OHE Mast Colour Coding Guide

Uploaded by

Piyush Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

TRACTION SYSTEM

PART-9
JAYANT INFRATECH LIMITED
Empowering E-motion

Colour Code Scheme on OHE MAST


INTRODUCTION
Colour coding is required on different OHE masts having some features like rail marking,
implantation etc. There are many methods of marking (colour coding) on critical OHE mast
which is being followed by Railways.
In this article, we will have an overview of how to do Colour coding on different OHE masts.
While proposing ACTM, CAMTECH & the practices being followed at different railways have
been Considered.
This colour coding scheme for the OHE mast is for easy identification/ indication for the
convenience of TrD staff.

The colour codes on the single mast


JAYANT INFRATECH LIMITED
Empowering E-motion
JAYANT INFRATECH LIMITED
Empowering E-motion

1. leaning of mast.
2. where the OHE mast holds two elementary sections with caution board.
3. Marking as per site condition only for Isolator mast
4. Excessive contact wire height
5. Critical implantation mast
6. Each mast a.
7. Each mast
8. Telephone socket direction
9. Kilometer & Location number on mast
10. ATD mast (Half tension length) 11. ATD Lower and Highest temperature marking (as
per site condition). 12. ATD ambient temperature (35°C). The height as per site
condition.
1. Leaning of Mast

2. One Mast Holding Two Elementary Section


JAYANT INFRATECH LIMITED
Empowering E-motion

3. Identification of Isolator for ASM

4. Excessive Contact Wire Wear

5. Critical Implantation
JAYANT INFRATECH LIMITED
Empowering E-motion

6. Rail Level

7. Setting Distance (Implantation)

8. Telephone Socket Direction


JAYANT INFRATECH LIMITED
Empowering E-motion

9. Kilometer and Location Number on OHE Mast Web (Opposite Number Plate/
Direction of Traffic)

10. OHE Tension length on ATD Mast (Half Tension Length)

11. ATD Lower and Highest Temperature Marking (Bottom of the Counterweight)
JAYANT INFRATECH LIMITED
Empowering E-motion

12. ATD Ambient Temperature (35°C) of Marking (Bottom of the Counter Weight)

13. Kilometre & Mast Number on Bottom Two Counter Weigh of ATD
JAYANT INFRATECH LIMITED
Empowering E-motion

14a. Headroom Height of ROB From Rail

14b. Headroom Height of FOB From Rail


JAYANT INFRATECH LIMITED
Empowering E-motion

15. Elementary section in station yards