The document provides details of a feasibility study and detailed project report preparation for improvement and widening of a road to intermediate lane configuration from Nandprayag to Kothiyalsain via Savrisain in Chamoli district of Uttarakhand. It discusses the scope of work, current progress of the project indicating status of various tasks completed and in progress, proposed design parameters and drawings of proposed cross sections, bridges and alignment.
The document provides details of a feasibility study and detailed project report preparation for improvement and widening of a road to intermediate lane configuration from Nandprayag to Kothiyalsain via Savrisain in Chamoli district of Uttarakhand. It discusses the scope of work, current progress of the project indicating status of various tasks completed and in progress, proposed design parameters and drawings of proposed cross sections, bridges and alignment.
The document provides details of a feasibility study and detailed project report preparation for improvement and widening of a road to intermediate lane configuration from Nandprayag to Kothiyalsain via Savrisain in Chamoli district of Uttarakhand. It discusses the scope of work, current progress of the project indicating status of various tasks completed and in progress, proposed design parameters and drawings of proposed cross sections, bridges and alignment.
The document provides details of a feasibility study and detailed project report preparation for improvement and widening of a road to intermediate lane configuration from Nandprayag to Kothiyalsain via Savrisain in Chamoli district of Uttarakhand. It discusses the scope of work, current progress of the project indicating status of various tasks completed and in progress, proposed design parameters and drawings of proposed cross sections, bridges and alignment.
configuration of Nandprayag to Kothiyalsain via Savrisain Motor Road in Badrinath assembly constituency of Chamoli district under Chardham Yatra 2023 M/s Skyway Engineers Private Limited Alignment Plan Scope of Consultancy Services
The scope of Works as per TOR / Agreement is as under:
1. Develop the existing alignment with intermediate lane configuration
2. Geometrical Improvements to the existing alignment 3. Development of existing bridges with 2-lane configuration 4. Development of existing culverts / cause ways to their appropriate hydrological requirement
M/s Skyway Engineers Private Limited
5. To strengthen the pavement conditions 6. Development of drainage network 7. Development of Protection measures 8. Development of safety features 9. Preparation of cost estimate 10. Preparation of Detailed Project Report 11. Vetting of bridge designs from IIT Current Work Progress The work progress as on 24.5.2024 is as under: S. No. Description Status 1 Submission of Inception Report for Road Works Submitted 2 Topography survey of the alignment Completed 3 Bench mark fixing Completed 4 Submission of Preliminary Project report Submitted 5 Alignment study report Submitted 6 Geological Study Report Submitted 7 Hydrological study report Submitted
M/s Skyway Engineers Private Limited
8 Design of Cross Section for Bridge Completed 9 General Arrangement Drawings (Bridge Works) Completed 10 Design of Bridges In Progress 11 Design of Culverts In Progress 12 Traffic study Yet to be done 13 CBR testing Yet to be done 14 Geological Investigation Yet to be done 15 LA & Utility Yet to be done Proposed Design Parameters The proposed Design Parameters, to be adopted as per IRC Provisions are as under: S. No. Item Mountainous / Steep Terrain 1 Design Speed (kmph) 30 kmph 2 Land width (m) – Right of Way 15.00 m 3 Width of carriageway (m) 5.5 m 4 Paved Shoulders - 5 Shoulders 2 x 1.5 m 6 Camber / Cross fall - (i) Carriageway 2.5 % (ii) Shoulders 3.0 %
M/s Skyway Engineers Private Limited
7 Maximum Super elevation 7% 8 Minimum Radii of Horizontal Curve (m) 30 m 9 Minimum length of vertical curves m) 20 m 10 Drains 0.6 m PCC drain on hill side 11 Sight Distance As per IRC 52 – 2019 12 Gradient (i) Ruling Gradient 5% (ii) Limiting Gradient 6% (iii) Exceptional Gradient 7% **Ref: IRC SP 48 – 2023 & IRC 52 – 2019 M/s Skyway Engineers Private Limited Proposed Cross Section – Road Works Proposed Cross Section – Bridge Works
M/s Skyway Engineers Private Limited
Proposed GAD – Bridge Works
M/s Skyway Engineers Private Limited
Bridge at km 1+250 with 1 x 90 meter span Proposed GAD – Bridge Works
M/s Skyway Engineers Private Limited
Bridge at km 6+325 with 1 x 36 meter span Proposed GAD – Bridge Works
M/s Skyway Engineers Private Limited
Bridge at km 11+730 with 1 x 70 meter span M/s Skyway Engineers Private Limited Proposed Alignment