Feasibility study and DPR preparation

for Improvement and Widening to Intermediate lane

M/s Skyway Engineers Private Limited


configuration of
Nandprayag to Kothiyalsain via Savrisain Motor Road
in Badrinath assembly constituency of Chamoli district
under Chardham Yatra 2023
M/s Skyway Engineers Private Limited
Alignment Plan
Scope of Consultancy Services

The scope of Works as per TOR / Agreement is as under:

1. Develop the existing alignment with intermediate lane configuration


2. Geometrical Improvements to the existing alignment
3. Development of existing bridges with 2-lane configuration
4. Development of existing culverts / cause ways to their appropriate hydrological
requirement

M/s Skyway Engineers Private Limited


5. To strengthen the pavement conditions
6. Development of drainage network
7. Development of Protection measures
8. Development of safety features
9. Preparation of cost estimate
10. Preparation of Detailed Project Report
11. Vetting of bridge designs from IIT
Current Work Progress
The work progress as on 24.5.2024 is as under:
S. No. Description Status
1 Submission of Inception Report for Road Works Submitted
2 Topography survey of the alignment Completed
3 Bench mark fixing Completed
4 Submission of Preliminary Project report Submitted
5 Alignment study report Submitted
6 Geological Study Report Submitted
7 Hydrological study report Submitted

M/s Skyway Engineers Private Limited


8 Design of Cross Section for Bridge Completed
9 General Arrangement Drawings (Bridge Works) Completed
10 Design of Bridges In Progress
11 Design of Culverts In Progress
12 Traffic study Yet to be done
13 CBR testing Yet to be done
14 Geological Investigation Yet to be done
15 LA & Utility Yet to be done
Proposed Design Parameters
The proposed Design Parameters, to be adopted as per IRC Provisions are as under:
S. No. Item Mountainous / Steep Terrain
1 Design Speed (kmph) 30 kmph
2 Land width (m) – Right of Way 15.00 m
3 Width of carriageway (m) 5.5 m
4 Paved Shoulders -
5 Shoulders 2 x 1.5 m
6 Camber / Cross fall -
(i) Carriageway 2.5 %
(ii) Shoulders 3.0 %

M/s Skyway Engineers Private Limited


7 Maximum Super elevation 7%
8 Minimum Radii of Horizontal Curve (m) 30 m
9 Minimum length of vertical curves m) 20 m
10 Drains 0.6 m PCC drain on hill side
11 Sight Distance As per IRC 52 – 2019
12 Gradient
(i) Ruling Gradient 5%
(ii) Limiting Gradient 6%
(iii) Exceptional Gradient 7%
**Ref: IRC SP 48 – 2023 & IRC 52 – 2019
M/s Skyway Engineers Private Limited
Proposed Cross Section – Road Works
Proposed Cross Section – Bridge Works

M/s Skyway Engineers Private Limited


Proposed GAD – Bridge Works

M/s Skyway Engineers Private Limited


Bridge at km 1+250 with 1 x 90 meter span
Proposed GAD – Bridge Works

M/s Skyway Engineers Private Limited


Bridge at km 6+325 with 1 x 36 meter span
Proposed GAD – Bridge Works

M/s Skyway Engineers Private Limited


Bridge at km 11+730 with 1 x 70 meter span
M/s Skyway Engineers Private Limited
Proposed Alignment

In Separate File
THANKS!!!