At the beginning of the automated assembly line project, I
played a pivotal role in project initiation. I started by holding
detailed meetings and discussions with clients to learn more
about their requirements, expectations, and specific objectives
for the new assembly line. I gathered detailed information
regarding the project's functional statements, organizational
charts, and existing workflow documentation to build a deep
understanding of the current processes and constraints. I
collaborated with the team in identifying the approach to the
project and dividing work based on individual strengths and
needs about the project. This has comprised milestones, set
timelines, and defined deliverables. I created a very detailed
project plan, outlining the different phases of design,
installation, and testing. I also managed communication
among the other departments: electrical engineering and
software engineering, such that the mechanical systems could
be combined with automation controls. I also conducted a
preliminary analysis to identify potential challenges and risks
associated with the project, thus developing mitigation
strategies. A structured approach at the project initiation
phase in detail is crucial for setting a solid foundation that can
ensure successful project execution for all projects to be
achieved based on the set client goals and objectives, within
schedule, and by effectively utilizing resources.
CDR Questionnaire Form
(It may include work division, methodology determination, Information
collection, meeting with clients, studying functional statements, organizational
charts and project information)
Responsibility 2: Parameters determinations
Technical difficulties is the area where you have to demonstrate your problem solving skills technical as an
engineer. The solution to these problem should technical and demonstrated the engineering activities rather than
the managerial work.