Monday, 05 February 2024

PT SARANA GASTEKINDO UTAMA


Jl. Sunda No. 11, RT.3/RW.4, Gondangdia,
Kec. Menteng, Jakarta Pusat

Attn. : Mr. Yasir Arafat

Inquiry/RFQ No. : Email

OSA Quotation No. : 523/MCV/BM/DA/1223 Rev.1

Subject : RFQ Control Valves (Brand: Masoneilan)


SP BERINGIN A - FIELD PRABUMULIH
PERTAMINA HULU ROKAN REGIONAL 1 - ZONA 4

Dear Sir/Madam,

PT. OSA Megah Indonesia is pleased to offer the enclosed quotation for your
requirements of MASONEILAN Control Valves.

If you need further information or clarification with regards to this quotation, please contact
on:

PT. OSA Megah Indonesia


Mr. Aidil Isman (email: [email protected])
Phone. 021 7280 0840
Hp. 0811 8160 930

On behalf of PT. OSA Megah Indonesia, we would like to thank you for allowing us the
opportunity to submit our proposal.

Very truly yours,


PT. OSA Megah Indonesia

a.isman
Aidil Isman
Sales Engineer
PRICE LIST SHEET - CONTROL VALVE

CUSTOMER : PT SARANA GASTEKINDO UTAMA


END USER : PT PERTAMINA HULU ROKAN
OUR QUOTE REF : 523/MCV/BM/DA/1223
DATE : 05-Feb-2024
REVISION : 1

MATERIAL ACTUATOR
SIZE LEAKAGE POSITIONER UNIT PRICE TOTAL PRICE
ITEM NO TAG NUMBER QTY VALVE TYPE MODEL NO RATING CONN. RATED CV / CHAR.
(INCH) CLASS RANGE W./ AIRSET (IDR) (IDR)
BODY PLUG SEAT MODEL SIZE
(PSIG)

BRA-PCV-1016,
Globe, LoDB 2 Stage - 316 St. St. Hard
1 BRA-PCV-2016, 3 87-41355 3x3x3 CL 600 RF Flanges 50 A216 gr WCC 17-4PH St. St. IV 87 16 3-15 SVI3-21111110 256.896.000 770.688.000
Reciprocating Linear Faced Seat
BRA-PCV-3016

TOTAL VALVES : 3 TOTAL EQUIPMENT PRICE, in IDR : 770.688.000


Standard Testing (Hydro, Seat Leakage, Functional Test), in IDR : Included
GRAND TOTAL, DDP JAKARTA (EXCLUDE VAT), in IDR : 770.688.000

Technical Notes:
1. Body Outlet Mach # limitation exceeded. Proposed to increase the valve size to 3 inch.
2. Noise Level Exceeds Allowable Limit. Proposed with LoDB 2 Stage - Linear trim to reduce sound level.

Terms and Conditions:


1. Price In IDR, Exclude of VAT
2. Delivery Time 26 Weeks, After receipt of order
3. Payment Term DP 30%, Balance before shipment
4. Price Validity 30 Days
5. Delivery Point DDP Jakarta
6. Painting, Testing, Certification and Documentation as per Manufacturer Standard
7. Price above exclude non-standard testing (e.g.: NDE, PMI, etc), if requested will be extra
8. Price above include Certificate of Origin (MFR Letterhead), Certificate of Conformance/Manufacture (COC/COM), Test Report and Warranty
9. COO Singapore (with Global Sourcing Material)
10. Brand: Masoneilan (Baker Hughes, formerly Dresser)