1ST FLOOR & SUSPENDED SLAB (FLAT ROOF)
NO MATERIAL QUANTITY PRICE AMOUNT
1 MACHINE CUT BLOCKS 2900 PCS
2. CEMENT 100 BAGS
3. QUARRY SAND 1 TIPPER
4. BALLAST 1 TIPPER
5. HOOP IRON 12 ROLLS
6. BINDINGI WIRE 2 ROLLS
7. HACKSAW BLADES 10 PCS
8. ORDINARY NAILS 50KG
FLAT ROOF SLAB
N NAME QUANTITY PRICE AMOUNT
O
1 PROPS 600 PCS
2. TRAPPERS 500PCS
3. 3”X2” TIMBER 2800FTS
4. 6”X1” TIMBER 2000FTS
5. ORDINARY NAILS 4” INCH 50KGS
3” INCH 50KGS
6. REINFORCEMENTS T8 300PCS
T10 280PCS
T16 160PCS
7. HACKSAW BLADES 20PCS
8. BALLAST 6 TIPPERS
9. QUARRY SAND 4 TIPPERS
10. CEMENT 320 BAGS
11. MACHINE & EQUIPMENTS &
TRANSPORTATION
12. WATER PROOF CEMENT 40KGS
SUBSTRUCTURE MATERIALS ESTIMATES
A. GROUND FLOOR
NO MATERIAL QUANTITY PRICE AMOUNT
1 CEMENT 100BAGS
2. MACHINE CUT BLOCKS 2900PCS
3. SAND 1 TIPPER
4. BALLAST 1 TIPPER
5. HOOP IRON 12 ROLLS
6. DPC 8 ROLLS
7. BINDING WIRE 3 ROLLS
8. CUTTING/HACKSAW BLADES 5 PCS
9. MARINE BOARDS 8 PCS
10. ORDINARY NAILS 2” 10KGS
11. USED OIL PETROL 20LITRES
SUSPENDED SLAB
NO MATERIAL QUANTITY
1 PROPS 600PCS
2. TRAPPERS 500PCS
3. 3”X 2” FRAMES 2800FTS
4. 6”X1” TIMBER 2000FTS
5. ORDINARY NAILS 4” INCH 50KGS
3” INCH 50KGS
6. REINFORCEMENTS T8 300 PCS
T10 280PCS
T12 80 PCS
7. HACKSAW BLADES 15 PCS
8. BALLAST 6 TIPPERS
9. SAND 4 TIPPERS
10. CEMENT 320 BAGS
11. MACHINE & EQUIPEMENT TRANSPORTATION
SUBSTRUCTURE MATERIALS ESTIMATES 29/09/2023
NO MATERIAL QUANTITY PRICE TOTAL
1 BUSH STONES 3600FTS
2. CEMENT 650 BAGS
3. HOOP IRON 3 ROLLS
4. HARDCORE 8 TIPPERS
5. MURRAM 3 TIPPERS
6. DPM ( 80 X 2/5 TYPE) (40KG ONES 3 ROLLS
GARGE 1000
7. BRC MESH A142 5 ROLLS
8. TIMBER 8” X 1” A20 FTS
9. BALLAST 8 TIPPERS
10. SAND 5 TIPPERS
11. HACKSAW BLADES 20 PCS
12. ANTI-TERMITE 3 LITRES
13. REINFORCEMENT T 8 95 PCS
T 10 72 PCS
T 12 39 PCS
T 16 80 PCS
14. BINDING WIRE 5 ROLLS
15. NORMAL NAILS 3 “ 25 KGS
4” 15KGS
16. MACHINES, EQUIPMENTS &
TRANSPORTATION
SITE PREPARATION/PRELIMARIES 29/9/2023
NO MATERIAL QUANTITY PRICE TOTAL
1 WHEELBARROWS 8
2. SPADES 10
3. PANGA 1
4. LIME 2 BAGS
5. BUILDERS LINE 8 STRINGS
6. CLEAR HORSEPIPE ¼ “ 1 ROLL
7. ROOFING NAILS 4” INCH 50KGS
5’’ INCH 20KGS
3” INCH 2KGS
8. POSTS 9 FEETS LONG 12
9. 3” X2 “ TIMBER 200FTS
10. CLAW BARS 2
11. ROOFING SHEETS 3M 12 PCS
2M 33 PCS
12. BALLAST 4 TONNES
13. SAND 3 TONNES
14. CEMENT 6 BAGS
15. WATER TANK 5000LITRES 2 PCS
16. CONTAINERS ( 20 LITRES CANS) 10
17 DOORS (PARTEN DOOR) 2
18. GLAZED WELDED WINDOWS 2
19. MATTOCKS 5 PCS
20. SLEDGE HAMMERS 3
21. HOADING IRON SHEETS 2.5 MTRS 100PCS
22. PROPS 50PCS