We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2
PHYSICAL FINANCIAL
PROJECTS/PROGRAMS/ACTIVITIES STATUS STATUS
ACCOMPLISHMENT ACCOMPLISHMENT TARGET ACTUAL TARGET ACTUAL TARGET Conduct 5 5 seminars 1. Waste Segregation Awareness Campaign Completed seminars conducted 2. Establishment of Materials Recovery Facility MRF Construct MRF Completed (MRF) constructed 4 clean-up Organize 4 clean- 3. Monthly Clean-up Drive drives Completed up drives organized 2 training Conduct 3 training 4. Training on Composting Techniques sessions Completed 20,000.00 10,000.00 Completed sessions conducted 30 bins 5. Installation of Waste Bins in Public Areas Install 30 bins Completed installed Implement in 5 Implemented 6. Recycling Program for Schools Completed schools in 5 schools Conduct 2 2 workshops 7. Community Education on Hazardous Waste Completed workshops conducted BARANGAY ECOLOGICAL SOLID WASTE AND MANAGEMENT PLAN (BESWMC) CY 2023 ACCOMPLISHMENT REPORT FOR THE MONTH OF JULY 2023
PROVINCE: SOUTHERN LEYTE
CITY/MUNICIPALITY: LIBAGON BARANGAY: MAYUGA
Prepared by: Noted by: Approved by:
_______________________ ______________________ ______________________ (Name and Designation) (Name and Designation) (Name and Designation)