ISA112 SCADA System Lifecycle
ISA112 SCADA System Lifecycle
ISA112 SCADA Systems Standards Committee International Society of Automation (ISA) www.isa.org/isa112/
ENTRY ENTRY
New SCADA System, Planned Upgrade,
Major Changes Planned, or New Site to be Added, or
Regulatory Changes Needed Change to System
DEVELOP SCHEDULE/RESOURCING
g Proof of Concept
e 1
f Application Development
Security Standards,
h Preliminary Architecture / Design
Guidelines and Procedures g Modeling and Simulation
c
i Confirm P&ID and Buy Parts / Components
f Facility Layout Drawings h Server Configuration
Network / Architecture Guide d Build Panels, Racks and Cabinets
i Workstation Configuration
j Develop Signals List e Build Supporting Equipment
REVIEW
p
Programming / Configuration Continuous
Guides
Improvement
q
Programming / Alarm /
Configuration Templates
5 6 7
j
r Data Collection / Data Storage /
INSTALLATION COMMISSIONING OPERATE Continuous
Historian Guide /DEPLOYMENT / STARTUP Improvement
a Installation / Deployment Plan a Commissioning Plan a In Service
s SCADA to Business Integration /
SECURITY DEPLOYMENT AND CONFIGURATION
bb
Design Standards
cc
Installation Standards
Notes
1) Security includes physical security, operational security, and cybersecurity.
2) Prerequisite tests typically include both cold and hot commissioning or dry / wet commissioning as applicable.
3) System Environment Requirements can include separate systems for development, testing, training, production, backup, disaster recovery,
digital twins, and other uses, as part of development and Management Of Change (MOC) procedures
Note: This is an interim working draft from the ISA112 SCADA Systems standards committee, as of 2022-07-08. (A previous version was released on 2020-06-15.) This diagram is still subject to change.