied to all fair faced ceiling
2 coats x National shield topcoat gloss concrete.
Color code 800 white. A colored liquid mixture, used as protection

M/s. National Paint Factories Co. LTD, Sharjah or coating Internally & Externally
Emulsion Paints
1 coat x National PVA Primer white.
High quality pure acrylic copolymer based
1 coat x National spray plaster medium
washable emulsion paint containing fungicides
2 coat x National spray plaster fine 1. Sample board signed by DEWA design engineer shall be kept at site for ready
to prevent fungus growth used along with
2 coat x National Matt emulsion reference.
compatible primer
2. Mockup sample ( 1M x 1M) shall be prepared at site to confirm workmanship prior to
Primer Coat
iii) Epoxy paint system (up to 2000mm from starting whole work.
As per tender Light textured acrylic copolymer base emulsion
skirting)– 11kV SWGR & 132kV GIS room. Internal (Walls, Columns, 3. Application shall be in full compliance with manufacturer’s recommendation.
document which coat
Respective 1x National Guard primer for cement clear Beams & Ceilings) & 4. Work to be carried out by DEWA approved painting applicator for this project.
CE MS C 15 27 Paint Civil Painting Substation ever is applicable Under Coat (Compound) Protect concrete serface Yes Site
substation 1x National Interguard H.B (smooth) External (Wall & Columns 5. Wall at eye-wash area shall be finished with approved tiles.
for repsective spray applied acrylic emulsion based textured
2x National Polyurethane Top Coat ( Matt finish) ) 6. Guarantee as per specification to be furnished in due course.
project. compound
External Painting System 7. RAL for other members ( GRC, Aluminium items, structural steel items, Overhead
Texterd coat
1 x National Acrylic Primer (W.B) door etc if applicable) in line with approved colour scheme shall be submitted for
light texturuling textured acrylic copolymer
1 x National nutex spray (Texture) approval.
based texture compond
2 x National Polyurethane topcoat 8. Moisture/dampness to be checked prior to painting and kept in record.
Two coats(External)
9. Color for the polyurethane top coat shall be as per approved external color scheme
high quality two component polyurethane
HEMPEL:
isocyanite cured paint giving a high glossy and
Internal walls & Columns
color stable surface.
i)1x MAESTRO PRO PRIMER 28832
Oil Paints
ii)2xMAESTRO Putty Filler 38820
Best quality high gloss alkyd based enamel paint
iii) 2 x MAESTRO MATT EMULSION 594ME
with compactible primer resistant to corrosion,
B. Walls & Columns - Epoxy paint system (up to
water, and fungus.
2000mm from skirting) in 11kV SWGR & 132kV GIS
room.
i) 1 x HEMPADUR SEALER 05990
ii)2 x HEMPADUR HI-BUILD 45200
iii) 1 x HEMPADUR MASTIC 45881
M/s. Hempel Paints LLC, Sharjah
C. Internal Ceiling and Beams
i) 1 x HEMPEL HI BUILD PRMIER 45200
ii) 2 x HEMPEL POLYURETHANE GLOSS ENAMEL
552 ME

D. External Walls
i) 1 x MAESTRO WB PRIMER 28830 ii) 1 x TOPAZ
SPATTER FINISH (SPRAY TEXTURE) 58860
iii) 2 x HEMPEL POLYURETHANE GLOSS ENAMEL
552 ME

©Transmission Engineering Department-2020 4 OF 24 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Material Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Related to Source / Manufacturer Product / Model No: T-Spec Ref General Description Use Location of usage General Comments Sample Remarks
ID Category inspection

SIGMA:
Internal Painting System
i) Walls & Columns:
a] 1 Coat x Sigma Masonry Primer 0805.
b] 2 Coats x Aquafill wall filler fin 0864.
c] 2 Coats x External topcoat AF-0968.
ii) Ceilings:
a] 1 Coat x Sigma Acrylic Primer Sealer 0852.
b] 2 Coats x Sigmadur Flat Finish 0865.
M/s. Sigma Paints, Dubai External Painting System
a] 1 Coat x Sigma Acrylic Primer Sealer 0852.
b] 2 Coats x Sigma Textured MP 0815.
c] 2 Coats x Sigmadur Finish High Gloss 0866.
Walls & Columns - Epoxy paint system (up to
2000mm from skirting) in 11kV SWGR & 132kV GIS
room.
a] 1 Coat x Sigma Acrylic Primer Sealer 0852.
b] 2 Coats x Sigma Concrete Filler 0896.
c] 2 Coats x Sigmacover 480-7441.

All structural steel works shall be hot Dip


JOTUN: Primer 1x Penguard, special red galvanized. Painting system : 1x Primer
M/s. Jotun Paints , Dubai Midcoat 1x Penguard MIO, grey Coat+1x Under Coat+2x Top Coat
1. All steel members shall be “Hot dip galvanized” (90 microns minimum) and painting system
Topcoat 2x Hardtop XP The painting system shall comprise of:
shall be as follows above of hot dip galvanization members.
1-Two component polyamide cured high
a. Primer - 75 Micron
SIGMA: molecular epoxy coating primer -75 micron
b. Midcoat -100 Micron
Primer: 1 coat x Sigmacap Zinc DFT.
M/s Sigma Paints, Dubai c. Topcoat - 80 Micron
Under: 1 coat x Sigmacap Coating EP 2-Two component polyamide cured epoxy with
2. Galvanization certificate shall be submitted for all structural steel works.
Top: 2 coats x Sigmacap Finish PU As per tender natural micceous iron oxide - 100 micron DFT.
3. Contractor is advised to submit the stagewise inspection procedures for all structural
document which 3-Two component polyurethane finishing coat - Handrail, Spiral staircase,
Respective HEMPEL: Protect Structural Steel steel works to the DEWA site engineer.
CE MS C 15 28 System for structural steel protection Civil Painting Substation ever is applicable 40micron DFT cat Ladders, other steel No Site
substation Primer: 1x Hempel Galvosil 15700 / Hempadur works 4. Painting system for structural steel should be line with specification, Painting colour code
for repsective Protection for galvanized steel metal
15570 Midcoat: 1x Hempadur M10,47950 / for all internal members should be as per DEWA approval and all external members should
project. Epoxy polyamide cured primer (solids by volume
M/s Hempel Paints (Emirates) LLC Hempadur Mastic 45880 / Hempadur Mastic 45881 be as per DEWA/Developer approval.
50% to 60%)
Topcoat 2x Hempathane Top Coat / Hempathane 5. Applicator shall be approved by DEWA.
Followed by epoxy polyamide cured high build
Top Coat 55210 / 89930 6. Surface preparation and application shall be as per DEWA specification & manufacturer
(solids by volume 50% to 60%) under coat
recommendation/method statement.
topped with a 2- component polyurethane
7. Guarantee as per specification to be furnished in due course.
NATIONAL: isocyanite cured paint with excellent color and
8. GI mesh and supporting angle can be accepted with powder coating.
PRIMER: 1 coat x National Zinc Phosphate gloss retention properties and resistant to
M/s. National Paints, Sharjah
MID: 1 coat x National Guard MIO H.B. abrasion, impact, chemical attacks and
TOP: 2 coats x National polyurethane Topcoat. corrosion.

M/s Henkel polybit industries, UAE/KSA POLYGLOW / Polycoat / Polycoat RBE


1. Black bitumen emulsion paint shall be of high quality water resistant paint.
M/s. Emirates Speciality Company LLC, Dubai SPEC
2. The finished film thickness (DFT) shall be as per manufacturer's instructions and the finish

M/s. National Paints Factories Co. Ltd, UAE National Bitumen Emulsion Paint As per tender film shall be uniform, smooth and free from runs & sags.
document which 3. Surface preparation, priming & application shall be as per manufacturer's instructions.
Respective High Quality moisture resistant bitumen paint Protect concrete serface
CE MS C 15 29 Black Bitumen Emulsion Paint Civil Painting Substation M/s. BASF construction chemicals LLC UAE Masterseal-410C / Masterseal 611 ever is applicable Above Suspended ceiling 4. Minimum 2coats shall be applied to cover the surface. No Site
substation in black color from moisture
for repsective 5. Inspection to be offered to the DEWA site engineer for the material as well as the
Epilux -5 Coal tar epoxy with Solvalux 7-45 project. concrete surface prior to application.
Epilux 160 (RU) Primer -Flexible primer with
Berger Paints Emirateds Limited Co LLC/UAE
Solvalux 7-45
Luxaprime 1500 Etch Primer with Solvalux 5-30

M/s Henkel polybit industries, UAE/KSA POLYHARD L 1. The concrete surface should be prepared as per manufacturer’sinstructions.
As per tender Concrete surface under
2. Application should be as per manufacturer’s instruction. Method statement from manufacturer to be submitted to the
M/s. Al Gurg Fosroc LLC., Dubai Nitoflor Lithurin 2 document which Material for treating the concrete surface which raised flooring in LVAC
Respective DEWA site engineer before proceeding with the work.
CE MS C 15 30 Dust Proofer/Surface Hardner Civil Painting Substation ever is applicable will not receive any subsequent finishes, shall Dust proofing seal coat room, control/protection No Site
substation M/s. SODAP Liban, Dubai SODAP 3. The concrete surface should be made smooth and even.
for repsective comprise of a epoxy based sealer and hardner. room. Telecom room, DC
4. The surface should be properly cured, cleaned & dried.
project. charger & corridor
M/s. BASF construction chemicals LLC UAE Master Top 20

LINDER: Stringer : Box Type RB H (30x40x1.2mm)


LIGNA 38STXM 40 with top finish
1.2 mm thick HPL & bottom 1.0mm galvanized steel
M/s. Lindener AG, Germany sheet.
Pedestal: M4
1. Stringer : Box Type (30x40x1.2mm) Galvanized steel and blue passivated, stiffening & gasket top.
2. Panel : - (600x600x40mm) high-density chipboard panel with top finish

INTEC: Panel PT 40 ( 600x600x40.2mm) with top 1.2 mm thick HPL laminated, sitting on 1.0 mm galvanized steel sheet.

finish 1.2mm thick HPL Laminated & bottom 1.0mm 3. Pedestal: Galvanized steel and blue passivated pedestal tube of 25mm dia & 2mm thick., with head, gasket, threaded

M/s. INTEC ITALY, Italy galvanized steel sheet. rod & base plate of 2.5mm thick. Height should be as per approved drawing.

Pedestal type dew 24x2mm 4. General : - Tile cut edges shall be trimmed with same ABS material using heating method. - Entire raised floor system
Raised access flooring system that can range in
Stringer 30x40x2mm box type. shall be independent of equipment support.
height. Flooring consist of floor panels
- All approved sample duly signed by DEWA engineer to be kept at site.
supported continuously on all four edges on
Stringer box type 50x30x2mm As per tender - Shop drawings in line with MEP/FPS, electrical requirement and actual site
easily removable snap-on metal stringers
Panel: Type AVR-HWC-HPL (55) 600x600x40mm document which Corridor, LVAC, control, measurement should be submitted to DEWA site for approval prior to
Respective supported on steel adjustable pedestals or Construct a cable basement
CE MS C 15 31 Raised Floor System Civil Floor Finishing Substation M/s. Avayo Electronics canada corporation, KSA with top finish 1.2mm HPL laminated & bottom ever is applicable protection, charger & installation. Yes Site
substation supports, with arrangment to resist side below floor level
1.0mm galvanized steel sheet for repsective telecom rooms - Pedestal shall be fixed mechanically in addition to glue fixing.
sway(letaral movement).
Pedestal 32mm Dia with 2.5mm thick. project. - Installation/Erection shall be carried out by specialist approved by DEWA.
- Pedestals shall not fixed on cable trays. Bridging to be done wherever cable
Raised floor system can above stable frame
MERO: Box Type (400x30x1.5mm) Panel : - Type trays obstruction pedestals.
supporting system as well.
- Entire raised floor system shall be independent of equipment support.
5GB 40 (600x600x40mm) with top finish
M/s. MERO TSK International, Germany 5. Bracing system - All peripheral pedestals shall be braced.
1.2 mm thick HPL laminated & bottom 1.0 mm
6. Guarantee as per specification to be provided in due course.
galvanized steel sheet.
7. Pedestals, stringer and tiles shall have manufacturer embossing on it.
Pedestal: (Type D25-M20)
8. Separate details for equipment supports shall be submitted to the concerned engineers.

Box Type (25x25x1.5mm, 538mm length) Panel : -


PEW40HDS-HPL (600x600x38mm) with top finish
1.2 mm thick HPL laminated & bottom 1.0 mm
M/s. Jiansu Huilian Access Floor Co. Ltd, China
galvanized steel sheet.
Pedestal: Yellow chromated steel pedestal tube of
32mm dia & 2mm thick

©Transmission Engineering Department-2020 5 OF 24 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Material Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Related to Source / Manufacturer Product / Model No: T-Spec Ref General Description Use Location of usage General Comments Sample Remarks
ID Category inspection

M/s. Al Jabri Crusher, Dubai


M/s. Lootah Group Crusher, Al Fujairah
M/s. Al Jaber Crusher & Quarry, UAE
M/s. Masaffi, Dubai
M/s. Top link crusher LLC Ajman UAE 1. Road base material (Each lot) should be offered to DEWA site engineer for inspection
M/s. Al Amara Crushers, Ajman UAE As per tender prior to unloading at site.
M/s Ali Moosa & Sons Crushers document which Below structural 2. Quarry name to be specified in the delivery notes.
Respective Sub base consisting of well graded natural Prepare formation for load
CE MS C 15 32 Road Base Civil Soil Improvement Substation M/s Wadi Al Rawada Shall comply with civil specification ever is applicable foundation and internal 3. Representative sample to be sent to the approved laboratory for testing to confirm No Site
substation sands, gravels or rock bearing serface
M/s.Fujairah National Construction & Transport, for repsective road the requirements of physical and chemical properties as per soil report and test
Fujairah project. report shall be submitted for final approval before placing.
M/s. Al Shoala Crusher
M/s.Adroit enterprises LLC. Dubai
M/s. Fala Bldg. Material, Dubai
M/s. Al Kawther Crushers, UAE
M/s. Al Oman General Transport LLC., UAE

FOSROC:
Primer: Nitoprime WB / Nitoprime 25.
Screed: Nitoflor TF5050 / Nitoflor TF5000.
Epoxy 1st & 2nd coating: Nitoflor FC140.
M/s Al-Gurg Fosroc LLC, Dubai
Henkel Polbit:
Floor Cleaning: POLYCLEAN
Epoxy Primer: POLYPRIM-EP
Epoxy Floor Screed: POLYPOXY
Epoxy 1st & 2nd coating: POLYPOXY FC(S)

BASF:
Screed System:
a) Primer – Mastertop 1240
b) Screed – Mastertop 1240
c) 1st & 2nd Epoxy coating – Mastertop 1120
M/s. BASF construction chemicals LLC UAE
(color: RAL-7040).
Epoxy Painting on concrete floors:
a) Primer – Mastertop 1120
11kV Switchgear room, 1. Manufacturer's method statement should be strictly followed.
b) 1st & 2nd Epoxy coating – Mastertop 1120 (color:
Transformer plinth, 2. Application shall be under direct supervision of representative from manufacturer/supplier.
RAL-7040). As per tender
capacitor bank, record, 3. Storage of material shall be as per manufaturer instructions.
document which Solvent free epoxy resin mortar screed
workshop, fire pump 4. Approved sample duly signed by DEWA engineer to be kept at site for ready reference.
SIKA: ever is applicable comprise a three component system of epoxy Floor Finishing Yes Site
house, air lock room, 5. Guarantee as per specification to be furnished in due course.
a) Primer – Sikafloor-161 for repsective resin, hardner and mineral aggregates.
Nitrogen room, Stair case 6. Pot holes, pin holes and Floor undulations shall be rectified by approved material as per manufacturer's instructions.
M/s Sika LLC, UAE b) Screed – Sikafloor-190 project.
steps and loading corridor
c)1st coat Epoxy – Sikafloor-264 SG
in first floor
Respective d)2nd coat Epoxy –Sokafloor-264 SG
CE MS C 15 33 Internal Epoxy Screed Civil Floor Finishing Substation
substation

CORROTECH:
Floor Cleaning: DISSOLVENT IS.
M/s. Corrotch Construction Chemicals, Dubai
Epoxy Primer: ISOPRIME 30-S.
Epoxy Floor Screed: ISOPOX 327.
Epoxy resin coating: POXILON-S ( 2 coats).

CONMIX:
Screed System:
a) Primer – Resigard Primer SF
b) Screed – Resigard ES
c) Primer - Resigard Primer SF
M/s. Conmix Limited Co LLC, Dubai d) 1st & 2nd Epoxy coating – Resigard EC-S (color:
RAL-7040).
Epoxy Painting on concrete floors:
a) Primer – Resigard Primer SF
b) 1st & 2nd Epoxy coating – Resigard EC-S (color:
RAL-7040).

HENKEL POLYBIT:

M/s Henkel polybit industries, UAE/KSA Primer: POLYPRIM-EP


Screed: POLYPOXY
1st & 2nd coating: POLYPOXY FC(S)

FOSROC:
M/s Al-Gurg Fosroc LLC, Dubai
Primer – Nitoprime 25
Screed – Nitoflor TF5000 / Nitoflor 120UB
1st & 2nd coating – Dekguard PU (color: RAL-7012).

BASF:
Screed System:
Primer – Mastertop 1240
Screed – Mastertop 1240
Mastertop P650 primer
M/s. BASF construction chemicals LLC UAE 1st & 2nd Epoxy top coat – Mastertop TC-256 (UV
Resistant) (color: RAL-7012).
Epoxy Painting System:
Primer – Mastertop P 650
1st & 2nd Epoxy coating – Mastertop TC-256 (UV
Resistant) (color: RAL-7012). Aliphatic Acrylic-Polyester Polyurethane, high 1. Method statement should be submitted to the DEWA site engineer prior to proceed with works

©Transmission Engineering Department-2020 6 OF 24 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Material Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Related to Source / Manufacturer Product / Model No: T-Spec Ref General Description Use Location of usage General Comments Sample Remarks
ID Category inspection

build, low sheen finish that has excellent 2. Application shall be under direct supervision of representative from manufacturer/supplier.
SIKA:
As per tender resistance to corrosion, chemicals and 3. Material storage shall be as per manufacturer's recommendation.
Primer – Sikafloor-161
document which abrasion.Suitable for application over a number External Area, off -loading 4. Floor undulations shall be rectified by approved material as per manufacturer's instruction.
Respective Screed – Sikafloor-190
CE MS C 15 34 External Epoxy Screed Civil Floor Finishing Substation M/s Sika LLC, UAE ever is applicable of Carboline primers and intermediates, this Floor Finishing platfroms, External steps 5. Anti slip materials to be used at steps/ramps. Yes Site
substation 1st coat Epoxy – Sikafloor-264 SG+3% extender T
for repsective material provides very good weathering etc., 6. Mixing application and sealing shall be as per manufacturer recommendation.
2nd coat Epoxy –Sokafloor-359 SG-Seal Coat UV
project. performance in a broad range of colors.Capable 7. Guarantee as per specification to be furnished in due course.
Resistant
to withstand alternate heat and cold Prevailed 8. Approved sample duly signed by DEWA engineer to be kept at site for ready reference.
CORROTECH: externally
Floor Cleaning : DISSOLVENT IS
M/s. Corrotch Construction Chemicals, Dubai Primer : ISOPRIME 30-S
Floor Screed : ISOPOX 327
1st & 2nd coating : CARBOTHANE 133 HB

CONMIX:
Epoxy Screed System:
Primer – Resigard Primer SF
Screed – Resigard ES
Primer - Resigard Primer SF
1st & 2nd Epoxy top coat – Resigard PU (UV
M/s. Conmix Limited Co LLC, Dubai
Resistant) (color: RAL-7012).
Epoxy Painting System:
Primer – Resigard Primer SF
1st & 2nd Epoxy coating – Resigard PU (UV
Resistant) (color: RAL-7012).

M/s. Supreme Floors, France


SO 100P

PVC skirting for Raised floor tiles SO 100 – black in colour, 100mm high / 19mm cove shall be used
As per tender Form a waterproof seal Fixation at walls and floor shall be as per the manufacturer’s recommendations and carried out by approved applicator.
document which between the floor and the Location of usage shall be as per the approved drawing/finishing schedule.
Respective 100mm High block in color polyvinyl chloride
CE MS C 15 35 PVC Skirting Civil Finishing Substation M/s. Gradus Accessories, UK SO 100 Black ever is applicable wall, and provide a neat, Raised floor area Contact adhesive / L80 Multi bond gold adhesive shall be used for skirting Yes Site
substation membrane with coving
for repsective attractive join between the Delivery certificate to be produced to site supervising engineer for confirmation of the material
project. wall and the floor. Approved sample duly signed by DEWA engineer to be kept at site for ready reference
Location and purpose of usage in substation:
Form a waterproof seal between the floor and the wall, and provide a neat, attractive joint between the wall and the floor
M/s. Marley Floors Ltd., England SO 100P
(raised floor area).

M/s. B & A Crusher,


Ras Al Khaimah.
M/s. Emirates Gabbro Quarries LLC.
As per tender
Ras Al Khaimah
document which Stone chips are to be clean hard crushed stone uniform grade of 20mm as per specification requirements.
Respective M/s. Lootah Group Crusher, Fujairah Stone chippings for use as substation surfacing are
CE MS C 15 36 Stone chips Civil Finishing Substation ever is applicable Coarse crashed aggregate of size 16-40 mm Surface dressing Yard area Stone chippings shall be laid and compacted to a minimum finished thickness of 100mm and as per RFC drawing. Yes Site
substation M/s. Al Kawther Crusher LLC, Dubai to be clean hard crushed stone uniform grade 20mm.
for repsective Delivery note containing the detail of quarry name shall be offered to the supervising engineer at site for inspection prior
M/s. Masafi Crusher, Fujairah,
project. to unloading.
M/s. Top Link Crusher LLC, Ajman, UAE
Approved sample to be kept at site for ready reference.
M/s. Ali Mousa & Son's Crushers, Ajman, UAE
M/s. Emaar Mahdha company, Oman
M/s. Wadi Al Rawdha

M/s. Emaar Mahdha company, Oman


M/s. Lootah Group Crusher, Fujairah 1. Cobble stones (size: 35-55mm, non-flake type round in shape) must be offered for physical
M/s. Emirates Gabbro Quarries LLC., RAK inspection to the DEWA supervising engineer at site prior to unloading.
As per tender
M/s. B & A Crusher, RAK 2. Delivery note shall be produced to the DEWA engineer for each lot.
document which
Respective M/s. Fujairah Ntional Construction & Transport Co Create void in the thrench to 3. Delivered material should be free from dust, mud etc
CE MS C 15 37 Cobble Stones Civil Finishing Substation non-flake cobble stone of size 35mm to 55mm ever is applicable 35-50 mm size cobble stone, non flake in shape Transformer trench Yes Site
substation LLC accommodate oil\ water 4. Name of Quarry/source to be specified in the delivery note of the supplied material and delivery notes to be handed
for repsective
M/s. Wadi Rawda Trading, Dubai. over to DEWA supervising engineer for physical inspection before unloading the cobble stones at site.
project.
M/s. Amar Mahda Company Al Semimi Mahda Oman 5. Sample approved by DEWA engineer to be kept at site for ready reference.
M/s. Masafi Crusher, Fujairah, 6. Cobble stones (should not be crushed material) shall be cleaned thoroughly prior to filling.
M/s. ADS crusher, Oman
M/s. Tarmac Quarryman, Oman
M/s. Al Jabri Crusher, Ajman

M/s. Henkel Polybit Industries, UAQ/KSA Ceresit CM8, CM 9 As per tender 1. Tile adhesive to form a bed not more than 3mm thick. Lay tiles dry and tamp well down to ensure a proper bond with
document which base and a level surface.
Respective M/s. Al Gurg Fosroc LLC, Dubai Nitotile 489, Nitotile GP Wall & Floor in Toilet &
CE MS C 15 38 Tile Sealant Civil Sealant Substation ever is applicable High performance waterproof tile Sealant Fix ceramic tile 2. Application and mixing details shall be as per manufacturer's instruction. Yes Site
substation Pantry
M/s. BASF construction chemicals LLC UAE Master tile RSG-705, Mastertile 30 for repsective
project.
M/s. Mix Uk Ltd, United Kingdom MIXTILE MTA

M/s. Henkel Polybit Industries, UAQ/KSA 1. Sealant color should match with the floor/wall tiles color.
Polybit CE 33, CE36 As per tender
document which Fill the joints of tiles where 2. Application and mixing details shall be as per manufacturer's instruction.
Respective M/s. BASF construction chemicals LLC UAE Mastertile 530L, Master tile RSG 705, Wall & Floor in Toilet &
CE MS C 15 39 Tile Grout Mortar Civil Grout Substation ever is applicable Waterproof tile grout the joint width not exceed 3. To be used only where the joints width are not exceeding 2mm. No Site
substation Pantry
M/s. Al Gurg Fosroc LLC, Dubai Nitotile 489, Nito Grout XS for repsective 4mm 4. Mock up shall be prepared on site before proceeding the whole work.
project.
M/s. Mix Uk Ltd, United Kingdom MIXGROUT MG

As per sample submitted.


Tiles shall have chamfer at top edge.
M/s. Terrazzo Ltd Co, Sharjah As per tender
Curing, Inspection and test plan, Loading and delivery shall be as per manufacturer's
M/s. Fujairah Marble & Tiles Factory document which
Respective instructions.
CE MS C 15 40 Precast Concrete Tile Civil Tiles Substation M/s. Al Serkal & Assarain Concrete Products LLC, Size: 400 X 400 X 40mm ever is applicable Precast Tile with chamfer at top edge Roof Finishing Roof Terrace Yes Site
substation Necessary test certificates to ensure the strength of concrete shall be submitted along
Dubai for repsective
with material inspection.
M/s. Bucomac Industries LLC, Dubai project.
Work shall be carried out as per approved method statement.
Material technical details should be inline with DM regulations.

©Transmission Engineering Department-2020 7 OF 24 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Material Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Related to Source / Manufacturer Product / Model No: T-Spec Ref General Description Use Location of usage General Comments Sample Remarks
ID Category inspection

Materials:
Interlock tiles with following thickness & color.
a) Foot path : RED (60mm thick)
M/s. Consent LLC, Dubai
b) Internal Road : GREY (80mm thick)
M/s. National Tiles & Blocks Co, Ltd., Ras Al Khaimah
c) Service lines : BLACK (thickness as per location)
M/s. Fujairah Building Industries, Fujairah As per tender Interlocking concrete block
d) Kerbstone “Half Batter K40-size 600x200x400”
M/s. Phonix Concrete Products., Dubai document which paving shall be 60mm thick for footpath, 80mm
Respective Footpath - RED color(60 mm thick), Road - GRAY External Area (Road &
CE MS C 15 41 Interlock blocks & kerb stone Civil Tiles Substation M/s. EMCON L.L.C, Dubai, UAE ever is applicable for internal road. Paving and footpath blocks No Site
substation (80 mm thick) and Service Lines - BLACK (thickness surfacing) Comments:
M/s. Al Serkal & Assarain Concrete Products LLC, for repsective Kerb
as per location). 1. DM certificate shall be provided for each lot.
Dubai project. Pre-cast concrete
2. Starter blocks to be used at edges for interlock paving.
M/s. Apex Concrete Block Factory, Dubai
3. Mockup shall be prepared at site for final approval before commencement of the work.
M/s Bucomac Industries LLC, Dubai
4. Kerb stone shall be laid as per specification and approved drawing.
5. Interlock tiles & kerbstone should comply with DM regulations and guidelines.
6. Bedding and haunching shall be provided for kerbstone.

M/s. Terrazzo Ltd Co, Sharjah


M/s. Fujairah Marble & Tile Factory, Fujairah
M/s. Al Massa Marble & Granite Factory,
M/s. Shakra Marble, Sharjah
1. Materials to be cut as per actual site measurements to fit properly.
M/s. Glaze Granite & Marble, AbuDhabi
2. Approved samples duly signed by DEWA engineer to be kept at each site for ready
M/s. Italian Marble & Granite FZE, Sharjah, UAE
As per tender reference.
M/s. White Carrara- Carrara, Italy Carrara marbel threshold single piece with edge
document which 3. Joints alround the window frame shall be sealed with approved elastic filler and the color of
Respective M/s. City crystal marble trading LLC, Dubai, UAE coving Stop/ adjust gap between
CE MS C 15 42 Marble threshold Civil Tiles Substation White Marble Threshold (width: 290 x 30mm thick) ever is applicable Threshold: Steel Door the filler should match with approved painting system. Yes Site
substation M/s. Al Intema Marbles Fix. LLC., Sharjah. Carrara marbel sill whereever change in floor floor and bottom of shutter.
for repsective 4. Marble threshold to be of single piece for all doors and to be fixed as per approved
M/s Marble World LLC, Ajman. finishes from one to other room.
project. architectural drawing.
M/s. Bin Lootah Crusher and Factories, Ajman
5. Width of marble threshold shall be same as that of the finished one.
M/s. EISA AL MARSHOODI, Sharjah
M/s. Olive Building Materials Trading LLC, Dubai
M/s Omani Beige, Muscat, Oman
M/s Tiles Gallery Marble and tiles trading LLC, Abu
Dhabi

Toilet:
648 LBE, size 200 x 200x7.8mm
548 LBE, size 200 x 300 x7.8mm
1. Tile shall be laid on approved chemical resistant mortar,thickness of the tile shall be
600 (200x200)
as per sample signed.
200 (200x300)
M/s. RAK ceramic tiles, UAE 2. Pointing of tiles shall be carried out using approved chemical grout.
3. Approved glazed ceramic tile shall be used for wall behind eyewash & wash basin.
Security room:
As per tender Glazed in Wall: 4. Wall/floor joint coving, angle sortant for external corner, angle rentrant for internal corner
Substation Floor tile 330*330*8mm 430-G
document which A vitrified covering which is practically and top edge round tiles to be used.
Respective
CE MS C 15 43 Ceramic Tile Civil Tiles ever is applicable impermeable. Wall & Floor finishing Toilet & Bathroom 5. Shop drawing shall be submitted for approval prior to start the work. Yes Site
substation Toilet, Security room ( Floor & Wall):
for repsective Non slipery in Floor: 6. .Color shall be uniform throughout.
6068 DBE (200x200x8mm)
project. A clay-based covering with a mat finish 7. Floor tiles shall have finish as per specification.
6068 DBE (200x300x6mm)
8. Tiles shall be fixed with approved tile mortar.
9. The joints in the tiles shall be finished with approved water proof tile grout.
Battery room
10. Work shall be carried out skilled tile fixer and ensure proper slope is provided toward floor out let.
M/s. Novoceram, France. Porphyre blanc noir D689-050
M/s. NOVOCERAM, Italy A187-050 Porphyre Blanc Noir
-Floor tile 200*200*11mm
-Wall Tile 200*200*/7.6mm

Toilet:
Skirting 648 LBE (200x100mm)
600 (200x200)
200 (200x300)
Security room:
1. Shop drawing shall be submitted for approval prior to start the work.
M/s. RAK ceramic tiles, UAE Skirting 330*80*8mm 430-G As per tender
2. Color shall be uniform throughout.
document which
Respective 3. Floor tiles shall have finish as per specification.
CE MS C 15 44 Ceramic Skirting Civil Tiles Substation Battery Room - Acid/Alkali Resistant Skirting ever is applicable clay-based covering with a mat finish Finish wall and floor joints Toilet & Bathroom Yes Site
substation 4. Tiles shall be fixed with approved tile mortar.
D689-050 Porphyre Blanc Noir - A187 for repsective
5. The joints in the tiles shall be finished with approved water proof tile grout.
200x100x7.6mm. project.
6. Work shall be carried out skilled tile fixer and ensure proper slope is provided toward floor out let.

D689-050 Porphyre Blanc Noir & skirting A187-050


M/s. Novoceram, France.
Porphyre Blanc Noir
M/s. NOVOCERAM, Italy
Model 4092 LBR 330x100x8.5mm

As per tender
M/s. Al Gurg Fosroc, Dubai CONPLAST WP200 1. It should be used for rush coat as well as with plaster.
document which Polymer based used in mortar and concrete as Waterproofing additive for
Respective 2. Dosage should be as recommended in data sheet.
CE MS C 15 52 Integral Waterproofing Agent Civil Water Proofing Substation M/s. BASF construction chemicals LLC UAE Rheomix141, Mastercast 141 ever is applicable an admixture and bonding agent to increase sand -cement plastering External & Internal wall No Site
substation 3. Mixing & application should be as per manufacturer's instruction.
for repsective water resistivity and durability. works
4. Storage of material shall be as per manufacturer recommendation.
M/s. Henkel Polybit Industries, UAQ/KSA Polybond SBR project.
5. Material inspection should be offered to the DEWA site engineer prior to use.

1. Waterproofing Bitumen Emulsion Paint (Cold applied) is approved for under ground
As per tender
block works and non-structural concrete surfaces.
document which
Respective Water Proofing Protection Duct banks and Block 2. Under ground concrete surfaces to be applied with DEWA approved water proofing
CE MS C 15 54 Waterproofing Protection Paint Civil Water Proofing Substation M/s. Henkel Polybit Industries Limited. UAE Polycoat RBE, Polycoat ever is applicable Liquid bitumen based paint No Site
substation Paint work below ground level system and as per approved RFC drawing / specification.
for repsective
3. Location of usage shall be as per approved RFC drawing.
project.

©Transmission Engineering Department-2020 8 OF 24 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Material Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Related to Source / Manufacturer Product / Model No: T-Spec Ref General Description Use Location of usage General Comments Sample Remarks
ID Category inspection

M/s. Habas Sinai Ve Tibbi Istanbul, Turkey


M/s. Ekincler Iron & Steel Inc. Turkery
M/s. Emirates Steel - Abu Dhabi
1. Manufacturer shall notify DEWA whenever source of billets is changed.
M/s. Saudi Iron & Steel Company - Saudi Arabia
2. Contractor shall notify in advance to site engineer prior to deliver alternate material at site.
M/s. Sharq Sohar Steel Mill LLC, Oman
3. Steel delivered to site shall have heat number tags and mill certificates for cross reference.
M/s. Al Ittefaq Steel Products Company,Saudi Arabia
4. Steel must have manufacturer embossing details on the reinforcement steel bar.
M/s Sohar Steel LLC , Oman As per tender
Reinforcement Steel of Dia: 8, 10,12, 14, 5. Reinforcement steel shall be stored properly to avoid any deterioration by weather or external effects as per
M/s. Conares Metal Supply Limited, Dubai. document which Provide required strength to All Structural members
Respective 16, 18, 20, 22, 25, 28, 30 & 32 mm Diameter 8mm to 32 mm, BS 4449 with minimum specification and manufacturer recommendations.
CE MS C 15 57 Civil Reinforcement Substation M/s. Hamriyah Steel FZC, Sharjah ever is applicable Mild steel and high yield steel bars (Hot rolled) the structural concrete (substructur and No Site
substation BS : 500 /460GR. yield strength Fy= 500 N/mm2 ( Grade B 500B) 6. Random samples shall be taken from each lot of the reinforcement delivered at site periodically & to be sent to the
M/s. Jindal Shadeed Iron and Steel LLC, Oman for repsective members superstructur)
ASTM : 425 GR 60 approved third party testing laboratory for physical, chemical and mechanical tests.
M/s Qatar Steel, Qatar project.
7. Test reports shall be submitted directly to DEWAsite engineer in a closed envelop from laboratory within 3 days.
M/s. YAZICI DEMIR CELIK SANAYIAS, Turkey
8. Each lot and dia. of steel bars delivered to site to be carried with mill certificate and
M/s. Harmiyah Steel FZC, Sharjah UAE
manufacturer's tag.
M/s Kaptan Demir celik Endustrisi , Turkey
9. Binding wire used for tieing the reinforcement shall be soft pliable annealed steel coated of 1.6mm diameter.
M/s. Qatar Steel Company FZE, Dubai
10. Rebars can be mixed/used at site any different brands from the approved manufacturer.
M/s. Emirate Steel Industries Co PJS - Branch 1 ICAD
II Mussafah, Abu Dhabi

M/s. Sharjah Cement Factory , Sahrjah


M/s.Gulf Cement Company, Ras Al Khaimah
M/s. Fujairah Cement industries L.L.C., Fujairah 1. For each delivery conformity certificate to the relevant standards to be provided.
M/s. M/s.National Cement company, Dubai As per tender 2. The cement shall be used for plastering works, block works and non-structural
M/s. Union Cement Company (P.S.C), RAK document which members only ( structural members to be casted with ready mix concrete of
Respective Portland cement (OPC), Sulphate-resisting RCC works, Block works,
CE MS C 15 58 Cement Civil Cement Substation M/s. Star Cement co. LLC, Ajman Shall comply with civil specification ever is applicable Substation Building approved mix design) No Site
substation Portland and supersulphated plaster and screed
M/s. Fujairah Cement industries L.L.C., Fujairah for repsective 3. Necessary tests shall be carried out in the approved laboratory for this project.
M/s. Hamriyah Cement Company, Sharjah UAE project. 4. OPC shall be used for all above ground block and plastering works.
M/s. Star Cement co. LLC, Ajman UAE 5. Type of cement to be used for substructure shall be as per the recommendations of
M/s Lafarge Emirates Cement, UAE the soil investigator.
M/s. Pioneer Cement Industries, Ras Al Khaimah, UAE 6. Storage of cement shall be as per the manufacturer recommendations and DEWA
specification .

As per tender 1. The board should have shiplap/cut edges for overlapping.
M/s. HAPRI Insulation Material Manufacturing, Dubai document which 2. Approved sample duly signed by DEWA engineer shall be kept at site for ready reference.
Respective "Hapri PUR-WF & Insultherm Polyurethane (PUR)" Insulation Board with maximum Density of 24- Reduce thermal conductivity
CE MS C 15 60 Cavity Insulation Board Civil Insulation Board Substation INSULTHERM Middle East LLC., UAQ. ever is applicable External Walls 3. Polyurethane insulation foam of 50 mm thickness with density 40-45kg/m3 from the Yes Site
substation of 50 mm thickness with density 40-45kg/m3 26 kg/m^3 , 50 mm thick with lapping cut out. of external wall
for repsective manufacturer is approved to use at above mentioned project for block work construction
project. only.

TMI:a) Ref: LSS-ST 200-200x30x2mm & LSS-


200x30x2mm
b) Ref:MC200S, Ref:MC150 & Ref: MC100)
c) Ref:CL-L 150S & CL-M 200S,Ref.CL-L 150S
M/s. Technical Metal Industries Co. LLC, Dubai
d) Ref.PSB 19-S,
Ref. PSB 19
e) Ref: ABS 55S &Ref: AB55-555mm wing
f) Ref: CRL-L75S-75x75mm, ref: CRL-L-75-
75x75mm
g) Ref: SL 150 -S & SL 150

Sigma:
Materials Approved:
a) Ref: B/P/50-30x200x2mm
b) Ref: BRM200-SS, 150mm Ref: BRM150 -GS &
100mm Ref: BRM100 -GS)
c) Ref:CLH15-SS & CLH 20-SS & Ref.CLH 15-GS
M/s. Sigma Factory for Steel Products, UAE
d) Ref.PST 19-SS 19mm wide Ref. PST 19-GS)
e)Ref: ABE 50-SS ,Ref: ABE 50-GS
f) Ref: CRM 50-GS-50x50 and ref: 50-SS, 50x50
g) Ref: SMH 10 -SS & SMH 10 -GS

Block work & plastering accessories shall be as


As per tender
following:

©Transmission Engineering Department-2020 9 OF 24 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Material Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Related to Source / Manufacturer Product / Model No: T-Spec Ref General Description Use Location of usage General Comments Sample Remarks
ID Category inspection
g
document which Reinforced plastering and 1. All accessories used externally shall be of stainless steel & internally shall be of galvanized steel.
Respective All accessories used externally shall be of Internal & external
CE MS C 15 62 Block work & Plastering accessories Civil Construction Substation METEX: ever is applicable block work joints against 2. The location of usage shall be as per approved drawing Yes Site
substation stainless steel. Plastering and Block works
a) SS & GI Block wall Tie-Fishtailed-30x200x2mm for repsective possible cracks 3. All screws/nails used for fixing accessories should be galvanized.
All accessories used internally shall be of
b) SS & GI Block mesh(200mm Ref:BRS200, 150mm project.
galvanized steel.
Ref:BRG150 & 100mm Ref: BRG100)
c) GI Plaster mesh 150mm & 200mm width(ref:MLC
03-D & MLC 064-D)
d) SS Plaster stopper - 19mm wide (Ref.SBS 031), GI
M/s. Metex Metal Expansion Factory, Dubai
Plaster stopper - 13mm & 19mm wide
( Ref. SBG 025 & SBG 031)
e) SS Angle bead (Ref: ABS 003) and GI angle bead
(Ref: ABG 003)
f) Strip mesh SS & GS ( Ref: SLG 094 & SLS 094 )

COREMETAL:
a) SS & GI Block wall Tie-Fishtailed-WTF
30x200x2mm SS & GS
b) SS & GI Block mesh(200mm Ref:SBM200-SS,
150mm Ref:SBM150SS & 150mm Ref: GBM150-GS
& GBM075-GS)
c) SS & GI Plaster mesh 150mm width(ref: SCL 150H-
M/s. Core Metal LLC, Sharjah, UAE SS & GCL 150M-GS)
d) SS Plaster stopper - 19mm wide (Ref.SSB 19 SS),
GI Plaster stopper - 13mm & 19mm wide
( Ref. GSB 13-GS GSB 19-GS)
e) SS & GI Angle bead (Ref: SAB 50-SS) and GI angle
bead (Ref: GAB50-GS)
f) Corner mesh SS & GS ( Ref: SAB50SS & GCM50H-
GS )

ICJ - 250mm Wide


1. Only prefabricated factory made welded joints should be used for corners & junctions.
M/s. Henkel Polybit Industries, UAQ/KSA ECJ - 250mm Wide
Jointing of placed continuous water stops by welding at site shall be done by trained /
IEJ - 250mm Wide
experienced person certified from the manufacturer.
EEJ - 250mm Wide
2. Brass eyelets shall be available with the PVC water stop (250mm width
internal type) as per the provided sample to keep in position.
As per tender 3. Joints should be welded well up to the satisfaction of DEWA supervising engineer at
Supercast-Wata Foil
M/s. Al Gurg Fosroc LLC, Dubai document which Prevent water penetration At joint of RC virtical and site.
Respective WaterStop Supercast Hydrofoil Profile of impervious material placed in the
CE MS C 15 63 Civil Water Proof Substation ever is applicable through the substructural horizontal member Below 4. Random samples from the lot supplied material shall be sent for testing ( tensile & Yes Site
substation (PVC Water stop 250mm widh) middle of concrete member
for repsective member ground level tearing) and test report shall be submitted to DEWA site engineer for review.
project. 5. Approved sample duly signed by the DEWA engineer to be kept at site for ready
M/s. Emirates Specialities, Dubai Spectite reference.
6. Location and place of usage shall be as per approved RFC drawing.
7. If any other model than supercast Watafoil is required, same to be incorporated in the

Kristop CJE-25 RFC drawing and material should be submitted to DEWA TED for review and approval.
M/s. Corrotech Ltd., Dubai
Kristop CJC 25

M/s. Al Gurg Fosroc, Dubai


NITO BOND PVA
FOSROC Nitobond EP
As per tender
1. Surface preparation , mixing and application should be in compliance with
document which Increse bonding strength of
Respective Bonding Agent for plastrering and floor POLYBOND PVA manufacturer’s instructions.
CE MS C 15 64 Civil Admixture Substation M/s. Henkel Polybit Industries, UAQ/KSA ever is applicable Polyvinyl acetate emulsion type mortor for plastering and Floor and wall No Site
substation screed. Poly Bond SBR 2. Dose should be as per manufacturer’s recommendation.
for repsective screed for flooring
project.

M/s. Emirates Specialities Co. LLC, Dubai


Spec Build BA 10

1. Shop drawings in coordination with electro-mechanical drawings and actual site


12.5mm thick, fire & moisture resistant FM EN520,
measurements to be submitted to DEWA site engineer for review.
M/s. knauf, Germany Type DFH1
As per tender 2. Fixing shall be as per manufacturer's instructions.
document which 3. All screws shall be GI.
Respective Fire and moisture resistant gypsum board of
CE MS C 15 65 Gypsum Board Civil Bulk Head Substation ever is applicable Hide A/C & vetilation ducts 11kV SWGR Room 4. Access door to be provided at required places as per site conditions in coordination with DEWA site supervising Yes Site
substation not less than 12mm thick
for repsective engineers.
PB 12STD, PB 13WAFS project. 5. Approved sample board duly signed by DEWA engineer shall be kept at site for ready
M/s. Boral Plasterboard Industries, Indonesia
Plasterboard PB 12.7 firestop reference.

M/s. Emirates Specialties Co. LLC, Dubai SPECcell Polyethelene 40

M/s. Henkel Polybit Industries, UAQ/KSA Polyboard PE As per tender


1. Polyethylene Flexible filler board of 20mm thick shall be placed to fill in the
document which Fill expansion joint & Joints
Respective M/s. Al Gurg Fosroc, LLC, Dubai expansion joints as per the approved drawing.
CE MS C 15 66 Polyethylene Flexible Board Civil Expansion Board Substation Fosroc Hydrocell XL ever is applicable Polyuthelene based filler board 20mm thick between floor screed and RC Concrete & block work Yes Site
substation 2. Approved sample duly signed by DEWA engineer shall be kept at site for ready reference.
for repsective walls/columns /block works.
M/s. Al Majara Polychem Ind LLC, UAE OXICELL PE 3. The joint filler board will be non-extruding and resilient, non-bituminous type.
project.
M/s. Plasto Joints Gmbh, Germany. MP Cellfoam MD40

M/s. Corrotech Construction Chemical, Dubai CORROCELL

M/s. Henkel Polybit Industries, Umm Al Quwain/KSA Polygrout NS, Polygrout EY 3000
1. Surface preparation, mixing, application, filling and curing of material should be as
As per tender
per manufacturer's instructions.
M/s. Al Gurg Fosroc LLC, Dubai Conbextra GP document which Equipment foundations,
Respective Fill gabs under load bearing 2. Material should be used with permission of engineer at site, inspection and location of
CE MS C 15 68 Non Shrinkage cementations Grout Civil Grout Substation ever is applicable High Strength, non shrink cementitious grout pre-cast concrete, bearing No Site
substation plates area must be done prior to application of material.
for repsective plates, etc.
M/s. BASF Construction Chemicals, Dubai, UAE Masterflow 928T, Masterflow 400 3. Concrete surfaces should be cleaned and cured properly prior to application.
project.
4. Material shall be used in areas which are mentioned and cannot be used for any other

M/s. Corrotech Construction Chemicals, Dubai. Corrogrout, Lanko 701 Clavex, repair works.

Masterflow 544
Masterflow 524 1. Surface preparation, mixing, application, filling and curing of material should be as
M/s. BASF Construction Chemicals, Dubai, UAE
Emaco 907 As per tender per manufacturer's instructions.

©Transmission Engineering Department-2020 10 OF 24 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Material Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Related to Source / Manufacturer Product / Model No: T-Spec Ref General Description Use Location of usage General Comments Sample Remarks
ID Category inspection

document which 2. Material should be used with permission of engineer at site, inspection and location of
Respective A mixture of lime or cement or a combination of
CE MS C 15 69 Cementitious Mortar Civil Construction Substation M/s. Al Gurg Fosroc LLC, Dubai Renderoc TG ever is applicable Fill tie rod hole, RCC Wall area must be done prior to application of material. No Site
substation both with sand and water
for repsective 3. PVC sleeve/pipe to be removed from the hole and shall be cleaned properly before
project. filling the holes.
M/s. Henkel Polybit Industries, Umm Al Quwain/KSA Polygrout NS

M/s. Al Gurg fosroc LLC, Dubai


REEBOL WB
M/s. Emirates Specialities Co. Sharjah SpECbuid MRA As per tender
CE document which A substance applied to the inside surfaces and
Respective M/s. Henkel Polybit Industries, Umm Al Quwain/KSA Polyrelease WB Mould release - oil Shutter Formwork for concrete
MS C 15 70 Mould and Shutter Release Agent Civil Construction Substation ever is applicable seams of a mold to prevent the casting from No Site
substation release agent works
for repsective adhering to the mold Material shall be stored at site as per manufacturer recommendations.
M/s. Eurobuild chemicals LLC, UAE Eurorelease WB 912
project. Mixing and application shall be done as per manufacturer recommendations

M/s. BASF Construction Chemicals, Dubai, UAE Masterfinish 202, Rheofinish RL 225

The substation sign board(s) shall be fabricated


M/s. Javed Arts & Graphic Signs Est., Al Ain by 1.8 mm thick aluminum 3d logo with digital
M/s. Bassam Sign, Ajman As per tender printing vinyl and UV lamination finish on top.
M/s. Al Merikh Advertising & Pub. Est, Sharjah, document which The size of the logo shall be 2000x2000x100
Respective The substation sign board shall be 3.8 mm Aluminium sheet 3D logo with digital printing vinyl and UV lamination finish
CE MS C 15 71 Sign Board Civil Others Substation M/s. Super Sign- UAE Shall comply to civil specification ever is applicable mm. Similarly 1.8 mm thick aluminum sheet Sign board Substation Building No Site
substation on top & SCADA name of substation in 3D text.
M/s. Onyx Advertizing & sign, Dubai for repsective shall be used to make 70x70x50 mm, 3D letters
Manufacturer shall provide guarantee for a minimum period of 10 years in writing as per DEWA specification.
M/s. United Color Film LLC, UAE project. of substation SCADA name. Logo and SCADA
Signboard and text should be UV resistant, non-deteriorating and non-warping.
name shall be UV resistant and be guaranteed
Size, location and text of signboard/ 3D logo should be as per approved RFC drawing.
for a minimum period of 10 years.

1. Plain Aluminium tiles with nortile clip in beveled edge size 600 x 600 x 0.8mm with Polyester powder coating ( color-
white RAL 9003) & Mineral Fiber tiles size 600x600x18mm shall be used.
2. Installation shall be as per manufacturer’s instruction and by the approved specialized agency.
3. Angles used on the wall sides to support the tiles should be fixed by screws.
4. Exposed T grid system to be fixed with adjustable hangers and each tile to be fixed with clips.
5. Ceiling preparation shall be as per the finishing schedule / specification.
M/s. USG Middle East, Saudi Arabia 6. 4mm Dia. (min) Galvanized steel rod hanger should be used as per specification and the same shall be checked and
M/s. Technical Metal Industries, Abu Dhabi As per tender proved at site prior to fixing.
Mineral Fiber tiles size 600x600x18 mm with Ceiling of LVAC, control &
M/s. Technomec Building Industries, Dubai document which Ceiling system supspended by ajustable hanger 7. Extra reinforcement to be provided to support the fixture for lightings and fire detection.
Respective aluminum foil ( Exposed grid system) in first floor & relay, telecom, charger room Hide service lines such as
CE MS C 15 72 False Ceiling System Civil Ceiling Substation M/s. Chicago Metallic, Malaysia ever is applicable and aluminum grid concealed with 8. Light fittings to be co-ordinated with the grid lines. Yes Site
substation 600 x 600 x 0.8mm with Polyester powder coating ( & corridor (Mineral) & Toilet ducts , wires, etc..
M/s. Friba Ceiling Products for repsective mineral/aluminum tiles 9. Location of usage shall be as per the approved architectural drawing.
color-white RAL 9003) in wet areas (Aluminum)
M/s. Ram Metal Industries LLC, Dubai UAE project. 10.Shop drawings to be prepared in coordination with electro-mechanical drawings/ actual site measurements and to be
M/s. Technessa , Italy submitted to DEWA site engineer for review.
11.Approved sample duly signed by DEWA engineer to be kept at site for ready reference.
12.Guarantee as per specification to be furnished in due course.

M/s. Apex Concrete Block Factory L.L.C., Duba


M/s. Juma Al Majid Concrete Pro. Plants LLC,Dubai
M/s. National Concrete Products, Dubai
1. Random samples from the supplied lot (all type of blocks) shall be taken in presence
M/s. EMCON L.L.C, Dubai
As per tender of DEWA site engineer and shall be tested to verify the specification requirements for
M/s. Phoenix Concrete Products, Dubai
document which compressive strength, “U” value, etc. from approved laboratory.
Respective M/s. Al Amaar Block Manufacturing Co LLC, Dubai Precast concrete blocks types: Hollow, Solid &
CE MS C 15 75 Blocks Civil Construction Substation Shall comply with civil specification ever is applicable Block works Walls 2. Each lot delivered to the site shall carry DM certification. No Site
substation M/s. Spectrum Light Block LLC, Abu Dhabi Thermo blocks size 100mm, 150mm & 200mm
for repsective 3. Use of specific type of block including size and location shall be as per the approved
M/s. Al Serkal & Assarain Concrete Products, Dubai
project. drawings. 60mm insulation shall be provided for the thermal insulated blocks.
M/s. Unimix block industry, Dubai, UAE
M/s. Bucomac Industries LLC, Dubai
M/s. Terrazzo Dubai Co. LLC, Dubai
M/s. Automatic Block Factory & Bldg Mat. Dubai

Copper Pipes:
1. Cleaning & disinfection should be done as per specification.
2. Insulated copper pipes “Wednesbury and solder fittings” from M/s. Mueller brass, UK
shall be used in this project.
3. Fittings with pipes shall be solder fittings.
4. Size of the pipes & fittings shall be as per the approved water supply drawings.
5. Different types of fittings like Tee, Sockets and elbow shall be from the same source.
6. Pipes routed on roof area shall be insulated by Armaflex and additionally protected
M/s. Mueller, UK - Copper pipe. As per tender by aluminium cladding.
M/s. Pegler, UK - Fittings document which 7. Approved sample board duly signed by DEWA engineer shall be kept at site for ready
Respective Copper Hot Water Pipes, Fittings & Pipes made of copper for supply of domestic
CE MS C 15 92 Civil Plumbing Substation M/s Pegler , UK Shall comply with civil specification ever is applicable Pantry / Toilet Domestic water supply reference. Yes Site
substation Valves. / Polypropylene Random (PP-R) water.
M/s Muller Europe Ltd. M/s Lamontite: England. for repsective Polypropylene Random (PP-R):
M/s. Flowflex, Uk & M/s. Flowflex, England. project. Polypropylene Random (PP-R) shall comply with DIN 8077 and DIN 8078 for dimensional and quality purpose
respectively.
a. Pipes used for external exposed conditions shall be mechanically insulated to prevent from UV degradation.
b. Additionally, external exposed pipes shall be provided with suitable thermal insulation and protected by aluminum
cladding.
c. PPR pipes and fittings shall be joined using fusion welding process.
d. Below the false ceiling, water distribution lines shall be provided through higher degree cross linked polyethylene (PEX)
pipes laid inside corrugated polyethylene conduits made of virgin high density polyethylene material to ensure high
flexibility.
e. The connection between the PEX pipes and PPR header shall be achieved by using brass male threaded adapters on the
PEX pipes, connected to either female threaded PPR Tee or female threaded PPR elbow on the PPR header.

©Transmission Engineering Department-2020 11 OF 24 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Material Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Related to Source / Manufacturer Product / Model No: T-Spec Ref General Description Use Location of usage General Comments Sample Remarks
ID Category inspection

1. Rain water outlet from M/s. Zurn, USA (Model no. Z187 size:4" & type: IP) oblique
As per tender
scupper drain dura coated cast iron body to drain water from roof shall be used with
document which
Respective Roof water outlet loacted on roof for draining rubber ring leak protection an with socket for pipe connection.
CE MS C 15 97 Rain Water Outlet. Civil Drainage Substation M/s Zurn, USA Model no. Z187 size:4" & type: IP ever is applicable Roof Rain water outlet No Site
substation rain water 2. Material inspection should be offered to DEWA supervising engineer prior to use.
for repsective
3. Size of the outlet shall match the approved drainage drawing.
project.
4. Threaded outlet for down pipe connection to be selected and ensure that downpipe
adopted is compatible to the fitting.

Diameter of the pipe and location of the pipes shall be as per approved drawing.
Laying shall be as per the manufacturer’s recommendation

As per tender Delivery note of supplied material shall be submitted to DEWA supervising site engineer.
M/s. ADPF Abudhabi pipe factory, UAE Necessary concrete encasement shall be provided.
document which
Respective M/s. Eissa Fiber Glass LLC, UAE
CE MS C 15 98 GRE pipes & fittings Civil Drainage Substation Shall comply with civil specification ever is applicable Clay pipes for removal of oily water in IDT & ET IDT & ET Oily waste water discharge Nominal reinforcement shall be provided for the concrete encasement under vehicular movement area. Yes Site
substation M/s. Extra co fiiber glass & prefab house LLC, Sharjah Joints shall be site laminated.
for repsective
UAE Data sheet for pipes from manufacturer & quality requirements in line with DEWA specification from manufacturer
project.
should be followed and ensured.
GRE sleeves with puddle flange shall be used for Oil water collection pits & U/G oil water tank inlet and outlet pipes.

Trigger spray with hook:


M/s. Grohe, Germany 27102
Trigger spray with hook:
M/s. Armitage Shanks, UK B0597AA
Angle valve for trigger spray:
22958
M/s. Grohe, Germany

Washbasin and fittings: E14321 WH, ES4910WH, RE 4341, E54910 WH,


M/s. Twyford, UK e100 round 600

Washbasin and fittings:


M/s. Armitage Shanks, UK W405901
Refresh btw / WC:
E11488WH, JY1438WH, COSTAWH
M/s. Twyford, UK

Refresh btw / WC: Claredon X038001, W311801, X033101, W7044 &


M/s. Armitage Shanks, UK W3014
Single lever basin mixer:
M/s. Grohe, Germany 33265
Single lever basin mixer:
M/s. Armitage Shanks, UK B9773AA, B9767AA, #X037
Single Lever Sink Mixer:
M/s. Grohe, Germany 33281
Single Lever Sink Mixer:
M/s. Armitage Shanks, UK B9770AA, B9307AA, B9771AA

Flush valve for WC: GR38661000 As per tender


Sanitary Wares ( wash basin , water closet
Wall plate: document which 1. Refresh btw shall be dual flush type ( 6/4 liters/ flushing cycle (full/low) with concealed flushing cistern type.
Respective , shower tray, wall mounted mirror, paper GR38505000 Includes all bath room / toilet fittings used in
CE MS C 15 99 Civil Plumbing Substation M/s. Grohe, Germany ever is applicable Pantry / Toilet Plumbing 2. Material should be delivered as per the approved source of each material and inspection to be offered to DEWA TED NO Not Required
substation holder, towel rail, nobe hook, hot air drier plumbing/drainage.
Rectangular mirror with shelf: for repsective site supervising engineer prior to use at site.
etc Acessories A0781B
M/s. Inda, Italy project.
Soap holder:
A22490
M/s. Inda, Italy
Toilet paper holder:
A22260
M/s. Inda, Italy
Robe hook:
A3620A
M/s. Inda, Italy
Bottle trap 1 1/4" CP:
5753
M/s. Viega, Germany
Bottle trap 1 1/2"
PEX 460
M/s. Viega, Germany
Sink for kitchen:
LR950
M/s. Leisure
Electric hand dryer:
AA14000
M/s. Sanibo, Spain

Bip tap 1/2" 30064

Concealed valve exposed part:


19854
M/s. Grohe, Germany
Concealed valve 3/4":
29802
M/s. Grohe, Germany
Concealed valve 1/2":
29800
M/s. Grohe, Germany
Towel rail:
A2218C
M/s. Inda, Italy
Soap Dispenser:
B6562
M/s. Bradley, USA
Eye wash:

M/s. Bradley, USA model no. (S19224 OC2GHBAOO)

Sink:
(FC 1034, FC 1044, S5915 ).
1. Material inspection shall be offered to the DEWA site engineer prior to execution of
M/s. Twyford, UK Grid waste fittings model no. ( WF 4343CP), Legs As per tender
It is a small basin located in battery room for work at site.
& support model no. ( SR 3048 XX) document which
Respective washing eye during emergency. It consists of 2. Warranty from the manufacturer shall be submitted in due course.
CE MS C 15 100 Eye Wash & Sink Civil Plumbing Substation M/s. Armitage Shanks, UK S5915 ever is applicable Battery rooms Emergency eye wash No Not Required
substation two jets which provide water at a high pressure 3. Installation shall be carried out by DEWA approved plumbing contractor for this project.
for repsective
to clean the eye. 4. Name of manufacturer shall be identified on the products.
project.

LR 950
M/s. Leisure, UK

©Transmission Engineering Department-2020 12 OF 24 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Material Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Related to Source / Manufacturer Product / Model No: T-Spec Ref General Description Use Location of usage General Comments Sample Remarks
ID Category inspection

1. All the covers shall be of ductile iron complying with BSEN 124 class D400 double seal
heavy duty.
2. Manhole covers and frames shall meet or exceed minimum loading requirements as defined for class D400.
3. Size shall match approved drainage drawings. If not mentioned in the drawing, all the cover size greater than
600x600mm shall be of two pieces heavy duty triangular type with GRP seal.
M/s Ducast Factory LLC, Dubai 4. Materials delivered to the site shall be as per approved RFC drawings.
M/s. Al Fatah International, Dubai As per tender 5. Size of the manhole cover with frame for foul water shall be additionally fixed with GRP seal plate
M/s. Veralco, Cyprus document which 6. Anti dry special grease (grease having micro particle of metal mixed in the grease) should be applied on the bottom of
Respective Storm/Sewer water
CE MS C 15 102 Manhole Cover & Channel Grating Civil Drainage Substation M/s Majid Bukathara Building Material Trading LLC Shall comply with civil specification ever is applicable Part of drainage system. External the cover prior to handing over the substation. No Site
substation drainage
M/s. UTK Moulders/Ferro Ind.Pvt.Ltd, Kolkatta, India for repsective 7. Covers shall be applied with solvent free epoxy painting system and the coating thickness should be 340 Microns
M/s. RBAC, India project. (DFT).Painting to be applied alround the manhole cover as well as frames.
8. Hempadur 15590 primer to be applied within three hours from completion of shot blasting.
9. If any damages observed to the manhole covers painting during installation at site, the same shall be painted as per
manufacturer's instructions.
10. Manhole covers shall be embossed with the word “Sewerage / Storm / Foul water / Fire water / Electrical / Chemical
/ Oil” in both English and Arabic relevant to the application.
11. Delivery note of supplied material shall be submitted to DEWA site engineer.

1. Golden brown uPVC pipes & fittings of different diameters with wall thickness of 3.2 and 4.9mm shall be used for
drainage works for the project as per approved drainage drawings.
2. Pipes and fittings manufactured under standards BSEN 1401 are approved for use in
underground drain and sewerages.
3. Pipes and fittings manufacture to BSEN 1329-1-2000 (grey colour) are approved for rain water down pipes fixed on
the centre of columns of the buildings and drainage installations above ground.
M/s Gulf Eternit Trdg, Dubai, UAE. As per tender
4. Pipes and fittings manufactured to BS EN 1455-1983 are to be used as waste pipes (grey color).
M/s. Coomoplast Industries, Co., LLC, Sharjah Shall comply with civil specification, shall haveKite document which
Respective UPVC Drainage pipes & fittings (BS Storm/Sewer water 5. Samples of above ground and waste water drainage pipes and fittings shall be submitted. uPVC pipes and fittings
CE MS C 15 104 UPVC Drainage pipes & fittings Civil Drainage Substation M/s. Polyfab Plastic Industries, Ajman UAE Mark Logo and Relevant standards embossing on the ever is applicable External Yes Site
substation 4660/4514/5255) drainage cannot be used for oil water drainage system.
M/s. Modern Plastic Industries, Dubai pipe for repsective
6. All pipes shall bear kite mark logo.
M/s. Hepworth, UK project.
7. Diameter of the pipe shall be as per the approved hydraulic calculation / drawing and location shall be as per the
approved drawing.
8. Laying and jointing shall be as per manufacturer’s recommendations.
9. Necessary concrete encasement shall be provided.
10. Delivery note of supplied material shall be submitted to DEWA/ Consultant’s site office.

M/s. Henkel Polybit Industries: Polyprime SB


M/s. Henkel Polybit Industries Limited, UAQ, UAE / Bituplus ULTRA E4270 4mm thick
KSA Bitustic 1.5mm thick
Bituboard 3.2mm & Bitumastic 4mm thick SBS bituminous membrane, having 1. Usage of 1.5mm membrane should be as per locations mentioned in approved RFC
non-woven polyester, reinforcement with drawings.
Water proofing System at Basement:
Membrane As per tender minimum 270 g/sq .m. 2. Application shall be as per manufacturer’s recommendations/specification and shall be
Water Proofing Membrane (Basement) Stop ingress of water in the Cable Basement/ Main
Waterproofing document which 1.5mm thick self adhesive waterproofing carried out by the applicator approved by DEWA.
Respective WaterProofing Self Adhesive membrane M/s. Imperbit Membrane Industries: IMI-Concrete basement. Protection Building Substructure,
CE MS C 15 182 Civil Waterproofing Substation ever is applicable membrane 3. Professional applicator to be proposed for DEWA approval. Yes Site
substation Water Proofing Primer Primer membrane to substructural Oil/Water Tank
Protection Board for repsective A solvent-based bituminous penetrating primer 4. The waterproofing membrane shall be covered up immediately after laying in position
Water Proofing Protection Baord Imperflex (S) Membrane : 4mm thick, SBS modified, member Kitchen/Toilet
Sealant project. Bitumen based, 3.2mm thick protection board (within 24hours) with a protection board/cement sand screed.
Water Proofing Sealant Reinforcement 270gr/m^2.
Bitumen based semi soild sealant (Non slump 5. Approved samples duly signed by DEWA engineer to be kept at site for ready reference.
M/s. Imperbit Membrane Industries, Dubai Imperseal 3000XL: Self-adhesive membrane (1.5mm
sealant) 6. Guarantee as per specification to be furnished in due course.
thick).
Protection board: : Protector board (3.2mm
thick).
Sealant: Ekoflash ME500

Water proofing System at Roof (


CE NNNA MS C 15 183 Civil
Conventional)

M/s. MAS Paints, Sharjah. MAS FOAMCEM As per tender


M/s. Emirates Chemical LLC, Dubai DAREX AE4 lighthweight material combining good
document which
mechanical strength with low thermal Achieve slope required for
Foam Concrete Civil Water Proofing Substation M/s. BASF Construction Chemicals UAE LLC, Dubai RHEOCELL 10ME ever is applicable Roof Terrace No Site
conductivity and ease of working. Density of roof water drainage
for repsective
M/s. Advance concrete Technology Actimix 1200kg/m^3
project.
M/s. CEMEX, UAE FOAM-LWC-V46D-FOAM MIX
M/s. Henkel Polybit Industries Limited, UAQ, UAE / As per tender
POLYPRIME SB
KSA document which Enhances adhesion of
Water Proofing Primer Civil Water Proofing Substation ever is applicable A solvent-based bituminous penetrating primer bituminous waterproofing Basement/Undergorund No Site
M/s. Imperbit Membrane Industries, Dubai for repsective membranes to substrates
IMI Concrete Primer
project.
BITUPLUS Ultra P4270-4mm APP 4mm thick APP bituminous membrane,
M/s. Henkel Polybit Industries Limited, UAQ, UAE / As per tender
BITUPLUS G4140 reinforced with minimum 260 g/sq.m. stable
KSA document which
BITUMASTIC non-woven polyester, finished on both sides Treat roof slab to prevent
Water Proofing Membrane (Roof) Civil Water Proofing Substation ever is applicable Roof Terrace Yes Site
with a macro perforated torch off film allowing the passage of water
EKOGUARD-270-4P-PBS-4MM for repsective
EKOGUARD-270-4P-PBS APP laying by torch. The laps are to be fully torched
M/s. Imperbit Membrane Industries, Dubai. SpecSeal PU25 project.
and seamed.

Roof Mate
M/s. Styro insulation material industries, sharjah

M/s. Arabian chemical Insulation company, Polystyrene board As per tender


document which
Isoboard ND Extruded polystyrene of minimum density 35
Roofing Insulation Board Civil Water Proofing Substation M/s. Isofoam Insulation Mat, Kuwait ever is applicable Roofing Insulation Board Roof Terrace Yes Site
Isoboard Extruded Polystyrene kg/m^3
for repsective
M/s. Emirates Extruded polystyrene LLC, Dubai EEP E Roof FOAM project.
1. Application shall be as per manufacturer's instruction.
M/s. Gulf insulating Materials - UAE ESSCOFOAM 2. Work to be carried out by DEWA approved applicator.
3. Method statement for entire system to be submitted to DEWA site engineer for
M/s. ALYAF industrial Co. Ltd - KSA review/approval.
Al yaf A201
4. Guarantee as per specification to be furnished in due course.
M/s. Freudenberg Politex, Italy. Drenotex
5. Sampling to be done for all the materials including foam concrete and testing to be done,
As per tender
Terram 900 Flood test will be done subject to satisfactory test results of all materials.
M/s.Terram, UK document which
Terram 1000UV 6. Guarantee as per specification shall be furnished in due course.
Roofing Separation layer Civil Water Proofing Substation ever is applicable A 100 gm/sq.m. geotextile separation layer Roofing Separation Layer Roof Terrace Yes Site
M/s.Sheridan for repsective
GEOTECH PET 140
Prime Geo 100 project.
M/s. Exeed geotextile LLC
Prime Geo 140

©Transmission Engineering Department-2020 13 OF 24 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Material Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Related to Source / Manufacturer Product / Model No: T-Spec Ref General Description Use Location of usage General Comments Sample Remarks
ID Category inspection

M/s. DUPONT TYPAR Geosynthetics TYPAR SF 32

As per tender
M/s. Terrazzo Co, Sharjah. document which
Roof Concrete Tile Civil Tiles Substation M/s. Fujairah Marble & Tiles, Fujairah. Size: 400 X 400 X 40mm ever is applicable Precast Tile with chamfer at top edge Roof Finishing Roof Terrace Yes Site
M/s. Al Serkal & Assarian, Dubai for repsective
project.

M/s.Alumill Tech Gulf LLC, UAE


M/s Extraco , Sharjah
M/s.Inventure metal products industries LLC, Dubai,
As per tender
UAE
document which
M/s. Star Tech Aluminium, Ajman To protect Termination of
Aluminum Flashing Civil Metalic Substation Shall comply with civil specification ever is applicable Aluminum Roof Flashing Roof Terrace Yes Site
M/s. Henan Xintai Aluminium Industries, China. WP membrane
for repsective
M/s. Al Maha Metalic Industries Co., Dubai
project.
M/s. Al Barary Aluminium and Glass LLC, Dubai
M/s. Guangdong Huayun Alum. Industries, China
M/s Hindalco Industries, India

CE NNNA MS C 15 183 Water proofing System at Roof ( Combo) Civil

Elastospray 1611/16
M/s. BASF Construction Chemicals, Dubai, UAE
Elastospray 1611/17
As per tender
Elastospray 1612/40
document which Application of 68-70mm thick P.U Foam
Spray Polyurethane Foam Civil Waterproofing Substation Baymer SHPU -40- 27A ever is applicable insulation spray applied to a density of 40-45 Yes Site
M/s. Bayer, UAE
SHPU-45FS-48, 44V20L for repsective Kg/cum
project.
M/s. Henkel Polybit Industries, UAE / KSA Polyfoam

M/s. BASF Construction Chemicals, Dubai, UAE MasterSeal 550


As per tender
document which
Polytex Application of 3 coat brown rubber bitumen
Waterproofing Coat Civil Waterproofing Substation M/s. Henkel Polybit Industries, UAE / KSA ever is applicable Yes Site
liquid emulsion
for repsective
project.
Mr. Dr. FIXIT, UAE Uniproof 5000

M/s. ALYAF industrial Co. Ltd - KSA


Al yaf A201
M/s. Freudenberg Politex, Italy. Drenotex
As per tender
Terram 900
M/s.Terram, UK document which
Terram 1000UV Laying of Geotextile membrane layer non-woven 1. Application shall be as per manufacturer's instruction.
Roofing Separation layer Civil Waterproofing Substation ever is applicable Roof Terrace 2. Work shall be carried out by DEWA approved applicator. Yes Site
M/s.Sheridan polyester
GEOTECH PET 140 for repsective 3. Method statement and shop drawing for entire system to be submitted to DEWA site
Prime Geo 100 project.
M/s. Exeed geotextile LLC engineer for review/approval.
Prime Geo 140
4. Guarantee for 25 years as proposed by contractor to be furnished in due course.
M/s. DUPONT TYPAR Geosynthetics TYPAR SF 32 5. Sampling to be done for all the materials and testing to be done, Flood test will be done
subject to satisfactory test results of all materials.
As per tender 6. If the applicator propose to use polyurethane foam and water proofing liquid membrane from different source, then a
document which undertaking letter from both manufacturers confirming the compatibility of the material shall be submitted to DEWA
Application of protection screed to the average Achieve slope required for
Concrete Screed Civil Concrete Substation Shall be submitted along with Material ID 59 concrete mix design for respective project. ever is applicable Roof Terrace site engineer. No Site
thickness of 80mm thick roof water drainage
for repsective 7. Standard drawing.No. 304 & 383 (Waterproofing for U/G Structure & Roof Slab and drainage
project. layout roof plan) shall be followed.
As per tender 8. Waterproof top coat shall be minimum 1mm thick for each coat as stated in the
M/s. Henkel Polybit Industries, UAE / KSA Polyboard document which manufacturer's technical data sheet.
Expansion Joint Filler Board Civil Expansion Board Substation ever is applicable 12mm thick with 35% Bitumen content Roof Terrace Yes Site

M/s STEICO STEICO, 19mm thick for repsective


project.
MasterSeal 121 As per tender
M/s. BASF Construction Chemicals, Dubai, UAE document which
Bonding Agent Civil Admixture Substation ever is applicable Formely Known as Rheomix 121 Roof Terrace
M/s. Henkel Polybit Industries, UAE / KSA Polybond PVA for repsective
project.
MasterSeal NP 472 As per tender
M/s. BASF Construction Chemicals, Dubai, UAE
Masterseal NP 473 U document which
Application of one component highly flexible
Polyurethane Joint Sealant Civil Sealant Substation ever is applicable Roof Terrace Yes Site
polyurathane joint sealant
M/s. Henkel Polybit Industries, UAE / KSA Polyseal 1PU for repsective
project.

As per tender
M/s. Henkel Polybit Industries, UAE / KSA COMBO CRC document which
Application of two component acrylic modified
Waterproof Top Coat Civil Waterproofing Substation ever is applicable Roof Terrace Yes Site
cementatious coating
MasterSeal 550 for repsective
M/s. BASF Construction Chemicals, Dubai, UAE
project.

Respective
CE MS C 15 194 PLUMBING AND DRAINAGE CIVIL
substation

©Transmission Engineering Department-2020 14 OF 24 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Material Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Related to Source / Manufacturer Product / Model No: T-Spec Ref General Description Use Location of usage General Comments Sample Remarks
ID Category inspection

1. Inlet, outlet, drains, vents,ball float valve,float control switches shall be integrated with the
tank.
2. Tanks shall be manufactured from glass fiber reinforced thermosetting polyester resin in
thickness of not less than 8 mm with an integral opaque membrane for the prevention of
ultra-violet penetration.
M/s. Extra Co Fibre Glass & Prefab Houses LLC, 3. Tanks shall feature integral supports suitable for stabilizing in unrestrained condition.
Sharjah 4. Ground water tank shall be made of cylindrical type for 600 Gallons ( imperial gallons)
As per tender
M/s Al. Shamsi Fibre Glass Industries LLC, UAE capacity.
document which
M/s. Union Fiber Glass Factory, LLC, UAE Storage of domestic water. 5. Submit details of ball cock arrangement and high/low level limit switch.
Domestic water storage tank Civil Plumbing Substation Domestic Water Tank Capacity 1000 imperial gallons ever is applicable Water storage External Area No Not Required
M/s Eissa Fiber Glass LLC, UAE Capacity: 600 Gallons 6. Provision for cleaning purposes to be provided for each tank.
for repsective
M/s. Polycon Gulf LLC, Dubai 7. Capacity of tank 600 imperial gallons at ground shall be checked and proved when they are
project.
M/s. Stars poly storage tank, dubai delivered at site.
M/s. Terrazzo Dubai Co.LLC, Dubai, UAE. 8. Access surrounding the tank shall be ensured with proper detailing.
9. Contractor shall submit shop drawing with all accessories to the DEWA supervising site
engineer.
10.Tanks shall have all the accessories as per specification.
11.Tanks shall have feature of integral hollow supports suitable for stabilizing in-situ with
concrete infill.

As per tender
1065 Forged Brass full bore.
document which 1. Cleaning & disinfection should be done as per specification.
1068 Forged Brass
Gate Valves Civil Plumbing Substation M/s. Pogler , UK ever is applicable Valves used for control of water supply. Pantry / Toilet Domestic water supply 2. Approved sample signed by DEWA should be kept at site for ready reference (If applicable). No Not Required
DN 100, Pattern V 950
for repsective 3. Gate valve should comply with BS 21 : 1973 (4" & 2" 1068 BRASS GATE VALVE)
Isolating Valves (79).
project.

M/s. Cosmoplast Industrial Co. LLC, Sharjah UAE SS-304


As per tender 1. Inlet and outlet uPVC Pipes to Floor Trap shall be followed by Solvent Type joint.
Floor trap 75 mm diameter with stainless document which Floor drains & floor cleanout covers (Stainless 2. Floor traps shall be placed with proper slope.
steel grating & Polypropylene road gully Civil Drainage Substation HEP4120B ever is applicable steel) Pantry/Toilet Plumbing 3. Name of the manufacturer to be embossed on the floor trap, as well as on the No Not Required
568 mm x 920 mm M/s. Hepworth PME , Sharjah , UAE (ABS) MDTOP-WH for repsective Part of drainage system. floor clean out cover.

160x110-D46/49 project. 4. Location shall be as per the approved drainage drawing.

1. uPVC Pressure pipes shall be from class E and solvent welded as per BS 3505.
2. Fittings-EN 1452: uPVC fittings are to be solvent joint fittings.
M/s. Hepworth , UK 3. Delivery note/certificate of the supplied materials shall be submitted to DEWA engineer before unloading of pipes.
As per tender
M/s. Cosmoplast Industrial Co. LLC, Sharjah UAE 4. Pipes provided under road to be encased as per approved drawing and in place other than road, it will be normal
document which
UPVC Pressure pipes & fittings (BS 3505, M/s. Polyfab Plastic Industries LLC., UAE/KSA Water supply / Burried encasement by concrete.
Civil Plumbing Substation BS 3505 Class E ever is applicable Water supply pipes burried underground. External No Not Required
Class E) M/s. Gulf Eternet Trading Co LTD LLC, Dubai pipes 5. Location and sizes of pipes & fittings shall be as per approved water supply drawings.
for repsective
M/s. Polyfab Plastic Industries LLC., UAE 6. All pipes shall be fixed in strict accordance with manufacturer’s instructions or BS code of practice using the correct
project.
M/s. Modern Plastic Industries LLC, Dubai brackets and clips as appropriate at the recommended centre.
7. Testing and disinfecting of pipes shall be done as per specification

M/s. Cosmoplast Industrial Co. LLC, Sharjah UAE uPVC Floor Trap Cover (SS-304) 1. Inlet and outlet uPVC Pipes to uPVC Floor Trap shall be followed by Solvent Type
As per tender
joint.
document which
UPVC Road Gully, Floor Traps & Gully 2. Floor traps shall be placed with proper slope.
Civil Drainage Substation M/s. Hepworth , UK HEP4103A ever is applicable UPVC Road Gully, Floor Traps & Gully Traps External Drainage No Not Required
Traps 3. Name of the manufacturer to be embossed on the floor trap, as well as on the
for repsective
floor clean out cover.
project.
4. Location shall be as per the approved drainage drawing.
DIS3633
M/s. Gulf Iternit Industries Co., Dubai

M/s. SCHOTT Technical Glass Solution GmbH,


PYRAN S 6mm Thick 1. Vision panel glass should be fire rated for minimum 2 hours in accordance with NFPA 80/
Germany. As per tender
BS 476 and must carry sticker for fire rating from accredited agency.
M/s. SCHOTT, UK document which
Respective Glass for vission panel (2 hrs fire rated) Mark of origin/make to be embossed on the To see other side of door In the steel doors of 2. Required civil defence certificate shall be submitted at later stage before commissioning of
CE MS C 15 195 Civil Glass Substation ever is applicable Yes Site
substation (25mmx30mm) Glass. without openning the door. Intranal Rooms the substation.
for repsective
M/s. Naffco Electromechanical Co. LLC, UAE M/s. 3. Glass should be minimum 6mm thick, with embossing of the manufacturer name.
FireLite NT project.
Firelite, Canada

As per tender
MP-FL02-55mm joint width 10-25mm document which
Respective Vertical and Horizontal cover on expansion Vertical and Hoarizontal Cover on the expansion
CE MS C 15 196 Aluminium Expansion Joint Cover Civil Metalic Substation M/s. Prakas Saho Building Materials LLC, Dubai. Model: 240-AV, size: 10" dia. ever is applicable 1. Width & shape 'L' or flat of the cover shall be followed as per RFC. Yes Site
substation joint. cover on expansion joint. joint.
MP-FLH02-55mm & MP-FLH02-70mm for repsective
project.

Painting System:
M/s. Al Jazeera Paints, KSA
M/s Al Jazeera Paints, KSA Primer: 1xAl Jazeera C primer, High visibility paint in dark, based on solvent

Base Coat: 2 x AFRW Base coat JA-16050 born acrylic and special fluorescent pigments.

Top Coat: 1 x AFRW Mudee JA-15030 As per tender


1. Application shall be in full compliance with manufacturer's instructions.
document which Colours: In line with Civil Defense regulation. To see the route easily in
Respective Photoluminous Paint (for fire escape On the floor along the fire 2. Fire escape route to be as per approved drawing and should comply all requirements of civil defence authority.
CE MS C 15 197 Civil Painting Substation ever is applicable dark to escape during fire or No Site
substation route) escape route. 3. Color code should be as per civil defence approval.
for repsective Top Coats: Minimum two coats of Fuorescent if there is no light.
4. Surface to be inspected before and after application of paint.
M/s. ALAADIN SAFI Paint, UAE project. Paint and Clear Coat over the same for
5. Painting works to be carried out by DEWA approved applicator for this project.
Primer: 2 coats of white guard epoxy primer. protection.
M/s. ALAADIN SAFI Paint manufacturer LLC, UAE 6. Guarantee as per specification shall be provided in due course.
Base coat: Minimum 2 layers of FLO-GP.
Top Coat: 1 coat of ADS floor glow paint

1. Door name plates shall be 300 x 100 x 1.5mm thick anodized black aluminum sheet. The
M/s. Javed Arts & Graphic Signs Est., Al Ain
inscriptions shall be engraved without color filling.
M/s. Bassam Sign, Ajman As per tender
2. Approved sample signed by DEWA engineer should be kept at site for ready reference.
M/s. Al Merikh Advertising & Pub. Est, Sharjah, document which
300 x 100 x 1.5mm thick anodized black aluminum 3. All the nameplates, signs and labels shall be non-deteriorating and non-warping under
CE NNNA MS C 15 198 Door name Plates Civil Metalic Substation M/s. Super Sign- UAE ever is applicable To identify the room. To identify the room. On the door screen. Yes Site
sheet aggressive weather conditions and shall be guaranteed for a minimum period of 10 years.
M/s. Onyx Advertizing & sign, Dubai for repsective
4. Fixing to be with countersunk stainless steel screws and holes on plates to be counter sunk
M/s. United Color Film LLC, UAE project.
to receive screws.
5. Sample duly signed by DEWA Engineer to kept at site for ready reference.

©Transmission Engineering Department-2020 15 OF 24 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Material Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Related to Source / Manufacturer Product / Model No: T-Spec Ref General Description Use Location of usage General Comments Sample Remarks
ID Category inspection

M/s. Extra Co. Fibre Glass & Prefab, Sharjah


M/s. Union Fibre Glass Factory LLC, Dubai
M/s. Image Fiber Glass Industry, Ajman
M/s. Sonara Fiber & Plasic Industry , Sharjah.
M/s. Naseer Fiber Glass, UAE GRP insitu/ lamination work shall be carried out as per approved sample board.

M/s. Alfa Fiber Glass industries, UAQ Thickness of lining shall not be less than 7mm.
As per tender
GRP Lining (7 mm thick) for fire water M/s. Al Kawther Fiber Glass Production Maintenace, In side the concrete fire Method statement for GRP lining works shall be submitted to DEWA/Consultant engineers at site to review and allow to
document which
Respective tank UAE water tank, Holding tank proceed with the works.
CE MS C 15 199 Civil Water Proofing Substation Shall comply with civil specification ever is applicable For water proofing. For water proofing. Yes Site
substation M/s. Eissa Fiber Glass LLC, Dubai and other locations as per Materials delivered at site to be offered to DEWA/EPE site engineer to confirm the materials.
for repsective
M/s. Indo Arab Décor Industries, Sharjah RFC drawing. Fiberglass reinforcement mat shall be bi-directional in alternate layers.
project.
M/s. Advance Fiber Glass Industries, UAE Final layer shall be protected with a layer of gel coat.

M/s Feather Touch Fiber, Glass LLC, Dubai Barcol hardness and pull of test shall be conducted before final acceptance of the work.

M/s Notredamme Fiber Glass & Ind., UAE Safety regulations shall be implemented as specified under the various material safety Data sheet.

M/s. Jim fiber glass est., Ajman Proper ventilation to be provided during the progress of work.
Leak test shall be carried out after completion of lining/lamination work.

1. Base of ladder shall be provided with floor mounting bracket


2. Material technical details should be in compliance with specification and other relevant
standards.
3. Ladder shall be made of GRP by pultrusion process with high quality finishing.
4. Thickness of all components shall be given in the shop drawing.
M/s. Extra Co. Fibre Glass & Prefab, Sharjah
5. Shop drawing with all connection details to be submitted for approval at site and the work
M/s. Union Fibre Glass Factory LLC, Dubai
As per tender shall be carried out as per the approved shop drawing.
M/s. Image Fiber Glass Industry, Ajman
document which 6. GRP ladder to be provided inside the oily water tank and other deep manholes must be
Respective 400mm wide GRP Ladder for oil water M/s. Sonara Fiber & Plasic Industry , Sharjah. To access during Oil water tank and
CE MS C 15 200 Civil Others Substation Shall comply with civil specification ever is applicable To access during mentainance. safe for climbing a person ( finishing of steps shall be rough so that steps will not slip) Yes Site
substation tank and basement sump pits M/s Advanced Fiber Glass Industries, UAE mentainance. Sump Pits at basement
for repsective 7. Width of ladder to be provided sufficient for holding a person safely climbing and
M/s. Leader Grate LLC, Dubai
project. ascending purposes.
M/s. Eissa Fiber Glass LLC, UAE
8. GRP ladder shall not be directly anchored on floor and wall of sump pit/tank. Concrete nibs
and upstand shall be provided respectively for fixing these anchors and details shall be
agreed at site with DEWA engineer before installation.
9. All rivets and anchors shall be of stainless steel grade 316.
10. Sample duly signed by DEWA engineer to be kept at site for ready reference.
11. Guarantee as per specification shall be furnished in due course.

Source:
M/s. Al Jazeera Steel products co, UAE
M/s. Al Jazeera Steel products co, Oman
M/s. Kar Demir, Turkey.
M/s. Demir Celik, Turkey
M/s. Mescier Demir Celik San.Tic.Ltd, Turkey
M/s. JSW steel, India
M/s. Kaptan Deimir Celik, Turkey
Fabricator:
M/s. Reliable Fabricators LLC, Dubai
M/s. Danway Electrical and mechanical engg. LLC,
Dubai
M/s. Notredame metal construction Co LLC, Dubai
1. The bottom flat plate of spike to be discontinued at expansion joint to allow movement of
M/s. Standard Fabrication Engineering EST, Dubai
boundary wall panel.
M/s. Link Midlle East Limited, Dubai
2. Steel Spikes to be galvanized & painted with RAL color as per approved external color
M/s. Link power building contracting LLC, Dubai
scheme and should match with boundary wall color.
M/s. Galadari Engineering Works Ltd, Dubai
As per tender 3. Delivery note of the material shall be submitted to DEWA site engineer before unloading
M/s. Shams Al Sabah Steel Construction Contracting, To stop entering to the
document which the material at site.
Respective Sharjah MS rod 10mm dia of each 100mm long and baseplate DEWA premises over the
CE MS C 15 201 Galvanized steel spikes Civil Metalic Substation ever is applicable To stop intrusion. At the boundary wall top. 4. Method statement and risk assessment shall be submitted for approval to DEWAsite Yes Site
substation M/s. Saqliya Steel Construction Contracting, Dubai 50x5mm boundary wall by the
for repsective engineer before installation of spikes. Works shall be carried out as per approved RFC
M/s. System engineering LLC, Dubai intruder.
project. drawing & specification.
M/s. Super Engineering Industry LLC & Al Jazira
5. Approved sample duly signed by DEWA engineer shall be kept at site for ready reference
Industries Co. LLC
6. The center to center distance between each spike shall not exceed 225mm.
M/s. YMS Engineering, Dubai
7. Welded connections shall be ground of as necessary to present a clean smooth finish.
M/s. Al Deraa Structural Steel and contracting LLC,
8. DEWA ITP for structural steel works to be followed for fabrication and painting.
Dubai
M/s. Diplomat Heavy Industries FZE, Sharjah
M/s. Gulf Steel Industries FZC, Sharjah
M/s. Technical Steel Engineering LLC, RAK
M/s. Lootah Industries (steel fabrication div.), Ajman
M/s. Future Metal Industries LLC, Dubai ( Minor
Works)
M/s. Oasis Metal Manufacturing LLC, Dubai ( Minor
Works)
M/s. Techno Fab, Dubai ( Minor works)
M/s. Al Maha Metalic Inudstries
M/s. Middle East Factory LLC, Dubai

As per tender
1. Structural design/calculations of supporting system & foundation considering stability and
document which
Respective wind load to be submitted along with the covering letter for DEWA approval.
CE MS C 15 202 Car parking Shed Civil Others 400kV Substation M/s. Al Hamara Shades Industries LLC, Dubai VALMEX - FR 900 MEHATOP - type II ever is applicable To protect car from sun/rain. To provide shed for Cars. In the car parking area. Site
substation 2. Ten years warranty of the car parking shed to be provided in due course. No
for repsective
project.

©Transmission Engineering Department-2020 16 OF 24 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Material Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Related to Source / Manufacturer Product / Model No: T-Spec Ref General Description Use Location of usage General Comments Sample Remarks
ID Category inspection

Source:
M/s. Gulf Extrusions Co. LLC, Dubai
M/s. Quality wire products Co LLC, WLL
M/s. Tiger steel industries LLC, UAE. M/s. Hebei
Yingkaimo metal net co ltd, china
M/s. Rawl 1. G1 Wire mesh (25 x 25 x 3.5mm) to be used as per the location mentioned RFC drawings.
As per tender
M/s.Xiamen C & D Aluminium Co, LTD, Galvanized and epoxy coated painted wire mesh 2. Necessary certificates to ensure the finished coating thickness should be produced prior to
document which
Fabricator: fencing of opening size not more than 25 x 25 IDT ,ET & Reactor front installation.
CE NNNA MS C 15 240 GI Mesh (if there is no Aluminum Claustra) Civil Aluminum Substation 25 x 25 x 3.5mm ever is applicable Architectural Element Yes Site
M/s. Alba Tower Aluminium Factory, Dubai mm and the mesh shall be of 3.5 mm dia rods enclusure 3. Approved sample duly signed by DEWA engineer to be kept at site for ready reference.
for repsective
M/s. Inventure LLC, metal product ind., Dubai in removable frames. 4. GI Mesh should be galvanized and epoxy coated or powder coated as per specification.
project.
M/s. Fattah Aluminum Factory, Sharjah 5. Color should be as per approved external color scheme for the subject project.
M/s. Reliable fabricators, dubai
M/s. Notredame Metal construction co. LLC
M/s. Link Middle East Limited Dubai
M/s. Standard Fabrication and Engineering . Dubai

1. Size, number & location shall be as per approved engineering drawings.


M/s. Hepworth PME LLC, Dubai 2. All types of sleeves (OSBM/OSS, DSBM & DSS) shall have puddle flange with grit surface for improved bond in
M/s. Power Plastic Factory, Ajman, concrete.
As per tender
UPVC PIPE & Fittings-Class C: (Dia- M/s. Modern plastic factory. 3. All the cable duct pipes shall be "class C" in compliance with BS 3506.
document which For cable entry/exit throgh the concrete duct
Respective 168mm/Thick-6.6mm & 114mm/Thick M/s Cosmoplast Industrial company, Dubai Cable crossings by open 4. Test certificate from the manufacturer shall be submitted along with material delivery note to the DEWA site
CE MS C 15 241 Civil Sleeve Cable Laying 100mm , 150mm & 200mm diameter ever is applicable by open cut method for cable route profile DUCT BANK Yes Site
substation 4.5mm) M/s. Polyfab Plastic Industries Co., Ajman cut inside the duct bank. engineer.
for repsective
M/s. Gulf Eternit Industries, Dubai 5. All bellmouth/pipes/sleeves shall be water /fire sealed from inside and water sealed from outside.
project.
M/s. RAK Universal Plastic Industries L.L.C RAK 6. Approved sample duly signed by DEWA engineer shall be kept at site for ready reference.
7. Sleeves kept for future use shall be extended beyond wall face and sealed with cap from same manufacturer.

M/s Gulf Eternit Ind. Co. Ltd., Dubai


M/s. RAK Universal Plastic Industries, RAK
M/s. Polyfab Plastic Industry L.L.C Ajman
M/s. Cosmoplast, Dubai
M/s Hepworth PME L.L.C, Dubai As per tender Cable route marker tapes for use during
1. HDPE Pipes and Fittings complying BS 1519 to be used
HDPE PIPE: (Dia-160mm/Thick-9.5mm & M/s. OMANPLAST,SULTANATE OF OMAN document which installation shall be continuously installed 300
Respective To use as a sleeve near On the route of cable 2. Diameter and use of pipes & fittings shall be as per the approved drawings
CE MS C 15 242 Dia-110mm/Thick 6.6mm) Civil Sleeve/Pipes Cable Laying M/s.Modern Plastics,Dubai,UAE 100mm & 150mm Diameter ever is applicable mm Yes Site
substation waterline crossing route profile 3. Works shall be carried out as per specifications.
M/s. Shield, UK for repsective directly above the cable or cable covers.
4. Approved sample signed by DEWA engineer to be kept at site for ready reference.
M/s. Wavin, UK M/s. Geberit, switzerland project.
M/s. Omanplast, UAE/Oman
M/s. Emirates Germany Pipe Industries LLC, UAE
M/s. SHIELD Polythene Piping System L.L.C, UAE

M/s. Kangaroo Plastics Middle East LLC


As per tender
M/s. Abu Mansoor Plastic Factory L.L.C, Abudhabi
document which
Respective M/s. Ace Plastic, RAK Provided to stop penetration of water of fresh
CE MS C 15 243 Polythene Sheet 1000 G Civil Water froofing Cable Laying 1000 G ever is applicable Under the fresh concrete Mass conctreting works. Yes Site
substation M/s. Shalimar Plastic Industries LLC., Ajman concrete to soil.
for repsective
M/s ASHKAL (FZE), Sharjah, UAE
project.

M/s. Kangaroo Plastics Middle East LLC As per tender


During installation shall be continuously
M/s. Shuaa Group - Plastic Division, Abu Dhabi document which 1. Surface printed black text not less than 20mm high in Arabic & English as per specification,
Respective Warning Tape(Yellow & Red with printing) installed 300 mm directly above the cable or Above the cables/cable-
CE MS C 15 244 Warning Tape (Yellow&Red with printing ) Civil Warning sign Cable Laying M/s.Interplast Co.Ltd.,Sharjah ever is applicable Safety of cable Printing should remain unaffected in all conditions. Yes Site
substation (150mmx500mmx100/150micron) cable covers. covers.
M/s Al Shalimar Plastic Factory L.L.C, Ajman for repsective 2. Tapes should exhibit good resistance to the minerals in subsoil and various chemicals.
M/s. Abu Mansoor Plastic Factory L.L.C, Abudhabi project. 3. Color of the tapes shall be red as per specification.

1. Link box marker shall be made with MS Steel pipe and painted as per approved drawing.
M/s. Al Ahad Gypsum works Co. LLC, Sharjah As per tender
Route Markers (Pole type for link Other markers shall be made with HDPE SDR-17 pipes and painted as per approved drawings.
M/s. Saad Precast LLC, Umm Al Quwain document which For the route of the cable profile a wooden
box,unmade&grass area.Surface route Identification of cable route 2. Approval for the HDPE markers is subject to observation of the proposed material for a period of one year from the
CE NNNA MS C 15 245 Civil Pole/Post Cable Laying M/s. Technical Engineering Services (TESCON), Shall comply with specification ever is applicable small posts are installed to identify the cable Above cable route. No Site
marker in tiles) profile date of handover.
Sharjah for repsective route profile
3. Letters and script size should be as the approved shop drawings.
M/s Interplast Co LTD. Sharjah, UAE project.
4. Approved mix design shall be used for concrete works.
5. Any new material required for this proposal should be submitted officially for approval.

Super cast SW 20
M/s. Al Gurg Fosroc, Dubai
Super cast SW 30
Supercast SWX or SW adhesive
As per tender 1. Application should be strictly in line with manufacturer's recommendations

M/s. Henkel Polybit Industries, UAE/KSA HYDROSEAL P document which Pile caps, sealing around 2. Supercast SWX or SW adhesive should be used for bonding as per manifacturer instructions.
Respective Piling / RCC Integral sealing for construction joints in Piling,OWMH, FMH &
CE MS C 15 248 Swellable water bar Civil Substation ever is applicable cutouts of pipe encasement, 3. Detailed method statement should be submitted to the DEWA site supervising engineer for review and approval. No Site
substation structures concrete cast in situ. SMH manholes
for repsective casting around old concrete. 4. The swellable water stop shall be fixed around the circumference of the pipe at the external and internal face of the
project. wall ensuring minimum concrete cover of 100mm.
M/s. BASF Construction Chemicals UAE LLC, Dubai Masterseal 910

Supercast PC
M/s. Al Gurg Fosroc, Dubai As per tender
Renderoc TGXtra
document which 1. Surface preparation, mixing and application shall be as per manufacturer's instruction.
Respective High performance pile top fairing grout and
CE MS C 15 249 Pile Grout Civil Piling Substation ever is applicable Pile cap reprofiling Substructure 2. Primer to be applied as per manufacturer instruction. No Site
substation cementitious void filler
for repsective 3. Method statement should be submitted to the supervising engineer for review and approval.
M/s. Henkel Polybit Industries, UAE/KSA Polygrout EY 3000 (PH) project.

©Transmission Engineering Department-2020 17 OF 24 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Material Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Related to Source / Manufacturer Product / Model No: T-Spec Ref General Description Use Location of usage General Comments Sample Remarks
ID Category inspection

1. Paint should be applied in 2 coats of road marker paint ( color : Yellow, Black & white)
M/s. National Paints, UAE As per tender
National Road Marker Paint A road marking paint based on combination of 2. Painting system shall be as per manufacturer's instructions.
document which For better visibility and
Respective Kerbstone and road marker painting special alkyd resin and chlorinated rubber. High 3. The paint should be resistance to weather, water, oil and other chemicals.
CE MS C 15 251 Civil Painting Substation ever is applicable provide information to Interlock tiles & Kerbstone No Site
substation system build paint pigmented with light fast weather 4. Dry film thickness shall be 100 microns (each coat).
for repsective vehicle users.
M/s. Jotun, UAE Road Marking Paint resistant pigment with tough inert extenders. 5. Storage of material shall as per manufacturer's instructions.
project.
6. Guarantee to be furnished in due course.

1. Reinforcement mat shall be multi-directional in alternate layers


2. Final layer shall be protected with a layer of gel coat.
3. Barcol hardness and pull of test shall be conducted before final acceptance of the
work.
4. Thickness shall be minimum 7.00 mm. If expected more than bearable load
M/s. Al Kawther Fiber Glass Industries, Sharjah. As per tender
as per manufacturer instructions.
M/s. Alfa Fiber Glass document which U/G Oil water tank,
Respective Reinforcing the water retaining capability and Oil and chemical 5. All joints shall shown to the supervising Engineers for his satisfaction.
CE MS C 15 252 GRE lining Civil Waterproofing Substation Industries, UAQ As per approved sample ever is applicable holding tank and other No Site
substation resistant to high temperature. tanks/manholes 6. Method statement should be submitted to the DEWA site engineer for review.
M/s Feather touch Fiber Glass LLC, Dubai for repsective deep structures.
7. Contractor's risk assessment should be strictly followed.
M/s. Eissa Fiber Glass LLC, Dubai project.
8. The laminated surface shall have Barcol hardness as manufacturer’s specified
hardness for the cured resin.
9. Approved sample should be kept at site for ready reference.
10. Guarantee from manufacturer should be furnished in due course.

Bentonite Fulbent 570, Thermocol, ILLBRUCK


FM310, DYMERIC 240, Nullifire B220, Neoprene
M/s. Tremco ILLBRUCK LLC, UK Boundary wall
Rubber Sheet, TREMproof 201/60 TP 60 Solution

1. Application should be as per manufacturer's instruction and method statement.


As per tender 2. Sequence of work and methodology should be as per standard drawing no. 304
M/s. Hauff Technik, Dubai 316L Mechanical sealers sealing of all spare sleeves,
document which standard drawing for U/G structures and roof slab, Rev -01.
Respective Waterproof / fire Basement sleeves with waterproof system from earthing cable sleeves and all
CE MS C 15 254 Sealing of cable ducts Civil Substation ever is applicable 3. Submit guarantee letter obtained from manufacturer for the product for a period of Yes Site
substation proof external and fire proof system from internal. basement sleeves from building basement RCC
for repsective 10 years from the date of taking over by DEWA and further endorsed by contractor.
M/s Roxtec Middle East FZE 316L Mechanical sealers inside walls as per applicable
project. 4. HRD-316L materials only allowed for installation.
specification 5. Contractor shall confirm that the proposed materials are compatible with existing ducts.

M/s. Hilti Emirates LLC, Dubai 316L Mechanical sealers

As per tender
M/s.Specialized Metal Design, Dubai 1. Stainless Steel Ladder must be in line with the approved drawing stamped RFC.
document which
Respective M/s. Viraj Profiles Limited, India-Flat bar & angle & To access during 2. GRP lining/water-proofing should be treated properly during fixing to avoid any damage.
CE MS C 15 256 Stainless steel ladder inside fire water tank Civil Others Substation Grade 316 L ever is applicable To access during mentainance. Fire water tank Yes Site
substation M/s. Chang-Hwa, Taiwan-Tube mentainance. 3. Installation must comply the rules & regulation of civil defense.
for repsective
project.

Respective
CE MS M 16 284 MEP Standard Materials ( HVAC & LSP)
substation

As per tender
1) M/s Tecnalco,UAE.
document which As shown in Basement ,
Air Terminals.(Diffuser, Grille, Sand trap 2) M/s Air master-UAE.
MEP HVAC Substation refer general comments ever is applicable Air distribution devices Ground , First , Roof Shall be as per approved schedule , sizes and type shown in RFC drawings. Yes Site
louvers/Exhaust Louvers). 3) M/s BETEC CAD-UAE.
for repsective HVAC Layout.
4) M/s BETA Industrial - UAE.
project.

As per tender
document which
1. M/s Mueller - USA Fire Pump Room and
Refrigerant copper piping MEP HVAC Substation refer general comments ever is applicable Connection between Indoor / Refrigerant piping sizes shall be as per manufacturers recommendation to suit the approved Split AC units capacities. Yes Site
2. M/s Maksal - South Africa Security Room
for repsective
project.

As per tender
1) Kimmco, Kuwait. document which
Thermal and Accoustic As shown in Ground , 1 ) Thermal Insulation : Indoor Insulation : 25 mm thick , 48kg/m3 density. Outdoor Insulation 50 mm thick , 48kg/m3
Duct Insulation(Thermal & Accoustic) MEP HVAC Substation 2) M/s Afico - KSA refer general comments ever is applicable Yes Site
Insulaton of AC Ducts First , Roof HVAC Layout. density , Hard board. 2) Accoustic Insulation 25 mm thick , 24kg/m3 density , Hard Board.
3. M/s. Knauf Insulation, UAE for repsective
project.

Al Cladding :
1. M/s Hindalco - India
2. M/s Garmco - Bahrain.
Access Doors :
As per tender 1. Aluminium Cladding : 0.8 mm thick.
1. M/s Safid Engineered Air Solutions.
Duct Finishes and Accessories.(Vapour document which As shown in Basement , 2. Access Doors : Indoor ducting with 25 mm thick and outdoor ducting 50 mm thick. Sizes shall be as per approved
2. M/s Aldes, UAE.
barrier,adhesive, sealant, Al MEP HVAC Substation refer general comments ever is applicable Fabrication of HVAC Ducts Ground , First , Roof drawings. Yes Site
3. M/s Tecnalco, UAE.
cladding,Access doors). for repsective HVAC Layout. 3. Foster : Duct Sealant 32-17 , Duct Adhesive 81-10 , Vapor Barrier Coating Indoor 30-36 , Vapor Barrier Coating
4. M/s BETEC CAD - UAE.
project. Outdoor - 30-36AF.
5. Weathermaker Limited - UAE.
Ducting Sealant , Adhesive and Coating - Foster -
USA

Fabricator -
1) M/s Weather Maker Limited-UAE,
2) M/s Leminar air conditioning - UAE,
3) M/s KAD Air conditioning -UAE.
4) M/s Horizon - UAE. As per tender
5) Al Muthathawerah - UAE document which As shown in Basement ,
Ducts.(Prefabricated AC ducts, Fire rated
MEP HVAC Substation GI Sheets - M/s Al Ghurair Iron - UAE, M/s Jindal- refer general comments ever is applicable Fabrication of HVAC Ducts Ground , First , Roof Shall be as per approved schedule shown in drawings. Yes Site
smoke extract ducts)
India.. for repsective HVAC Layout.
Fire Rated Duct/Fabricator - project.
1) M/s Casewell Fire Safe,UAE & UK .
2) M/s Fenland UK
3) M/s. Falmeshield, UK
4) M/s. Central Ventilation Systems, UAE

As per tender
( M/s. Riyadh cables.-KSA ) , ( M/s. Oman cables-
document which
Oman ) , (M/s. Gulf cable - Kuwait , (M/s. DUCAB- Single core, PVC insulated non-sheathed rated Wiring for lighting & small
Wires MEP LSP Substation refer general comments ever is applicable All areas Only for LSP sizes 2.5 sq mm for lighting and 4 sq mm for small power. No Site
UAE) , (M/s. National cables industry Sharjah- 450/750v grade with copper conductor wires. power circuits
for repsective
UAE),(M/s. Tekab-UAE), (Ms. Elsewedy cables-Egypt)
project.

©Transmission Engineering Department-2020 18 OF 24 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Material Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Related to Source / Manufacturer Product / Model No: T-Spec Ref General Description Use Location of usage General Comments Sample Remarks
ID Category inspection

( M/s. Syarikat-Ric industries-Malaysia ) , ( M/s. As per tender


Many folk enterprises limited- Hong kong ) , ( M/s. document which
Surface containment for
GI Conduit & accessories MEP LSP Substation Unicorn-Malaysia ) , ( M/s. Royal steel industries- refer general comments ever is applicable Heavy duty galvanized conduits, fittings, boxes & accessories As shown in LSP drawings GI Conduit Minimum size shall be 20mm dia. No Site
lighting & small power wiring
Thailand ), (M/s Wai Ming - Hong Kong). (M/s. Burn- for repsective
UK) project.

As per tender
M/s. L ' Isolante, Italy document which
Thermal insulation for
Insulation for split units refrigerant piping MEP HVAC Substation M/s. K - Flex , UAE refer general comments ever is applicable Fire/Security room 19 mm thick , diameter to suit the refrigerant piping sizes. Yes Site
refrigerant piping
M/s Armaflex - KSA for repsective
project.

As per tender
M/s Durodyne - UAE , document which
Flexible Duct Connector and Vibration Flexible Duct Connector - Packaged AC Units and Basement Ventilation Fans ( Model MFN333 # 10003 ) , Smoke
MEP LSP Substation M/s Durodyne - USA. refer general comments ever is applicable Vibration isolation Basement & Roof Yes Site
Isolators. Extract Fans ( Model MFT333 # 10005 ) , Vibration Isolators shall be as per fans individual loading points.
M/s Aeroduct -UAE for repsective
project.

As per tender
document which Concealed / embedded
(M/s. Interplast co. Ltd, Sharjah-UAE),(M/s. Syarikat Concealed areas in
PVC Conduits & accessories MEP LSP Substation refer general comments ever is applicable Heavy gauge PVC conduit, accessories & back boxes containment for lighting & PVC Conduits & accessories Minimum size shall be 20mm dia. No Site
Lan-Ric industries-Malaysia) concrete slab / wall / floor
for repsective small power wiring
project.

As per tender
document which
Filters(Aluminum and Synthetic). MEP HVAC Substation refer general comments ever is applicable Air Filters Basement and Roof Sizes and thickness shall be as per approved drawings. Yes Site
for repsective
project.

As per tender
M/s. Nova Blue-UAE , M/s.Sigma factory-UAE , M/s.
document which
Power solution industries, Ajman-UAE , Ms.Transdelta- Surface containment for
GI trunking & accessories MEP LSP Substation refer general comments ever is applicable Galvanized trunking with cover and fittings & accessories All areas GI trunking & accessories size should not be more than 100mm width. Thickness shall be as per specification. No Site
UAE , M/S. Technical metal Industries LLC – UAE, lighting & small power wiring
for repsective
M/s. Syarikat-Lan Ric industries-Malaysia
project.

As per tender
M/s. Syarikat-Ric industries-Malaysia , M/s Perfect
document which Surface containment for
tools & forgings - India , M/s. Adaptaflex-UK , PVC coated galvanized mettalic conduit and
Flexible metallic conduit & accessories MEP LSP Substation refer general comments ever is applicable lighting & small power wiring All areas Flexible metallic conduit & accessories Minimum size shall be 20mm dia. No Site
M/s.Flexicon-UK, M/s. Many folk enterprises limited- accessories
for repsective / cabling
Hong kong.,M/s. Kopex -UK.
project.

M/s. Power solution industries, Ajman-UAE , M/S. As per tender


Everest metal industries LLC – UAE, M/S. Technical document which Surface containment for
Cable tray & accessories MEP LSP Substation metal Industries LLC – UAE, M/s.Sigma factory-UAE, refer general comments ever is applicable Galvanized perforated tray with cover & accessories lighting & small power cables All areas Cable trays manufacturer shall be as per Cable Section. Sizes and thickness shall be as per approved drawings. No Site
Ms.Transdelta-UAE, M/s. Syarikat-Ric industries- for repsective used for power distribution.
Malaysia, M/s. Nova Blue, UAE project.

As per tender
document which
M/s.Prysmian , M/s Bicon-UK , M/s Braco Electricals- End termination and connection of
Cable gland, lugs & accessories MEP LSP Substation refer general comments ever is applicable Brass cable gland set and tinned cooper lugs. All areas Sizes shall be as per approved drawings & cables. No Site
India , M/s. Calter-India cables.
for repsective
project.

As per tender
document which
To use as junction box for the small
Junction box / enclosure MEP LSP Substation M/s. Scame-Italy , M/s. Rittal-Germany refer general comments ever is applicable As shown in LSP drawings Sizes and thickness shall be as per approved drawings. No Site
power & lighting installations
for repsective
project.

As per tender
1. M/s Fawaz - Kuwait Model FL-20/3-415/24-OP document which
1. M/s Fawaz - Kuwait Humidity Control in LVAC/
Electric Duct Heaters MEP HVAC Substation 2. M/s. Maxell, UAE 1) Model # MX-TP-400-21.0-3- ever is applicable Heater located in duct for control of humidity. Roof 3 stage No Not required
2. M/s. Maxell, UAE Control / Charger rooms
1200X1100-24-FTSL- (3 Stage). for repsective
project.

1)M/s. Hager- Malaysia / France Wall mounted-


EE840-360 ( Malaysia )/ Ceiling mounted- EE815-
360 (France) As per tender Automatic switching on/off
1)M/s. Hager- France/ Malaysia Basements, 11 KV rooms,
2) M/s Steinel -Germany Wall mounted-IS 3180 / document which of lights by closing and
Small Power & 2) M/s Steinel -Germany Sensors have time and light level adjustment 132 KV GIS room , LVAC
Passive infrared movement sensor (PIR) MEP Substation Ceiling mounted-IS3360 ever is applicable opening of circuits by No Not required
Lighting 3) M/s. Clipsal- Australia and it works on infrared principle. room, Control room ,
3) M/s. Clipsal- Australia Wall mounted-751R / for repsective detecting movement of
4) M/s Honeywell , UK Corridors
Ceiling mounted-SAE-UE-MS-CSAWE project. personnel.
4) M/s Honeywell , UK Wall mounted-MR1500PF
WMK / Ceiling mounted- LS3100RF

©Transmission Engineering Department-2020 19 OF 24 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Material Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Related to Source / Manufacturer Product / Model No: T-Spec Ref General Description Use Location of usage General Comments Sample Remarks
ID Category inspection

1) Fire resistance cable.


a) M/s. Tekab-UAE (type FIRETEK) with earth cable
Model SA7Z1.
1) Fire resistance cable.
b) M/s. Prysmian-UK (FP 200 flex white color cable)
a) M/s. Tekab-UAE (type FIRETEK) with earth cable.
with earth cable. c)
b) M/s. Prysmian-UK (FP 200 flex white color cable) Fire resistant cable used for
M/s. Cavicel-Italy model no. SR114E. As per tender
with earth cable. c) Fire resistant cable can sustain fire for a certain wiring of emergency lights
2) Heat resistance cable document which
Small Power & M/s. Cavicel-Italy period and heat resistant cable can sustain and heat resistant cable All areas (not succeptible
Fire resistant and Heat resistant cable MEP Substation a) M/s. Tekab-UAE (TEKAB operating temperature ever is applicable No Not required
Lighting 2) Heat resistance cable designated high emperature in normal used for final connection to to mechanical damage)
105°c) type H05V8V8-F / H05V2V2-F . for repsective
a) M/s. Tekab-UAE environment. Cables are of 300/500 V grade light fitting from fixed wiring
b) M/s. Ducab-UAE (Ducab operating temperature project.
b) M/s. Ducab-UAE . c) installation.
105°c) type H05V2V2-F.
M/s. Permanoid Ltd-UK
c) M/s. Permanoid Ltd-UK (operating temperature
105°C) .
i) 3C X 2.5 Sq.mm cable model no. 3093Y
ii) 4C X 2.5 Sq.mm cable model no. 3094Y

1) M/s. Finetek co ltd-Taiwan (level indicator) Model


no# PB-1471-T01-4021
2) M/s.Valcom -Italy (Level sensor) Model no# 271 C
1) M/s. Finetek co ltd-Taiwan (level indicator) As per tender
PI M02 8 B A04 I21
Level transmittar & indicator alert alarm / 2) M/s.Valcom -Italy (Level sensor) document which U/G Oil water tank,
3) M/s. Vega technique- Germany, Level indicator
sounder for septic tank, holding tank & MEP Plumbing Substation 3) M/s. Vega technique- Germany ever is applicable Plumbing Plumbing holding tank and security No At site
model no# Vegawell 52; Oil Level transmitter model
U/G oil water tank 4) M/s MAHY Khoory - Dubai withFloat Switch EHZ- for repsective room
no# Vegamet 381 & Foul water network model no#
FS-E2 -Germany project.
VEGAPULS WL 61
4)M/s MAHY Khoory - Dubai level indicator panel
with level alarm Float Switch EHZ-FS-E2 -Germany

As per tender
1) Xylem Lowara-Italy Model No. DIWA 11
1) Xylem Lowara-Italy document which Pump completely immersed in water for
Submersible Pump 2) Grundfos Hungary Model no. Unilift
MEP Drainage Substation 2) Grundfos Hungary ever is applicable pumping out deluge / oil water to respective Basements & External area External Drainage System No Not required
Capacity: 25 cu.m/hr at 8 m head AP12.40.08.A1
3) M/s.Davey -Australia for repsective areas.
3) M/s.Davey -Australia Model no. DCS-40A
project.

Respective
CE MS M 18 300 Fire Fighting System ( Standard Materials)
substation

M/s. Viking-USA
model- F1 & F2
As per tender
M/s. Reliable-USA. model DDX document which
Deluge Valve FPS Fire Fighting System Substation M/s Fluid - UK FX-H/HM , FD10 ever is applicable Deluge Manifold No Site
for repsective
M/s Victaulic - Canada Series 769N project.

M/s. Viking-USA model -F1R1725

Model- Micromatic VK100,VK102


M/s. Reliable-USA.
As per tender
document which
Wet Pilot Sprinkler FPS Fire Fighting System Substation M/s Fluid - UK Model 250 ever is applicable Yes Site
for repsective
project.
M/s. Masteco-Korea MT2500/2510

M/s Victaulic - Canada Series 760

M/s. GJ INNOVATION INC- USA SURE TEST (INNOVATION) As per tender


document which
AGF - USA model- 1000 (AGF) Near IDT, ET & Reactor
Test & Drain valve FPS Fire Fighting System Substation ever is applicable No Site
GIACOMINI - ITALY A61 Entrance
for repsective
SHIELD - UK SD-A61 project.

As per tender
M/s. Potter-USA PS120-2
document which
Pressure Switch FPS Fire Fighting System Substation ever is applicable Deluge Manifold No Site
for repsective
model - EPS10-2
M/s. System Sensor-USA. project.

As per tender
M/s. Watt-USA. Series 530C document which
Pressure Relief Valve FPS Fire Fighting System Substation ever is applicable Deluge Manifold No Site
for repsective
model- 55L
M/s. Claval-UK project.

M/s. Amerex-USA. Model-B456 As per tender


document which
M/s. Naffco - UAE NP6
DCP Fire Extinguisher FPS Fire Fighting System Substation ever is applicable Entire Substation No Site
M/s. Q-Fire-Singapore Q-6SP for repsective

M/s. KIDDE - USA Pro 10 MP project.

M/s. Amerex-USA. model- 330 As per tender


document which
CO2 Fire Extinguisher FPS Fire Fighting System Substation M/s. Naffco - UAE NC5 ever is applicable Entire Substation No Site
M/s. Q-Fire-Singapore Q-5CSEC for repsective
project.
Pro 10 CD
M/s. Kidde-USA
M/s. Amerex-USA. MODEL- 495
As per tender

M/s. Naffco - UAE NTP25 (DCP) document which


11KV / 132 KV
CO2/DCP Trolley Fire Extinguisher FPS Fire Fighting System Substation ever is applicable No Site
Switchgear room
M/s. Fluid-Singapore FEP25 / FEC30 for repsective

©Transmission Engineering Department-2020 20 OF 24 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Material Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Related to Source / Manufacturer Product / Model No: T-Spec Ref General Description Use Location of usage General Comments Sample Remarks
ID Category inspection

project.
M/s. Kidde-USA Model: PRO PLUS 50 (DCP)
As per tender
M/s. Al Arabia (Amerarex -USA) model-630
document which
Trolley Foam Fire Extinguisher FPS Fire Fighting System Substation M/s. Nafco-UAE NTFC135X ever is applicable Pump Room No Site
for repsective
M/s. Macron -UK NWAF135
project.
M/s. Maxell , Dubai

M/s. Al Arabia Safety & Security Dubai


As per tender

M/s. Bristol, Dubai. document which


Fire Extinguisher Cabinets FPS Fire Fighting System Substation As per specification ever is applicable Entire Substation No Site
for repsective
M/s Zener Fire - DUBAI
project.
M/s Newage - Dubai
M/s. Osool - Dubai

As per tender
document which
Deluge Manifold / Pump
Pressure Gauge FPS Fire Fighting System Substation M/s. Wika-USA model- 213.53 ever is applicable No Site
Room
for repsective
project.

As per tender
M/s. Potter-USA VSR-F document which
PUMP ROOM SPRINKLER
Flow Switch FPS Fire Fighting System Substation ever is applicable No Site
SYSTEM
for repsective
WFD-25 project.
M/s. System Sensor-USA.

As per tender

modelM 401063 document which


M/s.Angus fire-UK
Breeching Inlet - 4 Way FPS Fire Fighting System Substation ever is applicable Main Gate No Site
for repsective
project.
model NWR115
M/s. Naffco, UAE

As per tender
M/s. PHD-USA model Fig 141 & 141
document which
Pipe Hangers & Clips FPS Fire Fighting System Substation ever is applicable Entire Substation No Site
for repsective
M/s. Flamco-Holland BCS project.

As per tender
As per specification
M/s. National Paints - UAE document which
Paints for fire fighting pipes FPS Fire Fighting System Substation ever is applicable ENTIRE SUBSTATION No Site
for repsective
As per specification
M/s. Jotun Paint project.

As per tender
M/s. Moeller-USA model 911U
document which
Y type Strainer FPS Fire Fighting System Substation ever is applicable PUMP ROOM No Site
for repsective
BEF 70FF
M/s. Briston Fire - UAE project.

M/s. Valmatic-USA. VM-15A


As per tender
document which
Air Release Valve FPS Fire Fighting System Substation M/s. Fluid-Belgium 515 ever is applicable ENTIRE SUBSTATION No Site
for repsective
project.
Model AR25
M/s. Combat-Singapore.

M/s. Maxell , Dubai

M/s. Al Arabia Safety & Security Dubai


As per tender

M/s. Bristol, Dubai. document which


Fire Hose Cabinet FPS Fire Fighting System Substation As per specification ever is applicable OUTDOOR No Site
M/s Zener Fire - DUBAI for repsective
project.
M/s. Newage, Dubai

M/s. Osool - Dubai

M/s. Angus-UK M4512


As per tender
document which
Fire Hydrant FPS Fire Fighting System Substation M/s. Fluid-Belgium FFLVBN ever is applicable OUTDOOR No Site
for repsective
project.
model NDR-110
M/s. Naffco-Dubai

M/s. Viking-USA model-D1

As per tender
M/s. Reliable-USA. model- C-1 document which
Sprinkler Guard FPS Fire Fighting System Substation ever is applicable IDT,ET & REACTOR No Site
M/s Fluid - UK Model: 134 for repsective
project.

M/s Victaulic - Canada Model: V27 / V34

As per tender
Breathing Appparatus FPS Fire Fighting System Substation M/s.Sabre-UK. CTR 300 document which Security Room No Site
ever is applicable

As per tender
document which
Globe Valve FPS Fire Fighting System Substation M/s. Nibco-USA, F-718-8 (Nibco) ever is applicable PUMP ROOM No Site
for repsective
project.

M/s. Maxell , Dubai

©Transmission Engineering Department-2020 21 OF 24 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Material Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Related to Source / Manufacturer Product / Model No: T-Spec Ref General Description Use Location of usage General Comments Sample Remarks
ID Category inspection

M/s. Al Arabia Safety & Security Dubai As per tender


document which
M/s. Bristol, Dubai.
Breathing Appparatus Cabinet FPS Fire Fighting System Substation ever is applicable Security Room No Site
M/s Zener Fire - DUBAI As per specification
for repsective
M/s Newage - Dubai project.
M/s. Osool - Dubai

M/s. Maxell , Dubai

M/s. Al Arabia Safety & Security Dubai As per tender


document which
M/s. Bristol, Dubai.
Recessed Breeching Inlet Cabinet FPS Fire Fighting System Substation ever is applicable MAIN GATE No Site
M/s Zener Fire - DUBAI As per specification
for repsective
M/s Newage - Dubai
project.
M/s. Osool - Dubai

M/s. Angus Fire - UK, model 2SWA

M/s. Bristol - UK BF-AS-002. As per tender


document which
Fire Hose Reel FPS Fire Fighting System Substation ever is applicable ENTIRE SUBSTATION No Site
M/s. Q-Fire-Singapore AQF-ISW for repsective
project.

M/s. Naffco -UAE 25 NFH 020A

M/s. Bristol - UK BFE06-039-00A

Lock Sheild VALVE FPS Fire Fighting System substation

M/s. Naffco -UAE NLSV-25

As per tender
document which
M/s. Amerex-USA. model- 333 (Amerex) 11KV / 132 KV
CO2 Trolley Fire Extinguisher FPS Fire Fighting System Substation ever is applicable No Site
Switchgear room
for repsective
project.
M/s. Combat - Singapore model- C-30C

M/s. Crane-UK D151

As per tender

Gate Valve NRS FPS Fire Fighting System Substation document which
M/s Pegler -UK MODEL 1065 ever is applicable PUMP ROOM No Site
for repsective
project.

As per tender
M/s. Fill-Rite-USA FR-701
document which
Fuel Filling Pump FPS Fire Fighting System Substation ever is applicable PUMP ROOM No Site
M/s. Tuthill-USA. FR 310 for repsective
project.

As per tender
M/s. Angus -UK Type-3 DURALINE document which
Fire Hose, 65 mm X 30 M Long FPS Fire Fighting System Substation M/s. Macron Fireater-UK SARACEM HV4R064 ever is applicable Yard Fire Hydrant Substaion Yard No Site
M/s. Naffco-UAE DURALEX-65 for repsective
project.

As per tender
M/s. Angus -UK model- M2540 document which
Branch Pipe/Spray Nozzle with 9mm jet
FPS Fire Fighting System Substation M/s. Macron Fireater-UK Model 3211 ever is applicable Fire Hose Substaion Yard No
spray and 65mm instantenous coupling
M/s. Naffco-UAE NF-FB320 for repsective
project.

As per tender
document which
Tamper (Supervisory) Switch for OS&Y M/s. Potter Electric-USA/Canada Deluge Manifold / Pump
FPS Fire Fighting System Substation OSYSU-2 CRH ever is applicable Double Switch - Two sets of SPDT, 316 SS for OS&Y Gate valve
Gate valve, 02 sets of SPDT, 316 SS M/s. System Sensor-USA Room
for repsective
project.

As per tender
NIPPON SUMITOMO- JAPAN Size upto 2 inch - Factory galvanised document which
Carbon Steel Seamless pipes to ASTM A53 Substaion Yard and
FPS Fire Fighting System Substation Sheild-Russia 21/2 inch and above - hot dipped Galvanised as per ever is applicable Fire Protection System
GRADE B SCH.40 staircase
Leeuwen-Netherland. specification for repsective
project.

As per tender
Fire Stop coated Board System for wall document which
opening and penetration sealing with CP FPS Fire Fighting System Substation HILTI - GERMANY CP 670 ever is applicable Fire Sealing Entire Substaion
606, Ablative type for repsective
project.

As per tender
document which
Fire Stop Cable Coating material, Ablative
FPS Fire Fighting System Substation HILTI - GERMANY/Europe CP-679A ever is applicable Fire Sealing Entire Substaion
type, Model: CP 679A
for repsective
project.

As per tender
document which
Rockwool, 50mm thick, 160kg/cu.mtr
FPS Fire Fighting System Substation Fujairah Rockwool-UAE. 50mm thick, 160kg/cu.mtr density. ever is applicable Fire Sealing Entire Substaion
density.
for repsective
project.

Sheild - UK SDG

As per tender

©Transmission Engineering Department-2020 22 OF 24 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Material Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Related to Source / Manufacturer Product / Model No: T-Spec Ref General Description Use Location of usage General Comments Sample Remarks
ID Category inspection
As per tender
National - India Style 2 to 190 document which
Grooved Fitting Factory galvanised FPS Fire Fighting System substation ever is applicable Fire Protection System
Style 07, 75, 77, 741, 743, 750, 177, 922, 920,
for repsective
920N, AGS, No.10, 100, 11, 110, 20, 35, 25, 29T, 60,
Victaulic - USA/Poland project.
61, 41, 45F, 45R, 46F, 46R, 53, 54, 55, 80, 50, 51, 52,
10-DR,

Style-350, 364, 351, 300, 305, 358, 359, 369, 313,


Fluid - UK
361, 371, 309

Crane -UK Fig 140-289


As per tender
Threaded Fittings, Size upto 2”, Hot document which
dipped factory Galvansied, Ductile and FPS Fire Fighting System Substation Sheild - UK SDT ever is applicable Fire Protection System No Site
Malleable Iron for repsective
project.
Nefit - Brazil/Holland 90, 130, 270, 321, 240, 330, 280, 301, 291

Respective
CE MS E 18 301 Fire Alarm System ( Standard Materials)
substation

M/s Notifier-USA Model: LCD160

M/s Edwards-USA. 3-LCDANN


As per tender
The display should be same as main
M/s. Secutron-Canada MR-2644-SMR document which To repeat the same message 132kV GIS room, 11 kV
Fire Alarm Repeater panel of same LCD as main panel display, all the operating key
Fire Alarm Repeater Panel FPS Fire Alarm System Substation ever is applicable of any event of system Switchgear room & No At site
M/s. Fike-USA 10-2631 panel with all operating facilities. pad should be provided, reccessed
for repsective operation. Secuirty room
type, UL/FM Approved
project.
M/s. Potter-USA RA-6500

Model: FIRU009-R-LCD (PCA-N3060-LCDAN)


M/s. Nohmi Bosai-Japan

M/s. Notifier-USA FSP-851

M/s. EST-USA SIGA-PS As per tender


Addressable Optical type. UL/FM
document which
M/s. Secutron-USA MRI-2251B Addressable Optical Smoke Detector, c/w To detect the smoke caused In whole substation Approved, the detector addresses
Smoke Detector FPS Fire Alarm System Substation ever is applicable No At site
standard base. by fire in early stage building should be by software programming
M/s. Fike-USA 63-1052, 63-1055 for repsective
or by rotary switches.
project.
M/s. Potter Nohmi-Japan
PSA
M/s. Nohmi-Japan FDKU012-PSA

M/s Notifier-USA FST-851.

M/s. Edwards-USA SIGA-HRS, SIGA-HFS, As per tender


Addressable Rate of rise & fixed temp
M/s. Secutron-USA MRI-5251RB document which
Addressable Rate of rise & fixed temp heat To detect the heat caused by Battery room & type UL/FM Approved, the detector
Heat Detector FPS Fire Alarm System Substation ever is applicable No At site
M/s. Fike-USA 60-1039, 63-1055 detector, c/w standard base. fire in early stage. kitchen/pantry room addresses should be by software
for repsective
programming or by rotary switches.
M/s. Potter Nohmi-Japan RHA project.

M/s. Nohmi Bosai-Japan FDHU002-RHA

As per tender
In cas eof emergency the
document which
Addressable recessed/surface mounted Manual break galss unit can be used In whole substation Surface/Recessed type in indoor
Manual Call Point FPS Fire Alarm System Substation M/s. KAC-UK WCP1A-R470SG-K013-01 ever is applicable No At site
Break glass/Manual pull station, Red colour. to alert the peoples by building areas. Red colour
for repsective
sounder/strobe
project.

As per tender The db level & lux should be as per


M/s. System Sensor-Mexico P2RK
document which specfications, weatherproof for
Weatherproof Sounder/Strobe, Used as indicating devices in In whole substation
Sounder/Strobe FPS Fire Alarm System Substation M/s. EST-USA 757-7A-T ever is applicable No At site outdoor, basement, fire pump room.
Recessed/Surface mounted type. case of fire event building
for repsective Recessed type in indoor areas. Red
M/s. Potter-USA CHS-24RR-WP
project. colour. UL/FM approved
M/s. System Sensor-Mexico RA 100Z. As per tender
M/s. EST-USA SIGA-LED, document which Used as indication of sensing
Recessed type Remote indicator with Red colour
Remote Indicator FPS Fire Alarm System Substation ever is applicable device which is invisible for In control Building No At site As per specifications
M/s. Secutron-USA MRD-RA100Z LED flashes in case of detector activated.
for repsective the user.
M/s. Potter-USA MS-RA project.

M/s. Rittal-Germany AE Series, PK Series and KL Series


As per tender
M/s. Sarel-France 4408, 4410 document which
Weatherproof enclosure for fire alarm modules, In whole substation Outdoor/basement application shall
Enclosures for fire alarm equipments FPS Fire Alarm System Substation ever is applicable Fire Alarm System No At site
M/s. Schneider Electric-France / Hungary / Spain CRN and Thalassa Series IP65 building have Polycarbonate material
for repsective

Thomas & Betts-USA 521711234E project.

As per tender
document which
Circular Terminal Boxes, PVC covered M/s. Barton-UK M181-184, R281, F531, R507, M362, F409. Terminal Boxes, PVC covered Flexible Metallic In whole substation
FPS Fire Alarm System Substation ever is applicable Fire Alarm System No At site
Flexible Metallic Conduit and accessories M/s. Kopex-UK. KE Series Conduit and accessories building
for repsective
project

As per tender
BS4568 document which
Hot dip G.I. Steel Conduit and Accessories, M/s. Maruichi-Japan In whole substation
FPS Fire Alarm System Substation FC-P-20, FC-P-25, FC-PV-20, FC-PV-25, LR series ever is applicable G.I. Steel Conduit and Accessories, Fire Alarm System No At site
Heavy duty M/s. LanRic-Malaysia building
accessories for repsective
project
As per tender
document which
M/s. Unitrunk-UK TK Series In whole substation
G.I. Cable Trunkings FPS Fire Alarm System Substation ever is applicable G.I. Steel Conduit and Accessories, Fire Alarm System No At site
M/s. LanRic-Malaysia LR series accessories building
for repsective
project
M/s Notifier-USA ISO-X

M/s Edwards-USA. SIGA-IM As per tender

M/s. Secutron-USA MRI-M500X document which


In whole substation
Isolator Module FPS Fire Alarm System Substation ever is applicable Loop isolator module Fire Alarm System No At site As per specifications
M/s. Fike-USA 55-046 building
for repsective
M/s. Potter-USA SCI
project.
M/s. Nohmi Bosai-Japan FQIU004-SCI

M/s. Protectowire-USA PLR-190R As per tender


M/s. Safe Fire Detection-UK TC190P document which
Linear Heat Sensor cable, digital type, 2 core, Fire Detection & Alarm
/

©Transmission Engineering Department-2020 23 OF 24 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Material Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Related to Source / Manufacturer Product / Model No: T-Spec Ref General Description Use Location of usage General Comments Sample Remarks
ID Category inspection
g yp
LHS Cable FPS Fire Alarm System Substation ever is applicable In 132/11kV Basements No At site As per specifications
M/s. Proline-UK TH88 indoor/outdoor use, braided type. 85deg temp. System
for repsective

M/s. Kiidde-UK AD88P-0500 project.


As per tender
M/s. Prysmian-UK FP PLUS
document which
Fire Detection & Alarm In whole substation
Fire Resistance Cabl;e - 2hr FPS Fire Alarm System Substation M/s. Cavicel-Italy SR 114E ever is applicable RED colour, 2coreX1.5 Sqrmm. No At site
System building
for repsective
M/s. TF Kable - Poland Flame X-950
project.
As per tender
M/s. Sigcom-USA SG-42CXK1-YL with Back Box SGB-32C-YL
document which Near door of Nitrogen Fire
Manual Release Pull Station, ‘Agent ‘Agent Release’ wording, Dual action, Yellow
FPS Fire Alarm System Substation ever is applicable Fire Extinguishing System Suppression protected No At site As per specifications
Release’ wording, Dual action, Yellow Color Color
M/s. Potter -USA RMS-1T-LP-WP. for repsective room
project.

As per tender Fire Detection & Alarm In the field, loop passing
Primary Surge Protector M/s. Comm-Omni/TII Network Technologies-USA TII 326-2L /M In the field, loop passing one building to another
document which System one building to another

FPS Fire Alarm System Substation ever is applicable No At site As per specifications
M/s. Edco-Mexico SLCP-30 + PCB1B-WKEY for repsective Fire Detection & Alarm
Secondary Surge Protector In the Panel In the Panel
M/s. Emerson/ASCO-Mexico. 175D030S10K_PCNX+PCB1B-WKEY project. System

Respective
CE MS E 5 311 Cable ( Standard Materials)
substation
As per tender
M/s. Dynamic Engineering, India Substation basement,
document which
M/s. Maico, India Non magnetic clamps for 132kV or 11kV or LV capcitor bank room , IDT
Cable Cleat Cable Cable cleat Substation & Cable Laying - ever is applicable For clamping cables Yes Site
M/s. SS Engineering, India Cables installed in substations. rooms, ET rooms and
for repsective
M/s. SSB Crescent Industries, india cable risers
project.

M/s. BICC, UK
As per tender
M/s. CMP, UK Substation basement,
document which
M/s. Aftech, UK Used for termination of cables at the gland For termination of low capcitor bank room , IDT
LV & Control cable Gland Cable Cable Gland Substation & Cable Laying - ever is applicable Yes Site
M/s. A1-Electical, India plate of cubile/panel terminal boxes. voltage and control cables rooms, ET rooms and
for repsective
M/s. Barco, India cable risers
project.
M/s. Calter, India

M/s. BICC, UK
As per tender
M/s. CMP, UK
document which
Cable Lugs & M/s. Kompress, UK Used for termination of cables at the gland For termination of low all equipments in
LV & Control Cable Lugs & Ferrules Cable Substation & Cable Laying - ever is applicable Yes Site
Ferrules M/s. Hi Grip, India plate of cubile/panel terminal boxes. voltage and control cables substation
for repsective
M/s. Calter, India
project.
M/s. Barco, India
As per tender
document which In basements ,
M/s. Bandex, Taiwan Used for straping cables
Cable Tie Cable Cable Tie Substation & Cable Laying - ever is applicable Used for straping cables together Transformer rooms, cable Yes Site
M/s. Bandex, UK together
for repsective risers and in cable troughs
project.
As per tender
document which
Cable pulling M/s. American Polywater Corporation, USA Used in ductbanks , HDDs
Cable Pulling Lubricant Cable Cable Laying - ever is applicable Lubricant for pulling cables through ducts. Duct banks and HDDs No Site
lubricant M/s. 3M, USA for smooth cable laying
for repsective
project.

©Transmission Engineering Department-2020 24 OF 24 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - NON STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Priority of Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Material Category Related to Source / Manufacturer T-Spec Ref General Description Use Location of usage Sample Remarks
ID Submission inspection

NON STANDARD MATERIALS LIST

Material Source:
1. Fabricator shall be proposed under category C vendors in line with
Respective M/s. Gulf Extrusion co. LLC, UAE As per tender document which ever is applicable Suitable aluminum sections for Windows and
CE MS C 15 9 Aluminum Works Civil Aluminium Substation 3 Door and window opening Substation Building Yes Design Office project specific vendor monitoring sheet.
substation M/s. ALICO for repsective project. Doors
2. Material source shall be proposed in this submission.

Epoxy painted galvanised steel door of


Proprietary. Shall be in accordance with NFPA
1. Fabricator shall be proposed under category C vendors in line with
Respective As per tender document which ever is applicable 80 and fire barrriers rated for minimum 2
CE MS C 15 14 Fire rated steel door Civil Metalic Substation 3 Fire rated door Internal Rooms Yes Design Office project specific vendor monitoring sheet.
substation - for repsective project. hours fitted with vision panel. The door shall
2. Material source shall be proposed in this submission.
be provided with cutout and required
reiforcement to recive ironmongery.

M/s. Conmix,Dubai, UAE


1. To be applied in vertical

M/s Henkel polybit industries, UAE/KSA surfaces only, not to any floor,
As per tender slab or horizontal surfaces.

M/s. Emirates Specialties Co. LLC, Dubai document


Respective which ever is Coating formulated and recommended for Concrete surface for vertical members 2. Application shall be as per
CE MS C 15 26 Curing Compound Civil Plastering Substation Retard the evaporation of water No At Site
substation applicable for application to freshly placed concrete. (walls/columns) & RCC ceiling manufacturer’s instructions.
M/s. Algurg Fosroc, Dubai
repsective
project. 3. Material to be offered for
M/s. BASF construction chemicals LLC UAE
inspection to the DEWA site

M/s. Corrotech Construction Chemical, Dubai. engineer prior to use.

M/s. Conmix Ltd, Dubai


M/s. Unimix, Dubai
M/s. CEMEX TOPMIX LLC, Dubai
M/s. National ReadyMix Concrete Co. Dubai
M/s. R. M. B. Ready Concrete Manufacturing, Dubai
M/s. Al Naboodah Ready Mix Concrete (ARCON) LLC,
Dubai
M/s SS Lootha Ready Mix, Dubai
Ready Mix concrete to be as followings:
M/s. Arabian Mix Co., Dubai
1. Slump shall be 150 ± 25 mm as per specifications.
M/s. Readymix Gulf, Dubai
A composite building material made from the 2. W/C ratio shall be 0.45 maximum.
M/s. Transgulf Ready Mix Concrete Co., Dubai
combination of aggregate and cement binder. 3. Type of cement shall be as per soil test report.
M/s. Unibeton Readymix, Dubai
The most common form of concrete consists 4. Dust Content of mix design to be furnished and shall be with in
Respective Substation / Cable M/s. Technical Ready Mix Concrete Co. LLC, Dubai As per tender document which ever is applicable Substructure & Superstructure Works and Substructure and
CE MS C 15 59 Concrete mix design Civil Design 1 of Portland cement, mineral aggregates No Not required acceptable limit.
Substation Laying / OHL M/s. Al Ghurair, construction , Ready mix, Dubai for repsective project. screed(PCC) superstructure members
(generally gravel and sand) and water. Design 5. Dose of admixtures shall be as per manufacturer recommendations.
M/s. Middle East Ready Mix, Dubai UAE
mix should be green concrete in line with DM 6. Trial mix to be arranged in advance in co-ordination with DEWA
M/s. Emirates Beton Ready Mix LLC, Dubai
circular 202. engineer
M/s. Pure Ready Mix Concrete, Dubai
7. Confirmation of availability of stand by pump during major concrete
M/s. Quick Mix Beton LLC – Dubai Branch
pour.
M/s. RAK Mix, Jebel Ali Industrial, Dubai
M/s. ORYX MIX Concrete Manufacturing, Dubai
Industrial Park (DIP), Dubai
M/s. CONMIX Limited Co L.L.C Ajman Br.
M/s. Gulf Concrete, Ras Al Khaimah

Roof top packaged units is having all its


components assembled in a single Air conditioning of 132 kV GIS/
1. M/s Al Zamil - KSA .
Respective Air Conditioning - Roof top As per tender document which ever is applicable box/compartment. Its major parts are 11 kV Switchgear, Capacitor
CE MS M 16 77 MEP HVAC Substation 2. M/s Petra - Jordan. 1 Air Conditioning Equipment No Not required
Substation packaged AC for repsective project. compressor , evaporator , condensor , room and Control rooms.
3. M/s SKM - UAE.
expansion device , filters , supply/return/fresh Installed on Roof top.
air openings and electric control panel.

Ventillation of Basement , Fire


A Ventillation fans to extract the design pump room , Battery
1. M/s Soler and Palau - Spain. volume of air from enclosed area such as toilet room,Nitrogen room & Toilet /
Respective Fans (Ventillation and Smoke As per tender document which ever is applicable
CE MS M 16 78 MEP HVAC Substation 2. M/s Maico Italia(Dynair/Elicent) - Italy 1 , pantry , battery room & basements and Ventilation and smoke extraction Pantry.Smoke extraction of No Not required
Substation Extract) for repsective project.
3. M/s Casals - Spain Smoke extract fans for removal of smoke in Cable basement.
case of fire from cable basement. Installed in multiple location as
per approved layout.

©Transmission Engineering Department-2020 1 OF 7 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - NON STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Priority of Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Material Category Related to Source / Manufacturer T-Spec Ref General Description Use Location of usage Sample Remarks
ID Submission inspection

Located in LVAC room. It is a panel indicating


all the functions/status of Airconditioning &
Ventilation system in a substation. System 1
for First floor control rooms have 3 packaged
AC units with 2 on duty and one on standby all
of equal capacity. At any given stage the
Controlling & monitoring of HVAC system including
control panel can indicate the following status
Respective HVAC control panel, Field M/s. Swan (Siemens)-UAE As per tender document which ever is applicable managing fail recovery & duty sharing of equipments
CE MS M 16 79 MEP HVAC Substation 2 of AC units : - Run , Trip , Fault , Off , Air Flow LVAC Room No Not required
Substation devices and Instruments M/s. Sea Breeze (Johnson Controls)-UAE for repsective project. for best performance & energy management and
failure , Dirty filter , Compressor 1 & 2 On/Off
reporting fault/trouble
, Low pressure/High pressure of compressor
indications for each circuit , Bypass damper on
/ off , Return damper on / off , extract fans
on/off ). Any A/C or ventilation failure
indication will be communicated through
SCADA to najma control centre.

1) M/s BETEC CAD - UAE.


Control Dampers (Volume 2) M/s Aldes - UAE.
Respective As per tender document which ever is applicable Used to control the volume of air in each room Ground Floor , First Floor &
CE MS M 16 85 control damper,Motorised MEP HVAC Substation 3) M/s Safid - UAE. 3 Control of conditoned air. No Not required
Substation for repsective project. as per design requirement Roof
damper, Non return damper) 4) M/s Tecnalco-UAE.(Except NRD).
5) M/s GMAMCO -UAE.
Fire damper(Fusible link fire Used to prevent the spread of fire from one
1) M/s BETEC CAD - UAE.
Respective damper, Motorised fire As per tender document which ever is applicable room to another. Installed in air conditioning To prevent spread of Fire/Smoke between different Basement , Ground Floor , First
CE MS M 16 86 MEP HVAC Substation 2) M/s Safid - UAE. 3 No Not required
Substation damper, Motorised smoke for repsective project. duct or opening. Normally open & will close rooms / zones. Floor & Roof
3) M/s Aldes-UAE.
damper). during fire condition.

Used for communicating all signals from AC


1. M/s. Belden - Hungary & M/s. Cavicel spa-Italy (
Respective As per tender document which ever is applicable units to HVAC control panel. Used for communication and power supply for HVAC
CE MS M 16 87 Control & Power Cables. MEP HVAC Substation M/s.Tekab - UAE ), ( M/s. Ducab-UAE ) , ( M/s. Oman 3 Multiple Location. No Not required
Substation for repsective project. 16 AWG Control cable ( 2 , 4 & 7 core for volt equipements.
cables- Oman ) ,( M/s. Riyadh cables – KSA )
free contact )

Transfer pump located in ground floor is used


Respective Water Transfer Pumps set M/s Grundfos , Hungary As per tender document which ever is applicable for transfer of water to roof water storage
CE MS M 16 93 FPS Plumbing Substation 2 Roof & External area Domestic water supply No Not required
Substation ( one duty / one standby ) M/s Davey , Australia. for repsective project. tank. Consists of two pumps located on a
M/s. Xylem lowara-Italy common skid with one duty & one standby.

Booster pumps is same as transfer pump


M/s Grundfos- Hungary,
Respective Booster Pumps ( one duty / As per tender document which ever is applicable except that it is located on roof & used to
CE MS M 16 94 MEP Plumbing Substation M/s.Caprari-Italy, M/s.Xylem-Lowara-Italy, M/s.Davey- 2 Roof & External area Domestic water supply No Not required
Substation one standby ) for repsective project. maintain the supply pressure to the farthest
Australia
water tap.

1. M/s.Olympia-Greece
2. M/s.Cree-USA
3. M/s. Cooper /Broadway/THORN/JSB-UK
4. M/s.Cooper-USA/ Mexico/EU , Includes all surface, pendant and recessed
5. M/s.Ceag-Germany mounted high bay and low bay light fixtures.
6. M/s. Cooper, Orbik & Broadway - UK, Fixtures use fluorescent, HPMV, MH, HPSV
Respective As per tender document which ever is applicable
CE MS M 16 107 Light fixtures MEP Small Power & Lighting Substation 7. M/s. Luxtella-EU 1 lamps depending on application areas. Normal Illuminating the areas as required. All areas (Indoor & outdoor) No Not required
Substation for repsective project.
8. M/s. Dia light- UK and emergency light fixtures are used in all
9. M/s. Philips-PRC areas which operate on either 230 V AC or
10.M/s. Megalite- UK 110 V DC or on self contained battery.
11. Zumtobel -Austria
12. M/s.Mareli-Bulgeria
13. M/s. Orbik-UK
M/s. Crabtree-UK & M/s. Bals-Germany, M/S.MK-UK
& M/s. Gewiss-Italy,
M/s.BG-UK y, Wiring devices include normal and
Respective Wiring devices (Switches and As per tender document which ever is applicable On/off control of lights by switching, convenient
CE MS M 16 108 MEP Small Power & Lighting Substation M/s. lewden –UK, 3 weatherproof type switch, sockets, ceiling rose All areas (Indoor & outdoor) No Not required
Substation Sockets) for repsective project. socket outlet and wiring ancillaries
M/s. Palazzol-Italy, etc
M/s. Scame-Italy,
M/s. Eaton-UK

( M/s. SAS power-UAE with M/s. ABB components ) ,


( M/s. Connect switchgear-UAE with M/s. Schneider
components.
M/s. Alfanar-UAE enclosure ) , ( M/s. Al Hamad
industries-UAE with M/s. ABB components ) , ( M/s. Low voltage DBs contain one incomer isolator
Respective LV Distribution Boards for As per tender document which ever is applicable Distributing power supply to various lighting and LVAC Room , 132 KV GIS Room
CE MS M 16 109 MEP Small Power & Lighting Substation Scientechnic-UAE with M/s. Siemens components ) , ( 2 and outgoing circuit breakers. It also includes No Not required
Substation small power & lighting for repsective project. small power circuits. , 11KV rooms & Security Room.
M/s.Matrix-UAE with ABB components ), (M/s. Al timer, contactor as required.
sumaa Elect- UAE, UAE with ABB component),M/s.
ETA , PCS-UAE(M/s. M.A.H.Y Khorry co, UAE with
ABB component), (M/s Star electrical SWGR-UAE
with Schneider component.)

©Transmission Engineering Department-2020 2 OF 7 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - NON STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Priority of Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Material Category Related to Source / Manufacturer T-Spec Ref General Description Use Location of usage Sample Remarks
ID Submission inspection

Respective M/s Al Zamil ( Cooline ) , Saudi Arabia As per tender document which ever is applicable Split unit is a packaged unit split into an indoor
CE MS M 16 115 Split Units - Decorative type MEP HVAC Substation 3 Air Conditioning Equipment Fire pump room , Security room No Not required
Substation M/s York, Bahrain for repsective project. unit & an outdoor unit.
M/s SKM, UAE.

M/s. LPG(TYCO)-UK
Nitrogen gas flooding system for capacitor Capacitor rooms, as per DCD
M/s. Nohmi Bosai-Japan. Used as clean agant system in capacitor banks and
Respective As per tender document which ever is applicable banks including nitrogen cylinders, nozzles, requrirement for Control room, At manufacturer
CE MS M 18 153 Nitrogen Flooded System FPS Nitrogen Flooded System Substation M/s Eurotech- UK 1 as per DCD requirement for control room, telecom No The system should be as per specifications.
Substation for repsective project. releasing panel, detectors, manual release, Telecom room, LVAC room and factory
M/s Siex - Spain room, LVAC room and charger room
selector switch & isolation switch. Charger room
M/s. RG System-Spain

Aluminium or GI Fire Water Tank of capacity


1) M/s Tankeros - Spain,
as per hydraulic calculation, powder coated
Respective 2) M/s. Franklin Hodge-UK. (Aluminium Tanks) As per tender document which ever is applicable The capacity of water should be as per approved hydraulic calculations, the
CE MS M 18 155 Fire Water Tanks FPS Fire fighting system Substation 1 sheet with stainless steel installation Used as source of water for the system Beside Fire Pump Room No At site
Substation 3) M/s. CST Industries-UK for repsective project. base frame fixing bolt should be SS type.
acccessories & suction, test return, over flow,
4) M/s. Franklin Hodge-UK. (GI)
drain & infill flanges.

Respective Street lighting pole & Cut-out As per tender document which ever is applicable Galvanized light pole with arm to hold road
CE MS M 16 177 MEP Small Power & Lighting Substation M/s. Technopole-UAE 2 Illuminating the outdoor areas External areas No Not required
Substation box for repsective project. light or area flood light

( M/s.Matrix-UAE with ABB components ) , ( FPS -


M/S. Al sumaa Elect- UAE, UAE with ABB component
) , ( M/S. Connect with Schneider components - UAE )
This is a sub-main DB and contains one
, ( M/s. Star Elect- UAE with Schneider component. ) ,
Respective Distribution board for fire As per tender document which ever is applicable incomer isolator and outgoing circuit breakers.
CE MS M 16 179 MEP Small Power & Lighting Substation (M/s. Al Hamad industries-UAE),(M/s. Sea breeze- 2 Distributing power supply to fire pumps Fire pump room No Not required
Substation pumps for repsective project. It also includes indicator, selector switch,
UAE with schneider components),(M/s. ETA , PCS-
ammeter, voltmeter etc.
UAE ),(M/s. SAS power-UAE with M/s. ABB
components), (M/s.Scientecnic –UAE with M/s.
Siemens components )

Respective Heavy duty socket outlet with M/s Cavotec - Sweden , M/s. Stahl-Germany , M/s As per tender document which ever is applicable Heavy duty metal clad TPN+E power socket Power socket for supplying power to HV equipment GIS room, IDT rooms and ET
CE MS M 16 181 MEP Small Power & Lighting Substation 12 No Not required
Substation plug Pallazolli - Italy , M/s Marechal Electric - France for repsective project. with matching plug rated 200 A & 300 A testing machines room

Patterson-USA
Horizontal splitcase fire pump set of rated
Armstrong-Canada
capacity 1500 GPM, UL/FM Apprpoved,
Respective SPP-USA As per tender document which ever is applicable At manufacturer
CE MS M 18 184 Fire Pump Set FPS Fire Pump Set Substation 1 design as per NFPA20, complete with electric Use to maintain a constant system pressure Fire Pump room No
Substation Peerless-USA for repsective project. factory of pumps
motor, diesel engine, jockey pump, controllers
MAS DAF-Turkey
and accessories.
Nitin Pump-UAE

M/s. Patterson-USA
M/s. Armstrong-Canada As per tender document which ever is applicable Multi stage vertical pump with 3/50/400 V At manufacturer
Jockey Pump Set FPS Fire Pump Set Substation 1 Use to maintain a constant system pressure Fire Pump room No The capacity of pump should be as per NFPA standards.
M/s. Grundfos-EU. for repsective project. electric motor factory of pumps
M/s. SALMSON, France

M/s. Patterson-USA
M/s. Armstrong-Canada
Horizontal split case Electric Fire Pump Set,
M/s. Peerless-USA As per tender document which ever is applicable Used as duty source of flow demand for fire fighting At manufacturer The capacity of pump should be as per specifications, the voltage of
Electric Motor Pump Set FPS Fire Pump Set Substation 1 UL/FM Approved with 3/50/400 V UL Listed Fire Pump room No
M/s. Nitin pump - UAE for repsective project. system factory of pumps electric motor, jockey pump motor should be 400V, UL Listed
electric motor
M/s SPP - USA.
M/s. MAS DAF-Turkey

M/s. Patterson-USA
M/s. Armstrong-Canada
Horizontal split case Diesel Fire Pump Set,
M/s. Peerless-USA As per tender document which ever is applicable Used as standby source of flow demand for fire At manufacturer
DiEsel Pump Set FPS Fire Pump Set Substation 1 UL/FM Approved, UL/FM Approved Diesel Fire Pump room No The diesel controller battery charger should be of 24VDC. UL Listed
M/s. Nitin pump - UAE for repsective project. fighting system factory of pumps
engine
M/s SPP - USA.
M/s. MAS DAF-Turkey
Electric pump, Diesel pump & Jockey pump
controllers with IP56/NEMA 4 protection
Tornatech-Canada. As per tender document which ever is applicable rating. 12VDC charger for diesel engine To control & switch ON the pumps at required At manufacturer All the cotnroller should be of IP56 of equivalent NEMA standards. UL
Fire Pump Set Controllers FPS Fire Pump Set Substation 1 Fire Pump room No
Tornatech-UAE. for repsective project. controller, electric pump & jockey pump setted pressure. factory of pumps Listed. The pressuer transducer should be outside the controller.
controller with 3/50/400 V rating. UL/FM
Approved.

M/s. Global Vision-USA As per tender document which ever is applicable Flow Meter, 8" dia for the flow range of To measure the flow demand of pump during pump At manufacturer
Flow Meter & accessories FPS Fire Pump Set Substation 1 Fire Pump room No It should be flanged end connection or wafer type. UL/LPCP approved
M/s. Gerand-USA for repsective project. maximum demand of pump, wafer type testing & maintanance. factory of pumps

©Transmission Engineering Department-2020 3 OF 7 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - NON STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Priority of Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Material Category Related to Source / Manufacturer T-Spec Ref General Description Use Location of usage Sample Remarks
ID Submission inspection

Respective As per tender document which ever is applicable As mentioned


CE MS E 18 186 Fire Alarm System FPS Fire Alarm System Substation Addressable fire alarm system To detect the fire in terms of heat and smoke In whole substation building No
Substation for repsective project. below

M/s Notifier-USA 2 Loop Addressable Main Fire Alarm Control


UL/FM Approved Addressable type, minimum 2 loop, recess type, all the
M/s Edwards-USA. Panel, c/w 600 character display,
control modules of intelock & SCASA system should be installed in the
Main Fire Alarm Control M/s. Secutron-Canada As per tender document which ever is applicable programming & operation key pad, control To monitor & control the fire alarm system devices At manufacturer
FPS Fire Alarm System Substation 2 Control & Relay Room No FACP, The panel should have 600 charecters display & all the key pad for
Panel M/s. Fike-USA for repsective project. relays, sounder circuit & battery charger with & give output signals as per programming. factory
programming & operations, also the panel should have LED indications of
M/s. Potter-USA address, standard LEDs, LED switches for
all the events.
M/s. Nohmi Bosai-Japan control relays.

M/s Notifier-USA Addressable Fire Extinguishing Control Panel,


M/s Edwards-USA. min. two loops, c/w min. 160 character display,
Fire Extinguishing Control M/s. Secutron-Canada As per tender document which ever is applicable programming & operation key pad, control To monitor & control the fire extinguishing system At manufacturer
FPS Fire Alarm System Substation 2 Nitrogen Room No As per specifications
Panel M/s. Fike-USA for repsective project. relays, sounder circuit & battery charger with devices & give output signals as per programming. factory
M/s. Potter-USA address, standard LEDs, LED switches for
M/s. Nohmi Bosai-Japan control relays.
M/s. System Sensor-Mexico
M/s. EST-USA
M/s. Secutron-USA As per tender document which ever is applicable Addressable Duct Smoke Detector, c/w
Duct detector FPS Fire Alarm System Substation 2 To detect the smoke in HVAC Duct HVAC Return Air Duct No At site Length of Tube shall be as per HVAC Duct width.
M/s. Fike-USA for repsective project. Housing and tube.
M/s. Potter-USA

M/s Notifier-USA
M/s Edwards-USA.
M/s. Secutron-USA As per tender document which ever is applicable Monitor Module to interface conventional To inteface the conventional devices with The current & voltage rating of module should be as per the input field
Module FPS Fire Alarm System Substation 2 In whole substation building No At site
M/s. Fike-USA for repsective project. device to addressable system addressable system. signal requirement.
M/s. Potter-USA
M/s. Nohmi Bosai-Japan

M/s. Yuasa-UK
M/s. Yuasa-Japan As per tender document which ever is applicable
Battery FPS Fire Alarm System Substation 2 Fire Alarm contro Panel Batteries Fire Alarm System Control room No At site As per specifications
M/s. Powersonic-UK/USA /Taiwan for repsective project.
M/s Yausa - Taiwan

M/s. Talentum/FFE-UK
M/s. Spectrex-USA
M/s. Honeywell-USA
Flame Detector UV/IR2 or As per tender document which ever is applicable
FPS Fire Alarm System Substation M/s. ESP Safety-USA 2 UV/IR2 or UV/IR3 or IR3 Fire Detection & Alarm System Transformer area No At site
UV/IR3 or IR3 for repsective project.
M/s. Rezontect-Korea
M/s. Safe Fire-USA
M/s. Detronics-USA
Respective As per tender document which ever is applicable
CE MS M 18 187 Fire Fighting System FPS Fire Fighting System Substation
Substation for repsective project.

M/s. Viking-USA
M/s. AGF-USA As per tender document which ever is applicable High velocity solid cone water spray nozzle, Used to spray the water to cover all the hazard area 132kV
Spray Nozzles FPS Fire fighting system Substation 2 No At site 1" dia threaded ends, bronze body. UL/FM Approved
M/s. Reliable-USA for repsective project. 3/4",1/2' NPT, Brass body like IDT/ET/Reactor, Basements as per design. Basements/IDT/ET/Reactor
M/s. GJ Innovation-USA.

M/s. Nibco-USA
M/s. Kennedy-USA
As per tender document which ever is applicable Swing check valve, Flanged ends, bronze disc &
Swing Check Valve FPS Fire fighting system Substation M/s. Reliable-USA. 2 Used in Pump delivery pipe Pump room No At site Wafer, supervised type, UL/FM Approved.
for repsective project. seat with removable cover .
M/s. Fluid-UK.
M/s. Bristol-UK

M/s. Angus-UK
M/s. Macrom-UK
As per tender document which ever is applicable Bronze body, 2-1/2" dia connections suitable for loacl civil defence
Butterfly Valve FPS Fire fighting system Substation M/s. Nafco-UAE. 2 Supervised Butterfly valve Used in fire pump room sprinkler system Pump room No At site
for repsective project. requirement.
M/s. Fluid-UK.
M/s. Bristol-UK

M/s Sanvik - Swedan (for water mist)


As per tender document which ever is applicable
Stainless Pipe SS 316 FPS Fire fighting system Substation M/s Sanha (Aquasys) (For water mist) 2 SS 316 Fire pump sensing line Pump Room No At site Flanged ends, Bronze stem, epoxy coated externally, UL/FM Approved
for repsective project.
M/s. Eurotech-UK

M/s. Nibco-USA
M/s. Kennedy-USA
As per tender document which ever is applicable Used in fire pump room, deluge manifold & fire main Deluge Manifold, Fire Main Pipe
OS & Gate Valve FPS Fire fighting system Substation M/s. Reliable-USA. 2 OS & Y gate valve, Flanged ends. No At site Flanged ends, suitable for fire protection system, SS strainer, UL Listed
for repsective project. ring pipe to isolate the system & Fire Pump room
M/s. Fluid-UK.
M/s. Bristol-UK

Ms/. Benkan-UK,
As per tender document which ever is applicable Black steel welded type, slip on flange, Class
Black Flanges FPS Fire fighting system Substation M/s. Metalfar-Italy 2 Fire Fighting System In whole substation building No At site As per specifications
for repsective project. 150, ANSI.
M/s. Dellingpole-Italy

©Transmission Engineering Department-2020 4 OF 7 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - NON STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Priority of Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Material Category Related to Source / Manufacturer T-Spec Ref General Description Use Location of usage Sample Remarks
ID Submission inspection

Sprinklers
M/s. Viking-USA As per tender document which ever is applicable Upright/Pendent- Brass; Concealed type- Water fire suppression system for Pump Room, IDT/ET/Basement/Pump
(Upright/Pendent/Concelead FPS Fire Fighting System Substation 2 No At site As per specifications and design
M/s. Reliable-USA. for repsective project. White Chrome plated: 1/2", Temp-68, 79, 93 Contorl building Corridors, Workshop, Record Room. room/First Floor
)

MS Red powder coated cabinet with minimum


M/s. Viking-USA As per tender document which ever is applicable 6 numbers of each type and temperature
Spare Sprinklers Cabinet FPS Fire Fighting System Substation 2 To store spare Sprinklers and its Tools. IDT/ET/Basement/Pump room No At site As per specifications and design
M/s. Reliable-USA. for repsective project. rating of sprinkler head with sprinkler
wrenches.

Ms/. Awaji-Japan As per tender document which ever is applicable


Carbon Steel Butweld Fittings FPS Fire Fighting System Substation 2 ASME B16.9 Fire Fighting System In whole substation building No At site As per specifications
M/s. Thai Benkan-Thailand for repsective project.

Ms/. Lame-Italy
As per tender document which ever is applicable ASME B16.11, Class 3000 Forged Steel Nitrogen Fire Suppression
Forged Threaded Fittings FPS Fire Fighting System Substation M/s. Mega-Italy 2 Nitrogen Fire Suppression System No At site As per specifications
for repsective project. Fittings System Piping
M/s. Delcorte-France

Respective As per tender document which ever is applicable Elastomeric cementitious coating with inherent Pile head treatment, waterproofing between void Substructure, void space of fire
CE MS C 15 250 Liquid Waterproof Coating Civil Waterproofing Substation M/s. Al Gurg Fosroc, Dubai 3 No Site
Substation for repsective project. crack-bridging ability space of fire pump and fire water tank pump and fire water tank
1. Surface preparation, mixing and application shall be as per
manufacturer's instruction.
Respective As per tender document which ever is applicable Protection barrier for IDT, ET & Reactor room front At Manufacturer 2. Surface preparation recommendations for subsequent finishes not
CE MS C 15 257 Durasteel Civil Protection barrier Substation M/s. Invicta Durasteel, UAE 3 IDT, ET & Reactor rooms No
Substation for repsective project. enclosure testing facility mentioned in the technical
data sheet, confirmation from manufacturer to be obtained for the
same.
M/s. Gulf Precast Concrete Co. Dubai
M/s. Emirates Precast Construction LLC. Dubai, UAE
M/s. Dubai Precast
M/s. United Precast Concrete – Dubai (LLC)
M/s. Terrazzo Dubai Co LLC, Dubai
M/s. Beaver Gulf Precast Concrete Product A composite building material made from the
Manufacturing LLC, Dubai. combination of aggregate and cement binder.
M/s. SAAD Precast LLC, Dubai Branch (Cable Trough Volume III, 1.5.3.1.0.01, Rev. 12 to Rev-16, Clause The most common form of concrete consists
Respective
CE MS C 15 258 Precast Concrete Work Civil Design Substation & Boundary Wall). 3 Civil Works ( which ever is applicable to of Portland cement, mineral aggregates Precast Main building and boundary wall No Site
Substation
M/s. Al Naboodah Ready Mix Concrete (ARCON) LLC, respective project) (generally gravel and sand) and water. Design
Dubai mix should be green concrete in line with DM
M/s. LEGO Precast Manufacturing LLC, Dubai circular 202.
M/s. Hard Precast Building Systems LLC, Dubai.
M/s. Gulf Concrete, Ras Al Khaimah
M/s. Conmix Ltd, Dubai
M/s. CONMIX Limited Co L.L.C Ajman Br.

M/s. Arabian Extrusions factory, Dubai


Respective M/s. Visaka Industries Limited, India As per tender document which ever is applicable Special architectural element as per developer Main building, auxilliary building
CE MS C 15 259 Special Architectural Element Civil External façade Substation 3 To use for beautification of external elevation Yes Design Office
Substation M/s. U.S. Polymer INC, California,USA for repsective project. requirement external area
M/s. Hebei Lanxin Wire Mesh Products Co. Ltd China

Respective M/s. Elval Halcor Hellenic Copper and Aluminium , As per tender document which ever is applicable
CE MS C 15 260 Sunshade materials for GIB Civil Aluminium 400kV Substation 3 Sunshade for 400kV Outdoor GIB To protect from sun / rain 400kV Outdoor GIB Yes Design Office
Substation Greece for repsective project.

Glass door between 400KV GIS and 400kV


Respective As per tender document which ever is applicable
CE MS C 15 261 Glass door and partition Civil Glass 400kV Substation M/s. Al Deyar Metal bldg Const. Ind. LLC, Sharjah 3 LCC room for physical visibility during testing To see other side of LCC and 400kv GIS LCC/400kv GIS Room Yes Design Office
Substation for repsective project.
works.

Roof mounted equipment’s, if any, shall be


M/s. Alcon Concrete Products Factory LLC, UAE
Respective As per tender document which ever is applicable hidden /covered by concrete claustra blocks or
CE MS C 15 262 Claustra Blocks Civil Architectural Substation M/s. Tri Star Concrete products 3 Hiding roof mounted equipment Parapet Block works Yes Design Office
Substation for repsective project. similar approved for better
M/s. Emirates Precast Construction LLC, Dubai UAE
elevation/aesthetics
Samples of angles and plates used for tower
fabrication as per the approved design
drawings as well as samples of bolts used for
Structural Steel tower part,
Respective As per tender document which ever is applicable connections following DEWA specifications For all 132 & 400 kV
CE MS C 15 263 bolts & fasteners, Gantry, GIB Civil Structural Steel Cable Laying / OHL - 2 For OHL towers members and connections Yes Design Office
Substation for repsective project. and approved design drawings. transmission OHL
& GIL supports
The submittal should include the sources of
materials and all related MTC

All Structural members


M/s.Titan Enterprises co Ltd , Thailand
Respective Substation / Cable As per tender document which ever is applicable threaded mechanical couplers to reinforcing (substructure and
CE MS C 15 264 Reinforcement Couplers Civil Structural M/s. ANCON Building Products , UK 1 Mechanical jointing rebars No At site
Substation laying / OHL for repsective project. steel for use in accordance wih specification superstructure) as per RFC
M/s. Dextra Middle East
drawing

©Transmission Engineering Department-2020 5 OF 7 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - NON STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Priority of Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Material Category Related to Source / Manufacturer T-Spec Ref General Description Use Location of usage Sample Remarks
ID Submission inspection

Oil Splash resistance for front


Respective M/s IKM dsc Engineering AS Norway As per tender document which ever is applicable Front enclosure arrangement in IDT / ET & IDT , ET & Reactor rooms as per
CE MS C 15 265 enclosure of IDT / ET & Civil Protection barrier Substation 3 To resist oil splash Yes Design Office
Substation M/s. Al Fattah Aluminium Factory , Dubai for repsective project. Reactor rooms to resist oil splash. approved RFC drawing
reactor rooms

Primer - Resigard Primer SF


Chemical resistant epoxy Solvent free epoxy resin mortar screed
Respective As per tender document which ever is applicable Screed - Resigard ES
CE MS C 15 266 paint / Chemical resistant Civil Floor Finishing Substation M/s. Conmix Limited Co LLC, Dubai 3 comprise a three component system of epoxy Floor Finish Battery Room Yes Design Office
Substation for repsective project. Recon FCE
epoxy screed resin, hardner and mineral aggregates.
Resigard NC - 2 coats

Respective Corrosion Inhibitor ( For Substation / Cable As per tender document which ever is applicable Corrosion inhibitors, Corrosion resistance for steel
CE MS C 15 267 Civil Structural M/s Cortec Corporation, st Paul, USA 2 Corrosion resistance for steel reinforcement Exposed steel reinforcing bars No Site
Substation rebar) Laying for repsective project. reinforcement rebar

Respective Premix masonry mortar for As per tender document which ever is applicable
CE MS C 15 268 Civil Civil Substation M/s. Arkan Building Material Co. Dubai, UAE 2 Masonry mortar for fixing block works To fix Block Works Internal and External block walls No Site
Substation blockwork for repsective project.

Samples of bolts & fasteners used for


connections following DEWA specifications
and approved design drawings. 1. Fabricator shall be proposed under category C vendors in line with
Respective Structural Steel members, As per tender document which ever is applicable For substation structural steel members and For all 132 & 400 kV substation
CE MS C 15 269 Civil Structural Steel Substation - 2 The submittal should include the sources of Yes Design Office project specific vendor monitoring sheet.
Substation bolts & fasteners for repsective project. connections projects
materials and all related MTC of structural 2. Material source shall be proposed in this submission.
steel members and fasteners.

( M/s. ABB - Finland / Bulgaria/Sweden/Czech


Respective As per tender document which ever is applicable TPN, TP, DP or SP Metal clad or moulded case To use as isolator or safety isolator in the power
CE MS M 16 279 Isolator MEP Small Power & Lighting Substation Republic/EU) , (M/s. Scame-Italy) , (M/s. BG-UK), ( 3 All areas No Not required
Substation for repsective project. isolator circuit
M/s. GEWISS-EU), (M/s. MK-UK)

Respective 1)M/s. Canadian solar/ phocos/Coxcorp- Canada & As per tender document which ever is applicable At Manufacturer
CE MS M 16 285 Standalone solar light fixture MEP Small Power & Lighting Substation 2 Iluminating the area as required Outdoor Yes
Substation Deka-USA for repsective project. testing facility

1) M/s. LG-Korea
Respective As per tender document which ever is applicable At Manufacturer
CE MS M 16 286 Solar PV Panel MEP Small Power & Lighting Substation 2) M/s. WeCo Italy SRL - Korea 2 Generating supply feed to HVAC control panel Outdoor Yes
Substation for repsective project. testing facility
3) M/s. REC Solar PTE. LTD- Signapore

Respective As per tender document which ever is applicable At Manufacturer


CE MS M 16 287 Solar system Accessories MEP Small Power & Lighting Substation 1) M/s.ABB-Italy & M/s. Ducab-UAE 2 Generating supply feed to HVAC control panel Outdoor Yes
Substation for repsective project. testing facility

M/s. SAS power -UAE with M/s. ABB components ,


M/s. Star Elect- UAE with Schneider component ,
M/s. Sea breeze-UAE with schneider components,
This is a sub-main DB and contains one
M/s.Al sumaa Elect- UAE, UAE with ABB component,
Respective Distribution board for HSSD As per tender document which ever is applicable incomer isolator and outgoing circuit breakers.
CE MS M 16 296 MEP Small Power & Lighting Substation M/s.Scientecnic –UAE with M/s. Siemens 2 Distributing power supply to HSSD panels First floor control & relay room No Not required
Substation panels for repsective project. It also includes indicator, selector switch,
components, M/s.Matrix-UAE with ABB components,
ammeter, voltmeter etc.
M/s.Al hamad industries -UAE with ABB components,
M/s. M.A.H.Y KHORRY CO -UAE with ABB
components

M/s. Connect - UAE with Schneider components, M/s.


Eurovision-UAE, M/s.Matrix-UAE with ABB
This is a sub-main DB and contains one
components , M/s. ETA , PCS-UAE with ABB
Respective Distribution board for CCTV As per tender document which ever is applicable incomer isolator and outgoing circuit breakers.
CE MS M 16 297 MEP Small Power & Lighting Substation components, M/s. GAMAA security system-UAE with 2 Distributing power supply to HSSD panels First floor control & relay room No Not required
Substation cameras for repsective project. It also includes indicator, selector switch,
schneider components, M/s. ITS-UAE with ABB
ammeter, voltmeter etc.
components, M/s. SAS Power-UAE with ABB
components

Respective 1. M/s. Oman cables- Oman ) 2.( M/s. Riyadh cables – As per tender document which ever is applicable Cabling for LV power distribution boards & power
CE MS M 16 298 Cables MEP Small Power & Lighting Substation 2 All areas No Not required
Substation KSA) 3. M/s.Ducab-UAE 4. (M/s Firecel - Italy for repsective project. sockets

Sound attenuator for AHU of 400kv


Respective As per tender document which ever is applicable Roof of Control , 400kv and
CE MS M 16 299 Sound Attenuator MEP HVAC Substation M/s. Technalco-UAE 2 substations and installed in both supply and Sound Attenuation No At Site
Substation for repsective project. 132kv buildings
return air main ducts.

M/s. Riyadh Cables, KSA


M/s. LS, South Korea
M/s. Gaon Cable, South Korea
M/s. DUCAB, UAE
M/s. Brugg, Switzerland
Yellow Green PVC insulated Cables used for
M/s. Elsewedy Cables, Egypt
Respective Substation & Cable As per tender document which ever is applicable earthing equipments, or metallic structures. Inside as well as outside
CE MS E 5 312 Yellow green cables Cable Earthing cables M/s. Al Fanar Electric LLC , KSA 1 For earthing equipments, structures etc. No Site FAT application not required
Substation Laying for repsective project. Applicable for 400/132kV & 132/11kV substation
M/s. Oman Cables, Oman
Substation projects.
M/s. Jeddah Cables, KSA
M/s. Kuwait cables, Kuwait
M/s. LS Viana, Vietnam
M/s. Power plus Cables, Fujairah
M/s. Gulf cable Industries, Kuwait

©Transmission Engineering Department-2020 6 OF 7 Issue 6, Rev 0


MATERIAL SUBMITTAL CONTROL MONITORING SHEET - NON STANDARD MATERIALS LIST OF CIVIL, ELECTROMECHANICAL ELECTRICAL ITEMS FOR TRANSMISSION POWER PROJECTS

Material Priority of Location of


CE Contract No Type1 Type2 Code Name of Material Main Field Material Category Related to Source / Manufacturer T-Spec Ref General Description Use Location of usage Sample Remarks
ID Submission inspection

M/s. Riyadh Cables, KSA


M/s. LS, South Korea
M/s. Gaon Cable, South Korea
M/s. DUCAB, UAE
M/s. Brugg, Switzerland
M/s. Elsewedy Cables, Egypt Cables used in underground earthing works e.g:
Respective Substation & Cable As per tender document which ever is applicable
CE MS E 5 313 Bare Copper conductor Cable Earthing cables M/s. Al Fanar Electric LLC , KSA 1 substation earthing mat. Applicable for For underground substation earthing mat Below raft No Site FAT application not required
Substation Laying for repsective project.
M/s. Oman Cables, Oman 400/132kV & 132/11kV Substation projects.
M/s. Jeddah Cables, KSA
M/s. Kuwait cables, Kuwait
M/s. LS Viana, Vietnam
M/s. Power plus Cables, Fujairah
M/s. Gulf cable Industries, Kuwait

M/s. EM-Elektrik, Turkey


Respective Substation & Cable As per tender document which ever is applicable
CE MS E 5 314 Link Boxes (Flush Type) Cable Link Boxes M/s. Pfisterer SRI, Italy 3 Installed in 132kV Joint bays Installed in 132kV Joint bays 132kV Joint Bays No Site FAT application not required
Substation Laying for repsective project.
M/s. Pfisterer, Switzerland

M/s. EM-Elektrik, Turkey


M/s. Pfisterer SRI, Italy
Respective Link Boxes (Wall Mounted Substation & Cable M/s. NKT (CCC), Germany As per tender document which ever is applicable Installed for 132kV terminations and in 132kV Installed for 132kV terminations and in 132kV Joint Substation basemnts, IDT
CE MS E 5 315 Cable Link Boxes 3 No Site FAT application not required
Substation Type) Laying M/s. Brugg, Switzerland for repsective project. Joint bays bays rooms and Joint bays
M/s. Taihan, Korea
M/s. LS, South Korea

M/s. Riyadh Cables, KSA


M/s. Oman Cables, Oman
M/s. Jeddah cables, KSA
M/s. DUCAB, UAE Low voltage control and auxiliry cable used for
Respective Low voltage Power, Control LV, Control and Auxiliary As per tender document which ever is applicable Various electrical equipments in
CE MS E 5 316 Cable Substation M/s. Gulf Cable, Kuwait 2 substation works. Applicable for 400/132kV & Interconnection between panels and equipments No Site FAT application not required
Substation and Auxiliary cables cables for repsective project. substation
M/s. Elsewedy Cables, Kuwait 132/11kV Substation projects.
M/s. LS, South Korea
M/s. Daewoo, South Korea
M/s. Al Fanar Electric LLC , KSA
M/s. Riyadh Cables, KSA
M/s. Brugg, Switzerland
M/s. Demir Kablo, Turkey
M/s. Nexans, Germany
Respective Substation & Cable M/s. Taihan-Sacom, Vietnam As per tender document which ever is applicable Bonding cable used in joint bays and in 132kV
CE MS E 5 317 Bonding Cables Cable Bonding cables 3 To be used in 132kV Joints and terminations 132kV Joints and terminations No Site FAT application not required
Substation Laying M/s. Al Fanar Electric LLC , KSA (Type Test to be for repsective project. terminations.
completed)
M/s. LS Viena, Vietnam
M/s. DUCAB, UAE
M/s. Taihan-Sacom, Vietnam
M/s. Trabsdelta Int'l Industries LLC, Sharjah
M/s. ASEMA, Spain
M/s. Abahsain Cope SA, KSA
M/s. Power Solution Industries, Dubai & Ajman
M/s. Sigma Factory, Dubai
Different sizes of cable ladders and trays used
M/s. Alpha, Ajman
for low volatge and control cable installation
Respective Cable tray, ladder and M/s. Gersan, Turkey As per tender document which ever is applicable Substation basement, Cable
CE MS E 5 318 Cable Cable ladder and tray Substation 2 inside substation basement, cable risers and For low voltage and control cable installation No Site FAT application not required
Substation supports M/s. Lan Ric Industries, Malaysia for repsective project. risers and below rasied floors
below raised floors. Applicable for 400/132kV
M/s. Everest metal Industries, Dubai
& 132/11kV Substation projects.
M/s. Technical Metal Industries, Abu Dhabi
M/s. Nova Blue, Dubai
M/s. Al Meer, Kuwait
M/s. Oglaend Industries, Malaysia
M/s. M/s. Invention Steel Industries L.L.C., RAK

Spheres in colours prescribed by the ICAO for


Respective M/s. Shin Seong Elrex Corp, Korea As per tender document which ever is applicable makng the OHL shield wire/OPGW visible to To alert the aeroplanes and helicopters that fly
CE MS E 19 331 Aircraft Warning Sphere OHL OHL accessories OHL 2 On the OHL shield wire/OPGW Yes Site FAT application not required
Substation M/s. Avaids Technovators, India for respective project. aircrafts flying above. Applicable for above the OHL conductor
400/132kV & 132/11kV Substation projects.

Warning Lights prescribed by the ICAO for


Respective M/s. Shin Seong Elrex Corp, Korea As per tender document which ever is applicable makng the OHL Towers visible to aircrafts To alert the aeroplanes and helicopters that fly
CE MS E 19 332 Aircraft Warning Light OHL OHL accessories OHL 2 on the OHL Towers Yes Site FAT application not required
Substation M/s. Avaids Technovators, India for respective project. flying above.Applicable for 400/132kV & above the OHL Towers
132/11kV Substation projects.
M/s. W.J. Furse, UK
M/s. King Mill, UK
Earthing materials which is used for substation
Respective M/s. Wallis, UK As per tender document which ever is applicable proper earthing in substation use to protect all Burried under the ground level
CE MS E 5 342 Earthing materials Switchgear Earthing material Substation earthing 1 earthing. Applicable for 400/132kV & No Site FAT application not required
Substation M/s. Axis Electrical, India for repsective project. electrical equipments & all electrical equipment
132/11kV Substation projects.
M/s. KML (KUMWELL), Thailand
M/s. ELEMKO, Greece

©Transmission Engineering Department-2020 7 OF 7 Issue 6, Rev 0