Adidas - Line Balancing 1

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views14 pages

Adidas - Line Balancing 1

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 14

019

LINE
BALANCING
INTRODUCTION : WHAT IS LINE BALANCING?

 Everyone is doing the same amount of work


 Doing the same amount of work to customer
requirement
What is Line
 No one overburdened balancing?

 Variation is ‘smoothed’
 No one waiting
 Everyone working together in a BALANCED
fashion
LINE BALANCING

- Way of adjusting each operation’s loading to make each operation’s time value almost the same
- key driver for a good production efficiency
- based on workers cycle time / the average GSD SMV for the style

Prior to style change over, a line balance plan is used to determine:


 Machine requirement – number of units and machine type
 Operator
o Number of operators
o Required skill level
 Sequence of operations in the production line

LBR = ___________Total Cycle Time__________ x 100%


Number of workstations * Bottleneck CT
PRACTICE:

Your production line have 3 operations, below are details, how to calculate the line
balancing rate?

operation Cycle time (Mins) Number of workers

A 2 1
B 5 2
C 2 1
BOTTLENECK / CONSTRAINT
Why balancing is important in setting up the line:
To eliminate excessive work in progress (WIP) or bottlenecks

What is Bottleneck?
- operators completing sewing operations of higher SMV’s, compared to all other
operators
- holds up the work for operators further down the line causing production stoppages
BOTTLENECK / CONSTRAINT
How to determine bottleneck operation?
- through WIP (Work In Progress)
- cycle time check
What does WIP do?
• Hides the problem
• Disable quality control
• Limits labor utilization
5 FOCUSING STEPS

7
HOW TO ANALYZE THE LINE BALANCE
• Production output?
• SMV?
• Stop watch to check cycle time

8
LINE BALANCING

Redistribute the work in the most “waste-


free” manner

Improve the
operations
which are far
from takt time
or shows to
create potential
bottleneck

9
LINE BALANCING PROCESS

TIME
CYCLETIME
CYCLE
 Share Method
 Rearrange bottleneck operation
 OPERATOR 1 2 3 4 5
OPERATOR 1 2 3 4 5

CYCLE
OPERATOR
OPERATOR TIME
CYCLETIME 11 22 33 44 55

10
LINE BALANCING PROCESS

Optr 4

TIME
CYCLETIME
CYCLE
Optr 3
 Reduce cycle time by
additional/shared operator
OPERATOR
OPERATOR 1
1 2
2 3&
34 5
4 6
5

 Separate & Eliminate operation


elements

TIME
CYCLETIME
CYCLE
OPERATOR
OPERATOR 11 22 23 34 45

11
LINE BALANCING EXAMPLE

12
LINE BALANCING PROCESS
Build Sewer Database:
Sewer Database
- After finished sewing of the 1st style, IE updates highest potential efficiency of
the sewer on the Sewer Database.

Pre-set Line Balance :


- IE use the Sewer Database for initial line balancing and sewing line layout
- IE continuously monitor actual efficiency of the sewer and update the data

Line balancing study in 2nd days after changeover :


• IE conduct cycle study, Create LB Graph compared with target LB rate
• Provide recommendation to supervisor, and discuss with supervisor on the
improvement solution

Review the line balance 5th day after changeover :


• Analysis the reason if the line did not hit target
• IE continuously monitor actual efficiency of the sewer and update the data
THANK
YOU