Mud Pump-02 MPI Report

Uploaded by

abhilash
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
134 views9 pages

Mud Pump-02 MPI Report

Uploaded by

abhilash
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

Form Number: F-OPE-009a

Document Owner: OPS-NDT


Revision: 4
MAGNETIC PARTICLE INSPECTION REPORT
Effective Date: 01-May-23

Customer: GDI Rig Name: Al Zubarah Location: Qatar Offshore

P.O. No: PON599590 Job No: ALL-ME-6281 Report No: ME-6281-MPI-MP-001

Allrig Procedure: I-OPE-NDT-003 Surface: As Cleaned

Equipment: Electro Magnetic Yoke Equipment Serial No: IN22-0973

Magnetic
Ultra Violet Light: No Yes Coil: No
Flow:
Electromagnet/Pull 10lbs: Yes Voltage: 110V Current Flow: AC Longitudinal: Yes

Other: N/A Pole Spacing: 4" - 6" Circular: N/A


Magnaflux
Flux Indicator: Light Type: Background: Wet Indicator: Magnaflux 7HF
WCP
Batch No: 211107 Fl/Sample at:

Berthold: Natural: No Dry Indicator: UV: 0.4 at 100ml

Heat Temp: Visible: 2.4 at 100ml

Burmah Strip: Yes Artificial: Yes Batch No: Batch No: 221004

Manufacturer: NOV Item: Bull Gear

Drawing No: N/A Work Area: Mud Pump Room

Material: Carbon Steel Specification: API RP8B (CAT III) Dimension: NA

Identification / Serial No: 11469-H (Mud Pump-02) SWL: N/A Quantity: 1

Comments: Visual inspection was carried out prior to MPI.


Areas Inspected: MPI was carried out on all accessible areas. (As Mentioned in the NOV procedure)

Results: No relavant indication was noted when the time of inspection.

Recommendations: Acceptable to the specfications

PHOTO HERE PHOTO HERE

Inspector: S.Venkat Signature:

Qualification: PCN-LEVEL 2-MPI Date: 31-04-2024

For Client use: For Certifying Authority use:

This document shall not be reproduced except in full, without the written approval of an Allrig Senior Representative.
Page 1 of 9
Form Number: F-OPE-009a
Document Owner: OPS-NDT
Revision: 4
MAGNETIC PARTICLE INSPECTION REPORT
Effective Date: 01-May-23

Customer: GDI Rig Name: Al Zubarah Location: Qatar Offshore

P.O. No: PON599590 Job No: ALL-ME-6281 Report No: ME-6281-MPI-MP-002

Allrig Procedure: I-OPE-NDT-003 Surface: As Cleaned

Equipment: Electro Magnetic Yoke Equipment Serial No: IN22-0973

Magnetic
Ultra Violet Light: No Yes Coil: No
Flow:
Electromagnet/Pull 10lbs: Yes Voltage: 110V Current Flow: AC Longitudinal: Yes

Other: N/A Pole Spacing: 4" - 6" Circular: N/A


Magnaflux
Flux Indicator: Light Type: Background: Wet Indicator: Magnaflux 7HF
WCP
Batch No: 211107 Fl/Sample at:

Berthold: Natural: No Dry Indicator: UV: 0.4 at 100ml

Heat Temp: Visible: 2.4 at 100ml

Burmah Strip: Yes Artificial: Yes Batch No: Batch No: 221004

Manufacturer: NOV Item: Crank Shaft

Drawing No: N/A Work Area: Mud Pump Room

Material: Carbon Steel Specification: API RP8B (CAT III) Dimension: NA

Identification / Serial No: 11469-H (Mud Pump-02) SWL: N/A Quantity: 1

Comments: Visual inspection was carried out prior to MPI.


Areas Inspected: MPI was carried out on all accessible areas. (As Mentioned in the NOV procedure)

Results: No relavant indication was noted when the time of inspection.

Recommendations: Acceptable to the specfications

PHOTO HERE PHOTO HERE

Inspector: S.Venkat Signature:

Qualification: PCN-LEVEL 2-MPI Date: 31-04-2024

For Client use: For Certifying Authority use:

This document shall not be reproduced except in full, without the written approval of an Allrig Senior Representative.
Page 2 of 9
Form Number: F-OPE-009a
Document Owner: OPS-NDT
Revision: 4
MAGNETIC PARTICLE INSPECTION REPORT
Effective Date: 01-May-23

Customer: GDI Rig Name: Al Zubarah Location: Qatar Offshore

P.O. No: PON599590 Job No: ALL-ME-6281 Report No: ME-6281-MPI-MP-003

Allrig Procedure: I-OPE-NDT-003 Surface: As Cleaned

Equipment: Electro Magnetic Yoke Equipment Serial No: IN22-0973

Magnetic
Ultra Violet Light: No Yes Coil: No
Flow:
Electromagnet/Pull 10lbs: Yes Voltage: 110V Current Flow: AC Longitudinal: Yes

Other: N/A Pole Spacing: 4" - 6" Circular: N/A


Magnaflux
Flux Indicator: Light Type: Background: Wet Indicator: Magnaflux 7HF
WCP
Batch No: 211107 Fl/Sample at:

Berthold: Natural: No Dry Indicator: UV: 0.4 at 100ml

Heat Temp: Visible: 2.4 at 100ml

Burmah Strip: Yes Artificial: Yes Batch No: Batch No: 221004

Manufacturer: NOV Item: Pinion Shaft/Gear

Drawing No: N/A Work Area: Mud Pump Room

Material: Carbon Steel Specification: API RP8B (CAT III) Dimension: NA

Identification / Serial No: 11469-H (Mud Pump-02) SWL: N/A Quantity: 1

Comments: Visual inspection was carried out prior to MPI.


Areas Inspected: MPI was carried out on all accessible areas. (As Mentioned in the NOV procedure)

Results: No relavant indication was noted when the time of inspection.

Recommendations: Acceptable to the specfications

PHOTO HERE PHOTO HERE

Inspector: S.Venkat Signature:

Qualification: PCN-LEVEL 2-MPI Date: 31-04-2024

For Client use: For Certifying Authority use:

This document shall not be reproduced except in full, without the written approval of an Allrig Senior Representative.
Page 3 of 9
Form Number: F-OPE-009a
Document Owner: OPS-NDT
Revision: 4
MAGNETIC PARTICLE INSPECTION REPORT
Effective Date: 01-May-23

Customer: GDI Rig Name: Al Zubarah Location: Qatar Offshore

P.O. No: PON599590 Job No: ALL-ME-6281 Report No: ME-6281-MPI-MP-004

Allrig Procedure: I-OPE-NDT-003 Surface: As Cleaned

Equipment: Electro Magnetic Yoke Equipment Serial No: IN22-0973

Magnetic
Ultra Violet Light: No Yes Coil: No
Flow:
Electromagnet/Pull 10lbs: Yes Voltage: 110V Current Flow: AC Longitudinal: Yes

Other: N/A Pole Spacing: 4" - 6" Circular: N/A


Magnaflux
Flux Indicator: Light Type: Background: Wet Indicator: Magnaflux 7HF
WCP
Batch No: 211107 Fl/Sample at:

Berthold: Natural: No Dry Indicator: UV: 0.4 at 100ml

Heat Temp: Visible: 2.4 at 100ml

Burmah Strip: Yes Artificial: Yes Batch No: Batch No: 221004

Manufacturer: NOV Item: Pony Rod-01

Drawing No: N/A Work Area: Mud Pump Room

Material: Carbon Steel Specification: API RP8B (CAT III) Dimension: NA

Identification / Serial No: 11469-H (Mud Pump-02) SWL: N/A Quantity: 1

Comments: Visual inspection was carried out prior to MPI.


Areas Inspected: MPI was carried out on all accessible areas. (As Mentioned in the NOV procedure)

Results: No relavant indication was noted when the time of inspection.

Recommendations: Acceptable to the specfications

Inspector: S.Venkat Signature:

Qualification: PCN-LEVEL 2-MPI Date: 31-04-2024

For Client use: For Certifying Authority use:

This document shall not be reproduced except in full, without the written approval of an Allrig Senior Representative.
Page 4 of 9
Form Number: F-OPE-009a
Document Owner: OPS-NDT
Revision: 4
MAGNETIC PARTICLE INSPECTION REPORT
Effective Date: 01-May-23

Customer: GDI Rig Name: Al Zubarah Location: Qatar Offshore

P.O. No: PON599590 Job No: ALL-ME-6281 Report No: ME-6281-MPI-MP-005

Allrig Procedure: I-OPE-NDT-003 Surface: As Cleaned

Equipment: Electro Magnetic Yoke Equipment Serial No: IN22-0973

Magnetic
Ultra Violet Light: No Yes Coil: No
Flow:
Electromagnet/Pull 10lbs: Yes Voltage: 110V Current Flow: AC Longitudinal: Yes

Other: N/A Pole Spacing: 4" - 6" Circular: N/A


Magnaflux
Flux Indicator: Light Type: Background: Wet Indicator: Magnaflux 7HF
WCP
Batch No: 211107 Fl/Sample at:

Berthold: Natural: No Dry Indicator: UV: 0.4 at 100ml

Heat Temp: Visible: 2.4 at 100ml

Burmah Strip: Yes Artificial: Yes Batch No: Batch No: 221004

Manufacturer: NOV Item: Sub Rod-01

Drawing No: N/A Work Area: Mud Pump Room

Material: Carbon Steel Specification: API RP8B (CAT III) Dimension: NA

Identification / Serial No: 11469-H (Mud Pump-02) SWL: N/A Quantity: 1

Comments: Visual inspection was carried out prior to MPI.


Areas Inspected: MPI was carried out on all accessible areas. (As Mentioned in the NOV procedure)

Results: No relavant indication was noted when the time of inspection.

Recommendations: Acceptable to the specfications

Inspector: S.Venkat Signature:

Qualification: PCN-LEVEL 2-MPI Date: 31-04-2024

For Client use: For Certifying Authority use:

This document shall not be reproduced except in full, without the written approval of an Allrig Senior Representative.
Page 5 of 9
Form Number: F-OPE-009a
Document Owner: OPS-NDT
Revision: 4
MAGNETIC PARTICLE INSPECTION REPORT
Effective Date: 01-May-23

Customer: GDI Rig Name: Al Zubarah Location: Qatar Offshore

P.O. No: PON599590 Job No: ALL-ME-6281 Report No: ME-6281-MPI-MP-006

Allrig Procedure: I-OPE-NDT-003 Surface: As Cleaned

Equipment: Electro Magnetic Yoke Equipment Serial No: IN22-0973

Magnetic
Ultra Violet Light: No Yes Coil: No
Flow:
Electromagnet/Pull 10lbs: Yes Voltage: 110V Current Flow: AC Longitudinal: Yes

Other: N/A Pole Spacing: 4" - 6" Circular: N/A


Magnaflux
Flux Indicator: Light Type: Background: Wet Indicator: Magnaflux 7HF
WCP
Batch No: 211107 Fl/Sample at:

Berthold: Natural: No Dry Indicator: UV: 0.4 at 100ml

Heat Temp: Visible: 2.4 at 100ml

Burmah Strip: Yes Artificial: Yes Batch No: Batch No: 221004

Manufacturer: NOV Item: Pony Rod-02

Drawing No: N/A Work Area: Mud Pump Room

Material: Carbon Steel Specification: API RP8B (CAT III) Dimension: NA

Identification / Serial No: 11469-H (Mud Pump-02) SWL: N/A Quantity: 1

Comments: Visual inspection was carried out prior to MPI.


Areas Inspected: MPI was carried out on all accessible areas. (As Mentioned in the NOV procedure)

Results: No relavant indication was noted when the time of inspection.

Recommendations: Acceptable to the specfications

Inspector: S.Venkat Signature:

Qualification: PCN-LEVEL 2-MPI Date: 31-04-2024

For Client use: For Certifying Authority use:

This document shall not be reproduced except in full, without the written approval of an Allrig Senior Representative.
Page 6 of 9
Form Number: F-OPE-009a
Document Owner: OPS-NDT
Revision: 4
MAGNETIC PARTICLE INSPECTION REPORT
Effective Date: 01-May-23

Customer: GDI Rig Name: Al Zubarah Location: Qatar Offshore

P.O. No: PON599590 Job No: ALL-ME-6281 Report No: ME-6281-MPI-MP-007

Allrig Procedure: I-OPE-NDT-003 Surface: As Cleaned

Equipment: Electro Magnetic Yoke Equipment Serial No: IN22-0973

Magnetic
Ultra Violet Light: No Yes Coil: No
Flow:
Electromagnet/Pull 10lbs: Yes Voltage: 110V Current Flow: AC Longitudinal: Yes

Other: N/A Pole Spacing: 4" - 6" Circular: N/A


Magnaflux
Flux Indicator: Light Type: Background: Wet Indicator: Magnaflux 7HF
WCP
Batch No: 211107 Fl/Sample at:

Berthold: Natural: No Dry Indicator: UV: 0.4 at 100ml

Heat Temp: Visible: 2.4 at 100ml

Burmah Strip: Yes Artificial: Yes Batch No: Batch No: 221004

Manufacturer: NOV Item: Sub Rod-02

Drawing No: N/A Work Area: Mud Pump Room

Material: Carbon Steel Specification: API RP8B (CAT III) Dimension: NA

Identification / Serial No: 11469-H (Mud Pump-02) SWL: N/A Quantity: 1

Comments: Visual inspection was carried out prior to MPI.


Areas Inspected: MPI was carried out on all accessible areas. (As Mentioned in the NOV procedure)

Results: No relavant indication was noted when the time of inspection.

Recommendations: Acceptable to the specfications

Inspector: S.Venkat Signature:

Qualification: PCN-LEVEL 2-MPI Date: 31-04-2024

For Client use: For Certifying Authority use:

This document shall not be reproduced except in full, without the written approval of an Allrig Senior Representative.
Page 7 of 9
Form Number: F-OPE-009a
Document Owner: OPS-NDT
Revision: 4
MAGNETIC PARTICLE INSPECTION REPORT
Effective Date: 01-May-23

Customer: GDI Rig Name: Al Zubarah Location: Qatar Offshore

P.O. No: PON599590 Job No: ALL-ME-6281 Report No: ME-6281-MPI-MP-008

Allrig Procedure: I-OPE-NDT-003 Surface: As Cleaned

Equipment: Electro Magnetic Yoke Equipment Serial No: IN22-0973

Magnetic
Ultra Violet Light: No Yes Coil: No
Flow:
Electromagnet/Pull 10lbs: Yes Voltage: 110V Current Flow: AC Longitudinal: Yes

Other: N/A Pole Spacing: 4" - 6" Circular: N/A


Magnaflux
Flux Indicator: Light Type: Background: Wet Indicator: Magnaflux 7HF
WCP
Batch No: 211107 Fl/Sample at:

Berthold: Natural: No Dry Indicator: UV: 0.4 at 100ml

Heat Temp: Visible: 2.4 at 100ml

Burmah Strip: Yes Artificial: Yes Batch No: Batch No: 221004

Manufacturer: NOV Item: Pony Rod-03

Drawing No: N/A Work Area: Mud Pump Room

Material: Carbon Steel Specification: API RP8B (CAT III) Dimension: NA

Identification / Serial No: 11469-H (Mud Pump-02) SWL: N/A Quantity: 1

Comments: Visual inspection was carried out prior to MPI.


Areas Inspected: MPI was carried out on all accessible areas. (As Mentioned in the NOV procedure)

Results: No relavant indication was noted when the time of inspection.

Recommendations: Acceptable to the specfications

Inspector: S.Venkat Signature:

Qualification: PCN-LEVEL 2-MPI Date: 31-04-2024

For Client use: For Certifying Authority use:

This document shall not be reproduced except in full, without the written approval of an Allrig Senior Representative.
Page 8 of 9
Form Number: F-OPE-009a
Document Owner: OPS-NDT
Revision: 4
MAGNETIC PARTICLE INSPECTION REPORT
Effective Date: 01-May-23

Customer: GDI Rig Name: Al Zubarah Location: Qatar Offshore

P.O. No: PON599590 Job No: ALL-ME-6281 Report No: ME-6281-MPI-MP-009

Allrig Procedure: I-OPE-NDT-003 Surface: As Cleaned

Equipment: Electro Magnetic Yoke Equipment Serial No: IN22-0973

Magnetic
Ultra Violet Light: No Yes Coil: No
Flow:
Electromagnet/Pull 10lbs: Yes Voltage: 110V Current Flow: AC Longitudinal: Yes

Other: N/A Pole Spacing: 4" - 6" Circular: N/A


Magnaflux
Flux Indicator: Light Type: Background: Wet Indicator: Magnaflux 7HF
WCP
Batch No: 211107 Fl/Sample at:

Berthold: Natural: No Dry Indicator: UV: 0.4 at 100ml

Heat Temp: Visible: 2.4 at 100ml

Burmah Strip: Yes Artificial: Yes Batch No: Batch No: 221004

Manufacturer: NOV Item: Sub Rod-03

Drawing No: N/A Work Area: Mud Pump Room

Material: Carbon Steel Specification: API RP8B (CAT III) Dimension: NA

Identification / Serial No: 11469-H (Mud Pump-02) SWL: N/A Quantity: 1

Comments: Visual inspection was carried out prior to MPI.


Areas Inspected: MPI was carried out on all accessible areas. (As Mentioned in the NOV procedure)

Results: No relavant indication was noted when the time of inspection.

Recommendations: Acceptable to the specfications

Inspector: S.Venkat Signature:

Qualification: PCN-LEVEL 2-MPI Date: 31-04-2024

For Client use: For Certifying Authority use:

This document shall not be reproduced except in full, without the written approval of an Allrig Senior Representative.
Page 9 of 9